The city's published records show little recorded distress here in the last three years. Less recorded distress than 77% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 0.9. In ZIP 10027, 43% of residential buildings hold an A and
14% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
4 heat or hot-water complaints in the last three years (winter 2024–25: 4).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
31 service requests in the last three years. Most common: Noise (16) · Illegal Parking (10) · HEAT/HOT WATER (2) · Derelict Vehicles (1) · Blocked Driveway (1) · Street Sign (1).
Filed construction activity
$10,631,738 in permitted construction work filed since
2016 (29 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1961)
Yes
Six or more residential units (159)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
INTERNATIONAL HOUSE
Head officer
VINCENT MELITO
Managing agent
INTERNATIONAL HOUSE
Last registered
2025-10-31
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$15,320,000
$6,894,000
2026
$16,287,000
$7,329,150
2027
$17,206,000
$7,742,700
The city's market estimate has risen
12% between tax years 2025 and 2027.
Tax exemptions on the roll: STUDENT DORMITORY
Building systems
Energy grade (LL33)
C — ENERGY STAR score 66/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
125 St — 1 · 800 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Broadway / La Salle St — M4 M104 · 400 ft
Citi Bike
Broadway & Moylan Pl · 650 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: 36, 125. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
31 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $16,505,000 on
1996-04-26 (lender: Dormitory Authorityof The State Of New York), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
1996-04-26
Mortgage $16,505,000 — from INTERNATIONAL HOUSE to DORMITORY AUTHORITYOF THE STATE OF NEW Y
$16,505,000
1989-08-03
Mortgage $18,900,000 — from INTERNATIONAL HOUSE to DORMITORY AUTHORITYETC
$18,900,000
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
2024
35
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
1
5
11
3
20
2018
12
6
4
5
27
2019
5
5
6
5
21
2020
9
0
3
3
15
2021
0
2
7
4
13
2022
0
3
12
3
18
2023
0
1
6
4
11
2024
11
2
14
6
33
2025
12
2
16
5
35
2026
5
2
7
5
19
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Installation of a heavy duty sidewalk shed
2026-08-31
Rodent inspection: Passed
2026-08-19
Boiler inspection
2026-08-19
Boiler inspection
2026-08-19
311: Street Sign - Dangling — Stop
2026-07-17
Permit General Construction — Permit Issued
2026-06-27
311: Noise - Street/Sidewalk — Loud Music/Party
2026-06-25
Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2026-06-20
311: Noise - Street/Sidewalk — Loud Music/Party
2026-06-12
Job filed: Filing for parking structure repairs work that includes repair of concrete slab, repair of concrete foundation walls, waterproofing repairs, and misce
2026-05-08
ECB CLASS - 2 violation: FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THE BUILDING'S STRUCTURE AND A APPURTENANCES CONFORM TO THE PROVISIONS OF THE ADMINIST
2026-06-12Job filed: Filing for parking structure repairs work that includes repair of concrete slab, repair of concrete foundation walls, waterproofing repairs, and misce$175,000
2026-05-08ECB CLASS - 2 violation: FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THE BUILDING'S STRUCTURE AND A APPURTENANCES CONFORM TO THE PROVISIONS OF THE ADMINIST
2025-05-16Permit General Construction — Signed-off
2025-05-12311: Illegal Parking — Blocked Sidewalk
2025-05-09Permit Plumbing — Permit Issued
2025-05-08Permit Sprinklers — Signed-off
2025-05-02Job filed: Modifications to the existing sprinkler system on the cellar,1 floor (International House - Trash Holding Area) as per plans. No change to use, egress$20,000
2025-05-01Job filed: Modifications to the existing HVAC system on the cellar, 1st floor (International House) - Trash Holding Area) as per plans. No change to use, egress $10,000
2025-04-30Job filed: Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the cellar and 1st floor (International House - Trash $77,000
2025-04-29Job filed: Modifications to the existing plumbing system on the cellar,1st floor (International House - Trash Holding Area) as per plans. No change to use, egres$10,000
2025-04-29Job filed: Modifications to the existing sprinkler system on the cellar,1 floor (International House - Trash Holding Area) as per plans. No change to use, egress$20,000
2025-04-15Job filed: Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the cellar and 1st floor (International House - Trash $77,000
2025-03-31Asbestos abatement: Removal — New York Insulation, Inc.
2025-02-18Rodent inspection: Passed
2025-02-10Job filed: Installation of partitions, doors, suspended ceilings, flooring and millwork on 1st floor (North Office Side- International House- (Buildout Phase) as$69,984
2024-12-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-12-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-12-20Permit Plumbing — Signed-off
2024-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-13Permit General Construction — Signed-off
2024-11-12Permit Mechanical Systems — Signed-off
2024-11-05Job filed: Installation of partitions, doors, suspended ceilings, flooring and millwork on 1st floor (North Office Side- International House- (Buildout Phase) as$69,984
2024-11-04311: Illegal Parking — Blocked Sidewalk
2024-11-04Job filed: Modification of the HVAC system on the 1st floor (North Office Suite- International House- Buildout Phase) as per plans. No change to use, egress or o$3,850
2024-11-04Job filed: Modification to the existing plumbing system on the first floor (International House North Building Buildout) as per plans. No change to use, egress o$90,000
2024-10-22FDNY inspection (ANNUL-COL-UNI)
2024-10-15Permit General Construction — Signed-off
2024-09-16Job filed: Minor demolition of partitions, doors, suspended ceilings, flooring and millwork on 1st floor (North Office Side- International House- Demo Phase) as $69,984
2024-06-19Job filed: Minor demolition of partitions, doors, suspended ceilings, flooring and millwork on 1st floor (North Office Side- International House- Demo Phase) as $69,984
2024-06-18Job filed: HVAC removals on the 1st floor (North Office Suite- International House- Demo Phase) as per plans. No change to use, egress or occupancy.$3,850
2024-04-23Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEMS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$49,000
2024-04-12Boiler inspection
2024-04-12Boiler inspection
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-02-27311: Illegal Parking — Paper License Plates
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-10-17FDNY inspection (ANNUL-COL-UNI)
2023-09-18311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-05-13311: Abandoned Vehicle — With License Plate
2022-03-26311: Animal-Abuse — Tortured
2022-03-22FDNY inspection (ANNUL-COL-UNI)
2022-03-15Rodent inspection: Passed
2022-02-16Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2020-02-04Job filed: Hereby Filing to remove and install sprinkler heads with related piping as shown on plans filed herewith. No change to use, occupancy or egress.$81,936
2020-02-04Job filed: Hereby filing to demolish and install new plumbing fixtures with related piping in conjunction with Alt-1 to remove garage as shown on plan filed here$283,226
2020-02-04Job filed: Hereby filing to demolish and install new mechanical units and associated ductwork in conjunction with Alt-1 to remove the garage as shown on drawings$596,376
2020-01-30Job filed: HEREBY FILING FOUNDATION WORK FOR NEW BUILDING FOOTPRINT AS SHOWN ON PLANS FILED HEREWITH.
2020-01-30Job filed: HEREBY FILING FOUNDATION WORK FOR NEW BUILDING FOOTPRINT AS SHOWN ON PLANS FILED HEREWITH.
2020-01-30Job filed: HEREBY FILING FOUNDATION WORK FOR NEW BUILDING FOOTPRINT AS SHOWN ON PLANS FILED HEREWITH.
2020-01-27Job filed: HEREBY FILING TO DEMOLISH EXISTING ONE STORY GARAGE AND ADJACENT SPACES IN THE CELLAR, 1ST & 2ND FLOOR AND CONSTRUCT NEW EXTERIOR WALL AND COURTYA$2,470,188
2020-01-27Job filed: HEREBY FILING TO DEMOLISH EXISTING ONE STORY GARAGE AND ADJACENT SPACES IN THE CELLAR, 1ST & 2ND FLOOR AND CONSTRUCT NEW EXTERIOR WALL AND COURTYA$2,470,188
2020-01-27Job filed: HEREBY FILING TO DEMOLISH EXISTING ONE STORY GARAGE AND ADJACENT SPACES IN THE CELLAR, 1ST & 2ND FLOOR AND CONSTRUCT NEW EXTERIOR WALL AND COURTYA$2,470,188
2019
2019-11-25FDNY inspection (ANNUL-COL-UNI)
2019-11-22Boiler inspection
2019-11-22Boiler inspection
2019-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-08-30Permit EW — ISSUED
2019-08-09Job filed: EXTERIOR REPAIR TO WATER TASK ENCLOSURE RENOVATIONS TO REPLACE COPPER FLASHING AT BASE OF WATER TANK ENCLOSURES AND LINTELS AT EAST AND WEST ELEVATIO$75,000
2019-08-04311: Noise - Park — Loud Music/Party
2019-06-19311: Water System — Hydrant Leaking (WC1)
2019-05-30Rodent inspection: Passed
2019-04-04Job filed: REPLACEMENT (1) HIGH PRESSURE GAS SERVICE. NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. RECONNECT EXISTING HOUSE SERVICE. CONNECT TO (2) E$200,000
2019-04-04Permit EW — ISSUED
2019-04-04Permit PL — ISSUED
2019-03-15311: Food Establishment — Food Spoiled
2019-02-26311: Street Sign - Dangling — Other/Unknown
2019-02-15311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2019-02-15DOB complaint, category ?
2018
2018-12-20Elevator permit: Modernization of two elevators. Removal of existing Titan machines and install new Torin Gearless machines. All work to comply wit$430,000
2018-12-09311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2018-10-25DOB violation E:
2018-10-18Rodent inspection: Passed
2018-10-16FDNY inspection (ANNUL-COL-UNI)
2018-10-05HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-08-31Boiler inspection
2018-08-31Boiler inspection
2018-07-27Permit Construction Fence — Permit Issued
2018-07-25Job filed: INSTALLATION OF PLYWOOD FENCE AS PER PLANS.$7,000
2018-07-17Job filed: INSTALLATION OF PLYWOOD FENCE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-07-17Job filed: INSTALLATION OF PLYWOOD FENCE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-07-12311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2018-07-12Job filed: INSTALLATION OF PLYWOOD FENCE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-07-12DOB complaint, category ?
2018-07-12Job filed: INSTALLATION OF PLYWOOD FENCE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-07-12DOB violation C: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST. OPS SUS PENDED SCAFFOLD REMOVAL AT ROOF TOP LEVEL EXPOSURE #3 THE I-
2018-07-12ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: ACCORDING TO RIGGING FOREMAN LUIS ENCALADA$25,000
2018-07-12ECB CLASS - 2 violation: SEC. 3314.4 FAILURE TO USE SUSPENDED SCAFFOLD ACCORDING TO MANUFACTURER SPECIFICATIONS. NOTED: ACCORDING TO RIGGING FOREMAN LUIS E
2018-07-03Permit Sidewalk Shed — Permit Issued
2018-07-02Job filed: Installation of Sidewalk Shed as per Plans.$8,000
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-11-10Permit EW — ISSUED
2016-11-02Job filed: FILING FOR FACADE RESTORATION WORK THAT INCLUDES SHELF ANGLE REPAIRS, INSTALLATION OF ?SOFT JOINTS? AND BRICK MASONRY REPAIRS, ETC. AS SHOWN ON DRAWIN$825,000
2016-11-02Job filed: FILING FOR REPLACEMENT OF THE ROOFING MEMBRANE AND CONCRETE REPAIRS TO SLAB AT THE FITNESS CENTER?S ROOF AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANG$275,000
2016-02-16Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEMS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$49,000
2015
2015-11-13DOB violation E:
2015-11-13DOB violation E:
2015-11-05Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEMS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$49,000
2015-11-05Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEMS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$49,000
2015-10-27FDNY inspection (ANNUL-COL-UNI)
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-09-29311: Water System — Hydrant Leaking (WC1)
2015-09-28Permit EW — ISSUED
2015-08-05Permit EQ — ISSUED
2015-07-28Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE NO CHANGE TO US
2015-07-28Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE NO CHANGE TO US
2015-07-09Rodent inspection: Passed
2015-05-27Job filed: FILING FOR REPLACEMENT OF THE ROOFING MEMBRANE WORK INCLUDING THE REPLACEMENT OF PERIMETER FLASHINGS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN$775,000
2015-04-17Permit EW — ISSUED
2015-02-24Job filed: FILING FOR REPLACEMENT OF THE ROOFING MEMBRANE WORK INCLUDING THE REPLACEMENT OF PERIMETER FLASHINGS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN$50,000
2014
2014-12-01DOB violation E:
2014-12-01DOB violation E:
2014-11-06FDNY inspection (ANNUL-COL-UNI)
2014-08-11Rodent inspection: Passed
2014-01-12FDNY inspection (RISK)
2013
2013-10-22FDNY inspection (ANNUL-COL-UNI)
2013-10-01DOB violation E:
2013-10-01DOB violation E:
2013-08-06Rodent inspection: Passed
2013-06-10Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2013-06-10Permit EQ — ISSUED
2013-03-12311: Sanitation Condition — 12 Dead Animals
2013-03-12311: Sanitation Condition — 12 Dead Animals
2013-03-12311: Sanitation Condition — 12 Dead Animals
2012
2012-12-14DOB violation E:
2012-12-14DOB violation E:
2012-12-13Facade (LL11) filing, cycle 7: SAFE
2012-09-25Permit EW — ISSUED
2012-06-30311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-06-30DOB complaint, category ?
2012-06-25Permit EQ — ISSUED
2012-06-07Rodent inspection: Passed
2012-05-17311: Construction Safety Enforcement — SST Tracking Complaint
2012-05-17DOB complaint, category ?
2012-05-16ECB CLASS - 1 violation: NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED BY AUTHORIZED PERSON AT SITE. TWO MEN ON SUSPENDED SCAFFOLD DOING FA$2,400
2012-05-16ECB CLASS - 1 violation: RIGGER FAILED TO NAME A DESIGNATED FOREMAN. TWO MEN WORKING ON SUSPENDED SCAFFOLD DOING FACADE WORK NO FOREMAN ON SITE. REM:COMPLY$800
2012-05-16ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. OUTRIGGER BEAM IS SKEWED. NO DETAIL ON CD5 FOR O$250
2012-02-21Facade (LL11) filing, cycle 7: SAFE
2012-02-21DOB violation LL11/98: UNSAFE LOCAL LAW REPORT FILED
2011
2011-12-01Permit EQ — ISSUED
2011-11-23Permit EW — ISSUED
2011-08-09Permit PL — ISSUED
2011-07-19Job filed: REPLACE RAYPAK BOILER WITH (2) HOT WATER HEATERS$24,575
2011-07-19Job filed: REPLACE RAYPAK BOILER WITH (2) HOT WATER HEATERS$24,575
2011-06-16Job filed: INSTALLATION OF A MANUAL,AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE FIRE ALARM WITHONE WAY VOICE COMMUNICATION SYSTEM AS PER PLANS SUBMITT$234,000
2011-06-07Permit EW — ISSUED
2011-05-12Job filed: FILING FOR WATERPROOFING REPAIRS AND FACADE RESTORATION WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCUUPANCY$569,500
2011-04-07Permit EQ — ISSUED
2011-04-05Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 124' LONG X 8'-12' HIGH DURING FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED
2011-04-04Rodent inspection: Passed
2011-01-20DOB violation E:
2011-01-20DOB violation E:
2010
2010-06-08311: General Construction/Plumbing — Wall/Retaining Wall - Bulging/Cracked
2010-06-08DOB complaint, category ?
2010-06-03DOB violation C:
2010-04-14DOB violation E:
2010-04-14DOB violation E:
2010-04-08Rodent inspection: Passed
2010-03-10Rodent inspection: Failed for Rat Activity
2009
2009-06-30Job filed: INSTALLATION OF A FIRE ALARM SYSTEM AS SHOWN ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$200,000
2008
2008-08-15Facade (LL11) filing, cycle 6: SWARMP
2008-06-24DOB violation E:
2008-06-24DOB violation E:
2008-04-30ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN $700
2007
2007-06-25DOB violation L1198:
2007-02-21Facade (LL11) filing, cycle 6: SWARMP
2007-02-14DOB complaint, category ?
2007-01-26Agreement — from NYCDOT DIV. OF FRANCHISES, CONCESSIONS & to THE TRUSTEES OF COLUMBIA UNIVERSITY IN T
2006
2006-10-11DOB violation E:
2006-10-11DOB violation E:
2006-01-06DOB violation LL6291:
2005
2005-01-31DOB violation LL6291:
2005-01-24Tenant complaint: HEATING — HEAT RELATED
2004
2004-11-19Permit EW — ISSUED
2004-11-19Permit EW — ISSUED
2004-11-16Job filed: REPLACE BOILER AND OIL BURNER. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2004-11-16Job filed: REPLACE BOILER AND OIL BURNER. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2004-06-14DOB violation E:
2003
2003-03-21DOB violation LL1081:
2003-03-19DOB violation LL6291:
2002
2002-06-26Permit EW — ISSUED
2002-06-26Permit EW — ISSUED
2002-06-26Permit EW — ISSUED
2002-06-06Job filed: REPLACE (2) EXISTING L.P. BOILERS/BURNERS AND INSTALL (1) NEW L.P. BOILER/BURNER. CHANGE GRADE OF FUEL OIL FROM #6 OIL TO #2 OIL . NO CHANGE IN MEANS
2002-01-14DOB violation E: 1P25960
2002-01-14DOB violation E: 1P25959
2001
2001-01-25DOB violation E: 1P25959
2001-01-25DOB violation E: 1P25960
1999
1999-03-23DOB violation E: 1P25960
1999-03-23DOB violation E: 1P25959
1999-03-16DOB violation LL6291:
1998
1998-10-16DOB complaint, category ?
1998-04-03ECB Hazardous violation: FAILURE TO MAINTAIN. DEFECT ARE: VARIOUS VERTICAL CRACKS IN NORTH WALL OF BUILDING ADJACENT TO 175 CLAREMONT AVE WITH RUNNING WATE$2,500
1997
1997-08-19Permit PL — ISSUED
1997-08-19Permit EW — ISSUED
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1996
1996-05-01Mortgage satisfied — from INTERNATIONAL HOUSE to DORMITORY INTERNATIONAL HOUSE
1996-05-01SAGE — from DORMITORY AUTHORITYOF THE STATE OF NEW Y
1996-04-26Mortgage $16,505,000 — from INTERNATIONAL HOUSE to DORMITORY AUTHORITYOF THE STATE OF NEW Y$16,505,000
1996-04-26Mortgage assigned — from INTERNATIONAL HOUSE to DORMITORY AUTHORITYOF THE STATE OF NEW Y
1994
1994-08-22Permit EQ — ISSUED
1994-05-31DOB violation LL1081:
1992
1992-11-10Permit PL — ISSUED
1992-09-09Permit AL — ISSUED
1992-06-10Permit AL — ISSUED
1989
1989-08-03Agreement — from INTERNATIONAL HOUSE to UNION THEOLOGICAL ETAL
1989-08-03Mortgage assigned — from INTERNATIONAL HOUSE to DORMITORY AUTH NYS
1989-08-03Mortgage $18,900,000 — from INTERNATIONAL HOUSE to DORMITORY AUTHORITYETC$18,900,000
1989-08-03Agreement — from UNION TECOLOGICAL ETAL to INTERNATIONAL HOUSE
1989-08-03Deed — from UNION THEOLOGICAL ETAL to INTERNATIONAL HOUSE
1968
1968-03-01Deed — from CITY OF NEW YORK to UNION THLGCL SMNRY ETAL
1967
1967-02-02Deed — from DIR OF FINANCE to CITY OF NEW YORK