391 East 149 Street · Bronx · BBL 2023280025
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
155 service requests in the last three years. Most common: Panhandling (85) · Vendor Enforcement (20) · Food Establishment (10) · Dirty Condition (9) · Consumer Complaint (4) · Sidewalk Condition (3).
Filed construction activity
$8,750,248 in permitted construction work filed since
2016 (42 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$22,143,000
$9,964,350
2026
$23,229,000
$10,453,050
2027
$24,056,000
$10,825,200
The city's market estimate has risen
9% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 11/100, posted at the entrance by law (2022 disclosure cycle)
2 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick), shared by 3 restaurants 10 Food Establishment complaints to 311 at this address in the last three years (most often: Bare Hands in Contact w/ Food, Rodents/Insects/Garbage, Food Contaminated), shared by 3 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2016 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
3 Av-149 St — 2 5 · 100 ft straight-line (under a minute) · station accessibility: full 149 St-Hostos — 2 4 5 · 0.5 mi straight-line (about a 13-minute walk) · station accessibility: none
Bus
Nearest boarding stop: E 149 St / Melrose Av — Bx2 Bx19 · 50 ft
Citi Bike
Melrose Ave & E 150 St · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
155 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $218,848 on
1991-03-21 (lender: Banco Popular De Puerto), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2009-03-18
RPTT $45,884,979 — from FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK, N.A.
$45,884,979
1991-03-21
Mortgage $218,848 — from MELROSE ASSOCIATES to BANCO POPULAR DE PUERTO
$218,848
1985-10-18
Mortgage $2,458,063 — from MELROSE ASSOCIATES to BANCO POPULAR DE PUERTO
$2,458,063
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
80
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
23
17
20
0
60
2018
26
17
21
10
74
2019
21
7
25
1
54
2020
8
9
23
1
41
2021
3
2
22
0
27
2022
10
4
47
0
61
2023
2
4
20
9
35
2024
0
0
74
6
80
2025
0
0
59
4
63
2026
0
0
20
6
26
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-08-02311: Food Establishment — Facility Construction
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-25311: Elevator — Elevator - Multiple Devices On Property
2022-07-25311: Elevator — Elevator - Multiple Devices On Property
2022-07-25DOB complaint, category ?
2022-07-21311: Water System — Fire Hydrant Emergency (FHE)
2022-07-15311: Consumer Complaint — Vendor
2022-06-29Permit General Construction — Signed-off
2022-06-14Job filed: Application filed for General Construction including interior renovation & partitions.$60,000
2022-06-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-26Permit Plumbing — Signed-off
2022-05-25311: Dirty Condition — Trash
2022-05-25Permit Mechanical Systems — Signed-off
2022-05-25Permit Structural — Signed-off
2022-05-25Permit General Construction — Signed-off
2022-05-23Job filed: BANK RENOVATION WORK TO INCLUDE INTERIOR DEMOLITION AND FIT OUT ON NON-LOAD BEARING PARTITIONS, CEILINGS, DOORS, WORK TO INCLUDE STOREFRONT DOOR RENOV$159,755
2022-05-22Job filed: BANK RENOVATION WORK TO INCUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,100
2022-05-22Job filed: PLUMBING MODIFICAITONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,075
2022-05-20Job filed: BANK RENOVATION WORK TO INCUDE STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,960
2021-01-20311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-17311: Homeless Street Condition — N/A
2021-01-08311: Food Establishment — Bare Hands in Contact w/ Food
2021-01-08311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-06Permit EW — ISSUED
2021-01-04ECB CLASS - 1 violation: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION#39026824L ISSUED ON 08-12-20 AND TO FILE A CERTFICIA$1,563
2020
2020-12-31311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-23311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-23311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-23311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-11-28311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-25Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCU$1,170
2020-11-25Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS BLADE SIGN ON WALL NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS O$234
2020-11-20311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-14311: Homeless Person Assistance
2020-11-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-11-10311: Consumer Complaint — Electronics Store
2020-10-13ECB CLASS - 1 violation: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #39026824L ISSUED ON 08-12-20 AND TO FILE A CERTIFIC$1,265
2020-10-05Job filed: Propose installation of plumbing fixtures on first floor (Store 8B) and Cellar floor accessory to first floor store as per plans filed herewith. There$13,200
2020-09-26Job filed: Propose installation of new steel beams for the installation of a new floor hatch accessible to Store 8B as per plans filed herewith. There is no cha$2,500
2020-09-25Job filed: PROPOSE INTERIOR REMOVAL OF WALLS ON 1ST FLOOR, INTERIOR RENOVATION ON 1ST FLOOR AND CELLAR FLOOR TO COMMERCIAL STORE 8B TO INCLUDE FLOOR, WALL, AND C$36,870
2020-09-25Job filed: PROPOSE INTERIOR REMOVAL OF WALLS ON 1ST FLOOR, INTERIOR RENOVATION ON 1ST FLOOR AND CELLAR FLOOR TO COMMERCIAL STORE 8B TO INCLUDE FLOOR, WALL, AND C$36,870
2020-08-18311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-18311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-12ECB CLASS - 1 violation: WORK WITHOUT A PERMIT. WORK NOTED: NEW ELECTRICAL AND PLUMBING, NEW OPENING IN SLAB BETWEEN CELLAR AND FIRST STORY. ALSO- PARTITIO$2,500
2020-08-03311: Water System — Leak (Use Comments) (WA2)
2020-01-09311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2020-01-09DOB complaint, category ?
2019
2019-12-04ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. PREMISES UNDER ALT-2 JOB#220692034 LOC FOLDER$625
2019-10-18311: Non-Residential Heat — Inadequate or No Heat
2019-10-17311: Mold — Public Complaint - Comm Location
2019-09-27Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2019-04-16ECB CLASS - 1 violation: BC 3314.8.2. DEBRIS NETTING.@THE TIME OF INSPECTION OBSERVED A HEAVY DUTY SIDEWALK WITH PIPE SCAFOLDING ON TOP UPTO ROOF LVL @EXP
2019-04-09311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2019-04-09DOB complaint, category ?
2019-03-28DOB complaint, category ?
2019-03-27311: Consumer Complaint — Overcharge
2019-03-25Permit PL — ISSUED
2019-03-25Permit EW — ISSUED
2019-03-19Job filed: FURNISH AND INSTALL CONSTRUCTION FENCE TO INSTALL NEW NEW STOREFRONT UNDER DOB APPLICATION # 220692034. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY$5,000
2019-02-28Permit EW — ISSUED
2019-02-28Permit EW — ISSUED
2019-02-27Job filed: A2$88,000
2019-02-27Job filed: INSTALLATION OF HVAC SYSTEM INSTALL NEW PLUMBING AND SUPPLY LINES. ALL AS PER PLANS FILE HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY UND$87,000
2019-02-26Permit EW — ISSUED
2019-02-26Permit EW — ISSUED
2018
2018-12-27Asbestos abatement: Removal — City Green Street Inc.
2018-12-27Asbestos abatement: Removal — City Green Street Inc.
2018-12-27311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2018-12-27DOB complaint, category ?
2018-12-27Permit EW — ISSUED
2018-12-26ECB CLASS - 1 violation: BUILT CONTRARY TO PLAN. EQUIPMENT ONSITE IS CONTRARY TO APPROVED PLAN. NOTE: AT TIME OF INSPECTION, I OBSERVED SUPPORTED SCAFFOLD
2018-12-06ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS AS PER 3307.6.4.8.1.NOTE:AT TIME OF MY INSPECTION I OBSERVED SIDEWALK SHED$1,250
2018-12-06ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS AS PER 3307.6.5.3.NOTE:AT TIME OF MY INSPECTION I OBSERVED SIDEWALK SHED I$2,400
2018-12-06ECB CLASS - 2 violation: FAILURE TO PROVIDE INFORMATION PANEL.NOTE;AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE WITHOUT INFORMATION PANEL ON PAR$2,400
2018-11-30311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2018-11-30DOB complaint, category ?
2018-11-14Permit EW — ISSUED
2018-11-14Permit EW — ISSUED
2018-11-14Permit AL — ISSUED
2018-11-08Job filed: REMOVE AND DISPOSE EXISTING FURRED WALLS, STOREFRONT DISPLAY FIXTURES AND FINISHES TO THE DEMISE PARTITIONS IN THEIR ENTIRETY; ALL BUILT UP FLOORING. $15,000
2018-11-07Permit EW — ISSUED
2018-11-02Permit EW — ISSUED
2018-10-20Asbestos abatement: Removal — City Green Street Inc.
2018-10-12Job filed: REPAIR OF EXISTING ROOF. ALL AS PER PLANS FILE HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY$1,150,000
2018-10-12Permit EQ — ISSUED
2018-10-10Job filed: REPAIR OF EXISTING ROOF. ALL AS PER PLANS FILE HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY$1,150,000
2018-10-10Job filed: REPAIR OF EXISTING ROOF. ALL AS PER PLANS FILE HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY$1,150,000
2018-10-05Job filed: PROPOSING INTERIOR RENOVATION OF EXISTING RETAIL SPACE FOR STARBUCK'S COFFEE SHOP. WORK TO INCLUDE INTERIOR PARTITIONS, FINISHES & CASEWORK. WOR$295,350
2018-10-02311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2018-10-02DOB complaint, category ?
2018-10-02Permit EQ — ISSUED
2018-10-01ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRE PERMIT. AT THE TIME OFINSPECTION OBSERVED A HEAVY DUTY SIDEWALK SHED ON 149 ST AND
2018-10-01ECB CLASS - 2 violation: WORK W/O A PERMIT. AT THE TIME OF INSPECTION OFA 6 STORY EXISTING BLDGFACADE WORK UNDER CONSTRUCTION. SOME WORKERS ARE WORKING AT $625
2018-10-01ECB CLASS - 1 violation: LOG. AT THE TIME OF INSPECTION OF 6STORY EXISTING BUILDING FACADE WORKAT ROOF LEVEL UNDER CONSTRUCTION FOR REPLACING EXISTING STEE$1,250
2018-10-01ECB CLASS - 1 violation: BC3301.6.1 NO DESIGN DRAWING. AT TIME OF INSPECTION OF A 6STORY EXISTING BUILDING FACADE WORK UNDER CONSTRUCTION. SOME WORKERS AR$2,500
2018-09-12311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2018-09-12DOB complaint, category ?
2018-09-11ECB CLASS - 2 violation: FAILURE TO PROVIDE INFORMATION PNAEL. NOTE AT TIME OF INSPECTION I OB SERVED SIDEWALK SHED IN PLACE W/O INFORMATION PANEL ON PARAP$3,125
2018-09-04311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2018-03-26Asbestos abatement: Removal — City Green Street, Inc.
2018-03-26Asbestos abatement: Removal — City Green Street, Inc.
2018-03-26Asbestos abatement: Removal — City Green Street, Inc.
2018-03-26Asbestos abatement: Removal — City Green Street, Inc.
2018-03-26Asbestos abatement: Removal — City Green Street, Inc.
2018-03-09Permit EW — ISSUED
2018-03-06Permit EW — ISSUED
2018-02-28Permit EW — ISSUED
2018-02-26Job filed: FUJITSU AC UNITS ON LOW ROOF FOR DENTIST OFFICE. OBTAIN EQUIPMENT USE PERMITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,000
2018-02-26Job filed: FUJITSU AC UNITS ON LOW ROOF FOR DENTIST OFFICE. OBTAIN EQUIPMENT USE PERMITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,000
2018-02-15Boiler inspection
2018-02-13ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. BROKEN/DEFECTIVE PLASTER @ BATHROOM CEILING @ CELLAR: ALSO OBSERVED WATER LEAKI$250
2018-02-09Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,200,000
2018-02-09Job filed: WATER TANK SHORING AND STEEL DUNNAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2018-02-09Job filed: WATER TANK SHORING AND STEEL DUNNAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2018-02-09Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,200,000
2018-02-09Job filed: WATER TANK SHORING AND STEEL DUNNAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2018-02-02311: Non-Emergency Police Matter — Other (complaint details)
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-19Permit EW — ISSUED
2018-01-05Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY .$56,000
2017
2017-12-21Permit PL — ISSUED
2017-12-21Permit EW — ISSUED
2017-12-18Permit EW — ISSUED
2017-12-15Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#220619187, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND FIRE SU$3,000
2017-11-17311: Indoor Air Quality — Dust from Construction
2017-11-01311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2017-11-01DOB complaint, category ?
2017-10-28ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO # 35263841R ISSUED ON 09/24/17 & TO FILE A C OF C PURSUAN$400
2017-10-25Permit EW — ISSUED
2017-10-20Permit PL — ISSUED
2017-10-12311: General Construction/Plumbing — Failure To Maintain
2017-10-12DOB complaint, category ?
2017-10-11Permit SG — ISSUED
2017-10-05Permit EQ — ISSUED
2017-10-03Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2017-10-03Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2017-10-03Permit EW — ISSUED
2017-10-02Job filed: ALL PLUMBING, MECHANICAL AND SPRINKLER WORK RELATED TO INTERIOR RENOVATION OF EXISTING RETAIL SPACE$291,000
2017-10-02Job filed: INTERIOR RENOVATION TO EXISTING RETAIL SPACE. WORK TO INCLUDE REMOVAL, INTERIOR PARTITIONS, CEILING, FLOORING AND FINISHES. NO CHANGE IN USE EGRESS OR$350,532
2017-10-02Job filed: STRUCTURAL WORK RELATED TO INTERIOR RENOVATION OF EXISTING RETAIL SPACE$80,000
2017-09-29DOB violation C: EMERG WORK.FRONT FACADES ALONG E 149ST&MELROSE AVE CRACKED,PEELING OFF &PART COLL INTO SIDEWALK.APPROX 40 LINEAR FT OF CORNICE AT R
2017-09-26311: General Construction/Plumbing — Failure To Maintain
2017-09-26311: Borough Office — Construction Enforcement Work Order (DOB)
2017-09-26DOB complaint, category ?
2017-09-26DOB complaint, category ?
2017-09-26Permit EQ — ISSUED
2017-09-26DOB violation C: FTM BLDG.FRONT FACADES ALONG E.149TH ST&MELROSE AVE ARE CRACKED,PEEL OFF&HAVE PART COLL INTO SIDEWALK.REST OF FACADE AT BLDG PRES
2017-09-25311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2017-09-25311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-09-25DOB complaint, category ?
2017-09-25DOB complaint, category ?
2017-09-24ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED:AT TIME OF INSPECTION,OBSERVED APPROX 50'LONG,SECTION OF MASONRY MIS$1,000
2017-09-21Job filed: CHANGE IN USE OF THE 6TH FLOOR TO A SCHOOL AND CONSTRUCTION OF INTERIOR PARTITIONS AND PLUMBING.AS PER PLAN NO CHANGE TO USE,EGRESS OR OCCUPANCY.$28,000
2017-09-20Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE
2017-09-20Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE
2017-09-14Permit EW — ISSUED
2017-09-13Job filed: REMOVAL OF A PARTITION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$18,000
2017-08-22DOB complaint, category ?
2017-08-14Permit EW — ISSUED
2017-08-10Job filed: SUBDIVIDE EXISTING RETAIL STORE. WORK INCLUDES NEW DEMISING PARTITIONS, NEW STOREFRONT & ENTRY DOORS, NEW SUSPENDED CEILING, NEW FLOORING, NEW TOI$126,600
2017-04-12311: Street Condition — Failed Street Repair
2017-04-04311: Street Condition — Rough, Pitted or Cracked Roads
2017-03-13311: Broken Muni Meter — Coin or Card Did Not Register
2017-03-10ECB CLASS - 2 violation: B254,36 36-AS PER CLASS 254-36 BURNER NOT REGISTER AS PER DOB RECORDSCORRECT ALL VIOLATION CONDITIONS AND SUBMIT A CERTIFICATE OF
2017-02-17311: Homeless Person Assistance — N/A
2017-02-01DOB complaint, category ?
2017-01-21311: Street Sign - Missing — No Parking, Standing, Stopping
2016-06-09Job filed: MODIFICATION TO HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$134,190
2016-06-09Job filed: MODIFICATION TO HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$134,190
2016-06-09Job filed: A2$204,292
2016-06-09Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS A$52,816
2016-06-09Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$11,252
2013-05-14ECB CLASS - 2 violation: ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1-28-118.3.2 IN THAT TEMP CO #200214632T002 EXPD ON 3.19.13. AND BLD
2012-05-09311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2012-05-09DOB complaint, category ?
2012-05-07Job filed: JOB FILED TO RENOVATE THE EXISTING COMMERCIAL STORE, WORK IS LIMITED TO NEW CERAMIC TILES FLOORING, PLASTERING, PAINTING AND REPLACE THE EXISTING STOR$20,325
2012-05-07Permit EW — ISSUED
2012-05-07Permit EQ — ISSUED
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-04-25Job filed: AMENDMENT IS BEING FILED TO CORRECT SCOPE OF WORK TO "LEGALIZATION OF REMOVAL OF PLUMBING FIXTURES" THERE IS NO WORK TO BE DONE. FILED AT THE REQUEST $1,000
2012-03-20311: Street Condition — Guard Rail - Street
2012-01-19DOB violation E:
2012-01-19DOB violation E:
2012-01-19DOB violation E:
2012-01-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011
2011-12-13311: Street Condition — Pothole
2011-11-15311: Street Condition — Pothole
2011-11-08311: Food Establishment — Handwashing
2011-10-24Rodent inspection: Passed
2011-10-17ECB CLASS - 2 violation: 12Q03,35Q03,56Y13,67X10,68B07,71X10,71Q03,72M07,100M07,57Q03. 35Q- INSTALL COVER FOR ELECTRICAL BOX UNDER CAR. 57Q- INSTALL COVER
2011-10-17ECB CLASS - 2 violation: 01B07,68B07,72M07,100M07. 01B- PROVIDE ALARM FOR EMERGENCY STOP SWITCHIN CAR. 68B- PROVIDE UPDATED MAINTENANCE LOG. 100M- PROVIDE
2011-10-17ECB CLASS - 2 violation: 14M07,12Q03,35Q03,43Q03,59Q03,67X10,68B07,71M07,100M07. 35Q- INSTALL COVER FOR ELECTRICAL BOX UNDER CAR. 59Q- INSTALL COVER FOR EL
2011-09-29311: Vending — In Prohibited Area
2011-09-27Rodent inspection: Failed for Other Reason
2010-09-22Job filed: MECHANICAL WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$50,000
2010-09-22Job filed: PARTITION AND CEILING WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$329,000
2010-09-22Job filed: STRUCRUAL WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$50,000
2010-09-22Job filed: PARTITION AND CEILING WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$329,000
2010-09-22Job filed: MECHANICAL WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$50,000
2010-09-22Job filed: STRUCRUAL WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$50,000
2010-09-22Permit EW — ISSUED
2010-09-22Permit EW — ISSUED
2010-09-22Permit EW — ISSUED
2010-08-23311: General Construction/Plumbing — Building Permit - None
2010-08-23DOB complaint, category ?
2010-07-22Job filed: REMOVAL OF NON-STRUCTURAL PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2010-07-22Job filed: REMOVAL OF NON-STRUCTURAL PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2010-07-22Permit AL — ISSUED
2010-07-13ECB CLASS - 2 violation: FAIL TO COMPLY W/COMM ORDER TO FILE A CERTIFICATE OF CORRECTION W/DOB.NOTED: RESPONDENT FAILED TO COMPLY W.COMM ORDER TO CORRECT T$4,000
2010-07-07DOB violation E:
2010-07-07DOB violation E:
2010-07-07DOB violation E:
2010-06-29311: Street Condition — Pothole
2010-06-24311: Street Condition — Pothole
2010-06-11311: Smoking — Smoking Violation
2010-06-11311: Indoor Air Quality — Other (Explain Below)
2010-02-02ECB CLASS - 1 violation: IT SHALL BE UNLAWFUL TO FAIL TO COMPLY W/ORDER OF COMMISSIONER OR TO VIOLATE ANY ORDER OF COMMISSIONER ISSUED PURSUANT TO THIS COD$2,400
2009-03-18RPTT $45,884,979 — from FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK, N.A.$45,884,979
2009-01-21Permit PL — ISSUED
2008
2008-12-19Permit PL — ISSUED
2008-12-09Permit EW — ISSUED
2008-11-12Job filed: PROPOSED WORK AT FIRST FLOOR PORTION OF EXISTING MEDICAL OFFICE.$30,000
2008-11-12Job filed: PROPOSED WORK AT FIRST FLOOR PORTION OF EXISTING MEDICAL OFFICE.$30,000
2008-01-29DOB complaint, category ?
2007
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-04-23DOB violation E:
2007-04-23DOB violation E:
2007-04-23DOB violation E:
2007-01-19DOB violation LL6291:
2006
2006-12-08Mortgage satisfied — from CASPER, HARRY to EAST RIVER SAVINGS BANK
2006-09-15Permit AL — ISSUED
2006-08-03DOB violation E:
2006-08-03DOB violation E:
2006-08-03DOB violation E:
2006-07-20Permit SG — ISSUED
2006-07-20Permit SG — ISSUED
2006-06-27ECB Non-Hazardous violation: 36B7/ 36-INSUFFICIENT GREASE TO OVERHEAD SHEAVES PROVIDE GREASE.
2006-05-10Permit AL — ISSUED
2006-01-10Deed — from MELROSE ASSOCIATES to MELROSE LLC
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2005
2005-11-02Permit EW — ISSUED
2005-11-02Permit EW — ISSUED
2005-11-02Permit EQ — ISSUED
2005-10-18DOB violation E:
2005-10-18DOB violation E:
2005-10-17Permit PL — ISSUED
2005-10-14DOB violation E:
2005-09-01DOB complaint, category ?
2005-08-18Permit EW — ISSUED
2005-08-18Permit EQ — ISSUED
2005-08-18Permit EW — ISSUED
2005-07-22Job filed: propose to alter existing retail store to new bank, to include new storefront, interior non bearing partitions, acoustical hung ceilings, HVAC, plumbi$65,000
2005-07-22Job filed: propose to alter existing retail store to new bank, to include new storefront, interior non bearing partitions, acoustical hung ceilings, HVAC, plumbi$65,000
2005-03-21DOB violation E:
2005-02-16Mortgage satisfied — from CASPER, HARRY to EAST RIVER SAVINGS BANK
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-12Permit EW — ISSUED
2005-01-12Permit EW — ISSUED
2005-01-07Permit EW — ISSUED
2005-01-07Permit EW — ISSUED
2004
2004-12-23DOB complaint, category ?
2004-12-15Job filed: VAULT RECONSTRUCTION INCLUDING STRUCTURA L STEEL AND RELOCATION OF PIPI AND FIXTURES AS REQUIRED PER PLANS AND SPECIFICATIONS - NO CHANGE IN USE, OC$800,000
2004-12-15Job filed: VAULT RECONSTRUCTION INCLUDING STRUCTURA L STEEL AND RELOCATION OF PIPI AND FIXTURES AS REQUIRED PER PLANS AND SPECIFICATIONS - NO CHANGE IN USE, OC$800,000
2004-12-14Job filed: It is proposed to renovate existing store for an Eating & Drinking Establishment (use group#6) on 1st floor. Minor partition & mechanical wor$35,000
2004-12-08ECB Hazardous violation: FAILURE TO MAINTAIN. DEFECTS NOTED: FRONT SIDEWALK VAULT CONCRETE CEILING IS DEFECTIVE WITH LOOSE, SPALLING, CRACKING AND EXPOSED
2004-12-08ECB Hazardous violation: FAILURE TO MAINTAIN BLDG DEFECTS NOTED:FRONT SIDEWALK VAULT CONCRETE CELIING IS DEFECTIVE W/LOOSE,SPALLING,CRACKING & EXPOSED REIN
2004-07-29ECB Hazardous violation: FAILURE TO MAINTAIN.DEFECTS NOTED:FRONT SIDEWALK VAULT CONCRETE CEILING IS DEFECTIVE CRACKING AND SPALLING THROUGHOUT.REMEDY:MAINT
2004-06-16DOB violation E:
2004-06-16DOB violation E:
2004-04-21DOB violation LL1081:
2004-03-09ECB Non-Hazardous violation: FAILURE TO MAINTAIN. DEFECT IS AT THE CELLAR VAULT AREA THROUGHOUT ENTIRE CELLAR CEILING CONCRETE IS SPALLING AND DEFECTIVE MAKE S$800
2004-03-08DOB complaint, category ?
2004-03-08ECB Non-Hazardous violation: FAILURE TO MAINTAIN. DEFECT IS : AT THE BASEMENT OF BUILDING THE PARTITION WALL BETWEEN & 8 JEWERLY STORE KNOW ADDRESS 393 E 149 S$350
2004-02-19DOB violation E:
2004-02-19DOB violation E:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2003
2003-08-14DOB violation E:
2003-08-14DOB violation E:
2003-07-23DOB complaint, category ?
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2003-02-06ECB Non-Hazardous violation: PLUMBING WORK WITHOUT PERMIT COLOLTIONAL SUREMDER HEALS ADCLED TO BASEMENT. REMEDY: OBTIAN PERMIT AND ARRANGE FOR INSPECTION WITH
2002
2002-12-02DOB complaint, category ?
2002-11-27DOB violation E: 2P27
2002-11-27DOB violation E: 2P227
2002-03-26DOB violation LL6291:
2002-02-22DOB violation E:
2002-02-22DOB violation E:
2002-02-22DOB violation E:
2001
2001-07-30Permit EW — ISSUED
2001-07-30Permit EQ — ISSUED
2001-07-24Job filed: REMOVE/REPLACE LOOSE CORNICE AND POINTING AS PER PLAN FILED. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2001-07-24Job filed: REMOVE/REPLACE LOOSE CORNICE AND POINTING AS PER PLAN FILED. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2001-06-22DOB complaint, category ?
2001-04-02DOB complaint, category ?
2001-03-20Job filed: REMOVE EXISTING F.A. SYSTEM. NEW MINI CLASS E FIRE ALARM SYSTEM HAS BEEN INSTALLED AS PER 200637971. NO CHANGE TO USE EGRESS OR OCCUPANCY.$1,000
2001-02-27DOB violation LL6291:
2000
2000-10-23ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BDLG WALL. DEFECT IS: PIECES OF TRIANGULAR MASONRY HAVE FALLEN FROM THE 2ND STORY WEST SIDE FRONT OF $180
2000-10-04DOB complaint, category ?
2000-09-07Job filed: INSTALLATION OF NEW MINI CLASS E FIRE AL ARM SYSTEM.NO CHANGE IN USE EGR SS OR OCCUPANCY.$4,000
2000-09-07Job filed: INSTALLATION OF NEW MINI CLASS E FIRE AL ARM SYSTEM.NO CHANGE IN USE EGR SS OR OCCUPANCY.$4,000
2000-08-11ECB Non-Hazardous violation: 74D6. 74D6 PROPERLY SECURE STREET GAE BY CODE.
2000-05-04DOB violation E: 2P28
2000-05-04DOB violation E: 2P27
2000-05-04DOB violation E: 2P227
2000-02-07DOB violation LL6291:
1999
1999-11-24DOB violation E: 2P28
1999-11-24DOB violation E: 2P27
1999-11-24DOB violation E: 2P227
1999-04-29DOB complaint, category ?
1999-04-10ECB Non-Hazardous violation: 73P, DEVICE 000 RESTORE TO SERVICE TO SERVICE FOR PURPOSE OF PROPER INSPECTION TO BE MADE BY THE DEPARTMENT.$350
1999-04-10ECB Non-Hazardous violation: 57O,03O,46H,35T,37T,54T,33D,33Z,55O,22L,33M,75U. CAR TOP IS VERY DIRTY, HOIST CABLE DIRTY AND MEDIUM CROWN WEAR, MACHINE ROOM LOCK$350
1999-04-10ECB Non-Hazardous violation: 57Z,54T,37T,33Q,33T,3D,75U,33M. REMOVE WATER FROM PIT. REMOVE CITY ID TAG NUMBER ON MAINLINE AND CONTROLLER, PROVIDE LOCK AND LABE$350
1999-03-16DOB violation LL6291:
1999-01-26SAGE — from BANCO POPULAR DE PUERTO RICO
1999-01-26Mortgage assigned — from BANCO POPULAR DE PUERTO RICO to BANK OF NEW YORK
1997
1997-05-21DOB complaint, category ?
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1995
1995-04-17DOB violation LL1081:
1994
1994-05-31DOB violation LL1081:
1994-04-26ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED OPENING CREADTED AT NORTHEAST SECTION OF CELLAR (STORAGE ROOM) REMEDY: FILE PLANS OBTAIN PERMIT O$350
1993
1993-12-09Permit EW — ISSUED
1993-12-09Permit PL — ISSUED
1993-12-09Permit EW — ISSUED
1993-07-16Permit AL — ISSUED
1993-05-26ECB Non-Hazardous violation: DEPT OF TRANSPORTATION PERMIT FOR CONTAINER IN STREET NOT POSTED. CON-TAINER IN STREET IN FRONT OF 391 E 149 ST NO DOT PERMITS ON
1993-05-26ECB Non-Hazardous violation: WORK WITHOUT PERMIT - AT TIME OF INSPECTION ALT # PERMIT # 200214632 CALL FOR INTERIOR ALTERATION. FOR NEW FIRE RATED INTERERIOR
1993-03-22Permit AL — ISSUED
1993-02-10DOB violation C:
1992
1992-07-10DOB violation LL5:
1992-07-05DOB violation LL5:
1992-06-24ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPT. RECORDS. REMEDY: DISCONTINUE ILLEGAL USE OR OBTAIN A NEW CERTIFICATE OF OCCUP
1992-06-22ECB Non-Hazardous violation: EXIT PASSAGEWAY TOTALY OBSTRUCTED.DROP LADDER MISSING AT 2ND FLOOR LANDING.DOOR LEADING TO DROP LADDER EXIT WAS PAD LOCKED AT TIME$475
1992-05-06DOB violation C:
1992-04-30ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NOTED WORK: NEW OPENING CONSTRUCTED NORTHEAST SECTION OF CELLR STORAGE ROOM. REMEDY: FILE PLANS AND OBTAIN
1992-04-30DOB violation C:
1992-04-27DOB violation C:
1992-04-27ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED: NEW STORE FRONT CONSTRUCTED,NEW PARTITIONS AND STAIR TO BASEMENT. REMEDY: FILE PLANS AND OBT
1991
1991-12-17DOB complaint, category ?
1991-08-28DOB violation C:
1991-08-28ECB Unknown violation: WORK WITHOUT A PERMIT.WORK NOTED:ERECTED A SIGN APPROX.9'HIGH BY 25' WIDE STATING X'-PRESS AT THE EAST ELEVATION OF THE ABOVE PRE$285
1991-07-26ECB Non-Hazardous violation: USE OF ILLEGAL HARDWARE. EXITS TO FIRE ESCAPES AT NORTHWEST CORNER FROM 2ND TO 6TH FLOORS ARE PADLOCKED. REMEDY: REMOVE ILLEGAL HA$500
1991-03-21Mortgage assigned — from MELROSE ASSOCIATES to BANCO POPULAR DE P.R.
1991-03-21Mortgage $218,848 — from MELROSE ASSOCIATES to BANCO POPULAR DE PUERTO$218,848
1991-03-21Agreement — from BANCO POPULAR DE PUERTO to MELROSE ASSOCIATES
1991-03-05ECB Non-Hazardous violation: FAILURE TO MAINTAIN. BROKEN AND DEFECTIVE WINDOWS THROUGHOUT 5 STORY FIRE RETARDED MATERIALS BROKEN AND DEFECTIVE AROUND STEEL 5T$230
1990-03-19ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NEW STORE FRONT CONSTRUCTED. NEW PARTITION AND STAIR TO BASEMENT$285
1990-03-19ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NEW STORE FRONT CONSTRUCTED NEW PARTITIONS NEW PARTITIONS AND STAIR TO BASEMENT. REMEDY: FILE PLANS $250
1990-01-18ECB Hazardous violation: EXIT PASSAGEWAY TOTAL OBSTRUCTED METAL DOORS AND PAD LOCK 2ND THROUGH 6 STY. REMEDY: REMOVE OBSTRUCTION FROM PASSAGEWAY. NOTE: I $460
1989
1989-12-21ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. REMEDY: NEW OPENING CONSTRUCTED NORTHEAST SECTION OF CELLAR. REMEDY: IF FEASIBLE FILE PLANS AND OBTA$1,000
1989-12-19DOB complaint, category ?
1989-11-02ECB Unknown violation: DIRECTION SIGN THROUGHT ALL FLOOR. FAILS TO MEET BUILDING CODE. REMEDY: PROVIDE REQUIRED TYPE.$115
1989-11-02ECB Hazardous violation: EXIT PASSAGEWAY TOTAL OBSTRUCTION METAL DOORS AND PADLOCK 2ND THROUGH 6 STORY IN PLACE AT NORTH EAST SECTION.$460
1989-11-01DOB complaint, category ?
1985
1985-10-18Mortgage assigned — from HELMAN, RAY/EXECUTOROF; LIPPMAN, GERTRUDE; HELMAN, GILBERT/IND.&EXE; UNGAR, BEATRICE; HELM to BETESH, JOSEPH
1985-10-18Agreement — from BANCO POPULAR DE PUERTO to MELROSE ASSOCIATES
1985-10-18Mortgage assigned — from BETESH, JOSEPH to BANCO POPULAR DE PUERTO
1985-10-18Mortgage assigned — from BETESH, JOSEPH to BANCO POPULAR/PUERTORIC
1985-10-18Mortgage $2,458,063 — from MELROSE ASSOCIATES to BANCO POPULAR DE PUERTO$2,458,063
1983
1983-03-11Mortgage assigned — from EAST RIVER SAVINGS BANK to BETESH, JOSEPH
1978
1978-03-03Agreement — from MELROSE THIRD AVENUE CORP to EAST RIVER SAVINGS BANK
1977
1977-12-14Mortgage assigned — from MELROSE THIRD AVENUE CORPORATION to RAY HELMAN ESTATE OF; GILBERT HELMAN; MEYER B HELMAN; BEATRICE UNGAR; GERTRUDE LIPPRENDER
1977-09-01Mortgage — from MELROSE ASSOCIATES to MELROSE THIRD AVENUE CORPORATION
1977-09-01Deed — from MELROSE THIRD AVENUE CORPORATION to MELROSE ASSOCIATES
1972
1972-10-20Agreement — from MELROSE THIRD AVENUE CORPORATION to EAST RIVER SAVINGS BANK
1969
1969-11-05Agreement — from MELROSE THIRD AVENUE CORPORATION to EAST RIVER SAVINGS BANK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL