Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

122 Smith Street · Brooklyn · BBL 3001870027 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty points per 10 units; this building carries 0. In ZIP 11201, 70% of residential buildings hold an A and 5% grade D or F. How grades work

this building
A
C

Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

3 service requests in the last three years. Most common: New Tree Request (1) · Non (1) · Noise (1).

Filed construction activity

$62,800 in permitted construction work filed since 2016 (4 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1920)
NoSix or more residential units (2)
No421-a / J-51 tax benefit on the current tax roll

1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)Broom Realty LLC
Head officerMEIDAN WANG
Managing agentMEIDAN WANG
Last registered2025-08-06

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$3,637,000 $218,220
2026$4,080,000 $244,800
2027$4,385,000 $263,100

The city's market estimate has risen 21% between tax years 2025 and 2027.

Restaurants in this building

RestaurantCuisineGradeNotes
Ki SushiJapaneseAMice evidence

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 1 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayBergen St — F G · 300 ft straight-line (about a 2-minute walk) · station accessibility: none
Hoyt-Schermerhorn Sts — A C G · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
BusNearest boarding stop: Smith St / Bergen St — B57 B65 · 250 ft
Citi BikePacific St & Smith St · 200 ft · station location as of 2026-09-23; live availability
Bike facilityPainted bike lane mapped within 75 ft
School zones (2024–25 map)Elementary: P.S. 261 Zipporiah Mills. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

122 Smith Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

3 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $990,000 on 2010-04-22 (lender: JPMorgan Chase Bank, NA). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2010-04-22Mortgage $990,000 — from BLOOM REALTY LLC to JPMORGAN CHASE BANK, NA $990,000
2010-03-26Deed $1,500,000 — from FUENTES , AZUCENA; FUENTES , PEDRO to BLOOM REALTY, LLC $1,500,000
2008-08-22AL&R $775,000 — from FUENTES, PEDRO; FUENTES, AZUCENA to LANDMARK CAPITAL PARTNERS, LLC $775,000
2008-08-22Mortgage $775,000 — from FUENTES, AZUCENA; FUENTES, PEDRO to LANDMARK CAPITAL PARTNERS, LLC $775,000
2008-04-10AL&R $485,000 — from FUENTES, AZUCENA; FUENTES, PEDRO to GEMCAP EQUITY CORP. $485,000
2008-04-10Mortgage $485,000 — from FUENTES, AZUCENA; FUENTES, PEDRO to GEMCAP EQUITY CORP. $485,000
2005-05-16Mortgage $350,000 — from FUENTES, PEDRO; FUENTES, AZUCENA to JPMORGAN CHASE BANK, N.A. $350,000
2004-02-06Mortgage $210,000 — from FUENTES, PEDRO; FUENTES, AZUCENA to JPMORGAN CHASE BANK $210,000
2001-02-22Mortgage $128,000 — from FUENTES, PEDRO to CHASE MANHATTAN BANK $128,000
1995-08-31Mortgage $35,000 — from TEK MASTER SERVICE CORP; 122 UNION REALTY INC to TCPG DESIGN CORPORATION $35,000
1988-02-17Mortgage $140,000 — from NEPTUNE ASSOCIATES to SMITH ST PROPERTIESASSO $140,000

Ten-year activity

20100
12
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionHousing & tenantsOwnership & moneyHealth & systemsTotal
2017930012
201801001
201900101
202002002
202102002
202202002
202304004
202401012
202501012
202600011
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 3 records

DateRecord
2026-06-29Restaurant inspection: KI SUSHI · mice evidence
2025-12-06311: Noise — Noise: Manufacturing Noise (NK1)
2025-11-26Rodent inspection: Passed

The full timeline

2026
2026-06-29Restaurant inspection: KI SUSHI · mice evidence
2025
2025-12-06311: Noise — Noise: Manufacturing Noise (NK1)
2025-11-26Rodent inspection: Passed
2024
2024-10-04Restaurant inspection: KI SUSHI — grade A
2024-08-21311: Non-Emergency Police Matter — Other (complaint details)
2023
2023-11-09311: New Tree Request — For One Address
2023-07-03311: Noise — Noise: Jack Hammering (NC2)
2023-07-03311: Noise — Noise: Construction Equipment (NC1)
2023-05-21311: Street Light Condition — Lamppost Missing
2022
2022-10-17311: Illegal Parking — Blocked Bike Lane
2022-04-07311: Street Light Condition — Lamppost Damaged
2021
2021-03-22311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-05311: Broken Parking Meter — Out of Order
2020
2020-02-07311: Broken Parking Meter — No Receipt
2020-01-08311: Noise - Vehicle — Engine Idling
2019
2019-10-25Mortgage satisfied — from BLOOM REALTY LLC to JPMORGAN CHASE BANK, N.A.
2018
2018-10-12311: Electronics Waste Appointment — Ewaste appointment
2017
2017-11-09Permit EW — ISSUED
2017-10-31Permit PL — ISSUED
2017-09-27311: Illegal Parking — Blocked Bike Lane
2017-09-26Job filed: INSTALLATION OF KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION OF MAIN JOB APPLICATION (JOB#:321525480). NO CHANGE TO EXISTING USE, EGRES$3,000
2017-09-26Job filed: INSTALLATION OF KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION OF MAIN JOB APPLICATION (JOB#:321525480). NO CHANGE TO EXISTING USE, EGRES$3,000
2017-09-26Permit EQ — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-15Job filed: MINOR RENOVATION OF EXISTING RESTAURANT ON 1ST FLOOR AND CELLAR. REPLACE/RELOCATE EXISTING PLUMBING FIXTURES. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$28,400
2017-09-15Job filed: MINOR RENOVATION OF EXISTING RESTAURANT ON 1ST FLOOR AND CELLAR. REPLACE/RELOCATE EXISTING PLUMBING FIXTURES. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$28,400
2017-06-03311: Food Establishment — Food Contaminated
2017-02-03311: Taxi Complaint — Driver Complaint
2016
2016-12-17311: Broken Muni Meter — No Receipt
2016-12-16311: Illegal Parking — Blocked Bike Lane
2016-01-15FDNY inspection (RISK)
2011
2011-09-30Permit EQ — ISSUED
2011-09-30Permit EQ — ISSUED
2011-09-29Job filed: INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH 2
2011-09-29Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH 2008
2011-09-29Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH 2008
2011-09-29Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH 2008
2011-09-29Job filed: INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH 2
2011-09-29Job filed: INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH 2
2011-06-02311: Food Poisoning — 1 or 2
2010
2010-12-14311: General Construction/Plumbing — Failure To Maintain
2010-12-14DOB complaint, category ?
2010-12-14DOB violation C: REPAIR AND/OR REPLACE,MAINTAIN THE BUILDING,CONTACT THE DOB AT 718-802 -3685 FOR RE-INSPECTION UPON COMPLETION OF WORK
2010-12-03DOB violation C: WORK CONTRARY TO BUILDING CODE REMEDY; CONFORM TO BUILDING CODE AND REGULATION
2010-10-19311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2010-10-19DOB complaint, category ?
2010-09-13Permit PL — ISSUED
2010-09-07Permit EW — ISSUED
2010-09-07Permit EW — ISSUED
2010-05-13ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS FOR ALTERATIONS 2 JOB#320113006 OF WHICH PERMIT I
2010-05-12DOB complaint, category ?
2010-04-30Job filed: RENOVATION TO EXISTING 2ND & 3RD FLOOR APARTMENTS, REPLACE EXSTING WALL & FLOOR FINISHES, MINOR PARTITIONS AND PLUMBING FIXTURES TO BE INSTALL$24,244
2010-04-22Mortgage $990,000 — from BLOOM REALTY LLC to JPMORGAN CHASE BANK, NA$990,000
2010-03-26Deed $1,500,000 — from FUENTES , AZUCENA; FUENTES , PEDRO to BLOOM REALTY, LLC$1,500,000
2010-01-15Permit EW — ISSUED
2009
2009-12-31DOB violation LBLVIO:
2009-12-22Job filed: APPLICATION FILED TO REMOVE VIOLATION ECB #34045969Y. MINOR INTERIOR RENOVATION OF EXISTING 3RD STORY APARTMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS$22,050
2009-03-11Mortgage assigned — from GREEN MOUNTAIN FINANCE FUND LLC to WELLS FARGO FOOTHILL LLC
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2008
2008-10-22Mortgage assigned — from LANDMARK CAPITAL PARTNERS,LLC to GREEN MOUNTAIN FINANCE FUND, LLC
2008-08-29TL&R — from FUENTES, AZUCENA; FUENTES, PEDRO to GEMCAP EQUITY CORP.
2008-08-29Mortgage satisfied — from FUENTES, PEDRO; FUENTES, AZUCENA to GEMCAP EQUITY CORP.
2008-08-22AL&R $775,000 — from FUENTES, PEDRO; FUENTES, AZUCENA to LANDMARK CAPITAL PARTNERS, LLC$775,000
2008-08-22Mortgage $775,000 — from FUENTES, AZUCENA; FUENTES, PEDRO to LANDMARK CAPITAL PARTNERS, LLC$775,000
2008-08-05HPD litigation: Access Warrant - Non-Lead
2008-04-10AL&R $485,000 — from FUENTES, AZUCENA; FUENTES, PEDRO to GEMCAP EQUITY CORP.$485,000
2008-04-10Mortgage $485,000 — from FUENTES, AZUCENA; FUENTES, PEDRO to GEMCAP EQUITY CORP.$485,000
2008-04-07Mortgage satisfied — from FUENTES, PEDRO; FUENTES, AZUCENA to JPMORGAN CHASE BANK, N.A.
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-12-13City emergency repair (OMO): (apt. #1) at public hallway: trace and repair source of water leak. at public hallway north wall: 48sq. ft. room size 26$770
2007-11-28Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-11-28Tenant complaint: ELECTRIC — WIRING
2007-11-28Tenant complaint: ELECTRIC — WIRING
2007-11-28Tenant complaint: HEATING — HEAT RELATED
2007-11-28Tenant complaint: GENERAL — WINDOWS
2007-11-23Tenant complaint: HEATING — HEAT RELATED
2007-11-07Tenant complaint: GENERAL — WINDOWS
2007-11-07Tenant complaint: PLUMBING — RADIATOR
2007-11-07Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-11-07Tenant complaint: ELECTRIC — WIRING
2007-11-07Tenant complaint: GENERAL — WINDOWS
2007-11-07Tenant complaint: NONCONST — VERMIN
2007-11-07Tenant complaint: HEATING — HEAT RELATED
2007-10-31Tenant complaint: ELECTRIC — WIRING
2007-10-31Tenant complaint: ELECTRIC — LIGHTING
2007-10-31Tenant complaint: PLUMBING — WATER-LEAKS
2007-10-31Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-10-31Tenant complaint: GENERAL — WINDOWS
2007-10-31Tenant complaint: GENERAL — WINDOWS
2007-10-31Tenant complaint: NONCONST — VERMIN
2007-10-31Tenant complaint: HEATING — HEAT RELATED
2007-10-22Tenant complaint: PLUMBING — WATER-LEAKS
2007-10-22Tenant complaint: PAINT/PLASTER — CEILING
2007-10-22Tenant complaint: HEATING — HEAT RELATED
2007-10-22Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-10-22Tenant complaint: ELECTRIC — LIGHTING
2007-10-22Tenant complaint: ELECTRIC — WIRING
2007-10-22Tenant complaint: NONCONST — VERMIN
2007-10-22DOB complaint, category ?
2007-10-18Tenant complaint: HEATING — HEAT RELATED
2007-10-05Tenant complaint: PAINT/PLASTER — CEILING
2007-10-05Tenant complaint: ELECTRIC — WIRING
2007-10-05Tenant complaint: PLUMBING — WATER-LEAKS
2007-10-05Tenant complaint: NONCONST — VERMIN
2007-10-05DOB complaint, category ?
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-08-15Permit EW — ISSUED
2006-08-09Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB# 302086846. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2006-08-09Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB# 302086846. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2006-04-14Permit EW — ISSUED
2006-04-11Job filed: INSTALL FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH APPLICATION # 302086846. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2006-04-11Job filed: INSTALL FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH APPLICATION # 302086846. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2006-03-31Permit PL — ISSUED
2006-03-06Permit EQ — ISSUED
2006-03-06Permit EW — ISSUED
2006-03-06Permit EW — ISSUED
2006-03-02Job filed: RENOVATION OF RESTAURANT. INSTALL COOKING EQUIPMENT, RANGE HOOD, PLUMBING FIXTURES, FLOOR, MINOR PARTITIONS, NEW STOREFRONT AND HVAC SYSTEM & DUN$50,000
2006-03-02Job filed: RENOVATION OF RESTAURANT. INSTALL COOKING EQUIPMENT, RANGE HOOD, PLUMBING FIXTURES, FLOOR, MINOR PARTITIONS, NEW STOREFRONT AND HVAC SYSTEM & DUN$50,000
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2005
2005-10-14Mortgage satisfied — from FUENTES, PEDRO; FUENTES, AZUCENA to JP MORGAN CHASE BANK
2005-05-16Mortgage $350,000 — from FUENTES, PEDRO; FUENTES, AZUCENA to JPMORGAN CHASE BANK, N.A.$350,000
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2004
2004-02-13DOB violation LL6291:
2004-02-09Deed — from FUENTES, PEDRO to FUENTES, AZUCENA; FUENTES, PEDRO
2004-02-06Mortgage $210,000 — from FUENTES, PEDRO; FUENTES, AZUCENA to JPMORGAN CHASE BANK$210,000
2003
2003-09-12Mortgage satisfied — from FUENTES, PEDRO to JPMORGAN CHASE BANK F/K/A THE CHASE MANH
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2002
2002-03-26DOB violation LL6291:
2001
2001-04-30ECB Non-Hazardous violation: 3A,3B,3C,51,19B.INSTALL (CHECK VALVE) BACK FLOW PREVENTOR.$400
2001-03-09Deed — from 122 UNION REALTY INC to FUENTES, PEDRO
2001-03-09Mortgage satisfied — from 122 UNION REALTY INC to TCPG CORPORATION
2001-03-09Mortgage assigned — from TCPG DESIGN CONSTRUCTION to LARAM FUNDING CORP
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-22Mortgage $128,000 — from FUENTES, PEDRO to CHASE MANHATTAN BANK$128,000
2000
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1998
1998-05-04DOB violation LL6291:
1998-05-04DOB violation LL6291:
1995
1995-08-31Mortgage $35,000 — from TEK MASTER SERVICE CORP; 122 UNION REALTY INC to TCPG DESIGN CORPORATION$35,000
1995-08-31Mortgage assigned — from NATIONSCREDIT FINANCIAL SERVICES CORPORA to TCPG DESIGN CORP
1995-08-31Agreement — from 122 UNION REALTY INC to TCPG DESIGN CORPORATION
1994
1994-02-04DOB complaint, category ?
1991
1991-08-22DOB complaint, category ?
1991-08-21ECB Unknown violation: WORK WITHOUT A PERMIT.WORK NOTED.REMOVAL OF WOOD LATH AND PLASTER, AND REMOVAL OF INTERIOR PARTICTIONS AT 3RD STORY.REMEDY:STOP AL$285
1990
1990-07-23DOB violation B: 4A/18B/36
1990-03-27Deed — from NEPTUNE ASSOCIATES to 122 UNION REALTY INC
1990-03-02Deed — from NEPTUNE ASSOCIATES to 122 UNION REALTY INC
1989
1989-05-31Mortgage assigned — from SMITH STREET PROPERTIES to CHRYSLER FIRST FINANCIAL
1988
1988-02-17Deed — from SMITH ST PROPERTIESASSC to NEPTUNE ASSOCIATES
1988-02-17Mortgage $140,000 — from NEPTUNE ASSOCIATES to SMITH ST PROPERTIESASSO$140,000
1983
1983-09-26VAC — from NEW YORK CITY to VACATE ORDER
1983-08-25Deed — from CASTELLANO, ARMANDO to SMITH ST.PROPERTIESASSC
1983-08-25Mortgage satisfied — from CASTELLANOS, ARMANDO to ZLOTOFF, FRANCES
1983-04-25Deed — from COMMISSIONER OF FINANCE to NEW YORK CITY
1982
1982-03-05Deed — from J. C. GABY, INC. to CASTELLANOS, ARMANDO
1973
1973-04-10Deed — from CASTELLANOS ARMANDO to JC GABY INC
1973-01-24Mortgage — from CASTELLANOS ARMANDO to ZLOTOFF FRANCES
1973-01-24Deed — from ZLOTOFF FRANCES to CASTELLANOS ARMANDO

Support this site Back to the building page