Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
64 service requests in the last three years. Most common: Vendor Enforcement (56) · Standing Water (1) · Homeless Person Assistance (1) · Animal (1) · Encampment (1) · Air Quality (1).
Filed construction activity
$15,000 in permitted construction work filed since
2016 (1 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$2,430,000
$1,093,500
2026
$2,272,000
$1,022,400
2027
$2,215,000
$996,750
The city's market estimate has fallen
9% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2021 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Jay St-MetroTech — A C F R · 250 ft straight-line (about a 1-minute walk) · station accessibility: full Hoyt St — 2 3 · 300 ft straight-line (about a 2-minute walk) · station accessibility: partial (Outbound only)
Bus
Nearest boarding stop: Fulton St / Jay St — B25 B26 B38 B52 · 200 ft
Citi Bike
Lawrence St & Willoughby St · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
64 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,500,000 on
1999-03-05 (lender: Wharton Acquisitionscorporation). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2011-11-22
M&CON $246,850 — from WISSEH, TUWROH B; DOE, JAMES R to WELLS FARGO BANK, NA
$246,850
1999-03-05
Mortgage $1,500,000 — from 469 FULTON LLC to WHARTON ACQUISITIONSCORPORATION
$1,500,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
2024
2025
64
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
0
3
3
0
6
2018
0
0
1
0
1
2019
0
0
3
0
3
2020
0
0
2
0
2
2021
0
0
1
0
1
2022
1
0
3
0
4
2023
0
0
1
3
4
2024
0
0
2
0
2
2025
0
0
1
2
3
2026
0
0
61
3
64
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-07-21Job filed: Replacement of antennas and RRUs; installation of new antennas on the rooftop (T-Mobile - BK04054A) as per plans. All work is in compliance with TPPN $15,000
2022-05-19311: Noise — Noise: Construction Before/After Hours (NM1)
2022-05-18311: Noise — Noise: Construction Before/After Hours (NM1)
2015-09-10Job filed: FILE APPLICATION FOR FIRST FLOOR REPAIR AND RESTORATION AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$23,580
2015-05-05Job filed: INSTALLATION OF TELECOMMUNICATION ANTENNA COMPONENTS ON THE ROOF. RETROFIT EXISTING EQUIPMENT CABINET IN THE EQUIPMENT ROOM ON 4TH FLOOR. ALL WORK IS $15,000
2015-04-29Permit SG — ISSUED
2015-04-29Permit SG — ISSUED
2015-01-28311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2015-01-28DOB complaint, category ?
2015-01-07311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2015-01-07DOB complaint, category ?
2014
2014-12-31DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-11-10Permit EQ — ISSUED
2014-10-28ECB CLASS - 2 violation: FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OFCORRECTION W/ THE DEPT. OF BLDG FOR NOTICE OF VIO. # 3511181$800
2014-10-23Permit PL — ISSUED
2014-10-08Permit SG — ISSUED
2014-10-08Permit SG — ISSUED
2014-09-30ECB CLASS - 1 violation: FAILURE TO MAINTAIN NOTED AT EXPOSURE 3 WHERE EXPOSURE 3 MEETS EXPOSURE 4 ON LAWRENCE ST SECTIONS OF MASONRY/STUCCO IS CRACKED THR$1,000
2014-09-25311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2014-09-25DOB complaint, category ?
2014-09-24Job filed: INSTALLATION OF MECHANICAL DUCT AND EQUIPMENT; CONNECT TO EXISTING RTU. INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$32,000
2014-09-24Job filed: GENERAL CONSTRUCTION INCLUSIVE OF INSTALLATION OF PARTITIONS FOR 1ST FLOOR RETAIL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$124,000
2013-12-03Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2013-05-24Rodent inspection: Failed for Rat Activity
2013-05-16311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2013-05-16DOB complaint, category ?
2013-05-16ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER: NOTED AT 6TH FLR LANDING BULKHEAD WALLS AT BASE HAVE ROTTED AND ARE BEING TEMP
2013-04-29Rodent inspection: Bait applied
2013-04-22Rodent inspection: Monitoring visit
2013-04-15Rodent inspection: Bait applied
2013-04-08Rodent inspection: Monitoring visit
2013-04-01Rodent inspection: Bait applied
2013-03-06Rodent inspection: Failed for Rat Activity
2013-02-14Rodent inspection: Failed for Rat Activity
2012
2012-10-03311: Street Condition — Blocked - Construction
2012-09-21311: Street Condition — Pothole
2011
2011-11-22M&CON $246,850 — from WISSEH, TUWROH B; DOE, JAMES R to WELLS FARGO BANK, NA$246,850
2011-10-09311: Street Light Condition — Street Light Out
2011-06-22MLEA — from 469 FULTON LLC to OMNIPOINT COMMUNICATIONS, INC
2008
2008-12-10Permit AL — ISSUED
2008-11-20Job filed: CREATING TELECOMMUICATIONS ROOM WITH RELATED HVAC ON SIXTH FLOOR. RELATED ANTENNAS AND CONDENSER ON ROOF. ALL IN CONFORMANCE WITH TPPN #5/98. NO CHAN$50,000
2008-11-17DOB complaint, category ?
2006
2006-12-19Permit EW — ISSUED
2006-12-19Permit EW — ISSUED
2006-12-04Job filed: TO INSTALL AC UNIT ON ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2006-12-04Job filed: TO INSTALL AC UNIT ON ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2000
2000-03-17Mortgage assigned — from 469 FULTON LLC to BANCO POPULAR NORTHAMERICA
2000-03-17Agreement — from BANCO POPULAR NORTHAMERICA to 469 FULTON LLC
2000-03-17Mortgage assigned — from JJGK REALTY INC; SUTTON, JEFF to BANCO POPULAR NORTHAMERICA
2000-03-17Mortgage assigned — from SUTTON, JEFF; KHEZRIE, JIMMY to SUTTON, JEFF; JJGK REALTY NC
2000-03-16Permit EQ — ISSUED
2000-03-16Permit EW — ISSUED
2000-03-07Job filed: Replace existing storefront at first and second floors. Apply new stucco finish over existing facade at first and second floors as per plans. enlarge $25,000
2000-03-07Job filed: Replace existing storefront at first and second floors. Apply new stucco finish over existing facade at first and second floors as per plans. enlarge $25,000
2000-03-07Job filed: Replace existing storefront at first and second floors. Apply new stucco finish over existing facade at first and second floors as per plans. enlarge $25,000
1999
1999-09-20Mortgage assigned — from SUTTON, JEFF; KHEZRIE, JIMMY to SUTTON, JEFF; J J G K REALTY INC
1999-04-29DTL — from BANK OF NEW YORK
1999-04-29DTL — from BANK OF NEW YORK
1999-04-29DTL — from BANK OF NEW YORK
1999-04-21Mortgage assigned — from WHARTON ACQUISITIONSCORP to KHEZRIE, JIMMY; SUTTON, JEFF
1999-03-05Mortgage $1,500,000 — from 469 FULTON LLC to WHARTON ACQUISITIONSCORPORATION$1,500,000
1999-03-05Deed — from TROTTER, LUCY S/DEC'D; HAGEN, WINSTON H JR/TRUSTEE to 469 FULTON LLC
1999-01-25ATL — from NYCTL 1997-1 TRUST to BANK OF NEW YORK
1999-01-25ATL — from NYCTL 1998-1 TRUST to BANK OF NEW YORK
1998
1998-08-10TLS — from CITY OF NEW YORK to NYCTL 1998-1 TRUST
1998-03-16AMTL — from BANK OF NEW YORK
1997
1997-08-07TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1997-06-18TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1997-03-12DOB complaint, category ?
1996
1996-06-12TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1995
1995-12-13DOB violation C:
1995-08-31DOB complaint, category ?
1994
1994-11-04DOB complaint, category ?
1990
1990-03-20DOB violation ES:
1989
1989-06-16DOB violation Z:
1989-06-16DOB violation Z:
1989-06-16DOB violation Z:
1989-06-16DOB violation Z:
1989-06-16DOB violation Z:
1989-06-16DOB violation Z:
1985
1985-12-06Mortgage assigned — from 469 BKLYN HOLDING CORP to CHEMICAL BANK
1982
1982-10-19Agreement — from HAGEN, WINSTON H TRST; DEVEREUX, ALVIN TRST to HUTCHINGS, CHRISTINEH; PATTERSON, AUDREY H; HAGEN, WINSTON H JR; DEVEREUX, VIRGINIA W; HAG
1967
1967-01-11CTOR — from HAGEN WINSTON H EXRS OF; HAGEN WINSTON H JR; HUTCHINGS CHRISTINE H; DEVEREA VIRGINIA W; HA
1966
1966-07-06Deed — from DEVERDAUX ALVIN; DEVEREAUX ALVIN (AS TRUSTEE) to HAGEN AUDREY R; HAGEN WINSTON H JR IND & AS TRUSTEE; HUTCHINGS CHRISTINE H; HAGEN WINSTON