Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

6 Metrotech Center · Brooklyn · BBL 3001427502 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

4 heat or hot-water complaints in the last three years (winter 2024–25: 2 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.

2
’24–25
2
’25–26

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

72 service requests in the last three years. Most common: Illegal Parking (28) · Noise (20) · Street Condition (4) · Food Establishment (3) · Water System (3) · Homeless Person Assistance (2).

Filed construction activity

$164,986,502 in permitted construction work filed since 2016 (134 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$91,696,581 $41,263,461
2026$434,965 $195,735
2027$95,988,668 $43,194,900

The city's market estimate has risen 5% between tax years 2025 and 2027.

Tax exemptions on the roll: COLLEGE-UNIVERSITY

Building systems

Heating fuelNO2FUEL

Restaurants in this building

RestaurantCuisineGradeNotes
Jasper Kane CafeAmericanA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

2 food-poisoning reports to 311 at this address in the last three years (1 with three or more people sick)
3 Food Establishment complaints to 311 at this address in the last three years (most often: Food Spoiled, Facility Construction) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayJay St-MetroTech — A C F R · 250 ft straight-line (about a 1-minute walk) · station accessibility: full
Borough Hall — 2 3 4 5 R · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: partial
BusNearest boarding stop: Jay St / Myrtle Plaza — B54 · 200 ft
Citi BikeJay St & Tech Pl · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 287 Bailey K. Ashford. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

6 Metrotech Center

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

72 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Ten-year activity

2001000
2017
132
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201786130030129
20186371061132
2019438002071
2020171844851
20211091101040
20221971901661
202334271202598
2024287300772
20252961804699
2026400230770
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 106 records

DateRecord
2026-10-14Job filed: Plumbing work for IgNYte Lab, fifth floor: new sanitary, acid waste and vent, domestic water, RO water, vacuum, compressed air and lab gas piping, lab
2026-10-14Job filed: Sprinkler work for IgNYte Lab, fifth floor: modify existing sprinkler system, new deluge valve and deluge heads at flame test hood, temporary sprinkle
2026-10-13Job filed: Renovation of IgNYte Lab (Room 502J) on the fifth floor, including partitions, doors, ceilings, casework and finishes. No change in use, egress or occ
2026-10-13Job filed: mechanical modifications on fifth floor as shown on plans filed herewith. No change in egress, occupancy, or use.
2026-10-05311: Noise — Air Conditioner/Ventilation
2026-09-16311: Noise — Manufacturing Business/Plant
2026-09-12311: Noise — Air Conditioner/Ventilation
2026-09-08311: Noise — Air Conditioner/Ventilation
2026-09-03Restaurant inspection: JASPER KANE CAFE — grade A
2026-08-31311: Noise — Air Conditioner/Ventilation
2026-08-30311: Noise — Air Conditioner/Ventilation
2026-08-25311: Noise — Air Conditioner/Ventilation
2026-08-21311: Noise — Air Conditioner/Ventilation
2026-08-05Job filed: Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.
2026-07-29311: Homeless Person Assistance — Non-Chronic
2026-07-29311: Noise — Air Conditioner/Ventilation
2026-07-28311: Illegal Parking — Parking Permit Improper Use
2026-07-28Permit Sidewalk Shed — Permit Issued
2026-07-27Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-07-27Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2026-07-27Permit Supported Scaffold — Permit Issued
2026-07-27Permit Supported Scaffold — Permit Issued
2026-07-08Permit Plumbing — Permit Issued
2026-07-06Permit Structural — Permit Issued
2026-06-29311: Illegal Parking — Blocked Bike Lane
2026-06-29Job filed: Structural alterations at roof level: new steel dunnage framing for mechanical equipment, reinforcement of existing beam connections, new/infilled roo
2026-06-29Permit Construction Fence — Permit Issued
2026-06-29Permit Construction Fence — Permit Issued
2026-06-26Job filed: NYU ROGERS HALL: CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS
2026-06-25Permit General Construction — Permit Issued
2026-06-25Permit Structural — Permit Issued
2026-06-25Permit Structural — Permit Issued
2026-06-25Permit General Construction — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Structural — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-16Boiler inspection
2026-06-16Boiler inspection
2026-06-16Boiler inspection
2026-06-12Permit Sprinklers — Permit Issued
2026-06-12Permit Standpipe — Permit Issued
2026-06-04Permit Mechanical Systems — Permit Issued
2026-05-14311: Street Condition — Failed Street Repair
2026-05-12311: Illegal Parking — Blocked Bike Lane
2026-05-06Permit Plumbing — Permit Issued
2026-04-30311: Encampment — N/A
2026-03-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-25Asbestos abatement: Removal — PAR Environmental Corporation
2026-03-25Asbestos abatement: Removal — PAR Environmental Corporation
2026-03-25Asbestos abatement: Removal — PAR Environmental Corporation
2026-03-21311: Graffiti — Police Report Requested
2026-03-10311: Food Poisoning — 1 or 2
2026-03-10Job filed: CONSTRUCTION OF AREA OF NEW EXTERIOR CLADDING AT THE BLDG NORTH FACADE WHERE NOW EXPOSED BY DEMO OF ADJACENT BUILDING AND CONSTRUCTION OF A NEW ROOF O
2026-03-09Permit General Construction — Permit Issued
2026-03-09Permit Structural — Permit Issued
2026-02-24311: Snow or Ice — Snow Tracking
2026-02-23Permit Structural — Permit Issued
2026-02-18311: Water System — Hydrant Leaking (WC1)
2026-02-17311: Water System — Hydrant Leaking (WC1)
2026-02-09311: Bus Stop Shelter Placement — New Bus Stop Shelter Placement
2026-02-06Permit Plumbing — Permit Issued
2026-02-06Permit Plumbing — Permit Issued
2026-01-30Permit General Construction — Permit Issued
2026-01-29Permit Sprinklers — Permit Issued
2026-01-22Job filed: Interior Renovation of the 8th Floor for installation of temporary core sprinkler protection with (11) sprinkler heads.
2026-01-09Permit Structural — Permit Issued
2026-01-09Permit General Construction — Permit Issued
2025-12-24Permit Standpipe — Permit Issued
2025-12-24Permit Sprinklers — Permit Issued
2025-12-23Permit Standpipe — Permit Issued
2025-12-23Permit Sprinklers — Permit Issued
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation

showing the 80 most recent

The full timeline

2026
2026-10-14Job filed: Plumbing work for IgNYte Lab, fifth floor: new sanitary, acid waste and vent, domestic water, RO water, vacuum, compressed air and lab gas piping, lab
2026-10-14Job filed: Sprinkler work for IgNYte Lab, fifth floor: modify existing sprinkler system, new deluge valve and deluge heads at flame test hood, temporary sprinkle
2026-10-13Job filed: Renovation of IgNYte Lab (Room 502J) on the fifth floor, including partitions, doors, ceilings, casework and finishes. No change in use, egress or occ$1,380,163
2026-10-13Job filed: mechanical modifications on fifth floor as shown on plans filed herewith. No change in egress, occupancy, or use.
2026-10-05311: Noise — Air Conditioner/Ventilation
2026-09-16311: Noise — Manufacturing Business/Plant
2026-09-12311: Noise — Air Conditioner/Ventilation
2026-09-08311: Noise — Air Conditioner/Ventilation
2026-09-03Restaurant inspection: JASPER KANE CAFE — grade A
2026-08-31311: Noise — Air Conditioner/Ventilation
2026-08-30311: Noise — Air Conditioner/Ventilation
2026-08-25311: Noise — Air Conditioner/Ventilation
2026-08-21311: Noise — Air Conditioner/Ventilation
2026-08-05Job filed: Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.$750,000
2026-07-29311: Homeless Person Assistance — Non-Chronic
2026-07-29311: Noise — Air Conditioner/Ventilation
2026-07-28311: Illegal Parking — Parking Permit Improper Use
2026-07-28Permit Sidewalk Shed — Permit Issued
2026-07-27Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2026-07-27Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$30,000
2026-07-27Permit Supported Scaffold — Permit Issued
2026-07-27Permit Supported Scaffold — Permit Issued
2026-07-08Permit Plumbing — Permit Issued
2026-07-06Permit Structural — Permit Issued
2026-06-29311: Illegal Parking — Blocked Bike Lane
2026-06-29Job filed: Structural alterations at roof level: new steel dunnage framing for mechanical equipment, reinforcement of existing beam connections, new/infilled roo$859,812
2026-06-29Permit Construction Fence — Permit Issued
2026-06-29Permit Construction Fence — Permit Issued
2026-06-26Job filed: NYU ROGERS HALL: CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS $2,300
2026-06-25Permit General Construction — Permit Issued
2026-06-25Permit Structural — Permit Issued
2026-06-25Permit Structural — Permit Issued
2026-06-25Permit General Construction — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Structural — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-16Boiler inspection
2026-06-16Boiler inspection
2026-06-16Boiler inspection
2026-06-12Permit Sprinklers — Permit Issued
2026-06-12Permit Standpipe — Permit Issued
2026-06-04Permit Mechanical Systems — Permit Issued
2026-05-14311: Street Condition — Failed Street Repair
2026-05-12311: Illegal Parking — Blocked Bike Lane
2026-05-06Permit Plumbing — Permit Issued
2026-04-30311: Encampment — N/A
2026-03-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-25Asbestos abatement: Removal — PAR Environmental Corporation
2026-03-25Asbestos abatement: Removal — PAR Environmental Corporation
2026-03-25Asbestos abatement: Removal — PAR Environmental Corporation
2026-03-21311: Graffiti — Police Report Requested
2026-03-10311: Food Poisoning — 1 or 2
2026-03-10Job filed: CONSTRUCTION OF AREA OF NEW EXTERIOR CLADDING AT THE BLDG NORTH FACADE WHERE NOW EXPOSED BY DEMO OF ADJACENT BUILDING AND CONSTRUCTION OF A NEW ROOF O$2,497,253
2026-03-09Permit General Construction — Permit Issued
2026-03-09Permit Structural — Permit Issued
2026-02-24311: Snow or Ice — Snow Tracking
2026-02-23Permit Structural — Permit Issued
2026-02-18311: Water System — Hydrant Leaking (WC1)
2026-02-17311: Water System — Hydrant Leaking (WC1)
2026-02-09311: Bus Stop Shelter Placement — New Bus Stop Shelter Placement
2026-02-06Permit Plumbing — Permit Issued
2026-02-06Permit Plumbing — Permit Issued
2026-01-30Permit General Construction — Permit Issued
2026-01-29Permit Sprinklers — Permit Issued
2026-01-22Job filed: Interior Renovation of the 8th Floor for installation of temporary core sprinkler protection with (11) sprinkler heads.$10,000
2026-01-09Permit Structural — Permit Issued
2026-01-09Permit General Construction — Permit Issued
2025
2025-12-24Permit Standpipe — Permit Issued
2025-12-24Permit Sprinklers — Permit Issued
2025-12-23Permit Standpipe — Permit Issued
2025-12-23Permit Sprinklers — Permit Issued
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-18Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-17Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-17Asbestos abatement: Removal — PAR Environmental Corporation
2025-12-11311: Noise — Noise: Private Carting Noise (NQ1)
2025-12-11Permit Sprinklers — Signed-off
2025-12-11Permit Sprinklers — Permit Issued
2025-12-08Job filed: Fire Protection modifications on 8th Floor as shown on plans filed herewith. No change in egress, occupancy, or use.$178,781
2025-12-05Job filed: partial removal/modifications of Mechanical equipment on 8th floor as shown on plans filed herewith. Filed in conjunction with subsequent GC, PL, an$3,268,073
2025-12-05Job filed: Removal/modifications of Plumbing components on 7th and 8th floors as shown on plans filed herewith. Filed in conjunction with subsequent GC, MS, and$1,517,138
2025-12-04Job filed: Partial Demolition/ Renovation of 8th floor and additional enabling work on Cellar, 1st, 3rd, 4th, 5th, 7th and roof as shown on plans filed herewith.$11,017,266
2025-11-24Job filed: Interior Renovation of the 5th Floor for installation of temporary core sprinkler protection with 35 amount of heads.$15,000
2025-11-24Job filed: Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.$750,000
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-10-29311: Noise - Vehicle — Engine Idling
2025-10-24Job filed: Modifications to existing sprinkler system including the installation of temporary sprinkler loop and relocation of standpipe and auxiliary hose valve$345,000
2025-10-16Job filed: STRUCTURAL MODIFICATIONS FOR NEW STEEL FRAMING AT 5TH FL, ROOF LEVEL, AND WALL OPENING FOR EXHAUST DUCTWORK INCLUDING LIMITED CONCRETE INFIL OF MINOR $15,000
2025-10-14Permit Mechanical Systems — Permit Issued
2025-10-14Permit Plumbing — Permit Issued
2025-10-10Permit General Construction — Permit Issued
2025-10-09Job filed: Removal of ducts and CHWS&R/HWS&R piping on the 5th floor, removal of AHU and associated ducts and piping on the Roof to accommodate new mechanical eq$7,300,000
2025-10-08311: Panhandling — N/A
2025-10-08Job filed: Removal of plumbing fixtures and associated sanitary/water piping to accommodate all new plumbing fixtures and related piping including medical gas pi$2,050,000
2025-10-07Job filed: Removal of partitions, ceiling and finishes to accommodate the reconstruction of the 5th floor, including roof dunnage and access platform for mechani$10,400,000
2025-09-29Permit Supported Scaffold — Signed-off
2025-09-29Permit Sidewalk Shed — Signed-off
2025-09-28311: Illegal Parking — Posted Parking Sign Violation
2025-09-24Permit Structural — Permit Issued
2025-09-24Permit General Construction — Permit Issued
2025-09-23Job filed: EXISTING STEEL REINFORCEMENT FOR EXTERIOR PANEL INSTALLATION FROM THE 3 RD FLOOR LEVEL TO THE ROOF AS INDICATED ON PLANS SUBMITTED HEREWITH.$1,000,000
2025-09-16311: Illegal Parking — Parking Permit Improper Use
2025-09-09311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-25Asbestos abatement: Removal — PAR Environmental Corporation
2025-08-18311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-08-12Permit Sidewalk Shed — Signed-off
2025-08-08Job filed: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRES$3,000
2025-08-08Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$3,000
2025-08-08Permit Supported Scaffold — Signed-off
2025-07-21311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-07-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-07-14311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-07-13311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-07-10311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-07-10311: Noise — Noise: Manufacturing Noise (NK1)
2025-06-30Boiler inspection
2025-06-26Boiler inspection
2025-06-10311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-06-05Asbestos abatement: Removal — PAR Environmental Corporation
2025-06-05Asbestos abatement: Removal — PAR Environmental Corporation
2025-06-05Asbestos abatement: Removal — PAR Environmental Corporation
2025-06-05Asbestos abatement: Removal — PAR Environmental Corporation
2025-06-02311: Illegal Parking — Blocked Bike Lane
2025-04-24311: Water System — Hydrant Leaking (WC1)
2025-04-23311: Food Establishment — Facility Construction
2025-04-14Restaurant inspection: JASPER KANE CAFE — grade A
2025-02-27311: Illegal Parking — Parking Permit Improper Use
2024
2024-12-01311: Illegal Parking — Blocked Hydrant
2024-11-24311: Illegal Parking — Blocked Hydrant
2024-11-18Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500,000
2024-11-14311: Illegal Parking — Unauthorized Bus Layover
2024-11-10311: Illegal Parking — Blocked Sidewalk
2024-10-29311: Illegal Parking — Blocked Hydrant
2024-10-15311: HEAT/HOT WATER — APARTMENT ONLY
2024-10-15Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-10-08311: Illegal Parking — Parking Permit Improper Use
2024-10-07Job filed: HEREWITH FILING MECHANICAL MODIFICATIONS AS PER PLANS FOR THE TANDON SCHOOL OF ENGINEERING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,200,000
2024-10-05Asbestos abatement: Removal — PAR Environmental Corporation
2024-10-05311: Illegal Parking — Blocked Hydrant
2024-10-04Permit General Construction — Signed-off
2024-10-01Permit Mechanical Systems — Permit Issued
2024-09-30Permit Plumbing — Signed-off
2024-09-30Permit Sprinklers — Signed-off
2024-09-27311: Abandoned Vehicle — With License Plate
2024-09-27Permit Sprinklers — Signed-off
2024-09-27Permit Plumbing — Signed-off
2024-09-24Job filed: Herewith Filing Modifications to existing Plumbing and Sprinkler System as per plans. No change in use, egress or occupancy proposed.$2,000,000
2024-09-23311: Illegal Parking — Blocked Sidewalk
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2024-09-17311: Illegal Parking — Parking Permit Improper Use
2024-09-12Permit Mechanical Systems — Signed-off
2024-09-06311: Illegal Parking — Parking Permit Improper Use
2024-09-03Job filed: Interior renovation of laboratory space at NYU Tandon school of Engineering. No change in egress, occupancy,or use.$15,550,000
2024-08-22311: Illegal Parking — Posted Parking Sign Violation
2024-08-22Job filed: Structural modifications to accommodate alterations to the existing loading dock as per plans. no change to use, egress or occupancy.$97,000
2024-08-19Job filed: CONSTRUCTION OF AREA OF NEW EXTERIOR CLADDING AT THE BLDG NORTH FACADE WHERE NOW EXPOSED BY DEMO OF ADJACENT BUILDING AND CONSTRUCTION OF A NEW ROOF O$2,497,253
2024-08-13Job filed: INSTALLATION OF TEMPORARY CMU WALL INFILL TO SEAL FORMER TUNNEL DOOR THAT WAS CONNECTING 80 JOHNSON STREET, AS PER PLANS FILED HEREWITH. THE PERMANENT$3,840
2024-08-08Permit Plumbing — Signed-off
2024-08-06Cooling tower inspection
2024-08-06Cooling tower inspection
2024-08-02311: Illegal Parking — Double Parked Blocking Traffic
2024-07-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-07-26311: Illegal Parking — Blocked Bike Lane
2024-07-16311: Street Condition — Plate Condition - Shifted
2024-07-16Permit General Construction — Signed-off
2024-07-12Permit General Construction — Signed-off
2024-07-09Job filed: INSTALLATION OF TEMPORARY CMU WALL INFILL TO SEAL FORMER TUNNEL DOOR THAT WAS CONNECTING 80 JOHNSON STREET, AS PER PLANS FILED HEREWITH. THE PERMANENT$3,840
2024-07-09Job filed: NYU Rogers Hall, 3rd Floor Steel Framework Repairs as per the plans filed including Concrete Repairs, Partition Wall Repairs and Spray-Applied Firepro$162,040
2024-06-26Job filed: Removal of plumbing fixtures and installation of new in 'virtual Kitchen Area' as shown on drawings submitted herewith.$30,000
2024-06-25Job filed: Reconfiguration of interior non-bearing partitions in limited area of cafeteria to create a "virtual Kitchen Area" as shown on drawings submitted here$280,000
2024-06-25Job filed: Alteration
2024-06-11311: Illegal Parking — License Plate Obscured
2024-06-10311: Illegal Parking — Double Parked Blocking Traffic
2024-06-08311: Illegal Parking — Blocked Crosswalk
2024-06-05311: Street Condition — Cave-in
2024-05-22311: Illegal Parking — Posted Parking Sign Violation
2024-05-22311: Illegal Parking — Posted Parking Sign Violation
2024-05-20Job filed: Removal of sprinkler heads, dry pipe valve and dry piping servicing the loading dock as per the filed plans. No change to use, occupancy or egress.$5,000
2024-05-20Permit Sprinklers — Signed-off
2024-05-06Permit General Construction — Signed-off
2024-04-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-04-29311: Illegal Parking — Parking Permit Improper Use
2024-04-19Job filed: Reconfiguration of interior non-bearing partitions in limited area of cafeteria as shown on drawings submitted herewith.$100,000
2024-04-09311: Food Poisoning — 3 or More
2024-04-08Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2024-04-02Boiler inspection
2024-04-02Boiler inspection
2024-02-09311: Homeless Person Assistance
2024-02-02Facade (LL11) filing, cycle 9: SWARMP
2024-02-02311: Street Condition — Cave-in
2024-01-24FDNY inspection (CDA-90-DRILL)
2024-01-18Permit Structural — Signed-off
2024-01-18Permit General Construction — Signed-off
2024-01-14311: Illegal Parking — Blocked Bike Lane
2023
2023-11-17311: Illegal Parking — Blocked Crosswalk
2023-11-15Permit Structural — Signed-off
2023-11-13311: Food Establishment — Food Spoiled
2023-11-04311: Food Establishment — Food Spoiled
2023-11-02Job filed: Herewith Filing Modifications to existing Plumbing and Sprinkler System as per plans. No change in use, egress or occupancy proposed.$2,000,000
2023-11-01Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500,000
2023-10-24Permit Standpipe — Signed-off
2023-10-20Restaurant inspection: JASPER KANE CAFE — grade A
2023-10-10Permit Supported Scaffold — Signed-off
2023-10-09Job filed: Installation of temporary supported/access scaffold per plan submitted. No change in use, egress and/or occupancy with this application.$19,900
2023-10-03Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500,000
2023-09-29Permit Mechanical Systems — Permit Issued
2023-09-29Permit General Construction — Signed-off
2023-09-22Permit Structural — Signed-off
2023-09-22Permit Plumbing — Signed-off
2023-09-22Permit General Construction — Signed-off
2023-09-22Permit Sprinklers — Signed-off
2023-09-20Permit Plumbing — Signed-off
2023-09-20Permit Sprinklers — Signed-off
2023-09-14Permit General Construction — Signed-off
2023-09-14Permit Structural — Signed-off
2023-09-12Job filed: Interior renovation of laboratory space at NYU Tandon school of Engineering. No change in egress, occupancy,or use.$15,550,000
2023-09-11Job filed: Relocation of Standpipe in open lab space on 5th, 6th, and 7th floors as per shown on plans filed herewith. No change in use, egress or occupancy pro$3,000
2023-08-31Job filed: NYU Rogers Hall, 3rd Floor Steel Framework Repairs as per the plans filed including Concrete Repairs, Partition Wall Repairs and Spray-Applied Firepro$162,040
2023-08-04Boiler inspection
2023-08-04Boiler inspection
2023-07-28Job filed: Existing Screen Wall Removal as per the plans filed including: Removal, repairs & replacement of spalled concrete & deteriorated reinforcement of exte$1,376,962
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-05-24Permit Mechanical Systems — Signed-off
2023-05-10311: Illegal Parking — Posted Parking Sign Violation
2023-05-10311: Noise — Noise: Construction Before/After Hours (NM1)
2023-05-02311: Abandoned Vehicle — With License Plate
2023-05-02311: Abandoned Vehicle — With License Plate
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-05-01Asbestos abatement: Removal — PAR Environmental Corporation
2023-04-27Job filed: Mechanical work as per plans filed herewith. No change in Use, Egress or Occupancy.$344,000
2023-04-25Job filed: Herewith Filing Modifications to existing Plumbing and Sprinkler System as per plans. No change in use, egress or occupancy proposed.$2,000,000
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-20Job filed: HEREWITH FILING MECHANICAL MODIFICATIONS AS PER PLANS FOR THE TANDON SCHOOL OF ENGINEERING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,200,000
2023-04-18Cooling tower inspection
2023-04-18Cooling tower inspection — violation AH8H
2023-04-18Cooling tower inspection — violation AH8H
2023-04-18Cooling tower inspection — violation AH8H
2023-03-20Permit Plumbing — Signed-off
2023-03-14Permit General Construction — Signed-off
2023-03-14Permit Mechanical Systems — Signed-off
2023-03-09FDNY inspection (CDA-90-DRILL)
2023-03-08311: Illegal Parking — Posted Parking Sign Violation
2023-02-17311: Derelict Vehicles — Derelict Vehicles
2023-02-06Permit Sprinklers — Permit Issued
2023-02-03Permit General Construction — Permit Issued
2023-02-03Permit Mechanical Systems — Permit Issued
2023-01-31Rodent inspection: Passed
2023-01-31311: Illegal Parking — Blocked Crosswalk
2023-01-24Job filed: mechanical work as per plans herewith filed.$324,000
2023-01-17311: Illegal Parking — Blocked Bike Lane
2023-01-12Job filed: modification of existing sprinkler system as per plans filed herewith.$13,000
2023-01-10311: Street Condition — Plate Condition - Shifted
2023-01-05Permit Plumbing — Signed-off
2022
2022-12-16Asbestos abatement: Cleanup — PAR Environmental Corporation
2022-12-16Asbestos abatement: Repair — PAR Environmental Corporation
2022-12-16Asbestos abatement: Cleanup — PAR Environmental Corporation
2022-12-16Asbestos abatement: Cleanup — PAR Environmental Corporation
2022-12-16Job filed: plumbing work as per plans filed herewith.$100,000
2022-12-15Permit Plumbing — Signed-off
2022-12-12Job filed: herewith filing to increase the fire rating of chemical storage room to achieve a 3hr rating throughtout, as per plans$238,000
2022-12-03Permit Mechanical Systems — Signed-off
2022-12-03Permit General Construction — Signed-off
2022-12-01Boiler inspection
2022-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-12-01Permit Sprinklers — Signed-off
2022-11-15311: Food Establishment — Rodents/Insects/Garbage
2022-11-07311: Noise - Street/Sidewalk — Loud Music/Party
2022-11-04Job filed: FILING HEREWTIH MECHANICAL REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$73,920
2022-11-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-11-03Permit Structural — Signed-off
2022-11-03Permit General Construction — Signed-off
2022-11-01Job filed: FILING HEREWITH PLUMBING FIXTURE REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,980
2022-11-01Job filed: FILING HEREWITH REMOVAL OF EIGHT SPRINKLER HEADS AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2022-10-31311: Illegal Parking — Parking Permit Improper Use
2022-10-28Boiler inspection
2022-10-28Boiler inspection
2022-10-27311: Illegal Parking — Blocked Bike Lane
2022-10-24Job filed: FILING HEREWITH INTERIOR PARTITION REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$285,000
2022-09-16311: Dumpster Complaint — Overflowing
2022-09-15Cooling tower inspection — violation AH8H
2022-09-15Cooling tower inspection — violation AH8H
2022-09-15Cooling tower inspection — violation AH8H
2022-09-15Cooling tower inspection
2022-08-05Asbestos abatement: Removal — ETS Contracting, Inc.
2022-08-05Asbestos abatement: Removal — ETS Contracting, Inc.
2022-08-05Asbestos abatement: Removal — ETS Contracting, Inc.
2022-08-05Asbestos abatement: Removal — ETS Contracting, Inc.
2022-08-05311: Illegal Parking — Posted Parking Sign Violation
2022-08-04Permit Structural — Signed-off
2022-08-04Permit General Construction — Signed-off
2022-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-31311: Consumer Complaint — Mail Order
2022-07-18311: Illegal Parking — Blocked Bike Lane
2022-07-14FDNY inspection (CDA-90-DRILL)
2022-07-06Permit Supported Scaffold — Signed-off
2022-07-05Job filed: Installation of temporary supported/access scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egres$200,000
2022-06-09311: Illegal Parking — Blocked Bike Lane
2022-06-06311: Illegal Parking — Blocked Hydrant
2022-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-05-28311: Unleashed Dog — Unleashed Dog in Public
2022-05-25Job filed: Existing Screen Wall Removal as per the plans filed including: Removal, repairs & replacement of spalled concrete & deteriorated reinforcement of exte$1,376,962
2022-05-13Rodent inspection: Passed
2022-05-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-06311: Illegal Parking — Posted Parking Sign Violation
2022-05-05311: Rodent — Signs of Rodents
2022-04-22311: Street Condition — Rough, Pitted or Cracked Roads
2022-03-19311: Adopt-A-Basket — Adopt-A-Basket
2022-03-16311: Homeless Person Assistance
2022-03-15311: Street Condition — Crash Cushion Defect
2022-03-15DOB complaint, category ?
2022-03-10FDNY inspection (CDA-90-DRILL)
2022-02-15311: Street Condition — Crash Cushion Defect
2022-01-14Permit Supported Scaffold — Permit Issued
2022-01-14Permit Sidewalk Shed — Permit Issued
2021
2021-12-08311: Street Condition — Crash Cushion Defect
2021-12-03DOB complaint, category ?
2021-12-03DOB complaint, category ?
2021-11-25311: Taxi Complaint — Driver Complaint - Passenger
2021-09-22Cooling tower inspection
2021-09-22Cooling tower inspection
2021-09-22Cooling tower inspection — violation AH8S
2021-09-22Cooling tower inspection
2021-09-07311: Street Condition — Crash Cushion Defect
2021-09-01Boiler inspection
2021-09-01Boiler inspection
2021-08-24Permit AL — ISSUED
2021-08-19Permit EW — ISSUED
2021-08-14FDNY inspection (CDA-90-DRILL)
2021-07-27DOB complaint, category ?
2021-07-12Asbestos abatement: Removal — ETS Contracting, Inc.
2021-07-12Asbestos abatement: Removal — ETS Contracting, Inc.
2021-06-22Permit EW — ISSUED
2021-06-07DOB complaint, category ?
2021-06-07DOB complaint, category ?
2021-06-04Permit AL — ISSUED
2021-06-04Permit EW — ISSUED
2021-05-06Boiler inspection
2021-05-06Boiler inspection
2021-05-02FDNY inspection (CDA-90-DRILL)
2021-05-01311: Illegal Parking — Blocked Bike Lane
2021-04-04Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2021-04-04Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,500
2021-03-19ECB CLASS - 2 violation: SEC. 3307.6.4.8 SIDEWALK SHED LIGHTING. NOTE: AT TIME OF MY INSPECTIONOF AN 8 STY BLDG W/PROPOSED PANEL INSTALLATION AT PARAPET. N$625
2021-03-16311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-03-16DOB complaint, category ?
2021-03-07311: Street Condition — Pothole
2021-03-04311: Illegal Parking — Blocked Bike Lane
2021-03-04311: Illegal Parking — Blocked Bike Lane
2021-03-03311: Illegal Parking — Blocked Bike Lane
2021-03-01Permit EW — ISSUED
2021-03-01Permit EW — ISSUED
2021-03-01Permit EW — ISSUED
2021-01-29311: Illegal Parking — Double Parked Blocking Vehicle
2021-01-29311: Illegal Parking — Double Parked Blocking Traffic
2020
2020-12-22311: Illegal Parking — Unauthorized Bus Layover
2020-12-22311: Illegal Parking — Posted Parking Sign Violation
2020-12-16Boiler inspection
2020-12-16Boiler inspection
2020-12-15Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2020-11-26Permit Sidewalk Shed — Permit Issued
2020-11-26Permit Supported Scaffold — Permit Issued
2020-11-25Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2020-11-25Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,500
2020-10-29311: Street Sign - Missing — Street Cleaning - ASP
2020-10-16Permit EW — ISSUED
2020-10-08Permit AL — ISSUED
2020-09-16Cooling tower inspection
2020-09-15Cooling tower inspection
2020-09-14Cooling tower inspection — violation AH8S
2020-09-14Cooling tower inspection — violation AH8U
2020-09-14Cooling tower inspection — violation AH8D
2020-08-07311: New Tree Request — For One Address
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-28DOB complaint, category ?
2020-07-10Permit EW — ISSUED
2020-06-02Permit AL — ISSUED
2020-06-02Permit EW — ISSUED
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-02-28Permit EW — ISSUED
2020-02-28Permit EW — ISSUED
2020-02-26Permit PL — ISSUED
2020-02-26Permit PL — ISSUED
2020-02-11CDEC — from NEW YORK UNIVERSITY
2020-02-11MAPS — from 6 METROTECH CENTER CONDOMINIUM
2020-02-11CDEC — from NEW YORK UNIVERSITY
2020-02-11MAPS — from 6 METROTECH CENTER CONDOMINIUM
2020-01-21FDNY inspection (CDA-90-DRILL)
2020-01-17Permit AL — ISSUED
2020-01-17DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2020-01-16Permit EW — ISSUED
2020-01-16Permit EW — ISSUED
2020-01-16Permit EW — RE-ISSUED
2020-01-14DOB complaint, category ?
2020-01-14DOB complaint, category ?
2020-01-13ECB CLASS - 1 violation: FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKER COMP LAW AND DISABILITY BENEFITS LAW OR INSURANCE.AT TIME OF INSPECTION AT AN A$5,000
2020-01-13ECB CLASS - 1 violation: LOG-INADEQUATE AT TIME OF INSPECTION AT AN ACTIVE JOB SITE,UPON REVIEWING THE DAILY LOG BOOK,I OBSERVED THE CONSTRUCTION.SUPERINTE
2020-01-13ECB CLASS - 1 violation: BC 3301.13.4 SUPERINTENDENT CHANGE OF DESIGNATION.AT TIME OF INSPECTION AT AN ACTIVE JOB SITE,UPON REVIEWING THE DAILY LOG,I OBSER
2020-01-13ECB CLASS - 1 violation: FAILURE TO INSTITUTE SAFETY MEASURES AT A DEMOLITION/CONSTRUCTION SITEAT TIME OF INSPECTION AT AN ACTIVE JOBSITE,I OBSERVED EDISON$10,000
2019
2019-12-16Job filed: SUBDIVIDE LOT 1 INTO 2 COMMERCIAL LOTS 1101 & 1102.
2019-12-16Job filed: SUBDIVIDE LOT 1 INTO 2 COMMERCIAL LOTS 1101 & 1102.
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-02FDNY inspection (CDA-90-DRILL)
2019-09-23Boiler inspection
2019-09-23Boiler inspection — defects found
2019-09-23Boiler inspection
2019-09-12Job filed: OCCUPANT PROTECTION PLAN$1,000
2019-09-12Job filed: OCCUPANT PROTECTION PLAN$1,000
2019-09-12Certificate of occupancy Temporary
2019-09-12Certificate of occupancy Temporary
2019-08-06Permit EW — ISSUED
2019-08-06Permit EW — ISSUED
2019-07-19Permit EW — ISSUED
2019-07-19Permit PL — ISSUED
2019-07-19Permit EW — ISSUED
2019-07-19Permit EW — ISSUED
2019-07-17FDNY inspection (CDA-90-DRILL)
2019-07-05Asbestos abatement: Removal — P.A.L. Environmental Safety Corp.
2019-06-24Permit EW — RE-ISSUED
2019-06-24Permit AL — RE-ISSUED
2019-06-10Permit EW — ISSUED
2019-05-01Cooling tower inspection — violation AH8Q
2019-05-01Cooling tower inspection — violation AH8C
2019-05-01Cooling tower inspection — violation AH8R
2019-05-01Cooling tower inspection — violation AH8Q
2019-05-01Cooling tower inspection — violation AH8R
2019-05-01Cooling tower inspection — violation AH8Q
2019-05-01Cooling tower inspection — violation AH8Q
2019-05-01Cooling tower inspection — violation AH8R
2019-05-01Cooling tower inspection — violation AH8C
2019-04-29Job filed: INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRES$28,300
2019-04-29Permit Supported Scaffold — Signed-off
2019-04-18Permit EW — ISSUED
2019-04-18Permit EW — ISSUED
2019-04-18Permit EW — ISSUED
2019-04-16Job filed: INSTALLATION OF TOXIC GAS MONITORING SYSTEM TO BE TIED INTO EXISTING FIRE ALARM PANEL.$28,000
2019-04-16Permit EW — ISSUED
2019-04-16Permit EW — ISSUED
2019-04-04FDNY inspection (CDA-90-DRILL)
2019-04-04Permit Supported Scaffold — Permit Issued
2019-03-18Permit EW — ISSUED
2019-03-18Permit EW — ISSUED
2019-02-28Permit EW — ISSUED
2019-02-28Permit EW — ISSUED
2019-02-25Permit PL — ISSUED
2019-02-25Permit PL — ISSUED
2019-02-22Permit EW — ISSUED
2019-02-22Permit EW — ISSUED
2019-02-20Permit PL — ISSUED
2019-02-06Permit PL — ISSUED
2019-01-30Permit EW — ISSUED
2019-01-29Permit EW — ISSUED
2019-01-29Permit EW — ISSUED
2019-01-29Permit EW — ISSUED
2019-01-29Permit EW — ISSUED
2019-01-22Permit AL — ISSUED
2019-01-16Facade (LL11) filing, cycle 8: SWARMP
2019-01-16Permit Supported Scaffold — Signed-off
2019-01-15Job filed: INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY O$37,800
2019-01-11Permit Supported Scaffold — Permit Issued
2019-01-02Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-02Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-02Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-02Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-02Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-02Asbestos abatement: Removal — ETS Contracting, Inc.
2018
2018-12-23FDNY inspection (CDA-90-DRILL)
2018-12-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2018-12-17Permit Sidewalk Shed — Signed-off
2018-12-11Job filed: MODIFICATIONS TO THE MECHANICAL, SPRINKLER, STANDPIPE, AND PLUMBING SYSTEMS ON THE 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPA$2,612,900
2018-12-11Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM.$125,000
2018-12-11Job filed: MODIFICATIONS TO THE MECHANICAL, SPRINKLER, STANDPIPE, AND PLUMBING SYSTEMS ON THE 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPA$2,612,900
2018-12-11Job filed: PROPOSED STRUCTURAL WORK ON THE 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$100,000
2018-12-11Job filed: INTERIOR ALTERATIONS TO THE 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$6,137,500
2018-12-05Job filed: Installation of pipe scaffold as per plans. No change in use, egress, or occupancy.$1,000
2018-12-05Permit Supported Scaffold — Permit Issued
2018-12-04Job filed: HEREWITH FILING STRUCTURAL WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$200,000
2018-11-29Permit EW — ISSUED
2018-11-27Boiler inspection — defects found
2018-11-27Boiler inspection — defects found
2018-11-27Boiler inspection
2018-11-21Permit EW — ISSUED
2018-11-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,400
2018-11-15Permit Sidewalk Shed — Signed-off
2018-11-07Permit PL — ISSUED
2018-11-02Permit EW — ISSUED
2018-11-02Permit EW — ISSUED
2018-10-18Job filed: GENERAL CONSTRUCTION FOR 4TH FLOOR ROOF REPLACEMENT AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$176,000
2018-10-13Asbestos abatement: Removal — ETS Contracting, Inc.
2018-10-13Asbestos abatement: Removal — ETS Contracting, Inc.
2018-09-10Job filed: APPLICATION FILED FOR INTERIOR DEMOLITION INCLUDING REMOVAL OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE OCCUPANCY OR EGRESS.$240,454
2018-09-10Job filed: APPLICATION FILED FOR SPRINKLER DEMOLITION AND TEMP LOOP SAFETY SYSTEM.$1,000
2018-09-10Job filed: APPLICATION FILED FOR INTERIOR DEMOLITION INCLUDING REMOVAL OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE OCCUPANCY OR EGRESS.$240,454
2018-09-10Job filed: APPLICATION FILED FOR PARTIAL DEMOLITION OF HVAC SYSTEM AND DEMOLITION OF PIPING AND PLUMBING FIXTURES$12,500
2018-09-07Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS$10,000
2018-09-07Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS$10,000
2018-08-29Permit EW — ISSUED
2018-08-29Permit EW — ISSUED
2018-08-29Permit EW — ISSUED
2018-08-22Job filed: APPLICATION FILED FOR MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS.$77,400
2018-08-22Job filed: APPLICATION FILED FOR MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS.$77,400
2018-08-22Job filed: APPLICATION FILED FOR HVAC MODIFICATIONS AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS.$412,000
2018-08-22Job filed: APPLICATION FILE FOR GENERAL CONSTRUCTION ON THE 7TH FLOOR INCLUDING INSTALLATION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES.$650,500
2018-08-22Job filed: APPLICATION FILED FOR MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS.$77,400
2018-08-22Job filed: APPLICATION FILED FOR HVAC MODIFICATIONS AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS.$412,000
2018-08-22Job filed: APPLICATION FILE FOR GENERAL CONSTRUCTION ON THE 7TH FLOOR INCLUDING INSTALLATION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES.$650,500
2018-08-17Permit EW — ISSUED
2018-08-17Permit EW — ISSUED
2018-08-17Permit EW — ISSUED
2018-08-14FDNY inspection (CDA-90-DRILL)
2018-08-07Permit EW — ISSUED
2018-08-07Permit EW — ISSUED
2018-08-04311: Homeless Person Assistance
2018-07-19Permit PL — ISSUED
2018-07-13Permit EW — ISSUED
2018-07-13Permit EW — ISSUED
2018-06-25Permit EW — ISSUED
2018-06-18Permit AL — RE-ISSUED
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-29Asbestos abatement: Removal — PAR Environmental Corporation
2018-05-21FDNY inspection (ALT)
2018-05-18Asbestos abatement: Removal — ETS Contracting, Inc.
2018-05-18Asbestos abatement: Removal — ETS Contracting, Inc.
2018-05-18Asbestos abatement: Removal — ETS Contracting, Inc.
2018-05-18Asbestos abatement: Removal — ETS Contracting, Inc.
2018-05-18DOB complaint, category ?
2018-05-11Cooling tower inspection — violation AH8X
2018-05-11Cooling tower inspection — violation AH8S
2018-05-11Cooling tower inspection — violation AH8Z
2018-05-11Cooling tower inspection — violation AH8Z
2018-05-11Cooling tower inspection — violation AH8D
2018-05-11Cooling tower inspection — violation AH8C
2018-05-11Cooling tower inspection — violation AH8L
2018-05-11Cooling tower inspection — violation AH8M
2018-05-11Cooling tower inspection — violation AH8S
2018-05-11Cooling tower inspection — violation AH8S
2018-05-11Cooling tower inspection — violation AH8E
2018-05-11Cooling tower inspection — violation AH8X
2018-05-11Cooling tower inspection — violation AH8Z
2018-05-11Cooling tower inspection — violation AH8C
2018-05-11Cooling tower inspection — violation AH8X
2018-05-11Cooling tower inspection — violation AH8D
2018-05-11Cooling tower inspection — violation AH8Q
2018-05-11Cooling tower inspection — violation AH8E
2018-05-11Cooling tower inspection — violation AH8L
2018-05-11Cooling tower inspection — violation AH8M
2018-05-11Cooling tower inspection — violation AH8E
2018-05-11Cooling tower inspection — violation AH8X
2018-05-11Cooling tower inspection — violation AH8T
2018-05-11Cooling tower inspection — violation AH8D
2018-05-11Cooling tower inspection — violation AH8D
2018-05-11Cooling tower inspection — violation AH8L
2018-05-11Cooling tower inspection — violation AH8M
2018-05-11Cooling tower inspection — violation AH8L
2018-05-11Cooling tower inspection — violation AH8E
2018-05-11Cooling tower inspection — violation AH8R
2018-05-11Cooling tower inspection — violation AH8S
2018-05-09FDNY inspection (STRUC_INT_6)
2018-05-09FDNY inspection (ALT)
2018-04-27Permit EQ — ISSUED
2018-04-09Permit EW — ISSUED
2018-04-09Permit EW — ISSUED
2018-03-26FDNY inspection (ALT)
2018-03-23Permit PL — ISSUED
2018-03-19Permit PL — ISSUED
2018-03-14Permit AL — ISSUED
2018-03-12Permit EW — ISSUED
2018-02-27Permit EQ — ISSUED
2018-02-27Permit EQ — ISSUED
2018-02-22Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$25,000
2018-02-22Permit Sidewalk Shed — Permit Issued
2018-02-06Certificate of occupancy Temporary
2018-02-06Certificate of occupancy Temporary
2018-02-02Job filed: APPLICATION FILED FOR RENOVATION OF EXISTING RETAIL SPACE INCLUDING NEW NON-LOAD BEARING PARTITIONS, FINISHES, LIGHTING AND OTHER RELATED WORK AS PER $75,670
2018-02-02Job filed: APPLICATION FILED FOR RENOVATION OF EXISTING RETAIL SPACE INCLUDING NEW NON-LOAD BEARING PARTITIONS, FINISHES, LIGHTING AND OTHER RELATED WORK AS PER $75,670
2018-01-23Job filed: MODIFICATIONS OF AN EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP$6,300
2018-01-23Permit AL — ISSUED
2018-01-23Permit EW — ISSUED
2018-01-23Permit EW — ISSUED
2017
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-29Asbestos abatement: Removal — ETS Contracting, Inc.
2017-12-04Permit EW — ISSUED
2017-12-04Permit EW — ISSUED
2017-12-04Permit EW — ISSUED
2017-11-02Job filed: MODIFICATIONS TO EXISTING SPRINKLER AND STANDPIPE SYSTEM INCLUDING SPRINKLER PRE-ACTION SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$66,115
2017-10-31Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$161,000
2017-10-31Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2017-10-31Job filed: MODIFICATIONS TO EXISTING PLUMBING AND MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH WITH RELATED PIPING AND DUCT WORK IN ROGERS HALL RENOVATION AT N$4,697,000
2017-10-31Job filed: INTERIOR RENOVATIONS TO ROGERS HALL RENOVATION AT NYU TANDON. INSTALLATION & REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING MODIFICATIONS,$1,992,000
2017-10-31Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$161,000
2017-10-31Job filed: MODIFICATIONS TO EXISTING PLUMBING AND MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH WITH RELATED PIPING AND DUCT WORK IN ROGERS HALL RENOVATION AT N$4,697,000
2017-10-31Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2017-10-27Certificate of occupancy Temporary
2017-10-27Certificate of occupancy Temporary
2017-10-25DOB complaint, category ?
2017-10-20DOB complaint, category ?
2017-10-16DOB complaint, category ?
2017-10-13FDNY inspection (ABATE)
2017-10-03DOB complaint, category ?
2017-09-27FDNY inspection (ABATE)
2017-09-13Cooling tower inspection — violation AH8Q
2017-09-13Cooling tower inspection — violation AH8X
2017-09-13Cooling tower inspection — violation AH8D
2017-09-13Cooling tower inspection — violation AH8T
2017-09-13Cooling tower inspection — violation AH8X
2017-09-13Cooling tower inspection — violation AH8A
2017-09-13Cooling tower inspection — violation AH8W
2017-09-13Cooling tower inspection — violation AH8R
2017-09-13Cooling tower inspection — violation AH8E
2017-09-13Cooling tower inspection — violation AH8L
2017-09-13Cooling tower inspection — violation AH8T
2017-09-13Cooling tower inspection — violation AH8K
2017-09-13Cooling tower inspection — violation AH8S
2017-09-13Cooling tower inspection — violation AH8H
2017-09-13Cooling tower inspection — violation AH8F
2017-09-13Cooling tower inspection — violation AH8U
2017-09-13Cooling tower inspection — violation AH8S
2017-09-13Cooling tower inspection — violation AH8S
2017-09-13Cooling tower inspection — violation AH8C
2017-09-13Cooling tower inspection — violation AH8S
2017-09-13Permit PL — ISSUED
2017-09-05Permit EW — ISSUED
2017-09-05Permit EW — ISSUED
2017-09-05Permit EW — ISSUED
2017-08-31Permit AL — ISSUED
2017-08-29Job filed: MECHANICAL EQUIPMENT AND MEANS/METHODS FOR PARTIAL DEMO WORK FILED UNDER RELATED APPLICATION # 321575265.$50,000
2017-08-21Permit EW — ISSUED
2017-08-04ECB CLASS - 2 violation: FAILURE TO MAINTAIN SIDEWALK SHED IN CODE COMPLIANT MANNER.NOTE:AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED WITH FOLLOWING OBJE$2,400
2017-08-03ECB CLASS - 2 violation: FAILURE TO PROVIDE PARAPET JOB SIGN PANEL.NOTE:AT TIME OF INSPECTION II OBSERVED SIDEWALK SHED IN PLACE WITHOUT PROJECT INFORMATIO
2017-08-02FDNY inspection (ABATE)
2017-07-28DOB complaint, category ?
2017-07-27Permit EW — ISSUED
2017-07-26Permit PL — ISSUED
2017-07-26Permit EW — ISSUED
2017-07-21Permit EW — ISSUED
2017-07-21Permit EW — ISSUED
2017-07-20Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321551762, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND FIRE SU$3,000
2017-07-18Permit EW — ISSUED
2017-07-17Permit EW — ISSUED
2017-07-14Permit EW — ISSUED
2017-07-14Permit EW — ISSUED
2017-07-14Permit EW — ISSUED
2017-07-06Job filed: PA
2017-07-06Job filed: PA
2017-07-06Permit PL — ISSUED
2017-07-05Permit EW — ISSUED
2017-07-05Permit EW — ISSUED
2017-06-30FDNY inspection (ABATE)
2017-06-30DOB complaint, category ?
2017-06-28Job filed: INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. SCAFFOLD SHALL COMPLY WITH THE NEW YORK CITY BUILDING CODE 2014. NO CHANGES IN USE, EGRESS, OR OCCUP
2017-06-28Job filed: INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. SCAFFOLD SHALL COMPLY WITH THE NEW YORK CITY BUILDING CODE 2014. NO CHANGES IN USE, EGRESS, OR OCCUP
2017-06-28Permit EQ — ISSUED
2017-06-19FDNY inspection (ABATE)
2017-06-01Job filed: HEREWITH FILING EMERGENCY GENERATOR AND FUEL STORAGE WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$2,145,765
2017-05-24Job filed: HEREWITH FILING SPRINKLER STANDPIPE WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$1,298,304
2017-05-24Job filed: HEREWITH FILING SPRINKLER STANDPIPE WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$1,298,304
2017-05-23Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2017-05-22Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE EXISTING MAKE READY - ROGERS HALL. REMOVAL AND INSTALLATION OF FIXTURES, PIPING WITH RELATED DUCTWORK, RE$310,000
2017-05-22Job filed: INTERIOR RENOVATIONS TO ROGERS HALL 7TH/8TH FL MAKE READY AT NYU. INSTALLATION & REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING MODIFICATI$420,000
2017-05-22Permit EW — ISSUED
2017-05-22Permit PL — ISSUED
2017-05-19Job filed: HEREWITH FILING INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS AND INTERIOR BUILDOUT AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$1,148,395
2017-05-19Job filed: HEREWITH FILING INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS AND INTERIOR BUILDOUT AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$1,148,395
2017-05-19Job filed: HEREWITH FILING STRUCTURAL WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$11,500
2017-05-19Job filed: HEREWITH FILING MECHANICAL PLUMBING WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$6,583,784
2017-05-18Permit EW — ISSUED
2017-05-18Permit EW — ISSUED
2017-05-17Job filed: UPGRADE OF EXISTING FIRE ALARM SYSTEM TO MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION, SPRINKLER/PURGE FIRE ALARM WITH VOICE COMMUNICATION SYSTEM. $937,295
2017-05-17Job filed: HEREWITH FILING ALTERATION TYPE 1 FOR HORIZONTAL ENLARGEMENT. OBTAIN NEW C OF O._INCLUDING PARTIAL DEMO, FOOTINGS AND STRUCTURE$3,485,079
2017-05-17Job filed: HEREWITH FILING STRUCTURAL WORK IN CONJUNCTION WITH ALT-1 HORIZANTAL ENLARGEMENT._INCLUDING PARTIAL DEMO, FOOTINGS AND STRUCTURE
2017-05-17Job filed: HEREWITH FILING PARTIAL DEMOLITION OF EXISTING 2 STORY INTERSTITIAL BUILDING AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY.$1,568,860
2017-05-17Job filed: UPGRADE OF EXISTING FIRE ALARM SYSTEM TO MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION, SPRINKLER/PURGE FIRE ALARM WITH VOICE COMMUNICATION SYSTEM. $937,295
2017-05-16Permit EQ — ISSUED
2017-05-12Job filed: PROPOSED INSTALLATION OF CHAINLINK FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-05-12Job filed: PROPOSED INSTALLATION OF CHAINLINK FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-04-21Facade (LL11) filing, cycle 7: SWARMP
2017-04-13Permit EW — ISSUED
2017-03-31Job filed: A2$350,000
2017-03-31Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$6,200
2017-03-31Job filed: MODIFICATION TO EXISTING MECHANICAL AND PLUMBING SYSTEM AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$134,000
2017-03-31Job filed: MODIFICATION TO THE EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$36,340
2017-03-31Job filed: A2$350,000
2017-03-31Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$6,200
2017-03-13Permit EW — ISSUED
2017-03-03Permit EW — ISSUED
2017-03-03Permit EW — ISSUED
2017-03-01Permit EW — ISSUED
2017-03-01Permit EW — ISSUED
2017-03-01Permit EW — ISSUED
2017-03-01Permit EW — RE-ISSUED
2017-02-21Job filed: APPLICATION FILED FOR THE INSTALLATION OF METAL PANELS ON EXISTING ROOF PARAPET. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$249,500
2017-02-16Permit EQ — ISSUED
2017-02-15Job filed: STRUCTURAL MODIFICATIONS TO SUPPORT CHILLER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$86,500
2017-02-15Job filed: CHILLER REPLACEMENT AND RELATED MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,072,300
2017-02-15Job filed: CHILLER REPLACEMENT AND RELATED MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,072,300
2017-02-15Job filed: STRUCTURAL MODIFICATIONS TO SUPPORT CHILLER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$86,500
2017-02-15Job filed: GENERAL CONSTRUCTION TO SUPPORT CHILLER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2017-02-14Permit EQ — ISSUED
2017-02-10Job filed: PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-02-10Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-01-20Permit AL — ISSUED
2016
2016-10-07FDNY inspection (STANDARD)
2016-09-30FDNY inspection (RISK)
2016-09-29Permit EW — ISSUED
2016-08-30Permit EW — ISSUED
2016-08-30Permit EW — ISSUED
2016-08-30Permit EW — ISSUED
2016-08-30Permit EW — ISSUED
2016-08-30Permit EW — ISSUED
2016-08-18Permit EW — ISSUED
2016-08-18Permit EW — ISSUED
2016-08-18Permit EW — ISSUED
2016-08-17Permit EW — ISSUED
2016-08-15Job filed: PA
2016-08-11Job filed: PA
2016-08-02DOB complaint, category ?
2016-06-08Permit EW — ISSUED
2016-06-08Permit EW — ISSUED
2016-05-31Permit EQ — ISSUED
2016-05-31Permit EQ — ISSUED
2016-05-31Permit PL — ISSUED
2016-05-27Permit EQ — RE-ISSUED
2016-05-27Permit EW — ISSUED
2016-05-27Permit EW — RE-ISSUED
2016-05-27Permit EW — ISSUED
2016-05-20Permit EQ — ISSUED
2016-05-18Job filed: INSTALLATION OF A SCAFFOLD @ 4TH FLOOR ROOF AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY W
2016-05-16Permit PL — ISSUED
2016-05-12Permit EW — ISSUED
2016-05-12Permit EW — ISSUED
2016-05-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-04-21Permit EW — ISSUED
2016-04-21Permit EW — ISSUED
2016-04-06Job filed: A1$5,000
2016-04-06Permit EW — ISSUED
2016-04-06Permit PL — ISSUED
2016-03-16DOB complaint, category ?
2016-03-03Permit EW — ISSUED
2016-03-02Job filed: MODIFICATION / ADDITIONS TO EXISTING INTERIOR FIRE ALARM SYSTEM AS INDICATED ON PLANS SUBMITTED HEREWITH.$105,000
2016-02-25Job filed: SUBSEQUENT APPLICATION FILED STRUCTURAL MODIFICATIONS TO ACCOMMODATE WINDOW LINTELS, HVAC EQUIPMENT/CONVENIENCE STAIR SLAB PENETRATIONS AND INFILLS AS$590,000
2016-02-25Job filed: APPLICATION FILED FOR GENERAL CONSTRUCTION MODIFICATIONS TO ACCOMMODATE PARTIAL FLOOR RECONSTRUCTION, INCLUDING WINDOW REPLACEMENT AS INDICATED ON PLA$5,150,000
2016-02-25Job filed: SUBSEQUENT APPLICATION FILED FOR MODIFICATION TO SPRINKLER,STANDPIPE, PLUMBING AND HVAC SYSTEMS TO ACCOMMODATE PARTIAL FLOOR RECONSTRUCTION AND INSTAL$1,427,000
2016-02-25Job filed: SUBSEQUENT APPLICATION FILED STRUCTURAL MODIFICATIONS TO ACCOMMODATE WINDOW LINTELS, HVAC EQUIPMENT/CONVENIENCE STAIR SLAB PENETRATIONS AND INFILLS AS$590,000
2016-01-21Permit EW — ISSUED
2016-01-13Permit EW — ISSUED
2016-01-08Permit EW — ISSUED
2016-01-08Permit EW — ISSUED
2016-01-07ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.NOTE:OBSERVED SIDEWALK SHED ERECTED NEXT TO THE STARBUCKS COFFEE (RIGHT SI$800
2016-01-02DOB complaint, category ?
2015
2015-12-24DOB complaint, category ?
2015-12-11ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN IN$830
2015-11-16Job filed: SUBSEQUENT APPLICATION FILED FOR REMOVAL OF PLUMBING FIXTURES,SERVICE PIPING, HVAC SYSTEM FANS,VAV BOXES,DUCTWORK,RADIATORS, SERVICE PIPING AND SPRINK$37,100
2015-11-16Job filed: SUBSEQUENT APPLICATION FILED FOR REMOVAL OF PLUMBING FIXTURES,SERVICE PIPING, HVAC SYSTEM FANS,VAV BOXES,DUCTWORK,RADIATORS, SERVICE PIPING AND SPRINK$37,100
2015-11-16Job filed: APPLICATION FILED FOR REMOVAL OF INTERIOR PARTITIONS, FINISHES, ASSOCIATED APPURTENANCES INCLUDING NEW FLOOR PENETRATION AS SHOWN ON PLANS TO ACCOMMOD$253,000
2015-10-28Permit EW — ISSUED
2015-09-29Permit PL — ISSUED
2015-09-11Permit EW — ISSUED
2015-09-11Permit EW — ISSUED
2015-09-11Permit EW — ISSUED
2015-09-04FDNY inspection (ABATE)
2015-08-20Permit EW — ISSUED
2015-08-20Permit EW — ISSUED
2015-08-20Permit EW — ISSUED
2015-08-20Permit EW — ISSUED
2015-08-19FDNY inspection (OTHER)
2015-08-04FDNY inspection (ABATE)
2015-07-28Permit EW — ISSUED
2015-07-27Permit EW — ISSUED
2015-07-27Permit EW — ISSUED
2015-07-27Permit EW — ISSUED
2015-07-23Job filed: MODIFICATION / ADDITIONS TO EXISTING INTERIOR FIRE ALARM SYSTEM AS INDICATED ON PLANS SUBMITTED HEREWITH.$90,000
2015-07-23Job filed: MODIFICATION / ADDITIONS TO EXISTING INTERIOR FIRE ALARM SYSTEM AS INDICATED ON PLANS SUBMITTED HEREWITH.$90,000
2015-07-13ECB CLASS - 2 violation: B254,32A,50,50A,50,50C. 50-FRESH AIR INLET SCREEN TO ABOVE BOILERS.BOILER ROOM 1/2 CLOGGED; 50A-FRESH AIR FAN,IN BOILER ROOM,RUNNI$500
2015-07-10FDNY inspection (ABATE)
2015-07-01Job filed: INSTALL NEW ROOFING SYSTEM ON EXISTING ROOF DECK AND ATTACH NEW RAILING ON PARAPET WALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN EGRESS, USE OR O$4,191,500
2015-07-01Job filed: INSTALL NEW ROOFING SYSTEM ON EXISTING ROOF DECK AND ATTACH NEW RAILING ON PARAPET WALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN EGRESS, USE OR O$4,191,500
2015-06-25Permit EW — ISSUED
2015-06-25Permit EW — ISSUED
2015-06-18Permit EQ — ISSUED
2015-06-17Job filed: APPLICATION FILED FOR INTERIOR PARTITION MODIFICATIONS TO ACCOMMODATE NEW PARTIAL FLOOR RECONSTRUCTION AS INDICATED ON PLANS SUBMITTED HEREWITH. NO CH$3,151,000
2015-06-17Job filed: APPLICATION FILED FOR INTERIOR PARTITION MODIFICATIONS TO ACCOMMODATE NEW PARTIAL FLOOR RECONSTRUCTION AS INDICATED ON PLANS SUBMITTED HEREWITH. NO CH$3,151,000
2015-06-17Job filed: SUBSEQUENT APPLICATION FILED STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW HVAC EQUIPMENT AND INFRASTRUTRURE AT 7TH, 8TH AND ROOF LEVELS AS INDICATED ON$1,034,000
2015-06-17Job filed: SUBSEQUENT APPLICATION FILED STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW HVAC EQUIPMENT AND INFRASTRUTRURE AT 7TH, 8TH AND ROOF LEVELS AS INDICATED ON$1,034,000
2015-06-17Job filed: APPLICATION FILED FOR INTERIOR PARTITION MODIFICATIONS TO ACCOMMODATE NEW PARTIAL FLOOR RECONSTRUCTION AS INDICATED ON PLANS SUBMITTED HEREWITH. NO CH$3,151,000
2015-06-17Job filed: SUBSEQUENT APPLICATION FILED FOR MODIFICATION TO SPRINKLER, PLUMBING AND HVAC SYSTEMS TO ACCOMMODATE NEW PARTIAL FLOOR RECONSTRUCTION AND INSTALLATION$8,987,000
2015-06-10Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2
2015-06-10Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2
2015-06-10Permit EQ — ISSUED
2015-06-09Job filed: INSTALLATION OF MEDIUM DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2015-06-01Job filed: INSTALLATION OF STEEL DUNNAGE TO SUPPORT NEW HVAC UNIT AS PER PLANS FILED HEREWITH.$300,000
2015-06-01Job filed: GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$45,000
2015-06-01Job filed: INSTALLATION OF NEW HVAC UNIT AND ASSOCIATED PIPING AS PER PLANS.$1,200,000
2015-06-01Job filed: INSTALLATION OF NEW HVAC UNIT AND ASSOCIATED PIPING AS PER PLANS.$1,200,000
2015-06-01Job filed: GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$45,000
2015-06-01Job filed: INSTALLATION OF STEEL DUNNAGE TO SUPPORT NEW HVAC UNIT AS PER PLANS FILED HEREWITH.$300,000
2015-06-01Job filed: GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$45,000
2015-06-01Job filed: INSTALLATION OF NEW HVAC UNIT AND ASSOCIATED PIPING AS PER PLANS.$1,200,000
2015-04-15Permit SG — ISSUED
2015-04-15Permit SG — ISSUED
2015-03-23Permit PL — ISSUED
2015-03-23Permit EW — ISSUED
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2015-02-27Permit EW — ISSUED
2015-02-27Permit EW — ISSUED
2015-01-26DOB complaint, category ?
2015-01-13Job filed: THIS APPLICATION IS FOR ADDITIONS AND MODIFICATION TO THE FIRE ALARM SYSTEM AS ASSOCIATED WITH THE NEW HVAC SHAFT INSTALLED UNDER APPLICATION #3209988$45,000
2015-01-13Job filed: THIS APPLICATION IS FOR ADDITIONS AND MODIFICATION TO THE FIRE ALARM SYSTEM AS ASSOCIATED WITH THE NEW HVAC SHAFT INSTALLED UNDER APPLICATION #3209988$45,000
2015-01-13Job filed: THIS APPLICATION IS FOR MODIFICATIONS TO THE FIRE ALARM SYSTEM AS ASSOCIATED WITH THE HVAC WORK RELATED TO THE DISTRIBUTION DUCTWORK TO THE INDIVIDUAL$45,000
2014
2014-12-18DOB complaint, category ?
2014-12-16Job filed: THIS APPLICATION IS FOR ADDITIONS AND MODIFICATION TO THE FIRE ALARM SYSTEM ON THE SECOND FLOOR AS PER PLAN.$95,000
2014-12-03Job filed: FILING FOR REPLACEMENT OF EXISTING WINDOWS AS PER PLANS FILED HEREWITH.. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$2,900,000
2014-11-06Permit EW — ISSUED
2014-11-05Permit EW — ISSUED
2014-11-05Permit EW — ISSUED
2014-10-20Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$45,000
2014-10-20Job filed: HEREWITH FILING FOR THE REMOVAL AND INSTALLATION OF NEW GWB PARTITIONS. GENERAL CONSTRUCTIONS AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY OR EGR$800,000
2014-10-20Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$45,000
2014-10-20Job filed: HEREWITH FILING FOR THE REMOVAL AND INSTALLATION OF NEW GWB PARTITIONS. GENERAL CONSTRUCTIONS AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY OR EGR$800,000
2014-10-20Job filed: REMOVAL OF HVAC UNIT AND DUCTWORK, ASSOCIATED PIPING, REMOVAL OF PLUMBING FIXTURES. INSTALLATION OF NEW HVAC UNIT, DUCTWORK, PIPING, NEW PLUMBING FIX$320,000
2014-10-03Job filed: IT INFRASTRUCTURE WORK TO INCLUDE HVAC AND ASSOCIATED PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLI$200,000
2014-09-19Permit EW — ISSUED
2014-08-28Permit EW — ISSUED
2014-08-15Job filed: A2$580,000
2014-08-15Job filed: A2$260,000
2014-08-15Job filed: A2$580,000
2014-08-15Job filed: A2$260,000
2014-08-05Permit EW — ISSUED
2014-08-05Permit EW — ISSUED
2014-07-28Permit EW — ISSUED
2014-07-23Permit PL — ISSUED
2014-07-17Permit EW — ISSUED
2014-07-11Permit EW — ISSUED
2014-07-09Job filed: EXTERIOR REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY. PLANS FOR A SIDEWALK SHED ARE BEING FILED SEPERATELY.$197,398
2014-07-08Job filed: A2$580,000
2014-07-08Job filed: A2$580,000
2014-07-08Permit EW — ISSUED
2014-07-03Permit EW — ISSUED
2014-06-24Job filed: THE SCOPE OF THIS PROJECT INCLUDES INTERIOR RENOVATIONS TO NON-LOAD BEARING PARTITIONS AND ASSOCIATED GENERAL CONSTRUCTION WORK SUBITTED HEREWITH AS P$124,000
2014-06-24Job filed: THIS APPLICATION IS FILED FOR MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE INTERIOR MODIFICATIONS AS INDICATED ON PLANS SUBMITTED H$521,000
2014-06-24Job filed: THIS APPLICATION IS FILED FOR MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE INTERIOR MODIFICATIONS AS INDICATED ON PLANS SUBMITTED H$521,000
2014-06-24Job filed: THE SCOPE OF THIS PROJECT INCLUDES INTERIOR RENOVATIONS TO NON-LOAD BEARING PARTITIONS AND ASSOCIATED GENERAL CONSTRUCTION WORK SUBITTED HEREWITH AS P$124,000
2014-06-24Job filed: FILING FOR REPLACEMENT OF EXISTING WINDOWS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.$3,800,000
2014-06-24Certificate of occupancy Temporary
2014-04-11Certificate of occupancy Temporary
2014-04-09Certificate of occupancy Temporary
2014-02-21Rodent inspection: Passed
2013
2013-08-28DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-08-27Certificate of occupancy Temporary
2013-08-14Certificate of occupancy Temporary
2013-06-19Certificate of occupancy Temporary
2013-05-30Certificate of occupancy Temporary
2013-05-29ECB CLASS - 1 violation: B154,4B,50A,B. FOUND RBI 33 HW. HOW WATER BOILER W/HAZARDOUS CONDITION. 50- DEFECTIVE LOW WATER CUT-OFF. 50A- NO SHUT OFF SWITCH I$1,000
2013-04-16Certificate of occupancy Temporary
2013-04-02Certificate of occupancy Temporary
2013-02-15Facade (LL11) filing, cycle 7: SWARMP
2013-02-15DOB violation LL11/98: CYCLE 7 UNSAFE REPORT FILED
2013-02-14Certificate of occupancy Temporary
2013-02-13Rodent inspection: Passed
2012
2012-12-18Certificate of occupancy Temporary
2012-11-07Permit EW — ISSUED
2012-10-10Permit EW — ISSUED
2012-06-12Job filed: A2$8,000
2012-06-12Job filed: INSTALLATION OF SRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$58,000
2012-06-12Job filed: A2$8,000
2010
2010-04-01Permit AL — ISSUED
2009
2009-06-16Facade (LL11) filing, cycle 6: SAFE
2007
2007-02-21Facade (LL11) filing, cycle 6: SAFE
2002
2002-10-01Permit AL — ISSUED
2002-06-26Permit NB — ISSUED
2002-06-25Permit EW — ISSUED
2002-05-06Permit PL — ISSUED
2002-04-19Permit PL — ISSUED
2002-04-05Job filed: FILING FOR FIRE PROTECTION PLAN ROGERS HALL$1,000
2002-04-05Job filed: FILING FOR FIRE PROTECTION PLAN ROGERS HALL$1,000
2002-01-11Permit PL — ISSUED
2002-01-11Permit AL — ISSUED
2002-01-07Permit EW — ISSUED
2002-01-07Permit EW — ISSUED
2002-01-04Permit EW — ISSUED
2002-01-04Permit EW — ISSUED
2002-01-03Permit PL — ISSUED
2001
2001-12-05Job filed: PA
2001-12-05Job filed: PA
2001-11-13Permit EW — ISSUED
2001-10-30Job filed: INTERIOR PARTITION AND BATHROOM RENOVATI ON.$50,000
2001-10-26Permit EW — ISSUED
2001-10-26Permit EQ — ISSUED
2001-10-04Permit EQ — ISSUED
2001-10-04Permit NB — ISSUED
2001-09-07Job filed: Replace existing 7,500 gallon #4 heating oil UST in sidewalk vault with new tank. No change to use, zone or egress.$120,000
2001-07-03Job filed: BASEMENT PL-NEW UNDERGROUND DRAINAGE, D OMESTIC WATER, PLUMBING FIXTURE & KITCHEN EQIPMENT 1ST FL PL - NEW ROUG HING FOR SERVERY & KIOSK, RE
2001-07-03Job filed: STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW ELEVATORS, FOOTING AND FOUND ATION FOR ELEVATOR SHAFT, DUCTWORK SHAFT OPENINGS, DUCTWORK SUPPORTS
2001-07-03Job filed: STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW ELEVATORS, FOOTING AND FOUND ATION FOR ELEVATOR SHAFT, DUCTWORK SHAFT OPENINGS, DUCTWORK SUPPORTS
2001-07-03Job filed: TO PERFORM SPRINKLER WORK ON 1ST FL. AS PER DRAWINGS SUBMITTED. NO CHAN GE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$200,000
2001-07-03Job filed: TO PERFORM SPRINKLER WORK ON BASEMENT AN D 1ST FL. AS PER DRAWINGS SUBMT ED. NO CHANGE IN USE EGRESS OR OCCUPANC Y UNDER THIS APPLICATION.$20,000
2001-07-03Job filed: TO PERFORM SPRINKLER WORK ON 1ST FL. AS PER DRAWINGS SUBMITTED. NO CHAN GE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$200,000
2001-07-03Job filed: BASEMENT PL-NEW UNDERGROUND DRAINAGE, D OMESTIC WATER, PLUMBING FIXTURE & KITCHEN EQIPMENT 1ST FL PL - NEW ROUG HING FOR SERVERY & KIOSK, RE
2001-07-03Job filed: GENERAL CONSTRUCTION FOR NEW KITCHEN IN BASEMENT & ON 1ST FLOOR TO CONST RUCT NEW DINING ROOM, NEW STUDENT LOUNGE NEW OFFICES, STUDENT RECREATION$6,000
2001-07-03Job filed: TO PERFORM SPRINKLER WORK ON BASEMENT AN D 1ST FL. AS PER DRAWINGS SUBMT ED. NO CHANGE IN USE EGRESS OR OCCUPANC Y UNDER THIS APPLICATION.$20,000
2001-07-03Job filed: TO PERFORM SPRINKLER WORK ON 1ST FL. AS PER DRAWINGS SUBMITTED. NO CHAN GE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$200,000
2001-07-03Job filed: STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW ELEVATORS, FOOTING AND FOUND ATION FOR ELEVATOR SHAFT, DUCTWORK SHAFT OPENINGS, DUCTWORK SUPPORTS
2001-07-03Job filed: BASEMENT PL-NEW UNDERGROUND DRAINAGE, D OMESTIC WATER, PLUMBING FIXTURE & KITCHEN EQIPMENT 1ST FL PL - NEW ROUG HING FOR SERVERY & KIOSK, RE
2001-07-03Job filed: GENERAL CONSTRUCTION FOR NEW KITCHEN IN BASEMENT & ON 1ST FLOOR TO CONST RUCT NEW DINING ROOM, NEW STUDENT LOUNGE NEW OFFICES, STUDENT RECREATION$6,000
2001-06-26Job filed: TO PERFORM PLUMBING DEMOLITION, REMOVE A ND CAP FIXTURES IN BASEMENT AND 1 FLOOR AS PER DRAWINGS SUBMITTED. NO CH ANGE IN USE EGRESS OR OCCUPANCY UNDE$25,000
2001-06-26Job filed: TO PERFORM PLUMBING DEMOLITION, REMOVE A ND CAP FIXTURES IN BASEMENT AND 1 FLOOR AS PER DRAWINGS SUBMITTED. NO CH ANGE IN USE EGRESS OR OCCUPANCY UNDE$25,000
2001-06-13Job filed: TO DEMOLISH PARTITIONS IN BASEMENT & 1ST FLOOR IN THEIR ENTIRETY, AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL$50,000
2001-06-13Job filed: TO DEMOLISH PARTITIONS IN BASEMENT & 1ST FLOOR IN THEIR ENTIRETY, AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL$50,000
2001-06-07Job filed: TO MODIFY EXISTING INDIVIDUALLY CODED IN TERIOR FIRE ALARM SYSTEM AS PER DRAWINGS SUBMITTED, FOR BASEMENT AND FIR ST FLOORS ONLY. NO CHANGE IN USE EGR$20,000
2001-06-07Job filed: TO MODIFY EXISTING INDIVIDUALLY CODED IN TERIOR FIRE ALARM SYSTEM AS PER DRAWINGS SUBMITTED, FOR BASEMENT AND FIR ST FLOORS ONLY. NO CHANGE IN USE EGR$20,000
2001-06-07Job filed: TO MODIFY EXISTING INDIVIDUALLY CODED IN TERIOR FIRE ALARM SYSTEM AS PER DRAWINGS SUBMITTED, FOR BASEMENT AND FIR ST FLOORS ONLY. NO CHANGE IN USE EGR$20,000
2001-06-01Permit EQ — ISSUED
2001-05-18Job filed: FILING INCONJUCTION WITH APPLICATION #301079197 FOR INSTALLATION OF TEMPORARY PERSONAL/MATERIAL CONSTRUCTION HOIST DURING BUILDING CONSTRUCTION. DUAL
2001-05-18Job filed: FILING INCONJUCTION WITH APPLICATION #301079197 FOR INSTALLATION OF TEMPORARY PERSONAL/MATERIAL CONSTRUCTION HOIST DURING BUILDING CONSTRUCTION. DUAL
2001-05-18Permit EQ — ISSUED
2001-03-29Permit PL — ISSUED
2001-03-14Permit NB — ISSUED
2001-01-19Job filed: I' AM A SUBSEQUENT APPLICANT FILING FOR THE UNDERGROUND PLUMBING ONLY.
2001-01-19Job filed: I' AM A SUBSEQUENT APPLICANT FILING FOR THE UNDERGROUND PLUMBING ONLY.
2000
2000-12-08Permit EQ — ISSUED
2000-12-08Permit FO — ISSUED
2000-06-06Job filed: I AM A SUSEQUENT APPLICANT FILING FOR MECHANICAL ONLY FOR THE NEW BUILDING.
2000-06-06Job filed: NB
2000-06-06Job filed: I AM A SUSEQUENT APPLICANT FILING FOR MECHANICAL ONLY FOR THE NEW BUILDING.
2000-06-06Job filed: I AM A SUBSEQUENT APPLICANT FILING FOR STRUCTURAL WORK FOR THE NEW BUILDING.
2000-06-06Job filed: NB
2000-06-06Job filed: I AM A SUBSEQUENT APLICATN FILING FOR TH E PLUMBING ONLY FOR NEW BUILDIN
2000-06-06Job filed: I AM A SUBSEQUENT APPLICANT FILING FOR STRUCTURAL WORK FOR THE NEW BUILDING.
2000-06-06Job filed: I AM A SUBSEQUENT APLICATN FILING FOR TH E PLUMBING ONLY FOR NEW BUILDIN
1989
1989-10-23Air permit (REGISTRATION), fuel: NATURALGAS

Support this site Back to the building page