831 East 149 Street · Bronx · BBL 2026740017
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
13 service requests in the last three years. Most common: Consumer Complaint (3) · Illegal Parking (3) · Encampment (2) · Vendor Enforcement (1) · Emergency Response Team (ERT) (1) · Panhandling (1).
Filed construction activity
$11,504 in permitted construction work filed since
2016 (3 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,332,000
$599,400
2026
$1,409,000
$634,050
2027
$1,480,000
$666,000
The city's market estimate has risen
11% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
E 149 St — 6 · 250 ft straight-line (about a 1-minute walk) · station accessibility: full Jackson Av — 2 5 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Prospect Av / E 149 St — Bx17 · 200 ft
Citi Bike
Southern Blvd & E 149 St · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
13 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $745,289 on
2017-09-07 (lender: Jp Morgan Chase Bank NA). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2017-09-07
Agreement $1,500,000 — from 149TH STREET PARTNERS LLC to JP MORGAN CHASE BANK NA
$1,500,000
2017-09-07
Mortgage $745,290 — from 149TH STREET PARTNERS LLC to JP MORGAN CHASE BANK NA
$745,290
2012-09-19
Agreement $953,834 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK; HUDSON VALLEY BANK N.A.
$953,834
2005-04-28
Agreement $1,120,000 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK
$1,120,000
2005-04-28
AL&R $1,120,000 — from HUDSON VALLEY BANK to 149TH STREET PARTNERS LLC
$1,120,000
2005-04-28
Mortgage $557,500 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK
$557,500
2005-01-27
DEEDO $750,000 — from SUSSMAN, LINDA D; LANGER, AS TRUSTEE, DOROTHY; LANGER, AS TRUSTEE, MURRAY to 149TH STREET PARTNERS LLC
$750,000
2005-01-27
Mortgage $562,500 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK
$562,500
1983-11-15
Mortgage $350,000 — from LANGER, DOROTHY; LANGER, MURRY to FIRST WESTERN BANK
$350,000
Ten-year activity
50250
2017
21
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
3
0
4
4
0
11
2018
2
11
7
0
1
21
2019
2
0
2
0
0
4
2020
0
2
7
0
0
9
2021
0
0
2
0
0
2
2022
3
0
4
0
0
7
2023
0
10
1
0
2
13
2024
0
2
3
0
5
10
2025
0
3
8
0
0
11
2026
0
0
2
0
3
5
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-09-16Job filed: REPLACE A NEW FACE OF THE EXISTING CABINET - T-MOBILE STORE- NO CHANGE TO USE, EGRESS OR OCCUPATION$1,504
2022-07-30311: Illegal Dumping — Removal Request
2022-02-23311: Consumer Complaint — Retail Store
2022-01-11Job filed: INSTALLING ADDITIONAL COMMERCIAL COOKING EQUIPMENT IN EXISTING BAKERY. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2021
2021-12-29311: Consumer Complaint — Cell Phone Store
2021-04-23311: NonCompliance with Phased Reopening — Business not in compliance
2020
2020-12-17311: Snow Removal — Not Plowed
2020-12-16311: Food Establishment — Food Spoiled
2020-11-07311: NonCompliance with Phased Reopening — Business not in compliance
2018-12-13Job filed: PROPOSED TEMPORARY SHORING AND LIFT VACATE ORDER DUE TO VEHICLE HITTING BUILDING AND REPAIR EXTERIOR FACADE OF THE BUILDING AS SHOWN ON PLANS. NO CHAN$5,000
2018-12-13Permit EW — ISSUED
2018-11-26311: Borough Office — Construction Enforcement Work Order (DOB)
2018-11-26311: General Construction/Plumbing — Failure To Maintain
2018-11-26DOB complaint, category ?
2018-11-26DOB complaint, category ?
2018-11-23DOB violation C: FTM:BLDG IN SAFE COND 1S+C COMM BLDG LOAD BEARING WALLS ON 11/21/18 EXP2 WALL STRUCK IMPACTED BY VEHICLE 10'X3 FT SECTION OF MAS
2018-11-21311: General Construction/Plumbing — Failure To Maintain
2018-11-21311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2018-11-21DOB complaint, category ?
2018-11-21DOB complaint, category ?
2018-11-21DOB violation C: IMMEDIATELY CONSTRUCT SHORING OF FLOOR/ROOF IN VICINITY OF DAMAGED MASONRY WALL. SHORING TO BE CONSTRUCTED AT 1ST FLOOR AND CEL
2018-11-21DOB violation C: DUE TO VEHICLE STRIKING BUILDING AT EXPOSURE # 2 A VEHICLE STRUCK WALL CAUSING STRUCTURAL DAMAGE TO LOAD BEARING WALL
2016-06-20311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2016-02-19311: Food Establishment — Food Temperature
2016-01-19311: Graffiti — Graffiti
2015
2015-07-08DOB complaint, category ?
2015-06-26Permit EW — ISSUED
2015-06-26Permit EW — ISSUED
2015-06-26Permit PL — ISSUED
2015-06-23Job filed: INTERIOR RENOVATION OF EXISTING BAKERY STORE AND INSTALLATION OF HVAC UNIT ON ROOF. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.$44,500
2015-06-17Job filed: INTERIOR RENOVATION OF EXISTING BAKERY STORE AND INSTALLATION OF HVAC UNIT ON ROOF. NO CHANGE IN USE, OCCUPANCY OR MEAN OF EGRESS$44,500
2015-04-07311: Graffiti — Graffiti
2015-03-15FDNY inspection (RISK)
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2014
2014-09-26311: Graffiti — Graffiti
2014-05-16311: Graffiti — Graffiti
2013
2013-01-16311: Food Establishment — Bare Hands in Contact w/ Food
2013-01-10Permit PL — ISSUED
2013-01-07Permit EW — ISSUED
2013-01-07Permit EW — ISSUED
2013-01-04Job filed: MINOR INTERIOR RENOVATION, INSTALLATION OF PIZZA OVEN,EXHAUST SYSTEM,HVAC AND PLUMBING WORK.$25,500
2013-01-04Job filed: MINOR INTERIOR RENOVATION, INSTALLATION OF PIZZA OVEN,EXHAUST SYSTEM,HVAC AND PLUMBING WORK.$25,500
2012
2012-11-20Rodent inspection: Passed
2012-09-19Agreement $953,834 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK; HUDSON VALLEY BANK N.A.$953,834
2011-08-31Job filed: NEW STOREFRONT IN EXISTING OPENING, NEW SUSPENDED CEILING, NEW SHEETROCK FINISHES, REPLACE HVAC SYSTEM IN EXISTING COMMERCIAL BUILDING. NO CHANGE IN E$62,000
2011-08-05Rodent inspection: Passed
2011-04-06DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-04-06ECB CLASS - 2 violation: FAILURE TO COMPLY W/COMM'S ORDER TO FILE A COFC FOR OPEN ECB NOV#34883712L WITH THE DOB (FAILURE TO FIRESTOP CELLAR CEILING FLR JO$4,000
2011-03-24MLEA — from 149TH STREET PARTNERS to SUBWAY REAL ESTATE LLC
2011-03-24DOB complaint, category ?
2011-02-11311: General Construction/Plumbing — Failure To Maintain
2011-02-11DOB complaint, category ?
2011-01-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-01-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-01-10ECB CLASS - 1 violation: FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. RESPONDENT FAILED TOCORRECT CONDITIONS CITED IN NOV 34883712L AT CELLAR NO FIRES$12,000
2011-01-10ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3;27-345. NOTED: @ CELLAR WOOD FLR JOISTS EXPOSED T$10,000
2010
2010-12-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2010-11-05311: General Construction/Plumbing — Failure To Maintain
2010-11-05DOB complaint, category ?
2010-11-04311: HEATING — HEAT
2010-11-04Tenant complaint: HEATING — HEAT RELATED
2010-10-12ECB CLASS - 2 violation: FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BLDGS. NOTED: RESPONDENT FAILED $800
2010-10-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLAINT MANNER. NO FIRE STOPPING PER BC 712.3;27-345. NOTED: APPROX 140 SF OPEN 1ST FL CEILING,$1,000
2010-10-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLAINT MANNER. NOTED: APPROX 10 WOOD BEAMS,AT THE SOUTH END OF CELLAR,ARE TOO SHORT & NOT SUPP$1,000
2010-09-14Permit PL — ISSUED
2010-08-30311: General Construction/Plumbing — Failure To Maintain
2010-08-30311: Plumbing — Gas Hook-Up/Piping - Illegal Or Defective
2010-08-30DOB complaint, category ?
2010-08-30DOB complaint, category ?
2010-08-30ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTED:@ CELLAR LEVEL OF PREMISES WOODEN JOIST @ CEILING ARE LOOSE,NOT PROPERLY S$1,000
2010-08-30DOB violation P:
2010-08-26Permit EW — ISSUED
2010-08-26Permit EQ — ISSUED
2010-08-26Permit EW — ISSUED
2010-08-25Job filed: INTERIOR CONSTRUCTION AS PER PLANS SUBMITTED HEREWITH. SCOPE INCLUDES INTERIOR PARTITIONS, PLUMBING, HVAC, CONSTRUCTION FENCE. NO CHANGE TO USE EGRE$90,500
2010-05-27311: Graffiti — Graffiti
2010-05-18Rodent inspection: Passed
2010-03-24311: Consumer Complaint — Closed without Notice
2010-03-05311: Consumer Complaint — Closed without Notice
2010-02-03311: Consumer Complaint — Closed without Notice
2010-01-27311: Consumer Complaint — Closed without Notice
2010-01-22Rodent inspection: Passed
2010-01-20311: Consumer Complaint — Closed without Notice
2007
2007-07-24ECB Non-Hazardous violation: B4A-50.FULTON V.T. BOILER,10 HP, NB 73187, GAS,1995.50-IMPROPER ARRANGEMENT OF THE BLOWDOWN VALVES.INSTALL A SCREW TYPE (SLOW) VAL
2006
2006-04-27DOB complaint, category ?
2005
2005-10-13Permit PL — ISSUED
2005-09-09Permit EW — ISSUED
2005-09-09Permit EW — ISSUED
2005-09-09Permit EW — ISSUED
2005-08-03Job filed: APPLICATION IS FILED FOR THE INSTALLATION OF TWO AIR CONDITIONING UNITS AT ROOF AND OBTAINING OF EQUIPMENT USE PERMITS, INSTALLATION OF NEW GAS METER $19,000
2005-08-03Job filed: APPLICATION IS FILED FOR THE INSTALLATION OF TWO AIR CONDITIONING UNITS AT ROOF AND OBTAINING OF EQUIPMENT USE PERMITS, INSTALLATION OF NEW GAS METER $19,000
2005-08-03Job filed: APPLICATION IS FILED FOR THE INSTALLATION OF TWO AIR CONDITIONING UNITS AT ROOF AND OBTAINING OF EQUIPMENT USE PERMITS, INSTALLATION OF NEW GAS METER $19,000
2005-04-28Agreement $1,120,000 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK$1,120,000
2005-04-28AL&R $1,120,000 — from HUDSON VALLEY BANK to 149TH STREET PARTNERS LLC$1,120,000
2005-04-28TL&R — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK
2005-04-28Mortgage $557,500 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK$557,500
2005-04-14Job filed: REPLACE EXIST. FLOORING WITH CONC. FLOOR INSTALL NEW STEEL BEAM ON LALLY COLUMNS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2005-04-14Job filed: REPLACE EXIST. FLOORING WITH CONC. FLOOR INSTALL NEW STEEL BEAM ON LALLY COLUMNS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2005-04-14Job filed: REPLACE EXIST. FLOORING WITH CONC. FLOOR INSTALL NEW STEEL BEAM ON LALLY COLUMNS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2005-04-14Permit EW — ISSUED
2005-01-27AL&R — from HUDSON VALLEY BANK to 149TH STREET PARTNERS LLC
2005-01-27DEEDO $750,000 — from SUSSMAN, LINDA D; LANGER, AS TRUSTEE, DOROTHY; LANGER, AS TRUSTEE, MURRAY to 149TH STREET PARTNERS LLC$750,000
2005-01-27Mortgage $562,500 — from 149TH STREET PARTNERS LLC to HUDSON VALLEY BANK$562,500
2005-01-27Mortgage satisfied — from LANGER, DOROTHY; LANGER, MURRAY to U.S. SMALL BUSINESS ADMINISTRATION
2002
2002-04-30RTXL — from GARFINKEL, ADELE
2002-04-30Deed — from SUSSMAN, LINDA D./EXEC to SUSSMAN, LINDA D.
1998
1998-11-09Permit EW — ISSUED
1998-11-09Permit EW — ISSUED
1996
1996-03-04Deed — from LANGER, DOROTHY; LANGER, MURRAY to LANGER, DOROTHY/ TRUSTEE; LANGER, MURRAY/ TRUSTEE