Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
9 heat or hot-water complaints in the last three years (winter 2023–24: 4 · winter 2024–25: 3 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.
4
’23–24
3
’24–25
2
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
118 service requests in the last three years. Most common: Illegal Parking (59) · Homeless Person Assistance (6) · For Hire Vehicle Complaint (5) · Noise (4) · Dead Animal (4) · HEAT/HOT WATER (3).
Filed construction activity
$20,883,222 in permitted construction work filed since
2016 (82 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$145,186,000
$65,333,700
2026
$147,345,000
$66,305,250
2027
$150,980,000
$67,941,000
The city's market estimate has risen
4% between tax years 2025 and 2027.
Tax exemptions on the roll: HOSPITAL
Building systems
Energy grade (LL33)
A — ENERGY STAR score 87/100 (2022 disclosure cycle)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
174-175 Sts — B D · 550 ft straight-line (about a 3-minute walk) · station accessibility: none Mt Eden Av — 4 · 1,050 ft straight-line (about a 5-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Grand Concourse / Mount Eden Av — Bx1 Bx2 · 200 ft
Citi Bike
Grand Concourse & E Mount Eden Ave · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
118 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $32,911,000 on
2018-01-08 (lender: Dormitory Authority Of The State Of New York), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2018-01-08
Mortgage $32,911,000 — from THE BRONX-LEBANON HOSPITAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
$32,911,000
2010-04-28
RPTT&RET $73,123,490 — from DUANE READE SHAREHOLDERS LLC to WALGREEN CO
$73,123,491
2009-03-11
Mortgage $36,510,000 — from THE BRONX-LEBANON HOSPITAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
$36,510,000
2007-02-05
Mortgage $97,065,000 — from THE BRONX-LEBANON HOSPITAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
$97,065,000
2004-09-13
Agreement $169,695,000 — from THE BRONX - LEBANON HOSPITIAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
$169,695,000
1987-03-26
Mortgage $195,000,000 — from BRONX LEBANON HOSPITL CT to NEW YORK STATE MEDCLETC
$195,000,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
90
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
23
20
12
0
14
69
2018
18
16
19
4
16
73
2019
26
22
15
0
14
77
2020
18
10
23
0
19
70
2021
22
9
10
0
11
52
2022
10
5
25
0
7
47
2023
16
29
33
0
12
90
2024
14
12
27
0
15
68
2025
15
7
28
0
11
61
2026
4
0
56
0
10
70
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Mechanical modifications to accommodate interior renovations proposed under X01084643-I1 at the 14th floor. No change to use, egress or occupancy prop
2026-08-11
Job filed: Limited plumbing work related to interior renovation to upgrade in-patient medical and surgical bed unit. No changes to use, egress or occupancy under
2026-08-11
Job filed: Furnish & install a wet sprinkler system within the 14th floor. No change to use, egress or occupancy proposed under this alteration.
2026-08-11Job filed: Mechanical modifications to accommodate interior renovations proposed under X01084643-I1 at the 14th floor. No change to use, egress or occupancy prop$250,000
2026-08-11Job filed: Limited plumbing work related to interior renovation to upgrade in-patient medical and surgical bed unit. No changes to use, egress or occupancy under$200,400
2026-08-11Job filed: Furnish & install a wet sprinkler system within the 14th floor. No change to use, egress or occupancy proposed under this alteration.$196,500
2025-11-13311: Taxi Complaint — Driver Complaint - Non Passenger
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-10-28311: Vendor Enforcement — Food Vendor
2025-10-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-23311: Illegal Posting — Poster or Sign
2025-10-21311: Dirty Condition — Trash
2025-10-13Boiler inspection
2025-10-10311: Homeless Person Assistance — Non-Chronic
2025-09-23Job filed: Installation of new sprinkler heads in existing 3rd floor operating room$103,500
2025-09-22311: Street Sign - Dangling — Stop
2025-09-19Boiler inspection
2025-09-19311: General Construction/Plumbing — Building Permit - None
2025-09-19DOB complaint, category ?
2025-09-16Job filed: Installation of new sprinkler heads at 2nd floor specialty pharmacy in conjunction with interior renovations. No change to use, egress or occupancy pr$130,000
2025-09-04Permit General Construction — Signed-off
2025-03-05Job filed: Installation of new sprinkler heads at 2nd floor specialty pharmacy in conjunction with interior renovations. No change to use, egress or occupancy pr$130,000
2025-02-25Boiler inspection
2025-02-25Boiler inspection
2025-02-25Boiler inspection
2025-02-25Boiler inspection
2025-02-21Permit General Construction — Signed-off
2025-02-14Job filed: At 2nd Floor, Ductwork to be revised to serve new Specialty Pharmacy and support spaces.$125,000
2025-02-14Job filed: At 2nd Floor, Plumbing to be extended to new sinks. Install new Fixtures$2,000
2025-01-28Job filed: AT 2ND FLOOR, INTERIOR RENOVATION OF EXISTING OFFICE SPACE MODIFY TO PROPOSED SPECIALTY PHARMACY. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$377,200
2025-01-24Permit Mechanical Systems — Signed-off
2025-01-21Restaurant inspection: AU BON PAIN
2025-01-14311: Non-Residential Heat — Inadequate or No Heat
2024-10-23Job filed: Mechanical modifications on the first floor for CT replacement project at Bronx Care Health System to install a new split HVAC system within the equip$180,000
2024-10-21Job filed: Install new pre-action sprinkler system to protect new CT equipment within exam room 1, 2 &3. Install new sprinkler protection on the first floor for $250,000
2024-10-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-08Permit EW — ISSUED
2024-09-30Job filed: 14th FLOOR INTERIOR RENOVATION: RENOVATE THE EXISTING 14th FL INTERIOR SPACE TO UPGRADE IN-PATIENT MEDICAL & SURGICAL BED UNIT, PER APPROVAL OF THE D$3,670,800
2024-09-04Job filed: general construction modifications to first floor CT replacement project Bronx Care Health System. No change in use, egress, or occupancy.$150,000
2024-04-27311: Abandoned Vehicle — With License Plate
2024-04-25Permit Sprinklers — Permit Issued
2024-04-24Permit General Construction — Permit Issued
2024-04-24Permit Structural — Permit Issued
2024-04-01Job filed: "Chiller Equipment" Roof Terrace. New Mechanical Equipment for Ophthalmology Room, New Pump system (total of 2 pumps in system).$40,000
2024-01-02Job filed: update plumbing fixtures on 5, 6, and 14 fl. Including selective demo on 5th floor for creation of visitor lounge. In restrooms demolished and replace$1,700,000
2023
2023-12-27Asbestos abatement: Removal — EHW Abatement Limited Liability Company
2023-12-27Job filed: herewith filing for sprinkler modifications on the 5th, 6th, and 14th floors. No change to use, egress or occupancy.$350,000
2023-12-22311: Street Condition — Plate Condition - Shifted
2023-12-20Job filed: Women's Health L&D Interior Renovation Project, at 5th, 6th, 14th, to update furniture and finishes. Creation of new seated waiting area on 5th floor,$4,845,002
2023-09-10311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-09-07Permit Structural — Permit Issued
2023-09-07Permit General Construction — Permit Issued
2023-09-05Permit EW — ISSUED
2023-08-22Job filed: NEW OPENINGS PITCH POCKET AT "ER" ROOF TO INSTALL STRUCTURAL PLATFORM FOR NEW EQUIPMENT "CHILLER". FOR OPHTAMOLOGY ROOM.$10,000
2023-08-10311: Overgrown Tree/Branches — Dead Branches in Tree
2023-08-03Rodent inspection: Passed
2023-07-10Job filed: Modification existing sprinkler system at 2nd floor cafe to relocate & install new heads. No change to use, egress or occupancy.$35,200
2023-07-10Job filed: Modification to existing sprinkler system to install new sprinkler heads. No change to use, egress or occupancy.$16,000
2023-07-05311: Water System — Hydrant Running (WC3)
2021-10-08ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C AND 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES $1,250
2021-10-01Job filed: Plumbing modifications to existing Sterilization center. No change to use, egress or occupancy.$250,000
2021-09-30Job filed: Limited Sprinkler system upgrade in the HVAC Mechanical Room on the 1st floor and Ophthalmology room on the 2nd floor. No standpipe work required. No $74,400
2021-04-28Job filed: Removal of four (4) existing #2 oil-fired Fulton high pressure steam boilers and replace with two (2) new medium pressure steam boilers and new fuel $350,000
2021-04-28Job filed: Plumbing related work associated with Heating plant upgrade.$50,000
2021-04-15Permit Mechanical Systems — Permit Issued
2021-03-29311: NonCompliance with Phased Reopening — Business not in compliance
2021-03-19Permit EQ — ISSUED
2021-03-11Job filed: erect illuminated accessory business sign on wall reading "Bronx-Lebanon Hospital Center. Not with in 200 feet of an arterial highway or public park
2021-03-02Job filed: Installation of new sprinkler heads in existing 3rd floor operating room$103,500
2020-12-22Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED (SHED COVER COVID-19 TESTING RENTS FROM SNOW) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SH$1,000
2020-12-22Permit Sidewalk Shed — Permit Issued
2020-12-18Boiler inspection
2020-12-18Boiler inspection
2020-12-18Boiler inspection
2020-12-18Boiler inspection
2020-12-15Cooling tower inspection
2020-12-07Permit EW — ISSUED
2020-12-07Permit EW — ISSUED
2020-11-24Rodent inspection: Bait applied
2020-11-23Permit AL — ISSUED
2020-11-22311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-10Job filed: FACADE SITE SAFETY PLAN FILED IN CONJUNCTION WITH APPLICATION # 220516644 .NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$2,000
2020-09-14Permit Mechanical Systems — Permit Issued
2020-09-14Permit EW — ISSUED
2020-09-08311: Maintenance or Facility — Garbage or Litter
2020-09-08311: Maintenance or Facility — Garbage or Litter
2020-09-08Job filed: Installation of eighteen (18) fan coil units on the second floor, one (1) Air handling Unit, AHU-1-1 unit on the first flr, and duct work. No change$261,000
2020-06-03ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABEL AMENDED CYCEL 7C AND 8C REPORT INDICATES CORRECTION OF UNSAFE CONDITIOSN DESCRIBED IN INITIAL FACADES R
2020-05-01311: Non-Emergency Police Matter — Face Covering Violation
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-02-27Permit EW — ISSUED
2020-02-24Rodent inspection: Passed
2020-02-20Elevator permit: Installation of mandated Door Lock Monitor per city code ASME A17.3 (2002). All work to comply with Chapter 30 of the NYC Building$126,174
2020-02-20311: Hazardous Materials — Chemical Odor (HD1)
2020-02-17Elevator permit: Installation of mandated Door Lock Monitor per city code ASME A17.3 (2002). All work to comply with Chapter 30 of the NYC Building$108,149
2020-02-12Permit Mechanical Systems — Permit Issued
2020-02-10Job filed: Removal of two existing cooling towers and subsequent installation of new towers$224,000
2020-02-10Job filed: Installation of new sprinkler heads in the new Cooling Towers at roof level.$26,000
2020-01-23DOB complaint, category ?
2020-01-17DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2020-01-17DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-09-20Job filed: INTERIOR, RENOVATION OF EMERGENCY ROOM @ 2ND FLOOR, INCLUDING PLUMBING FILED UNDER SEPARATED APPLICATION (DOBNOW). NO CHANGE IN OCCUPANCY, USE OR EGRE$325,000
2019-09-20Job filed: INTERIOR, RENOVATION OF EMERGENCY ROOM @ 2ND FLOOR, INCLUDING PLUMBING FILED UNDER SEPARATED APPLICATION (DOBNOW). NO CHANGE IN OCCUPANCY, USE OR EGRE$325,000
2019-06-27Job filed: FILING FOR EMERGENCY WORK PERFORMED UNDER LAA #220378188 TO REPLACE EXISTING FIRE PUMP. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2019-05-07Job filed: PROPOSED INSTALLATION OF TWO (2) SPLIT SYSTEMS - (2) 6 TONS AIR COOLED CONDENSING UNITS - NEW DUCT WORK. NO CHANGES TO USE, OCCUPANCY, OR EGRESS.$90,000
2019-04-27311: Illegal Parking — Parking Permit Improper Use
2019-02-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-02-06Rodent inspection: Passed
2019-01-23311: Homeless Person Assistance
2019-01-11Permit Construction Fence — Signed-off
2019-01-07Job filed: Install 8' high #9 gauge chain link fence with gates behind property line as per plans in connection with LO2 upgrade project. No change in use, egres$1,000
2018
2018-12-31311: Street Sign - Damaged — Other/Unknown
2018-12-28Permit PL — ISSUED
2018-12-26Boiler inspection
2018-12-26Boiler inspection
2018-12-26Boiler inspection
2018-12-20Asbestos abatement: Removal — EHW Abatement Limited Liability Company
2018-12-04Job filed: INSTALLATION OF NEW ELECTRIC VAPORIZER/HEAT EXCHANGER UNIT FOR EVAPORATION OF LIQUID OXYGEN TO GASEOUS OXYGEN AND SUPPLY TO EXISTING MEDICAL GAS SYSTE$17,000
2018-12-04Job filed: INSTALLATION OF NEW ELECTRIC VAPORIZER/HEAT EXCHANGER UNIT FOR EVAPORATION OF LIQUID OXYGEN TO GASEOUS OXYGEN AND SUPPLY TO EXISTING MEDICAL GAS SYSTE$17,000
2018-08-01ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT
2018-07-25Job filed: MODIFICATIONS OF EXISTING FIRE ALARM SYSTEM.$33,500
2018-07-17311: Consumer Complaint — Overcharge
2018-07-03311: Water System — Fire Hydrant Emergency (FHE)
2018-07-02Permit EW — ISSUED
2018-05-28311: Street Sign - Missing — No Parking, Standing, Stopping
2018-05-23Job filed: ADDITIONS/MODIFICATIONS TO EXISTING MODIFIED CLASS 'E' FIRE ALARM SYSTEM (ELECTRICAL SERVICE EQUIPMENT REPLACEMENT).$9,000
2018-05-23Job filed: ADDITIONS/MODIFICATIONS TO EXISTING MODIFIED CLASS 'E' FIRE ALARM SYSTEM (TURNSTILES).$1,800
2018-05-23Job filed: ADDITIONS/MODIFICATIONS TO EXISTING MODIFIED CLASS 'E' FIRE ALARM SYSTEM (TURNSTILES).$1,800
2018-05-04Job filed: INSTALLATION OF (2) TURNSTILES AT MAIN LOBBY ENTRANCES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-03-28311: Street Condition — Pothole
2018-03-27311: Street Condition — Pothole
2018-03-26311: Food Establishment — Handwashing
2018-03-23Job filed: INSTALLATION OF NEW CHILLED WATER/ STEAM AIR HANDLING UNIT INCLUDING SUPPLY AND RETURN AIR DUCT WORK,DIFFUSERS,RETURN AIR GRILLS,CONTROLS. REMOVAL OF $350,000
2017-09-22Job filed: INSTALLATION OF NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY. NETTING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING C
2017-09-13Boiler inspection
2017-09-12Boiler inspection
2017-09-12Job filed: INSTALLATION OF FUEL OIL BELLY TANK IS INTEGRAL PART OF 800 KW EMERGENCY GENERATOR AND INSTALLATION OF FUEL OIL PIPING TO EXISTING FUEL OIL STORAGE TA$10,000
2017-09-12Job filed: INSTALLATION OF FUEL OIL BELLY TANK IS INTEGRAL PART OF 800 KW EMERGENCY GENERATOR AND INSTALLATION OF FUEL OIL PIPING TO EXISTING FUEL OIL STORAGE TA$10,000
2017-08-18ECB CLASS - 2 violation: 2B10,3M7,15M7,39B11,3B11. 2B10-ALARM BELL INSUFFICIENT DID NOT RING; 3M7-DEVICE IS NOT TAG WITH CITY ID# IN THE CAB; 15M7-CERTIFI$500
2017-08-18ECB CLASS - 2 violation: 3M7,15M7,39B11,3B11. 3M7-DEVICE IS NOT GAG WITH CITY ID# IN THE CAB; 15M7-CERTIFICATE MISSING OR LOCATION FOR CERTIFICATE; 29B11-$500
2017-06-14311: Water System — Fire Hydrant Emergency (FHE)
2017-06-05Job filed: FILING APPLICATION FOR THE INSTALLATION MEDICAL GAS ALARM SYSTEM AT BASEMENT LEVEL. (LEBANON HOSPITAL CENTER). NO CHANGE IN USE, EGRESS OR OCCUPANCY.$99,000
2017-05-24311: Street Condition — Pothole
2017-05-20311: Street Condition — Pothole
2017-05-02311: For Hire Vehicle Complaint — Driver Complaint
2017-05-01311: For Hire Vehicle Complaint — Driver Complaint
2017-04-11FDNY inspection (RISK)
2017-03-08311: For Hire Vehicle Complaint — Car Service Company Complaint
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2017-02-21Permit EW — ISSUED
2017-02-21Permit EW — ISSUED
2017-02-13Permit EW — ISSUED
2017-02-08Permit EW — ISSUED
2017-02-08Permit EW — ISSUED
2017-02-02Permit AL — ISSUED
2017-01-26311: Illegal Parking — Blocked Sidewalk
2017-01-24Rodent inspection: Passed
2017-01-18Permit AL — ISSUED
2017-01-18Permit AL — ISSUED
2017-01-13311: Street Light Condition — Street Light Out
2017-01-10Job filed: REMOVAL OF EXISTING PLUMBING FIXTURES AND PROVIDING NEW PLUMBING FIXTURES NO CHANGE IN USE,OCCUPANCY OR EGRESS$20,000
2017-01-10Job filed: REMOVAL OF EXISTING PLUMBING FIXTURES AND PROVIDING NEW PLUMBING FIXTURES NO CHANGE IN USE,OCCUPANCY OR EGRESS$20,000
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016-12-05Tenant complaint: WATER LEAK — SLOW LEAK
2016-11-25Job filed: REMOVAL OF EXISTING DUCT WORK AND INSTALLATION OF NEW SUPPLY AND RETURN DUCT WORK INCLUDING DIFFUSERS, RETURN AIR GRILLS DAMPERS,HEATING COILS AND CO$75,000
2016-11-19311: Homeless Person Assistance — N/A
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-10Permit AL — ISSUED
2016-11-07ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT. $800
2016-11-03Permit EW — ISSUED
2016-10-14Permit EQ — ISSUED
2016-10-14Permit AL — ISSUED
2016-10-13Permit AL — ISSUED
2016-10-09311: Homeless Person Assistance — N/A
2016-09-16Job filed: INSTALLATION OF 800 KW EMERGENCY GENERATOR ON EXTERIOR STRUCTURAL STEEL PLATFORM. AND ASSOCIATE WITH EXISTING FUEL OIL TANK AT CELLAR LEVEL. NO CHAN$260,000
2016-09-16Job filed: A2$75,000
2016-09-14Rodent inspection: Passed
2016-09-07Permit PL — ISSUED
2016-08-12Job filed: INSTALLATION OF PLUMBING FIXTURES AND PIPING. NO CHANGE IN EGRESS,OCCUPANCY OR EXIT.$7,000
2016-08-08Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2016-08-08Job filed: MODIFICATION OF EXISTING ELECTRICAL AND MECHANICAL ROOM. WORK TO BE PARTITIONS, MECHANICAL AND SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE$262,360
2016-08-08Job filed: MODIFICATION OF EXISTING ELECTRICAL AND MECHANICAL ROOM. WORK TO BE PARTITIONS, MECHANICAL AND SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE$262,360
2016-08-08Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2016-05-10311: Water System — Hydrant Defective (WC2)
2016-05-05311: Non-Emergency Police Matter — Other (complaint details)
2016-04-13Permit AL — ISSUED
2016-04-04Job filed: FILING APPLICATION FOR THE INSTALLATION OF OXYGEN PIPING AND MEDICAL GAS ALARM SYSTEM AT BASEMENT LEVEL. (LEBANON HOSPITAL CENTER). NO CHANGE IN USE, $99,000
2016-03-22FDNY inspection (RISK)
2016-02-23Job filed: RENOVATION OF EXISTING CT SCAN SUIT INCLUDING, REMOVAL OF EXISTING PARTITIONS, HUNG CEILING,FLOORING,DOORS TOILET,LAVATORY,SINKS AND PROVIDING NEW PA$300,000
2016-02-23Job filed: INTERIOR RENOVATION INCLUDING REMOVALS,NEW PARTITION WALLS,CEILING,FLOORING, DOORS, MILL WORK, LOCKERS COMPLETE. NO CHANGE IN USE, EXIT OR OCCUPANCY.$250,000
2016-02-19Rodent inspection: Passed
2016-02-12Job filed: FACADE REPAIR$347,650
2016-02-12Job filed: FACADE REPAIR$347,650
2016-02-09Permit EW — ISSUED
2016-02-09Permit EW — ISSUED
2016-02-08311: Consumer Complaint — Receipt Incomplete/Not Given
2016-01-28311: Blocked Driveway — No Access
2015
2015-12-23311: For Hire Vehicle Complaint — Driver Complaint
2015-12-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-10-30Permit EQ — ISSUED
2015-10-29Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF
2015-09-21Job filed: CONVERT EXISTING STORAGE ROOM IN TO MEDICAL GAS CYLINDER STORAGE ROOM. NO CHANGE IN USE, EXIT OR OCCUPANCY.$10,000
2015-09-21Job filed: CONVERT EXISTING STORAGE ROOM IN TO ELECTRICAL EQUIPMENT ROOM AND EXTEND LOADING DOCK ROOF STRUCTURE TO INSTALL NEW 800 KVA GENERATOR. NO CHANGE IN U$30,000
2015-09-21Job filed: CONVERT EXISTING STORAGE ROOM IN TO MEDICAL GAS CYLINDER STORAGE ROOM. NO CHANGE IN USE, EXIT OR OCCUPANCY.$10,000
2015-09-12311: Vending — In Prohibited Area
2015-09-02ECB CLASS - 1 violation: FAILURE TO TAKE AND PROVIDE SAFETY MEASURES SUCH AS SIDEWALK SHED,FENCE, ETC WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FR$12,000
2015-05-21Job filed: ACTIVATE GAS PORTION OF (2) EXISTING GAS/OIL BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$89,475
2015-05-21Permit PL — ISSUED
2015-05-21Permit EW — ISSUED
2015-04-30DOB violation E:
2015-04-30DOB violation E:
2015-04-30DOB violation E:
2015-04-29311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2015-04-28Permit EW — ISSUED
2015-04-24Permit EW — ISSUED
2015-03-20FDNY inspection (RISK)
2015-03-12Job filed: MODIFICATION/ADDITION TO EXISTING MODIFIED CLASS "E" FIRE ALARM SYSTEM FOR NEW CARDIAC-CATHETERIZATION LAB.$12,000
2015-02-24311: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-13311: For Hire Vehicle Complaint — Driver Complaint
2015-01-26311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-05ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &$400
2014
2014-12-09Permit EW — ISSUED
2014-12-09Permit EW — ISSUED
2014-12-04Permit PL — ISSUED
2014-12-03DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-12-01FDNY inspection (SPECIAL-OTH)
2014-11-05311: Water System — Excessive Water In Basement (WEFB)
2014-10-17DOB complaint, category ?
2014-09-09Permit EW — ISSUED
2014-09-04ECB CLASS - 1 violation: ALTERED BLDG IS OCCUPIED W/O A VALID C OF O #200804095 EXPIRED IN 2007. REMEDY: OBTAIN A VALID C OF O.$1,000
2014-08-20Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PREACTION SPRINKLER SYSTEM FOR NEW CARDIAC CATH LAB.$9,000
2014-03-17Job filed: CONVERT (6) EXISTING BURNERS FROM #2 OIL TO #2 OIL/NAT GAS. REPLACEMENT (1) NEW H.P GAS SERVICE, METER AND REDUCING STATION IN OUTSIDE ENCLOSURE. NEW $200,000
2014-02-07311: Street Condition — Defective Hardware
2014-01-21Permit EW — ISSUED
2013
2013-12-31Permit EW — ISSUED
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-12-05Permit PL — ISSUED
2013-11-25Permit EW — ISSUED
2013-11-01Permit EW — ISSUED
2013-10-15311: Animal Abuse — Tortured
2013-10-04Job filed: MODIFY MECHANICAL DUCTWORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$55,000
2013-10-04Job filed: CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY AS SHOWN ON DRAWINGS FILED HEREWITH.$125,000
2013-10-04Job filed: MODIFY MECHANICAL DUCTWORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$55,000
2013-10-04Job filed: MODIFICATION FIRE ALARM SYSTEM TO THE EXISTING SYSTEM. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2013-09-23Permit EW — ISSUED
2013-09-23Permit EW — ISSUED
2013-09-23Permit EW — ISSUED
2013-09-13311: Air Quality — Air: Smoke, Vehicular (AA4)
2013-08-21311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2013-08-21DOB complaint, category ?
2013-08-16Permit EW — ISSUED
2013-08-16Permit PL — ISSUED
2013-08-06Job filed: RENOVATION OF EXISTING 8TH FLOOR TO BIULD NEW CARDIAC CATH LAB INTERIOR FIT-OUT AS SHOWN ON THE PLANS.WORK INCLUDES THE INSTALLATION OF NON_BEARING PA$420,000
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-05-30Permit EW — ISSUED
2013-05-14Job filed: A2$18,000
2013-05-14Job filed: MODIFICATION TO THE EXISTING SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,300
2013-05-14Job filed: A2$18,000
2013-05-14Job filed: MODIFICATION TO THE EXISTING SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,300
2013-05-13Job filed: INSTALLATION OF 55 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2013-05-13Permit EQ — ISSUED
2013-05-03Job filed: RENOVATION AND ALTERATION OF (11) OBSERVATION BEDS. 1ST FLOOR.PARTIAL DEMOLITION,NEW GYPSUM BOARD PARTITIONS,ACOUSTICAL CEILING, FLOORINGS,DOORS.CABIN$525,000
2013-05-03Job filed: RENOVATION AND ALTERATION OF (11) OBSERVATION BEDS. 1ST FLOOR.PARTIAL DEMOLITION,NEW GYPSUM BOARD PARTITIONS,ACOUSTICAL CEILING, FLOORINGS,DOORS.CABIN$525,000
2013-04-30Job filed: SEE COMMENTS$758,000
2013-04-25Job filed: STRUCTURAL WORK FOR MECHANICAL EQUIPMENT ROOM AND CHILLERS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$160,000
2013-03-21DOB violation E:
2013-03-21DOB violation E:
2013-03-21DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-20DOB violation E:
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-01-08311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2013-01-08311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2013-01-08DOB complaint, category ?
2013-01-08DOB complaint, category ?
2013-01-08DOB complaint, category ?
2012
2012-12-04311: Cranes and Derricks — Accident - Cranes/Derricks/Suspension Scaffold
2012-12-04DOB complaint, category ?
2012-12-04ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OPERATION OF A CRANE/DERRICK HOISTING EQUIPMENT IN AN UNSAFE MANNER. THE JOB SITE WAS ON AN INCLINE. TH$24,000
2012-12-04ECB CLASS - 1 violation: SUPERVISION OR USE OF POWER OPERATED HOISTING MACHINE W/O A HOISTING MACHINE OPERATORS LICENSE. THE ONLY ACTION THAT IS ALLOWED IN
2012-12-04ECB CLASS - 1 violation: OPERATING AN ARTICULATING BOOM CRANE W/O A CERTIFICATE OF OPERATION ATTHE TIME OBSERVED.EQUIPMENT WAS BEING USED OUTSIDE OF THE EX
2012-12-04ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. THERE WERE NO FLAGGERS ON THE SITE TO KEEP PERSO$12,000
2012-12-04ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. THERE WERE NO FLAGGERS ON THE SITE TO KEEP PERSO
2012-12-04ECB CLASS - 1 violation: BC3320.3.1 IMPROPERLY MARKED OR NON-IDENTIFIED HOISTING EQUIPMENT,RIG-GING,SHACKLES,WIRE ROPE AND NYLONS THAT ARE NOT TAGGED.A TRA
2012-12-04ECB CLASS - 1 violation: OPERATING AN ARTICULATING BOOM CRANE W/O A C/O AT THE TIME OF OPERATION AT THE TIME OBSERVED. EQUIPMENT WAS BEING USED OUTSIDE OF $5,000
2012-12-04ECB CLASS - 1 violation: SUPERVISION OR USE OF POWER OPERATED HOISTING MACHINE W/O A HOISTING MACHINE OPERATORS LICENSE. THE ONLY ACTION IS ALLOWED IN ORD$8,000
2012-12-04ECB CLASS - 1 violation: SUPERVISION OR USE OF RIGGING EQUIPMENT W/O A RIGGERS LICENSE. IT IS UNLAWFUL TO HOIST OR LOWER ANY ARTICLE ON THE OUTSIDE OF ANY
2012-12-04ECB CLASS - 1 violation: SEC. BC 3320.3.1. IMPROPERLY MARKED OR NON-IDENTIFIED HOISTING EQUIPMENT, RIGGING, SHACKLES, WIRE ROPE SLINGS AND NYLONS THAT ARE $8,000
2012-12-04ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OPERATION OF A CRANE/DERRICK HOISTING EQUIPMENT IN AN UNSAFE MANNER.THE JOBSITE WAS ON AN INCLINE.THERE
2012-12-04ECB CLASS - 1 violation: SUPERVISION OR USE OF RIGGING EQUIPMENT W/O A RIGGERS LICENSE. IT IS UNLAWFUL TO HOIST OR LOWER ANY ARTICLE ON THE OUTSIDE OF ANY$24,000
2012-11-05SMIS — from BRONX LEBANON HOSPITAL CENTER
2012-10-24Permit EW — ISSUED
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-26311: New Tree Request — For One Address
2012-09-07Permit EW — ISSUED
2012-09-07Permit EW — ISSUED
2012-08-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-08-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-08-03Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PREACTION SPRINKLER SYSTEM FOR NUCLEAR CAMERA AREA IN ACCORDANCE WITH FDNY LETTER DATED 08/24/201$10,500
2012-07-11311: Water System — Hydrant Running Full (WA4)
2012-07-03Job filed: PLUMBING WORK IN CONNECTION WITH 11TH FLOOR ENLARGEMENT IN CONJUNCTION WITH ALT I # 201038910. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2012-07-03Job filed: STRUCTURAL WORK IN CONNECTION WITH 11TH FLOOR ENLARGEMENT IN CONJUNCTION WITH ALT I # 201038910. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2012-07-03Job filed: STRUCTURAL WORK IN CONNECTION WITH 11TH FLOOR ENLARGEMENT IN CONJUNCTION WITH ALT I # 201038910. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2012-06-22Permit EW — ISSUED
2012-06-22Permit EW — ISSUED
2012-06-22Permit AL — ISSUED
2012-05-22Job filed: REPLACEMENT OF HVAC UNITS ON 7TH AND 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$183,000
2012-05-22Job filed: REPLACEMENT OF HVAC UNITS ON 7TH AND 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$183,000
2012-05-11ECB CLASS - 1 violation: SEC. 28-116.4.1. 97X10- OPERATING DEVICE W/O C/COMPLIANCE, NO REPORT OF INSPECTION SUBMITTED TO DOB AND NO WITNESSING OF TEST BY $1,600
2012-05-11ECB CLASS - 1 violation: SEC. 28-116.4.1. 97R07- OPERATING DEVICE W/O C/COMPLIANCE NO REPORT OFINSPECTION SUBMITTED TO DOB AND NO WITNESSING OF TEST BY DOB$1,600
2012-05-09311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2012-05-09DOB complaint, category ?
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-03-22Permit EW — ISSUED
2012-03-09Rodent inspection: Passed
2012-02-07Job filed: FACADE REPAIR.$124,155
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-02-03DOB violation E:
2012-01-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011
2011-12-28311: Taxi Complaint — Driver Complaint
2011-12-21Permit EW — ISSUED
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-11-14Job filed: CHANGE GRADE OF OIL FOR NYC BOILER NO.28149-03,&04.$10,000
2011-11-14Job filed: CHANGE GRADE OF OIL FOR NYC BOILER NO.28149-03,&04.$10,000
2011-11-09Permit PL — ISSUED
2011-09-09Permit EW — ISSUED
2011-09-09Permit EW — ISSUED
2011-08-31Permit EW — ISSUED
2011-08-24Permit EW — ISSUED
2011-08-15311: Street Condition — Cave-in
2011-08-12Job filed: INSTALLTION OF PREACTION FIRE ALARM SYSTEM. SPRINKLER WORKTYPE HAS BEEN FILED UNDER SEPARATE APPLICATION NUMBER 220067745.$13,500
2011-08-12Job filed: INSTALLTION OF PREACTION FIRE ALARM SYSTEM. SPRINKLER WORKTYPE HAS BEEN FILED UNDER SEPARATE APPLICATION NUMBER 220067745.$13,500
2011-08-11Permit EW — ISSUED
2011-08-11Permit EW — ISSUED
2011-07-28311: For Hire Vehicle Complaint — Car Service Company Complaint
2011-07-21Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2011-07-21Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2011-06-27Job filed: INSTALLATION OF A NEW UNDERGROUND OIL STORAGE TANK ALONG WITH THE REMOVAL OF THE EXISTING TWO UNDERGROUND OIL STORAGE TANK. NO CHANGE TO USE, EGRESS O$449,787
2011-06-27Job filed: INSTALLATION OF A NEW UNDERGROUND OIL STORAGE TANK ALONG WITH THE REMOVAL OF THE EXISTING TWO UNDERGROUND OIL STORAGE TANK. NO CHANGE TO USE, EGRESS O$449,787
2011-06-27Job filed: INSTALLATION OF A NEW UNDERGROUND OIL STORAGE TANK ALONG WITH THE REMOVAL OF THE EXISTING TWO UNDERGROUND OIL STORAGE TANK. NO CHANGE TO USE, EGRESS O$449,787
2011-05-06311: Sanitation Condition — 12 Dead Animals
2011-03-16Rodent inspection: Failed for Rat Activity
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-03DOB violation E:
2011-03-02DOB violation E:
2011-03-02DOB violation E:
2011-03-02DOB violation E:
2011-02-14Permit EW — ISSUED
2011-02-11Rodent inspection: Failed for Other Reason
2011-01-12DOB complaint, category ?
2010
2010-12-23Job filed: MISCELLANEOUS RENOVATION @ 11TH FLOOR TO INCLUDE LIMITED DEMOLITION, CARPENTRY, PLUMBING, ELECTRICAL AND FINISH WORK. NO CHANGE TO EGRESS, USE OR OCCU$118,000
2010-11-10Permit EW — ISSUED
2010-11-10Permit EW — ISSUED
2010-11-05Job filed: INSTALLATION OF SPLIT H.V.A.C SYSTEM ON THE SECOND FLOOR ROOF AND IN THE BASEMENT OF A HOSIPTAL. NO CHANGE IN USE EXIT OR OCCUPANCY.$93,000
2010-11-05Job filed: INSTALLATION OF SPLIT H.V.A.C SYSTEM ON THE SECOND FLOOR ROOF AND IN THE BASEMENT OF A HOSIPTAL. NO CHANGE IN USE EXIT OR OCCUPANCY.$93,000
2010-08-25Job filed: RENOVATION OF EXISTING SPACE FOR NUCLEAR CAMERA INCLUDES REMOVAL OF EXISTING PARTITIONS, INSTALLATION OF NEW GYPSUM WALL PARTITION WALLS, NEW BATH ROO$105,000
2010-07-19DOB violation E:
2010-07-19DOB violation E:
2010-07-19DOB violation E:
2010-07-06311: Water System — Fire Hydrant Emergency (FHE)
2010-06-30Permit EW — ISSUED
2010-06-15Job filed: UPGRADE TO THE EXISTING FIRE SPRINKLER AND STANDPIPE SYSTEMS AS NOTED ON PLANS STREET CONECTION APPLICATION FILED UNDER SEPARATE DOB APPLICATION NO.20$1,614,438
2010-06-15Job filed: UPGRADE TO THE EXISTING FIRE SPRINKLER AND STANDPIPE SYSTEMS AS NOTED ON PLANS STREET CONECTION APPLICATION FILED UNDER SEPARATE DOB APPLICATION NO.20$1,614,438
2010-04-28RPTT&RET $73,123,490 — from DUANE READE SHAREHOLDERS LLC to WALGREEN CO$73,123,491
2010-03-25311: Vending — In Prohibited Area
2010-02-18Permit PL — ISSUED
2010-02-17Permit EW — ISSUED
2010-01-07Job filed: THIS APPLICATION IS TO BE FILE AN ALTERATION TYPE 3. JOB INCLUDES PARTIAL INTERIOR PARTITIONS REMOVALS AND ERECTING OF PARTITIONS IN NEW LAYOUT, NEW D$60,000
2010-01-07Job filed: THIS APPLICATION IS TO BE FILE AN ALTERATION TYPE 3. JOB INCLUDES PARTIAL INTERIOR PARTITIONS REMOVALS AND ERECTING OF PARTITIONS IN NEW LAYOUT, NEW D$60,000
2009
2009-12-31DOB violation LBLVIO:
2009-12-31DOB violation LBLVIO:
2009-12-11Job filed: THIS APPLICATION IS TO BE FILE AN ALTERATION TYPE 2,DIRECTIVE 14.JOB INCLUDES DEMOLITION AND ERRECTION OF PARTITIONS IN NEW LAYOUT.NEW PLUMBING AND FI$200,000
2009-12-11Job filed: THIS APPLICATION IS TO BE FILE AN ALTERATION TYPE 2,DIRECTIVE 14.JOB INCLUDES DEMOLITION AND ERRECTION OF PARTITIONS IN NEW LAYOUT.NEW PLUMBING AND FI$200,000
2009-11-06Permit PL — ISSUED
2009-11-05Permit PL — ISSUED
2009-11-04Permit EW — ISSUED
2009-10-30Permit EW — ISSUED
2009-10-27Permit EW — ISSUED
2009-10-23Permit PL — ISSUED
2009-10-20Permit EW — ISSUED
2009-10-08Rodent inspection: Passed
2009-09-30Permit AL — ISSUED
2009-08-18Job filed: THIS APPLICATION IS TO BE FILE AN ALTERATION TYPE 3. JOB INCLUDES DEMOLITION AND ERECTING OF PARTITIONS IN NEW LAYOUT, NEW DROP CEILING AND ELECTRICAL$30,000
2009-08-18Job filed: THIS APPLICATION IS TO BE FILE AN ALTERATION TYPE 2 DIRECTIVE 14. JOB INCLUDE DEMOLITION AND ERECTING OF PARTITIONS IN NEW LAYOUT, NEW DROP CEILING, N$70,000
2009-08-10Permit PL — ISSUED
2009-07-24Permit EW — ISSUED
2009-07-23Permit EW — ISSUED
2009-07-23Permit EW — ISSUED
2009-06-23Job filed: INSTALLATION OF A SCAFFOLD 50'LONG BY 36'HIGH ON TOP OF EXISTING SIDEWALK SHED (SHED PERMIT NUMBER 210017514) AS PER PLANS DURING FACADE RESTORATION.S
2009-06-23Permit EQ — ISSUED
2009-06-19Job filed: TO FILE AN ALTERATION TYPE 2, DIRECTIVE 14 JOB, WHICH INCLUDES ERECTING OF PARTITIONS IN NEW LAYOUT. NEW DROP CEILING AND MECHANINCAL DUCTWORK,FIXTURE$300,000
2009-06-19Job filed: TO FILE AN ALTERATION TYPE 2, DIRECTIVE 14 JOB, WHICH INCLUDES ERECTING OF PARTITIONS IN NEW LAYOUT. NEW DROP CEILING AND MECHANINCAL DUCTWORK,FIXTURE$300,000
2009-06-19Job filed: FILING TO RENOVATE EXISITING MEDICATION ROOM AS PER PLANS, PLUMBING AND CONSTRUCTION WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2009-05-28Permit EW — ISSUED
2009-05-13Job filed: INSTALLATION OF NEW TEMPORARY HVAC SYSTEM AND EMERGENCY GENERATOR AS PER PLANS SUBMITTED HEREWITH.$16,500
2009-05-13Job filed: INSTALLATION OF NEW ROOF TOP DUNNAGE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$10,000
2009-05-13Permit PL — ISSUED
2009-04-29Job filed: THIS ALTERATION TYPE 2, DIRECTIVE 14 APPLICATION IS FILED FOR THE RENOVATION OF 1ST AND 2ND FLOOR MEDICAL SUITE. PLUMBING WORK WILL BE DONE. NO CHANGE$120,000
2009-04-29Job filed: THIS ALTERATION TYPE 2, DIRECTIVE 14 APPLICATION IS FILED FOR THE RENOVATION OF 1ST AND 2ND FLOOR MEDICAL SUITE. PLUMBING WORK WILL BE DONE. NO CHANGE$120,000
2009-04-27Permit EW — ISSUED
2009-04-27Permit EW — ISSUED
2009-04-23Job filed: PROPOSED INSTALLATION OF NEW 25-TON HVAC SYSTEM ON EXISTING DUNNAGE BEAMS AT FIRST FLOOR ROOF. INSTALLATION OF DUCTWORK, CHILLED WATER AND LOW PRESSUR$145,000
2009-04-09Permit PL — ISSUED
2009-04-07Permit AL — ISSUED
2009-04-01Job filed: EXTENSION OF FIRE ALARM SYSTEM TO FLOORS 3,4 AND 5 ONLY AS PER ATTACHED PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS.$54,000
2009-04-01Permit EQ — ISSUED
2009-03-18Permit EW — ISSUED
2009-03-18Permit EW — ISSUED
2009-03-17Permit PL — ISSUED
2009-03-11Mortgage $36,510,000 — from THE BRONX-LEBANON HOSPITAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW $36,510,000
2009-03-11Mortgage assigned — from DORMITORY AUTHORITY OF THE STATE OF NEW to TD BANK, N.A.; U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2009-03-11ECB CLASS - 3 violation: 50. FULTON VT BOILER,50HP, NB 53058, OIL,1987.50-BOILER FEED WATER INLET HEADER SECTION IS COPPER SWEAT - PIT CONSTRUCTION.INSTALL
2009-03-11ECB CLASS - 3 violation: 50. FULTON VT BOILER, 50HP, NB53069, OIL 1987.BOILER FEED WATER INLET HEADER SECTION IS COPPER SWEAT - FIT CONSTRUCTION.INSTALL RE
2009-03-11ECB CLASS - 3 violation: 50. FULTON VT BOILER 50HP, NB 53070,OIL 1987.50-BOILER FEED WATER INLET HEADER SECTION IS COPPER SWEAT -FIT CONSTRUCTION.INSTALL R
2009-03-11ECB CLASS - 3 violation: 50. FULTON VT BOILER,50HP,NB 53055,OIL,1987. 50-BOILER FEED WATER INLET HEADER SECTION IS COPPER MATERIAL & SWEAT-FIT CONSTRUCTION
2009-03-06Job filed: FILING FOR RENOVATION IF THE 11TH FLOOR EDIP MEDICAL ROOM.CONSTRUCTION,PLUMBIN G,AND MECHNICAL WORK TO BE DONE.NO CHNAGE IN USE EGRESS OR OCCUPANCY.$150,000
2009-03-06Job filed: FILING TO RENOVATE EXISTING MEDICAL ROOMS AS PER PLANS PLUMBING AND CONSTRUCTI ON WORK TO BE DONE NO CHANGE IN USE EGRESS OR OCCUPANCY.$120,000
2009-03-06Job filed: FILING FOR RENOVATION IF THE 11TH FLOOR EDIP MEDICAL ROOM.CONSTRUCTION,PLUMBIN G,AND MECHNICAL WORK TO BE DONE.NO CHNAGE IN USE EGRESS OR OCCUPANCY.$150,000
2009-02-23Job filed: FILING FOR THE RENOVATION OF 7TH FLR MEDICAL ROOM. CONSTRUCTION, PLUMBING AND MECHANICAL WORK TO BE DONE. NO CHANGE IN USE EGRESS OR OCCUPANCY.$240,000
2009-02-23Job filed: FILING FOR THE RENOVATION OF 7TH FLR MEDICAL ROOM. CONSTRUCTION, PLUMBING AND MECHANICAL WORK TO BE DONE. NO CHANGE IN USE EGRESS OR OCCUPANCY.$240,000
2009-01-27ECB CLASS - 2 violation: ALTERED BLDG OCCUPIED W/O A VALID C OF O. TCO #200804095T003 EXP 2.12.07. REMEDY: OBTAIN A VALID C OF O OR DISCONTINUE ILLEGAL OCC
2009-01-16DOB complaint, category ?
2009-01-01DOB violation LL6291:
2008
2008-12-01ECB CLASS - 2 violation: ALTERED CHANGE BLDG OCCUPIED W/O A VALID C OF O NOTE C/O 200804095T003 EXP 2/12/07 REMEDY: OBTAIN VALID C/O$2,500
2008-11-18DOB complaint, category ?
2008-10-25DOB complaint, category ?
2008-07-23DOB complaint, category ?
2008-07-01Permit EW — ISSUED
2008-06-13Permit EW — ISSUED
2008-05-21Job filed: INSTALLATION OF H.V.A.C UNITS ON THE 7TH FLOOR LOW ROOF AND 9TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY$50,000
2008-05-21Job filed: INSTALLATION OF H.V.A.C UNITS ON THE 7TH FLOOR LOW ROOF AND 9TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY$50,000
2008-05-01Permit EQ — ISSUED
2008-04-18Job filed: APPLICATION BEING FILED TO OBTAIN EQUIPMENT USE PERMITS FOR EXISTING ROOFTOP HVAC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2008-04-18Job filed: APPLICATION BEING FILED TO OBTAIN EQUIPMENT USE PERMITS FOR EXISTING ROOFTOP HVAC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2008-04-01Permit EW — ISSUED
2008-04-01Permit AL — ISSUED
2008-03-24DOB complaint, category ?
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-19DOB violation E:
2008-03-18DOB violation E:
2008-03-18DOB violation E:
2008-03-18DOB violation E:
2008-03-18DOB violation E:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-12-11Permit PL — ISSUED
2007-11-09Permit EW — ISSUED
2007-11-09Permit EW — ISSUED
2007-11-05Permit EQ — ISSUED
2007-10-22Permit PL — ISSUED
2007-10-09Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 90' DURING FACADE REPAIR. NO CHANGES IN USE,EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2007-10-02Job filed: THIS APPLICATION SEEKS APPROVAL FOR THE RENOVATION OF AN EXISTING LABORATORY SPACE LOCATED WITHIN THE BUILDING. THE SCOPE OF WORK INCLUDES RECONFIGURA$29,137
2007-08-29Permit EW — ISSUED
2007-07-11Permit EW — ISSUED
2007-07-09ECB Non-Hazardous violation: 8V1/11I11/15I11/16H10/25D6/31H10/36I10/40T7/44M7/55X13/56M7/58Y11/74M7/84E10/86U6/##10/.16-TOP PIVOTS ON 1,2,5,6.ALSO DOOR CHECKS
2007-06-13Permit EQ — ISSUED
2007-06-04Job filed: Add additional devices to existing fire alarm system at third, fourth, and fifth floors as per attached plans. No change in egress, use or occupancy.$25,000
2007-05-30Permit EQ — ISSUED
2007-05-29Job filed: PROPOSED INSTALLATION OF 10 FEET LONG X 6 FEET WIDE X 8 FEET HIGH PLYWOOD FENCE FOR ROOF REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS
2007-05-24Permit EQ — ISSUED
2007-05-15Job filed: ERECT HEAVY DUTY SIDEWALK SHED FOR A TOTAL OF 135 FT LONG AT 1650 GRAND CONCOURSE. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91. NO CHANG
2007-04-27Permit PL — ISSUED
2007-04-26DOB violation E:
2007-04-20Permit EW — ISSUED
2007-04-10Job filed: INSTALLATION OF TEMPORARY FENCE AND ENCLOSURE FOR MOBILE MRI TRAILER NO CHANGE IN USE,EGRESS, OR OCCUPANCY$20,000
2007-04-10Permit EW — ISSUED
2007-04-10Permit EW — ISSUED
2007-04-10Permit PL — ISSUED
2007-04-03Permit AL — ISSUED
2007-03-02Permit AL — ISSUED
2007-02-12Job filed: Filing for the installation of oxygen storage tanks and tank support frame as shown on drawings filed herewith. No change in use, egress or occupancy$15,000
2007-02-05Mortgage satisfied — from THE BRONX-LEBANON HOSPITAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
2007-02-05Mortgage $97,065,000 — from THE BRONX-LEBANON HOSPITAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW $97,065,000
2006-11-03Job filed: INSTALLATION OF 171' LF OF HEAVY DUTY SIDEWALK SHED FOR MINOR REPAIR OF PARAPET WALL. SHED WILL COMPLY WITH TPPN 9/1999 AND LL 33-91. NO CHANGE IN USE
2006-09-14Permit EW — ISSUED
2006-08-25Job filed: REPAIR EXTERIOR FACADE. NO CHANGE IN OCCUPANCY USE OR EGRESS SIDEWALK SHED FILED UNDER APPLICATION # 200974339$150,000
2006-06-13ECB Hazardous violation: NEWE BLDG OCCUPIED W/O A VALID C OF O NB# 200399121 TCO EXPIRED 5/30/06. REMEDY: OBTAIN A VALID C OF O.
2006-05-23Permit EQ — ISSUED
2006-04-05DOB complaint, category ?
2006-03-10Job filed: Installation of medical gas piping at fourth floor as per attached plans. No change in egress, use or occupancy.$50,000
2006-03-10Job filed: Installation of medical gas piping at fourth floor as per attached plans. No change in egress, use or occupancy.$50,000
2006-03-06Job filed: Modification of exising sprinkler system inclusive of new sprinkler heads at third, fourth & fifth floors as per attached plans, and extension of $105,000
2006-03-06Job filed: Mechanical & Plumbing for third, fourth & fifth floors as per attached plans. No change in egress, use or occupancy.$240,000
2006-03-06Job filed: Structural plans for fourth & fifth floors as per attached plans. No change in egress, use or occupancy.$250,000
2006-03-06Job filed: Structural plans for fourth & fifth floors as per attached plans. No change in egress, use or occupancy.$250,000
2006-03-06Job filed: Enlargement of fourth & fifth floors, inclusive of partition changes to third, fourth & fifth floors as per attached plans.$1,250,000
2006-03-06Job filed: Modification of exising sprinkler system inclusive of new sprinkler heads at third, fourth & fifth floors as per attached plans, and extension of $105,000
2006-02-08DOB violation E:
2006-02-08DOB violation E:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2005
2005-10-01DOB violation LL1081:
2005-06-28Permit PL — ISSUED
2005-06-01Job filed: Install heavy duty sidewalk shed 45 ft long at 1650 Grand Concourse - during remedial repairs. Work shall comply with LL33/91. No change in use
2005-06-01Permit EQ — ISSUED
2005-05-24DOB violation E:
2005-05-02Permit EW — ISSUED
2005-04-19Job filed: 1ST FLOOR ER-HEREWITH FILING FOR THE MODIFICATIONS OF THE EXISTING FIRE ALARM SYSTEM AS INDICATED ON PLANS NO CHANGE IN USE,EGRESS OR OCCUPANCY$20,000
2005-04-07Job filed: 1ST FLOOR ER-HEREWITH FILING FOR INTERIOR PARTITION MODIFICATIONS FOR THE 1ST FLOOR EMERGENCY ROOM WHICH IS BEING DONE IN 2 PHASES AS INDICATED ON PLA$30,000
2005-04-07Job filed: 1ST FL ER - HEREWITH FILING FOR THE MODI FICATION OF THE EXISTING SPRIN ER SYSTEM AS INDICATED ON PLANS. NO CHAN GE IN USE, EGRESS OR OCCUPANCY.$10,000
2005-04-07Job filed: 1ST FL. ER-HEREWITH FILING FOR PLUMBING AND MECHANICAL MODIFICATIONS AS INDICATED ON PLANS NO CHANGE IN USE,EGRESS OR OCCUPANCY$35,000
2005-04-07Job filed: 1ST FL. ER-HEREWITH FILING FOR PLUMBING AND MECHANICAL MODIFICATIONS AS INDICATED ON PLANS NO CHANGE IN USE,EGRESS OR OCCUPANCY$35,000
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2004
2004-10-29Permit PL — ISSUED
2004-10-20DOB violation E:
2004-10-12Permit EW — ISSUED
2004-10-12Permit EW — ISSUED
2004-10-08Permit EQ — ISSUED
2004-10-08Permit EW — ISSUED
2004-10-08Permit EW — ISSUED
2004-10-08Permit EW — ISSUED
2004-09-13Agreement $169,695,000 — from THE BRONX - LEBANON HOSPITIAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW $169,695,000
2004-09-07Job filed: PROPOSE TO DEMOLISH EXISTING INTERIOR P ARTITIONS, CEILINGS AND DOORS. INSTALL NEW STOREFRONT, AND WINDOWS, NEW PARTITIONS, CEILINGS AND SOORS AS SH$300,000
2004-09-07Job filed: SEE ITEMS 16$150,000
2004-09-07Job filed: PROPOSE TO DEMOLISH EXISTING INTERIOR P ARTITIONS, CEILINGS AND DOORS. INSTALL NEW STOREFRONT, AND WINDOWS, NEW PARTITIONS, CEILINGS AND SOORS AS SH$300,000
2004-09-07Job filed: SEE ITEMS 16$150,000
2004-09-07Job filed: PROPOSE TO DEMOLISH EXISTING INTERIOR P ARTITIONS, CEILINGS AND DOORS. INSTALL NEW STOREFRONT, AND WINDOWS, NEW PARTITIONS, CEILINGS AND SOORS AS SH$300,000
2004-09-07Job filed: SEE ITEMS 16$150,000
2004-09-07Permit AL — ISSUED
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-14DOB violation E:
2004-07-13DOB violation E:
2004-07-13DOB violation E:
2004-07-13DOB violation E:
2004-07-13DOB violation E:
2004-07-13DOB violation E:
2004-06-18Job filed: INSTALLAATION OF NEW PARTITION, NEW BATH ROOMS, PLUMBING, MECHANICAL VE TILATION, DUCT WORK, SPRINKLER HEADS FOR NEW PATIENT'S BEDS. NO CHANGE IN U$550,000
2004-03-23ECB Non-Hazardous violation: 48B-44A-50- FULTON 1987 NB53058. 50= REVERSE THE VALVES ON THE BOTTOM BLOWDON LINES SO THAT THE QUICK OPENING VALVE IS CLOSEST TO $180
2004-03-23ECB Non-Hazardous violation: 50A-FULTON 1987 NATL BD 53055.50= REVERSE THE BOTTOM BLOWDOWN VALVES SO THAT THE QUICK CLOSING VALVE IS CLOSEST TO THE BOILER FOLL$180
2004-03-23ECB Non-Hazardous violation: CLEAR BROOK L.P 50/ 50= PIPE DOWN THE SAFETY VALVE DISCHARGE TO A SAFE POINT$180
2004-03-23ECB Non-Hazardous violation: 32A/50A/50B. FULTON 1987 NB 53069. 50A=REVERSE THE VALVES ON THE BOTTOM BLOW DOWN LINE SO THAT THE QUICK CLOSSING VALVE IS CLOSEST$180
2004-03-23ECB Non-Hazardous violation: 32A/1987 FULTON N.B #53070.50= REVERSE THE BOTTOM BLOW DOWN VALVES SO THAT THE QUICK OPENING VALVE IS CLOSEST TO THE BOILER BY THE$180
2004-03-23ECB Non-Hazardous violation: 50/ CLEANER BROOKS L.P BLR.50 PIPE DOWN THE SAFETY VALVE DISCHARGE TO A SAFE POINT$180
2004-02-28DOB complaint, category ?
2004-02-18DOB violation E:
2004-02-18DOB violation E:
2004-02-18DOB violation E:
2004-02-18DOB violation E:
2004-02-18DOB violation E:
2003
2003-12-12Job filed: Installation of pre-action fire alarm system located in cellar and first floor as per attached plans and applications. There is no change in use, oc$30,000
2003-08-21Job filed: APPLICATION BEING FILED TO AMEND CERTIF- ICATE OF OCCUPANCY AND TO U APPLICATION ALT 44/87. NO WORK BEING DO NE UNDER THIS APPLICATION.$10,000
2003-08-12Permit EW — ISSUED
2003-08-12Permit PL — ISSUED
2003-08-11Permit EW — ISSUED
2003-07-22Permit SG — ISSUED
2003-07-22Permit SG — ISSUED
2003-07-22Permit SG — ISSUED
2003-07-02Permit AL — ISSUED
2003-06-20Job filed: REPAIR EXTERIOR FACADE. INSTALLATION OF SIDEWALK SHED. NO CHANGE IN OCCU PANCY USE OR EGRESS.$150,000
2003-06-20Job filed: INSTALLATION OF NEW PARTITIONS,SPRINKLER HEADS,MECHANICAL VENTILATION, DUCTWORK, AND PLUMBING FOR NEW PATIENT'S BEDS AND ON CALL ROOMS NO CHANGE IN US$300,000
2003-06-20Job filed: REPAIR EXTERIOR FACADE. INSTALLATION OF SIDEWALK SHED. NO CHANGE IN OCCU PANCY USE OR EGRESS.$150,000
2003-06-20Job filed: INSTALLATION OF NEW PARTITIONS,SPRINKLER HEADS,MECHANICAL VENTILATION, DUCTWORK, AND PLUMBING FOR NEW PATIENT'S BEDS AND ON CALL ROOMS NO CHANGE IN US$300,000
2003-06-19Job filed: TEMPORARY ENTRANCE RAMP REQUIRED WHILE I NSTALLATION OF NEW CANOPY OVER ERMANANT ENTRANCE. NO CHANGE IN USE OCCU PANCY OR EGRESS UNDER THIS APPLICATIO$5,000
2003-06-19Job filed: TEMPORARY ENTRANCE RAMP REQUIRED WHILE I NSTALLATION OF NEW CANOPY OVER ERMANANT ENTRANCE. NO CHANGE IN USE OCCU PANCY OR EGRESS UNDER THIS APPLICATIO$5,000
2003-05-02Permit EW — ISSUED
2003-04-30Job filed: Installation of Modified Class 'E' Fire Alarm and Voice Communication System. There is no change in use, egress or occupancy.$600,000
2003-04-30Job filed: Installation of Modified Class 'E' Fire Alarm and Voice Communication System. There is no change in use, egress or occupancy.$600,000
2003-04-30Job filed: Installation of Modified Class "E" Fire Alarm and Voice Communication System. There is no change in use, egress or occupancy.$600,000
2003-04-15Job filed: REPLACE EXISTING FUEL OIL PIPING OUTSIDE THE BUILDING WITH NEW DOUBLEWAL FIBERGLASS PIPING. INSTALL NEW FILBOXES WITH SPILL CONTAINMENT. ASSOCIATED $40,000
2003-04-15Job filed: REPLACE EXISTING FUEL OIL PIPING OUTSIDE THE BUILDING WITH NEW DOUBLEWAL FIBERGLASS PIPING. INSTALL NEW FILBOXES WITH SPILL CONTAINMENT. ASSOCIATED $40,000
2003-04-15Job filed: REPLACE EXISTING FUEL OIL PIPING OUTSIDE THE BUILDING WITH NEW DOUBLEWAL FIBERGLASS PIPING. INSTALL NEW FILBOXES WITH SPILL CONTAINMENT. ASSOCIATED $40,000
2003-04-10Permit SG — ISSUED
2003-04-10Permit SG — ISSUED
2003-03-21DOB violation LL1081:
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2003-03-14Permit PL — ISSUED
2003-02-11Permit EW — ISSUED
2003-02-11Permit EW — ISSUED
2002
2002-11-06Permit EW — ISSUED
2002-11-06Permit EW — ISSUED
2002-10-23Permit PL — ISSUED
2002-10-15Permit EW — ISSUED
2002-10-03Permit EW — ISSUED
2002-10-03Permit EW — ISSUED
2002-08-23Job filed: RELOCATION OF ASTHMA CLINIC,INSTALLATION OF NEW PARTITIONS NEW HUNG CEILING, PLUMBING,MECHANICAL VENTILATION AND RELOCATION OF SPRINKLER HEADS.NO CHAN$180,000
2002-08-23Job filed: RELOCATION OF ASTHMA CLINIC,INSTALLATION OF NEW PARTITIONS NEW HUNG CEILING, PLUMBING,MECHANICAL VENTILATION AND RELOCATION OF SPRINKLER HEADS.NO CHAN$180,000
2002-08-08DOB violation L1198:
2002-08-06Permit EW — ISSUED
2002-05-16Permit EW — ISSUED
2002-05-16Permit EW — ISSUED
2002-02-19DOB violation LL1081:
2002-02-19DOB violation E:
2002-02-19DOB violation LL1081:
2001
2001-12-27DOB complaint, category ?
2001-07-03DOB violation E: 2P5492
2001-07-02DOB violation E: 2P5482
2001-06-29Permit EW — ISSUED
2001-06-29Permit EW — ISSUED
2001-05-29Permit PL — ISSUED
2001-05-29Permit PL — ISSUED
2001-05-07Permit EW — ISSUED
2001-04-02Job filed: PROPOSED ALTERATION TO EXTEND EXISTING D IALYSIS UNIT,REMOVED AND ERECT ARTITIONS,RELOCATE EXISTING SINKS.NO CHA NGE IN USE/OCCUPANCY OR EGRESS.$55,000
2001-04-02Job filed: PROPOSED ALTERATION TO EXTEND EXISTING D IALYSIS UNIT,REMOVED AND ERECT ARTITIONS,RELOCATE EXISTING SINKS.NO CHA NGE IN USE/OCCUPANCY OR EGRESS.$55,000
2001-03-08DOB violation E:
2001-03-08DOB violation LL1081:
2001-03-08DOB violation LL1081:
2001-02-01Permit EQ — ISSUED
2001-01-09Permit SG — ISSUED
2001-01-09Permit SG — ISSUED
2000
2000-09-06Job filed: RELOCATION OF EXISTING MEDICAL RECORDS I NSTALLATION OF NEW PARTITIONS,S RINKLER HEADS AND MEDICAL VENTILATION DU CTWORK.NO CHANGE TO EGRESS,USE OR EG$250,000
2000-09-06Job filed: RELOCATION OF EXISTING MEDICAL RECORDS I NSTALLATION OF NEW PARTITIONS,S RINKLER HEADS AND MEDICAL VENTILATION DU CTWORK.NO CHANGE TO EGRESS,USE OR EG$250,000
2000-08-03Job filed: MODIFICATION TO EXISTING FIRE ALARM INCL UDING PRE-ACTION SPRINKLER SYST M.NO CHANGE IN USE,EGRESS OR OCCUPANY.$16,000
2000-08-03Job filed: MODIFICATION TO EXISTING CLASS E FIRE AL ARM SYSTEM.NO CHANGE IN USE,EGR SS OR OCCUPANCY.$16,000
2000-08-03Job filed: MODIFICATION TO EXISTING FIRE ALARM INCL UDING PRE-ACTION SPRINKLER SYST M.NO CHANGE IN USE,EGRESS OR OCCUPANY.$16,000
2000-08-03Job filed: MODIFICATION TO EXISTING CLASS E FIRE AL ARM SYSTEM.NO CHANGE IN USE,EGR SS OR OCCUPANCY.$16,000
2000-07-11Permit EW — RE-ISSUED
2000-07-07Job filed: MODIFY EXISTING SPRINKLER SYSTEM AS PER PLANS$16,000
2000-07-07Job filed: HEREWITH FILING FOR PARTITION WORK AS IN DICATED ON PLANS.$120,000
2000-07-07Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS I NDICATED ON PLANS.$22,000
2000-07-07Job filed: HEREWITH FILING FOR PARTITION WORK AS IN DICATED ON PLANS.$120,000
2000-07-07Job filed: PL AND MECH WORK AS PERPLANS$35,000
2000-07-07Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS I NDICATED ON PLANS.$22,000
2000-07-07Job filed: HEREWITH FILING FOR PARTITION WORK AS IN DICATED ON PLANS.$120,000
2000-07-07Job filed: PL AND MECH WORK AS PERPLANS$35,000
2000-07-07Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS I NDICATED ON PLANS.$22,000
2000-07-07Job filed: MODIFY EXISTING SPRINKLER SYSTEM AS PER PLANS$16,000
2000-06-29Job filed: HEREWITH FILING FOR MEDICAL GASES.NO CHA NGE IN USE,EGRESS OR OCCUPANCY.$20,000
2000-06-29Job filed: HEREWITH FILING FOR MEDICAL GASES.NO CHA NGE IN USE,EGRESS OR OCCUPANCY.$20,000
2000-03-10DOB violation LL1081:
2000-03-10DOB violation E:
2000-03-10DOB violation LL1081:
2000-02-25Job filed: INSTALLATION OF A TEMPORARY FENCE.
2000-02-25Job filed: INSTALLATION OF A TEMPORARY FENCE.
2000-02-25Permit EQ — ISSUED
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
1999
1999-11-23Permit EQ — ISSUED
1999-11-08Permit EW — ISSUED
1999-11-08Permit EW — ISSUED
1999-07-29DOB violation E: 2F183
1999-07-29DOB violation E: 2P5487
1999-07-29DOB violation E: 2P5491
1999-07-29DOB violation E: 2P5482
1999-07-29DOB violation E: 2P5486
1999-07-29DOB violation E: 2P5483
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-01-20DOB violation E:
1999-01-20DOB violation LL1081:
1999-01-20DOB violation LL1081:
1998
1998-08-27Permit EW — ISSUED
1998-07-16Agreement — from BRONX-LEVANON HOSPITAL CENTER to NYS DORMITORY AUTHORITY
1998-05-22Permit PL — ISSUED
1998-05-21ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FOUR REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDICATING CORRECT$400
1998-05-06Permit EW — ISSUED
1998-05-06Permit EW — ISSUED
1998-01-06DOB violation LL1081:
1998-01-06DOB violation LL1081:
1998-01-06DOB violation E:
1997
1997-09-05Permit PL — ISSUED
1997-09-05Permit EW — ISSUED
1997-08-06DOB violation LL10/80:
1997-07-17Permit PL — ISSUED
1997-07-16Permit PL — ISSUED
1997-07-10Permit EW — ISSUED
1997-07-01DOB violation LL1080:
1997-05-27Permit EW — ISSUED
1997-05-27Permit EW — ISSUED
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1996
1996-03-15Permit EQ — ISSUED
1996-03-08DOB violation LL1081:
1996-03-08DOB violation LL1081:
1995
1995-12-22Permit PL — ISSUED
1995-12-14Permit EW — ISSUED
1995-11-30Permit PL — ISSUED
1995-04-19Permit PL — ISSUED
1995-04-17DOB violation LL1081:
1995-04-17DOB violation LL1081:
1995-04-17DOB violation E:
1995-04-10Permit EW — ISSUED
1995-02-10Permit EW — ISSUED
1995-02-10Permit EW — ISSUED
1995-01-30Permit PL — ISSUED
1995-01-30Permit PL — ISSUED
1994
1994-12-12ECB Non-Hazardous violation: 74T. PROVIDE CITY IDENTIFICATION #'S ON ALL ELEVATOR EQUIPMENT.
1994-12-12ECB Non-Hazardous violation: 74T. 74-PROVIDE CITY IDENTIFICATION #'S ON ALL ELEVATOR EQUIPMENT.
1994-12-12ECB Non-Hazardous violation: 74--PROVIDE CITY IDENTIFICATION #'S ON ALL ELEVATOR EQUIPMENT.
1994-12-05ECB Non-Hazardous violation: 73U. 73-PROVIDE CITY INDENTIFICATION#'S ON ELEVATOR AND ALL ELEVATOR EQUIPMENT.
1994-12-05ECB Non-Hazardous violation: 75#,542. 75-PERFORM 5 YEAR TEST, PROPERLY TAG DEVICE AND FILE ELV 3 FORM. 54-REPAIR WATER LEAK ABOVE MAIN LINE DISCONNECT SWIT
1994-12-05ECB Non-Hazardous violation: 75#,50Y,54Z. 75-PERFORM 5 YEAR TEST PROPERLY TAG DEVICE AND FILE ELV 3 FORM. 54-REPAIR WATER LEAK ABOVE MAIN LINE DISCONNECT SWIT
1994-10-18DOB complaint, category ?
1994-08-30Permit PL — ISSUED
1994-07-28Permit EW — ISSUED
1994-07-28Permit EW — ISSUED
1994-07-15Permit EW — ISSUED
1994-07-15Permit EW — ISSUED
1994-05-31DOB violation LL1081:
1994-05-31DOB violation E:
1994-05-31DOB violation LL1081:
1993
1993-06-28DOB violation LL1081: 6
1993-06-28DOB violation LL1081: 6
1993-06-28DOB violation E:
1992
1992-04-07DOB violation E:
1992-04-07DOB violation LL1081: 6
1992-01-24Permit EW — ISSUED
1992-01-06Permit EW — ISSUED
1991
1991-12-17Permit PL — ISSUED
1991-12-17Permit EW — ISSUED
1991-11-18Permit EW — ISSUED
1991-11-18Permit EW — ISSUED
1991-11-18Permit EW — ISSUED
1991-11-18Permit EW — ISSUED
1991-10-07Permit PL — ISSUED
1991-10-04Permit EW — ISSUED
1991-04-25DOB violation LL1081: 6
1991-04-25DOB violation E:
1991-04-25DOB violation LL1081: 6
1990
1990-12-05Permit PL — ISSUED
1990-11-19Permit AL — ISSUED
1990-11-19Permit AL — ISSUED
1990-06-29DOB violation LL1081: 6
1990-06-29DOB violation LL1081: 6
1990-06-29DOB violation E:
1990-05-02STP — from BRONX-LEBANON HOSPITAL
1990-05-02Permit EW — ISSUED
1990-04-23Permit EW — ISSUED
1989
1989-11-09Permit EW — ISSUED
1989-11-09Permit EW — ISSUED
1989-10-12DOB violation LL1081: 6
1989-10-12DOB violation LL1081: 1
1989-06-02Air permit (WORK PERMIT), fuel: NO2FUEL
1989-04-13ECB Hazardous violation: DEPART. OF TRANSPORATION PERMIT FOR SIDEWALK CLOSING NOT POSTED STORING CONSTRUCTION MATERIAL ON THE NORTH SIDE OF 173 ST. AND IN $300
1989-04-10ECB Hazardous violation: DEPT. OF TRANSPORTATION PERMIT FOR SIDEWALK CLOSING NOT SASTED. STORING CONSTRUCTION MATERIAL ON THE NORTHSIDE OF 173 ST. REMEDY$1,000
1989-03-13DOB complaint, category ?
1989-01-25DOB violation E: (51)PROVIDE PROPER TAG ON GOVERNOR (52)REMOVED WATER FROM PIT
1989-01-25DOB violation E: (51)PROVIDE PROPER TAG ON GOVERNOR
1989-01-25DOB violation E: (51)PROVIDE PROPER TAG ON GOVERNOR (52)FILE A BN APP FOR ALL NEWLY INSTALLED ELEVATOR EQUIPMENT
1989-01-25DOB violation E: (51)PROVIDE PROPER TAG ON GOVERNOR
1989-01-25DOB violation E: (51)PROVIDE PROPER TAG ON GOVERNOR (52)REMOVE WATER FROM PIT
1988
1988-08-10ECB Hazardous violation: VERTICAL SAFETY NETTING NOT PROVIDED ON THE NORTH SOUTH AND WESTSIDES OF BLDG AT OPEN WINDOWS ON FLOORS 3 THRU 4. REMEDY; PROVIDE$1,875
1987
1987-03-26Mortgage $195,000,000 — from BRONX LEBANON HOSPITL CT to NEW YORK STATE MEDCLETC$195,000,000
1987-03-03Mortgage satisfied — from LEBANON HOSPITAL ASS/NY to CONNECTICUT MUTUAL LIFE