Patterns
1 heat or hot-water complaints in the last three years (winter 2025–26: 1).
No bedbug-infested units reported in the last three years of filings.
$20,625 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
41 service requests in the last three years. Most common: Noise (8) · PLUMBING (6) · Sewer (5) · Street Condition (3) · Graffiti (2) · Illegal Parking (2).
Filed construction activity
$190,219,902 in permitted construction work filed since
2016 (419 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Registered with HPD — the names behind the building
Registered owner(s)
FORDHAM UNIVERSITY
Head officer
MARCO VALERA
Managing agent
FORDHAM UNIVERSITY
Last registered
2014-09-23
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$561,368,000
$252,615,600
2026
$569,716,000
$256,372,200
2027
$583,771,000
$262,696,950
The city's market estimate has risen
4% between tax years 2025 and 2027.
Tax exemptions on the roll: COLLEGE-UNIVERSITY
Building systems
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Protection), shared by 9 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2026 (2 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Kingsbridge Rd — B D · 0.5 mi straight-line (about a 14-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Eastfordham Rd / Bathgate Av — Bx9 Bx12 Bx22 · 900 ft
Citi Bike
E 191 St & Bathgate Ave · 650 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
41 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $50,000 on
2004-01-15 (lender: Quicken Loans INC.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-05-20
EASE $50,000 — from FORDHAM UNIVERSITY to BLUE SKY TOWERS, LLC
$50,000
2012-07-31
Deed $30,000,000 — from THE JESUITS OF FORDHAM, INC. to FORDHAM UNIVERSITY
$30,000,000
2004-01-15
Mortgage $50,000 — from SEMPER, CHARLES; SEMPER, RUTHLIN to QUICKEN LOANS INC.
$50,000
1998-10-20
Mortgage $79,105,000 — from FORDHAM UNIVERSITY to DORMITORY AUTHORITYOF STATE OF NEW YORK
$79,105,000
1994-04-07
Mortgage $74,905 — from FORDHAM UNIVERSITY to NYS DORMITORY AUTHORITY
$74,905
1992-02-06
Mortgage $3,500,000 — from FORDHAM UNIVERSITY to UNITED STATES/DEPT/EDUCA
$3,500,000
1990-04-11
Mortgage $12,240 — from FORDHAM UNIVERSITY to DORMITORY AUTHORITY/NYS
$12,240
1986-09-05
Mortgage $18,690,000 — from FORDHAM UNIVERSITY to DORMITORY AUTHORITY/NYS
$18,690,000
Ten-year activity
5002500
2017
2018
2019
293
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
52
43
5
0
60
160
2018
53
43
6
0
51
153
2019
81
53
13
2
74
223
2020
161
42
34
2
54
293
2021
138
29
14
0
27
208
2022
125
19
14
0
68
226
2023
134
47
9
0
47
237
2024
142
42
7
0
66
257
2025
66
51
11
3
63
194
2026
51
18
32
1
31
133
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS
2026-09-23
Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS
2026-09-18
Job filed: Events in Edwards Parade Lawn at Fordham University, Rose Hill Campus.
2026-09-17
Permit Boiler Equipment — Permit Issued
2026-09-15
Restaurant inspection: FORDHAM U - SALT & SESAME AT FACULTY MEMORIAL HALL — grade A
2026-09-14
Restaurant inspection: URBAN KITCHEN — grade A
2026-09-01
EASE — from ROSE HILL APARTMENTS, L.P. to FORDHAM UNIVERSITY; FORDHAM PREPATORY SCHOOL
2026-08-27
Permit Plumbing — Permit Issued
2026-08-24
311: UNSANITARY CONDITION — PESTS
2026-08-24
Tenant complaint: UNSANITARY CONDITION — PESTS
2026-08-23
311: PLUMBING — RADIATOR
2026-08-23
311: PLUMBING — RADIATOR
2026-08-23
311: FLOORING/STAIRS — FLOOR
2026-08-23
311: PLUMBING — RADIATOR
2026-08-23
311: PLUMBING — RADIATOR
2026-08-23
311: PLUMBING — RADIATOR
2026-08-23
311: PLUMBING — RADIATOR
2026-08-23
311: UNSANITARY CONDITION — PESTS
2026-08-23
311: PAINT/PLASTER — RADIATOR
2026-08-23
Tenant complaint: PAINT/PLASTER — RADIATOR
2026-08-23
Tenant complaint: PLUMBING — RADIATOR
2026-08-23
Tenant complaint: PLUMBING — RADIATOR
2026-08-23
Tenant complaint: PLUMBING — RADIATOR
2026-08-23
Tenant complaint: PLUMBING — RADIATOR
2026-08-23
Tenant complaint: PLUMBING — RADIATOR
2026-08-23
Tenant complaint: PLUMBING — RADIATOR
2026-08-23
Tenant complaint: FLOORING/STAIRS — FLOOR
2026-08-23
Tenant complaint: UNSANITARY CONDITION — PESTS
2026-08-18
Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS
2026-08-07
Permit General Construction — Permit Issued
2026-08-07
Permit Mechanical Systems — Permit Issued
2026-08-06
311: Noise — Air Conditioner/Ventilation
2026-08-06
Permit General Construction — Permit Issued
2026-08-02
311: Bike/Roller/Skate — N/A
2026-07-30
Job filed: Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed here
2026-07-30
Job filed: Architectural scope associated with Keating Hall Veterans Center Renovation as shown on plans filed herewith. No change of use, egress and occupancy.
2026-07-30
Job filed: Plumbing work associated with Keating Hall Veterans Center renovation, as shown on plans filed herewith. No change of use, egress and occupancy.
2026-07-15
Restaurant inspection: GRAB & GO — grade A
2026-07-15
Restaurant inspection: MARKETPLACE AT MCGINLEY CENTER FORDHAM UNIVERSITY — grade A
2026-07-11
311: Noise — Manufacturing Business/Plant
2026-07-11
311: Noise - Street/Sidewalk — Loud Talking
2026-07-10
Job filed: INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE PROGRAM.
2026-06-29
Permit Structural — Permit Issued
2026-06-27
311: Noise - Street/Sidewalk — Loud Talking
2026-06-26
Air permit (REGISTRATION), fuel: NO2FUEL
2026-06-25
Permit General Construction — Permit Issued
2026-06-23
FDNY inspection (ANNUL-COL-UNI)
2026-06-23
FDNY inspection (RISK)
2026-06-23
FDNY inspection (RISK)
2026-06-23
FDNY inspection (THEATER)
2026-06-23
FDNY inspection (ANNUL-COL-UNI)
2026-06-22
Boiler inspection
2026-06-17
Boiler inspection
2026-06-15
Boiler inspection
2026-06-15
FDNY inspection (RISK)
2026-06-15
FDNY inspection (ANNUL-COL-UNI)
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-10
Boiler inspection
2026-06-05
Permit Suspended Scaffold — Signed-off
2026-06-03
Permit Boiler Equipment — Permit Issued
2026-06-03
Permit Boiler Equipment — Permit Issued
2026-06-03
Job filed: Mechanical work associated with the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, e
2026-06-02
FDNY inspection (RISK)
2026-06-02
FDNY inspection (ANNUL-COL-UNI)
2026-06-02
FDNY inspection (ANNUL-COL-UNI)
2026-06-02
FDNY inspection (RISK)
showing the 80 most recent
The full timeline
showing the 2,000 most recent of
4,202 events
2026
2026-10-06Permit General Construction — Permit Issued
2026-10-06Permit Mechanical Systems — Permit Issued
2026-10-06Permit General Construction — Permit Issued
2026-10-02Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS $190,000
2026-09-23Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS $190,000
2026-09-18Job filed: Events in Edwards Parade Lawn at Fordham University, Rose Hill Campus.
2026-09-17Permit Boiler Equipment — Permit Issued
2026-09-15Restaurant inspection: FORDHAM U - SALT & SESAME AT FACULTY MEMORIAL HALL — grade A
2026-09-14Restaurant inspection: URBAN KITCHEN — grade A
2026-09-01EASE — from ROSE HILL APARTMENTS, L.P. to FORDHAM UNIVERSITY; FORDHAM PREPATORY SCHOOL
2026-08-18Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS $190,000
2026-08-07Permit General Construction — Permit Issued
2026-08-07Permit Mechanical Systems — Permit Issued
2026-08-06311: Noise — Air Conditioner/Ventilation
2026-08-06Permit General Construction — Permit Issued
2026-08-02311: Bike/Roller/Skate — N/A
2026-07-30Job filed: Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed here$25,000
2026-07-30Job filed: Architectural scope associated with Keating Hall Veterans Center Renovation as shown on plans filed herewith. No change of use, egress and occupancy.$29,132
2026-07-30Job filed: Plumbing work associated with Keating Hall Veterans Center renovation, as shown on plans filed herewith. No change of use, egress and occupancy.$22,850
2026-07-15Restaurant inspection: GRAB & GO — grade A
2026-07-15Restaurant inspection: MARKETPLACE AT MCGINLEY CENTER FORDHAM UNIVERSITY — grade A
2026-07-10Job filed: INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE PROGRAM.$700,000
2026-06-25Permit General Construction — Permit Issued
2026-06-23FDNY inspection (ANNUL-COL-UNI)
2026-06-23FDNY inspection (RISK)
2026-06-23FDNY inspection (RISK)
2026-06-23FDNY inspection (THEATER)
2026-06-23FDNY inspection (ANNUL-COL-UNI)
2026-06-22Boiler inspection
2026-06-17Boiler inspection
2026-06-15Boiler inspection
2026-06-15FDNY inspection (RISK)
2026-06-15FDNY inspection (ANNUL-COL-UNI)
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-10Boiler inspection
2026-06-05Permit Suspended Scaffold — Signed-off
2026-06-03Permit Boiler Equipment — Permit Issued
2026-06-03Permit Boiler Equipment — Permit Issued
2026-06-03Job filed: Mechanical work associated with the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, e$504,000
2026-06-02FDNY inspection (RISK)
2026-06-02FDNY inspection (ANNUL-COL-UNI)
2026-06-02FDNY inspection (ANNUL-COL-UNI)
2026-06-02FDNY inspection (RISK)
2026-05-26Job filed: Fordham University's Jubilee Weekend events in the tents on the lawn.
2026-05-22Job filed: Facade Inspection
2026-05-21Job filed: mechanical work associated with legal council offices renovation as shown on the drawings filed herewith, no change to use, egress or occupancy$800,000
2026-05-20Elevator permit: Hydraulic Cylinder Replacement and Replacement of Underground Oil Line. All work to comply with Safety Code for Elevators and Esca$100,000
2026-05-11Permit General Construction — Permit Issued
2026-05-11Job filed: Event in the lawns of Fordham University Campus.
2026-04-21Permit Mechanical Systems — Permit Issued
2026-04-20Permit Mechanical Systems — Permit Issued
2026-04-20Permit Earth Work — Permit Issued
2026-04-20Permit Structural — Permit Issued
2026-04-17Job filed: Structural work associated with the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, e$20,000
2026-04-17Job filed: the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, egress or occupancy.$1,010,000
2026-03-25Restaurant inspection: DAGGER JOHNS AT MCGINLEY FORDHAM UNIVERSITY — grade A
2026-03-25Job filed: earthwork associated with the civil work as shown on plans filed herewith. No change to use, egress, or occupancy.$250,000
2026-03-22311: Street Condition — Cave-in
2026-03-17311: School Maintenance — Heating Problem
2026-03-17Job filed: INSTALLATION OF 3 NEW CONDENSING BOILERS AT WALSH HALL AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$425,000
2026-03-16311: Sewer — Street Flooding (SJ)
2026-03-12Permit Structural — Permit Issued
2026-03-10FDNY inspection (ANNUL-COL-UNI)
2026-03-10FDNY inspection (RISK)
2026-03-10FDNY inspection (RISK)
2026-03-03FDNY inspection (ANNUL-COL-UNI)
2026-03-03FDNY inspection (RISK)
2026-03-03FDNY inspection (ANNUL-COL-UNI)
2026-03-03FDNY inspection (RISK)
2026-02-25311: Sewer — Street Flooding (SJ)
2026-02-20Permit Mechanical Systems — Permit Issued
2026-02-20Job filed: Civil work that includes flood mitigation for the existing parking, as shown on the drainage and stormwater plans. No change of use, egress or occupan$615,405
2026-02-19Permit Mechanical Systems — Permit Issued
2026-02-19Permit Plumbing — Permit Issued
2026-02-19Permit Plumbing — Permit Issued
2026-02-13Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$40,000
2026-02-13Job filed: INSTALLING NEW MECHANICAL EQUIPMENT, INCLUDING BUT NOT LIMITED TO CONTROL VALVES AND A HOT WATER SYSTEM BTU METER AT JOHN MULCAHY HALL. NO CHANGEOF US$249,000
2026-02-10Permit Plumbing — Permit Issued
2026-02-10Job filed: INSTALLATION OF NEW DOMESTIC HOT WATER HEATER INCLUDING NEW DOMESTICWATER PIPING AND INSTALLATION OF NEW NATURAL GAS PIPING. NO CHANGE OF USE, EGRESS $190,000
2026-02-10Job filed: INSTALLING NEW MECHANICAL EQUIPMENT, INCLUDING BUT NOT LIMITED TO PUMPS, HEAT EXCHANGERS, CONTROL VALVES, EXPANSION TANK, AND HOT WATER SYSTEM BTU MET$1,825,400
2026-02-09Restaurant inspection: STARBUCKS (Fordham University) — grade A
2026-02-06Job filed: Civil work that includes flood mitigation for the existing parking, as shown on the drainage and stormwater plans. No change of use, egress or occupan$615,405
2026-02-06Job filed: Structural work associated with the new wall opening, as shown on plans filed hereinafter. No change to use, egress, or occupancy.$13,000
2026-01-14Job filed: Plumbing work associated with new Hot Water heater installation and associated piping for the Boiler at the O'Hare Hall. No change of use, egress, or $250,000
2026-01-06Job filed: Mechanical scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall. No change of use, egress, or occupancy.$250,000
2025-10-23Job filed: Mechanical scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall. No change of use, egress, or occupancy.$250,000
2025-10-22Rodent inspection: Passed
2025-10-17Job filed: Structural scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall. No change of use, egress or occupancy.$50,000
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-15Asbestos abatement: Removal — Kiss Construction Inc.
2025-10-14FDNY inspection (THEATER)
2025-10-14FDNY inspection (RISK)
2025-10-14FDNY inspection (ANNUL-COL-UNI)
2025-10-14FDNY inspection (ANNUL-COL-UNI)
2025-10-14FDNY inspection (RISK)
2025-10-14Job filed: Events for Fordham University inside the Campus. Homecoming and Presidents Ball.
2025-10-07Elevator permit: Modernization of 2P10224. All work shall comply with the Safety Code for Elevators and Escalators ASME A17.1-2013, Part 8, Section$150,000
2025-10-06FDNY inspection (RISK)
2025-10-06FDNY inspection (ANNUL-COL-UNI)
2025-09-29Permit Protection and Mechanical Methods — Signed-off
2025-09-25Job filed: INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,000
2025-09-25Job filed: Keating Hall, Roof repair PHASE 2- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concr$977,480
2025-09-24Permit Foundation — Permit Issued
2025-09-24Permit General Construction — Permit Issued
2025-09-24DOB complaint, category ?
2025-09-24ECB CLASS - 1 violation: AT TIME OF INSPECTION OBSERVED CONTRACTOR FAILED TO FOLLOW UP ONLINE INCIDENT REPORT ON 8-7-25 WHERE WORKER FELL FROM LADDER ON SC$2,500
2025-09-22Boiler inspection
2025-09-22Boiler inspection
2025-09-22Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Boiler inspection
2025-09-19Permit Supported Scaffold — Signed-off
2025-09-18Permit General Construction — Permit Issued
2025-09-18Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCC$1,000
2025-09-17311: Street Condition — Rough, Pitted or Cracked Roads
2025-09-16Boiler inspection
2025-09-15Restaurant inspection: FORDHAM POD EXPRESS AT KEATING HALL — grade A
2025-09-12Job filed: INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2025-09-03Cooling tower inspection
2025-09-03Cooling tower inspection
2025-09-03Cooling tower inspection
2025-09-03Cooling tower inspection
2025-09-03Cooling tower inspection
2025-09-03Cooling tower inspection
2025-09-03Permit Structural — Signed-off
2025-09-03Permit General Construction — Signed-off
2025-09-03Permit Mechanical Systems — Signed-off
2025-08-27Permit Mechanical Systems — Signed-off
2025-08-25Permit Mechanical Systems — Signed-off
2025-08-25Permit General Construction — Permit Issued
2025-08-25Permit Mechanical Systems — Permit Issued
2025-08-25Permit General Construction — Signed-off
2025-08-08Permit General Construction — Signed-off
2025-08-07DOB complaint, category ?
2025-08-07ECB CLASS - 1 violation: AT TIME OF INCIDENT OF A BUILDING APPROX. 50 FT IN HEIGHT WHERE A WORKER FELL OFF FROM A CLIMBING LADDER APPROX.6FT AND LANDED ON $5,000
2025-08-07ECB CLASS - 1 violation: AT A BUILDING APPROX.50 FT IN HEIGHT WHERE A WORKER WAS CLIMBING A LADDER ON PIPE SCAFFOLD AND FELLING APPROX. 6 FT ONTO PIPE SCAF$625
2025-07-30Elevator permit: MODERNIZATION OF 2P3851.All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part 8, Section$150,000
2025-07-25Boiler inspection
2025-07-25Permit Structural — Permit Issued
2025-07-20FDNY inspection (EDU)
2025-07-10Boiler inspection
2025-07-08Permit General Construction — Permit Issued
2025-07-08DOB complaint, category ?
2025-07-03Certificate of occupancy Renewal Without Change
2025-07-01FDNY inspection (STRUC_INT_3)
2025-07-01FDNY inspection (ANNUL-COL-UNI)
2025-07-01FDNY inspection (ANNUL-COL-UNI)
2025-07-01FDNY inspection (ANNUL-COL-UNI)
2025-06-30Permit Mechanical Systems — Permit Issued
2025-06-29311: Water System — Hydrant Running Full (WA4)
2025-06-25Job filed: architectural scope associated with the structure improvement for the building as shown on plans filed herewith. No change to use, egress or occupancy$50,000
2025-06-07Asbestos abatement: Removal — ACA Environmental Services, Inc.
2025-06-06Permit Mechanical Systems — Signed-off
2025-06-06Permit Plumbing — Signed-off
2025-06-04Job filed: removal and replacement of chiller and associated piping on part of cellar$1,031,444
2025-06-04Job filed: FILING HEREWITH THE INSTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS ENERGY FUEL CELLS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPAN$313,548
2025-05-27FDNY inspection (ANNUL-COL-UNI)
2025-05-27FDNY inspection (ANNUL-COL-UNI)
2025-05-27FDNY inspection (ANNUL-COL-UNI)
2025-05-27FDNY inspection (ANNUL-COL-UNI)
2025-05-27Job filed: Dining events with entertainment in temporary tents, for Fordham University campus.
2025-05-21Job filed: Plumbing work associated with the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, egr$48,000
2025-05-20Mortgage satisfied — from UNIVERSITY, FORDHAM to DORMITORY AUTHORITY OF THE STATE OF NEW
2025-05-20EASE $50,000 — from FORDHAM UNIVERSITY to BLUE SKY TOWERS, LLC$50,000
2025-05-20REL — from UNIVERSITY, FORDHAM to MIZUHO BANK
2025-05-20Permit Structural — Signed-off
2025-05-20Permit General Construction — Signed-off
2025-05-20Job filed: Mechanical work associated with the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, e$504,000
2025-05-19Job filed: Like kind replacement of roof top packaged system. There is no change in use, occupancy, or egress.$15,000
2025-05-09Job filed: Dining events with entertainment in temporary tents, for graduating students and family members at the Fordham University campus.
2025-05-05FDNY inspection (RISK)
2025-05-05FDNY inspection (ANNUL-COL-UNI)
2025-04-30Job filed: Structural work associated with the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, e$20,000
2025-04-29Job filed: the proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, egress or occupancy.$1,010,000
2025-04-23Rodent inspection: Passed
2025-04-22Job filed: Outdoor concert in the Fordham University campus in the lawn.
2025-04-11FDNY inspection (RISK)
2025-04-11FDNY inspection (ANNUL-COL-UNI)
2025-04-08Certificate of occupancy Renewal Without Change
2025-03-12ECB CLASS - 1 violation: UPON INSPECTION OBSERVED 5-MEN WORKING ON SITE WITH THE SCOPE OF WORK BEING COMPLETED UNDER X01116736 AND FAILURE TO OBEY THE SWO $10,000
2025-03-05Job filed: FILING HEREWITH FOR REMOVAL OF TEMPORARY EGRESS STAIR AND INSTALLATION OF NEW CURTAIN WALL WINDOW AS PER PLANS.$110,000
2025-02-25Restaurant inspection: URBAN KITCHEN — grade A
2025-02-25Restaurant inspection: MARKETPLACE AT MCGINLEY CENTER FORDHAM UNIVERSITY — grade A
2025-02-20Facade (LL11) filing, cycle 9: SWARMP
2025-02-20Facade (LL11) filing, cycle 9: SWARMP
2025-02-20Restaurant inspection: FORDHAM U - SALT & SESAME AT FACULTY MEMORIAL HALL — grade A
2025-02-20Restaurant inspection: FORDHAM U - COSI AT CAMPBELL HALL · mice evidence
2025-02-20Facade (LL11) filing, cycle 9: SWARMP
2025-02-20Restaurant inspection: STARBUCKS (Fordham University) — grade A
2025-02-18Facade (LL11) filing, cycle 9: SWARMP
2025-02-18311: Street Condition — Cave-in
2025-02-13Permit Mechanical Systems — Signed-off
2025-02-13DOB complaint, category ?
2025-02-13ECB CLASS - 1 violation: UPON COMPLIANCE INSPECTION, AS PER CURRENT DOB RECORDS, A PSWO WAS ISSUED UNDER COMPLAINT 2407691 FOR JOB X01116736-I1-GC. HOWEVER
2025-02-12Certificate of occupancy Renewal With Change
2025-02-12Permit Mechanical Systems — Signed-off
2025-02-08Job filed: Mechanical work associated with the installation of a new combustion air fan at the Thebaud Hall. No change of use, egress, or occupancy.$500,000
2025-02-06Permit Supported Scaffold — Signed-off
2025-02-05FDNY inspection (RISK)
2025-02-05Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2025-01-29Job filed: structural repairs of existing slab at St John's as shown on plans filed herewith. No change to use, egress or occupancy$65,000
2025-01-16Cooling tower inspection
2025-01-16Permit Supported Scaffold — Signed-off
2025-01-16Job filed: John Mulcany Hall - Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change
2025-01-13Permit General Construction — Permit Issued
2025-01-10Job filed: INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2025-01-09DOB complaint, category ?
2025-01-08Permit Structural — Permit Issued
2025-01-08Permit Mechanical Systems — Permit Issued
2025-01-08Permit General Construction — Signed-off
2025-01-07Elevator permit: Furnish and Install New controller 8.7.3.31.5, New main disc. switche, 110Vav car light dis. switch 2.26.4. All work to comply wit$50,000
2025-01-07DOB complaint, category ?
2025-01-07ECB CLASS - 1 violation: UPON INSPECTION, ACCESS GAINED AND OBSERVED CONTRACTOR IS ON PREMISES WITH 5-MEN WORKING ON SITE. CURRENTLY PERMITS AND TPP ARE PO$2,500
2025-01-06Permit Foundation — Permit Issued
2025-01-06Permit General Construction — Permit Issued
2024-12-18Job filed: FILING HEREWITH FOR REMOVAL OF TEMPORARY EGRESS STAIR AND INSTALLATION OF NEW CURTAIN WALL WINDOW AS PER PLANS.$110,000
2024-12-16Asbestos abatement: Removal — Kiss Construction Inc.
2024-12-16Asbestos abatement: Removal — Kiss Construction Inc.
2024-12-16Asbestos abatement: Removal — Kiss Construction Inc.
2024-12-16Asbestos abatement: Removal — Kiss Construction Inc.
2024-12-16Asbestos abatement: Removal — Kiss Construction Inc.
2024-12-16Permit Mechanical Systems — Permit Issued
2024-12-10Permit Plumbing — Signed-off
2024-12-10Permit Sprinklers — Signed-off
2024-12-10Permit Sprinklers — Signed-off
2024-12-10Permit Plumbing — Signed-off
2024-12-09DOB complaint, category ?
2024-12-09Job filed: FACADE INSPECTION
2024-12-09Job filed: FACADE INSPECTION
2024-12-09Job filed: facade inspection
2024-12-06Permit Boiler Equipment — Signed-off
2024-12-05Permit Structural — Permit Issued
2024-12-05Certificate of occupancy Renewal Without Change
2024-12-03FDNY inspection (ANNUL-COL-UNI)
2024-12-03FDNY inspection (ANNUL-COL-UNI)
2024-12-03FDNY inspection (RISK)
2024-12-03FDNY inspection (RISK)
2024-12-03FDNY inspection (ANNUL-COL-UNI)
2024-11-29Permit General Construction — Signed-off
2024-11-26Permit Structural — Signed-off
2024-11-26Job filed: Plumbing and Sprinkler scope associated with the offices renovation at O'Hare Hall. No change of use, egress or occupancy.$41,000
2024-11-26Job filed: MECHANICAL SCOPE ASSOCIATED WITH THE OFFICE RENOVATION AT O'HARE HALL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$100,000
2024-11-22FDNY inspection (RISK)
2024-11-22FDNY inspection (ANNUL-COL-UNI)
2024-11-22Permit Plumbing — Permit Issued
2024-11-19Permit General Construction — Signed-off
2024-11-18Job filed: Plumbing work associated with new Hot Water heater installation and associated piping for the Boiler at the O'Hare Hall. No change of use, egress, or $250,000
2024-11-13Certificate of occupancy Renewal Without Change
2024-11-08Job filed: Coffey Field Data Center heat recovery chillers installation. No change of use, egress or occupancy.$500,000
2024-11-06Elevator permit: Furnish and Install New controller 8.7.3.31.5, New main disc. switche, 110Vav car light dis. switch 2.26.4. All work to comply wit$50,000
2024-11-01Job filed: Structural scope associated with the interior renovation of the existing offices at O'Hare Hall. No change of use, egress, or occupancy.$20,000
2024-10-31Job filed: Architectural scope associated with the interior renovation of the existing offices at O'Hare Hall. No change of use, egress, or occupancy.$440,000
2024-10-30311: Illegal Parking — Blocked Bike Lane
2024-10-28Restaurant inspection: GRAB & GO — grade A
2024-10-28Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY W$1,000
2024-10-24Job filed: Plumbing work associated with new Hot Water heater installation and associated piping for the Boiler at the O'Hare Hall. No change of use, egress, or $250,000
2024-10-18Rodent inspection: Failed for Rat Activity
2024-10-18Job filed: INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2024-10-07Permit Plumbing — Signed-off
2024-10-04Permit Protection and Mechanical Methods — Signed-off
2024-10-03Permit Mechanical Systems — Signed-off
2024-09-30Permit Structural — Signed-off
2024-09-30Job filed: Mechanical work associated with LAB 530 renovation. No change to use, egress or occupancy.$350,000
2024-09-30Job filed: Plumbing work associated with LAB 530 renovation. No change to use, egress or occupancy.$100,000
2024-09-26Permit Supported Scaffold — Signed-off
2024-09-26Permit Sidewalk Shed — Signed-off
2024-09-26Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY W$1,000
2024-09-25Permit General Construction — Permit Issued
2024-09-25Job filed: Keating Hall- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installa$900,000
2024-09-24FDNY inspection (ANNUL-COL-UNI)
2024-09-24FDNY inspection (RISK)
2024-09-23Permit Foundation — Permit Issued
2024-09-23Permit General Construction — Permit Issued
2024-09-17FDNY inspection (RISK)
2024-09-16Permit General Construction — Signed-off
2024-09-13Job filed: Repairs and conservation of university church. Including masonry replacement, replication, and repair of deteriorated architectural features; repairs $758,229
2024-09-12Job filed: STRUCTURAL SCOPE ASSOCIATED WITH RENOVATION OF JMH LAB 530 AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$50,000
2024-09-11Permit Foundation — Signed-off
2024-09-11Permit Foundation — Signed-off
2024-09-11Permit General Construction — Signed-off
2024-09-11Permit Plumbing — Signed-off
2024-09-11Permit General Construction — Signed-off
2024-09-11Permit Plumbing — Signed-off
2024-09-11Permit Foundation — Signed-off
2024-09-11Permit Plumbing — Signed-off
2024-09-11Permit General Construction — Signed-off
2024-09-11Job filed: RENOVATION OF JMH LAB 530 AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$500,000
2024-09-11Job filed: 2 Events within Fordham University at Edwards Parade Lawn. Homecoming and Presidents Ball. 3 Fire Guards for the Ball, 25 for Homecoming.
2024-09-09Job filed: 2 Events within Fordham University at Edwards Parade Lawn. Homecoming and Presidents Ball. 3 Fire Guards for the Ball, 25 for Homecoming.
2024-09-04311: Graffiti — Graffiti
2024-09-04Permit Suspended Scaffold — Signed-off
2024-09-03Cooling tower inspection
2024-09-03Cooling tower inspection
2024-08-30311: Graffiti — Graffiti
2024-08-23FDNY inspection (RISK)
2024-08-23FDNY inspection (RISK)
2024-08-23Certificate of occupancy Renewal With Change
2024-08-22Permit Sidewalk Shed — Signed-off
2024-08-22Job filed: Installation of suspended scaffold for facade work or inspection
2024-08-22Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2024-08-20Permit Supported Scaffold — Signed-off
2024-08-19Job filed: INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2024-08-16Permit Supported Scaffold — Signed-off
2024-08-16Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$12,000
2024-08-14Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-14Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-14Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-14Permit Structural — Signed-off
2024-08-14Permit General Construction — Signed-off
2024-08-13Permit General Construction — Signed-off
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-08-06Job filed: INSTALLATION OF TEMPORARY SHANTY AS PER DWGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$3,000
2024-08-05Job filed: Partial demolition of chimney as per plans filed herewith.$75,005
2024-08-01Permit General Construction — Signed-off
2024-08-01Permit Mechanical Systems — Signed-off
2024-08-01Permit Structural — Signed-off
2024-07-31Job filed: Facade inspection
2024-07-30Permit General Construction — Signed-off
2024-07-24Elevator permit: Furnish and Install New controller 8.7.3.31.5, New main disc. switche, 110Vav car light dis. switch 2.26.4. All work to comply wit$50,000
2024-07-18311: Illegal Dumping — Chronic Dumping
2024-07-18Job filed: Walsh Hall- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installati$867,690
2024-07-17Job filed: Decommissioning of one (1) existing 15,000-gallon underground fuel oil (No.4 Fuel Oil) tank to be abandoned in place and filled with FDNY-approved foa$150,000
2024-07-08Job filed: Walsh Hall- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installati$867,690
2024-07-03Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-07-03Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-07-03Job filed: MODIFICATIONS TO PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,700,000
2024-07-02Job filed: Installing new MH equipment, including but not limited to the AC unit, control valves, pumps, and other hydronic specialties at Tierney Hall. No chang$150,000
2024-07-01Rodent inspection: Failed for Rat Activity
2024-07-01311: Damaged Tree — Tree Trunk Split
2024-07-01Job filed: MODIFICATIONS TO HVAC SYSTEM FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$1,299,937
2024-06-28Permit General Construction — Signed-off
2024-06-27FDNY inspection (ANNUL-COL-UNI)
2024-06-27FDNY inspection (ANNUL-COL-UNI)
2024-06-27Job filed: Plumbing scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall. No change of use, egress, or occupancy.$100,000
2024-06-27Job filed: Mechanical scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall. No change of use, egress, or occupancy.$250,000
2024-06-25FDNY inspection (RISK)
2024-06-25FDNY inspection (ANNUL-COL-UNI)
2024-06-25FDNY inspection (ANNUL-COL-UNI)
2024-06-25FDNY inspection (ANNUL-COL-UNI)
2024-06-25Permit General Construction — Permit Issued
2024-06-20Job filed: TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2024-06-19Job filed: Structural scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall. No change of use, egress or occupancy.$50,000
2024-06-18Job filed: INSTALLATION OF STEEL PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2024-06-17FDNY inspection (ANNUL-COL-UNI)
2024-06-17FDNY inspection (ANNUL-COL-UNI)
2024-06-13Permit Foundation — Permit Issued
2024-06-13Permit General Construction — Signed-off
2024-06-13Permit Structural — Permit Issued
2024-06-13Permit General Construction — Permit Issued
2024-06-13Permit General Construction — Permit Issued
2024-06-13Permit Mechanical Systems — Signed-off
2024-06-13Permit Mechanical Systems — Permit Issued
2024-06-12Job filed: MODIFICATIONS TO PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,700,000
2024-06-11Boiler inspection
2024-06-11FDNY inspection (THEATER)
2024-06-11FDNY inspection (ANNUL-COL-UNI)
2024-06-11FDNY inspection (RISK)
2024-06-11FDNY inspection (ANNUL-COL-UNI)
2024-06-11FDNY inspection (ANNUL-COL-UNI)
2024-06-11FDNY inspection (ANNUL-COL-UNI)
2024-06-11FDNY inspection (RISK)
2024-06-11Job filed: Architectural scope associated with the Bepler Chair Laboratory on 001FL renovation at Freeman Hall and minor work on the 2-3 floors. No change of use$500,000
2024-06-07Permit General Construction — Signed-off
2024-06-06Permit Boiler Equipment — Signed-off
2024-06-05Boiler inspection
2024-06-05Permit Mechanical Systems — Permit Issued
2024-06-05Job filed: Civil and Structural scope associated with the Murphy/Bahoshy Sport Fields restoration, project includes but is not limited to the existing retainer w$1,375,000
2024-06-04Permit Sidewalk Shed — Signed-off
2024-05-31Permit General Construction — Signed-off
2024-05-31Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$10,000
2024-05-30Boiler inspection
2024-05-30Permit Plumbing — Signed-off
2024-05-29Job filed: Murphy/Bahoshy Sport Fields restoration, project includes but is not limited to the replacement of the turf, clay infill, field fence repair, and adja$2,225,000
2024-05-28Job filed: Events with food, beverage and entertainment for Fordham university.
2024-05-24Job filed: Events with food, beverage and entertainment for Fordham university. Tents under X00511469.
2024-05-22Permit General Construction — Signed-off
2024-05-21Job filed: MODIFICATIONS TO PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,700,000
2024-05-20Job filed: REMOVAL OF THE 2 OLD GAS FIRETUBE BOILERS AND INSTALLATION OF 3 NEW CONDENSING BOILERS AT THE O'HARE HALL AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE$500,000
2024-05-20Job filed: Install a new hot water piping b/w O'Hare Hall and Spellman/Tierney Halls. Installing new MH units, incl. but not limited to pump, heat exchangers, co$1,300,000
2024-05-20Job filed: Plumbing work associated with new Hot Water heater installation and associated piping for the Boiler at the O'Hare Hall. No change of use, egress, or $250,000
2024-05-14Job filed: Dining event entertainment in temporary tents in the lawn.
2024-05-13Job filed: structural work associated with south wings roof repair as shown on plans filed herewith. no change to use, egress, or occupancy.$54,180
2024-05-10Job filed: south wings roof repair including insulation and PMMA roofing, wood deck replacement as shown on plans filed herewith. no change to use, egress, or oc$72,240
2024-05-08Restaurant inspection: FORDHAM POD EXPRESS AT KEATING HALL — grade A
2024-05-06Restaurant inspection: DAGGER JOHNS AT MCGINLEY FORDHAM UNIVERSITY — grade A
2024-05-02Job filed: Mechanical work associated with the installation of a new combustion air fan at the Thebaud Hall. No change of use, egress, or occupancy.$500,000
2024-04-26Job filed: LOYOLA HALL SOUTH AND EAST FACADE REPAIRS INCLUDE MORTAR REPOINTING, PRECAST REPLACEMENT, FIELDSTONE REPLACEMENT, AND STEEL REPLACEMENT. NO CHANGE OF$318,000
2024-04-26Job filed: interior and exterior renovation for the legal council offices as shown on the drawings filed herewith, no change to use, egress or occupancy$1,000,000
2024-04-24Job filed: Event inside the the Fordham University campus. A an outdoor concert in the lawn and a reception inside a tent with food, beverage and entertainment.
2024-04-16Elevator permit: Furnish and Install the following: New piston 8.7.3.24 and jack 8.7.3.23.1, New controller 8.7.3.31.5, new rupture valve 8.7.3.24,$450,000
2024-04-12Rodent inspection: Failed for Rat Activity
2024-03-28Job filed: mechanical work associated with legal council offices renovation as shown on the drawings filed herewith, no change to use, egress or occupancy$800,000
2024-03-25Certificate of occupancy Renewal Without Change
2024-03-18Job filed: interior and exterior renovation for the legal council offices as shown on the drawings filed herewith, no change to use, egress or occupancy$1,000,000
2024-03-14Permit Foundation — Signed-off
2024-03-14Permit General Construction — Signed-off
2024-03-12Job filed: Accessory dining tent in the ground floor terrace adjacent to the cafe. Dealy Hall.
2024-03-12Job filed: Accessory dining tent in the ground floor terrace adjacent to the dormitory dining room within the Fordham campus. Faber Hall.
2024-03-12Job filed: Accessory dining tent in the ground floor terrace adjacent to the cafe and meeting hall within the Fordham campus. Campbell Hall.
2024-02-23Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$14,998,296
2024-02-22Permit General Construction — Signed-off
2024-02-22Permit Foundation — Signed-off
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22Job filed: New installation of low-pressure gas service, to serve existing rooftop gas-fired air handler. New piping connects to exist. gas meter. Pipe routed ov$50,000
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Boiler inspection
2024-02-15Job filed: MODIFICATIONS TO PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,700,000
2024-02-05Restaurant inspection: FORDHAM U - COSI AT CAMPBELL HALL — grade A
2024-02-05Restaurant inspection: FORDHAM U - A CRUST & BOAR'S HEAD — grade A
2024-02-05Restaurant inspection: FORDHAM U - SALT & SESAME AT FACULTY MEMORIAL HALL — grade A
2024-02-05Restaurant inspection: MARKETPLACE AT MCGINLEY CENTER FORDHAM UNIVERSITY — grade A
2024-02-02Certificate of occupancy Renewal Without Change
2024-01-26Permit Foundation — Permit Issued
2024-01-26Permit General Construction — Permit Issued
2024-01-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2024-01-23Permit Foundation — Signed-off
2024-01-23Permit General Construction — Signed-off
2024-01-18311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2024-01-18DOB complaint, category ?
2024-01-16Permit Mechanical Systems — Signed-off
2024-01-09Permit General Construction — Permit Issued
2023
2023-12-21Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-12-21Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-12-21Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-12-21Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-12-20Job filed: FILING HEREWITH THE INSTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS ENERGY FUEL CELLS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPAN$313,548
2023-12-20Job filed: FILING HEREWITH THE ISNTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS ENERGY FUEL CELLSAS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANC$333,256
2023-12-20Job filed: FILING HEREWITH THE INSTALLATION OF FOUR (4) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS CLEAN ENERGY SERVERS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCC$383,538
2023-12-20Job filed: FILING HEREWITH THE ISNTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS CLEAN ENERGY SERVERS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCU$275,548
2023-12-20Job filed: FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF A BLOOM ENERGY ES5 OUTDOOR FUEL CELL FACILITY AS PER PLANS.$73,108
2023-12-20Job filed: FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF A BLOOM ENERGY ES5 OUTDOOR FUEL CELL FACILITY AS PER PLANS.$73,081
2023-12-20Job filed: FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF A BLOOM ENERGY ES5 OUTDOOR FUEL CELL FACILITY AS PER PLANS.$83,452
2023-12-20Job filed: FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF A BLOOM ENERGY ES5 OUTDOOR FUEL CELL FACILITY AS PER PLANS.$60,123
2023-12-19Job filed: MODIFICATIONS TO HVAC SYSTEM FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$1,299,937
2023-12-19Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$14,998,296
2023-12-12Permit General Construction — Signed-off
2023-12-12Job filed: Accessory dining tent in the ground floor terrace adjacent to the cafe and meeting hall within the Fordham campus. Campbell Hall.
2023-12-12Job filed: Accessory dining tent in the ground floor terrace adjacent to the cafe. Dealy Hall.
2023-12-12Job filed: Accessory dining tent in the ground floor terrace adjacent to the dormitory dining room within the Fordham campus. Faber Hall.
2023-12-11Permit General Construction — Permit Issued
2023-12-08Permit General Construction — Permit Issued
2023-12-04Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-12-04Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-12-04Job filed: Temporary accessory tent accessory to the dining room in the adjacent terrace. Faber hall. No changes to existing structures, use or egress.$5,000
2023-12-01Job filed: Temporary accessory tent for the cafe in the adjacent terrace. Campbell hall. No changes to existing structures, use or egress.$5,000
2023-12-01Job filed: Temporary accessory tent in the cafe terrace. Dealy Hall. No changes to existing structures, use or egress.$5,000
2023-11-29Boiler inspection
2023-11-27Job filed: No Work
2023-11-20Permit Plumbing — Signed-off
2023-11-13Permit Plumbing — Signed-off
2023-11-07311: Bus Stop Shelter Complaint — Damaged Other
2023-11-03Certificate of occupancy Renewal Without Change
2023-11-02Job filed: Plumbing work associated with LAB 604, 608 renovation. No change to use, egress or occupancy.$70,000
2023-10-31Permit Structural — Signed-off
2023-10-31Permit General Construction — Signed-off
2023-10-26Permit Protection and Mechanical Methods — Signed-off
2023-10-26Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDIN$10,000
2023-10-23Restaurant inspection: STARBUCKS (Fordham University) — grade A
2023-10-18Rodent inspection: Passed
2023-10-16Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-10-11Certificate of occupancy Renewal With Change
2023-10-06Permit Structural — Signed-off
2023-10-06Permit General Construction — Signed-off
2023-10-06Permit Plumbing — Signed-off
2023-10-06Permit Mechanical Systems — Signed-off
2023-10-05Permit Sign — Signed-off
2023-10-04Job filed: INSTALLATION OF NON-ILLUMINATED ACCESSORY ENTRANCE CANOPY SIGN STATING "MCSHANE CAMPUS CENTER" AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS $700
2023-10-04Job filed: Receptions, with food beverage and entertainment, various layouts in the same temporary tented facility.
2023-10-04Job filed: Temporary tents on lawns for Fordham Univ. Programming. Removed after use. TPAs required for 75 persons or more. No changes to existing structures, us$55,000
2023-09-21Job filed: MODIFICATIONS TO HVAC SYSTEM FOR THIRD FLOOR MER ROOM AND ON FIRST FLOOR IN NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$3,000
2023-09-21Job filed: MODIFICATIONS TO PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,700,000
2023-09-21Job filed: MODIFICATIONS TO HVAC SYSTEM FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$1,299,937
2023-09-19Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH OPERABLE PARTITIONS FOR MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER $150,000
2023-09-19Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$14,998,296
2023-09-18Boiler inspection
2023-09-18Boiler inspection
2023-09-16311: Street Condition — Line/Marking - Faded
2023-09-14Boiler inspection
2023-09-14Boiler inspection
2023-09-14Boiler inspection
2023-09-14Job filed: FILING HEREWITH FOR GAS PLUMBING MODIFICATIONS WITH EXISTING GAS METER FOR DAGGER JOHN'S AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THI$110,000
2023-09-11Job filed: FILING HEREWITH FOR GAS PLUMBING MODIFICATIONS FOR DAGGER JOHN'S AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$110,000
2023-09-11Job filed: Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress
2023-09-07Permit General Construction — Signed-off
2023-09-01311: Traffic Signal Condition — LED Lense
2023-09-01311: Traffic Signal Condition — Veh Sgnl Mult Lamps
2023-08-31Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ$4,500
2023-08-31Job filed: Plumbing work associated with LAB 604, 608 renovation. No change to use, egress or occupancy.$70,000
2023-08-30311: Street Condition — Rough, Pitted or Cracked Roads
2023-08-24Permit Mechanical Systems — Signed-off
2023-08-24Permit General Construction — Signed-off
2023-08-24Job filed: Tierney Hall roof repair/replacement, including the replacement of insulation. No change of use, egress or occupancy.$585,000
2023-08-23Restaurant inspection: GRAB & GO
2023-08-21Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-08-18Permit Sidewalk Shed — Signed-off
2023-08-15Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$14,998,296
2023-08-14Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-08-14Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-08-11Job filed: MODIFICATIONS TO HVAC SYSTEM FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$1,299,937
2023-08-09Certificate of occupancy Renewal Without Change
2023-08-04Permit Plumbing — Signed-off
2023-08-02Job filed: FILING HEREWITH FOR GAS PLUMBING MODIFICATIONS WITH EXISTING GAS METER FOR DAGGER JOHN'S AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THI$110,000
2023-07-28Permit Structural — Signed-off
2023-07-28Permit General Construction — Signed-off
2023-07-27Cooling tower inspection
2023-07-27Cooling tower inspection
2023-07-26Cooling tower inspection
2023-07-26Cooling tower inspection
2023-07-26311: Lead — Lead Kit Request (Residential) (L10)
2023-07-26Permit Mechanical Systems — Signed-off
2023-07-26Job filed: MODIFICATIONS TO PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR NEW MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,700,000
2023-07-25Cooling tower inspection
2023-07-25Certificate of occupancy Renewal With Change
2023-07-25Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH OPERABLE PARTITIONS FOR MARKETPLACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER $150,000
2023-07-18Job filed: Plumbing work associated with LAB 604, 608 renovation. No change to use, egress or occupancy.$70,000
2023-07-18Job filed: Replacement of the Multistack Units at the Faber Hall. No change of ue, egress or occupancy.$300,000
2023-07-17FDNY inspection (ANNUL-COL-UNI)
2023-07-17FDNY inspection (RISK)
2023-07-17FDNY inspection (ANNUL-COL-UNI)
2023-07-17FDNY inspection (ANNUL-COL-UNI)
2023-07-17FDNY inspection (ANNUL-COL-UNI)
2023-07-17FDNY inspection (RISK)
2023-07-14Boiler inspection
2023-07-12Permit Protection and Mechanical Methods — Signed-off
2023-07-12Job filed: INSTALLATION OF PLATFORM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS A$3,600
2023-05-31Job filed: Fordham University alumni events. Receptions, with food, beverage and entertainment.
2023-05-25Permit Standpipe — Signed-off
2023-05-23Job filed: No Work
2023-05-19Job filed: RENOVATION OF FOUR EXISTING ANCILLARY STRUCTURES (SECURITY BOOTHS) LOCATED IN ROSE HILL CAMPUS, FORDHAM UNIVERSITY. NO CHANGES TO EXISTING STRUCTURES$260,000
2023-05-17Certificate of occupancy Renewal Without Change
2023-05-17Job filed: Receptions, with food, beverage and entertainment.
2023-05-16FDNY inspection (ANNUL-COL-UNI)
2023-05-16Certificate of occupancy Renewal Without Change
2023-05-11Job filed: FILING HEREWITH NEW FIRE PUMP UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH ALT. 1# $5,000
2023-05-10Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$792,000
2023-05-05FDNY inspection (ANNUL-COL-UNI)
2023-05-02FDNY inspection (ANNUL-COL-UNI)
2023-05-02Permit Mechanical Systems — Signed-off
2023-04-25FDNY inspection (ANNUL-COL-UNI)
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
2023-04-24Permit General Construction — Permit Issued
2023-04-19Permit Structural — Signed-off
2023-04-19Permit General Construction — Signed-off
2023-04-18Asbestos abatement: Removal — ACA Environmental Services, Inc.
2023-04-05Elevator permit: Furnish and install one (1) Vertical Platform Lift as detailed in the attached drawings. All work will comply with ASME A18.1-201$26,800
2023-04-05Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$791,826
2023-04-04Job filed: Plumbing work associated with Thebaud Hall renovation including BAS and 001FL work. Replacement of the Plumbing fixtures and all associated associated$275,000
2023-03-30FDNY inspection (RISK)
2023-03-28FDNY inspection (RISK)
2023-03-28FDNY inspection (ANNUL-COL-UNI)
2023-03-24Permit Mechanical Systems — Signed-off
2023-03-24Permit Plumbing — Signed-off
2023-03-24Job filed: Mechanical scope associated with the 003FL renovation, Thebaud Hall. No change of use, egress, or occupancy.$500,000
2023-03-22Permit Boiler Equipment — Signed-off
2023-03-22Permit General Construction — Signed-off
2023-03-22Job filed: Plumbing work associated with LAB 604, 608 renovation. No change to use, egress or occupancy.$70,000
2023-03-22Job filed: Mechanical work associated with LAB 604, 608 renovation. No change to use, egress or occupancy.$75,000
2023-03-21Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2023-03-21Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2023-03-21Job filed: Plumbing work associated with the installation of three new Boilers at the Theabud Hall, including the removal of the temp.gas piping to the temp. gas$177,000
2023-03-21Job filed: New installation of low-pressure gas service, to serve existing rooftop gas-fired air handler. New piping connects to exist. gas meter. Pipe routed ov$50,000
2023-03-21Job filed: Hellenic Society will hold their annual Greek Night event. Dancing will occur as well as food. Alcohol will be served.
2023-03-15Job filed: RENOVATION OF JMH LAB 604, 608 AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$140,000
2023-03-09Job filed: Mechanical work associated with Thebaud Hall renovation of basement, installation of a temp.heater on a 1st floor,removal of old boilers, boiler breec$640,000
2023-03-07FDNY inspection (RISK)
2023-03-07FDNY inspection (ANNUL-COL-UNI)
2023-03-07FDNY inspection (ANNUL-COL-UNI)
2023-03-07FDNY inspection (ANNUL-COL-UNI)
2023-03-07FDNY inspection (RISK)
2023-03-07FDNY inspection (RISK)
2023-03-07Permit Standpipe — Signed-off
2023-03-07Permit Sprinklers — Signed-off
2023-03-07Permit Standpipe — Signed-off
2023-03-07Permit Sprinklers — Signed-off
2023-03-07Job filed: Mechanical scope associated with the 003FL renovation, Thebaud Hall. No change of use, egress, or occupancy.$500,000
2023-02-27Certificate of occupancy Renewal Without Change
2023-02-27Job filed: Slainte will perform along with other student performers as part of their yearly Irish Night event. Food will be served.
2023-02-24Certificate of occupancy Renewal Without Change
2023-02-15Job filed: Monthly Senior Night event. February's event is being held in the McShane Campus Center and is open to all graduating seniors and will be serving food
2023-01-24Certificate of occupancy Renewal Without Change
2023-01-20Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$791,837
2023-01-19Job filed: Spring Club Fair is for students to meet the many clubs available to join for the Spring 2023 semester. Over 160 clubs will be present.
2023-01-17Permit Construction Fence — Signed-off
2023-01-13FDNY inspection (RISK)
2023-01-13FDNY inspection (ANNUL-COL-UNI)
2023-01-12Permit General Construction — Permit Issued
2023-01-10DOB complaint, category ?
2023-01-10DOB complaint, category ?
2023-01-06Permit General Construction — Signed-off
2023-01-04Permit Structural — Signed-off
2023-01-04Permit Mechanical Systems — Signed-off
2023-01-04Permit General Construction — Signed-off
2023-01-04Permit Mechanical Systems — Signed-off
2023-01-03FDNY inspection (ANNUL-COL-UNI)
2023-01-03FDNY inspection (RISK)
2023-01-03Permit EW — ISSUED
2023-01-03Permit EW — ISSUED
2023-01-03Permit Protection and Mechanical Methods — Signed-off
2023-01-03Permit Mechanical Systems — Signed-off
2023-01-03Job filed: Emergency ceiling repair and fireproofing at the 002FL of McShane Hall (previously known as McGinley Hall). No change of use, egress or occupancy.$185,000
2022-12-14Job filed: FLOOR 2 WILL BE USED AS SERVERY AND DINING WHILE THE MARKETPLACE IS BEING RENOVATED IN FLOOR 1.
2022-12-13FDNY inspection (RISK)
2022-12-13FDNY inspection (ANNUL-COL-UNI)
2022-12-13FDNY inspection (ANNUL-COL-UNI)
2022-12-13FDNY inspection (RISK)
2022-12-13Certificate of occupancy Renewal Without Change
2022-12-09FDNY inspection (RISK)
2022-12-09FDNY inspection (RISK)
2022-12-09Permit Protection and Mechanical Methods — Signed-off
2022-12-06Job filed: INSTALLATION OF THE EXHAUST DUCT ENCLOSURE ON THE SOUTH EXTERIOR WALL OF THE DEALY HALL. THE MH DUCTWORK FILED UNDER THE INITIAL JOB # X00524112-I1. T$150,000
2022-12-05311: Street Condition — Line/Marking - Faded
2022-12-05Permit Sidewalk Shed — Signed-off
2022-12-02FDNY inspection (RISK)
2022-12-02FDNY inspection (RISK)
2022-11-29Rodent inspection: Passed
2022-11-21Certificate of occupancy Renewal Without Change
2022-11-10311: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-10Job filed: Commuting Students Association's Annual event to fundraise for Part of the Solution. Thanksgiving Dinner, catered by Boston Market, is served. Perform
2022-11-07FDNY inspection (ANNUL-COL-UNI)
2022-11-07FDNY inspection (ANNUL-COL-UNI)
2022-11-07FDNY inspection (THEATER)
2022-11-04Restaurant inspection: FORDHAM POD EXPRESS AT KEATING HALL — grade A · mice evidence
2022-10-27Permit Support of Excavation — Signed-off
2022-10-24Permit Earth Work — Signed-off
2022-10-18FDNY inspection (ANNUL-COL-UNI)
2022-10-13Rodent inspection: Failed for Rat Activity
2022-10-12Job filed: SUPPORT OF EXCAVATOIN ASSOCIATED WITH WATER AND SANITARY LINE REPLACEMENT ON BELLARMINE ROAD AS PER PLANS FILED HEREWITH. FOUNDATION DRAWINGS APPROVED$50,000
2022-10-05Certificate of occupancy Renewal Without Change
2022-10-05Job filed: Receptions, with food beverage and entertainment. Presidents' inauguration events.
2022-09-26Permit AL — ISSUED
2022-09-20Permit General Construction — Signed-off
2022-09-19Job filed: Dining, orientation and waiting area for a film crew.
2022-09-19Job filed: Temporary tents for a film crew. Removed after the programming. No changes to existing structures, use or egress$8,000
2022-09-14Permit Plumbing — Signed-off
2022-09-14Job filed: Events on Edwards Parade Lawn for Fordham University. Presidents Ball and Homecoming.
2022-09-06Cooling tower inspection
2022-09-06FDNY inspection (ANNUL-COL-UNI)
2022-09-05311: Food Establishment — Food Spoiled
2022-08-29Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-08-26311: Illegal Dumping — Chronic Dumping
2022-08-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-23Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-23Certificate of occupancy Renewal Without Change
2022-08-23Job filed: The New Student Orientation team will welcome our 1,900 incoming students to campus from August 28 - 30. Small groups of orientation leaders and stude
2022-08-22Permit General Construction — Permit Issued
2022-08-18Certificate of occupancy Renewal Without Change
2022-08-17Job filed: CIVIL SITE WORK ASSOCIATED WITH WATER AND SANITARY LINE REPLACEMENT ON BELLARMINE ROAD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$1,050,000
2022-08-16Permit General Construction — Signed-off
2022-08-16Job filed: New Student Orientation team will provide training to 250 Orientation Leaders in order to prepare them to welcome our 1,900 incoming students to campu
2022-08-16Job filed: New Student Orientation team will provide training to 275 Orientation Leaders in order to prepare them to welcome our 1,900 incoming students to campu
2022-08-16Job filed: New Student Orientation team will provide training to 275 Orientation Leaders in order to prepare them to welcome our 1,900 incoming students to campu
2022-08-16Job filed: New Student Orientation team will provide training to 275 Orientation Leaders in order to prepare them to welcome our 1,900 incoming students to campu
2022-08-10Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-08-10Elevator permit: FURNISH AND INSTALL THE FOLLOWING: HALL STATIONS-ALL LANDING SERVED 8.7.31.8, CAR STATION 8.7.3.31.8, POWER UNIT 8.7.3.29, HYDRAUL$210,000
2022-08-10Elevator permit: FURNISH AND INSTALL THE FOLLOWING: HALL STATIONS-ALL LANDING SERVED 8.7.31.8, CAR STATION 8.7.3.31.8, POWER UNIT 8.7.3.29, HYDRAUL$300,000
2022-08-10Job filed: RENOVATION OF FOUR EXISTING ANCILLARY STRUCTURES (SECURITY BOOTHS) LOCATED IN ROSE HILL CAMPUS, FORDHAM UNIVERSITY. NO CHANGES TO EXISTING STRUCTURES$260,000
2022-08-08Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-08-04311: Water System — Fire Hydrant Emergency (FHE)
2022-08-04Permit Plumbing — Signed-off
2022-08-04Permit Sidewalk Shed — Signed-off
2022-08-02Cooling tower inspection
2022-08-02Cooling tower inspection
2022-08-01Job filed: Plumbing work associated with the installation of three new Boilers at the Theabud Hall, including the removal of the temp.gas piping to the temp. gas$177,000
2022-07-29311: Missed Collection — Recycling - Paper
2022-07-22Permit Sprinklers — Signed-off
2022-07-22Permit Standpipe — Signed-off
2022-07-21Permit Sprinklers — Signed-off
2022-07-21Permit Standpipe — Signed-off
2022-07-19FDNY inspection (ANNUL-COL-UNI)
2022-07-18Cooling tower inspection
2022-07-18Cooling tower inspection
2022-07-18Cooling tower inspection
2022-07-15Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-15Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-15Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-15Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-15Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-15Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-15Job filed: FILING HEREWITH FOR WORK ASSOCIATED WITH WATER AND SANITARY LINE REPLACEMENT ON BELLARMINE ROAD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$1,050,000
2022-07-15Job filed: PLUMBING MODIFICATIONS ASSOCIATED WITH WATER AND SANITARY LINE REPLACEMENT ON BELLARMINE ROAD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR$550,000
2022-07-14Certificate of occupancy Renewal Without Change
2022-07-12Permit Sprinklers — Signed-off
2022-07-12Permit Standpipe — Signed-off
2022-07-08Permit Sprinklers — Signed-off
2022-07-08Permit Sprinklers — Signed-off
2022-07-08Permit Standpipe — Signed-off
2022-07-08Permit Standpipe — Signed-off
2022-07-07Permit Structural — Signed-off
2022-07-07Permit Supported Scaffold — Signed-off
2022-07-07Permit General Construction — Signed-off
2022-07-06Job filed: The final opportunity for new students and their families to receive an orientation to Fordham before late August Orientation/classes start in the Fal
2022-07-02Permit General Construction — Permit Issued
2022-07-01Elevator permit: FURNISH AND INSTALL THE FOLLOWING: HALL STATIONS-ALL LANDING SERVED 8.7.31.8, CAR STATION 8.7.3.31.8, POWER UNIT 8.7.3.29, HYDRAUL$300,000
2022-07-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-07-01Elevator permit: FURNISH AND INSTALL THE FOLLOWING: HALL STATIONS-ALL LANDING SERVED 8.7.31.8, CAR STATION 8.7.3.31.8, POWER UNIT 8.7.3.29, HYDRAUL$210,000
2022-06-27Job filed: Installation of three new high-pressure gas Boilers at the Thebaud Hall. No change of use, egress or occupancy.$1,771,000
2022-06-27Job filed: LOYOLA HALL SOUTH AND EAST FACADE REPAIRS INCLUDE MORTAR REPOINTING, PRECAST REPLACEMENT, FIELDSTONE REPLACEMENT, AND STEEL REPLACEMENT. NO CHANGE OF$318,000
2022-06-23Job filed: Summer orientation meetings.
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-15Boiler inspection
2022-06-14Elevator permit: FURNISH AND INSTALL THE FOLLOWING: HALL STATIONS-ALL LANDING SERVED 8.7.31.8, CAR STATION 8.7.3.31.8, POWER UNIT 8.7.3.29, HYDRAUL$300,000
2022-06-14Elevator permit: FURNISH AND INSTALL THE FOLLOWING: HALL STATIONS-ALL LANDING SERVED 8.7.31.8, CAR STATION 8.7.3.31.8, POWER UNIT 8.7.3.29, HYDRAUL$210,000
2022-06-13Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-06-10Job filed: INSTALL THE SUPPORT OF EXCAVATION AND BRACING SYSTEM AS SHOWN WITHIN THESE PLANS TO INSTALL THE FORDHAM PHASE II ARCADE FOUNDATION. FOUNDATION DRAWING$1,100,550
2022-06-01Permit Mechanical Systems — Signed-off
2022-06-01Job filed: Reception, with food, beverage and entertainment.
2022-05-23311: Missed Collection — Trash and Bulky Trash
2022-05-18Permit Mechanical Systems — Signed-off
2022-05-18Permit General Construction — Signed-off
2022-05-18Job filed: Reception, with food, beverage and entertainment.
2022-05-17Certificate of occupancy Renewal Without Change
2022-05-14Permit Protection and Mechanical Methods — Signed-off
2022-05-13Job filed: INSTALLATION OF TEMPORARY SHORING SYSTEM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHORING SYSTEM TO COMPL$10,000
2022-05-12Job filed: Mechanical work associated with the installation of three new Boilers at the Theabud Hall. No change of use, egress or occupancy.$1,771,000
2022-05-10Permit Sidewalk Shed — Signed-off
2022-05-10Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress a$26,000
2022-05-09Job filed: Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or $3,000
2022-05-05Job filed: MODIFICATIONS TO HVAC SYSTEM ASSOCIATED WITH EARLY SOFT DEMOLITION WORK FOR THE ARCADE AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$85,375
2022-05-03Permit Plumbing — Signed-off
2022-05-03Job filed: north and south wings roof repair as shown on plans filed herewith. no change to use, egress, or occupancy.$918,476
2022-04-28Certificate of occupancy Renewal Without Change
2022-04-26Job filed: Temporary tents on lawns for Fordham Univ. Programming. Removed after use. TPAs required for 75 persons or more. No changes to existing structures, us$50,000
2022-04-26Job filed: MODIFICATIONS TO PLUMBING SYSTEM FOR ARCADE ENLARGEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FIL$700,000
2022-04-25Job filed: 2 Part program with outdoor concert in the lawn and reception in the adjacent tents
2022-04-19Certificate of occupancy Renewal Without Change
2022-04-19DOB complaint, category ?
2022-04-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSKEEPING PER SECTION REQUIREMENTS-POORHOUSKEEPING AT EXP4.NOTED AT TIME OF INSPECTION OF A 4 STORY
2022-04-15Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2022-04-01Permit General Construction — Signed-off
2022-04-01Permit Mechanical Systems — Signed-off
2022-03-29Job filed: MODIFICATIONS TO HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH ALT.$500,000
2022-03-28Permit Plumbing — Signed-off
2022-03-28Permit Plumbing — Signed-off
2022-03-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-03-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-03-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-03-17Permit Structural — Signed-off
2022-03-15Job filed: Remove existing generator at cellar and install new generator at OSP on new concrete pad. No change in use, egress, or occupancy.$60,000
2022-03-14Permit Mechanical Systems — Signed-off
2022-03-11FDNY inspection (RISK)
2022-03-11Elevator permit: Removal of elevator as per ASME A17.1-2000/03, Chapter 30, Appendix K Rule 8.11.1.4..Perform all necessary inspections in presence$5,000
2022-03-09Permit Support of Excavation — Signed-off
2022-03-08Permit General Construction — Signed-off
2022-03-02Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH EARLY SOFT DEMOLITION WORK FOR THE ARCADE AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP$939,610
2022-03-02Job filed: MODIFICATIONS TO HVAC SYSTEM ASSOCIATED WITH EARLY SOFT DEMOLITION WORK FOR THE ARCADE AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$85,375
2022-03-02Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$791,837
2022-03-01Permit Structural — Signed-off
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2022-02-28Permit General Construction — Signed-off
2022-02-24Job filed: Application is filed for exterior work including existing stair and railing replacement at the Tennis House as shown on plans filed herewith. No chang$150,000
2022-02-15Job filed: No Work
2022-02-10311: Illegal Dumping — Removal Request
2022-02-08Job filed: No Work
2022-02-08Job filed: No Work
2022-02-04Permit General Construction — Signed-off
2022-02-04Permit Mechanical Systems — Signed-off
2022-02-01Job filed: Plumbing work associated with Thebaud Hall renovation, including boiler room in a basement. No change of use, egress or occupancy.$275,000
2022-01-31Certificate of occupancy Renewal With Change
2022-01-28Permit Construction Fence — Signed-off
2022-01-28Job filed: INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.FENCE TO COMPLY WITH 20124 NYC BUILDING CODE, CHAPT$5,000
2022-01-27FDNY inspection (ALT)
2022-01-27Permit Plumbing — Signed-off
2022-01-27Permit Plumbing — Signed-off
2022-01-21Certificate of occupancy Renewal Without Change
2022-01-21Job filed: Mechanical work associated with Thebaud Hall renovation of basement and 001 floor, minor work on 002-003 floors mech. rooms, including installation of$960,000
2022-01-19Permit Plumbing — Signed-off
2022-01-19Job filed: FILING HEREWITH FOR PROTECTIVE AND MECHANICAL MEANS AND METHODS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN C$800,000
2022-01-18Cooling tower inspection
2022-01-14FDNY inspection (ANNUL-COL-UNI)
2022-01-13Job filed: Student Orientation
2022-01-12Permit Supported Scaffold — Signed-off
2022-01-12Job filed: INSTALLATION OF A TEMPORARY SYSTEM SCAFFOLD ACCESS TOWER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2014 NYC BUILDIN$5,000
2022-01-11Permit Mechanical Systems — Signed-off
2022-01-11Permit Mechanical Systems — Signed-off
2022-01-11Permit Mechanical Systems — Signed-off
2022-01-11Permit General Construction — Signed-off
2022-01-11Permit Structural — Signed-off
2022-01-10Elevator permit: Furnish and install one (1) new MRL elevator as per attached drawings, Plan# N1G455. All work to comply with ASME A17.1-2005S, a$251,489
2022-01-10Permit EW — ISSUED
2022-01-10Permit EW — ISSUED
2022-01-10Certificate of occupancy Renewal Without Change
2022-01-07Permit Protection and Mechanical Methods — Signed-off
2022-01-07Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, C$5,000
2022-01-06Job filed: INSTALLATION OF THE ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTE$15,000
2022-01-05Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH EARLY SOFT DEMOLITION WORK FOR THE ARCADE AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP$939,610
2022-01-04Job filed: MODIFICATIONS TO HVAC SYSTEM ASSOCIATED WITH EARLY SOFT DEMOLITION WORK FOR THE ARCADE AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$85,375
2021
2021-12-25311: HEAT/HOT WATER — ENTIRE BUILDING
2021-12-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-12-23Job filed: EARLY SOFT DEMOLITION WORK FOR THE ARCADE AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CON$113,780
2021-12-20Permit EW — ISSUED
2021-12-17Permit Protection and Mechanical Methods — Signed-off
2021-12-16Job filed: INSTALLATION OF A TEMPORARY ACCESS PLATFORM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$5,000
2021-12-15Job filed: INSTALLATION OF A TEMPORARY ACCESS PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK.NO CHANGE IN USE, EGRESS OR OCCUPANCY.ACCESS PLATFORM TO COM
2021-12-15Job filed: INSTALLATION OF A TEMPORARY ACCESS PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK.NO CHANGE IN USE, EGRESS OR OCCUPANCY.ACCESS PLATFORM TO COM
2021-12-15Job filed: INSTALLATION OF A TEMPORARY ACCESS PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK.NO CHANGE IN USE, EGRESS OR OCCUPANCY.ACCESS PLATFORM TO COM
2021-12-09Boiler inspection
2021-12-09Boiler inspection
2021-12-08Permit Sidewalk Shed — Signed-off
2021-12-07Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, C$5,000
2021-12-06Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2021-12-01Job filed: FORDHAM DINNER
2021-11-29FDNY inspection (ANNUL-COL-UNI)
2021-11-29311: Beach/Pool/Sauna Complaint — Beach/Pool Water
2021-11-08Cooling tower inspection
2021-11-08Permit Structural — Signed-off
2021-10-27Permit General Construction — Permit Issued
2021-10-19Certificate of occupancy Renewal Without Change
2021-10-18FDNY inspection (RISK)
2021-10-18FDNY inspection (THEATER)
2021-10-14Permit Mechanical Systems — Signed-off
2021-10-14Job filed: Plumbing work associated with JMH, 208 lab renovation, including new sink installation for a new chemistry fume hood, new gas safety shut-off valve an$14,000
2021-10-13Job filed: Structural scope associated with the 003FL renovation, Thebaud Hall. No change of use, egress, or occupancy.$100,000
2021-10-12Permit AL — ISSUED
2021-10-03Permit General Construction — Signed-off
2021-10-02Job filed: Events on Edwards Parade Lawn for Fordham University Homecoming
2021-09-30FDNY inspection (RISK)
2021-09-30Permit General Construction — Signed-off
2021-09-29Job filed: Temporary tents on lawns for Fordham Univ. ProgrammingRemoved after use. TPAs required for 75 persons or more. No changes to existing structures, use $30,000
2021-09-28Job filed: Mechanical scope associated with the 003FL renovation, Thebaud Hall. No change of use, egress, or occupancy.$500,000
2021-09-28Job filed: Plumbing scope associated with the 003FL renovation, Thebaud Hall. No change of use, egress, or occupancy.$110,000
2021-09-27Rodent inspection: Stoppage done
2021-09-27311: Food Establishment — Bare Hands in Contact w/ Food
2021-09-23Job filed: Temporary tent for events at Stone Mill banquet room. Removed after programming. No changes to existing structures, use or egress.$5,000
2021-09-23Job filed: Event area, in temporary tent, in the existing at grade terrace, adjacent to the banquet hall.
2021-09-23Job filed: Interior renovation of the offices on 003FL at the Thebaud Hall, including interior partitions removal and installation. No change of use, egress, or $1,900,000
2021-09-21FDNY inspection (ALT)
2021-09-16Permit General Construction — Permit Issued
2021-09-15Permit Supported Scaffold — Signed-off
2021-09-15Permit General Construction — Signed-off
2021-09-15Permit Mechanical Systems — Signed-off
2021-09-15Certificate of occupancy Renewal Without Change
2021-09-14Job filed: Plumbing work associated with JMH, 208 lab renovation, including new sink installation for a new chemistry fume hood, new gas safety shut-off valve an$14,000
2021-09-01Permit Sidewalk Shed — Signed-off
2021-09-01Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ$4,500
2021-08-31DOB complaint, category ?
2021-08-31Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$588,992
2021-08-30Job filed: Temporary tents on lawns for Fordham Univ. ProgrammingRemoved after use. TPAs required for 75 persons or more. No changes to existing structures, use $10,000
2021-08-30Job filed: INSTALLATION OF TEMPORARY 85' HIGH PIPE SCAFFOLD ORIGINATING (OFF 1ST FLOOR) AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COM$1,000
2021-08-29Job filed: replacement of domestic water heaters and associated gas and water piping as shown on plans filed herewith. no change to use, egress, or occupancy.$100,000
2021-08-29Job filed: replacement of domestic water heaters and associated gas and water piping as shown on plans filed herewith. no change to use, egress, or occupancy.$100,000
2021-08-29Job filed: Installation of hot water heating system including pumps and piping. Installation of motorized control valves, combustion air fans, and vent piping to$300,000
2021-08-29Job filed: Installation of hot water heating system including pumps and piping. Installation of motorized control valves, combustion air fans, and vent piping to$300,000
2021-08-21Job filed: installation of dual-return condensing boilers as shown on plans filed herewith. no change to use, egress, or occupancy.$100,000
2021-08-21Job filed: installation of dual-return condensing boilers as shown on plans filed herewith. no change to use, egress, or occupancy.$100,000
2021-08-20Permit General Construction — Permit Issued
2021-08-18Job filed: INSTALLATION OF THE EXHAUST DUCT ENCLOSURE ON THE SOUTH EXTERIOR WALL OF THE DEALY HALL. THE MH DUCTWORK FILED UNDER THE INITIAL JOB # X00524112-I1. T$150,000
2021-08-05Job filed: application is filed for exterior work including existing steps and ramp replacement as shown on plans filed herewith. no change to use, egress, or oc$94,500
2021-08-04Permit Plumbing — Signed-off
2021-08-02FDNY inspection (ALT)
2021-07-30Permit Supported Scaffold — Signed-off
2021-07-30Permit Supported Scaffold — Signed-off
2021-07-29Job filed: Plumbing work associated with 208 lab renovation, including new sink installation for a new chemistry fume hood, new gas safety shut-off valve and gas$14,000
2021-07-28311: Blocked Driveway — No Access
2021-07-28DOB complaint, category ?
2021-07-26Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$588,996
2021-07-23Permit Supported Scaffold — Signed-off
2021-07-22Job filed: INSTALLATION OF TEMPORARY 85' HIGH PIPE SCAFFOLD ORIGINATING (OFF 1ST FLOOR) AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COM$1,000
2021-07-21Permit General Construction — Permit Issued
2021-07-19Permit PL — ISSUED
2021-07-19Certificate of occupancy Renewal Without Change
2021-07-15Job filed: O'HARE HALL FACADE REPAIRS INCLUDING BUT NOT LIMITED TO REMOVAL AND REPLACEMENT OF SEALANT JOINT AT VARIOUS LOCATIONS, LIMESTONE CRACK REPAIRS, SPALL $425,000
2021-07-15Job filed: FACADE REPAIRS IN RESPONSE TO ECB VIOLATION# 39030422K FAILURE TO MAINTAIN THE FACADE. REPAIRS INCLUDE CORNICE REPAIR, STONE REPLACEMENT, MISCELLANEOU$145,000
2021-07-14Permit Standpipe — Signed-off
2021-07-14Permit Sprinklers — Signed-off
2021-07-13DOB complaint, category ?
2021-07-13Job filed: Plumbing work associated with Thebaud Hall renovation, including boiler room in a basement. No change of use, egress or occupancy.$275,000
2021-07-12FDNY inspection (ANNUL-COL-UNI)
2021-07-12FDNY inspection (ANNUL-COL-UNI)
2021-07-12Certificate of occupancy Renewal Without Change
2021-07-07Permit Mechanical Systems — Signed-off
2021-07-07Permit Structural — Signed-off
2021-07-02Job filed: application is filed for exterior work including existing steps and ramp replacement as shown on plans filed herewith. no change to use, egress, or oc$94,500
2021-06-30Cooling tower inspection
2021-06-26DOB complaint, category ?
2021-06-25Permit Supported Scaffold — Signed-off
2021-06-25Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHA$5,000
2021-06-24Elevator permit: Modernization of device: Furnish and install the following new equipment: car door contacts 8.7.2.14, car and cwt guide roller, c$200,000
2021-06-23Permit General Construction — Signed-off
2021-06-22Permit Structural — Signed-off
2021-06-21Permit Mechanical Systems — Signed-off
2021-06-20311: Noise - Vehicle — Engine Idling
2021-06-16Permit Plumbing — Signed-off
2021-06-15Job filed: INSTALL NEW EXTR CPVC EXHAUST DUCT B/W THE BLDGS BAS ANNEX AND AN EXHAUST FAN (EF-4) LOCATED IN MECH. ROOM ON MAIN ROF OF THE BLDG, TO BYPASS DAMAGED $135,000
2021-06-11Permit AL — ISSUED
2021-06-11Job filed: Temporary tents on lawns for Fordham Univ. ProgrammingRemoved after use. TPAs required for 75 persons or more. No changes to existing structures, use $10,000
2021-06-11Job filed: Fordham University Summer Orientation Events in Edwards Parade lawn
2021-06-09Job filed: Plumbing work associated with Thebaud Hall renovation, including boiler room in a basement. No change of use, egress or occupancy.$275,000
2021-06-06Elevator permit: RAPTURE VALVE. 8.7.3.24. PISTON 8.7.3.23.2,ALL WORK WILL BE DONE IN COMPLIANCE OF ASME A17.1-2000/2003, CHAPTER 30, PART 3, APPEND$30,000
2021-06-04FDNY inspection (ANNUL-COL-UNI)
2021-06-04Job filed: INSTALL THE SUPPORT OF EXCAVATION AND BRACING SYSTEM AS SHOWN WITHIN THESE PLANS TO INSTALL THE FORDHAM PHASE II ARCADE FOUNDATION. FOUNDATION DRAWING$1,100,550
2021-06-01FDNY inspection (ANNUL-COL-UNI)
2021-06-01Permit Supported Scaffold — Signed-off
2021-05-28FDNY inspection (ANNUL-COL-UNI)
2021-05-28Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD TOWER SYSTEM (FIELD LOCATED) AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY$5,000
2021-05-26Permit Supported Scaffold — Signed-off
2021-05-25FDNY inspection (ANNUL-COL-UNI)
2021-05-25Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress a$5,000
2021-05-20Permit General Construction — Signed-off
2021-05-19Permit Mechanical Systems — Signed-off
2021-05-14Job filed: RENOVATIONS FOR MAKE READY WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH A$500,000
2021-05-13Permit Protection and Mechanical Methods — Signed-off
2021-05-13Job filed: Use of temporary mini crane construction equipment as per plans filed herewith.$154
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Rodent inspection: Passed
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-12Boiler inspection
2021-05-11FDNY inspection (ALT)
2021-05-11Permit General Construction — Permit Issued
2021-05-10Permit Protection and Mechanical Methods — Signed-off
2021-05-10Job filed: INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2021-05-07Permit Structural — Signed-off
2021-05-06FDNY inspection (EDU)
2021-05-05FDNY inspection (EDU)
2021-05-04FDNY inspection (ANNUL-COL-UNI)
2021-05-03Elevator permit: Furnish and install one (1) new MRL elevator as per attached drawings, Plan# N1G455. All work to comply with ASME A17.1-2005S, a$251,489
2021-05-03Permit EW — ISSUED
2021-04-28Permit AL — ISSUED
2021-04-28Job filed: Temporary tents on lawns for Fordham Univ. Programming. Removed after use. TPAs required for 75 persons or more. No changes to existing structures, us$55,000
2021-04-28Job filed: APPLICATION IS FILED FOR STRUCTURAL WORK ASSOCIATED WITH THE EXISTING STAGE RIGGING SYSTEM REPLACEMENT. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$325,000
2021-04-26FDNY inspection (ANNUL-COL-UNI)
2021-04-25Elevator permit: Legalize an existing condition, New Installation of (1) One Accessibility Vertical Platform Lift, where old wheelchair lift was re$21,080
2021-04-23311: Traffic — Congestion/Gridlock
2021-04-23Job filed: Plumbing work associated with JMH, 208 lab renovation, including new sink installation for a new chemistry fume hood, new gas safety shut-off valve an$14,000
2021-04-22Permit Supported Scaffold — Signed-off
2021-04-08Permit Supported Scaffold — Signed-off
2021-04-08Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o$26,000
2021-04-06Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ$24,000
2021-03-31Permit Supported Scaffold — Signed-off
2021-03-30Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress a$26,000
2021-03-29Permit Boiler Equipment — Signed-off
2021-03-29Permit Boiler Equipment — Signed-off
2021-03-24Permit Supported Scaffold — Signed-off
2021-03-23Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE,CHAPTER 33$5,000
2021-03-22Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 3$5,000
2021-03-19Permit Supported Scaffold — Signed-off
2021-03-19Permit Supported Scaffold — Signed-off
2021-03-19Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 3$5,000
2021-03-19Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 $5,000
2021-03-18Elevator permit: RELOCATING MACHINE ROOM TO THE LOWER LEVEL.-All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17.10-03 as mod$10,000
2021-03-18311: Noise — Noise: Construction Before/After Hours (NM1)
2021-03-17Permit Plumbing — Signed-off
2021-03-17DOB complaint, category ?
2021-03-17ECB CLASS - 1 violation: RESPONDENT PERMITTED USE OF MOBILE CRANE CN#928/20 CD#4741 TO HOST MATERIALS.NO SAFETY MEETING/NO DAILY INSPECTION LOGS FROM H.M.O$10,000
2021-03-17ECB CLASS - 2 violation: RESPONDENT(LIFT DIRECTOR) PERMITTED WORKERS TO PERFORM RIGGING ACTIVITIES WITHOUT ANY PROOF OF PRE TASK SAFETY MEETING., PERFORM D$2,500
2021-03-17ECB CLASS - 2 violation: MOBILE CRANE CN#928/20 CD#4741 WAS ERECTED AND IN OPERATION BUT H.M.O DID NOT DO HIS DAILY INSPECTION LOG.; BC3301.4, COMPLY WITH $625
2021-03-17ECB CLASS - 1 violation: RESPONDENT PERMITTED USE OF MOBILE CRANE CN#928/20 CD#4741 TO HOST MATERIALS.NO SAFETY MEETING/NO DAILY INSPECTION LOGS FROM H.M.O$1,250
2021-03-10Elevator permit: Furnish and install three (3) new MRL elevator as per attached drawings, Plan# N1G452, N1G453 and N1G454 new hoistway in the exist$663,120
2021-03-10Elevator permit: Furnish and install one (1) new MRL elevator as per attached drawings, Plan# N1G455. All work to comply with ASME A17.1-2005S, a$251,489
2021-03-08Permit Mechanical Systems — Permit Issued
2021-03-05Permit General Construction — Signed-off
2021-03-04Elevator permit: All work to comply with ASME ANSI A17.1 2000/2003, Chapter 30, Appendix K. ASME A17.1 2000/2003 Section 8.7.2.21 Section 16. Re-gr$5,000
2021-03-04Permit EQ — ISSUED
2021-03-03Permit Supported Scaffold — Signed-off
2021-03-03Permit Plumbing — Signed-off
2021-03-03Permit Plumbing — Signed-off
2021-03-02Job filed: PROPOSED INSTALLATION OF A TEMPORARY LOADING DOCK AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.LOADING
2021-03-02Job filed: PROPOSED INSTALLATION OF A TEMPORARY LOADING DOCK AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.LOADING
2021-03-02Job filed: PROPOSED INSTALLATION OF A TEMPORARY LOADING DOCK AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.LOADING
2021-03-01311: Consumer Complaint — Furniture Store
2021-03-01Permit Plumbing — Signed-off
2021-02-25Job filed: installation of a new 300-ton water-cooled, centrifugal electric chiller to replace an existing as shown on plans filed herewith. no change to use, eg$500,000
2021-02-24Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMP$5,000
2021-02-24Job filed: MODIFICATIONS TO HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH ALT.$500,000
2021-02-23Job filed: STRUCTURAL MODIFICATIONS INCLUDING ROOFTOP DUNNAGE, FLOOR AND ROOF FRAMED OPENINGS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY $150,000
2021-02-23Job filed: RENOVATIONS FOR MAKE READY WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH A$500,000
2021-02-19311: NonCompliance with Phased Reopening — Business not in compliance
2021-02-18311: Private or Charter School Reopening — N/A
2021-02-17311: Private or Charter School Reopening — N/A
2021-02-16Asbestos abatement: Removal — ACA Environmental Services, Inc.
2021-02-16Asbestos abatement: Removal — ACA Environmental Services, Inc.
2021-02-07311: Private or Charter School Reopening — N/A
2021-02-07Job filed: Plumbing work associated with Thebaud Hall renovation, including boiler room in a basement. No change of use, egress or occupancy.$275,000
2021-02-05Job filed: Plumbing work associated with 640 lab renovation, including remove: (1) sink; replace/relocate: (2) sinks, (1) fume hood; new: (3) fume hoods, (2) eye$70,350
2021-02-04Job filed: RENOVATION OF JMH LAB 640 as shown on plans filed herewith. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$120,225
2021-01-26Permit Mechanical Systems — Signed-off
2021-01-26Permit Mechanical Systems — Signed-off
2021-01-25Certificate of occupancy Temporary
2021-01-15Permit Plumbing — Signed-off
2021-01-12Permit EW — ISSUED
2021-01-12Permit EW — ISSUED
2021-01-07Job filed: gas boiler replacement as shown on plans filed herewith. no change to use, egress or occupancy$75,000
2021-01-07Job filed: gas boiler replacement as shown on plans filed herewith. no change to use, egress or occupancy$75,000
2020
2020-12-30Certificate of occupancy Temporary
2020-12-30Certificate of occupancy Final
2020-12-29FDNY inspection (THEATER)
2020-12-29Permit EQ — ISSUED
2020-12-22Job filed: INSTALLATION OF A TEMPORARY DEBRIS CHUTE AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.DEBRIS CHUTE SHAL
2020-12-22Job filed: INSTALLATION OF A TEMPORARY DEBRIS CHUTE AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.DEBRIS CHUTE SHAL
2020-12-22Job filed: INSTALLATION OF A TEMPORARY DEBRIS CHUTE AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.DEBRIS CHUTE SHAL
2020-12-22Job filed: INSTALLATION OF A TEMPORARY DEBRIS CHUTE AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION.NO CHANGE IN USE, EGRESS OR OCCUPANCY.DEBRIS CHUTE SHAL
2020-12-18Permit Construction Fence — Signed-off
2020-12-18Permit Sidewalk Shed — Signed-off
2020-12-18Job filed: APPLICATION IS FILED FOR ARCHITECTURAL WORK ASSOCIATED WITH THE EXISTING STAGE RIGGING SYSTEM RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$32,000
2020-12-18Job filed: APPLICATION IS FILED FOR ARCHITECTURAL WORK ASSOCIATED WITH THE EXISTING STAGE RIGGING SYSTEM RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$32,000
2020-10-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-10-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-10-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-10-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-10-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-10-23Boiler inspection
2020-10-23Boiler inspection
2020-10-21Permit Supported Scaffold — Signed-off
2020-10-20Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD IN THE ELEVATOR SHAFT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BU$5,000
2020-10-17311: Street Condition — Pothole
2020-10-15Permit Plumbing — Signed-off
2020-10-15ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION NOTED THE FACADE BRICK COLUMN AT EXPOSURE #2 IN DISRE$625
2020-08-30311: Violation of Park Rules — Social Distancing
2020-08-28FDNY inspection (ANNUL-COL-UNI)
2020-08-27Certificate of occupancy Temporary
2020-08-26Permit EW — ISSUED
2020-08-25311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-24311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-24311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-24Job filed: FILING HEREWITH FOR STORM MAIN PIPING AND ASSOCIATED FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CON$450,000
2020-08-24Job filed: FILING HEREWITH FOR SANITARY AND WATER MAIN PIPING WITH ASSOCIATED FIXTURSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$450,000
2020-08-22311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-18Permit Sidewalk Shed — Signed-off
2020-08-17DOB complaint, category ?
2020-08-17ECB CLASS - 1 violation: CLASS 2 VIOLATION ISSUED CAR DOOR RESTRICTOR CAM THATS IN HOIST WAY IS INSUFFICIENT REMEDY; ADJUST AND REPAIR CAM
2020-08-17Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ$4,500
2020-08-13Elevator permit: INSTALLATION OF ONE (1) NEW SCHINDLER 3300 PASSENGER TRACTION ELEVATOR INTO AN EXISTING BUILDING AS DESCRIBED HEREIN AND ON THE AT$143,000
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-13DOB complaint, category ?
2020-08-12Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 $10,000
2020-08-11Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-08-11Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-08-11Permit Mechanical Systems — Signed-off
2020-08-11ECB CLASS - 2 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. NOTED: AT TIME OF INSPECTION OF ALT-1 UNDER CONSTRUCTION
2020-08-11DOB complaint, category ?
2020-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT &/OR APPROVED AMENDMENTDS. NOTED: AT TIME OF INSPECTION OF A ALT-1 UNDER C$2,500
2020-08-10Rodent inspection: Failed for Rat Activity
2020-08-06Permit AL — ISSUED
2020-08-03Permit Mechanical Systems — Signed-off
2020-07-31Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-07-31Permit PL — ISSUED
2020-07-31Job filed: INSTALL OF TEMPORARY TENTS FOR COVID 19 SPACING REQUIREMENTS IN THE FORDHAM CAMPUS. ALL IN THE SAME LOT AND BLOCK. WEATHER MANAGEMENT REQUIRED BY FACI$5,000
2020-07-30Permit Plumbing — Signed-off
2020-07-28Elevator permit: INSTALLATION OF ONE (1) NEW SCHINDLER 3300 PASSENGER TRACTION ELEVATOR INTO AN EXISTING BUILDING AS DESCRIBED HEREIN AND ON THE AT$143,000
2020-07-14Job filed: Mechanical work associated with Thebaud Hall renovation of basement and 001 floor, minor work on 002-003 floors mech. rooms, including installation of$960,000
2020-07-14Job filed: Plumbing work associated with Thebaud Hall renovation including BAS and 001FL work. Replacement of the Plumbing fixtures and all associated associated$275,000
2020-06-30Job filed: THIS APPLICATION IS BEING FILED FOR 6 TEMPORARY TENTS TO HANDLE THE EMERGENCY OF COVID-19 PANDEMIC (CORONAVIRUS). THE TENTS WILL BE USED FOR PATIENTS $1,000,000
2020-06-30Job filed: THIS APPLICATION IS BEING FILED FOR 6 TEMPORARY TENTS TO HANDLE THE EMERGENCY OF COVID-19 PANDEMIC (CORONAVIRUS). THE TENTS WILL BE USED FOR PATIENTS $1,000,000
2020-06-29ZONE — from VALERA, MARCO
2020-06-29CERT — from STEWART TITLE INSURANCE COMPANY
2020-06-29Job filed: New supply and exhaust ductwork, new diffusers, return grilles and temperature sensor. Relocate existing control panel for rooftop unit. No change to $59,969
2020-06-29Job filed: STRUCTURAL WORK THAT INCLUDES ADDITIONAL STEEL TO ACCOMMODATE THE MOVEABLE PARTITION DURING FOOTBALL OFFICES RENOVATION$113,760
2020-06-26Permit Plumbing — Signed-off
2020-06-25Permit Sprinklers — Signed-off
2020-06-25Permit Standpipe — Signed-off
2020-06-24311: Illegal Fireworks — N/A
2020-06-24Permit Mechanical Systems — Permit Issued
2020-06-23Permit Sprinklers — Signed-off
2020-06-23Permit Standpipe — Signed-off
2020-06-23Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit PL — ISSUED
2020-06-17Permit Supported Scaffold — Signed-off
2020-06-17Permit Sidewalk Shed — Signed-off
2020-06-16Job filed: Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or o$4,000
2020-06-16Job filed: Installation of temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and$4,000
2020-06-15Job filed: Mechanical work associated with Thebaud Hall renovation of basement, installation of a temp.heater on a 1st floor,removal of old boilers, boiler breec$640,000
2020-06-15Job filed: Plumbing work associated with Thebaud Hall renovation, including boiler room in a basement. No change of use, egress or occupancy.$275,000
2020-06-12Permit EW — ISSUED
2020-06-10Permit Plumbing — Permit Issued
2020-06-10Job filed: HYDROTHERAPY ROOM RENOVATION IN CONJUNCTION WITH DOB # 240272183 AND #240272192. REMOVE (1) FLOOR DRAIN. RELOCATE (3) EXISTING FLOOR DRAINS. RELOCATE $6,000
2020-06-09Job filed: Plumbing work associated with JMH 6FL Advanced Chem Center renovation, including: Replace (4) emergency showers, replace/relocate: (2) sinks, (1) fume$125,000
2020-06-09Job filed: Mechanical work associated with existing bathrooms renovation at Martyr's Court, including the new gas-fired make-up air units on a roof and new exhau$151,175
2020-06-05Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-06-05Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-05-30311: School Maintenance — Air Conditioning Problem
2020-05-27Job filed: RENOVATION OF EXISTING BATHROOMS AT MARTYR'S COURT. ASSOCIATED PLUMBING SCOPE IS FILED UNDER "DOB NOW" JOB#X00339212, ASSOCIATED MECHANICAL SCOPE IS F$662,000
2020-05-26Permit Mechanical Systems — Signed-off
2020-05-21311: Street Sign - Missing — St Name - Attached to Pole
2020-05-20311: For Hire Vehicle Complaint — Car Service Company Complaint
2020-05-15Permit EW — ISSUED
2020-05-15Job filed: RENOVATION OF JMH ADVANCED CHEMISTRY TEACH & LEARN CENTER. ASSOCIATED PLUMBING SCOPE IS FILED UNDER "DOB NOW" JOB#X00345005. NO CHANGE OF USE, EGR$758,000
2020-05-14311: Non-Emergency Police Matter — Social Distancing
2020-05-14Permit EW — ISSUED
2020-05-14Job filed: RENOVATION OF THE THEBAUD HALL INCLUDING BOILER ROOM, 001 FLOOR OFFICES, MINOR SCOPE ON 002-003 FLOORS AND ROOF; TEMPORARY CHANGE OF EGRESS. ASSOCIATE$2,320,000
2020-05-14Job filed: STRUCTURAL WORK AT THEBAUD HALL INCLUDING WORK IN A BOILER ROOM, MEZZANINE FRAMING,001FL REPLACEMENT, ROOF FRAMING AND NEW DUNNAGE FOR MECHANICAL UNIT$1,825,000
2020-05-14Job filed: RENOVATION OF THE THEBAUD HALL INCLUDING BOILER ROOM, 001 FLOOR OFFICES, MINOR SCOPE ON 002-003 FLOORS AND ROOF; TEMPORARY CHANGE OF EGRESS. ASSOCIATE$2,320,000
2020-05-12Job filed: APPLICATION IS FILED FOR UNIVERSITY CHURCH FACADE AND BELL TOWER REPAIR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$150,000
2020-05-12Job filed: APPLICATION IS FILED FOR UNIVERSITY CHURCH FACADE AND BELL TOWER REPAIR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$150,000
2020-05-12Job filed: APPLICATION IS FILED FOR UNIVERSITY CHURCH FACADE AND BELL TOWER REPAIR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$150,000
2020-05-11Permit Mechanical Systems — Signed-off
2020-05-05Permit Mechanical Systems — Signed-off
2020-05-04Job filed: installation of new sink for the football offices as shown on plans filed herewith. no change to use, egress or occupancy.$25,000
2020-05-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-05-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-05-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-04-29Certificate of occupancy Temporary
2020-04-28311: Non-Emergency Police Matter — Social Distancing
2020-04-28Permit Mechanical Systems — Signed-off
2020-04-27Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-04-27Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-04-27Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-04-21Permit Plumbing — Signed-off
2020-04-16Job filed: New supply and exhaust ductwork, new diffusers, return grilles and temperature sensor. Relocate existing control panel for rooftop unit. No change to $59,969
2020-04-15Job filed: APPLICATION IS FILED FOR HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$236,000
2020-04-15Job filed: STRUCTURAL WORK ASSOCIATED WITH HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2020-04-15Job filed: STRUCTURAL WORK ASSOCIATED WITH HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2020-04-09311: Consumer Complaint — Tax Preparer
2020-04-07Job filed: STRUCTURAL WORK ASSOCIATED WITH HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2020-04-07Job filed: STRUCTURAL WORK ASSOCIATED WITH HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2020-04-06Job filed: APPLICATION IS FILED FOR FOOTBALL OFFICE SPACE RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$1,000,000
2020-04-06Job filed: APPLICATION IS FILED FOR HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$236,000
2020-04-06Job filed: APPLICATION IS FILED FOR HYDROTHERAPY ROOM RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$236,000
2020-04-06Job filed: APPLICATION IS FILED FOR FOOTBALL OFFICE SPACE RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$1,000,000
2020-04-02311: Non-Emergency Police Matter — Social Distancing
2020-03-31Job filed: FILING HEREWITH FOR STORM MAIN PIPING AND ASSOCIATED FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CON$450,000
2020-03-30Permit Plumbing — Signed-off
2020-03-30Job filed: MECHANICAL WORK ASSOCIATED WITH 2ND FLOOR RENOVATION INCLUDED DUCT WORK AND INSTALLATION OF NEW SPLIT UNITS.$50,000
2020-03-27311: Water System — Hydrant Knocked Over/Missing (WC)
2020-03-27Permit Supported Scaffold — Signed-off
2020-03-26Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 $10,000
2020-03-24Permit EW — ISSUED
2020-03-24Permit EW — ISSUED
2020-03-19Job filed: FILING HEREWITH FOR SANITARY AND WATER MAIN PIPING WITH ASSOCIATED FIXTURSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$450,000
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-11Job filed: CIVIL SITE WORK ASSOCIATED WITH SANITARY PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CO$450,000
2020-03-11Job filed: CIVIL SITE WORK ASSOCIATED WITH SANITARY PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CO$450,000
2020-03-10Job filed: CIVIL SITE WORK ASSOCIATED WITH STORM PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJU$450,000
2020-03-10Job filed: CIVIL SITE WORK ASSOCIATED WITH STORM PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJU$450,000
2020-03-06Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS PARTIALLY PLACED ON ROADWAY IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS$5,000
2020-03-06Job filed: INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS PARTIALLY PLACED ON ROADWAY IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EG$5,000
2020-03-05Permit EW — ISSUED
2020-03-05Permit EW — ISSUED
2020-03-04Permit EW — ISSUED
2020-02-28FDNY inspection (ANNUL-COL-UNI)
2020-02-28Job filed: INSTALLATION OF NEW AUTOMATIC WET COMBINED SPRINKLER-STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP$792,000
2020-02-27Job filed: FILING HEREWITH FOR MODIFICATIONS TO HVAC SYSTEM ASSOCIATED WITH DEMOLITION OF THE WEST WING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $500,000
2020-02-26Permit EW — ISSUED
2020-02-21Job filed: Installation of new Low Pressure gas piping to 3 Temp Boilers outside the Thebaud Hall. No change of use, egress or occupancy.$10,000
2020-02-18Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-18Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-18Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-14FDNY inspection (ANNUL-COL-UNI)
2020-02-14FDNY inspection (RISK)
2020-02-11Certificate of occupancy Temporary
2020-02-07Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2020-02-07311: Elevator — Elevator - Multiple Devices On Property
2020-02-07DOB complaint, category ?
2020-02-07ECB CLASS - 2 violation: 97R05: (97-R-05) WORK DONE WITHOUT PERMIT, DEVICE INSTALLED WITHOUT PERMIT. REMEDY: FILE APPLICATION & OBTAIN PERMIT$1,250
2020-02-07ECB CLASS - 2 violation: 97R9: (97-R-9) DEVICE ILLEGALLY REMOVED. REMEDY: FILE APPLICATION AND OBTAIN PERMIT$1,250
2020-02-05Permit Sprinklers — Signed-off
2020-02-04FDNY inspection (ANNUL-COL-UNI)
2020-02-04311: Elevator — Elevator - Multiple Devices On Property
2020-02-04DOB complaint, category ?
2020-02-04DOB complaint, category ?
2020-02-04DOB complaint, category ?
2020-02-03Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-03Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-03Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-03Asbestos abatement: Removal — ACA Environmental Services, Inc.
2020-02-03ECB CLASS - 1 violation: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. I OBSERVED OIL BURNER INSTALLER LICENSE NUMBER 005406 AFTER HAVING EWN$2,500
2020-01-31Job filed: FILED HEREWITH FOR PARTIAL DEMOLITION AS PER PLANS.$450,000
2020-01-29Job filed: FILING HEREWITH FOR SUPPORT OF EXCAVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCT$100,000
2020-01-29Job filed: FILING HEREWITH FOR EXCAVATION AND CAST-IN-PLACE FOUNDATION FOR NEW BUILDING ADDITION AS PER PLANS.$100,000
2020-01-29Job filed: FILING HEREWITH FOR SUPPORT OF EXCAVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCT$100,000
2020-01-28Job filed: FILING HEREWITH FOR PARTIAL STRUCTURAL DEMOLITION OF THE WEST WING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLI$250,000
2020-01-28Job filed: FILING HEREWITH FOR PARTIAL STRUCTURAL DEMOLITION OF THE WEST WING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLI$250,000
2020-01-28Job filed: FILING HEREWITH FOR PARTIAL STRUCTURAL DEMOLITION OF THE WEST WING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLI$250,000
2020-01-24Certificate of occupancy Temporary
2020-01-24Permit EW — ISSUED
2020-01-24Certificate of occupancy Temporary
2020-01-23Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2020-01-21Permit EW — ISSUED
2020-01-17Permit EW — ISSUED
2020-01-16311: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-07Permit EW — ISSUED
2020-01-07Permit EW — ISSUED
2020-01-07Permit EW — ISSUED
2020-01-07Permit EW — ISSUED
2020-01-07Permit EW — ISSUED
2020-01-07Permit EW — ISSUED
2020-01-06FDNY inspection (RISK)
2020-01-06Permit Construction Fence — Signed-off
2020-01-06Permit Sidewalk Shed — Signed-off
2020-01-06Job filed: INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS PARTIALLY PLACED ON ROADWAY IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EG$5,000
2020-01-06Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS PARTIALLY PLACED ON ROADWAY IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS$5,000
2020-01-03Job filed: APPLICATION IF FILED FOR INTERIOR RENOVATION OF PARTIAL CELLAR AT WALSH LIBRARY AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANC$300,000
2020-01-03Job filed: APPLICATION IF FILED FOR INTERIOR RENOVATION OF 2ND FLOOR OFFICES AT CUNNIFFE HAOUSE BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$200,000
2020-01-03Job filed: APPLICATION IF FILED FOR INTERIOR RENOVATION OF PARTIAL CELLAR AT WALSH LIBRARY AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANC$300,000
2019
2019-12-30Permit Sidewalk Shed — Signed-off
2019-12-24Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000
2019-12-21Permit Plumbing — Signed-off
2019-12-20Job filed: Mechanical work associated with partial cellar renovation at the Walsh Library (Fordham University) including the re-routing of the existing ductwork.$100,000
2019-12-18Job filed: FILING HEREWITH FOR REMOVAL OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR THE SOFT DEMOLITION OF THE WEST WING AS PER PLANS FILED HEREWI$500,000
2019-12-18Job filed: TEMPORARY EGRESS INCLUDING EXTERIOR DEMOLITION AND LANDSCAPING WITH SITE PREPARATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OR OCCUPANCY UNDER $1,000
2019-12-17Job filed: Installation of small exhaust fan, new ductwork supply and exhaust ductwork, new controls for supply and exhaust systems. Selective demolition of exis$156,492
2019-12-16Job filed: Installation of new Low Pressure gas piping to 3 Temp Boilers outside the Thebaud Hall. No change of use, egress or occupancy.$10,000
2019-12-16Job filed: Installation of new High Pressure gas piping to 3 Temp Boilers outside the Thebaud Hall.$10,000
2019-12-13FDNY inspection (ANNUL-COL-UNI)
2019-12-12Permit Plumbing — Signed-off
2019-12-10FDNY inspection (ANNUL-COL-UNI)
2019-12-10FDNY inspection (RISK)
2019-12-09Permit Structural — Signed-off
2019-12-09Job filed: Sprinkler work associated with partial renovation at Walsh Library (Fordham University) as shown no plans filed herewith. Sprinkler work includes the $75,000
2019-12-06FDNY inspection (RISK)
2019-12-06FDNY inspection (ANNUL-COL-UNI)
2019-12-06Job filed: Remedial structural support installation on 2 floor, attic and the roof. Interior work only. No change of use, egress or occupancy.$350,000
2019-11-29FDNY inspection (ANNUL-COL-UNI)
2019-11-26Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$38,500
2019-11-26Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$9,265
2019-11-26Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$9,625
2019-11-26Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$9,625
2019-11-26Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$38,500
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-25Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-11-20Permit EW — ISSUED
2019-11-19Job filed: GAS PIPING, WATER AND SANITARY PIPING RELOCATION WITHIN THE SAME ROOM ON 6TH FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$150,000
2019-11-18Permit Mechanical Systems — Signed-off
2019-11-18Certificate of occupancy Temporary
2019-11-18Job filed: Installation of new High Pressure gas piping to 3 Temp Boilers outside the Thebaud Hall.$10,000
2019-11-12FDNY inspection (THEATER)
2019-11-12FDNY inspection (ANNUL-COL-UNI)
2019-11-04Certificate of occupancy Temporary
2019-10-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-10-29Job filed: 19_864_ Homecoming event in tents for invited guests of fordham University. Food and beverage served.
2019-10-24Cooling tower inspection
2019-10-18Permit PL — ISSUED
2019-10-17Permit EW — ISSUED
2019-10-17Permit EW — ISSUED
2019-10-16Job filed: Installation of 4 new mechanical units and associated ductwork within the Rose Hill Gym building. No change of use, egress or occupancy.$100,000
2019-10-15FDNY inspection (ANNUL-COL-UNI)
2019-10-15FDNY inspection (RISK)
2019-10-15Rodent inspection: Passed
2019-10-07FDNY inspection (ANNUL-COL-UNI)
2019-10-07FDNY inspection (RISK)
2019-10-07Permit EW — ISSUED
2019-09-30311: Lost Property — Bag/Wallet
2019-09-26Certificate of occupancy Temporary
2019-09-24311: Air Quality — Air: Dust, Other (Use Comments) (AE5)
2019-09-20Job filed: GAS PIPING, WATER AND SANITARY PIPING RELOCATION WITHIN THE SAME ROOM ON 6TH FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$150,000
2019-09-11Permit EW — ISSUED
2019-09-11Permit EW — ISSUED
2019-09-11Permit EW — ISSUED
2019-09-06Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-08-27ECB CLASS - 1 violation: AT TIME OF INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE , I OBSERVED IN BOILER ROOM AND NEW MOBILE BOILER LOCATION APROX. 200
2019-08-21Job filed: Modification to existing Verizon telecommunications site. Replace 3 antennas on roof. All in conformance with TPPN 5/98. No change in use, egress, or $3,300
2019-08-09Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-08-09Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-08-08Boiler inspection
2019-08-08311: HEAT/HOT WATER — ENTIRE BUILDING
2019-08-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-08-07Job filed: 19_451-Lunch Orientation - Private Campus lunch orientation event for new students in tent
2019-08-01DOB complaint, category ?
2019-08-01DOB complaint, category ?
2019-07-30ECB CLASS - 2 violation: CLEAVER BROOKS BOILER MDL# CB-400-250. MISSING LADDER AND PLATFORM. MISSING DISCHARGE PIPING ON SAFETY VALVE BODY DRAIN. RESOLVE V$625
2019-07-30ECB CLASS - 2 violation: CLEAVER BROOKS BOILER MDL# CB-900-150. MISSING LADDER AND PLATFORM. MISSING DISCHARGE PIPING ON SAFETY VALVE BODY DRAIN. MISSING C$625
2019-07-30ECB CLASS - 2 violation: CLEAVER BROOKS BOILER MDL# CB-400-250. MISSING LADDER AND PLATFORM. MISSING DISCHARGE PIPING ON SAFETY VALVE BODY DRAIN. RESOLVE V$625
2019-07-28311: Homeless Person Assistance — N/A
2019-07-26Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-26Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-26Permit EW — ISSUED
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-22Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-07-19Permit EW — ISSUED
2019-07-18Job filed: FACADE REHABILITATION AS SHOWN ON PLANS.$597,000
2019-07-18Job filed: FACADE REHABILITATION AS SHOWN ON PLANS.$597,000
2019-07-05Certificate of occupancy Temporary
2019-07-03ECB CLASS - 1 violation: ELECTRICAL WORK WITHOUT A PERMIT.FOR THE INSTALLATION OF TEMPORARY LIGHTS IN THE BOILER ROOM.REM:OBTAIN PERMIT.$800
2019-07-02ECB CLASS - 2 violation: KEWANEE L3S-200 BOILER. EXPLOSION DOOR NEEDS NEW GASKET. FRONT REFRACTORY SHOWS PROOF OF DETERIORATION. RESOLVE VIOLATING CONDITIO$625
2019-07-02ECB CLASS - 2 violation: KEWANEE L3S-200 BOILER. EXPLOSION DOOR NEEDS NEW GASKET. FRONT REFRACTORY SHOWS PROOF OF DETERIORATION. REAR OBSERVATION PORT GLAS$625
2019-07-01Cooling tower inspection
2019-07-01Cooling tower inspection
2019-06-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-06-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-06-28Job filed: FILING HEREWITH FOR SUPERSTRUCTURE AS PER PLANS.
2019-06-28Job filed: FILING HEREWITH FOR FOUNDATION/EXCAVATION AS PER PLANS.
2019-06-28Job filed: A1$1,000,000
2019-06-28Job filed: FILING HEREWITH FOR SUPERSTRUCTURE AS PER PLANS.
2019-06-28Job filed: MODIFICATIONS TO HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.
2019-06-28Job filed: FILING HEREWITH FOR FOUNDATION/EXCAVATION AS PER PLANS.
2019-06-25ECB CLASS - 1 violation: CLEAVER BROOKS H.P. BOILER MDL# CB200X. CORRUGATED FURNACE COLLAPSED AND SPLIT. DO NOT OPERATE BOILER UNTIL ALL HAZARDOUS CONDITIO$1,250
2019-06-25ECB CLASS - 2 violation: CLEAVER BROOKS H.P. BOILER MDL# CB200X. OBSERVED EXCESSIVE THERMAL HEAT ON REAR DOOR OF BOILER CAUSING BLISTERING. RESOLVE VIOLATI$312
2019-06-25ECB CLASS - 2 violation: CLEAVER BROOKS H.P. BOILER MDL# CB200X. OBSERVED EXCESSIVE THERMAL HEAT ON REAR DOOR OF BOILER CAUSING BLISTERING. RESOLVE VIOLATI$312
2019-06-25DOB complaint, category ?
2019-06-24Permit EW — ISSUED
2019-06-21FDNY inspection (ANNUL-COL-UNI)
2019-06-21FDNY inspection (ANNUL-COL-UNI)
2019-06-21FDNY inspection (ANNUL-COL-UNI)
2019-06-21FDNY inspection (ANNUL-COL-UNI)
2019-06-21FDNY inspection (ANNUL-COL-UNI)
2019-06-21FDNY inspection (OTHER)
2019-06-18Permit PL — ISSUED
2019-06-14Permit EW — ISSUED
2019-06-14Permit EW — ISSUED
2019-06-14Job filed: PLUMBING, MECHANICAL AND FIRE PROTECTION SCOPE ASSOCIATED WITH ADA ELEVATOR INSTALLATION WITHIN THE COLLINS HALL. NO CHANGE OF USE, EGRESS OR OCCUPANC$40,500
2019-06-14Job filed: PLUMBING, MECHANICAL AND FIRE PROTECTION SCOPE ASSOCIATED WITH ADA ELEVATOR INSTALLATION WITHIN THE COLLINS HALL. NO CHANGE OF USE, EGRESS OR OCCUPANC$40,500
2019-06-14Job filed: PLUMBING, MECHANICAL AND SPRINKLER WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.$483,000
2019-06-14Job filed: APPLICATION IS FILED FOR INTERIOR RENOVATION TO CHANGE THE USE IN THE BASEMENT TO ESTABLISH THE BAND ROOM AS SHOWN ON PLANS FILED HEREWITH.$812,000
2019-06-14Job filed: APPLICATION IS FILED FOR REMOVAL OF EXISTING MASONRY WALLS AND COLUMN ENCLOSURES, PORTIONS OF TWO GWB PARTITIONS, AND CUTTING AND CHOPPING OF EXISTING$30,000
2019-06-12Job filed: STRUCTURAL SCOPE ASSOCIATED WITH ADA ELEVATOR INSTALLATION WITHIN THE COLLINS HALL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$555,400
2019-06-12Job filed: APPLICATION IS FILED FOR INSTALLATION OF ADA COMPLIANT ELEVATOR SHAFT WITHIN THE COLLINS HALL FROM BASEMENT TO MEZZANINE. NO CHANGE TO USE, EGRESS OR $397,600
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$18,000
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$33,000
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$22,500
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$15,000
2019-05-28Elevator permit: FURNISH AND INSTALL DOOR LOCK MONITORING SYSTEM. ALL WORK TO COMPLY WITH ASME A17.3 OF 2002, AS MODIFIED BY CHAPTER 30 OF 2014 NYC$7,500
2019-05-23Permit EW — ISSUED
2019-05-23Permit EW — ISSUED
2019-05-22Certificate of occupancy Temporary
2019-05-21FDNY inspection (ANNUL-COL-UNI)
2019-05-21Job filed: APPLICATION IS FILED FOR ROSE HILL GYM INTERIOR RENOVATION INCLUDING THE FLOOR REPLACEMENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS $1,015,270
2019-05-21Job filed: STRUCTURAL WORK ASSOCIATED WITH FLOOR REPLACEMENT AT ROSE HILL GYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$1,271,954
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-14Job filed: 19_054 Jubilee Weekend Dance. Dinner and drinks served. Event program has three occupancies. See Description.
2019-05-14Job filed: .$281,112
2019-05-13Job filed: 19_054 GSAS + PADD Weekend Dance. Dinner and drinks served
2019-05-07FDNY inspection (ANNUL-COL-UNI)
2019-05-07Job filed: 19_054 GSAS + PADD Weekend Dance. Dinner and drinks served
2019-05-03FDNY inspection (ANNUL-COL-UNI)
2019-04-26FDNY inspection (ANNUL-COL-UNI)
2019-04-18Job filed: 19_053 Concert and Party for Fordham Spring weekend and Under the tent event.
2019-04-17Permit AL — ISSUED
2019-04-11Certificate of occupancy Temporary
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05Job filed: INSTALL OF TENTS AND OTHER PRODUCTION EQUIPMENT FOR ANNUAL FORDHAM UNIV. EVENT PROGRAMMING. NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQU$5,000
2019-04-03Rodent inspection: Passed
2019-04-02Job filed: CIVIL SITE WORK AND RELOCATION OF EXISTING PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$3,687,000
2019-03-28Asbestos abatement: Removal — ACA Environmental Services, Inc.
2019-03-28311: Street Condition — Pothole
2019-03-21Permit AL — ISSUED
2019-03-19Job filed: INSTALLATION OF TEMPORARY SHORING AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.$16,254
2019-03-19Job filed: INSTALLATION OF TEMPORARY SHORING AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.$16,254
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection — defects found
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection
2019-03-15Boiler inspection — defects found
2019-03-15Boiler inspection
2019-03-14DOB complaint, category ?
2019-03-08Permit EW — ISSUED
2019-03-06DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-03-05FDNY inspection (ANNUL-COL-UNI)
2019-03-04FDNY inspection (ANNUL-COL-UNI)
2019-02-25FDNY inspection (ANNUL-COL-UNI)
2019-02-25Certificate of occupancy Temporary
2019-02-22Mortgage satisfied — from SEMPER, RUTHLIN; SEMPER, CHARLES to QUICKEN LOANS, INC.
2019-02-22Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $13,900
2019-02-22FDNY inspection (ANNUL-COL-UNI)
2019-02-08FDNY inspection (ANNUL-COL-UNI)
2019-01-29FDNY inspection (ANNUL-COL-UNI)
2019-01-23TERA — from DANESHVAR, SHAHIN to 625 FORDHAM LLC
2019-01-15Certificate of occupancy Temporary
2019-01-13311: Taxi Complaint — Driver Complaint
2019-01-09Job filed: LEGALIZATION OF EXISTING INDIVIDUALLY CODED INTERIOR FIRE ALARM SYSTEM AT JOHN MUCAHY HALL IN ACCORDANCE WITH FDNY LETTER FP INDEX # 18071108 DATED NO$1,000
2019-01-09Job filed: LEGALIZATION OF EXISTING INDIVIDUALLY CODED INTERIOR FIRE ALARM SYSTEM AT JOHN MUCAHY HALL IN ACCORDANCE WITH FDNY LETTER FP INDEX # 18071108 DATED NO$1,000
2019-01-07FDNY inspection (ANNUL-COL-UNI)
2018
2018-12-26Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-12-26Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-12-26Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-12-21ECB CLASS - 1 violation: 97.1.10=RESTORE SERVICE SO FILE INSPECTION BE MADE BY THE DEPT.
2018-12-14FDNY inspection (ANNUL-COL-UNI)
2018-12-11Job filed: INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$25,000
2018-12-10Job filed: INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$15,000
2018-12-04Certificate of occupancy Temporary
2018-11-27FDNY inspection (THEATER)
2018-11-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-09-11Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. HOMECOMING ON EDWARDS PARADE SCHEDULED ON SEPTEMBER, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT $5,000
2018-09-10Permit EW — ISSUED
2018-09-10Job filed: APPLICATION IS FILED FOR ROOF REPLACEMENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$347,800
2018-09-06Permit EW — ISSUED
2018-09-05Job filed: Modification to existing Verizon telecommunications site. Replace 3 antennas on roof. All in conformance with TPPN 5/98. No change in use, egress, or $3,300
2018-08-23Permit AL — ISSUED
2018-08-23Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. EVENTS, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED FOR SOME LAYOUTS. ALL EQUIPMENT REMOVED$5,000
2018-08-17Permit AL — ISSUED
2018-08-13Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. LUNCH ORIENTATION ON MARTYRS LAWN, SCHEDULED ON AUGUST 24, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA P$5,000
2018-08-10Permit EW — ISSUED
2018-08-10Job filed: APPLICATION IS FILED FOR ROOF REPLACEMENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$503,485
2018-08-08Cooling tower inspection
2018-08-07Elevator permit: Furnish and Install Door Lock Monitoring. All work to comply with ASME A17.3-2003 as modified by Chapter K3 of 2014 NYC BC Appendi$16,000
2018-08-07Elevator permit: Furnish and Install Door Lock Monitoring. All work to comply with ASME A17.3-2003 as modified by Chapter K3 of 2014 NYC BC Appen$7,500
2018-08-07Elevator permit: Furnish and Install Door Lock Monitoring. All work to comply with ASME A17.3-2003 as modified by Chapter K3 of 2014 NYC BC Appendi$7,500
2018-08-07Elevator permit: Furnish and Install Door Lock Monitoring. All work to comply with ASME A17.3-2003 as modified by Chapter K3 of 2014 NYC BC Appen$8,000
2018-08-07Permit Supported Scaffold — Signed-off
2018-08-06Job filed: Installation of Pipe Scaffold as per plans.$4,000
2018-08-02Permit Sidewalk Shed — Signed-off
2018-08-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-08-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-08-01Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-08-01Job filed: Installation of Sidewalk Shed as per Plans.$4,000
2018-07-20DOB complaint, category ?
2018-07-10Permit PL — ISSUED
2018-06-30Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-06-30Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-06-25FDNY inspection (ANNUL-COL-UNI)
2018-06-22FDNY inspection (ANNUL-COL-UNI)
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-20Cooling tower inspection
2018-06-19FDNY inspection (ANNUL-COL-UNI)
2018-06-18Permit EW — ISSUED
2018-06-18Permit EW — ISSUED
2018-06-18DOB violation E:
2018-06-18DOB violation E:
2018-06-18DOB violation E:
2018-06-15Job filed: APPLICATION IS FILED FOR MECHANICAL SCOPE ASSOCIATED WITH 001 FLOOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$34,760
2018-06-15Job filed: APPLICATION IS FILED FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON A FIRST FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCU$12,000
2018-06-15Job filed: APPLICATION IS FILED FOR DEALY HALL FIRST FLOOR LOBBY,CORRIDOR AND CLASSROOMS RENOVATIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR$750,836
2018-06-15Job filed: APPLICATION IS FILED FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON A FIRST FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCU$12,000
2018-06-15Job filed: APPLICATION IS FILED FOR DEALY HALL FIRST FLOOR LOBBY,CORRIDOR AND CLASSROOMS RENOVATIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR$750,836
2018-06-14DOB violation E:
2018-06-14DOB violation E:
2018-06-14DOB violation E:
2018-06-14DOB violation E:
2018-06-14DOB violation E:
2018-06-13DOB violation E:
2018-06-11FDNY inspection (ANNUL-COL-UNI)
2018-06-11Elevator permit: Filing this application to modernize of the above mentioned device as details listed below. All work to conform to Safety Code fo$165,000
2018-06-08FDNY inspection (ANNUL-COL-UNI)
2018-06-08FDNY inspection (ANNUL-COL-UNI)
2018-06-05Permit EW — ISSUED
2018-06-05Permit EW — ISSUED
2018-06-04Boiler inspection
2018-05-29FDNY inspection (ANNUL-COL-UNI)
2018-05-29Permit AL — ISSUED
2018-05-29Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. JUBILEE SCHEDULED ON JUNE 1 TO 3, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED. ALL EQ$5,000
2018-05-29Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. JUBILEE SCHEDULED ON JUNE 1 TO 3, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED. ALL EQ$5,000
2018-05-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-05-24Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-05-17Permit Sidewalk Shed — Signed-off
2018-05-17Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000
2018-05-16FDNY inspection (SPECIAL-OTH)
2018-05-15Permit AL — ISSUED
2018-05-14Certificate of occupancy Temporary
2018-05-11Boiler inspection
2018-05-11Boiler inspection
2018-05-11Boiler inspection
2018-05-11Boiler inspection
2018-05-11FDNY inspection (ANNUL-COL-UNI)
2018-05-11Job filed: PLUMBING, MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 003 FLOOR, JOHN MULCAHY HALL BUILDING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO $697,000
2018-05-11Job filed: APPLICATION IS FILED FOR INTERIOR RENOVATION OF 003 FLOOR AND STOREFRONT REPAIR, JOHN MULCAHY HALL BUILDING AS SHOWN ON PLANS FILED HEREWITH. NO CHANG$783,000
2018-05-11Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ASSOCIATED WITH INTERIOR RENOVATION OF 003 FLOOR, JOHN MULCAHY HALL BUILDING AS SHOWN ON PLANS FILED HEREWI$31,500
2018-05-11Job filed: APPLICATION IS FILED FOR INTERIOR RENOVATION OF 003 FLOOR AND STOREFRONT REPAIR, JOHN MULCAHY HALL BUILDING AS SHOWN ON PLANS FILED HEREWITH. NO CHANG$783,000
2018-05-11Job filed: PLUMBING, MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 003 FLOOR, JOHN MULCAHY HALL BUILDING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO $697,000
2018-05-11Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ASSOCIATED WITH INTERIOR RENOVATION OF 003 FLOOR, JOHN MULCAHY HALL BUILDING AS SHOWN ON PLANS FILED HEREWI$31,500
2018-05-10Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. PADD SCHEDULED ON MAY 18, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED. ALL EQUIPMENT $5,000
2018-05-10Job filed: INSTALL OF TEMP TENTS FOR FORDHAM UNIV. PADD SCHEDULED ON MAY 18, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED. ALL EQUIPMENT $5,000
2018-05-08FDNY inspection (ANNUL-COL-UNI)
2018-05-07FDNY inspection (ANNUL-COL-UNI)
2018-04-27Asbestos abatement: Removal — ACA Environmental Services, Inc.
2018-04-27FDNY inspection (ANNUL-COL-UNI)
2018-04-26Boiler inspection
2018-04-19311: Food Poisoning — 1 or 2
2018-04-18Permit AL — ISSUED
2018-04-18Job filed: INSTALL OF TEMP TENTS AND PLATFORM FOR UNDER THE TENT SCHEDULED ON APRIL 28, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED. ALL$5,000
2018-04-18Job filed: INSTALL OF TEMP TENTS AND PLATFORM FOR UNDER THE TENT SCHEDULED ON APRIL 28, 2018, NO ALTERATION OF EXISTING STRUCTURES, A TPA PERMIT IS REQUIRED. ALL$5,000
2017-11-21Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000
2017-11-21Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000