Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

2 St. Ann's Avenue · Bronx · BBL 2025430001 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

2 heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

12 service requests in the last three years. Most common: Indoor Air Quality (2) · Food Poisoning (1) · Rodent (1) · General Construction/Plumbing (1) · Water System (1) · Abandoned Vehicle (1).

Filed construction activity

$2,603,756 in permitted construction work filed since 2016 (37 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$112,613,000 $50,675,850
2026$123,657,000 $55,645,650
2027$124,918,000 $56,213,100

The city's market estimate has risen 11% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)F — did not submit required benchmarking data, posted at the entrance by law (2022 disclosure cycle)

Restaurants in this building

RestaurantCuisineGradeNotes
Fresh Direct CafeteriaAmericanA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Temperature) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

In the FEMA 1%-annual-chance floodplain (2015 preliminary flood maps) — lenders typically require flood insurance here.

Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayCypress Av — 6 · 0.4 mi straight-line (about an 11-minute walk) · station accessibility: none
BusNearest boarding stop: Main Rdwy / T B T A — M35 · 900 ft
Citi BikeE 133 St & Cypress Pl · 950 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

2 St. Ann's Avenue

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

12 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $31,750,000 on 2026-06-02 (lender: UBS Ag New York Branch), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-06-02Agreement $100,000,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH $100,000,000
2026-06-02Mortgage $31,750,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH $31,750,000
2026-06-02AL&R $100,000,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH $100,000,000
2025-05-01AL&R $70,000,000 — from FRESH PROPERTY BRONX, LLC to WHITEHAWK CAPITAL PARTNERS LP $70,000,000
2025-05-01Mortgage $70,000,000 — from FRESH PROPERTY BRONX, LLC to WHITEHAWK CAPITAL PARTNERS LP $70,000,000
2025-04-23RPTT $44,562,109 — from GETIR B.V. to TAVAN73 TEKNOLOJI ANONIM SIRKET $44,562,109
2024-01-18RPTT $217,543,263 — from THE STOP & SHOP SUPERMARKET COMPANY LLC to GETIR US, INC. $217,543,263
2022-05-25MLEA $2,736,788 — from HRY HOLDINGS, LLC; HARLEM RIVER YARDS VENTURES, INC. to CONSOLIDATED EDISON COMPANY OF NEW YORK, $2,736,788
2021-07-09RPTT $206,151,615 — from SHAREHOLDERS OF FRESH DIRECT HOLDINGS, I to RFD II, INC. $206,151,615
2021-07-09RPTT $230,608,331 — from RFD I, LLC to SPRINTER HOLDING, LLC $230,608,331
2019-08-19Agreement $100,000,000 — from HRY HOLDINGS, LLC; HARLEM RIVER YARD VENTURES, INC. to BANK OF AMERICA, N.A. $100,000,000
2019-01-11Mortgage $5,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION $5,000,000
2018-12-17Mortgage $50,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK $50,000,000
2018-12-17Agreement $10,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK $10,000,000
2018-11-01Mortgage $20,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK $20,000,000

Ten-year activity

100500
97
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20175124139097
2018181317443
20197274828
202063170329
20215545928
20227043317
202344621733
20240321915
20250263617
20260059721
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 25 records

DateRecord
2026-09-18Mortgage assigned — from UBS AG NEW YORK BRANCH, to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2026-09-18AALR — from UBS AG NEW YORK BRANCH, to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2026-09-01311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-18Agreement — from HARLEM RIVER YARD VENTURES, INC.; HRY HOLDINGS, LLC to FRESH PROPERTY BRONX, LLC; UBS AG NEW YORK BRANCH; BANK OF AMERICA, N.A.
2026-06-02Agreement $100,000,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH
2026-06-02Mortgage $31,750,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH
2026-06-02TL&R — from WHITEHAWK CAPITAL PARTNERS LP to FRESH PROPERTY BRONX, LLC
2026-06-02Mortgage assigned — from WHITEHAWK CAPITAL PARTNERS LP to UBS AG NEW YORK BRANCH
2026-06-02AL&R $100,000,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH
2026-06-02Agreement — from UBS AG NEW YORK BRANCH; FRESH PROPERTY BRONX, LLC; FRESH DIRECT, LLC to U.T.F. TRUCKING, INC.
2026-05-28Restaurant inspection: Fresh Direct Cafeteria
2026-05-17311: Food Establishment — Food Temperature
2026-05-08311: Consumer Complaint — Supermarket or Grocery Store
2026-05-01Cooling tower inspection
2026-05-01Cooling tower inspection
2026-05-01Cooling tower inspection
2026-03-24Boiler inspection
2026-03-24Boiler inspection — defects found
2026-01-25311: Street Condition — Rough, Pitted or Cracked Roads
2026-01-16Boiler inspection
2025-12-24311: Illegal Parking — Double Parked Blocking Traffic
2025-12-19Boiler inspection — defects found
2025-10-30311: Abandoned Vehicle — With License Plate
2025-10-20Boiler inspection

The full timeline

2026
2026-09-18Mortgage assigned — from UBS AG NEW YORK BRANCH, to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2026-09-18AALR — from UBS AG NEW YORK BRANCH, to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2026-09-01311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-18Agreement — from HARLEM RIVER YARD VENTURES, INC.; HRY HOLDINGS, LLC to FRESH PROPERTY BRONX, LLC; UBS AG NEW YORK BRANCH; BANK OF AMERICA, N.A.
2026-06-02Agreement $100,000,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH$100,000,000
2026-06-02Mortgage $31,750,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH$31,750,000
2026-06-02TL&R — from WHITEHAWK CAPITAL PARTNERS LP to FRESH PROPERTY BRONX, LLC
2026-06-02Mortgage assigned — from WHITEHAWK CAPITAL PARTNERS LP to UBS AG NEW YORK BRANCH
2026-06-02AL&R $100,000,000 — from FRESH PROPERTY BRONX, LLC to UBS AG NEW YORK BRANCH$100,000,000
2026-06-02Agreement — from UBS AG NEW YORK BRANCH; FRESH PROPERTY BRONX, LLC; FRESH DIRECT, LLC to U.T.F. TRUCKING, INC.
2026-05-28Restaurant inspection: Fresh Direct Cafeteria
2026-05-17311: Food Establishment — Food Temperature
2026-05-08311: Consumer Complaint — Supermarket or Grocery Store
2026-05-01Cooling tower inspection
2026-05-01Cooling tower inspection
2026-05-01Cooling tower inspection
2026-03-24Boiler inspection
2026-03-24Boiler inspection — defects found
2026-01-25311: Street Condition — Rough, Pitted or Cracked Roads
2026-01-16Boiler inspection
2025
2025-12-24311: Illegal Parking — Double Parked Blocking Traffic
2025-12-19Boiler inspection — defects found
2025-10-30311: Abandoned Vehicle — With License Plate
2025-10-20Boiler inspection
2025-06-25311: Water System — Dirty Water (WE)
2025-05-01AL&R $70,000,000 — from FRESH PROPERTY BRONX, LLC to WHITEHAWK CAPITAL PARTNERS LP$70,000,000
2025-05-01Mortgage $70,000,000 — from FRESH PROPERTY BRONX, LLC to WHITEHAWK CAPITAL PARTNERS LP$70,000,000
2025-04-23RPTT $44,562,109 — from GETIR B.V. to TAVAN73 TEKNOLOJI ANONIM SIRKET$44,562,109
2025-03-21Cooling tower inspection
2025-03-21Cooling tower inspection
2025-03-21Cooling tower inspection
2025-03-17Restaurant inspection: Fresh Direct Cafeteria — grade A
2025-02-16311: Indoor Air Quality — Ventilation
2025-02-16311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2025-02-16DOB complaint, category ?
2025-02-07311: Rodent — Rat Sighting
2025-01-08FDNY inspection (STRUC_INT_6)
2024
2024-12-31Boiler inspection
2024-12-28311: Indoor Air Quality — Ventilation
2024-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2024-09-18Boiler inspection
2024-09-18Boiler inspection
2024-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-06-06311: Food Poisoning — 1 or 2
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-03-20Cooling tower inspection — violation AH8F
2024-03-20Cooling tower inspection — violation AH8U
2024-03-20Cooling tower inspection — violation AH8F
2024-03-20Cooling tower inspection — violation AH8U
2024-03-20Cooling tower inspection — violation AH8F
2024-03-20Cooling tower inspection — violation AH8U
2024-01-18RPTT $217,543,263 — from THE STOP & SHOP SUPERMARKET COMPANY LLC to GETIR US, INC.$217,543,263
2023
2023-12-01Boiler inspection
2023-09-20FDNY inspection (STRUC_INT_3)
2023-09-19311: Noise - Commercial — Banging/Pounding
2023-09-05311: Food Poisoning — 1 or 2
2023-08-27311: Noise - Street/Sidewalk — Loud Music/Party
2023-08-23TL&R — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION C
2023-08-23Mortgage satisfied — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISRIBUTION CE
2023-07-16311: Food Poisoning — 3 or More
2023-07-16311: Food Establishment — Food Protection
2023-07-12Boiler inspection
2023-07-12Boiler inspection
2023-06-29Permit Mechanical Systems — Permit Issued
2023-06-23Job filed: #8750 - Installation of refrigeration equipment. No change in egress, use or occupancy.$1,300,000
2023-06-06Rodent inspection: Passed
2023-06-01311: Illegal Parking — Posted Parking Sign Violation
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
2023-04-13Job filed: #8750 - Steel Structural Supports for refrigeration Units. No change in egress, use, or occupancy.$225,000
2023-03-22Cooling tower inspection — violation AH8R
2023-03-22Cooling tower inspection — violation AH8C
2023-03-22Cooling tower inspection — violation AH8C
2023-03-22Cooling tower inspection — violation AH8Q
2023-03-22Cooling tower inspection — violation AH8U
2023-03-22Cooling tower inspection — violation AH8Q
2023-03-22Cooling tower inspection — violation AH8Q
2023-03-22Cooling tower inspection — violation AH8R
2023-03-22Cooling tower inspection — violation AH8U
2023-03-22Cooling tower inspection — violation AH8C
2023-03-22Cooling tower inspection — violation AH8R
2023-03-22Cooling tower inspection
2023-03-22Cooling tower inspection — violation AH8U
2023-03-03Job filed: TO INSTALL ADDITIONAL CONVEYOR EQUIPMENT TO THE EXISTING CONVEYOR SYSTEM. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$925,992
2022
2022-12-21TERA — from CITI NMTC SUBSIDIARY CDE XX, LLC to U.T.F. TRUCKING, INC.; FRESH PROPERTY BRONX EQUIPMENT I, LLC; FRESH PROPERTY BRONX, LLC; F
2022-12-21TERA — from RIVER VENTURES, L.L.C.; CNMC SUB-CDE 82, LLC; MID-CITY COMMUNITY SUB-CDE XVII, LLC; UACD S to FRESH PROPERTY BRONX, LLC; FRESH DIRECT, LLC; U.T.F. TRUCKING, INC.; FRESH PROPERTY BRONX
2022-11-25311: Consumer Complaint — Bodega/Deli/Supermarket
2022-11-18Certificate of occupancy Final
2022-11-18Certificate of occupancy Final
2022-11-14311: Industrial Waste — Waterway-Color (IHD)
2022-09-06Certificate of occupancy Renewal With Change
2022-08-12Certificate of occupancy Renewal With Change
2022-06-14Job filed: No Work
2022-06-01Certificate of occupancy Renewal Without Change
2022-05-25MLEA $2,736,788 — from HRY HOLDINGS, LLC; HARLEM RIVER YARDS VENTURES, INC. to CONSOLIDATED EDISON COMPANY OF NEW YORK,$2,736,788
2022-05-16311: Blocked Driveway — No Access
2022-04-07Cooling tower inspection
2022-04-07Cooling tower inspection
2022-04-07Cooling tower inspection
2022-03-22311: Food Poisoning — 1 or 2
2022-03-14Certificate of occupancy Renewal Without Change
2021
2021-12-10Certificate of occupancy Renewal Without Change
2021-12-05311: Illegal Parking — Commercial Overnight Parking
2021-12-03311: Consumer Complaint — Retail Store
2021-10-31311: Food Poisoning — 1 or 2
2021-10-01Job filed: No Work
2021-09-22Boiler inspection
2021-09-22Boiler inspection
2021-09-22Certificate of occupancy Renewal Without Change
2021-09-16311: Street Condition — Pothole
2021-08-23Cooling tower inspection — violation AH8S
2021-08-23Cooling tower inspection — violation AH8D
2021-08-23Cooling tower inspection — violation AH8D
2021-08-23Cooling tower inspection — violation AH8S
2021-08-23Cooling tower inspection — violation AH8D
2021-08-23Cooling tower inspection — violation AH8S
2021-07-09RPTT $206,151,615 — from SHAREHOLDERS OF FRESH DIRECT HOLDINGS, I to RFD II, INC.$206,151,615
2021-07-09RPTT $230,608,331 — from RFD I, LLC to SPRINTER HOLDING, LLC$230,608,331
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-19Permit Sign — Signed-off
2021-04-05Boiler inspection
2021-03-23MLEA — from HRY HOLDINGS, LLC to FRESH PROPERTY BRONX, LLC
2021-03-23Mortgage satisfied — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION C
2021-03-23TL&R — from BRONX FOOD PROCESSING AND DISTRIBUTION C to FRESH PROPERTY BRONX, LLC
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-02-23Certificate of occupancy Temporary
2020
2020-12-30311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-18Certificate of occupancy Temporary
2020-12-16Boiler inspection
2020-12-16Boiler inspection
2020-11-21311: Taxi Complaint — Driver Complaint - Passenger
2020-11-02311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-10-22Certificate of occupancy Temporary
2020-08-31311: Food Poisoning — 1 or 2
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-08-01311: Taxi Report — Driver Report - Passenger
2020-07-29Certificate of occupancy Temporary
2020-07-28Boiler inspection
2020-07-15311: NonCompliance with Phased Reopening — Business not in compliance
2020-06-01311: Illegal Parking — Commercial Overnight Parking
2020-05-26311: Noise - Commercial — Car/Truck Horn
2020-05-08Certificate of occupancy Temporary
2020-05-06311: Street Condition — Rough, Pitted or Cracked Roads
2020-05-06311: Street Sign - Missing — St Name - Attached to Pole
2020-05-06311: Sidewalk Condition — Broken Sidewalk
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-04-29311: Non-Emergency Police Matter — Social Distancing
2020-04-27311: Non-Emergency Police Matter — Social Distancing
2020-04-14311: Non-Emergency Police Matter — Social Distancing
2020-03-31311: Consumer Complaint — Retail Store
2020-03-20311: Food Poisoning — 3 or More
2020-03-05311: Food Poisoning — 1 or 2
2020-02-13Job filed: INSTALLATION OF (1) INDIRECTLY ILLUMINATED NON-ADVERTISING SIGN ON THE NORTH SIDE OF BUILDING, INSTALLATION OF (1) INDIRECTLY ILLUMINATED NON-ADVERTIS$49,882
2020-01-30Certificate of occupancy Temporary
2019
2019-12-06Boiler inspection
2019-11-06Certificate of occupancy Temporary
2019-10-09Boiler inspection
2019-08-24311: Sidewalk Condition — Broken Sidewalk
2019-08-24311: Sidewalk Condition — Broken Sidewalk
2019-08-23311: Sidewalk Condition — Broken Sidewalk
2019-08-21311: Sidewalk Condition — Broken Sidewalk
2019-08-19Agreement $100,000,000 — from HRY HOLDINGS, LLC; HARLEM RIVER YARD VENTURES, INC. to BANK OF AMERICA, N.A.$100,000,000
2019-08-15Certificate of occupancy Temporary
2019-08-13311: Sidewalk Condition — Broken Sidewalk
2019-07-29FDNY inspection (RISK)
2019-07-09Boiler inspection
2019-05-22Certificate of occupancy Temporary
2019-04-25311: Water System — Dirty Water (WE)
2019-04-15Permit Sign — Signed-off
2019-04-03Cooling tower inspection
2019-04-03Cooling tower inspection
2019-04-03Cooling tower inspection
2019-03-19TL&R — from STERLING NATIONAL BANK
2019-03-19Mortgage assigned — from STERLING NATIONAL BANK to BRONX FOOD PROCESSING AND DISTRIBUTION C
2019-03-15Job filed: INSTALLATION OF (1) INDIRECTLY ILLUMINATED NON-ADVERTISING SIGN ON THE NORTH SIDE OF BUILDING, INSTALLATION OF (1) INDIRECTLY ILLUMINATED NON-ADVERTIS$49,882
2019-03-09311: Consumer Complaint — Damaged/Defective Goods
2019-03-08Rodent inspection: Passed
2019-03-08DOB complaint, category ?
2019-03-04Permit PL — ISSUED
2019-03-01Boiler inspection
2019-02-25Certificate of occupancy Temporary
2019-01-11Mortgage $5,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION$5,000,000
2018
2018-12-21Boiler inspection
2018-12-17Mortgage assigned — from STERLING NATIONAL BANK to BRONX FOOD PROCESSING AND DISTRIBUTION C
2018-12-17Mortgage $50,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$50,000,000
2018-12-17Agreement $10,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$10,000,000
2018-11-27Certificate of occupancy Temporary
2018-11-01Mortgage assigned — from STERLING NATIONAL BANK to BRONX FOOD PROCESSING AND DISTRIBUTION C
2018-11-01Mortgage $20,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$20,000,000
2018-11-01Agreement $30,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$30,000,000
2018-09-28311: Illegal Parking — Posted Parking Sign Violation
2018-09-20311: Dirty Conditions — E15 Illegal Postering
2018-09-20311: Street Sign - Damaged — Other/Unknown
2018-08-13Certificate of occupancy Temporary
2018-08-10Permit EW — ISSUED
2018-08-06Job filed: FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEMS IN EXISTING COMMERCIAL SPACE. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THI$2,000
2018-07-03Permit EW — ISSUED
2018-06-29Permit NB — ISSUED
2018-06-18Permit EW — ISSUED
2018-06-12Permit AL — ISSUED
2018-06-12Permit EW — ISSUED
2018-05-15Mortgage assigned — from STERLING NATIONAL BANK to BRONX FOOD PROCESSING AND DISTRIBUTION C
2018-05-15Mortgage $10,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$10,000,000
2018-05-15Agreement $40,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$40,000,000
2018-05-15Certificate of occupancy Temporary
2018-04-12Permit EW — ISSUED
2018-03-30Mortgage assigned — from STERLING NATIONAL BANK to BRONX FOOD PROCESSING AND DISTRIBUTION
2018-03-30Mortgage $50,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$50,000,000
2018-03-30Agreement $45,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$45,000,000
2018-03-29Permit EW — ISSUED
2018-03-28Cooling tower inspection
2018-03-28Cooling tower inspection
2018-03-28Cooling tower inspection
2018-03-06Permit EW — ISSUED
2018-03-05Permit PL — ISSUED
2018-02-27Permit EW — ISSUED
2018-02-22Certificate of occupancy Temporary
2018-02-14Permit PL — ISSUED
2018-02-12Agreement $50,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$50,000,000
2018-02-12Mortgage assigned — from STERLING NATIONAL BANK to BRONX FOOD PROCESSING AND DISTRIBUTION C
2018-02-12Mortgage $5,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$5,000,000
2018-02-12AL&R $5,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION C$5,000,000
2018-01-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-01-08Permit NB — ISSUED
2018-01-02RPTT $28,050,000 — from LEVEL 3 COMMUNICATIONS LLC to CENTURY LINK INC.$28,050,000
2017
2017-12-28Certificate of occupancy Temporary
2017-12-08Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNC$1,000
2017-12-08Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNC$1,000
2017-12-08Permit EW — ISSUED
2017-12-04Permit EW — ISSUED
2017-11-20Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUN$1,000
2017-11-15Permit EW — ISSUED
2017-11-01Permit NB — ISSUED
2017-10-25311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-10-25DOB complaint, category ?
2017-10-24ECB CLASS - 1 violation: BC3303.10/OPERATIONS IN OCCUPIED BUILDINGS;NOTE AT TIME OF INSPECTION OF A 2 STORY WAREHOUSE,CONSTRUCTION WORK IN PROGRESS.I OBSER$8,000
2017-10-20Permit NB — ISSUED
2017-10-17FDNY inspection (CONSTR)
2017-10-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-10-17DOB complaint, category ?
2017-10-16Job filed: FILING HEREWITH FOR MODIFICATIONS OT HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FIL$2,000
2017-09-29Certificate of occupancy Temporary
2017-09-26Permit NB — ISSUED
2017-09-26Permit EQ — ISSUED
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-08Job filed: GENERAL CONSTRUCTION WORK FOR INSTALLATION OF CONCRETE PADS AS PER PLANS FILED HEREWITH.$1,000
2017-09-08Job filed: GENERAL CONSTRUCTION WORK FOR INSTALLATION OF CONCRETE PADS AS PER PLANS FILED HEREWITH.$1,000
2017-09-06FDNY inspection (CONSTR)
2017-09-06Permit EW — ISSUED
2017-09-05Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#220211866, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTE$6,000
2017-09-01FDNY inspection (CONSTR)
2017-08-22Job filed: FILING HEREWITH FOR INTERIOR RENOVATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB#2202$1,000
2017-08-21Permit EW — ISSUED
2017-08-17Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#220211866, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTE$3,000
2017-08-13311: Illegal Parking — Commercial Overnight Parking
2017-08-12311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2017-08-09311: Consumer Complaint — Non-Delivery Goods/Services
2017-08-07Job filed: A2$1,000
2017-08-07Job filed: A2$1,000
2017-08-03Permit AL — ISSUED
2017-08-01311: Plumbing — Sprinkler System - Inadequate
2017-08-01DOB complaint, category ?
2017-07-23FDNY inspection (CONSTR)
2017-07-21311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-07-21DOB complaint, category ?
2017-07-20311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-07-20DOB complaint, category ?
2017-07-17FDNY inspection (CONSTR)
2017-07-12Mortgage $50,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$50,000,000
2017-07-12Agreement — from THE PEOPLE OF THE STATE OF NEW YORK to HARLEM RIVER YARD VENTURES, INC.; FRESH PROPERTY BRONX, LLC; STERLING NATIONAL BANK; BRONX
2017-07-12Agreement — from HARLEM RIVER YARD VENTURES, INC.; BANK OF AMERICA, N.A.; HRY HOLDINGS, LLC; FRESH PROPERTY to STERLING NATIONAL BANK; BRONX FOOD PROCESSING AND DISTRIBUTION C
2017-07-12AL&R $50,000,000 — from FRESH PROPERTY BRONX, LLC to STERLING NATIONAL BANK$50,000,000
2017-07-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-07-11DOB complaint, category ?
2017-07-10Permit PL — ISSUED
2017-06-28Permit EW — ISSUED
2017-06-28Permit EW — ISSUED
2017-06-28Permit AL — ISSUED
2017-06-22FDNY inspection (CONSTR)
2017-06-22Permit EW — ISSUED
2017-06-21Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#220211866, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTE$2,500
2017-06-21Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#220211866, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTE$2,500
2017-06-09FDNY inspection (CONSTR)
2017-06-02Permit AL — ISSUED
2017-06-01Job filed: FILING HEREWITH FOR OCCUPANT PROTECTION PLAN AND ASSOCIATED TEMPORARY SAFETY MEASURES AS PER PLANS. FILED IN CONJUNCTION WITH NB #220211866.$1,000
2017-05-12Permit PL — ISSUED
2017-05-11311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-05-11DOB complaint, category ?
2017-05-09FDNY inspection (CONSTR)
2017-04-26311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-04-26DOB complaint, category ?
2017-04-25Permit EW — ISSUED
2017-04-25Permit EW — ISSUED
2017-04-24Permit EW — ISSUED
2017-04-20311: Consumer Complaint — Non-Delivery Goods/Services
2017-04-17Permit EW — ISSUED
2017-04-17Permit EW — ISSUED
2017-04-12Job filed: INSTALL 1 MW MICRO-TURBINE WITH ASSOCIATED GAS AND HOT WATER PIPING, VALVES, EXPANSION TANK, AND PUMPS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, $3,000
2017-04-03Agreement $85,000,000 — from FRESH PROPERTY BRONX, LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to BRONX FOOD PROCESSING AND DISTRIBUTION$85,000,000
2017-04-03Mortgage $17,500,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION$17,500,000
2017-04-03TL&R — from BRONX FOOD PROCESSING AND DISTRIBUTION
2017-04-03AL&R $85,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION$85,000,000
2017-03-27FDNY inspection (CONSTR)
2017-03-23Job filed: PA
2017-03-17311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-17DOB complaint, category ?
2017-03-16Permit PL — ISSUED
2017-03-09Job filed: INSTALLATION OF HOT WATER BOILER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH $1,000
2017-03-02Mortgage $10,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION C$10,000,000
2017-02-28Job filed: FILING HEREWITH FOR FIRE PROTECTION PLAN AS PER PLANS. FILED IN CONJUNCTION WITH ALT. 1# 220211866.$1,000
2017-02-27Permit EW — ISSUED
2017-02-27Permit EW — ISSUED
2017-02-26FDNY inspection (CONSTR)
2017-02-24Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYST EM ON 2ND FLOOR OFFICES-ACCESSORY TO WAREHOUSE SERVING MAIN COMPUTER RO$1,000
2017-02-24Job filed: INSTALLATION OF SEMI-AUTOMATIC DRY STANDPIPE SYSTEM SERVING THE REGRIGERATED AREAS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2017-02-24Job filed: INSTALLATION OF SEMI-AUTOMATIC DRY STANDPIPE SYSTEM SERVING THE REGRIGERATED AREAS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2017-02-24Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYST EM ON 2ND FLOOR OFFICES-ACCESSORY TO WAREHOUSE SERVING MAIN COMPUTER RO$1,000
2017-02-24Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYST EM ON MEZZANINE ACCESSORY OFFICES-TRANSPORTATION SERVING MAIN COMPUTER $1,000
2017-02-24Job filed: INSTALLATION OF EMERGENCY GENERATOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WI$2,000
2017-01-17FDNY inspection (CONSTR)
2016
2016-12-19FDNY inspection (CONSTR)
2016-11-21FDNY inspection (CONSTR)
2016-11-18FDNY inspection (CONSTR)
2016-11-18Job filed: FILING HEREWITH FOR INSTALLATION OF NEW COGENERATION SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJU$3,000
2016-11-18Job filed: FILING HEREWITH FOR INSTALLATION OF NEW COGENERATION SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJU$3,000
2016-11-07Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to BANK OF AMERICA, N.A.
2016-11-07Mortgage $74,496,249 — from HARLEM RIVER YARD VENTURES, INC; HRY HOLDINGS LLC to BANK OF AMERICA, N.A.$74,496,249
2016-11-07Agreement $100,000,000 — from HRY HOLDINGS LLC; HARLEM RIVER YARD VENTURES, INC to BANK OF AMERICA, N.A.$100,000,000
2016-11-07Agreement — from HARLEM RIVER YARD VENTURES, INC; HRY HOLDINGS LLC; BANK OF AMERICA, N.A. to FEDERAL EXPRESS CORPORATION; ARC FEBNXNY001, LLC; MIDFIRST BANK
2016-11-07Agreement — from BANK OF AMERICA, N.A.; HARLEM RIVER YARD VENTURES, INC; HRY HOLDINGS LLC to FRESH PROPERTY BRONX, LLC; BRONX FOOD PROCESSING & DISTRIBUTION CTR
2016-11-07Agreement — from BANK OF AMERICA, N.A. to 21ST CENTURY FOX AMERICA INC
2016-11-07Agreement — from BANK OF AMERICA, N.A. to USA WASTE SERVICES OF NYC, INC.
2016-10-26Permit EW — ISSUED
2016-10-26Permit EW — ISSUED
2016-10-19FDNY inspection (CONSTR)
2016-10-03DOB complaint, category ?
2016-09-28Mortgage assigned — from SIGNATURE BANK to BRONX FOOD PROCESSING AND DISTRIBUTION
2016-09-26Permit FO — ISSUED
2016-09-26Permit EQ — ISSUED
2016-09-26Permit NB — ISSUED
2016-09-26Permit FO — ISSUED
2016-09-21FDNY inspection (CONSTR)
2016-09-18FDNY inspection (CONSTR)
2016-09-08Permit EW — ISSUED
2016-09-08Permit EW — ISSUED
2016-09-08Permit EW — ISSUED
2016-08-23FDNY inspection (CONSTR)
2016-08-22Job filed: FILING HEREWITH FOR STRUCTURAL MODIFICATIONS RELATED TO RACKING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$1,000
2016-08-22Job filed: FILING HEREWITH FOR STRUCTURAL MODIFICATIONS RELATED TO FRAMING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$1,000
2016-08-22Job filed: FILING HEREWITH FOR STRUCTURAL MODIFICATIONS RELATED TO STRUCTURAL LOAD LAYOUTS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$1,000
2016-08-22Job filed: FILING HEREWITH FOR STRUCTURAL MODIFICATIONS RELATED TO STRUCTURAL LOAD LAYOUTS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$1,000
2016-07-29311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-07-29DOB complaint, category ?
2016-07-26FDNY inspection (CONSTR)
2016-07-26FDNY inspection (SPECIAL-OTH)
2016-07-18311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-07-18DOB complaint, category ?
2016-07-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-07-14DOB complaint, category ?
2016-06-29311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-06-29DOB complaint, category ?
2016-06-27311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-06-27DOB complaint, category ?
2016-06-27Permit EW — ISSUED
2016-06-27Permit EW — ISSUED
2016-06-27Permit EQ — ISSUED
2016-06-24FDNY inspection (CONSTR)
2016-06-24Permit PL — ISSUED
2016-06-23Mortgage $14,500,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; FRESH PROPERTY BRONX, LLC to SIGNATURE BANK$14,500,000
2016-06-23Mortgage $28,000,000 — from FRESH PROPERTY BRONX, LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to SIGNATURE BANK$28,000,000
2016-06-23Mortgage assigned — from SIGNATURE BANK to BRONX FOOD PROCESSING AND DISTRIBUTION
2016-06-23Agreement $42,500,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; FRESH PROPERTY BRONX, LLC to SIGNATURE BANK$42,500,000
2016-06-23MLEA — from HRY HOLDINGS, LLC to FRESH PROPERTY BRONX, LLC
2016-06-23Mortgage $15,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION$15,000,000
2016-06-23AL&R $15,000,000 — from FRESH PROPERTY BRONX, LLC to BRONX FOOD PROCESSING AND DISTRIBUTION$15,000,000
2016-06-06Permit EW — ISSUED
2016-06-06Permit EW — ISSUED
2016-05-27FDNY inspection (CONSTR)
2016-05-02FDNY inspection (CONSTR)
2016-04-26DOB complaint, category ?
2016-04-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-04-14DOB complaint, category ?
2016-04-13Job filed: FILING HEREWITH INSTALLATION OF REFRIGERATION SYSTEM TO SERVICE COLD STORAGE WAREHOUSE AND FOOD PROCESSING FACILITIES AS PER PLANS. NO CHANGE IN USE, $2,000
2016-04-13Job filed: FILING HEREWITH INSTALLATION OF REFRIGERATION SYSTEM TO SERVICE COLD STORAGE WAREHOUSE AND FOOD PROCESSING FACILITIES AS PER PLANS. NO CHANGE IN USE, $2,000
2016-04-13Permit PL — ISSUED
2016-04-03FDNY inspection (CONSTR)
2016-03-11FDNY inspection (CONSTR)
2016-03-06FDNY inspection (CONSTR)
2016-02-26FDNY inspection (CONSTR)
2016-02-22Permit EW — ISSUED
2016-02-22Permit EW — ISSUED
2016-02-21FDNY inspection (CONSTR)
2016-02-17FDNY inspection (CONSTR)
2016-02-10Permit EQ — ISSUED
2016-02-08Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33
2016-02-08Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33
2016-02-02Permit EQ — ISSUED
2016-01-26Permit EQ — ISSUED
2016-01-20Job filed: INSTALLATION OF 196 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTE
2016-01-20Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2016-01-20Job filed: INSTALLATION OF 196 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTE
2016-01-15FDNY inspection (CONSTR)
2016-01-14Job filed: FILING HEREWITH FOR TEMPORARY CHAIN LINK CONSTRUCTION FENCE WITH FABRIC MESH AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO
2016-01-14Job filed: FILING HEREWITH FOR TEMPORARY CHAIN LINK CONSTRUCTION FENCE WITH FABRIC MESH AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO
2016-01-14Job filed: FILING HEREWITH FOR FALL PROTECTION AND NETTING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH
2016-01-14Permit EQ — ISSUED
2016-01-14Permit EQ — ISSUED
2016-01-08311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-01-08DOB complaint, category ?
2016-01-07ECB CLASS - 1 violation: 3307.6.2 AREAS TO BE PROCTED:NO ONE LED PROTECTION IN EGRESS.NOTE:OBSERVED ACTIVE JOBSITE LARGE STEEL CONSTRUCTION SITE.AT EXPOSUR$1,600
2016-01-07ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED ACCEPTED PLANS CONSTRUCTION DOCUMENTS AT JOBSITE AT TIME OF INSP.NO SITE SAFETY PLAN.NOTE:I OBSERVED A
2016-01-07ECB CLASS - 2 violation: JOBSITE NOT CONSTRUCTED PURSUANT TO SUBSECTION.NOTE:OBSERVED CHAIR/LINK CONSTRUCTION FENCE CROSSING LARGE CONSTRUCTION SITE.THE CH
2016-01-07ECB CLASS - 1 violation: FAILURE TO MAINTAIN.GUARDRAILS MISSING/INADEQUATE NOTE:JOB SITE ACTIVE .JOBSITE ERECTED APPROX.45'HIGH.OBSERVED AT ROOF LEVEL WORK$2,400
2016-01-07ECB CLASS - 2 violation: HOUSEKEEPING: MATERIAL AT EDGE OF BLDG.NOTE:OBSERVED ACTIVE STEEL CONSTRUCTION SITE ERECTED APPROX.45-60 FEET HIGH ST MEZZANE LEVE$400
2016-01-07ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTE:OBSERVED ACTIVE LARGE STEEL CONSTRUCTION SI$2,400
2015
2015-12-30Agreement — from CNMC SUB-CDE 82, LLC; RIVER VENTURES, L.L.C.; MID-CITY COMMUNITY SUB-CDE XVII, LLC; UACD S to U.T.F. TRUCKING , INC.; FRESH DIRECT, LLC; FRESH PROPERTY BRONX EQUIPMENT I, LLC; FRESH P
2015-12-30Agreement — from CITI NMTC SUBSIDIARY CDE XX, LLC to U.T.F. TRUCKING, INC.; FRESH DIRECT, LLC; FRESH PROPERTY BRONX EQUIPMENT I, LLC; FRESH PRO
2015-12-21FDNY inspection (CONSTR)
2015-12-04Job filed: INSTALLATION OF NEW SPRINKLER SYSTEM AND STANDPIPE SYSTEM WITH ASSOCIATED PIPING, SUCTION TANK AND BOOSTER PUMP. FILED IN CONJUNCTION WITH NB APPLICA$2,000
2015-11-18FDNY inspection (CONSTR)
2015-10-20FDNY inspection (CONSTR)
2015-10-01Permit NB — RE-ISSUED
2015-10-01Permit EQ — ISSUED
2015-10-01Permit FO — RE-ISSUED
2015-10-01Permit FO — ISSUED
2015-09-29FDNY inspection (CONSTR)
2015-09-25FDNY inspection (CONSTR)
2015-09-25311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2015-09-25DOB complaint, category ?
2015-08-31FDNY inspection (CONSTR)
2015-08-10Permit EW — ISSUED
2015-08-10Permit EQ — ISSUED
2015-08-02FDNY inspection (CONSTR)
2015-07-29Permit NB — ISSUED
2015-07-28Permit EW — ISSUED
2015-07-09FDNY inspection (CONSTR)
2015-06-26Permit PL — ISSUED
2015-06-08FDNY inspection (CONSTR)
2015-05-19311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-05-19DOB complaint, category ?
2015-05-12FDNY inspection (CONSTR)
2015-04-30Permit FO — ISSUED
2015-04-30Permit EQ — ISSUED
2015-04-30Permit EQ — ISSUED
2015-04-30Permit FO — ISSUED
2015-04-19FDNY inspection (CONSTR)
2015-04-10FDNY inspection (CONSTR)
2015-03-31Permit PL — ISSUED
2015-03-30Agreement — from SIGNATURE BANK; FRESH PROPERTY BRONX, LLC; HRY HOLDINGS, LLC; HARLEM RIVER YARD VENTURES, to BRONX FOOD PROCESSING AND
2015-03-30Agreement — from THE PEOPLE OF THE STATE OF NEW YORK; SIGNATURE BANK; HRY HOLDINGS, LLC; HARLEM RIVER YARD to BRONX FOOD PROCESSING AND
2015-03-30Mortgage $42,500,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; FRESH PROPERTY BRONX, LLC to SIGNATURE BANK$42,500,000
2015-03-05Permit PL — ISSUED
2015-02-13Permit EW — ISSUED
2015-01-30FDNY inspection (CONSTR)
2015-01-16FDNY inspection (CONSTR)
2015-01-14311: Consumer Complaint — Non-Delivery Goods/Services
2014
2014-12-19FDNY inspection (CONSTR)
2014-12-09Permit FO — ISSUED
2014-12-09Permit EQ — ISSUED
2014-12-09Permit FO — ISSUED
2014-11-26311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-11-26DOB complaint, category ?
2014-11-26ECB CLASS - 1 violation: FAILURE TO HAVE SITE SAFETY MGR/COORDINATOR PRESENT AS REQUIRED. "FULLSTOP WORK ORDER" ISSUED PURSUANT TO 28-207.2 AND POSTED AT P$1,200
2014-07-01Permit EQ — ISSUED
2014-07-01Permit EW — ISSUED
2014-04-24Job filed: A2$2,000
2014-04-24Job filed: A2$2,000
2014-03-28ZONE — from CYBUL, CYBUL WILHELM ARCHITECTS, LLC
2014-03-28CERT — from COMMONWEALTH LAND TITLE INSURANCE COMPAN
2014-03-12LEAS — from FRESH PROPERTY BRONX, LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2014-03-12MLEA — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to FRESH PROPERTY BRONX, LLC
2014-03-12MLEA — from HARLEM RIVER YARD VENTURES, INC. to HRY HOLDINGS, LLC
2014-03-12MLEA — from HRY HOLDINGS, LLC to FRESH PROPERTY BRONX, LLC
2014-01-09Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE, HEAT AND CO DETECTION, SPRINKLER ALARM WITH CENTRAL OFFICE CONNECTION AND SMOKE PURGE SYSTEM AS PER PLANS $100,000
2014-01-09Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE, HEAT AND CO DETECTION, SPRINKLER ALARM WITH CENTRAL OFFICE CONNECTION AND SMOKE PURGE SYSTEM AS PER PLANS $100,000
2014-01-08Permit EW — ISSUED
2014-01-08Permit EQ — ISSUED
2014-01-07Job filed: GRADING & GRUBBING, SITE PREPARATION AND TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB#220211866$1,000
2014-01-07Job filed: GRADING & GRUBBING, SITE PREPARATION AND TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB#220211866$1,000
2013
2013-12-06Job filed: ON-SITE CAR & TRUCK ASPHALT-PAVED PARKING AREAS WITH CONCRETE CURBING & SIDEWALK, UNDERGROUND UTILITIES FOR STORM, SANITARY, WATER, ELECTRIC $2,000
2013-11-29Job filed: FILING HEREWITH FOR TEMPORARY CONSTRUCTION FENCE AS PER PLANS
2013-11-29Job filed: FILING HEREWITH SUPERSTRUCTURE AS PER PLANS
2013-11-29Job filed: FILING HEREWITH FOR FOUNDATION WORK AS PER PLANS.
2013-11-29Job filed: FILING HEREWITH FOR EXCAVATION/SOE (SUPPORT OF EXCAVATION) DRAWINGS AS PER PLANS
2013-11-29Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS
2013-11-29Job filed: FILING HEREWITH SUPERSTRUCTURE AS PER PLANS
2013-11-29Job filed: FILING HEREWITH FOR TEMPORARY CONSTRUCTION FENCE AS PER PLANS
2013-11-26Job filed: FILING HEREWITH FOR UNDERGROUND PLUMBING AS PER PLANS. FILED IN CONJUNCTION WITH NB#220211866$1,000
2013-11-26Job filed: ON-SITE CAR & TRUCK ASPHALT-PAVED PARKING AREAS WITH CONCRETE CURBING & SIDEWALK, UNDERGROUND UTILITIES FOR STORM, SANITARY, WATER, ELECTRIC $2,000
2013-11-25Job filed: FILING HEREWITH FOR UNDERGROUND PLUMBING AS PER PLANS. FILED IN CONJUNCTION WITH NB#220211866$1,000
2013-11-22Job filed: NB
2013-11-20311: Consumer Complaint — Non-Delivery Goods/Services
2013-08-27SAGE — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; WELLS FARGO BANK, N.A., AS TRUSTEE
2013-08-27EASE $613,000 — from HRY HOLDINGS, LLC; HARLEM RIVER YARD VENTURES, INC. to THE CITY OF NEW YORK$613,000
2013-08-27SMIS — from CONSOLIDATED EDISON COMPANY OF NEW YORK, to THE CITY OF NEW YORK
2013-03-21RPTT $21,092,890 — from AMERICAN REALTY CAPITAL TRUST, INC. to REALTY INCOME CORPORATION$21,092,890
2013-02-13311: Consumer Complaint — Non-Delivery Goods/Services
2013-01-12311: Sanitation Condition — 12 Dead Animals
2012
2012-05-02CORR — from HARLEM RIVER YARDS VENTURES, INC to CONSOLIDATED EDISON COMPANY OF NEW YORK,
2011
2011-08-24Rodent inspection: Passed
2010
2010-11-23Agreement — from NEW YORK STATE DEPARTMENT OF TRANSPORTAT to HARLEM RIVER YARDS VENTURES, INC.; CONSOLIDATED EDISON COMPANY OF NEW YORK,; HRY HOLDINGS,
2010-11-23Agreement — from NEW YORK STATE DEPARTMENT OF TRANSPORTAT to CONSOLIDATED EDISON COMPANY OF NEW YORK,; HRY HOLDINGS, LLC; HARLEM RIVER YARDS VENTURES,
2010-11-23MLEA — from HRY HOLDINGS, LLC; HARLEM RIVER YARDS VENTURES, INC. to CONSOLIDATED EDISON COMPANY OF NEW YORK,
2010-11-17RPTT $850,000 — from HRY HOLDINGS, LLC; HARLEM RIVER YARDS VENTURES, INC. to CONSOLIDATION EDISON COMPANY OF NEW YOR$850,000
2010-11-02311: Sidewalk Condition — Unsafe Worksite
2010-10-04311: Sidewalk Condition — Broken Sidewalk
2010-05-27Rodent inspection: Passed
2010-04-28311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2010-04-28DOB complaint, category ?
2009
2009-11-04Permit PL — ISSUED
2009-10-14ECB CLASS - 1 violation: NEW BUILDING OCCUPIED W/O A VALID TEMPORARY/FINAL C OF O. TEMP C.O. #201126478T007 WAS ISSUED ON 7/8/09 & EXPIRED 8/10/09. REMEDY:$800
2009-09-17Permit PL — ISSUED
2009-09-14Permit SG — ISSUED
2009-09-14Permit SG — ISSUED
2009-06-29DOB complaint, category ?
2009-06-29DOB complaint, category ?
2009-03-13Permit EW — ISSUED
2009-03-13Permit EW — ISSUED
2009-01-20Job filed: FILING FOR THE INSTALLATION OF AN EMERGENCY GENERATOR AND A 750 GALLON SUB-BASE GENERATOR FUEL TANK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN $75,000
2008
2008-09-23Mortgage satisfied — from MDG-NYC, LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to BANK OF THE WEST
2008-09-23Mortgage satisfied — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; MDG-NYC, LLC to BANK OF THE WEST
2008-09-15Permit PL — ISSUED
2008-06-27Permit AL — ISSUED
2008-06-27Permit SG — ISSUED
2008-06-11Permit EW — ISSUED
2008-02-28Permit PL — ISSUED
2008-02-25Permit EW — ISSUED
2008-02-06Permit EW — ISSUED
2008-02-05Job filed: INSTALLATION OF SPRINKLER ON AN EXISTINGSYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$16,000
2008-01-22ECB Non-Hazardous violation: PLUMBING WORK W/O A PERMIT FOUND SPRINKLER SYSTEM INSTALLED W/O PERMITFROM THIS DEPT.REMEDY:OBTAIN A PERMIT & ARRANGE APPT W/THIS $800
2007
2007-12-20Permit EW — ISSUED
2007-12-20Permit EW — ISSUED
2007-12-19Permit EW — ISSUED
2007-11-20Permit EW — ISSUED
2007-11-16Permit PL — ISSUED
2007-10-29Job filed: A2$2,000
2007-10-29Permit EW — ISSUED
2007-09-20Permit EW — ISSUED
2007-09-14Permit PL — ISSUED
2007-09-11Permit NB — ISSUED
2007-07-10Permit EW — ISSUED
2007-05-22Job filed: FILING FOR THE INSTALLATION OF A NEW FIRE ALARM SYSTEM AS SHOWN ON DRAWI NGS FILED HEREWITH.NO CHANG EIN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH$20,000
2007-04-18Mortgage assigned — from BANK OF AMERICA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2007-04-18TL&R — from HARLEM RIVER YARD VENTURES, INC. to FLEET BANK; BANK OF AMERICA, N.A.
2007-04-18TL&R — from HARLEM RIVER YARD VENTURES, INC. to FLEET BANK; BANK OF AMERICA, N.A.
2007-04-18M&CON $30,000,000 — from HARLEM RIVER YARD VENTURES, INC.; HARLEM RIVER YARD VENTURES II, INC.; HRY HOLDINGS LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$30,000,000
2007-04-18Mortgage assigned — from BANK OF AMERICA, N.A.; FLEET NATIONAL BANK to BANK OF AMERICA, N.A.
2007-02-13Agreement — from FEDERAL EXPRESS CORPORATION; MGD-NYC, LLC to BANK OF THE WEST
2007-02-13EASE — from HARLEM RIVER YARD VENTURES, INC. to FEDERAL EXPRESS CORPORATION; THE PEOPLE OF THE STATE OF NEW YORK
2007-02-13MLEA — from HARLEM RIVER YARD VENTURES, INC. to MDG-NYC, LLC
2007-02-13Agreement — from MDG-NYC, LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2007-02-13Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to MDG-NYC, LLC
2007-02-13MLEA — from MDG-NYC, LLC to FEDERAL EXPRESS CORPORATION
2007-02-13Agreement — from FEDERAL EXPRESS CORPORATION to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2007-02-13Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to FEDERAL EXPRESS CORPORATION
2007-02-13EASE — from HARLEM RIVER YARD VENTURES, INC. to FEDERAL EXPRESS CORPORATION
2007-02-13Agreement — from MGD-NYC, LLC; HARLEM RIVER YARD VENTURES, INC.; BANK OF AMERICA, N.A. to BANK OF THE WEST; FEDERAL EXPRESS CORPORATION
2007-02-13Agreement — from MGD-NYC, LLC; HARLEM RIVER YARD VENTURES, INC.; THE PEOPLE OF THE STATE OF NEW YORK-NEW ; to FEDERAL EXPRESS CORPORATION; BANK OF THE WEST
2007-02-13Mortgage $18,084,048 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; MGD-NYC, LLC to BANK OF THE WEST$18,084,048
2007-02-13Mortgage $869,952 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; MGD-NYC, LLC to BANK OF THE WEST$869,952
2007-02-06MLEA — from THE NEW YORK STATE DEPARTMENT OF TRANSPO to HARLEM RIVER YARD VENTURES, INC.
2006
2006-12-27Permit EW — ISSUED
2006-12-27Permit EW — ISSUED
2006-12-06Permit EW — ISSUED
2006-12-06Permit EW — ISSUED
2006-11-09Job filed: Filing for VMX foundation and earthwork only, new building to be filed under a separate application as shown on drawings filed herewith. No change in$110,000
2005
2005-05-13DEED COR — from BOND, RICHARD C; AS TRUSTEES OF PROPERTY OF P,C, TRANSPOR; BLANCHETTE, ROBERT W; MCARTHUR, to CONSOLIDATED RAIL CORPORATION
2001
2001-12-04Mortgage assigned — from FLEET NATIONAL BANK to HARLEM RIVER YARD VENTURES, INC.
2001-12-04Agreement — from FLEET NATIONAL BANK to HARLEM RIVER YARD VENTURES, INC.
2001-07-25SMIS — from HARLEM RIVER YARD VENTURES, INC. to FLEET NATIONAL BANK
2001-07-25SMIS — from HARLEM RIVER YARD VENTURE, INC. to FLEET NATIONAL BANK
2001-05-22SAGE — from HARLEM RIVER YARD VENTURES INC. to PEOPLE OF THE STATEOF NEW YORK
2001-01-30MAPS — from NYS DEPARTMENT OF TRANSPORTATION
2000
2000-01-05EASE — from HARLEM RIVER YARD VENTURES, INC. to NEW YORK TELEPHONE COMPANY
1999
1999-03-04Agreement — from PEOPLE/NYS/DEPARTMENT OF TRANSPORTATION; NYP STATUTORY TRUST-1998; NEWS AMERICA INCORPORAT to CITIBANK, NA
1999-03-04Agreement — from NYP HOLDING, INC; NYP STATUTORY TRUST-1998; FLEET NATIONAL BANK; NEWS AMERICA INCORPORATED to CITIBANK, NA; HARLEM RIVER YARD VENTURES, INC
1999-02-04Mortgage $3,465,347 — from HARLEM RIVER YARD VENTURES, INC. to FLEET NATIONAL BANK$3,465,347
1999-02-04Agreement — from FLEET NATIONAL BANK to GALESI, FRANCESCO; HARLEM RIVER YARD VENTURES, INC
1999-02-04Mortgage assigned — from HARLEM REIVER YARD VENTURES, INC. to FLEET BANK/SUCC OF; FLEET NATIONAL BANK/SUCC
1999-02-04Mortgage assigned — from HARLEM RIVER YARD VENTURES, INC to FLEET NATIONAL BANK
1999-02-04Mortgage $7,474,653 — from HARLEM RIVER YARD VENTURES, INC to FLEET NATIONAL BANK$7,474,653
1997
1997-02-11SAGE — from HARLEM RIVER YARD VENTURES INC.
1996
1996-09-10DECL — from HARLEM RIVER YARD VENTURES, INC.
1996-06-04Agreement — from HARLEM RIVER YARDS INC. to GALESI, FRANCESCO; FLEET BANK
1996-05-28Mortgage $1,530,000 — from HARLEM RIVER YARD VENTURES to FLEET BANK$1,530,000
1996-05-28Agreement — from FLEET BANK to HARLEM RIVER YARDS,INC
1996-05-28Mortgage assigned — from HARLEM RIVER YARD VENTURES, INC to FLEET BANK
1994
1994-09-21Mortgage $1,500,000 — from HARLEM RIVER YARD VENTURES, INC. to FLEET BANK$1,500,000
1994-09-21Mortgage assigned — from HARLEM RIVER YARD VENTURES, INC to FLEET BANK
1994-09-09VAC — from CITY OF NEW YORK to COMMISSIONER OF FINANCE/NEW YORK CITY
1992
1992-12-09Deed — from COMMISSIONER/FINANCE/NYC to CITY OF NEW YORK
1986
1986-01-23MISC — from NYC
1985
1985-01-14CTOR — from CITY OF NEW YORK
1984
1984-08-24Deed — from COMMISSIONER OF FINANCE to CITY OF NEW YORK
1984-04-06MISC — from F.W. WOOLWORTH
1984-04-06MISC — from MORGAN GUARANTY TRUST
1984-04-06MISC — from OWASCO RIVER RAILWAY
1984-04-06MISC — from DELBAY CORPORATION
1984-04-06MISC — from NEW YORK WASTE & ENERGY
1984-04-06MISC — from DEPARTMENT OF STATE
1983
1983-03-24MISC — from NEW YORK STATE DEPT/TRAN
1982
1982-12-29MAPS — from NEW YORK STATE/TRANSPORT
1978
1978-12-19Deed — from BOND RICHARD C TRS; BLANCHETTE ROBERT W TRS; PENN CENTAL TRANSPORTATION COMPANY; MCARTHUR to CONOLIDATED RAIL CORPORATION; CONSOLIDATED RAIL CORPORATION
1978-11-16Deed — from BOND RICHARD C (TRS); BLANCHETT ROBERT W (TRS); BOND RICHARD C TS; PENN CENTRAL TRANSPORTA to OWASCO RIVER RAILWAY; ORVASCO RIVER RAILWAY INC; OWASCO RIVER RAILWAY CO; OWASCO RIVER PAR
1973
1973-09-26LIC — from PENN CENTRAL TRANSPORTATION COMPANY DEBT; BAKER GEORGE P; LANGDON JEVIS JR TRUSTEES; BOND to CITY OF NEW YORK
1969
1969-04-08Deed — from KIRK WILLIAM J TR TRUSTEES OF; NY NEW HAVEN + HARTFORD R.R CO DEBTOR; NEW YORK NEW HAVEN A to PENN CENTRAL COMPANY
1969-04-08Mortgage — from PENN CENTRAL COMPANY to JOSEPH F MCDONALD TRUSTEES; JOSEPH F MACDONALD (TRUSTEES); JOSEPH F MCDONALD (TRUSTEES); J

Support this site Back to the building page