48 East 183 Street · Bronx · BBL 2031820028
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
47 service requests in the last three years. Most common: Noise (30) · Consumer Complaint (2) · Encampment (2) · LinkNYC (2) · Food Establishment (1) · Graffiti (1).
Filed construction activity
No permitted work with a declared cost filed in the last decade. Permit
costs cover filed construction work only — they do not capture routine maintenance or repairs done
without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$424,000
$190,800
2026
$434,000
$195,300
2027
$436,000
$196,200
The city's market estimate has risen
3% between tax years 2025 and 2027.
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Spoiled) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
183 St — 4 · 350 ft straight-line (about a 2-minute walk) · station accessibility: none 182-183 Sts — B D · 800 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Jerome Av / E 183 St — Bx32 · 350 ft
Citi Bike
Walton Ave & E 183 St · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
47 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $100,000 on
1988-08-12 (lender: 48-58 East 183 St. Corp.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
1988-08-12
Mortgage $100,000 — from LEE, BUM SUP; LEE, JUNG AE to 48-58 EAST 183 ST. CORP.
$100,000
1986-12-30
Mortgage $150,000 — from 48-58 E 183 ST DVLPMT CP to BORGIA, STEFANO; BORGIA, MARIA R.
$150,000
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
2024
2025
29
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
2
2
14
5
23
2018
1
2
3
4
10
2019
0
0
13
4
17
2020
0
0
1
3
4
2021
0
0
2
3
5
2022
0
0
21
4
25
2023
0
0
20
5
25
2024
0
2
14
6
22
2025
0
0
5
8
13
2026
0
0
24
5
29
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2014-09-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-08-04Rodent inspection: Passed
2014-07-02ECB CLASS - 1 violation: 404.0 PIPING&/OR EQUIPMENT INSTALLED IMPROPERLY.IN THE KITCHEN AREA A GAS BURNER FOR POTS IS CONNECTED USING A DOMESTIC GAS FLEX.I$1,600
2014-05-15311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2014-05-15DOB complaint, category ?
2014-05-12ECB CLASS - 2 violation: WORK W/O A PERMIT.@ EXP.1&4 FACING E. 183 ST & FACING WALTON AVE.INSTALLED ILLUMINATED BUSINESS ACCESSORY SIGNAGE.2 SIGNS APPROX.1$830
2014-05-10311: Special Projects Inspection Team (SPIT) — Sign - In Danger Of Falling
2013-01-24Tenant complaint: HEATING — HEAT RELATED
2013-01-24Tenant complaint: HEATING — HEAT RELATED
2012
2012-09-24311: Emergency Response Team (ERT) — M.A.R.C.H. Program (Interagency)
2012-09-24DOB complaint, category ?
2012-09-23ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BUILDING DEPT RECORDS. ALT 2 #210039965 ALLOWS FOR A MAXIMUM OCCUPANCY OF 38 P$6,000
2012-07-16Rodent inspection: Passed
2012-07-16311: Water System — Hydrant Running Full (WA4)
2012-03-09Permit EW — ISSUED
2012-01-02311: Noise Survey — People Created Noise
2011
2011-09-16Permit EW — ISSUED
2011-09-01311: Consumer Complaint — Overcharge
2011-07-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-06-27Permit AL — ISSUED
2011-06-01Rodent inspection: Passed
2011-05-26Job filed: TO INSTALL AND REPAIR FIRST FLOOR WOOD JOISTS, INSTALL STEEL COLUMNS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$14,860
2011-04-14DOB complaint, category ?
2011-04-14ECB CLASS - 1 violation: WORK W/O A PERMIT.NOTED:@ 1ST STORY STORE OCCUPIED AS A PHARMACY "PRAYOSHA PHARMACY", 1ST FLR AND CELLAR CEILING FLR SYSTEM, WOOD $1,600
2011-03-18311: Miscellaneous Categories — FDNY Referral - Pilot
2009-02-18ECB CLASS - 2 violation: 40.48B.18B.38.50A. 40 DRAFT STAT MISSING 38 FRESH REQUIRED DIRECTLY INTO BOILER RM 50A SILONOID VALVE AT BURNER LEAKING FUEL OIL$2,500
2008
2008-04-04Permit EW — ISSUED
2008-03-13Job filed: APPLICATION HEREWITH FILE IS TO OBTAIN APPROVAL FOR AN EATING OR DRINKING ESTABLISHMENT EQUIPMENTS. APPLICATION IS TO SUPERCED APPLICATION # 200259665$24,000
2007
2007-07-18ECB Non-Hazardous violation: B4A/18A/18B/34A/11A/38/50A/50B/.50A-EXPOSED WOODEN CEILING IN THE BOILER ROOM.50B-HOLES ON THE BOILER ROOM CEILING.$180
2004
2004-03-01ECB Non-Hazardous violation: 50A,50B,50C,50D.48AB. FULTON VT BOILER,10 HP,NB 74734,OIL FIRED,1995.50A-FLUE PIPE UNSUPPORTED AND NOT PROPERLY SEALED TO THE CHIM
2001
2001-05-03Permit PL — ISSUED
2001-03-07Permit EW — ISSUED
2001-03-07Permit EW — ISSUED
2001-03-02Job filed: new opening to adjacent restaurant, misc. partitions, suspended ceiling, no stru ctural changes new A/C unit on roof Luxaire 12 1/2 tons MEA# 250-96E $29,500
2001-03-02Job filed: new opening to adjacent restaurant, misc. partitions, suspended ceiling, no stru ctural changes new A/C unit on roof Luxaire 12 1/2 tons MEA# 250-96E $29,500
2000
2000-10-26Deed — from LEE, BUM SUYP; LEE, JUNG AE to 267 KINGSTON REALTYCORP.
2000-02-03Permit EW — ISSUED
2000-02-01Job filed: NEW FIRE-SUPPRESSION SYSTEM FOR KITCHEN ON 1ST FLOOR IN CONJUNCTION WITH APPLICATION #200523665.$1,500
2000-02-01Job filed: NEW FIRE-SUPPRESSION SYSTEM FOR KITCHEN ON 1ST FLOOR IN CONJUNCTION WITH APPLICATION #200523665.$1,500
1999
1999-06-22Permit EW — ISSUED
1999-06-22Permit EW — ISSUED
1999-06-22Permit EW — ISSUED
1999-06-22Permit EW — ISSUED
1999-06-09Permit PL — ISSUED
1999-06-07DOB complaint, category ?
1998
1998-09-18Permit PL — ISSUED
1998-08-20Permit EW — ISSUED
1998-08-20Permit EW — ISSUED
1997
1997-01-30ECB Non-Hazardous violation: FAILURE TO MAINTAIN DEFECT ROTTED AND SOGING FLOOR AT REAR OF STORE, 2 BROKEN AND DEFECTIVE CEILING IN CELLAR THROUGHOUT CELLAR RE$175
1997-01-30ECB Non-Hazardous violation: WORK WITHOUT A PERMIT NOTED CREATING MEZZANIED ABOVE CEILING AT REAR OF STORE USING SPACE FOR SLEEPING QUARTERS CREATING PARTITION$350
1995
1995-05-19Permit PL — ISSUED
1995-05-19Permit EW — ISSUED
1995-02-14Mortgage satisfied — from 45-58 EAST 183 ST. DEVELOPMENT CORP. to BORGIA, STEFANO; BORGIA, MARIA
1995-01-26Mortgage satisfied — from LEE, BUM SUP; LEE, JUNG AE to 45-58 EAST 183 STREET CORP.
1993
1993-09-30Permit PL — ISSUED
1993-09-17Permit EW — ISSUED
1993-09-13Permit EW — ISSUED
1993-07-08ECB Non-Hazardous violation: DESIGN PRESSURE OF THE BOILER IS 100PSI EXISTING SAFTY VALVE IS SELF FOR 125PSI LATER SHALL BE REPLACED BY NEW ONE SEL MAXIMUM UP $250
1992
1992-05-01DOB complaint, category ?
1992-05-01DOB complaint, category ?
1990
1990-12-21Mortgage assigned — from 48-58 EAST 183 ST CORP to MALEKAN, CARMEN; MALEKAN, MOJDEH; SINGER, BARUCH
1990-12-10DOB violation C:
1990-12-10DOB violation C:
1990-12-10DOB violation C:
1990-12-10DOB violation C:
1990-11-28DOB complaint, category ?
1990-11-27DOB complaint, category ?
1990-09-24DOB violation C:
1990-03-12ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. REMEDY: FILE PLANS AND OBTAIN PERMIT FOR WORK DONE.$1,000
1990-03-01DOB complaint, category ?
1988
1988-08-12Mortgage $100,000 — from LEE, BUM SUP; LEE, JUNG AE to 48-58 EAST 183 ST. CORP.$100,000
1988-08-12Deed — from 48-58 EAST 183RD STETC. to LEE, JUNG AE; LEE, BUM SUP
1988-08-12CERT — from BORGIA, STEFANO; BORGIA, MARIA R.
1986
1986-12-30Mortgage $150,000 — from 48-58 E 183 ST DVLPMT CP to BORGIA, STEFANO; BORGIA, MARIA R.$150,000
1986-12-30Deed — from EAST 183RD ST. HLDNGCP to 48-58 E. 183 ST. DEV. CP
1980
1980-09-08RTXL — from BROCK ENTERPRISES INC
1979
1979-06-13Deed — from BROCK ENTERPRISES INC to EAST 183RD STREET HOLDING CORP
1970
1970-12-23Deed — from 1860 3RD AVE CORP to CIRCLE CIRCUIT INC