Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
2 heat or hot-water complaints in the last three years (winter 2025–26: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
95 service requests in the last three years. Most common: Illegal Parking (56) · Consumer Complaint (8) · Abandoned Vehicle (7) · Street Sign (5) · For Hire Vehicle Complaint (5) · Vendor Enforcement (2).
Filed construction activity
$13,959,429 in permitted construction work filed since
2016 (87 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$52,825,000
$23,771,250
2026
$56,671,000
$25,501,950
2027
$59,395,000
$26,727,750
The city's market estimate has risen
12% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
B — ENERGY STAR score 78/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
4 street-flooding or sewer-backup complaints at this address since
2016 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
High St — A C · 450 ft straight-line (about a 2-minute walk) · station accessibility: none York St — F · 550 ft straight-line (about a 3-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Sands St / Pearl St — B69 · 250 ft
Citi Bike
Adams St & Prospect St · 150 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
95 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $77,816,732 on
2017-04-13 (lender: Citibank, N.A.), covering 4 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-03-30
RPTT $7,378,078 — from STB SOLIDCORE INVESTOR, LLC; HENNING, WILLIAM; SCOTT, NATHAN; FRAZIER, KATIE; KSOL HOLDING to CORE BIDCO INC
$7,378,078
2018-09-04
Agreement $325,000,000 — from RFR 81 PROSPECT OWNER LLC; RFR/K 77 SANDS OWNER LLC; RFR/K 55 PROSPECT OWNER LLC; RFR/K 81 to CITI REAL ESTATE FUNDING INC.
$325,000,000
2018-09-04
AL&R $325,000,000 — from RFR 117 ADAMS OWNER LLC; RFR 55 PROSPECT OWNER LLC; RFR 81 PROSPECT OWNER LLC; RFR 77 SAND to CITI REAL ESTATE FUNDING INC.
$325,000,000
2017-04-13
Agreement $174,500,000 — from 81 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 55 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC
$174,500,000
2017-04-13
Mortgage $110,553,349 — from 81 PROSPECT OWNER LLC; 117 ADAMS OWNER LLC; 55 PROSPECT OWNER LLC; 77 SANDS OWNER LLC to NATIXIS REAL ESTATE CAPITAL LLC
2026-09-29Job filed: Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.$54,400
2026-02-19Permit General Construction — Permit Issued
2026-02-19Permit General Construction — Permit Issued
2026-02-09Job filed: Mechanical scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.$49,700
2026-02-09Job filed: Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.$54,400
2026-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-16Job filed: Architectural scope associated with the restaurant renovation on the 002FL (Ground floor), no change of use, egress of egress.$55,000
2024-01-09Job filed: Sprinkler modification to floors 2 thru 8 as per plans filed herewith. No change in egress, use, or occupancy.$20,207
2024-01-09Permit General Construction — Signed-off
2024-01-03Job filed: PLUMBING WORKS RELATED TO THE FIT-OUT PROPOSED UNDER GC APPLICATION B00710690-I1$12,042
2024-01-02Job filed: General construction taking place on the 2nd-9th floors as per plans filed herewith. no change in egress, use, or occupancy.$2,778,048
2024-01-02Job filed: Mechanical modifications taking place on the 2nd-8th floors as per plans filed herewith. No change in use, egress or occupancy.$20,090
2024-01-02Job filed: Modification to existing plumbing system on 2nd & 6th floors as per plans filed herewith.$29,606
2023
2023-12-15Certificate of occupancy Renewal Without Change
2023-12-06Job filed: SUBSEQUENT APPLICATION FOR PLUMBING AND SPLINKER WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$65,996
2023-11-10Job filed: PAA FILED ADD 2ND FLOOR TO THE SCOPE OF WORK AND TO MATCH EXISTING CERTIFICATE OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$90,000
2023-11-10Job filed: SUBSEQUENT APPLICATION FOR PLUMBING AND SPLINKER WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$65,996
2023-11-06311: Abandoned Vehicle — With License Plate
2023-08-14Certificate of occupancy Renewal Without Change
2023-08-14Permit EW — ISSUED
2023-07-26Boiler inspection
2023-07-26Boiler inspection
2023-07-26Permit EW — ISSUED
2023-07-20Job filed: PAA FILED ADD 2ND FLOOR TO THE SCOPE OF WORK AND TO MATCH EXISTING CERTIFICATE OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$90,000
2023-07-20Job filed: No Work
2023-07-20Job filed: SUBSEQUENT APPLICATION FOR PLUMBING AND SPLINKER WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$65,996
2023-05-30FDNY inspection (COM_OCPCY)
2023-05-22Restaurant inspection: ETSY
2023-05-18FDNY inspection (COM_OCPCY)
2023-05-18FDNY inspection (COM_OCPCY)
2023-05-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-12Certificate of occupancy Renewal Without Change
2023-05-09FDNY inspection (COM_OCPCY)
2023-05-09FDNY inspection (SPECIAL-OTH)
2023-04-26Job filed: Plumbing modification for gas piping. No change to use, egress or occupancy.$7,000
2023-04-12FDNY inspection (RISK)
2023-03-20Cooling tower inspection
2023-03-02311: Taxi Complaint — Driver Complaint - Non Passenger
2023-02-13Certificate of occupancy Renewal Without Change
2023-01-23Permit General Construction — Signed-off
2022-10-26Certificate of occupancy Renewal Without Change
2022-10-24Permit Plumbing — Signed-off
2022-10-24Permit Sprinklers — Signed-off
2022-10-21Permit Mechanical Systems — Permit Issued
2022-10-06Permit Mechanical Systems — Permit Issued
2022-10-06Permit General Construction — Signed-off
2022-08-10Boiler inspection
2022-08-10Boiler inspection
2022-07-28Job filed: Interior work @ retail area # 5 for "Tanning Salon". Minor interior demolition. Remove & relocate 1 metal stair, new partition in bathroom, flexible c$25,875
2022-07-21Job filed: RE-USE EXISTING HVAC EQUIPMENT WITH NEW DUCTWORK & DIFFUSERS$10,704
2022-07-21Job filed: SPRINKLER WORK RELATED TO COMMERCIAL FIT OUT FILED UNDER APPLICATION B007100690-I1$20,070
2022-07-21Job filed: PLUMBING WORKS RELATED TO THE FIT-OUT PROPOSED UNDER GC APPLICATION B00710690-I1$12,042
2022-07-20Certificate of occupancy Renewal Without Change
2022-07-06Permit General Construction — Signed-off
2022-06-15Job filed: General construction on floors 003 thru 005 and 007 thru 009 as per plans filed herewith. No change to use, egress or occupancy.$797,680
2022-05-24Job filed: General Construction and non load bearing partition work for a new tenant space as per plans filed herewith. Subsequent filings carrying S1-S3 Suffixe$218,940
2022-05-09Cooling tower inspection
2022-04-29ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG FACADE&APPURTENANCES.NOTE:OBSERVED@EXP1(PROSPECTST) CRACKED/SPALLING STUCCO@FACADE,PARAPET&LINTELS.2)EXP2$620
2022-04-15Job filed: SPRINKLER MODIFICATIONS TO THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$22,184
2022-04-15Job filed: SPRINKLER MODIFICATIONS ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$8,268
2022-03-21311: Damaged Tree — Entire Tree Has Fallen Down
2022-03-08DOB complaint, category ?
2022-03-01Permit Mechanical Systems — Permit Issued
2022-02-24Permit Plumbing — Signed-off
2022-02-24Permit Sprinklers — Signed-off
2022-02-23Permit Sprinklers — Signed-off
2022-02-23Permit Plumbing — Signed-off
2022-02-16Job filed: General Construction on 6th floor as per plans filed herewith. No change to use, egress or occupancy.$739,986
2022-02-16Job filed: General Construction on the 2nd floor as per plans filed herewith. No change to use, egress or occupancy.$945,947
2021-09-23Permit General Construction — Signed-off
2021-09-23Permit Mechanical Systems — Signed-off
2021-09-20Job filed: PLUMBING MODIFICATIONS ON THE 3rd thru 5th and 7th thru 9th FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$6,628
2021-09-20Job filed: MECHANICAL MODIFICATIONS ON THE 3rd thru 5th and 7th thru 9th FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$32,334
2021-09-20Job filed: SPRINKLER MODIFICATIONS ON THE 3RD THRU 5TH AND 7TH THRU 8TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$11,802
2021-09-19311: New Tree Request — For One Address
2021-09-18Job filed: General construction on floors 003 thru 005 and 007 thru 009 as per plans filed herewith. No change to use, egress or occupancy.$797,680
2021-09-02311: Illegal Parking — Parking Permit Improper Use
2021-08-25Permit Plumbing — Signed-off
2021-08-25Permit Plumbing — Signed-off
2021-08-03Permit General Construction — Signed-off
2021-08-02Permit Mechanical Systems — Signed-off
2021-08-02Permit Mechanical Systems — Signed-off
2021-08-02Permit General Construction — Signed-off
2021-08-02Permit Plumbing — Signed-off
2021-07-29Job filed: No Work
2021-07-29Permit Sprinklers — Signed-off
2021-07-29Permit Plumbing — Signed-off
2021-07-29Permit Sprinklers — Signed-off
2021-07-28Job filed: General Construction on the 2nd floor as per plans filed herewith. No change to use, egress or occupancy.$945,947
2021-07-28Job filed: General Construction on 6th floor as per plans filed herewith. No change to use, egress or occupancy.$739,986
2021-07-27Job filed: MECHANICAL MODIFICATIONS ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$53,053
2021-07-27Job filed: SPRINKLER MODIFICATIONS TO THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$22,184
2021-07-27Job filed: PLUMBING MODIFICATIONS ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$83,957
2021-07-27Job filed: SPRINKLER MODIFICATIONS ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$8,268
2021-07-27Job filed: PLUMBING MODIFICATIONS ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY.$71,656
2021-07-26Job filed: MECHANICAL MODIFICATIONS TO THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$187,974
2021-07-13FDNY inspection (RISK)
2021-07-13FDNY inspection (COM_OCPCY)
2021-07-13FDNY inspection (SPECIAL-OTH)
2021-06-20DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
2021-06-19DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
2021-06-18DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
2021-06-17DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
2021-06-16DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-16311: New Tree Request — For One Address
2021-03-08Certificate of occupancy Temporary
2021-03-01Permit Sign — Signed-off
2021-02-25Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - ETSY - NO CHANGE TO USE, EGRESS, OR OCCUPANCY$2,225
2021-02-24Permit Plumbing — Signed-off
2021-02-12Permit Sidewalk Shed — Signed-off
2021-02-11Job filed: PROPOSED INSTALLATOIN OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014$5,000
2021-01-28Permit EW — ISSUED
2020
2020-12-31Certificate of occupancy Temporary
2020-11-13Permit Standpipe — Signed-off
2020-10-13FDNY inspection (SPECIAL-OTH)
2020-10-02311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-09-30Certificate of occupancy Temporary
2020-08-04Job filed: SUBSEQUENT APPLICATION FOR PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$66,000
2020-07-16Job filed: SUBSEQUENT APPLICATION FOR PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$66,000
2020-07-08Job filed: Standpipe scope of work shall encompass modifications to the 1st thru 9th floors: replace existing fire hose racks with new fire hose valves as per pl$6,500
2020-07-07Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$64,000
2020-06-16Boiler inspection
2020-06-16Boiler inspection
2020-06-16Permit Plumbing — Signed-off
2020-06-05Permit EW — ISSUED
2020-05-07Job filed: No Work
2020-05-04Job filed: PROPOSE TO MODIFY AND INSTALL NEW SPRINKLER HEADS ON EXISTING SYSTEM AS PER PLANS FILEDHEREWITH.$14,250
2020-04-27Job filed: PROPOSE TO RENOVATE EXISTING EATING AND DRINKING ESTABLISHMENT. WORK WILL INCLUDE MINOR PARTITION CHANGES, NEW COUNTERS AND FINISHES AS PER PLANS FILE$102,000
2020-04-27Job filed: PROPOSE TO RENOVATE EXISTING EATING AND DRINKING ESTABLISHMENT. WORK WILL INCLUDE MINOR PARTITION CHANGES, NEW COUNTERS AND FINISHES AS PER PLANS FILE$102,000
2020-04-24Job filed: PROPOSE TO MODIFY AND INSTALL NEW SPRINKLER HEADS ON EXISTING SYSTEM AS PER PLANS FILEDHEREWITH.$14,250
2020-04-24Job filed: PROPOSE TO MODIFY AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.$14,000
2020-04-16DOB violation E:
2020-04-16DOB violation E:
2020-04-16DOB violation E:
2020-04-16DOB violation E:
2020-03-18Job filed: SUBSEQUENT APPLICATION FOR PLUMBING AND SPRINKLER WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$66,000
2019-07-31Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,691
2019-07-31Job filed: ERECT A NON-ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$264
2019-07-31Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,691
2019-07-29Permit EW — ISSUED
2019-07-29Permit EW — ISSUED
2019-07-29Permit EW — ISSUED
2019-07-24311: New Tree Request — For One Address
2019-07-18Job filed: PAA FILED ADD 2ND FLOOR TO THE SCOPE OF WORK AND TO MATCH EXISTING CERTIFICATE OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$90,000
2019-07-17Facade (LL11) filing, cycle 8: SAFE
2019-07-17Job filed: SUBSEQUENT APPLICATION FOR PLUMBING AND SPLINKER WORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$65,996
2019-07-12311: Illegal Parking — Blocked Bike Lane
2019-07-09Job filed: ARCHITECTURAL RENOVATIONS TO SPACE FOR NEW RESTAURANT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$300,000
2019-07-02RPTT&RET — from HEARTLAND MULTIFAMILY JV LLC to KUSHNER DUMBO PARTNERS 1 LLC
2019-07-01DOB complaint, category ?
2019-06-28Job filed: HVAC MODIFICATIONS AND NEW PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY.$93,500
2019-06-28Job filed: REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OC$332,332
2019-05-29Permit EW — ISSUED
2019-05-16Permit Sidewalk Shed — Signed-off
2019-05-07311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2019-05-07DOB complaint, category ?
2019-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-04-23Cooling tower inspection
2019-04-23DOB violation E:
2019-04-23DOB violation E:
2019-04-23DOB violation E:
2019-04-23DOB violation E:
2019-04-23DOB violation E:
2019-04-13Permit EW — ISSUED
2019-04-13Permit EW — ISSUED
2019-04-10Job filed: MECHANICAL MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$30,000
2019-04-10Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$5,000
2019-04-10Job filed: SPRINKLER MODIFICATION TO AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$10,000
2019-04-10Job filed: GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$125,000
2019-04-10Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$5,000
2019-04-10Permit EW — ISSUED
2019-04-10Permit EW — ISSUED
2019-04-09311: Street Condition — Pothole
2019-03-14Permit EW — ISSUED
2019-03-07Permit Sidewalk Shed — Signed-off
2019-03-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$88,250
2019-03-04Job filed: Temporary Place of Assembly for Business Workshop (Lecture Hall/Classroom)
2019-02-19FDNY inspection (RISK)
2019-01-31311: Street Sign - Dangling — Other/Unknown
2019-01-11Mortgage assigned — from CITI REAL ESTATE FUNDING INC. to WELLS FARGO BANK, NATIONAL ASSOCIATION,
2019-01-11AALR — from CITI REAL ESTATE FUNDING INC. to WELLS FARGO BANK, NATIONAL ASSOCIATION,
2018-10-10Agreement — from NYC DEPARTMENT OF TRANSPORTATION to RFR 117 ADAMS OWNER LLC
2018-10-03Job filed: FILING TO PATCH/REPAIR CONCRETE CRACKS AND APPLY PROTECTIVE COATING WHERE INDICATED AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC$78,050
2018-10-01Boiler inspection
2018-10-01Boiler inspection
2018-09-11Agreement — from NYC DEPARTMENT OF TRANSPORATION to RFR 117 ADAMS OWNER LLC
2018-09-04Mortgage assigned — from CITIBANK, N.A. to CITI REAL ESTATE FUNDING INC.
2018-09-04Agreement $325,000,000 — from RFR 81 PROSPECT OWNER LLC; RFR/K 77 SANDS OWNER LLC; RFR/K 55 PROSPECT OWNER LLC; RFR/K 81 to CITI REAL ESTATE FUNDING INC.$325,000,000
2018-09-04AL&R $325,000,000 — from RFR 117 ADAMS OWNER LLC; RFR 55 PROSPECT OWNER LLC; RFR 81 PROSPECT OWNER LLC; RFR 77 SAND to CITI REAL ESTATE FUNDING INC.$325,000,000
2018-09-04Agreement — from CITI REAL ESTATE FUNDING INC.; ETSY, INC. to KC 55 PROSPECT OWNER LLC; RFR/K 117 ADAMS OWNER LLC; RFR 55 PROSPECT OWNER LLC; RFR/K PROS
2018-09-04TL&R — from CITIBANK, N.A. to RFR/K 117 ADAMS OWNER LLC; KC 81 PROSPECT OWNER LLC; RFR 55 PROSPECT OWNER LLC; RFR/K 77 S
2018-07-23Certificate of occupancy Temporary
2018-07-15311: For Hire Vehicle Complaint — Driver Complaint
2018-06-13311: Broken Parking Meter — Out of Order
2018-05-29311: Consumer Complaint — Receipt Incomplete/Not Given
2018-05-18Job filed: MODIFICATION OF AUTOMATIC AND MANUAL SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION. NO CHA$1,000
2018-05-01Job filed: PLUMBING AND MECHANICAL AND SPRINKLER WORK BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION FOR RENOVATION OF OFFICE SPACE AT THE 2ND FLOOR. $36,170
2018-05-01Job filed: RENOVATE EXISTING OFFICE SPACE ON THE 2ND FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON LOAD BEARING PARTITIONS, LIGHTING AND FINIS$77,000
2018-05-01Job filed: PLUMBING AND MECHANICAL AND SPRINKLER WORK BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION FOR RENOVATION OF OFFICE SPACE AT THE 2ND FLOOR. $36,170
2018-05-01Job filed: RENOVATE EXISTING OFFICE SPACE ON THE 2ND FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON LOAD BEARING PARTITIONS, LIGHTING AND FINIS$77,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001684 HAS BEEN INSPECTED,TESTED,AND DISINFECTED,AND THAT A MAINTENANC$1,000
2017-06-14FDNY inspection (SPECIAL-OTH)
2017-04-19FDNY inspection (RISK)
2017-04-13Agreement $174,500,000 — from 81 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 55 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC$174,500,000
2017-04-13Mortgage $110,553,349 — from 81 PROSPECT OWNER LLC; 117 ADAMS OWNER LLC; 55 PROSPECT OWNER LLC; 77 SANDS OWNER LLC to NATIXIS REAL ESTATE CAPITAL LLC$110,553,349
2017-04-13Deed — from 117 ADAMS OWNER LLC to IMRF WATCHTOWER MEMBER, LLC; RFR/K DUMBO LLC
2017-04-13Mortgage assigned — from NATIXIS REAL ESTATE CAPITAL LLC to CITIBANK, N.A.
2017-04-13TL&R — from NATIXIS REAL ESTATE CAPITAL LLC to 81 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 175 PEARL OWNER LLC; 55 PROSPECT OWNER LLC; 117
2017-04-13TL&R — from NATIXIS REAL ESTATE CAPITAL LLC to 77 SANDS OWNER LLC; 81 PROSPECT OWNER LLC; 55 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 117
2017-04-13TL&R — from NATIXIS REAL ESTATE CAPITAL LLC to 55 PROSPECT OWNER LLC; 117 ADAMS OWNER LLC; 77 SANDS OWNER LLC; 175 PEARL OWNER LLC; 81 PR
2017-04-13Mortgage assigned — from NATIXIS REAL ESTATE CAPITAL LLC to CITIBANK, N.A.
2017-04-13Mortgage assigned — from NATIXIS REAL ESTATE CAPITAL LLC to CITIBANK, N.A.
2017-04-13Deed — from RFR/K DUMBO LLC to RFR/K 117 ADAMS OWNER LLC
2017-03-31Sold for $98,463,962$98,463,962
2017-03-31Deed transfer (nominal price)
2017-03-23FDNY inspection (SPECIAL-OTH)
2017-03-23311: Dead/Dying Tree — Planted More Than 2 Years Ago
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-02-21Facade (LL11) filing, cycle 8: SAFE
2017-01-26Permit EW — ISSUED
2017-01-08311: Found Property — Bag/Wallet
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-10-25Permit EW — ISSUED
2016-10-12Job filed: FILING FOR THE FIRE SUPPRESSION SYSTEM ONLY, THE GAS VALVE HAS BEEN FILED UNDER JOB NUMBER 321407483 THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY$5,000
2016-10-12Job filed: FILING FOR THE FIRE SUPPRESSION SYSTEM ONLY, THE GAS VALVE HAS BEEN FILED UNDER JOB NUMBER 321407483 THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY$5,000
2016-09-23Certificate of occupancy Temporary
2016-09-07Permit PL — ISSUED
2016-09-06Permit EW — ISSUED
2016-09-01Job filed: RENOVATE EXISTING COMMERCIAL SPACE ON THE 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$119,000
2016-08-30Permit PL — ISSUED
2016-08-30Permit EW — ISSUED
2016-08-29Permit EW — ISSUED
2016-08-29Permit EW — ISSUED
2016-08-24Permit EW — ISSUED
2016-08-24Permit EW — ISSUED
2016-07-20Permit EW — ISSUED
2016-07-08Permit PL — ISSUED
2016-07-07Job filed: ADDITIONS/ MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM FILED IN CONJUNCTION WITH ALTERATION TYPE 2, JOB NUMBER 321357465. NO CHANGE TO USE, EGRESS, OR$10,000
2016-06-24Permit EW — ISSUED
2016-06-23Permit EW — ISSUED
2016-06-22Job filed: PROPOSED AN EATING AND DRINKING ESTABLISHMENT AT 1ST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$100,000
2016-06-20Certificate of occupancy Temporary
2016-06-16Job filed: FILING SPRINKLER AND PLUMBING WORK FOR CELLAR AND 1ST FLOOR IN CONJUNCTION WITH RETAIL SPACE RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$20,000
2016-06-16Job filed: FILING SPRINKLER AND PLUMBING WORK FOR CELLAR AND 1ST FLOOR IN CONJUNCTION WITH RETAIL SPACE RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$20,000
2016-03-24Job filed: RENOVATE RETAIL SPACE AT THE 1ST AND 2ND FLOOR. NO CHANGE TO USE OR OCCUPANCY.$644,000
2016-03-24Job filed: STRUCTURAL WORK BEING FILED IN CONJUNCTION WITH ALTERATION 2 JOB TO RENOVATE EXISTING RETAIL SPACE ON THE 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCU$10,000
2016-03-24Job filed: STRUCTURAL WORK BEING FILED IN CONJUNCTION WITH ALTERATION 2 JOB TO RENOVATE EXISTING RETAIL SPACE ON THE 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCU$10,000
2016-03-02Job filed: INSTALLATION OF SOLAR ELECTRIC PANELS ON ROOF. NON CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$38,850
2016-02-26311: Illegal Parking — Blocked Sidewalk
2016-02-24Job filed: INSTALLATION OF SOLAR ELECTRIC PANELS ON ROOF. NON CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$38,850
2016-02-20Job filed: INSTALLATION OF SOLAR ELECTRIC PANELS ON ROOF. NON CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$38,850
2016-02-18311: Street Sign - Missing — No Parking, Standing, Stopping
2016-02-18311: Illegal Parking — Blocked Sidewalk
2016-01-29Certificate of occupancy Temporary
2015
2015-10-06FDNY inspection (RISK)
2015-09-14311: Street Condition — Blocked - Construction
2015-09-10Certificate of occupancy Temporary
2015-09-01311: Street Condition — Blocked - Construction
2015-07-30Permit EW — ISSUED
2015-07-20Permit EW — ISSUED
2015-07-16Permit PL — ISSUED
2015-07-07Permit EW — ISSUED
2015-07-02Permit EW — ISSUED
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-08311: Blocked Driveway — No Access
2015-05-13Job filed: FIRE ALARM MODIFICATION TO THE REFERENCED FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$260,000
2015-05-13Job filed: FIRE ALARM MODIFICATION TO THE REFERENCED FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$260,000
2015-05-13Job filed: FIRE ALARM MODIFICATION TO THE REFERENCED FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$260,000
2015-05-12Certificate of occupancy Temporary
2015-04-30Job filed: PA
2015-04-30Job filed: PA
2015-04-30Job filed: PA
2015-04-30Job filed: PA
2015-04-08Permit AL — ISSUED
2015-04-08Permit EW — ISSUED
2015-04-08Permit EW — ISSUED
2015-04-08Permit EW — ISSUED
2015-04-08Permit EW — ISSUED
2015-03-23Job filed: STRUCTURAL MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$725,000
2015-03-23Job filed: ARCHITECTURAL RENOVATION AND GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$12,500,000
2015-03-23Job filed: SPRINKLER MODIFICATION TO AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,293,259
2015-03-23Job filed: MECHANICAL AND PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,389,000
2015-03-23Job filed: SPRINKLER MODIFICATION TO AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,293,259
2015-03-13Job filed: ARCHITECTURAL RENOVATION AND GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$12,500,000
2015-03-13Job filed: STRUCTURAL MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$725,000
2015-03-13Job filed: SPRINKLER MODIFICATION TO AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,293,259
2015-03-13Job filed: MECHANICAL AND PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,389,000
2015-03-13Job filed: ARCHITECTURAL RENOVATION AND GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$12,500,000
2015-02-04Job filed: FIRE PROTECTION PLAN SUBMITTED AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION.$1,000
2015-02-04Job filed: FIRE PROTECTION PLAN SUBMITTED AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION.$1,000
2015-01-29DOB complaint, category ?
2015-01-26Permit EW — ISSUED
2015-01-23Permit PL — ISSUED
2015-01-09Job filed: INSTALLING 2 LOW PRESSURE GAS BOILERS AT THE ROOF. BOILERS TO BE USED FOR HOT WATER HEATING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$575,000
2015-01-09Job filed: INSTALLING 2 LOW PRESSURE GAS BOILERS AT THE ROOF. BOILERS TO BE USED FOR HOT WATER HEATING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$575,000
2014
2014-12-18AL&R $53,346,842 — from 81 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 55 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC$53,346,842
2014-12-18M&CON $53,346,842 — from 77 SANDS OWNER LLC; 175 PEARL OWNER LLC; 55 PROSPECT OWNER LLC; 81 PROSPECT OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC$53,346,842
2014-12-18AL&R $90,993,158 — from 55 PROSPECT OWNER LLC; 81 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 175 PEARL OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC$90,993,158
2014-12-18M&CON $90,993,158 — from 77 SANDS OWNER LLC; 175 PEARL OWNER LLC; 117 ADAMS OWNER LLC; 55 PROSPECT OWNER LLC; 81 PR to NATIXIS REAL ESTATE CAPITAL LLC$90,993,158
2014-12-18Agreement $174,500,000 — from 81 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 55 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC$174,500,000
2014-12-18AL&R $174,500,000 — from 175 PEARL OWNER LLC; 77 SANDS OWNER LLC; 55 PROSPECT OWNER LLC; 81 PROSPECT OWNER LLC; 117 to NATIXIS REAL ESTATE CAPITAL LLC$174,500,000
2014-12-08Permit EW — ISSUED
2014-12-03Permit EW — ISSUED
2014-11-13Job filed: INSTALLATION OF EMERGENCY GENERATOR WITH FUEL OIL STORAGE. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$500,000
2014-11-13Job filed: INSTALLATION OF EMERGENCY GENERATOR WITH FUEL OIL STORAGE. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$500,000
2014-11-07311: Damaged Tree — Entire Tree Has Fallen Down
2014-09-17MLEA — from 55 PROSPECT OWNER LLC; 117 ADAMS OWNER LLC to ETSY, INC.
2014-08-18Permit EW — ISSUED
2014-08-18Permit EW — ISSUED
2014-08-14Job filed: MODIFICATION OF CURB CUT AS PER PLANS FILED HEREWITH.
2014-07-28Permit EW — ISSUED
2014-07-28Permit EW — ISSUED
2014-06-24Job filed: BUILDERS PAVEMENT PLAN AS PER PLANS FILED HEREWITH.
2014-06-04Permit PL — ISSUED
2014-06-04Permit PL — RE-ISSUED
2014-05-29FDNY inspection (SPECIAL-OTH)
2014-05-28Permit EQ — ISSUED
2014-05-27Job filed: PROPOSED INSTALLATION OF PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-05-22Permit EW — ISSUED
2014-05-22Permit EW — ISSUED
2014-05-19Permit EW — RE-ISSUED
2014-05-09Permit AL — ISSUED
2014-05-07Permit EW — ISSUED
2014-04-16Permit EW — ISSUED
2014-04-16Permit EW — ISSUED
2014-04-05311: Street Condition — Pothole
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-24Permit PL — ISSUED
2014-03-07Job filed: INSTALLATION OF MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER ALARM, EMERGENCY VOICE/ALARM AND FDNY TWO WAY COMMUNCIATION WITH PURGE OPERATION.$206,000
2014-02-19Job filed: BASE BUILDING STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$640,000
2014-02-07Job filed: DECOMMISSIONING OF THE EXISTING STANDPIPE SYSTEM. INSTATLLATION OF DRY STANDPIPE PER BC 3303.8. PROPOSED NEW SPINKLER/STANDPIPE SYSTEM HAS BEEN FILE$5,000
2014-02-07Permit EW — ISSUED
2014-02-07Permit EW — ISSUED
2014-01-31Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS PER THE ATTACHED PLANS. NO CHANGE TO EGRESS OCCUPANCY OR USE.$15,000
2014-01-31Job filed: INTERIOR REMOVAL OF PARTITIONS AS PER PLANS FILED HEREWITH. DEMOLITION TO BE PERFORMED BY HAND TOOLS ONLY. NO MECHANICAL MEANS WILL BE USED UNDER THI$30,000
2014-01-31Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS PER THE ATTACHED PLANS. NO CHANGE TO EGRESS OCCUPANCY OR USE.$15,000
2014-01-29Agreement — from NYC DEPARTMENT OF TRANSPORTATION to 117 ADAMS OWNER LLC & 77 SANDS OWNER LLC
2014-01-29Job filed: INSTALLATION OF NEW BASEBUILDING STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$63,000
2014-01-29Job filed: INSTALLATION OF NEW BASEBUILDING STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$63,000
2014-01-28Job filed: BASE BUILDING STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$640,000
2014-01-27Agreement — from NYC DEPARTMENT OF TRANSPORTATION to 55 PROSPECT OWNER LLC & 117 ADAMS OWNER
2014-01-22Job filed: BASE BUILDING STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$640,000
2014-01-22Job filed: BASE BUILDING MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$2,300,000
2014-01-22Job filed: INSTALLATION OF NEW BASE BUILDING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH . NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$200,000
2014-01-22Job filed: BASE BUILDING PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$1,200,000
2014-01-22Job filed: BASEBUILDING GENERAL CONSTUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION.$2,500,000
2013
2013-11-20Job filed: A1$50,000
2013-10-16Mortgage $38,848,344 — from 81 PROSPECT OWNER LLC; 117 ADAMS OWNER LLC; 175 PEARL OWNER LLC; 55 PROSPECT OWNER LLC; 77 to NATIXIS REAL ESTATE CAPITAL LLC$38,848,344
2013-10-16Mortgage $35,491,656 — from 77 SANDS OWNER LLC; 81 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 117 ADAMS OWNER LLC; 55 PR to NATIXIS REAL ESTATE CAPITAL LLC$35,491,656
2013-10-16AL&R $174,500,000 — from 117 ADAMS OWNER LLC; 175 PEARL OWNER LLC; 77 SANDS OWNER LLC; 55 PROSPECT OWNER LLC; 81 PR to NATIXIS REAL ESTATE CAPITAL LLC$174,500,000
2013-10-16AL&R $38,848,344 — from 175 PEARL OWNER LLC; 117 ADAMS OWNER LLC; 81 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 55 PR to NATIXIS REAL ESTATE CAPITAL LLC$38,848,344
2013-10-16AL&R $35,491,656 — from 81 PROSPECT OWNER LLC; 117 ADAMS OWNER LLC; 55 PROSPECT OWNER LLC; 175 PEARL OWNER LLC; 77 to NATIXIS REAL ESTATE CAPITAL LLC$35,491,656
2013-10-16Deed $46,000,000 — from WATCHTOWER BIBLE AND TRACT SOCIETY OF N. to 117 ADAMS OWNER LLC$46,000,000
2013-10-16Mortgage $174,500,000 — from 117 ADAMS OWNER LLC; 175 PEARL OWNER LLC; 55 PROSPECT OWNER LLC; 77 SANDS OWNER LLC; 81 PR to NATIXIS REAL ESTATE CAPITAL LLC$174,500,000
2013-02-05Rodent inspection: Passed
2012
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-02-17Facade (LL11) filing, cycle 7: SAFE
2011
2011-10-25Permit EQ — ISSUED
2011-02-21311: Street Sign - Dangling — St Name - Attached to Pole
2010
2010-11-03DOB violation E:
2010-10-29Permit EQ — ISSUED
2010-03-01Permit EQ — ISSUED
2009
2009-05-26Permit EQ — ISSUED
2009-03-27DOB complaint, category ?
2009-02-09DOB violation E:
2008
2008-10-03Permit EQ — ISSUED
2008-10-02Job filed: ERECTION OF SUPPORTED SCAFFOLD FOR ROUTINE INTERIOR WATER TANK CLEANING. THE SCOPE OF THIS ORDINARY MAINTENANCE FUNCTION DOES NOT REQUIRE AN ADDITION
2008-10-02Job filed: ERECTION OF SUPPORTED SCAFFOLD FOR ROUTINE INTERIOR WATER TANK CLEANING. THE SCOPE OF THIS ORDINARY MAINTENANCE FUNCTION DOES NOT REQUIRE AN ADDITION
2008-09-10DOB violation E:
2007
2007-12-05Permit EW — ISSUED
2007-08-07Job filed: In order to improve efficency and conserve energy we are proposing to provide and install a new source of chill water from an existing central chill w$32,000
2007-05-02Agreement — from NYCDOT DIV. OF FRANCHISES, CONCESSIONS & to WATCHTOWRE BIBLE AND TRACT SOCIETY OF NE
2007-04-20DOB violation E:
2007-04-20DOB violation E:
2007-03-07Agreement — from NYCDOT DIV. OF FRANCHISES, CONCESSIONS & to WATCHTOWER BIBLE AND TRACT SOCIETY OF N.
2007-02-21DOB complaint, category ?
2007-02-20Facade (LL11) filing, cycle 6: SAFE
2004
2004-06-29Air permit (REGISTRATION), fuel: NONE
2004-05-17DOB violation C:
2003
2003-12-01Permit EW — ISSUED
2003-12-01Permit EW — ISSUED
2003-11-12Job filed: Addition of telecom rooms and new mechanical ventilation on floors 6, 7, 8, and 9 in a nine story manufacturing building. There is no change to use, $50,000
2003-11-12Job filed: Addition of telecom rooms and new mechanical ventilation on floors 6, 7, 8, and 9 in a nine story manufacturing building. There is no change to use, $50,000
2002
2002-04-18Permit AL — ISSUED
2002-04-10Job filed: Work consists of exterior repairs to the masonry veneer at the 9th floor stairwell east elevation. The repair work is only cosmetic, not structural. $10,000
2002-04-10Job filed: Work consists of exterior repairs to the masonry veneer at the 9th floor stairwell east elevation. The repair work is only cosmetic, not structural. $10,000
2002-04-10Job filed: Work consists of exterior repairs to the masonry veneer at the 9th floor stairwell east elevation. The repair work is only cosmetic, not structural. $10,000
2001
2001-12-31Permit EQ — ISSUED
2001-11-15Permit EQ — ISSUED
2001-11-15Permit EQ — ISSUED
2001-11-09Job filed: Install new smoke detection control panel on first floor. Install three new system area smoke detectors on ninth floor. Provide fuse cut out box and a$15,000
2001-11-09Job filed: Erection of sidewalk shed for protection of pedestrian traffic during exterior maintenance operations. No change to use, egress or occupancy.
2001-11-09Job filed: Erection of sidewalk shed for protection of pedestrian traffic during exterior maintenance operations. No change to use, egress or occupancy.
2001-05-14Permit EQ — ISSUED
2001-05-03Job filed: Installation of trash chute to facilitate the removal of old roofing material. No change to use, egress, or occupancy
2001-05-03Job filed: Installation of trash chute to facilitate the removal of old roofing material. No change to use, egress, or occupancy
2000
2000-09-22Permit AL — ISSUED
1999
1999-12-30Permit EQ — ISSUED
1999-12-10Permit AL — ISSUED
1999-10-19Permit EQ — ISSUED
1999-06-22Permit EQ — ISSUED
1999-02-08Mortgage $50,000 — from KOPOLOVICH, SIMKA; MILLER, JOSEPH to LUBINSKY, RUFINA$50,000
1998
1998-11-17Permit EW — ISSUED
1998-10-07Permit EW — ISSUED
1998-04-27Permit EW — ISSUED
1998-04-27Permit EW — ISSUED
1998-04-13Permit PL — ISSUED
1997
1997-05-02Permit EW — ISSUED
1997-05-02Permit PL — ISSUED
1997-05-02Permit EW — ISSUED
1997-01-09Permit PL — ISSUED
1997-01-02Permit EW —
1996
1996-03-01Permit EW — ISSUED
1996-01-26Permit EW — ISSUED
1996-01-24Permit PL — RE-ISSUED
1996-01-24Permit EW — RE-ISSUED
1996-01-17Permit EW — ISSUED
1995
1995-12-05Permit PL — ISSUED
1995-12-04Permit EW — ISSUED
1995-02-14Permit EW — ISSUED
1994
1994-11-29Permit EW — ISSUED
1994-11-29Permit PL — ISSUED
1994-11-29Permit PL — ISSUED
1994-11-29Permit EW — ISSUED
1994-10-03Permit EW — RE-ISSUED
1994-01-20Permit EW — ISSUED
1994-01-20Permit EW — ISSUED
1994-01-20Permit EW — ISSUED
1994-01-20Permit PL — ISSUED
1994-01-20Permit PL — ISSUED
1993
1993-11-24Permit EW — ISSUED
1993-11-24Permit PL — ISSUED
1992
1992-09-03Permit EQ — ISSUED
1992-07-10Permit PL — ISSUED
1992-07-10Permit EW — ISSUED
1992-07-10Permit EW — ISSUED
1992-07-10Permit EW — ISSUED
1992-04-15Permit EW — ISSUED
1992-04-13ECB Non-Hazardous violation: FAILURE TO PROVIDE DURABLE ELEVATOR LANDING SIGNS THROUGHOUT.FAILURE TO PROVIDE DURABLE(3)FLOOR NUMBER SIGNS THROUGHOUT. FAILURE