Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

3304 White Plains Road · Bronx · BBL 2046000002 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class4
PestsBedbug filings, failed rodent inspections, rodent 311s3.5
DisplacementMarshal evictions executed4
GRADE C

A meaningful record of code violations or complaints relative to its peers. More recorded distress than 93% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty points per 10 units; this building carries 38.3. In ZIP 10467, 51% of residential buildings hold an A and 15% grade D or F. How grades work

this building
A
C

Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations13 total — 2 class C (immediately hazardous), 9 class B, 2 class A. Oldest open since 2005-05-25.

status snapshot refreshed weekly from HPD records

Patterns

1 heat or hot-water complaints in the last three years (winter 2025–26: 1).

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

11 service requests in the last three years. Most common: Noise (4) · Food Establishment (1) · Illegal Parking (1) · Non (1) · Rodent (1) · Indoor Air Quality (1).

Filed construction activity

No permitted work with a declared cost filed in the last decade. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1930)
NoSix or more residential units (1)
No421-a / J-51 tax benefit on the current tax roll

1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$807,000 $48,420
2026$731,000 $43,860
2027$670,000 $40,200

The city's market estimate has fallen 17% between tax years 2025 and 2027.

Restaurants in this building

RestaurantCuisineGradeNotes
Triple Z'S Bar & LoungeAmericanAMice evidence

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 1 with mice evidence · See them on the Mice Map

1 Food Establishment complaint to 311 at this address in the last three years (most often: Rodents/Insects/Garbage) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayBurke Av — 2 5 · 650 ft straight-line (about a 3-minute walk) · station accessibility: none
BusNearest boarding stop: White Plains Rd / Magenta St — Bx39 · 600 ft
Citi BikeE 205 St & Webster Ave · 0.4 mi · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 041 Gun Hill Road
Middle: 287, 370. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

3304 White Plains Road

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

11 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $89,909 on 2016-04-12 (lender: Secretary Of Housing And Urban Development). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-05-12M&CON $867,300 — from OSIME, EMMANUEL to BANK OF AMERICA, N.A.; SHELLPOINT MORTGAGE SERVICING; NEWREZ LLC $867,300
2025-11-06M&CON $845,265 — from OSIME, EMMANUEL to NEWREZ LLC; SHELLPOINT MORTGAGE SERVICING $845,265
2016-07-15M&CON $550,806 — from OSIME, EMMANUEL to BANK OF AMERICA, N.A. $550,806
2016-04-12Mortgage $89,910 — from OSIME, EMMANUEL to SECRETARY OF HOUSING AND URBAN DEVELOPME $89,910
2009-01-22Mortgage $32,489 — from OSIME, EMMANUEL to SECRETARY OF HOUSING & URBAN DEVELOPMENT $32,489
2005-03-25Mortgage $400,000 — from OSIME, EMMANUEL to MERS $400,000
2005-03-25Deed $433,500 — from JUNCAJ, NIKOLA to OSIME, EMMANUEL $433,500
2003-11-03AL&R $206,500 — from GREENPOINT MORTGAGE FUNDING INC to JUNCAJ, NIKOLA $206,500
2003-11-03Mortgage $206,500 — from JUNCAJ, NIKOLA to GREENPOINT MORTGAGE FUNDING INC $206,500

Ten-year activity

100500
2017
2018
2019
57
2020
2021
2022
2023
2024
2025
2026
EnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201700112
201801012
201900033
20200560157
202104004
202205027
20232120216
202413105
202513105
202615129
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 11 records

DateRecord
2026-09-24311: Building/Use — Illegal Conversion Of Residential Building/Space
2026-09-24DOB complaint, category ?
2026-05-12M&CON $867,300 — from OSIME, EMMANUEL to BANK OF AMERICA, N.A.; SHELLPOINT MORTGAGE SERVICING; NEWREZ LLC
2026-03-12Rodent inspection: Passed
2026-01-30Rodent inspection: Failed for Rat Activity and Other Reason
2026-01-29311: Consumer Complaint — Barber Shop, Beauty Salon, or Nail Salon
2026-01-21311: Indoor Air Quality — Sewage Odor
2026-01-21311: Rodent — Rat Sighting
2026-01-21311: Non-Residential Heat — Inadequate or No Heat
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-06M&CON $845,265 — from OSIME, EMMANUEL to NEWREZ LLC; SHELLPOINT MORTGAGE SERVICING

The full timeline

2026
2026-09-24311: Building/Use — Illegal Conversion Of Residential Building/Space
2026-09-24DOB complaint, category ?
2026-05-12M&CON $867,300 — from OSIME, EMMANUEL to BANK OF AMERICA, N.A.; SHELLPOINT MORTGAGE SERVICING; NEWREZ LLC$867,300
2026-03-12Rodent inspection: Passed
2026-01-30Rodent inspection: Failed for Rat Activity and Other Reason
2026-01-29311: Consumer Complaint — Barber Shop, Beauty Salon, or Nail Salon
2026-01-21311: Indoor Air Quality — Sewage Odor
2026-01-21311: Rodent — Rat Sighting
2026-01-21311: Non-Residential Heat — Inadequate or No Heat
2025
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-06M&CON $845,265 — from OSIME, EMMANUEL to NEWREZ LLC; SHELLPOINT MORTGAGE SERVICING$845,265
2025-08-06Eviction executed (1ST)
2025-03-07311: Noise - Residential — Loud Music/Party
2025-03-01311: Noise - Residential — Loud Music/Party
2024
2024-12-14311: Illegal Parking — Double Parked Blocking Traffic
2024-10-27311: Noise - Residential — Loud Music/Party
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-08-11311: Noise - Commercial — Loud Music/Party
2024-07-23Mortgage assigned — from EVERBANK to BANK OF AMERICA, N.A.
2023
2023-11-06311: Food Establishment — Rodents/Insects/Garbage
2023-10-15311: Noise - Commercial — Loud Talking
2023-10-11311: Noise - Commercial — Loud Music/Party
2023-10-08311: Noise - Commercial — Loud Music/Party
2023-10-04311: Noise - Commercial — Loud Music/Party
2023-09-30311: Noise - Commercial — Loud Music/Party
2023-09-27311: Noise - Commercial — Loud Music/Party
2023-09-23311: Noise - Commercial — Loud Music/Party
2023-09-16311: Noise - Commercial — Loud Music/Party
2023-07-16311: Food Establishment — Food Worker Hygiene
2023-07-16311: Food Establishment — Food Protection
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-03Restaurant inspection: TRIPLE Z'S BAR & LOUNGE — grade A
2023-03-03311: Drinking — Underage - Licensed Est
2023-02-02Restaurant inspection: TRIPLE Z'S BAR & LOUNGE · mice evidence
2022
2022-12-31311: Noise - Commercial — Loud Music/Party
2022-11-16311: Illegal Parking — Posted Parking Sign Violation
2022-10-21311: Street Condition — Dumpster - Construction Waste
2022-08-12Rodent inspection: Passed
2022-07-30311: Noise - Commercial — Car/Truck Music
2022-07-17311: Noise - Commercial — Loud Music/Party
2022-06-21Rodent inspection: Failed for Rat Activity
2021
2021-11-07311: Noise - Commercial — Loud Music/Party
2021-03-12311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-21311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2021-01-11311: NonCompliance with Phased Reopening — Business not in compliance
2020
2020-12-30311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-22311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-19311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-08Boiler inspection
2020-11-27311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-24311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2020-11-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-10311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-07311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-29311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-25311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2020-10-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-16311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-14311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-13311: NonCompliance with Phased Reopening — Business not in compliance
2020-09-30311: NonCompliance with Phased Reopening — Business not in compliance
2020-09-09311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-25311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-21311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-18311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-12311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-11311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-07311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-05311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-03311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-31311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-29311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-28311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-28311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-07-24311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-22311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-07-20311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-14311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-11311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-08311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-07311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-07311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-06311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-07-06311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-05311: Noise - Street/Sidewalk — Loud Talking
2020-06-25311: Illegal Fireworks — N/A
2020-06-25311: Non-Emergency Police Matter — Face Covering Violation
2020-06-04311: Non-Emergency Police Matter — Social Distancing
2020-06-04311: Non-Emergency Police Matter — Social Distancing
2020-05-26311: Noise - Commercial — Loud Music/Party
2020-05-26311: Non-Emergency Police Matter — Social Distancing
2020-05-22311: Non-Emergency Police Matter — Social Distancing
2020-05-21311: Non-Emergency Police Matter — Social Distancing
2020-05-20311: Non-Emergency Police Matter — Social Distancing
2020-05-19311: Non-Emergency Police Matter — Social Distancing
2020-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2019
2019-12-05Boiler inspection
2019-07-05Rodent inspection: Passed
2019-05-21Rodent inspection: Failed for Rat Activity
2018
2018-12-07Boiler inspection
2018-01-03311: Graffiti — Graffiti
2017
2017-12-06Boiler inspection
2017-03-07Mortgage assigned — from BANK OF AMERICA, NA to EVERBANK
2016
2016-07-15M&CON $550,806 — from OSIME, EMMANUEL to BANK OF AMERICA, N.A.$550,806
2016-06-30Mortgage assigned — from EVERBANK; BANK OF AMERICA N.A. to BANK OF AMERICA, N.A.
2016-06-21Mortgage assigned — from BANK OF AMERICA NA; EVERBANK to BANK OF AMERICA, N.A.
2016-04-12Mortgage $89,910 — from OSIME, EMMANUEL to SECRETARY OF HOUSING AND URBAN DEVELOPME$89,910
2015
2015-07-17Tenant complaint: ELECTRIC — NO LIGHTING
2015-07-17Tenant complaint: ELECTRIC — NO LIGHTING
2015-07-17311: ELECTRIC — NO LIGHTING
2015-07-17311: ELECTRIC — NO LIGHTING
2014
2014-12-30311: Consumer Complaint — False Advertising
2014-07-25Mortgage assigned — from BANK OF AMERICA, N.A. SUCCESSOR BY MERGE to EVERBANK
2014-02-27FDNY inspection (RISK)
2013
2013-06-12311: Street Light Condition — Street Light Out
2012
2012-09-21HPD class A: SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE AT PUBLIC HALL, 2nd STORY
2012-09-21HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE DOOR LOCK AT VESTIBULE AT PUBLIC HALL, 1st STORY
2012-09-21HPD class A: SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CONCEALED WATER LEAK AT CEILING AT PUBLIC HALL,
2012-09-20Tenant complaint: GENERAL — DOORS
2012-09-20Tenant complaint: GENERAL — LOCKS
2012-09-20Tenant complaint: PLUMBING — WATER-LEAKS
2012-09-20Tenant complaint: PLUMBING — WATER-LEAKS
2012-09-20Tenant complaint: ELECTRIC — LIGHTING
2012-09-20Tenant complaint: ELECTRIC — LIGHTING
2012-09-20Tenant complaint: GENERAL — LOCKS
2012-09-20311: ELECTRIC — LIGHTING
2012-09-20311: PLUMBING — WATER-LEAKS
2012-09-20311: PLUMBING — WATER-LEAKS
2012-09-20311: GENERAL CONSTRUCTION — LOCKS
2012-09-20311: GENERAL CONSTRUCTION — LOCKS
2012-09-20311: ELECTRIC — LIGHTING
2012-09-20311: GENERAL CONSTRUCTION — DOORS
2012-01-09Mortgage assigned — from MERS; COUNTRYWIDE HOME LOANS INC. to BAC HOME LOANS SERVICING LP
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-02-23Tenant complaint: HEATING — HEAT RELATED
2011-02-23311: HEATING — HEAT
2009
2009-12-31DOB violation LBLVIO:
2009-12-30HPD litigation: Heat and Hot Water
2009-12-22HPD class B: SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST
2009-12-17Tenant complaint: HEATING — HEAT RELATED
2009-12-16Tenant complaint: HEATING — HEAT RELATED
2009-12-16Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-16Tenant complaint: PLUMBING — RADIATOR
2009-12-16Tenant complaint: PLUMBING — RADIATOR
2009-12-15HPD litigation: Tenant Action
2009-12-15Tenant complaint: HEATING — HEAT RELATED
2009-12-15Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-15Tenant complaint: PAINT/PLASTER — CEILING
2009-12-15Tenant complaint: PLUMBING — RADIATOR
2009-12-15Tenant complaint: PLUMBING — RADIATOR
2009-12-15Tenant complaint: PLUMBING — RADIATOR
2009-12-15Tenant complaint: PAINT/PLASTER — CEILING
2009-12-15Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-14Tenant complaint: GENERAL — LOCKS
2009-12-14Tenant complaint: PAINT/PLASTER — CEILING
2009-12-14Tenant complaint: ELECTRIC — WIRING
2009-12-14Tenant complaint: PLUMBING — RADIATOR
2009-12-14Tenant complaint: PLUMBING — RADIATOR
2009-12-14Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-14Tenant complaint: PAINT/PLASTER — CABINET
2009-12-14Tenant complaint: HEATING — HEAT RELATED
2009-12-12Tenant complaint: GENERAL — DOORS
2009-12-12Tenant complaint: PAINT/PLASTER — CEILING
2009-12-12Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-12Tenant complaint: HEATING — HEAT RELATED
2009-12-09Tenant complaint: GENERAL — DOORS
2009-12-09Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2009-12-09Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-09Tenant complaint: HEATING — HEAT RELATED
2009-12-06Tenant complaint: GENERAL — DOORS
2009-12-06Tenant complaint: HEATING — HEAT RELATED
2009-12-06Tenant complaint: ELECTRIC — WIRING
2009-12-06Tenant complaint: GENERAL — COOKING GAS
2009-12-06Tenant complaint: GENERAL — LOCKS
2009-12-01Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2009-12-01Tenant complaint: HEATING — HEAT RELATED
2009-11-28Tenant complaint: HEATING — HEAT RELATED
2009-11-25HPD class C: SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR LOCK, DOOR FROM STREET TO BUILDING AT PUBLIC HALL, 2nd ST
2009-11-24HPD class C: SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK TO BUILDING ENTRANCE DOOR LOCATED AT PUBLIC PARTS 1, 1st STORY
2009-11-23Tenant complaint: HEATING — HEAT RELATED
2009-11-23Tenant complaint: GENERAL — COOKING GAS
2009-11-20Tenant complaint: PLUMBING — RADIATOR
2009-11-20Tenant complaint: PLUMBING — WATER SUPPLY
2009-11-20Tenant complaint: PAINT/PLASTER — WALL
2009-11-20Tenant complaint: ELECTRIC — WIRING
2009-11-20Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2009-11-20Tenant complaint: GENERAL — LOCKS
2009-11-20Tenant complaint: PAINT/PLASTER — CEILING
2009-11-20Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2009-11-18Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2009-11-18Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2009-11-18Tenant complaint: HEATING — HEAT RELATED
2009-11-16HPD litigation: Tenant Action
2009-11-13Tenant complaint: HEATING — HEAT RELATED
2009-11-13HPD class B: SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE , ALL ELECTRICAL OUTLETS IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT
2009-11-12Tenant complaint: HEATING — HEAT RELATED
2009-11-12Tenant complaint: PAINT/PLASTER — CEILING
2009-11-12Tenant complaint: PLUMBING — WATER-LEAKS
2009-11-12Tenant complaint: GENERAL — DOORS
2009-11-12Tenant complaint: ELECTRIC — WIRING
2009-11-12Tenant complaint: ELECTRIC — WIRING
2009-11-06Tenant complaint: HEATING — HEAT RELATED
2009-11-06Tenant complaint: HEATING — HEAT RELATED
2009-10-29Tenant complaint: GENERAL — DOORS
2009-10-29Tenant complaint: PLUMBING — WATER-LEAKS
2009-10-29Tenant complaint: ELECTRIC — WIRING
2009-10-29Tenant complaint: GENERAL — LOCKS
2009-10-29Tenant complaint: HEATING — HEAT RELATED
2009-10-29Tenant complaint: GENERAL — LOCKS
2009-10-29Tenant complaint: HEATING — HEAT RELATED
2009-10-29Tenant complaint: PAINT/PLASTER — CEILING
2009-10-29Tenant complaint: GENERAL — DOORS
2009-10-27Tenant complaint: HEATING — HEAT RELATED
2009-10-19Tenant complaint: PAINT/PLASTER — CEILING
2009-10-19Tenant complaint: ELECTRIC — WIRING
2009-10-19Tenant complaint: ELECTRIC — WIRING
2009-10-19Tenant complaint: HEATING — HEAT RELATED
2009-10-19Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2009-10-14Tenant complaint: APPLIANCE — REFRIGERATOR
2009-10-14Tenant complaint: PAINT/PLASTER — CEILING
2009-10-14Tenant complaint: HEATING — HEAT RELATED
2009-10-14Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2009-10-14Tenant complaint: PAINT/PLASTER — CEILING
2009-10-14Tenant complaint: PLUMBING — WATER-LEAKS
2009-10-14Tenant complaint: GENERAL — DOORS
2009-10-14Tenant complaint: GENERAL — LOCKS
2009-04-14Tenant complaint: GENERAL — LOCKS
2009-04-14Tenant complaint: PAINT/PLASTER — CEILING
2009-04-14Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2009-04-14Tenant complaint: NONCONST — VERMIN
2009-04-14Tenant complaint: NONCONST — VERMIN
2009-03-21Tenant complaint: HEATING — HEAT RELATED
2009-03-13Tenant complaint: HEATING — HEAT RELATED
2009-03-13Tenant complaint: ELECTRIC — WIRING
2009-03-13Tenant complaint: ELECTRIC — WIRING
2009-02-18Tenant complaint: HEATING — HEAT RELATED
2009-01-22Mortgage $32,489 — from OSIME, EMMANUEL to SECRETARY OF HOUSING & URBAN DEVELOPMENT$32,489
2009-01-14HPD litigation: Heat and Hot Water
2009-01-01DOB violation LL6291:
2008
2008-11-20Tenant complaint: PLUMBING — RADIATOR
2008-11-20Tenant complaint: ELECTRIC — LIGHTING
2008-11-19HPD litigation: Tenant Action
2008-07-27Tenant complaint: PLUMBING — WATER SUPPLY
2008-07-27Tenant complaint: PLUMBING — WATER SUPPLY
2008-04-25Tenant complaint: HEATING — HEAT RELATED
2008-01-03DOB violation LL6291:
2007
2007-10-27Tenant complaint: PLUMBING — WATER SUPPLY
2007-10-27Tenant complaint: PLUMBING — WATER SUPPLY
2007-09-21Tenant complaint: PLUMBING — WATER SUPPLY
2007-06-27Tenant complaint: HEATING — HEAT RELATED
2007-04-27Tenant complaint: PLUMBING — WATER-LEAKS
2007-04-27Tenant complaint: PLUMBING — WATER SUPPLY
2007-04-24HPD class B: SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 1, 2nd S
2007-04-24HPD class B: SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EA
2007-04-15Tenant complaint: PLUMBING — WATER-LEAKS
2007-04-15Tenant complaint: PAINT/PLASTER — CEILING
2007-02-15HPD litigation: Heat and Hot Water
2007-02-10Tenant complaint: HEATING — HEAT RELATED
2007-01-23HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED A
2007-01-23HPD class B: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1, 2n
2007-01-23HPD class B: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WINDOW COUNTER BALANCE IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st AP
2007-01-22Tenant complaint: HEATING — HEAT RELATED
2007-01-21Tenant complaint: PAINT/PLASTER — CEILING
2007-01-21Tenant complaint: PLUMBING — WATER-LEAKS
2007-01-21Tenant complaint: HEATING — HEAT RELATED
2007-01-21Tenant complaint: PLUMBING — RADIATOR
2007-01-21Tenant complaint: GENERAL — WINDOWS
2007-01-20Tenant complaint: HEATING — HEAT RELATED
2007-01-19DOB violation LL6291:
2006
2006-12-20HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1s
2006-12-18Tenant complaint: GENERAL — WINDOWS
2006-12-18Tenant complaint: PLUMBING — RADIATOR
2006-12-18Tenant complaint: HEATING — HEAT RELATED
2006-12-18Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2006-10-12Tenant complaint: GENERAL — WINDOWS
2006-10-12Tenant complaint: PAINT/PLASTER — WALL
2006-10-12Tenant complaint: HEATING — HEAT RELATED
2006-10-12Tenant complaint: GENERAL — MOLD
2006-10-12Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2006-10-12Tenant complaint: PLUMBING — WATER-LEAKS
2006-10-12Tenant complaint: GENERAL — WINDOWS
2006-10-12Tenant complaint: NONCONST — VERMIN
2006-10-12Tenant complaint: ELECTRIC — WIRING
2006-05-30Tenant complaint: PLUMBING — WATER-LEAKS
2006-05-30Tenant complaint: PAINT/PLASTER — CEILING
2006-05-30Tenant complaint: GENERAL — WINDOWS
2006-05-30Tenant complaint: PAINT/PLASTER — CEILING
2006-05-30Tenant complaint: GENERAL — WINDOWS
2006-05-30Tenant complaint: PAINT/PLASTER — CEILING
2006-05-30Tenant complaint: GENERAL — MOLD
2006-05-30Tenant complaint: HEATING — HEAT RELATED
2006-05-30Tenant complaint: ELECTRIC — WIRING
2006-01-06DOB violation LL6291:
2005
2005-11-25Tenant complaint: HEATING — HEAT RELATED
2005-08-09Tenant complaint: PLUMBING — BASIN/SINK
2005-08-09Tenant complaint: GENERAL — WINDOWS
2005-08-09Tenant complaint: GENERAL — CABINET
2005-08-09Tenant complaint: NONCONST — RUBBISH
2005-08-09Tenant complaint: GENERAL — FLOOR
2005-08-03TL&R — from JUNCAJ, NIKOLA to GREENPOINT MORTGAGE FUNDING INC
2005-08-03Mortgage satisfied — from JUNCAJ, NIKLOA to GREENPOINT MORTGAGE FUNDING INC
2005-07-27HPD class A: SECTION 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS AT ALL STYS AT PUBLIC HALL
2005-07-25Tenant complaint: GENERAL — FLOOR
2005-07-25Tenant complaint: PAINT/PLASTER — WALL
2005-07-25Tenant complaint: PLUMBING — WATER SUPPLY
2005-07-25Tenant complaint: GENERAL — FLOOR
2005-07-25Tenant complaint: NONCONST — RUBBISH
2005-07-25Tenant complaint: GENERAL — MAILBOX
2005-07-25Tenant complaint: NONCONST — RUBBISH
2005-07-25Tenant complaint: HEATING — HEAT RELATED
2005-07-25Tenant complaint: GENERAL — WINDOWS
2005-06-21Tenant complaint: PLUMBING — WATER SUPPLY
2005-06-21Tenant complaint: NONCONST — RUBBISH
2005-06-21Tenant complaint: GENERAL — DOORS
2005-06-21Tenant complaint: PLUMBING — BASIN/SINK
2005-06-21Tenant complaint: GENERAL — WINDOWS
2005-06-21Tenant complaint: GENERAL — WINDOWS
2005-06-21Tenant complaint: NONCONST — VERMIN
2005-06-21Tenant complaint: NONCONST — VERMIN
2005-06-06HPD class B: SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE WOOD, GARAGE BAG
2005-05-25HPD class A: SECTION 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY
2005-05-24Tenant complaint: NONCONST — RUBBISH
2005-05-24Tenant complaint: NONCONST — VERMIN
2005-05-24Tenant complaint: PLUMBING — BASIN/SINK
2005-05-24Tenant complaint: PLUMBING — BASIN/SINK
2005-05-24Tenant complaint: HEATING — HEAT RELATED
2005-05-24Tenant complaint: GENERAL — WINDOWS
2005-05-24Tenant complaint: GENERAL — LOCKS
2005-05-24Tenant complaint: GENERAL — DOORS
2005-05-23Tenant complaint: GENERAL — MAILBOX
2005-05-23Tenant complaint: GENERAL — WINDOWS
2005-05-23Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2005-05-23Tenant complaint: NONCONST — RUBBISH
2005-05-23Tenant complaint: GENERAL — DOORS
2005-05-23Tenant complaint: GENERAL — DOORS
2005-05-20Tenant complaint: HEATING — HEAT RELATED
2005-04-02Tenant complaint: HEATING — HEAT RELATED
2005-03-25Mortgage $400,000 — from OSIME, EMMANUEL to MERS$400,000
2005-03-25Deed $433,500 — from JUNCAJ, NIKOLA to OSIME, EMMANUEL$433,500
2004
2004-12-17Tenant complaint: HEATING — HEAT RELATED
2004-12-14Tenant complaint: ELECTRIC — LIGHTING
2004-12-14Tenant complaint: HEATING — HEAT RELATED
2004-12-14Tenant complaint: PLUMBING — WATER-LEAKS
2004-12-14Tenant complaint: NONCONST — RUBBISH
2004-11-25Tenant complaint: HEATING — HEAT RELATED
2004-09-20Tenant complaint: NONCONST — RUBBISH
2004-09-20Tenant complaint: PLUMBING — WATER-LEAKS
2004-09-20Tenant complaint: GENERAL — DOORS
2004-09-20Tenant complaint: PLUMBING — WATER-LEAKS
2004-09-20Tenant complaint: HEATING — HEAT RELATED
2004-08-19Tenant complaint: PLUMBING — WATER-LEAKS
2004-08-19Tenant complaint: PLUMBING — WATER-LEAKS
2003
2003-11-03AL&R $206,500 — from GREENPOINT MORTGAGE FUNDING INC to JUNCAJ, NIKOLA$206,500
2003-11-03Mortgage $206,500 — from JUNCAJ, NIKOLA to GREENPOINT MORTGAGE FUNDING INC$206,500
2003-03-19DOB violation LL6291:
2002
2002-07-12Deed — from DEDVUKAJ, GJON to JUNCAJ, NIKOLA
2002-03-26DOB violation LL6291:
2002-01-02Permit PL — ISSUED
2001
2001-09-14Deed — from AMVIC REALTY LTD. to DEDVUKAJ, GJON
2001-07-30Mortgage satisfied — from FRAN-GIN REALTY CORP. to NORTH NEW YORK SAVINGS AND LOAN ASSOCIAT
2001-06-04Permit EW — ISSUED
2001-05-24Job filed: FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE TO USE EGRESS OR OCCUPANCY$2,000
2001-05-24Job filed: FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE TO USE EGRESS OR OCCUPANCY$2,000
1996
1996-10-25Deed — from FRAN-GIN REALTY CORP. to AMVIC REALTY LTD.
1990
1990-05-04DOB violation ES:
1968
1968-05-13Mortgage — from FRAN GIN REALTY CORP to NORTH NEW YORK SAVINGS AND LOAN ASSOCIAT
1968-05-13Deed — from DI COSTANZO VINCENT; DE CELESTINO BIASO J to FRAN GIN REALTY CORP

Support this site Back to the building page