Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

20 Jay Street · Brooklyn · BBL 3000190001 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$12,500 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

113 service requests in the last three years. Most common: Illegal Parking (76) · Noise (12) · For Hire Vehicle Complaint (4) · Abandoned Vehicle (3) · Street Sign (3) · Sidewalk Condition (3).

Filed construction activity

$6,165,778 in permitted construction work filed since 2016 (66 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$75,216,000 $33,847,200
2026$74,050,000 $33,322,500
2027$76,697,000 $34,513,650

The city's market estimate has risen 2% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)A — ENERGY STAR score 92/100 (2022 disclosure cycle)
Heating fuelNO4FUEL
Facade (Local Law 11)SAFE (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
FontainhasIndianA—
UsaginyJapaneseA—

Report to 311: Food poisoning · Food safety complaint

2 restaurants · 0 with mice evidence · See them on the Mice Map

1 Food Establishment complaint to 311 at this address in the last three years (most often: Toilet Facility), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

In the FEMA 1%-annual-chance floodplain (2015 preliminary flood maps) — lenders typically require flood insurance here.

Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

2 street-flooding or sewer-backup complaints at this address since 2013 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayYork St — F · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: none
High St — A C · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: none
BusNearest boarding stop: York St / Jay St — B67 · 950 ft
Citi BikeFront St & Jay St · 600 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 307 Daniel Hale Williams. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

20 Jay Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

113 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $65,273,969 on 2016-09-20 (lender: Manufacturers And Traders Trust Company). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2023-11-06Agreement $108,353,564 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY $108,353,564
2016-09-20AL&R $135,000,000 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY $135,000,000
2016-09-20Agreement $135,000,000 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY $135,000,000
2016-09-20Mortgage $65,273,970 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY $65,273,970
2012-09-10Agreement $75,000,000 — from DUMBO PARTNERS B LLC; BROOKLAKE ASSOCIATES, L.L.C.; DUMBO PARTNERS A LLC to NEW YORK COMMUNITY BANK $75,000,000
2012-09-10Mortgage $38,318,344 — from BROOKLAKE ASSOCIATES, L.L.C.; DUMBO PARTNERS B LLC; DUMBO PARTNERS A LLC to NEW YORK COMMUNITY BANK $38,318,344
2010-11-18Deed $5,668,200 — from CAGE ASSOCIATES, LLC to DUMBO PARTNERS B LLC $5,668,200
2010-11-18Deed $5,668,200 — from CAGE ASSOCIATES, LLC to DUMBO PARTNERS A LLC $5,668,200
2009-04-13AL&R $38,220,000 — from BROOKLAKE ASSOCIATES, L.L.C. to NEW YORK COMMUNITY BANK $38,220,000
2009-04-13Agreement $38,220,000 — from BROOKLAKE ASSOCIATES, L.L.C. to NEW YORK COMMUNITY BANK $38,220,000
2009-04-13Mortgage $25,127,314 — from BROOKLAKE ASSOCIATES, L.L.C. to NEW YORK COMMUNITY BANK $25,127,314
2004-10-15Mortgage $2,999,990 — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK $2,999,990
2004-10-15Agreement $14,378,291 — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK $14,378,291
2004-10-15Mortgage $2,000,000 — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK $2,000,000
2001-05-01Mortgage $3,000,000 — from BROOKLAKE ASSOCIATESLLC to NORTH FORK BANK $3,000,000

Ten-year activity

100500
2017
2018
99
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201715113401474
201833111502180
2019518350599
202077201338
202149220338
202253241538
2023114211441
2024224310562
2025233510683
202621310438
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 53 records

DateRecord
2026-10-14311: Illegal Parking — Parking Permit Improper Use
2026-09-20311: Illegal Parking — Blocked Crosswalk
2026-09-06311: Animal-Abuse — Other (complaint details)
2026-09-06311: Animal-Abuse — Chained
2026-09-05311: Animal-Abuse — Chained
2026-08-25311: Illegal Parking — Posted Parking Sign Violation
2026-08-21Certificate of occupancy Renewal Without Change
2026-07-20Restaurant inspection: FONTAINHAS
2026-07-11311: Noise — Noise: Alarms (NR3)
2026-07-06311: Noise — Noise: Construction Equipment (NC1)
2026-06-22311: Illegal Parking — Blocked Bike Lane
2026-06-16311: Noise — Noise: Alarms (NR3)
2026-06-04311: Sidewalk Condition — Sidewalk Violation
2026-06-04311: Sidewalk Condition — Sidewalk Violation
2026-06-02311: Illegal Parking — Parking Permit Improper Use
2026-06-01311: Street Condition — Line/Marking - After Repaving
2026-05-30311: Obstruction — Trash or Recycling
2026-05-19311: Illegal Parking — Blocked Bike Lane
2026-04-30311: Illegal Parking — Blocked Bike Lane
2026-04-29Boiler inspection
2026-04-29Boiler inspection
2026-04-27311: Illegal Parking — Posted Parking Sign Violation
2026-04-21FDNY inspection (SPECIAL-OTH)
2026-03-20311: Illegal Parking — Blocked Sidewalk
2026-03-10311: Illegal Parking — Paper License Plates
2026-03-09311: Illegal Parking — Blocked Bike Lane
2026-03-09Certificate of occupancy Renewal Without Change
2026-03-08311: Sidewalk Condition — Dumpster - Construction Waste
2026-03-06311: Illegal Parking — Posted Parking Sign Violation
2026-03-06311: Illegal Parking — Posted Parking Sign Violation
2026-03-01311: Illegal Parking — Paper License Plates
2026-02-25311: Illegal Parking — Posted Parking Sign Violation
2026-02-10311: Illegal Parking — Blocked Sidewalk
2026-01-22311: Illegal Parking — Blocked Crosswalk
2026-01-21Rodent inspection: Passed
2026-01-09311: Illegal Parking — Blocked Bike Lane
2026-01-08311: Illegal Parking — Blocked Bike Lane
2026-01-08311: Illegal Parking — Blocked Bike Lane
2025-12-29311: Illegal Parking — Blocked Bike Lane
2025-12-26Certificate of occupancy Renewal Without Change
2025-12-11311: Illegal Parking — Posted Parking Sign Violation
2025-12-04311: Illegal Parking — Blocked Bike Lane
2025-12-04311: Illegal Parking — Blocked Sidewalk
2025-11-14311: Illegal Parking — Posted Parking Sign Violation
2025-11-11311: Noise - Commercial — Loud Music/Party
2025-11-11311: Noise - Commercial — Loud Music/Party
2025-11-06Permit General Construction — Permit Issued
2025-11-06Permit Structural — Permit Issued
2025-10-28Job filed: Repair deteriorated elements of the parking garage
2025-10-27311: Illegal Parking — Posted Parking Sign Violation
2025-10-24311: Illegal Parking — Blocked Bike Lane
2025-10-24311: Illegal Parking — Posted Parking Sign Violation
2025-10-22311: Illegal Parking — Blocked Bike Lane

The full timeline

2026
2026-10-14311: Illegal Parking — Parking Permit Improper Use
2026-09-20311: Illegal Parking — Blocked Crosswalk
2026-09-06311: Animal-Abuse — Other (complaint details)
2026-09-06311: Animal-Abuse — Chained
2026-09-05311: Animal-Abuse — Chained
2026-08-25311: Illegal Parking — Posted Parking Sign Violation
2026-08-21Certificate of occupancy Renewal Without Change
2026-07-20Restaurant inspection: FONTAINHAS
2026-07-11311: Noise — Noise: Alarms (NR3)
2026-07-06311: Noise — Noise: Construction Equipment (NC1)
2026-06-22311: Illegal Parking — Blocked Bike Lane
2026-06-16311: Noise — Noise: Alarms (NR3)
2026-06-04311: Sidewalk Condition — Sidewalk Violation
2026-06-04311: Sidewalk Condition — Sidewalk Violation
2026-06-02311: Illegal Parking — Parking Permit Improper Use
2026-06-01311: Street Condition — Line/Marking - After Repaving
2026-05-30311: Obstruction — Trash or Recycling
2026-05-19311: Illegal Parking — Blocked Bike Lane
2026-04-30311: Illegal Parking — Blocked Bike Lane
2026-04-29Boiler inspection
2026-04-29Boiler inspection
2026-04-27311: Illegal Parking — Posted Parking Sign Violation
2026-04-21FDNY inspection (SPECIAL-OTH)
2026-03-20311: Illegal Parking — Blocked Sidewalk
2026-03-10311: Illegal Parking — Paper License Plates
2026-03-09311: Illegal Parking — Blocked Bike Lane
2026-03-09Certificate of occupancy Renewal Without Change
2026-03-08311: Sidewalk Condition — Dumpster - Construction Waste
2026-03-06311: Illegal Parking — Posted Parking Sign Violation
2026-03-06311: Illegal Parking — Posted Parking Sign Violation
2026-03-01311: Illegal Parking — Paper License Plates
2026-02-25311: Illegal Parking — Posted Parking Sign Violation
2026-02-10311: Illegal Parking — Blocked Sidewalk
2026-01-22311: Illegal Parking — Blocked Crosswalk
2026-01-21Rodent inspection: Passed
2026-01-09311: Illegal Parking — Blocked Bike Lane
2026-01-08311: Illegal Parking — Blocked Bike Lane
2026-01-08311: Illegal Parking — Blocked Bike Lane
2025
2025-12-29311: Illegal Parking — Blocked Bike Lane
2025-12-26Certificate of occupancy Renewal Without Change
2025-12-11311: Illegal Parking — Posted Parking Sign Violation
2025-12-04311: Illegal Parking — Blocked Bike Lane
2025-12-04311: Illegal Parking — Blocked Sidewalk
2025-11-14311: Illegal Parking — Posted Parking Sign Violation
2025-11-11311: Noise - Commercial — Loud Music/Party
2025-11-11311: Noise - Commercial — Loud Music/Party
2025-11-06Permit General Construction — Permit Issued
2025-11-06Permit Structural — Permit Issued
2025-10-28Job filed: Repair deteriorated elements of the parking garage$300,000
2025-10-27311: Illegal Parking — Posted Parking Sign Violation
2025-10-24311: Illegal Parking — Blocked Bike Lane
2025-10-24311: Illegal Parking — Posted Parking Sign Violation
2025-10-22311: Illegal Parking — Blocked Bike Lane
2025-10-09311: Illegal Parking — Blocked Bike Lane
2025-10-09311: Illegal Parking — Blocked Sidewalk
2025-10-09311: Illegal Parking — Posted Parking Sign Violation
2025-10-08311: Noise — Noise: Private Carting Noise (NQ1)
2025-10-08311: Illegal Parking — Posted Parking Sign Violation
2025-10-02Certificate of occupancy Renewal Without Change
2025-09-30311: Illegal Parking — Blocked Bike Lane
2025-09-30Permit General Construction — Permit Issued
2025-09-29311: Illegal Parking — Blocked Bike Lane
2025-09-29311: Illegal Parking — Blocked Bike Lane
2025-09-23311: Illegal Parking — Blocked Bike Lane
2025-09-23311: Illegal Parking — Blocked Bike Lane
2025-09-19Permit Plumbing — Permit Issued
2025-09-16311: Illegal Parking — Blocked Bike Lane
2025-09-15311: Illegal Parking — Blocked Bike Lane
2025-09-11311: Illegal Parking — Blocked Bike Lane
2025-09-04Permit General Construction — Permit Issued
2025-08-28Restaurant inspection: USAGINY — grade A
2025-08-26Job filed: Addition of new (2) pantry sinks, (2) water heaters, (2) ejector pumps and associated piping.$19,950
2025-08-25Job filed: Renovation of an existing office space to accommodate new conference rooms and offices, including partitions. No change in use or bulk.$749,550
2025-08-21311: Noise — Noise: Private Carting Noise (NQ1)
2025-08-19311: Noise — Noise: Private Carting Noise (NQ1)
2025-08-13311: Illegal Parking — Blocked Sidewalk
2025-08-06311: Illegal Parking — Blocked Bike Lane
2025-08-05Permit Plumbing — Signed-off
2025-08-01311: Illegal Parking — Blocked Bike Lane
2025-07-29Boiler inspection
2025-07-29Boiler inspection
2025-07-29Job filed: Installation of new (8) sinks, (3) floor drains, (1) lavatory, (1) water closet, (1) ejector pump, (1) floor sink, (2) water heaters, (1) hose bib and$30,000
2025-07-25Job filed: Construction of new partitions as shown on plans$99,984
2025-07-24311: Illegal Parking — Posted Parking Sign Violation
2025-07-22311: Illegal Parking — Blocked Sidewalk
2025-07-18Restaurant inspection: USAGINY
2025-07-11311: Illegal Parking — Posted Parking Sign Violation
2025-07-11311: Illegal Parking — Posted Parking Sign Violation
2025-07-09Certificate of occupancy Renewal Without Change
2025-07-03311: Illegal Parking — Blocked Sidewalk
2025-06-24311: Illegal Parking — Posted Parking Sign Violation
2025-06-24311: Illegal Parking — Posted Parking Sign Violation
2025-06-18311: Illegal Parking — Posted Parking Sign Violation
2025-05-21ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PARKING STRUCTURE, TO SECURE PUBLIC SAFETY AND/ORMAKE THE BUILDING'S STRUCTURE AND APPURTENANCES CONFORM TO T$10,000
2025-05-21DOB complaint, category ?
2025-05-15311: Street Sign - Missing — No Parking, Standing, Stopping
2025-05-13311: Street Sign - Missing — No Parking, Standing, Stopping
2025-05-12311: Street Sign - Missing — No Parking, Standing, Stopping
2025-05-10311: Illegal Parking — Paper License Plates
2025-05-06311: Illegal Parking — Double Parked Blocking Traffic
2025-04-28311: Abandoned Vehicle — With License Plate
2025-04-15Certificate of occupancy Renewal With Change
2025-04-14311: Abandoned Vehicle — With License Plate
2025-04-07311: Consumer Complaint — Restaurant
2025-04-07Permit Sprinklers — Signed-off
2025-03-31Permit Structural — Permit Issued
2025-03-31Permit General Construction — Permit Issued
2025-03-26Job filed: Installation of temporary shoring at the garage interior$25,000
2025-03-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-03-19Job filed: Installation of temporary shoring at the garage interior$25,000
2025-03-15311: Abandoned Vehicle — With License Plate
2025-03-04Certificate of occupancy Renewal Without Change
2025-02-26Restaurant inspection: FONTAINHAS — grade A
2025-02-01311: Food Establishment — Toilet Facility
2025-01-27311: Noise — Noise: Jack Hammering (NC2)
2025-01-27Permit Mechanical Systems — Signed-off
2025-01-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2025-01-21Rodent inspection: Passed
2025-01-21311: Blocked Driveway — No Access
2025-01-21Job filed: Plumbing work for office space$100,000
2025-01-08311: For Hire Vehicle Complaint — Driver Report - Non Passenger
2024
2024-12-10Eviction executed (824)
2024-11-29Permit Sprinklers — Signed-off
2024-11-27311: Illegal Parking — Blocked Sidewalk
2024-11-19Permit Boiler Equipment — Signed-off
2024-11-18Permit Plumbing — Signed-off
2024-11-17311: Illegal Parking — Blocked Crosswalk
2024-11-14Permit General Construction — Signed-off
2024-11-11Job filed: Plumbing work for office space$100,000
2024-11-06311: Blocked Driveway — No Access
2024-11-01Job filed: Modification of existing sprinkler system for office space$10,000
2024-11-01Job filed: Mechanical work for office space as shown on plans$50,000
2024-10-29Job filed: Renovation of existing office space to accommodate new conference rooms and offices. No change in use.$1,200,000
2024-10-25Certificate of occupancy Renewal Without Change
2024-10-20311: Noise - Street/Sidewalk — Loud Music/Party
2024-10-03Job filed: ABANDON EXISTING ABOVE GROUND 5,000-GALLON WRAPPED FUEL OIL STORAGE TANK IN PLACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$27,000
2024-10-01ECB CLASS - 1 violation: FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPEC$2,500
2024-09-20Boiler inspection
2024-09-20Boiler inspection
2024-09-06311: Illegal Parking — Blocked Crosswalk
2024-08-29311: Illegal Parking — Blocked Sidewalk
2024-08-25311: Illegal Parking — License Plate Obscured
2024-08-15311: Illegal Parking — Blocked Sidewalk
2024-08-05Certificate of occupancy Renewal Without Change
2024-07-26ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS: AT THE TIME OF INSPECTION, OBSERVE
2024-07-03311: Illegal Parking — Blocked Sidewalk
2024-07-02311: Plumbing — Sprinkler System - Inadequate
2024-07-02DOB complaint, category ?
2024-06-27311: Illegal Parking — Blocked Sidewalk
2024-06-19311: Illegal Parking — Blocked Sidewalk
2024-06-17311: Illegal Parking — Blocked Sidewalk
2024-06-17311: Illegal Parking — Blocked Sidewalk
2024-06-17311: Illegal Parking — Blocked Sidewalk
2024-06-14311: Illegal Parking — Blocked Sidewalk
2024-06-04311: Illegal Parking — Blocked Sidewalk
2024-06-03311: Illegal Parking — Blocked Sidewalk
2024-05-19311: Illegal Parking — Posted Parking Sign Violation
2024-05-08311: Illegal Parking — Blocked Crosswalk
2024-05-07311: Illegal Parking — Double Parked Blocking Traffic
2024-05-06Certificate of occupancy Renewal Without Change
2024-04-29Job filed: Renovations to the existing plumbing system. No change in egress, use or occupancy.$40,000
2024-04-19311: Illegal Parking — Blocked Sidewalk
2024-04-12311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2024-04-12311: For Hire Vehicle Complaint — Driver Report - Non Passenger
2024-04-09311: Noise - Helicopter — Other
2024-04-02Permit Mechanical Systems — Signed-off
2024-04-02Permit General Construction — Signed-off
2024-03-25Restaurant inspection: USAGINY — grade A
2024-03-15311: Illegal Parking — Blocked Sidewalk
2024-03-13311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2024-03-13DOB complaint, category ?
2024-03-07311: Illegal Parking — Blocked Sidewalk
2024-03-07311: Illegal Parking — Blocked Sidewalk
2024-03-07Permit General Construction — Signed-off
2024-03-04Permit Plumbing — Signed-off
2024-02-21Certificate of occupancy Renewal Without Change
2024-02-16Permit Plumbing — Signed-off
2024-02-12Rodent inspection: Passed
2024-02-05Permit Mechanical Systems — Signed-off
2024-02-01Job filed: Interior renovations to the existing mechanical system. No change in use, egress or occupancy.$20,006
2024-01-22Permit General Construction — Signed-off
2024-01-17Cooling tower inspection
2024-01-13311: Commercial Disposal Complaint — Waste Left in Front of Residence
2023
2023-12-20Job filed: Mechanical work in conjunction with interior fitout of a Pilates studio as shown on plans.$2,500
2023-12-19Job filed: Plumbing work in conjunction with fitout of pilates studio$4,800
2023-12-17Job filed: APPLICATION IS FILED FOR THE INTERIOR FITOUT OF A PILATES STUDIO IN AN EXISTING GROUND FLOOR COMMERCIAL SPACE.NO CHANGE IN EGRESS, USE OR OCCUPANCY IS$35,060
2023-12-14Certificate of occupancy Renewal Without Change
2023-12-07Job filed: Interior renovations to the existing retail space. No change in use, egress or occupancy.$160,000
2023-12-07Job filed: Renovations to the existing plumbing system. No change in egress, use or occupancy.$40,000
2023-11-06Agreement $108,353,564 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY$108,353,564
2023-10-28311: Noise — Noise: Construction Before/After Hours (NM1)
2023-10-06Certificate of occupancy Renewal Without Change
2023-09-12311: Illegal Parking — Double Parked Blocking Traffic
2023-09-06311: Illegal Parking — Blocked Sidewalk
2023-08-31311: Illegal Parking — Posted Parking Sign Violation
2023-08-09FDNY inspection (COM_OCPCY)
2023-08-09FDNY inspection (RISK)
2023-08-09FDNY inspection (COM_OCPCY)
2023-08-01Certificate of occupancy Renewal Without Change
2023-07-28Elevator permit: "Remove and permanently discontinue of a vertical platform lift of Device # 3W11381. All work to comply with ASME A18.1-2017, Sect$3,000
2023-07-20311: Illegal Parking — Posted Parking Sign Violation
2023-07-20311: Illegal Parking — Posted Parking Sign Violation
2023-07-14311: Rodent — Rat Sighting
2023-06-29311: Illegal Parking — Blocked Sidewalk
2023-06-26Restaurant inspection: USAGINY
2023-06-26311: Illegal Parking — Blocked Sidewalk
2023-06-26311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2023-06-26DOB complaint, category ?
2023-06-23311: Noise - Street/Sidewalk — Loud Music/Party
2023-06-03311: Illegal Parking — Blocked Sidewalk
2023-05-22311: Water System — Leak (Use Comments) (WA2)
2023-05-11Certificate of occupancy Renewal With Change
2023-05-03311: Illegal Parking — Blocked Sidewalk
2023-04-21311: WATER LEAK — HEAVY FLOW
2023-04-21Tenant complaint: WATER LEAK — HEAVY FLOW
2023-04-20311: Illegal Parking — Posted Parking Sign Violation
2023-04-14311: Noise - Street/Sidewalk — Loud Music/Party
2023-04-09311: Water System — Leak (Use Comments) (WA2)
2023-04-05Certificate of occupancy Renewal Without Change
2023-02-21Boiler inspection
2023-02-21Boiler inspection
2023-01-28311: Water System — Leak (Use Comments) (WA2)
2023-01-27311: Illegal Parking — Blocked Sidewalk
2023-01-20Certificate of occupancy Renewal With Change
2022
2022-12-06311: Bike Rack Condition — Bike Rack Repair
2022-12-02Certificate of occupancy Renewal Without Change
2022-11-12311: Noise - Commercial — Loud Music/Party
2022-11-12311: Noise - Commercial — Loud Music/Party
2022-11-10311: Illegal Parking — Blocked Sidewalk
2022-11-09311: Illegal Parking — Blocked Sidewalk
2022-10-26311: Street Sign - Missing — No Parking, Standing, Stopping
2022-10-21311: Illegal Parking — Blocked Sidewalk
2022-10-13311: Illegal Dumping — Removal Request
2022-10-13311: Abandoned Vehicle — With License Plate
2022-10-13311: Abandoned Vehicle — With License Plate
2022-10-05Elevator permit: INSTALL NEW 1:2 CHAIN HYDRAULIC VERTICAL PLATFORM WHEELCHAIR LIFT PER ASME A18.1-2005 B, SECTION 2 and NYC BUILDING CODE. PROVIDE $30,693
2022-09-23Certificate of occupancy Renewal Without Change
2022-09-20311: Illegal Parking — Blocked Sidewalk
2022-09-20311: Abandoned Vehicle — With License Plate
2022-09-15311: Abandoned Vehicle — With License Plate
2022-09-15311: Illegal Parking — Blocked Sidewalk
2022-08-24311: Sidewalk Condition — Blocked - Construction
2022-08-21DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
2022-08-20DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
2022-07-27311: Illegal Dumping — Removal Request
2022-07-10311: Noise - Residential — Loud Music/Party
2022-07-04311: Illegal Dumping — Chronic Dumping
2022-07-04311: Homeless Person Assistance
2022-06-24Certificate of occupancy Renewal Without Change
2022-06-16311: Homeless Person Assistance
2022-05-21311: Illegal Parking — Posted Parking Sign Violation
2022-05-10FDNY inspection (RISK)
2022-04-15Certificate of occupancy Renewal Without Change
2022-04-07311: Street Condition — Pothole
2022-04-06RPTT — from COGNIZANT TECHNOLOGY SOLUTIONS U.S. CORP to DANIEL J. EDELMAN HOLDINGS, INC
2022-03-10Eviction executed
2022-02-28311: Noise - Residential — Loud Music/Party
2022-02-24Boiler inspection
2022-02-24Boiler inspection
2022-02-19Facade (LL11) filing, cycle 9: SAFE
2022-02-16Cooling tower inspection
2022-02-07Certificate of occupancy Renewal Without Change
2021
2021-12-18311: Street Condition — Pothole
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-11-29Certificate of occupancy Renewal Without Change
2021-11-25311: Encampment — N/A
2021-10-28311: Illegal Parking — Posted Parking Sign Violation
2021-10-27311: Illegal Parking — Posted Parking Sign Violation
2021-10-26311: Illegal Parking — Posted Parking Sign Violation
2021-10-21311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-10-07Certificate of occupancy Renewal Without Change
2021-10-05FDNY inspection (RISK)
2021-10-01311: Illegal Parking — Double Parked Blocking Traffic
2021-09-21311: Illegal Parking — Posted Parking Sign Violation
2021-09-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-09-14311: Blocked Driveway — Partial Access
2021-09-13311: Illegal Parking — Posted Parking Sign Violation
2021-09-13311: Illegal Parking — Posted Parking Sign Violation
2021-09-03311: Noise - Commercial — Loud Music/Party
2021-08-22311: General Construction/Plumbing — Building Permit - None
2021-08-22DOB complaint, category ?
2021-08-05Certificate of occupancy Renewal With Change
2021-05-28311: Elevator — Elevator - Single Device On Property/No Alternate Service
2021-05-28DOB complaint, category ?
2021-05-17311: Street Condition — Blocked - Construction
2021-05-12311: Derelict Bicycle — 14B Derelict Bicycle
2021-05-11Boiler inspection
2021-05-11Boiler inspection
2021-05-07311: Dead/Dying Tree — Planted More Than 2 Years Ago
2021-05-04311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2021-05-04311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2021-05-04DOB complaint, category ?
2021-05-04DOB complaint, category ?
2021-04-28DOB violation E:
2021-04-21Facade (LL11) filing, cycle 8: SAFE
2021-04-08Certificate of occupancy Renewal Without Change
2021-03-24311: NonCompliance with Phased Reopening — Business not in compliance
2021-03-14DOB complaint, category ?
2021-03-02311: Illegal Parking — Blocked Sidewalk
2021-01-07ECB CLASS - 2 violation: REMOVAL OF SIDEWALK SHED AND OTHER SAFETY MEASURES W/O DEPT APPROVAL. NOTE AT THE TIME OF INSPECTION THE BUILDINGS FACADE WAS STIL$1,280
2020
2020-12-29Certificate of occupancy Temporary
2020-12-28LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-11-26311: Noise — Noise: Construction Before/After Hours (NM1)
2020-11-16311: Street Condition — Blocked - Construction
2020-10-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-10-17311: Illegal Parking — Blocked Hydrant
2020-10-16311: Illegal Parking — Blocked Hydrant
2020-10-10311: Illegal Parking — Blocked Hydrant
2020-10-06Certificate of occupancy Temporary
2020-09-21Boiler inspection
2020-09-21Boiler inspection
2020-08-22311: Noise — Noise: Construction Before/After Hours (NM1)
2020-08-19Cooling tower inspection
2020-07-18311: Noise — Noise: Construction Before/After Hours (NM1)
2020-07-16Certificate of occupancy Temporary
2020-07-14311: Illegal Parking — Posted Parking Sign Violation
2020-06-29DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
2020-06-24311: Illegal Parking — Posted Parking Sign Violation
2020-06-13311: Noise — Noise: Construction Before/After Hours (NM1)
2020-06-03Certificate of occupancy Temporary
2020-04-26311: Non-Emergency Police Matter — Social Distancing
2020-04-25311: Non-Emergency Police Matter — Social Distancing
2020-03-26DOB violation E:
2020-03-26DOB violation E:
2020-03-26DOB violation E:
2020-03-26DOB violation E:
2020-03-17Certificate of occupancy Temporary
2020-03-12311: Water System — Dirty Water (WE)
2020-03-11311: Water System — Dirty Water (WE)
2020-03-10311: Noise - Commercial — Banging/Pounding
2020-03-09311: Water System — No Water (WNW)
2020-03-02Certificate of occupancy Temporary
2020-02-19311: Water System — Dirty Water (WE)
2020-02-12Certificate of occupancy Temporary
2020-01-23ECB CLASS - 2 violation: PEDESTRIAN PROTECITON DOES NOT MEET CODE SPECIFICATIONS.AT TIME OF INSPECIOTN OF A 11 STORY OCCUPED BUILDING I OBSERVED SIDEWALK S$625
2020-01-16311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2020-01-16DOB complaint, category ?
2020-01-04311: Noise — Noise: Construction Before/After Hours (NM1)
2019
2019-12-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-12-12311: Illegal Parking — Blocked Sidewalk
2019-12-12Certificate of occupancy Temporary
2019-12-10311: Illegal Parking — Blocked Sidewalk
2019-11-21Permit EW — ISSUED
2019-11-18311: Missed Collection (All Materials) — 2 Bulk-Missed Collection
2019-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-16311: Illegal Parking — Posted Parking Sign Violation
2019-11-13311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2019-11-12Permit EW — ISSUED
2019-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-25311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-10-23FDNY inspection (RISK)
2019-10-19311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-16311: Noise - Commercial — Banging/Pounding
2019-10-15Permit EW — ISSUED
2019-10-12311: Sidewalk Condition — Broken Sidewalk
2019-10-12311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-09Certificate of occupancy Temporary
2019-10-05311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-28311: Noise - Residential — Loud Music/Party
2019-09-28311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-20Boiler inspection — defects found
2019-09-20Boiler inspection
2019-09-19Permit Sprinklers — Signed-off
2019-09-17Job filed: RELOCATE 12 SP HEADS IN EXISTING LOCATIONS. NO CHANGE IN USE OCCUPANCY OR EGRESS.$6,000
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-31311: Noise — Noise: Construction Before/After Hours (NM1)
2019-08-29Permit EW — ISSUED
2019-08-27311: Street Sign - Missing — No Parking, Standing, Stopping
2019-08-21Permit EW — ISSUED
2019-08-21Permit EW — ISSUED
2019-08-15Permit EW — ISSUED
2019-08-13Job filed: APPLICATION FILED TO CONVERT EXISTING BOILERS TO DUAL FUEL, ASSOCIATED PLUMBING WORK AND GAS PIPING FILED UNDER APPLICATION 301473091.$2,500
2019-08-10311: Sidewalk Condition — Broken Sidewalk
2019-08-02Job filed: FILING HEREWITH PLANS FOR INTERIOR OFFICE RENOVATION ON 4TH FLOOR. WORK TYPES TO INCLUDE ARCHITECTURAL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$85,000
2019-07-23Certificate of occupancy Temporary
2019-07-22311: Sewer — Street Flooding (SJ)
2019-07-17311: Missed Collection (All Materials) — 2 Bulk-Missed Collection
2019-07-08311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-06-19311: New Tree Request — For One Address
2019-06-18311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2019-06-17Permit EW — ISSUED
2019-06-17Permit EW — ISSUED
2019-05-30Permit EW — ISSUED
2019-05-30Permit EW — ISSUED
2019-05-30Permit EW — ISSUED
2019-05-29Permit PL — ISSUED
2019-05-16311: Street Condition — Pothole
2019-05-16311: Sidewalk Condition — Broken Sidewalk
2019-05-15Job filed: MECHANICAL WORK AS PER PLANS FILED HEREWITH$49,000
2019-05-15Job filed: INTERIOR RENOVATION OF OFFICE INCLUDING NEW PARTITIONS AND FINISHES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$90,000
2019-05-15Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,600
2019-05-15Job filed: Installation of temporary sidewalk shed per plan submitted. Sidewalk shed legs are to be placed on the street. Work shall comply with 2014 building c
2019-05-15Permit PL — ISSUED
2019-05-10Job filed: APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS HERE WITH$24,000
2019-05-09Job filed: ADDITIONS AND MODIFICATION OF EXISTING FIRE ALARM SYSTEM$55,000
2019-05-09Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN$448,000
2019-05-09Job filed: MODIFICATION OF EXISTING MECHANICAL SYSTEM AS SHOWN ON PLANS FILED HERE WITH$160,000
2019-05-09Job filed: MODIFICATION OF EXISTING MECHANICAL SYSTEM AS SHOWN ON PLANS FILED HERE WITH$160,000
2019-05-08Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $6,000
2019-05-07311: Illegal Parking — Blocked Sidewalk
2019-05-07Permit EW — ISSUED
2019-05-06Certificate of occupancy Temporary
2019-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-05-03Permit EW — ISSUED
2019-04-30Cooling tower inspection
2019-04-30Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $32,628
2019-04-24Permit PL — ISSUED
2019-04-17DOB violation E:
2019-04-17DOB violation E:
2019-04-17DOB violation E:
2019-04-17DOB violation E:
2019-04-15311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-15Job filed: Installation of temporary sidewalk shed per plan submitted. Sidewalk shed legs are to be placed on the street. Work shall comply with 2014 building c
2019-04-15Permit Sidewalk Shed — Signed-off
2019-04-14311: Noise — Noise, Barking Dog (NR5)
2019-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-08Job filed: FACADE REPAIR ONLY. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,100,000
2019-04-04Permit EW — ISSUED
2019-04-04Permit EW — ISSUED
2019-03-08Permit EW — ISSUED
2019-03-08Permit EW — ISSUED
2019-03-08Permit EW — ISSUED
2019-03-07Job filed: APPLICATION FILED FOR FUEL OIL EMERGENCY GENERATOR DESIGNED TO COMPLY WITH BB 2018-10. NO CHANGE IN USE EGRESS OR OCCUPANCY$25,000
2019-03-07Job filed: APPLICATION FILED FOR FUEL OIL EMERGENCY GENERATOR DESIGNED TO COMPLY WITH BB 2018-10. NO CHANGE IN USE EGRESS OR OCCUPANCY$25,000
2019-03-07Job filed: STRUCTURAL WORK IN CONJUNCTION WITH GENERATOR FILING.$8,500
2019-03-06311: Illegal Parking — Blocked Sidewalk
2019-02-28Job filed: FIRE PROTECTION PLAN$1,000
2019-02-28Job filed: FIRE PROTECTION PLAN$1,000
2019-02-19Job filed: INSTALLATION OF PHOTOLUMINESCENT MARKINGS AS PER LL 26 OF 2004 NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2019-02-19Job filed: INSTALLATION OF PHOTOLUMINESCENT MARKINGS AS PER LL 26 OF 2004 NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2019-02-17DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-02-15Certificate of occupancy Temporary
2019-02-13Permit EW — ISSUED
2019-02-01311: Food Establishment — Food Preparation Location
2019-01-16311: Taxi Complaint — Driver Complaint
2019-01-08311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-11-30Rodent inspection: Bait applied
2018-11-30Rodent inspection: Bait applied
2018-11-29Certificate of occupancy Temporary
2018-11-23Rodent inspection: Monitoring visit
2018-11-23Rodent inspection: Bait applied
2018-11-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-11-20Job filed: STRUCTURAL WORK IN CONJUNCTION WITH GENERATOR FILING.$8,500
2018-11-20Job filed: STRUCTURAL WORK IN CONJUNCTION WITH GENERATOR FILING.$8,500
2018-11-20Job filed: SPRINKLER MODIFICATION AS SHOWN ON PLANS FILED HEREWITH$16,000
2018-11-20Job filed: APPLICATION FILED FOR FUEL OIL EMERGENCY GENERATOR DESIGNED TO COMPLY WITH BB 2018-10. NO CHANGE IN USE EGRESS OR OCCUPANCY$25,000
2018-11-20Job filed: ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM$6,000
2018-11-20Job filed: STRUCTURAL WORK IN CONJUNCTION WITH GENERATOR FILING.$8,500
2018-11-15Rodent inspection: Bait applied
2018-11-15Rodent inspection: Bait applied
2018-11-13Permit EW — ISSUED
2018-11-07311: Street Sign - Missing — No Parking, Standing, Stopping
2018-11-04311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2018-11-02Rodent inspection: Bait applied
2018-11-02Rodent inspection: Bait applied
2018-10-16DOB complaint, category ?
2018-09-25Permit PL — ISSUED
2018-09-13Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$5,000
2018-09-11Rodent inspection: Failed for Rat Activity and Other Reason
2018-09-07Boiler inspection
2018-09-07Boiler inspection
2018-08-24311: Animal Abuse — Other (complaint details)
2018-08-20Permit PL — ISSUED
2018-08-15Certificate of occupancy Temporary
2018-08-13311: Street Sign - Missing — Stop
2018-08-11311: Street Sign - Damaged — One Way
2018-08-07311: Indoor Air Quality — Other (Explain Below)
2018-08-03DOB complaint, category ?
2018-08-01ECB CLASS - 2 violation: FAILURE TO FILL ACCEPTABEL AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INTIAL REPORT REQUIRED $1,250
2018-07-28Permit EW — ISSUED
2018-07-27311: Noise — Noise, Barking Dog (NR5)
2018-06-16311: Sidewalk Condition — Broken Sidewalk
2018-06-14Job filed: HEREWITH FILING PLANS TO INSTALL NEW AC UNITS AND MINOR SPRINKLER WORK.$11,000
2018-06-08Rodent inspection: Failed for Rat Activity
2018-06-08Permit EW — ISSUED
2018-05-31Permit EW — ISSUED
2018-05-31Permit EW — ISSUED
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-31Permit EW — ISSUED
2018-05-22311: Unsanitary Animal Facility — Animal Waste
2018-05-21Certificate of occupancy Temporary
2018-05-16Job filed: NEW CONSTRUCTION OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, DOOR FRAMES AND FIXTURES (SUITE 203).$9,000
2018-05-16Job filed: NEW CONSTRUCTION OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, DOOR FRAMES AND FIXTURES (SUITE 203).$9,000
2018-05-15Permit EW — RE-ISSUED
2018-05-11Permit EW — ISSUED
2018-05-09Cooling tower inspection — violation AH8Z
2018-05-09Cooling tower inspection — violation AH8R
2018-05-09Cooling tower inspection — violation AH8B
2018-05-09Cooling tower inspection — violation AH8D
2018-05-09Cooling tower inspection — violation AH8M
2018-05-09Cooling tower inspection — violation AH8T
2018-05-09Cooling tower inspection — violation AH8Q
2018-05-09Cooling tower inspection — violation AH8S
2018-05-09Cooling tower inspection — violation AH8L
2018-05-02Job filed: NEW CONSTRUCTION OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS AND WALLS AS SHOWN ON PLANS FILED HEREWITH (M10).$57,000
2018-04-16Permit EW — ISSUED
2018-04-13DOB violation E:
2018-04-13DOB violation E:
2018-04-13DOB violation E:
2018-04-13DOB violation E:
2018-03-27Job filed: INSTALLATION OF MINOR 45LF INTERIOR PARTITION, REPLACE 1 SINK AS PER BC 28-105.4.2.1 ORDINARY REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2018-03-27Job filed: INSTALLATION OF MINOR 45LF INTERIOR PARTITION, REPLACE 1 SINK AS PER BC 28-105.4.2.1 ORDINARY REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2018-03-23311: Noise — Noise, Barking Dog (NR5)
2018-03-22Job filed: A2$17,000
2018-03-22Job filed: A2$17,000
2018-02-27311: Blocked Driveway — Partial Access
2018-02-27Permit EW — ISSUED
2018-02-23ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS.OBSERVED AT 8TH FLOOR AND THROUG$1,200
2018-02-21Certificate of occupancy Temporary
2018-02-20311: Executive Inspections — Enforcement Work Order (DOB)
2018-02-20DOB complaint, category ?
2018-02-07Job filed: MECHANICAL SCOPE RELATED TO NEW AC EQUIPMENT AS SHOWN ON PLANS FILED HEREWITH AT 9TH, 10TH, 11TH AND ROOF LEVELS.$200,000
2018-02-07Job filed: MECHANICAL SCOPE RELATED TO NEW AC EQUIPMENT AS SHOWN ON PLANS FILED HEREWITH AT 9TH, 10TH, 11TH AND ROOF LEVELS.$200,000
2018-02-02311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2018-02-02DOB complaint, category ?
2018-01-08311: Adopt-A-Basket — Adopt-A-Basket
2017
2017-12-13311: Street Condition — Pothole
2017-12-13311: Street Condition — Pothole
2017-12-01Certificate of occupancy Temporary
2017-11-19311: Street Sign - Missing — No Parking, Standing, Stopping
2017-11-05311: Noise - Commercial — Loud Music/Party
2017-11-05311: Noise - Residential — Loud Music/Party
2017-11-04311: Noise - Residential — Loud Music/Party
2017-11-04311: Noise - Residential — Loud Music/Party
2017-10-29311: Noise - Street/Sidewalk — Loud Music/Party
2017-10-28311: Noise - Residential — Loud Talking
2017-10-18Boiler inspection — defects found
2017-10-18Boiler inspection — defects found
2017-10-14311: Noise — Noise: Jack Hammering (NC2)
2017-09-14FDNY inspection (RISK)
2017-09-06311: Noise - Commercial — Loud Music/Party
2017-09-05Certificate of occupancy Temporary
2017-08-30311: Street Sign - Missing — No Parking, Standing, Stopping
2017-08-27311: Noise — Noise, Barking Dog (NR5)
2017-07-31311: Street Condition — Cave-in
2017-07-18311: Street Condition — Cave-in
2017-06-24311: Noise — Noise: Construction Before/After Hours (NM1)
2017-06-20ECB CLASS - 2 violation: FAILURE TO ANNUAL CERTIFICATION THAT COOLING TOWER 1000002052 HAS BEENINSPECTED,TESTED AND DISINFECTED, AND TAHT A MAINTENANCE PLA$2,000
2017-06-09Certificate of occupancy Temporary
2017-06-05311: Noise — Noise: Construction Before/After Hours (NM1)
2017-06-05Permit EW — ISSUED
2017-06-04311: Noise — Noise: Jack Hammering (NC2)
2017-06-04311: Noise — Noise: Construction Before/After Hours (NM1)
2017-06-04311: Noise — Noise: Construction Equipment (NC1)
2017-06-03311: Street Condition — Pothole
2017-05-31DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-05-28311: Noise — Noise, Barking Dog (NR5)
2017-04-27FDNY inspection (COMPLAINT)
2017-04-24Cooling tower inspection — violation AH8B
2017-04-24Cooling tower inspection — violation AH8V
2017-04-24Cooling tower inspection — violation AH8R
2017-04-24Cooling tower inspection — violation AH8L
2017-04-24Cooling tower inspection — violation AH8T
2017-04-24Cooling tower inspection — violation AH8M
2017-04-24Cooling tower inspection — violation AH8C
2017-04-24Cooling tower inspection — violation AH8S
2017-04-24Cooling tower inspection — violation AH8Q
2017-04-24Cooling tower inspection — violation AH8G
2017-04-24Cooling tower inspection — violation AH8Z
2017-04-14Facade (LL11) filing, cycle 8: SAFE
2017-04-14DOB violation FISP:
2017-04-12311: Noise — Noise, Barking Dog (NR5)
2017-03-20Permit EW — ISSUED
2017-03-14Certificate of occupancy Temporary
2017-03-11311: Recycling Enforcement — ER5 Comm. Recyc. (Bldg Mgmt)
2017-03-11311: Recycling Enforcement — ER6 Comm. Recyc. (Comm. Tenant)
2017-03-03311: Elevator — Elevator - Defective/Not Working
2017-03-03DOB complaint, category ?
2017-02-23Permit PL — ISSUED
2017-02-19311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-02-19311: Noise — Noise: Construction Before/After Hours (NM1)
2017-02-19DOB complaint, category ?
2017-02-16Permit EW — ISSUED
2017-02-16Permit EW — ISSUED
2017-02-15ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY MEASURES SUCH AS SIDEWALK SHED. FENCE ETC TOPROTECT PUBLIC FROM UNSAFE FACADES AS PER 1RCNY 103-04 AND A$2,400
2017-01-24311: Street Sign - Missing — No Parking, Standing, Stopping
2017-01-24311: Facades — Facade (LL11/98)- Unsafe Notification
2017-01-24DOB complaint, category ?
2017-01-23311: Street Sign - Dangling — No Parking, Standing, Stopping
2017-01-22311: Noise — Noise, Barking Dog (NR5)
2017-01-17ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT TIME OF INSPECTION,OBSERVED EXP#1 HAS CRACKING ABOVE 2ND FL WINDOW,EXP#$500
2017-01-16311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-01-16DOB complaint, category ?
2017-01-11311: Noise — Noise: Construction Before/After Hours (NM1)
2017-01-10Job filed: ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM.$7,500
2017-01-10Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS ON THE 11TH FLOOR.$100,500
2017-01-10Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INITIAL FILING.$10,500
2017-01-10Job filed: SPRINKLER WORK AS SHOWN ON PLANS ON THE 11TH FLOOR.$8,688
2017-01-10Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS ON THE 11TH FLOOR.$100,500
2017-01-10Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INITIAL FILING.$10,500
2016
2016-12-27311: Noise — Noise, Barking Dog (NR5)
2016-12-25311: Noise — Noise, Barking Dog (NR5)
2016-12-25311: Noise — Noise, Barking Dog (NR5)
2016-12-20311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2016-12-13311: Illegal Parking — Blocked Sidewalk
2016-12-02311: Smoking — Smoking Violation
2016-11-27311: Noise — Noise, Barking Dog (NR5)
2016-11-27311: Noise — Noise, Barking Dog (NR5)
2016-11-02Rodent inspection: Passed
2016-10-11Rodent inspection: Passed
2016-10-11311: Air Quality — Air: Other Air Problem (Use Comments) (AZZ)
2016-10-06311: Illegal Parking — Blocked Sidewalk
2016-09-20TL&R — from NEW YORK COMMUNITY BANK to BROOKLAKE ASSOCIATES, L.L.C.
2016-09-20AL&R $135,000,000 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY$135,000,000
2016-09-20Agreement $135,000,000 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY$135,000,000
2016-09-20Mortgage $65,273,970 — from 20 JAY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY$65,273,970
2016-09-20Deed — from DUMBO PARTNERS B LLC; DUMBO PARTNERS A LLC; BROOKLAKE ASSOCIATES, L.L.C. to 20 JAY LLC
2016-09-20Mortgage assigned — from NEW YORK COMMUNITY BANK to MANUFACTURERS AND TRADERS TRUST COMPANY
2016-09-11311: Noise - Residential — Loud Music/Party
2016-09-02311: Street Condition — Defective Hardware
2016-09-01Deed transfer (nominal price)
2016-08-23FDNY inspection (RISK)
2016-08-18311: Street Condition — Defective Hardware
2016-08-04Rodent inspection: Failed for Rat Activity
2016-08-04311: Taxi Complaint — Driver Complaint
2016-08-03Certificate of occupancy Temporary
2016-07-26311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-26311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-19311: Taxi Complaint — Driver Complaint
2016-07-18ECB CLASS - 1 violation: 05X10 DOOR ZONE RESTRICTOR HAS BEEN DISABLED.$500
2016-07-18ECB CLASS - 2 violation: 97X10.RETURN THIS DEVICE TO SERVICE.
2016-07-18ECB CLASS - 2 violation: 21J01,29L11,59U15,67X10.21J01 INTERLOCK ON THE 6TH&7TH FLR ARE BEING CLIPPED;29L11 RETRACTION VANE ROLLER IS JAMMED;59U15 BRAKE MA
2016-07-18ECB CLASS - 2 violation: 59U15,67X10.59U15 BRAKE MAINTENANCE TAG;67X10 PHONE IS NOT WORKING.
2016-07-18ECB CLASS - 2 violation: 05X10,59U15,67X10.05X10 DOOR ZONE RESTRICTOR HAS BEEN DISABLE;59U15 BRAKE MAINTENANCE TAG;67X10 PHONE IS NOT WORKING.
2016-07-13311: Elevator — Elevator - Defective/Not Working
2016-07-13DOB complaint, category ?
2016-07-11ECB CLASS - 2 violation: 34B,50,50A,50,50C,50D. 50-SAIL SWITCH ON FRESH AIR FAN DEFECTIVE;50A-LOOSE BRICKS ABOVE CHIMNEY BASE DOOR; 50B-REAR FLAME SIGHT G$500
2016-07-07311: Elevator — Elevator - Defective/Not Working
2016-07-07DOB complaint, category ?
2016-07-01311: Street Condition — Pothole
2016-06-16311: Rodent — Condition Attracting Rodents
2016-06-02311: Street Sign - Damaged — Stop
2016-05-25Permit EW — ISSUED
2016-05-17Permit EW — ISSUED
2016-05-17Permit EW — ISSUED
2016-05-10Certificate of occupancy Temporary
2016-05-02311: Smoking — Smoking Violation
2016-04-29Permit EW — ISSUED
2016-04-18311: Smoking — Smoking Violation
2016-04-11DOB violation E:
2016-04-11DOB violation E:
2016-04-11DOB violation E:
2016-04-11DOB violation E:
2016-04-05Job filed: APPLICATION FILED TO LEGALIZE THE REMOVAL OF TWO(2) PLUG IN NON-REQUIRED AC WALL UNITS AND PATCHING OF OPENING. APPLICATION IS BEING FILED TO DISMISS $3,840
2016-03-31311: Street Sign - Damaged — No Parking, Standing, Stopping
2016-03-30Job filed: HEREWITH FILLING THE INCLUDED PLANS AND DOCUMENTS TO RELOCATE TWO EXISTING SPRINKLERS IN THE LOADING DOCK. FILED TO RESOLVE ECB VIOLATION 35116018K$600
2016-03-30Job filed: HEREWITH FILLING THE INCLUDED PLANS AND DOCUMENTS TO RELOCATE TWO EXISTING SPRINKLERS IN THE LOADING DOCK. FILED TO RESOLVE ECB VIOLATION 35116018K$600
2016-03-30Job filed: HEREWITH FILLING THE INCLUDED PLANS AND DOCUMENTS TO RELOCATE TWO EXISTING SPRINKLERS IN THE LOADING DOCK. FILED TO RESOLVE ECB VIOLATION 35116018K$600
2016-02-26Rodent inspection: Passed
2016-02-01Rodent inspection: Bait applied
2016-02-01Certificate of occupancy Temporary
2016-01-26311: Water System — Dirty Water (WE)
2016-01-21311: Derelict Bicycle — 14B Derelict Bicycle
2016-01-20Rodent inspection: Bait applied
2016-01-13Rodent inspection: Bait applied
2016-01-08311: Taxi Complaint — Driver Complaint
2016-01-08Permit EW — ISSUED
2016-01-06Rodent inspection: Bait applied
2015
2015-12-17311: Sidewalk Condition — Broken Sidewalk
2015-12-14Job filed: CONSTRUCTION OF NEW PARTITIONS, DOOR, DOOR FRAME AND FINISHES AS SHOWN ON PLAN(SUITE 620). NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO$23,923
2015-12-14Job filed: CONSTRUCTION OF NEW PARTITIONS, DOOR, DOOR FRAME AND FINISHES AS SHOWN ON PLAN(SUITE 620). NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO$23,923
2015-11-12FDNY inspection (ANNUL-K-12)
2015-11-12Certificate of occupancy Temporary
2015-11-01311: Noise - Residential — Loud Music/Party
2015-10-26Rodent inspection: Failed for Rat Activity
2015-10-24311: Taxi Complaint — Driver Complaint
2015-10-19DOB complaint, category ?
2015-10-06311: Street Condition — Pothole
2015-09-29ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS.JOB#P.C-A02#321058948,ON AN LOC INSPECTION FOR THE BUILD OUT OF 3R$1,200
2015-09-29ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS & JOB UNDER PC#A2-320818479,ON LOC INSPECTION OBSERVED PROPOSED SP$1,200
2015-09-28DOB complaint, category ?
2015-09-28DOB complaint, category ?
2015-09-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-09-10FDNY inspection (ANNUL-K-12)
2015-08-26FDNY inspection (OTHER)
2015-08-21Certificate of occupancy Temporary
2015-08-13311: Water System — Leak (Use Comments) (WA2)
2015-07-14311: Non-Emergency Police Matter — Other (complaint details)
2015-07-07FDNY inspection (SPECIAL-OTH)
2015-06-25311: Illegal Parking — Posted Parking Sign Violation
2015-06-24311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2015-06-24DOB complaint, category ?
2015-06-18311: Blocked Driveway — No Access
2015-06-13311: Miscellaneous Categories — Inspection Work Order (DOB)
2015-06-13DOB complaint, category ?
2015-06-12311: Blocked Driveway — No Access
2015-06-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: OBSERVED AT TIME OF INSPECTION ON 3RD FL ON ROOMS #352,353,354,356 & ON $1,000
2015-06-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.@ TIME OF INSPECTIONI OBSERVED SPRINKLER HEAD IN LOADING DOCK BEING OBSTRUCTED B$250
2015-06-11Permit EW — ISSUED
2015-06-11Permit EW — ISSUED
2015-06-11Permit EW — ISSUED
2015-06-09Permit EW — ISSUED
2015-06-09Permit EW — ISSUED
2015-06-04311: Noise - Residential — Loud Music/Party
2015-06-04Certificate of occupancy Temporary
2015-06-04Permit PL — ISSUED
2015-05-18311: Illegal Parking — Posted Parking Sign Violation
2015-05-17311: Noise - Residential — Banging/Pounding
2015-04-24311: Sidewalk Condition — Broken Sidewalk
2015-04-09Permit EW — ISSUED
2015-04-01Job filed: INTERIOR RENOVATION ON THE 7TH FLOOR SUITE 700 AS WELL AS PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.$30,000
2015-03-18FDNY inspection (OTHER)
2015-03-06Certificate of occupancy Temporary
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2015-02-27Permit EW — ISSUED
2015-02-10DOB violation HBLVIO:
2015-02-10DOB violation E: ...........THIS PVT REPLACES PVT 535810
2015-02-10DOB violation E:
2015-02-10DOB violation E:
2015-02-10DOB violation E:
2015-02-10DOB violation E:
2015-01-29Job filed: INTERIOR RENOVATION TO INCLUDE DEMOLITION OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR O$51,000
2015-01-29Job filed: INTERIOR RENOVATION TO INCLUDE DEMOLITION OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR O$51,000
2014
2014-12-17311: Taxi Report — Driver Report
2014-12-08Certificate of occupancy Temporary
2014-11-26Permit EW — ISSUED
2014-11-20Permit PL — ISSUED
2014-11-05Permit EW — ISSUED
2014-10-22FDNY inspection (ANNUL-K-12)
2014-10-15Permit EW — ISSUED
2014-10-15Permit EW — ISSUED
2014-09-30Certificate of occupancy Temporary
2014-09-25Job filed: MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS AND OCCUPANCY UNDER THIS APPLICATION.$604,000
2014-09-13311: Illegal Parking — Double Parked Blocking Vehicle
2014-08-25Job filed: INTERIOR RENOVATION TO INCLUDE DEMOLITION OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES. PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.$450,000
2014-08-25Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM$8,000
2014-08-25Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$15,000
2014-08-25Job filed: MECHANICAL WORK AS SHOWN ON PLANS.$15,000
2014-08-25Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM$8,000
2014-08-15Job filed: A2$1,000
2014-08-07Permit PL — ISSUED
2014-08-07Permit PL — ISSUED
2014-07-31FDNY inspection (RISK)
2014-07-30Permit EW — ISSUED
2014-07-27311: Derelict Vehicles — Derelict Vehicles
2014-07-21311: Derelict Bicycle — 14B Derelict Bicycle
2014-07-15Job filed: SPRINKLER MODIFICATIONS IN CONJUNCTION WITH COOLING TOWER AS SHOWN ON PLANS FILED HERE WITH. FILED IN CONJUNCTION WITH 320906427 & 320906436$4,500
2014-06-30Certificate of occupancy Temporary
2014-06-26Permit PL — ISSUED
2014-06-05Permit EW — ISSUED
2014-06-05Permit EW — ISSUED
2014-06-02Permit EW — ISSUED
2014-06-02Permit EW — ISSUED
2014-06-02Permit EW — ISSUED
2014-06-02Permit EW — ISSUED
2014-04-03Certificate of occupancy Temporary
2014-02-14DOB violation E:
2014-02-14DOB violation E:
2014-02-11Permit PL — ISSUED
2014-02-10311: Street Sign - Missing — St Name - Attached to Pole
2014-01-31Permit EW — ISSUED
2014-01-31Permit EW — ISSUED
2014-01-09Certificate of occupancy Temporary
2013
2013-12-22311: General Construction/Plumbing — Failure To Maintain
2013-12-22DOB complaint, category ?
2013-12-20Permit EW — ISSUED
2013-12-20Permit EW — ISSUED
2013-12-19Permit PL — ISSUED
2013-12-16Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS SHOWN$10,000
2013-12-10Job filed: GENERAL CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH$285,000
2013-12-10Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN$57,500
2013-12-10Permit EW — ISSUED
2013-12-07DOB violation C: (28-205.4)UNREG
2013-12-06311: Sewer — Manhole Cover Missing (Emergency) (SA3)
2013-11-14Certificate of occupancy Temporary
2013-11-12311: Illegal Parking — Double Parked Blocking Traffic
2013-11-07Job filed: PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH$10,500
2013-10-31311: Hazardous Materials — Chemical Spill/Release (HA1)
2013-10-15Job filed: TEMPORARY MOCK UP FILED AS PER LPC REQUEST$2,200
2013-10-15Permit AL — ISSUED
2013-10-07Job filed: APPLICATION FILED FOR COOLING TOWER INSTALLTION/RENOVATION AS SHOWN ON PLANS FILED HEREWITH$1,350,000
2013-10-07Job filed: APPLICATION FILED FOR COOLING TOWER INSTALLTION/RENOVATION AS SHOWN ON PLANS FILED HEREWITH$1,350,000
2013-10-07Job filed: STRUCTURAL WORK AS SHOWN IN PLANS FILED HEREWITH.$97,000
2013-10-07Job filed: STRUCTURAL WORK AS SHOWN IN PLANS FILED HEREWITH.$97,000
2013-10-07Job filed: APPLICATION FILED FOR COOLING TOWER INSTALLATION/RENOVATION AS SHOWN ON PLANS FILED HEREWITH.$52,000
2013-08-30Rodent inspection: Passed
2013-08-30Job filed: APPLICATION FILED FOR COOLING TOWER INSTALLATION/RENOVATION AS SHOWN ON PLANS FILED HEREWITH.$1,350,000
2013-08-08Rodent inspection: Bait applied
2013-08-07Permit PL — ISSUED
2013-08-07Permit PL — ISSUED
2013-07-31Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM.$300,000
2013-07-31Permit EW — ISSUED
2013-07-31Permit EW — ISSUED
2013-07-22311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2013-07-18Job filed: INSTALL NEW SPRINKLERS AND PIPING AS PER PLANS$43,000
2013-07-17311: Noise — Noise: Construction Before/After Hours (NM1)
2013-06-27311: Street Condition — Pothole
2013-06-26DOB violation C:
2013-06-21Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS FILED HEREWITH. AS WELL AS SOME PLU$536,000
2013-06-21Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.$534,500
2013-06-21Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON PLANS FILED HEREWITH. AS WELL AS SOME PLU$536,000
2013-06-21Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.$534,500
2013-06-12Permit EW — ISSUED
2013-06-06311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2013-06-06DOB complaint, category ?
2013-05-31Permit EW — ISSUED
2013-05-31Permit EW — ISSUED
2013-05-28Permit EW — ISSUED
2013-05-28Permit EW — ISSUED
2013-05-28Permit EQ — ISSUED
2013-05-21Permit PL — ISSUED
2013-05-10311: Consumer Complaint — False Advertising
2013-04-26Permit AL — ISSUED
2013-04-03DOB complaint, category ?
2013-03-26DOB violation C:
2013-03-25DOB complaint, category ?
2013-03-15Job filed: INTERIOR DEMOLITION, INCLUDING DEMO OF PARTITIONS, FINISHES, MECHANICAL DUCTWORK AND PLUMBING AS SHOWN ON PLANS FILED HEREWITH$14,000
2013-03-15Permit EQ — ISSUED
2013-03-05Job filed: STRUCTURAL MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH.$5,000
2013-03-05Job filed: ERECT TEMPORARY CONSTRUCTION FENCE.
2013-03-05Job filed: STOREFRONT MODIFICATIONS AND PARTIAL DEMOLITION OF EXTERIOR WALLS AND STAIRS/RAMP AT SIDEWALK AS SHOWN ON PLANS FILED HEREWITH. CONSTRUCTION FENCE FIL$178,500
2013-03-05Job filed: STRUCTURAL MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH.$5,000
2013-03-05Job filed: STOREFRONT MODIFICATIONS AND PARTIAL DEMOLITION OF EXTERIOR WALLS AND STAIRS/RAMP AT SIDEWALK AS SHOWN ON PLANS FILED HEREWITH. CONSTRUCTION FENCE FIL$178,500
2013-02-28Rodent inspection: Failed for Rat Activity
2013-02-21Job filed: MECHANICAL & PLUMBING MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH
2013-02-19Job filed: SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH$29,700
2013-02-19Job filed: SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH$29,700
2013-02-19Job filed: A1$840,000
2013-02-13DOB violation E:
2013-02-13DOB violation E:
2013-02-13DOB violation E:
2013-02-01Rodent inspection: Failed for Rat Activity
2013-01-29311: Blocked Driveway — No Access
2013-01-29311: Lead — Lead Kit Request (Residential) (L10)
2012
2012-12-03311: Sewer — Manhole Sunken/Damaged/Raised (SB1)
2012-12-03311: Street Condition — Pothole
2012-09-10Agreement $75,000,000 — from DUMBO PARTNERS B LLC; BROOKLAKE ASSOCIATES, L.L.C.; DUMBO PARTNERS A LLC to NEW YORK COMMUNITY BANK$75,000,000
2012-09-10Mortgage $38,318,344 — from BROOKLAKE ASSOCIATES, L.L.C.; DUMBO PARTNERS B LLC; DUMBO PARTNERS A LLC to NEW YORK COMMUNITY BANK$38,318,344
2012-09-07Rodent inspection: Passed
2012-07-13Rodent inspection: Failed for Rat Activity
2012-06-04DOB violation LANDMK:
2012-06-04DOB violation LANDMK:
2012-06-04DOB violation LANDMK:
2012-05-25Permit EW — ISSUED
2012-05-25Permit EW — ISSUED
2012-05-25Permit EW — ISSUED
2012-05-18Permit EW — ISSUED
2012-05-14Job filed: A2$7,600
2012-05-14Job filed: A2$7,600
2012-04-24Rodent inspection: Passed
2012-04-14311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2012-02-16DOB violation E:
2012-01-27Rodent inspection: Failed for Rat Activity
2011
2011-12-19311: Consumer Complaint — Overcharge
2011-11-23Rodent inspection: Failed for Rat Activity
2011-10-28Permit EW — ISSUED
2011-10-06311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2011-10-06DOB complaint, category ?
2011-10-05311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2011-09-26311: Indoor Air Quality — Other (Explain Below)
2011-09-26311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2011-09-24311: Noise - Street/Sidewalk — Loud Music/Party
2011-09-24311: Noise - Commercial — Loud Music/Party
2011-09-15311: Street Sign - Missing — No Parking, Standing, Stopping
2011-09-15Permit EW — ISSUED
2011-08-03311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2011-08-02Job filed: STRUCTURAL WORK IN ASSOCIATION WITH ELEVATOR REMOVAL AS SHOWN ON PLANS FILED HEREWITH.$44,800
2011-08-02Job filed: STRUCTURAL WORK IN ASSOCIATION WITH ELEVATOR REMOVAL AS SHOWN ON PLANS FILED HEREWITH.$44,800
2011-08-02Job filed: STRUCTURAL WORK IN ASSOCIATION WITH ELEVATOR REMOVAL AS SHOWN ON PLANS FILED HEREWITH.$44,800
2011-07-05311: Noise — Noise: Jack Hammering (NC2)
2011-06-21Job filed: DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS & FINISHES AS SHOWN ON PLANS FILED HEREWITH$420,000
2011-06-21Job filed: DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS & FINISHES AS SHOWN ON PLANS FILED HEREWITH$420,000
2011-06-21Job filed: DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS & FINISHES AS SHOWN ON PLANS FILED HEREWITH$420,000
2011-06-21Permit EW — ISSUED
2011-04-06Facade (LL11) filing, cycle 7: SWARMP
2011-03-09DOB violation E:
2011-01-19Permit EW — ISSUED
2010
2010-11-18Deed $5,668,200 — from CAGE ASSOCIATES, LLC to DUMBO PARTNERS B LLC$5,668,200
2010-11-18Deed $5,668,200 — from CAGE ASSOCIATES, LLC to DUMBO PARTNERS A LLC$5,668,200
2010-11-18Deed — from BROOKLAKE ASSOCIATES, L.L.C. to CAGE ASSOCIATES, LLC
2010-08-20311: Illegal Parking — Blocked Hydrant
2010-07-01Permit EW — ISSUED
2010-06-30Job filed: DEMOLITION & CONSTRUCTION OF PARTITIONS, CAPENTRY WORK AS SHOWN ON PLANS FILED HEREWITH.$289,500
2010-04-28DOB violation E:
2010-04-28DOB violation E:
2010-04-28DOB violation E:
2010-04-28DOB violation E:
2010-02-19311: Traffic/Illegal Parking — Blocked Sidewalk
2009
2009-07-21Permit PL — ISSUED
2009-04-13Mortgage assigned — from CAPITAL ONE, N.A. to NEW YORK COMMUNITY BANK
2009-04-13Mortgage satisfied — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK; CAPITAL ONE, N.A.
2009-04-13TL&R — from BROOKLAKE ASSOCIATES, L.L.C. to CAPITAL ONE, N.A.
2009-04-13TL&R — from BROOKLAKE ASSOCIATES, L.L.C. to CAPITAL ONE, N.A.
2009-04-13AL&R $38,220,000 — from BROOKLAKE ASSOCIATES, L.L.C. to NEW YORK COMMUNITY BANK$38,220,000
2009-04-13Agreement $38,220,000 — from BROOKLAKE ASSOCIATES, L.L.C. to NEW YORK COMMUNITY BANK$38,220,000
2009-04-13Mortgage $25,127,314 — from BROOKLAKE ASSOCIATES, L.L.C. to NEW YORK COMMUNITY BANK$25,127,314
2009-01-29DOB violation E:
2009-01-29DOB violation E:
2009-01-29DOB violation E:
2009-01-29DOB violation E:
2008
2008-09-05DOB violation E:
2008-09-05DOB violation E:
2008-05-18DOB complaint, category ?
2008-05-09Permit EW — ISSUED
2008-05-02Permit EQ — ISSUED
2008-05-02Permit EW — ISSUED
2008-05-01Permit EW — ISSUED
2008-05-01Permit EQ — ISSUED
2008-05-01Permit EW — ISSUED
2008-05-01Permit EW — ISSUED
2008-04-24Permit AL — ISSUED
2008-04-01Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-03-26DOB complaint, category ?
2008-02-22DOB complaint, category ?
2008-02-17DOB complaint, category ?
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-30Permit PL — ISSUED
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-17Job filed: Plumbing work, piping & meter filed for oil to gas conversion on existing boilers as shown on plans filed herewith. All Work is below grade. No c$40,000
2008-01-03Permit EW — ISSUED
2007
2007-12-28Job filed: Interior renovation to include demo of existing and construction of new partitions and hung ceilings as shown on plans filed herewith.$250,000
2007-12-19Permit EW — ISSUED
2007-12-18Permit EW — ISSUED
2007-12-14Permit EW — ISSUED
2007-12-12DOB complaint, category ?
2007-12-12DOB violation C: FAILURE TO COMPLY WITH SWO #(9 SWO)ON GOING WORK 2 PEOPLE WORKING IN ELEVATOR SHAFT CONTRARY TO SWO 4 PEOPLE INSTALLING DUCK FOR
2007-12-12DOB complaint, category ?
2007-11-07Job filed: Interior renovation to include new partitions and hung ceiling as shown on plans filed herewith. No change in use, egress or occupancy.$200,000
2007-11-07Job filed: Interior renovation to include new partitions and hung ceiling as shown on plans filed herewith. No change in use, egress or occupancy.$200,000
2007-11-05Job filed: Structural work at Elevator Machine Room on 11th floor as shown on plans HEREWITH. APPLICATION TO REMEDYVIOLATION # 071807C0202JS. NO CHANGE IN USE$95,000
2007-11-02Job filed: Interior renovation to include new partitions as shown on plans filed herewith. No change in use, egress or occupancy.$120,000
2007-10-31DOB complaint, category ?
2007-10-04DOB violation C:
2007-10-04DOB complaint, category ?
2007-09-21DOB complaint, category ?
2007-09-20DOB complaint, category ?
2007-09-18DOB violation C:
2007-09-18DOB complaint, category ?
2007-09-18DOB complaint, category ?
2007-09-18DOB violation C:
2007-09-18DOB violation C:
2007-09-18ECB Hazardous violation: WORK W/O A PERMIT- WORK NOTED @ 1ST FLR INTERIOR HALLWAY OFFICES APPROX: 2FT BY 2FT OPENING CREATED @ DIFFERENT LOCATIONS & AC UNI$800
2007-09-17DOB violation E:
2007-09-12DOB violation C:
2007-08-28DOB violation C:
2007-08-28DOB complaint, category ?
2007-08-22DOB complaint, category ?
2007-08-22DOB violation C: FAILURE TP COMPLY WITH S.W.O 081807C0201DR REMEDY: COMPLY WITH S.W.O
2007-08-18DOB complaint, category ?
2007-08-18DOB violation C:
2007-08-18DOB violation C:
2007-07-18DOB violation C:
2007-07-13DOB complaint, category ?
2007-07-10DOB complaint, category ?
2007-07-10DOB violation C: FAILURE TO COMPLY WITH STOP WORK ORDER#020307C0203RG/04 NOTED:WORKERS ENGAGED IN INTERIOR SHEETROCK WORK @ 2ND FL & EXTERIOR FACAD
2007-07-10DOB violation C: FAILURE TO COMPLY WITH STOP WORK ORDER #020307CO20
2007-07-09Permit EW — ISSUED
2007-07-09Permit AL — ISSUED
2007-07-09Permit EQ — ISSUED
2007-07-06Job filed: Storefront & lobby renovation as shown on plans filed herewith. Erect temp plywood construction fence, not to be placed more than 3'-0" from prope$66,000
2007-07-05Job filed: Erect new marquee as shown. No change in use, egress or occupancy.$20,000
2007-06-20DOB complaint, category ?
2007-06-18DOB complaint, category ?
2007-06-09DOB complaint, category ?
2007-06-09DOB violation C:
2007-06-09DOB violation C:
2007-06-08DOB complaint, category ?
2007-05-31Permit EQ — ISSUED
2007-05-17Job filed: PROPOSED INSTALLATION OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91 & TPPN 9/1999.
2007-05-17Job filed: PROPOSED INSTALLATION OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91 & TPPN 9/1999.
2007-04-18DOB complaint, category ?
2007-04-02DOB complaint, category ?
2007-03-07Permit EW — ISSUED
2007-02-26Permit EW — ISSUED
2007-02-03DOB violation C: WORK WITHOUT A VARIANCE-FAILURE TO CARRY OUT PERMITTED WORK IN ACCORD- ANCE WITH APPLICABLE LAWS & REGULATIONS.CONST.ACTIVITES BEIN
2007-02-03ECB Hazardous violation: FAILURE TO COMPLY W/ STOP WORK ORDER.NOTED:STOP WORK ORDER IN EFFECT UNDER D.O.B. VIOLATIONS #'S 013007C0201EC/02EC WITH WORKERS O$2,500
2007-02-03DOB complaint, category ?
2007-02-01DOB complaint, category ?
2007-02-01DOB violation C: ONGOING WORK AT 1ST FLOOR N/W SIDE.PERMIT#302297137 CONTRARY TO PREVIO USLY ISSUED S.W.O#102806C02GW01 & 102806C2GW02 & 03007C0202E
2007-01-31DOB complaint, category ?
2007-01-30DOB violation C:
2007-01-30DOB violation C: ON GOING WORK AT 1ST FLOOR N/W SIDE OF BLDG.PERMIT#302297137 CONTRARY TO PREVIOUSLY ISSUED S.W.O.#102806602GW01 AND 102806602GW02
2007-01-30Permit PL — ISSUED
2007-01-30DOB complaint, category ?
2007-01-26Permit EW — ISSUED
2007-01-26Permit EW — ISSUED
2007-01-22Job filed: Install new HVAC as shown on plans filed herewith.$73,000
2007-01-19Job filed: Interior renovation to include construction of partitions, hung ceiling and plumbing work as shown on plans filed herewith. No change in use, egress o$545,000
2007-01-19Job filed: Interior renovation to include construction of partitions, hung ceiling and plumbing work as shown on plans filed herewith. No change in use, egress o$545,000
2007-01-18Job filed: Install new sprinkler heads with associated piping as shown on plans filed herewith. No change in use, egress or occupancy.$43,000
2007-01-17Job filed: TIE IN TO EXISTING SPRINKLER SYSTEM ANDADD HEADS AS PER PLANS SUBMITTED .$35,000
2007-01-17Job filed: TIE IN TO EXISTING SPRINKLER SYSTEM ANDADD HEADS AS PER PLANS SUBMITTED .$35,000
2007-01-08Facade (LL11) filing, cycle 6: SAFE
2006
2006-11-29Permit EW — ISSUED
2006-11-29Permit EQ — ISSUED
2006-11-28Job filed: Storefront replacement and sidewalk fence. No change in use, egress or occupancy.$100,000
2006-11-28Job filed: Storefront replacement and sidewalk fence. No change in use, egress or occupancy.$100,000
2006-11-01DOB complaint, category ?
2006-10-28ECB Non-Hazardous violation: WORK W/O A PERMIT. AS NOTED:AT A COMMERCIAL SPACE APPROX 8,000SQ FT I BEAM ARE BEING INSTALLED,CONNECTING TO COLUMNS APPROX 10' IN$2,500
2006-10-28ECB Non-Hazardous violation: FAILURE TO COMPLY W/ STOP WORK ORDER:AS NOTED IN A SPACE APPROX 8,000SQ FT AT THE GROUND FL LEVEL,I BEAMS ARE BEING INSTALLED C CO$2,500
2006-10-28DOB violation C:
2006-10-25DOB complaint, category ?
2006-09-22DOB complaint, category ?
2006-09-19DOB violation C:
2006-09-19DOB complaint, category ?
2006-09-15DOB complaint, category ?
2006-09-10DOB complaint, category ?
2006-08-23DOB violation E:
2006-08-23DOB violation E:
2006-08-23DOB violation E:
2006-08-23DOB violation E:
2006-08-05DOB complaint, category ?
2006-08-03DOB violation C:
2006-07-27DOB complaint, category ?
2006-03-15DOB complaint, category ?
2005
2005-11-02Permit EW — ISSUED
2005-10-19DOB violation E:
2005-10-14Job filed: Application filed for interior demolition and general construction associated with new walls and doors as shown on plans filed herewith. No change in$50,000
2005-09-09ECB Hazardous violation: WORK WITHOUT A PERMIT. WORK NOTED: NON-LOAD BEARING WALL REMOVED, PARTS OF CEILING AND OTHER PARTITION REMOVE AT 11TH FLOOR OF BUI$500
2005-09-08DOB complaint, category ?
2005-08-22Permit SG — ISSUED
2005-08-22Permit EW — ISSUED
2005-08-17Permit EW — ISSUED
2005-08-17Permit SG — ISSUED
2005-08-02Job filed: REPAIR EXISTING INDIRECTLY ILLUMINATED ROOF SIGN STRUCTURE FACING SOUTH ON PLYMOUTH STREET, SIGN FILED SEPERATELY. NOT ADJACENT TO HIGHWAY, INSIDE BU$135,000
2005-06-30Job filed: REPAIR EXISTING INDIRECTLY ILLUMINATED ROOF SIGN STRUCTURE FACING WEST ON PEARL STREET,SIGN FILED SEPERATELY. NOT ADJACENT TO HIGHWAY, INSIDE BUILDIN$135,000
2005-04-18DOB violation E:
2005-04-13DOB violation E:
2005-04-13DOB violation E:
2005-04-13DOB violation E:
2004
2004-10-15TL&R — from NORTH FORK BANK to BROOKLAKE ASSOCIATES, L.L.C.
2004-10-15AL&R — from NORTH FORK BANK to BROOKLAKE ASSOCIATES, L.L.C.
2004-10-15Mortgage $2,999,990 — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK$2,999,990
2004-10-15AL&R — from NORTH FORK BANK to BROOKLAKE ASSOCIATES, L.L.C.
2004-10-15Agreement $14,378,291 — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK$14,378,291
2004-10-15Mortgage $2,000,000 — from BROOKLAKE ASSOCIATES, L.L.C. to NORTH FORK BANK$2,000,000
2004-06-11Permit EW — ISSUED
2004-06-02Job filed: Application filed for interior renovation to include new partitions and hung ceiling as shown on plans filed herewith. All additional trades to be fi$800,000
2004-06-02Job filed: Application filed for interior renovation to include new partitions and hung ceiling as shown on plans filed herewith. All additional trades to be fi$800,000
2004-05-21DOB complaint, category ?
2004-04-13Permit EW — ISSUED
2004-04-13Permit EW — ISSUED
2004-04-06Job filed: INSTALL 2 HIGH PRESSURE GAS BOILERS AND BOILER ROOM ENCLOSURE ALL GAS PI PING AND METER UNDER 301809292 NO CHANGE IN EGRESS OCCUPANCY OR USE UNDER THI$35,000
2004-03-03Permit PL — ISSUED
2004-02-27Job filed: INSTALLATION OF APPROXIMATELY 150 L.F. OF 3" STEEL PIPING FOR GAS DISTRIBUTION. NO CHANGE IN EGRESS,USE OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.$10,000
2004-02-26DOB violation E:
2004-02-26DOB violation E:
2003
2003-05-19DOB violation E:
2003-05-19DOB violation E:
2003-05-19DOB violation E:
2003-04-15Permit EW — ISSUED
2003-04-15Permit EW — ISSUED
2003-04-08Job filed: Structural work in conjunction with new convenience ramp as shown on plans filed herewith.$9,000
2003-04-08Job filed: Structural work in conjunction with new convenience ramp as shown on plans filed herewith.$9,000
2003-04-08Job filed: Install new convenience ramp for access to existing warehouse at basement as per plans filed herewith. No change in use, egress or occupancy.$4,000
2003-03-12Permit EW — ISSUED
2003-01-07Permit PL — ISSUED
2002
2002-12-03Job filed: Application filed for new AC units with associated duct work and piping along with new gas meter & 8 inline duct heaters with associated piping a$200,000
2002-10-15ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NOTED: AT FRONT OF BUILDING W AT CORNER JAY ANDD PLYMOUTH CREATED STEEL RAMP IN DIAMOND PLATED IN BATH SIDE$2,500
2002-09-18DOB complaint, category ?
2002-09-12DOB complaint, category ?
2002-09-12DOB complaint, category ?
2002-07-31DOB violation E: 3F5058
2002-07-31DOB violation E: 3P230
2002-07-31DOB violation E: 3F2588
2002-07-31DOB violation E: 3F8079
2002-07-31DOB violation E: 3F5059
2002-07-31DOB violation E: 3F5396
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2001
2001-11-02DOB complaint, category ?
2001-06-08Permit PL — ISSUED
2001-05-11Job filed: INSTALL 4 LAV ON 5TH FLOOR.$30,000
2001-05-11Job filed: INSTALL 4 LAV ON 5TH FLOOR.$30,000
2001-05-01Agreement — from BROOKLAKE ASSOCIATESLLC to NORTH FORK BANK
2001-05-01Mortgage assigned — from BROOKLAKE ASSOCIATESL.L.C. to NORTH FORK BANK
2001-05-01SAGE — from NORTH FORK BANK to BROOKLAKE ASSOCIATESLLC
2001-05-01Mortgage $3,000,000 — from BROOKLAKE ASSOCIATESLLC to NORTH FORK BANK$3,000,000
2001-03-08DOB violation LL1081:
2001-02-27ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL.NOTED:AT ALL ELEVATIONS:WINDOW NOUNTED AIR CONDITIONERS NOT PROPERLY SUPPORTED.REMEDY:P$180
2001-02-08Agreement — from BROOKLAKE ASSOCIATESLLC to NORTH FORK BANK
2001-02-08Mortgage $8,500,000 — from BROOKLAKE ASSOCIATESLLC to NORTH FORK BANK$8,500,000
2001-02-08SAGE — from M & T REAL ESTATE INC
2001-02-08Deed — from 20 JAY STREET ASSOCIATES LLC to BROOKLAKE ASSOCIATESLLC
2001-02-08Mortgage assigned — from M & T REAL ESTATE INC to NORTH FORK BANK
2001-02-08Mortgage assigned — from BROOKLAKE ASSOCIATESLLC to NORTH FORK BANK
2000
2000-04-28ECB Non-Hazardous violation: 46H12. 46H- HOIST ROPES UNDERSIZED AND WORN$180
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-01-06Permit EW — ISSUED
2000-01-06Permit EW — ISSUED
2000-01-06Permit EW — ISSUED
1999
1999-12-21Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
1999-08-11CERT — from NYC DEPARTMENT OF FINANCE
1999-07-12ECB Non-Hazardous violation: 73R, FILE FOR WORK THAT WAS DONE WITH DEPARTMENT OF BUILDINGS.
1999-07-12ECB Non-Hazardous violation: 73R. FILE FOR REMOVEL OR DISMANTLE WITH DEPARTMENT OF BUILDINGS.
1999-07-12ECB Non-Hazardous violation: 73R, FILE FOR REMOVEL OR DISMANTLE WITH THIS DEAPRTMENT.
1999-05-12Mortgage assigned — from 20 JAY STREET ASSOCIATES LLC to M&T REAL ESTATE INC
1999-05-12Mortgage $1,500,000 — from 20 JAY STREET ASSOCIATES LLC to M&T REAL ESTATE INC$1,500,000
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-01-06Permit EQ — ISSUED
1998
1998-11-24ECB Non-Hazardous violation: 9H12,22D6,74##. -74 DO ALL VIOLATION WORK ON DEVICE TAG 3F2589 AND THEN INSTALL PROPER CITY I.D. NUMBER AS PER DEPT RECORDS
1998-11-24ECB Non-Hazardous violation: 73R#, -73 ILLEGAL DISMANTLE ELEV. #3P230 WITHOUT A PERMIT, RESTORE TO SERVICE$500
1998-11-18Permit EW — ISSUED
1998-11-04ECB Non-Hazardous violation: 6X11. -6X11 CEASE USE UNTIL 6X11 IS COMPLIED WITH BEFORE RETURNING TO SERVICE CALL 312-8737 FOR REINSPECTION$500
1998-11-04ECB Non-Hazardous violation: 73X11. -73 RESTORE TO SERVICE OR FILE FOR DISMANTLE
1998-11-04ECB Non-Hazardous violation: 73, RESTORE TO SERVICE, SO A FULL INSPECTION CAN BE MADE.$2,500
1998-11-04ECB Non-Hazardous violation: 39H8,36Q7,36T7,60B7,6X11. -60B7 COUNTERWEIGHT RUN BY CEASE USE UNTIL ITEMS 60B7 AND 6X11 ARE COMPLIED WITH BEFORE RETURNING TO SE$500
1998-11-04ECB Non-Hazardous violation: 73X11. -73 RESTORE TO SERVICE OR FILE FOR DISMANTLE
1998-06-24Permit EQ — ISSUED
1998-03-31ECB Non-Hazardous violation: 39H,57O,03O,03-0-02-TOP OF CAR
1998-03-31ECB Non-Hazardous violation: 73X 73X-# RESTORE DEVICE TO SERVICE OR FILE APPLICATION AND OBTAIN PERMIT FOR DISMANTLE OR REMOVAL.
1998-03-31ECB Non-Hazardous violation: 37T50T54T 37,50,54-T-07, PROVIDE PROPER CITY ID #S
1998-03-31ECB Non-Hazardous violation: 73X,73-X #RETORE DEVICE TO SERVICE OR FILE APPLICATION AND OBTAIN PERMIT FOR DISMANTLE OR REMOVAL.$2,500
1998-03-31ECB Non-Hazardous violation: 36I46H37T50T 50,37-T-07, PROVIDE CITY ID#5
1998-01-06DOB violation LL1081:
1997
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1996
1996-08-08ECB Non-Hazardous violation: 21I,22I,75M,07I,74L,37G,. 74- PROVIDE LIFT & PERFORMANCE TEST TO TEST BRAKE CAPABILITY FOR 125% FULL LOAD.
1996-08-07DOB complaint, category ?
1996-08-07DOB complaint, category ?
1996-06-21DOB complaint, category ?
1996-03-08DOB violation LL1081:
1995
1995-06-27DOB complaint, category ?
1995-06-09DOB complaint, category ?
1995-04-17DOB violation LL1081:
1994
1994-08-01Mortgage assigned — from STAR DISTRIBUTORS LTD; TRI-CITE MANAGEMENTINC to MARKED INC
1994-08-01Mortgage assigned — from MARKED INC to STAR DISTRIBUTORS LTD; TRI-CITE MANAGEMENTINC
1994-07-25DOB violation LL6291:
1994-05-31DOB violation LL1081:
1993
1993-06-28DOB violation LL1081: 1
1992
1992-07-01DOB violation LL1080:
1992-05-29ECB Non-Hazardous violation: 05L,06X,21L,30O, #05-06-CEASE USE OF ELEVATOR UNTIL REPAIR GATE AND GATE CONTACT. #21-REPAIR ANNUCIATOR.
1992-05-29ECB Non-Hazardous violation: 73X, #73-RETURN ELEVATOR TO SERVICE OR DISMANTLE.$75
1992-05-29ECB Non-Hazardous violation: 17M,15B,35#,74#, #17-PROVIDE GLASS ON VISION PANEL AT MAIN FLOOR LANDING. #35-REPLACE BROKEN GLASS ON M R WINDOW #74-REPAIR S$75
1992-05-22LEAS — from FEDERATED DEPT STORES IN to ABRAHAM & STRAUS INC
1992-05-22LEAS — from FEDERATED DEPT STORES IN to ABRAHAM & STRAUS INC
1992-04-07DOB violation LL1081: 1
1991
1991-04-25DOB violation LL1081: 1
1988
1988-10-19DOB violation E: (51)REMOVE EMERGENCY BY PASS KEY.(52)RENEW BROKEN SHACKLE SPRINGS IN MOTOR ROOM
1988-10-19DOB violation E: (51)RESTORE TO SERVICE SO THAT A COMPLETE INSPECTION CAN BE MADE BY THIS DEPARTMENT
1988-10-19DOB violation E:
1987
1987-03-10Mortgage assigned — from ABRAHAM & STRAUS INC to FEDERATED DEPART.STORES
1987-03-10DECL — from 20 JAY ST LEASING CORP
1987-03-10LEAS — from FEDERATED DEPART.STORES to 20 JAY ST LEASING CORP
1983
1983-04-08Deed — from METROPOLITAN LIFE INS CO to ARS JAY STREET CORP
1983-04-08Deed to 20 JAY STREET ASSOCIATES

Support this site Back to the building page