Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
206 service requests in the last three years. Most common: Noise (164) · Illegal Parking (16) · Street Condition (8) · For Hire Vehicle Complaint (4) · Lost Property (4) · Green Taxi Complaint (1).
Filed construction activity
$791,686 in permitted construction work filed since
2016 (37 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$87,048,000
$39,171,600
2026
$105,660,000
$47,547,000
2027
$106,493,000
$47,921,850
The city's market estimate has risen
22% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 6/100, posted at the entrance by law (2022 disclosure cycle)
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
High St — A C · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none Clark St — 2 3 · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Old Fulton St / Hicks St — B25 · 800 ft
Citi Bike
Old Fulton St · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
206 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $3,000,000 on
2024-10-07 (lender: Brooklyn Bridge Park Development Corporation , DBA), covering 6 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-10-07
AL&R $113,000,000 — from BROOKLYN PIER 1 HOTEL TENANT, L.P.; BROOKLYN PIER 1 HOTEL OWNER, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$113,000,000
2024-10-07
Agreement $113,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$113,000,000
2024-10-07
Mortgage $3,000,000 — from BROOKLYN PIER 1 HOTEL TENANT, L.P.; BROOKLYN PIER 1 HOTEL OWNER, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$3,000,000
2019-11-06
Agreement $120,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BARCLAYS BANK PLC
$120,000,000
2019-11-06
AL&R $120,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$120,000,000
2019-11-06
Agreement $120,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$120,000,000
2019-11-06
Mortgage $40,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$40,000,000
2016-12-30
AL&R $80,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P. to CAPITAL ONE, NATIONAL ASSOCIATION
$80,000,000
2016-12-30
Agreement $80,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P. to CAPITAL ONE, NATIONAL ASSOCIATION
$80,000,000
2014-11-26
AL&R $32,934,280 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA; D/B/A EMPIRE STATE DEVELOPMENT
$32,934,280
2014-11-26
AL&R $127,065,720 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to D/B/A EMPIRE STATE DEVELOPMENT; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$127,065,720
2014-11-26
Mortgage $32,934,280 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to D/B/A EMPIRE STATE DEVELOPMENT; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$32,934,280
2014-11-26
Mortgage $127,065,720 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to D/B/A EMPIRE STATE DEVELOPMENT; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
$127,065,720
2012-07-06
MLEA $9,657,187 — from BROOKLYN BRIDGE PARK CORPORATION to BROOKLYN PIER 1 HOTEL OWNER, L.P.
$9,657,187
Ten-year activity
2001000
2017
2018
2019
2020
2021
2022
2023
2024
124
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
27
12
43
2
11
95
2018
20
6
36
0
12
74
2019
13
8
46
8
3
78
2020
5
6
10
0
1
22
2021
2
5
16
0
1
24
2022
4
2
11
0
3
20
2023
6
1
12
0
7
26
2024
8
3
90
9
4
114
2025
21
9
93
0
1
124
2026
7
3
18
0
2
30
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-07-14Job filed: Filing plumbing and gas renovation to existing first floor Eating and Drinking establishment as per plans. No change in use, egress, or occupancy und$31,415
2025-06-25Job filed: Filing to remove partitions, lighting, and finishes, and install acoustical partitions and finishes at 1st floor Eating & drinking establishment as p$120,000
2025-06-18Job filed: Filing plumbing and gas renovation to existing first floor Eating and Drinking establishment as per plans. No change in use, egress, or occupancy und$27,000
2025-05-27Permit General Construction — Signed-off
2025-05-22Job filed: Filing plumbing and gas renovation to existing first floor Eating and Drinking establishment as per plans. No change in use, egress, or occupancy und$25,000
2025-04-01Certificate of occupancy Renewal Without Change
2025-04-01Job filed: HVAC modification- disconnect and remove existing abandoned equipment to install new Walk-in Cooler condensing unit as per plans. No change in use, e$25,000
2025-04-01Job filed: Filing to remove partitions, lighting, and finishes, and install acoustical partitions and finishes at 1st floor Eating & drinking establishment as p$120,000
2025-04-01Job filed: Filing plumbing and gas renovation to existing first floor Eating and Drinking establishment as per plans. No change in use, egress, or occupancy und$31,415
2025-03-23311: Illegal Parking — Paper License Plates
2025-01-03Certificate of occupancy Renewal Without Change
2025-01-02311: Encampment — N/A
2024
2024-12-18Job filed: Filing to remove gas fireplace and all existing gas piping at 10th floor space as per plans. No change in use, egress, or occupancy under this applic$23,000
2024-12-18Job filed: Filing to remove existing Fireplace ductwork completely and fully seal. Also installing acoustic partitions and doors- all as per plans submitted her$2,000
2024-12-18Job filed: Interior renovation to 10th floor space as per plans. No change in use, egress, or occupancy under this application.$32,000
2024-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2024-10-09Restaurant inspection: HARRIET'S LOUNGE / HARRIET'S ROOFTOP — grade A
2024-10-07Agreement — from THE BOARD OF MANAGERS OF PIERHOUSE CONDO; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN PIER 1 HOTEL OWNER, L.P.; SUMITOMO MITSUI BANKING CORPORATION
2024-10-07Agreement — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to SUMITOMO MITSUI BANKING CORPORATION
2024-10-07AALR — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to SUMITOMO MITSUI BANKING CORPORATION
2024-10-07Mortgage assigned — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to SUMITOMO MITSUI BANKING CORPORATION
2024-10-07AL&R $113,000,000 — from BROOKLYN PIER 1 HOTEL TENANT, L.P.; BROOKLYN PIER 1 HOTEL OWNER, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$113,000,000
2024-10-07Agreement $113,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$113,000,000
2024-10-07Mortgage $3,000,000 — from BROOKLYN PIER 1 HOTEL TENANT, L.P.; BROOKLYN PIER 1 HOTEL OWNER, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$3,000,000
2024-10-07AALR — from BARCLAYS BANK PLC to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
2024-10-07Mortgage assigned — from BARCLAYS BANK PLC to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
2023-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2023-11-26311: Lost Property — Electronics/Phones
2023-11-09311: Noise - Helicopter — Other
2023-11-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-29311: Noise - Helicopter — Other
2023-10-18Permit Antenna — Signed-off
2023-10-16Certificate of occupancy Renewal Without Change
2023-10-11311: Rodent — Rat Sighting
2023-08-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-07-19Job filed: DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH unit and 1 GPS unit on the roof. Installing 1 new equipment cabinet on steel beams in $83,800
2023-07-13Certificate of occupancy Renewal Without Change
2023-04-13Elevator permit: FURNISH AND INSTALL NEW SHEAVE-All work to comply with ASME A17.1-2013, Part 5, Section 5.2 Safety Code for Elevators and Escalato$10,000
2020-05-22311: Non-Emergency Police Matter — Social Distancing
2020-03-31Certificate of occupancy Temporary
2020-03-13Cooling tower inspection
2020-03-07311: Noise - Helicopter — Other
2020-01-21Certificate of occupancy Temporary
2019
2019-12-09TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to BROOKLYN PIER I HOTEL OWNER, L.P.
2019-12-03Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. -All work to comply with AS$111,000
2019-11-15311: Green Taxi Complaint — Driver Complaint - Passenger
2019-11-13311: Green Taxi Complaint — Driver Complaint - Passenger
2019-11-06Agreement $120,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BARCLAYS BANK PLC$120,000,000
2019-11-06AALR — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BARCLAYS BANK PLC
2019-11-06Mortgage assigned — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BARCLAYS BANK PLC
2019-11-06AL&R $120,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$120,000,000
2019-11-06Agreement $120,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$120,000,000
2019-11-06Mortgage $40,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 HOTEL TENANT, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$40,000,000
2019-11-06Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
2018-09-10Job filed: GENERAL CONSTRUCTION, MECHANICAL, PLUMBING, AND SPRINKLER ASSOCIATED WITH TENANT FIT-OUT FOR FIRST FLOOR ACCESSORY HOTEL "HAIR SALON". NO CHANGE IN US$107,400
2018-07-17311: Elevator — Elevator - Single Device On Property/No Alternate Service
2018-07-17311: Elevator — Elevator - Multiple Devices On Property
2018-07-17DOB complaint, category ?
2018-07-17ECB CLASS - 1 violation: 5A10.78B14.(5A10)DOOR ZONE RESTRICTOR NOT WORKING.THIS IS A SAFETY DEVICE TO ENSURE ELEVATOR PASSENGER SAFETY.REPAIR RESTRACTOR AN$1,250
2018-07-17DOB complaint, category ?
2018-07-17ECB CLASS - 1 violation: 5A10.78B14.(5A10)DOOR ZONE RESTRICTOR NOT WORKING.THIS IS A SAFETY DEVICE TO ENSURE PASSENGER SAFETY.REPAIR RESTRICTOR AND CONTACT$1,250
2018-07-06Job filed: INSTALL OF TEMP PLATFORM, NO ALTERATIONS TO EXIST STRUCTURES, FOR THE MERCEDES PRESS EVENT ON JULY 26, 2018. A TPA PERMIT IS REQUIRED. PRODUCER IS RES$5,000
2017-10-16Job filed: INSTALLATION OF TEMPORARY TENTS FOR WEATHER PROTECTION OF PUBLIC FOR PRIVATE EVENT. THE EVENT WILL ALSO INVOLVE 90 FURMAN STREET, LOT 15, RESTAURANT. $30,000
2017-10-16Job filed: INSTALLATION OF TEMPORARY TENTS FOR WEATHER PROTECTION OF PUBLIC FOR PRIVATE EVENT. THE EVENT WILL ALSO INVOLVE 90 FURMAN STREET, LOT 15, RESTAURANT. $30,000
2017-04-12Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH ALT 2 APPLICATION 321375365$1,000
2017-04-12Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH ALT 2 APPLICATION 321375365$1,000
2017-04-05Job filed: MECHANICAL, PLUMBING AND SPRINKLER ASSOCIATED WITH TENANT FITOUT FOR CELLAR ACCESSORY HOTEL SPA. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJ$3,000
2017-04-05Job filed: MECHANICAL, PLUMBING AND SPRINKLER ASSOCIATED WITH TENANT FITOUT FOR CELLAR ACCESSORY HOTEL SPA. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJ$3,000
2017-04-05Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TENANT FITOUT FOR CELLAR ACCESSORY HOTEL SPA. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NB$1,000
2017-03-17TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION
2017-03-17TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION
2016-12-30AL&R $80,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P. to CAPITAL ONE, NATIONAL ASSOCIATION$80,000,000
2016-12-30Agreement $80,000,000 — from BROOKLYN PIER 1 HOTEL OWNER, L.P. to CAPITAL ONE, NATIONAL ASSOCIATION$80,000,000
2016-12-22Permit NB — ISSUED
2016-12-21Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 320377659$1,000
2016-12-21Permit EW — ISSUED
2016-12-14311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-12-14311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-12-14DOB complaint, category ?
2016-12-02Agreement — from BROOKLYN BRIDGE PARK CORPORATION; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P.; BROOKLYN PIER 1 HOTEL OWNER, L.P.
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01Permit PL — ISSUED
2016-11-14Job filed: PA
2016-10-19311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-10-19DOB complaint, category ?
2016-09-21Permit EW — ISSUED
2016-09-21Permit EW — ISSUED
2016-09-13Permit EW — ISSUED
2016-09-13Permit EW — ISSUED
2016-08-30EASE — from BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to BROOKLYN PIER I HOTEL OWNER, L.P.
2016-08-30EASE — from BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to BROOKLYN PIER I HOTEL OWNER, L.P.
2016-08-25Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPP. SHUT OFF VALVES HAVE BEEN FILED UNDER DOB#320377659. NO CHANGE IN OCCUPANCY, USE, O$3,000
2016-08-25Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPP. SHUT OFF VALVES HAVE BEEN FILED UNDER DOB#320377659. NO CHANGE IN OCCUPANCY, USE, O$3,000
2016-08-25Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPP. SHUT OFF VALVES HAVE BEEN FILED UNDER DOB#320377659. NO CHANGE IN OCCUPANCY, USE, O$3,000
2016-08-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-08-22DOB complaint, category ?
2016-08-10DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-08-09Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDIN
2016-08-09Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDIN
2016-08-09Permit EQ — ISSUED
2016-08-03FDNY inspection (CDA-90-DRILL)
2016-06-30311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-06-30DOB complaint, category ?
2016-05-27Permit NB — ISSUED
2016-05-24Permit EQ — ISSUED
2016-05-23Job filed: FILING FOR FENCE
2016-05-16311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-05-16ECB CLASS - 1 violation: SEC: BC3307.7.5. DESIGN OF FENCES. NOTE: @ TIME OF INSP OF 10 STORY BLDG @ BULKHEAD LEVEL, CONSTRUCTION WORK IN PROGRESS. RESPONDI$1,600
2016-05-16DOB complaint, category ?
2016-05-16ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS &/OR APPROVED AMENDMENTS. NOTE: @ TIME OF INSP OF 10 STORY BLDG @ BULKHEAD LEV$250
2016-05-16Permit EW — ISSUED
2016-05-12Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 320377659$1,000
2016-05-12Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 320377659$1,000
2016-05-09Permit EW — ISSUED
2016-04-21Permit EW — ISSUED
2016-04-19Job filed: INSTALLATION OF OIL FIRED EMERGENCY GENERATOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NEW BUILDING #320377659.$2,000
2016-04-01Job filed: INSTALLATION OF 103 LINEAR FEET OF HEAVY DUTY SIDEWALK DURING NEW BUILDING CON STRUCTION.FILED SEPARATELY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33
2016-04-01Job filed: INSTALLATION OF 103 LINEAR FEET OF HEAVY DUTY SIDEWALK DURING NEW BUILDING CON STRUCTION.FILED SEPARATELY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33
2016-04-01Permit EQ — ISSUED
2016-03-28Permit NB — ISSUED
2016-03-25Permit EQ — ISSUED
2016-03-07Job filed: INSTALLATION OF A LOADING DOCK AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPERATELY. LOADING DOCK SHALL COMPLY WITH CHAPTER #33 OF THE N
2016-03-07Job filed: INSTALLATION OF A LOADING DOCK AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPERATELY. LOADING DOCK SHALL COMPLY WITH CHAPTER #33 OF THE N
2016-03-07Permit EQ — ISSUED
2016-02-24Permit EQ — ISSUED
2016-02-09Permit EW — ISSUED
2016-01-16Permit EW — ISSUED
2015
2015-12-19FDNY inspection (CDA-90-DRILL)
2015-12-03Permit PL — ISSUED
2015-11-17Permit EW — ISSUED
2015-11-09Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPP. SHUT OFF VALVES HAVE BEEN FILED UNDER DOB#320377659. NO CHANGE IN OCCUPANCY, USE, O$8,000
2015-10-01311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2015-10-01DOB complaint, category ?
2015-09-28Permit EW — ISSUED
2015-09-28Permit EQ — ISSUED
2015-09-25Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-09-21Permit EW — ISSUED
2015-09-18FDNY inspection (CDA-90-DRILL)
2015-09-17Job filed: FIRE PROTECTION PLAN. FILED IN CONJUNCTION WITH NEW BUILDING #320377659$1,000
2015-09-17Job filed: FIRE PROTECTION PLAN. FILED IN CONJUNCTION WITH NEW BUILDING #320377659$1,000
2015-07-21Job filed: PA
2015-07-21Job filed: PA
2015-07-20Job filed: PA
2015-07-20Job filed: PA
2015-06-24FDNY inspection (CDA-90-DRILL)
2015-05-27Permit EQ — ISSUED
2015-05-27Permit NB — ISSUED
2015-05-14311: Water System — Hydrant Defective (WC2)
2015-05-04Permit PL — ISSUED
2015-03-28FDNY inspection (CDA-90-DRILL)
2015-03-17Permit EQ — ISSUED
2015-02-17Permit EW — ISSUED
2015-01-21ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO TOEBOARDS NOTED:AT TIME OF INSPECTION RESERV$1,000
2015-01-21ECB CLASS - 2 violation: BC3308.3 VERTICAL SAFETY NETTING NOT PER CODE, DAMAGES OR INADEQUATE. NOTED: 10 STORY BUILDING UNDER CONSTRUCTION HAS VERTICAL NET
2015-01-21ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARDRAILS.N OTED: AT 10STORY NEW BLDG UNDER$1,200
2014
2014-12-23EASE — from BROOKLYN PIER 1 RESIDENTIAL OWNERS, L.P. to BROOKLYN PIER 1 HOTEL OWNER, L.P.
2014-12-23Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2014-12-23Permit EQ — ISSUED
2014-12-08FDNY inspection (CDA-90-DRILL)
2014-11-26AALR — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to CAPITAL ONE, NATIONAL ASSOCIATION
2014-11-26Mortgage assigned — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to CAPITAL ONE, NATIONAL ASSOCIATION
2014-11-26Mortgage assigned — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to CAPITAL ONE, NATIONAL ASSOCIATION
2014-11-26AL&R $32,934,280 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA; D/B/A EMPIRE STATE DEVELOPMENT$32,934,280
2014-11-26AL&R $127,065,720 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to D/B/A EMPIRE STATE DEVELOPMENT; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$127,065,720
2014-11-26Mortgage $32,934,280 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to D/B/A EMPIRE STATE DEVELOPMENT; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$32,934,280
2014-11-26Mortgage $127,065,720 — from BROOKLYN PIER 1 HOTEL OWNER, L.P.; BROOKLYN PIER 1 RESIDENTIAL OWNER, L.P. to D/B/A EMPIRE STATE DEVELOPMENT; BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA$127,065,720
2014-09-29Permit EW — ISSUED
2014-09-13FDNY inspection (CDA-90-DRILL)
2014-09-05Permit NB — ISSUED
2014-09-03311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2014-09-03DOB complaint, category ?
2014-09-03ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS UNSAFE STRIPPING OPERATIONS. INCIDENT INSPECTION.$2,400
2014-08-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-07-29311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-07-29311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-07-29DOB complaint, category ?
2014-07-29ECB CLASS - 1 violation: FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. NOTED:AT TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS. BLDG WAS APPROXIMA$4,800
2014-07-29DOB complaint, category ?
2014-07-28ECB CLASS - 1 violation: FAILURE TO HAVE SITE SAFETY MANAGER OR COORDINATOR PRESENT AS REQUIREDAT TIME OF INSPECTION 7/28/14 6:30PM MEN WORKING ON SITE UND$1,200
2014-06-23Permit EQ — ISSUED
2014-06-05FDNY inspection (CDA-90-DRILL)
2014-06-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2014-06-05ECB CLASS - 1 violation: BC3307.4.3 FAILURE TO HAVE YODOCK BARRICADES FILL W/ WATER OR SAND AS REQUIRED BY THE MANUFACTURE. @ THE TIME OF MY INSP. CONST. W$1,600
2014-06-05DOB complaint, category ?
2014-06-05ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST.OPERS.@ THE TIME OF MY INSPEC.AS REPORTED BY SSM#1866 A WORKER WAS E
2014-06-02Permit NB — ISSUED
2014-05-31FDNY inspection (CDA-90-DRILL)
2014-05-30Permit EQ — ISSUED
2014-05-21Permit PL — ISSUED
2014-05-09Permit PL — ISSUED
2014-05-03FDNY inspection (CDA-90-DRILL)
2014-04-17Job filed: INSTALLATION OF 160 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2014-04-17Permit EQ — ISSUED
2014-03-12Permit NB — RE-ISSUED
2014-02-26DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-02-26Permit EW — ISSUED
2014-02-15FDNY inspection (CDA-90-DRILL)
2014-01-28311: Building Marshals office — Unlicensed/Illegal/Improper Work In Progress
2014-01-28DOB complaint, category ?
2014-01-25311: Construction Safety Enforcement — Excavation Tracking Complaint
2014-01-25DOB complaint, category ?
2014-01-15Job filed: INSTALLATION OF A DUAL 6000 LB CAPACITY PERSONAL/ MATERIAL HOIST DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #
2014-01-15Permit EQ — ISSUED
2014-01-08Job filed: TEMPORARY STANDPIPE AIR PRESSURIZATION ALARM. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NB# 320377659$1,000
2013
2013-12-31Job filed: INSTALLATION OF GAS EMERGENCY GENERATOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NEW BUILDING #320377659$2,000
2013-12-30311: General Construction/Plumbing — Site Conditions Endangering Workers
2013-12-30311: General Construction/Plumbing — Site Conditions Endangering Workers
2013-12-30DOB complaint, category ?
2013-12-30DOB complaint, category ?
2013-12-11311: Construction Safety Enforcement — Excavation Tracking Complaint
2013-12-11DOB complaint, category ?
2013-12-07311: General Construction/Plumbing — Site Conditions Endangering Workers
2013-12-07DOB complaint, category ?
2013-12-07ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: WHILE MAINTAINING A PILE DRIVING MACHINE (
2013-11-27Permit FO — ISSUED
2013-11-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2013-11-12DOB complaint, category ?
2013-11-02FDNY inspection (CDA-90-DRILL)
2013-10-15Job filed: INSTALLATION OF SPRINKLER & STANDPIPE SYSTEM. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NEW BUILDING #320377659$2,000
2013-10-15Job filed: INSTALLATION OF SPRINKLER & STANDPIPE SYSTEM. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NEW BUILDING #320377659$2,000
2013-10-10Job filed: INSTALLATION OF MANUAL, AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH TWO-WAY VOICE COMMUNCATION AND POST FIRE SMOKE PURGE &a$1,000
2013-08-05FDNY inspection (CONSTR)
2013-07-22FDNY inspection (CONSTR)
2013-07-10311: Investigations and Discipline (IAD) — Investigative Inspection
2013-07-10DOB complaint, category ?
2013-07-05FDNY inspection (CONSTR)
2013-06-28311: Construction Safety Enforcement — Excavation Tracking Complaint
2013-06-28DOB complaint, category ?
2013-06-24FDNY inspection (CONSTR)
2013-06-14Permit FO — RE-ISSUED
2013-06-14Permit EQ — ISSUED
2013-05-29Permit EQ — ISSUED
2013-05-21Job filed: INSTALLATION OF TEST PILES AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NB #320377659$1,000
2013-05-21Job filed: INSTALLATION OF TEST PILES AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NB #320377659$1,000
2013-05-21Job filed: INSTALLATION OF TEST PILES AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NB #320377659$1,000
2013-05-21Permit EW — RE-ISSUED
2013-05-01Permit EQ — ISSUED
2013-04-30Job filed: FILING FOR INSTALLATION OF FENCE
2013-04-30Job filed: FILING FOR INSTALLATION OF FENCE
2012
2012-11-20Job filed: PLUMBING WORK ASSOCIATED WITH FULL NEW BUILDING WORK
2012-11-15Job filed: NB
2012-11-15Job filed: FOUNDATION WORK ASSOCIATED WITH NEW BUILDING
2012-11-15Job filed: STRUCTURAL WORK ASSOCIATED WITH FULL NEW BUILDING WORK
2012-11-15Job filed: NB
2012-11-15Job filed: MECHANICAL WORK ASSOCIATED WITH NEW BUILDING
2012-11-15Job filed: SHEETING & SHORING WORK FOR SUPPORT OF EXCAVATION ASSOCIATED WITH NEW BUILDING
2012-11-15Job filed: UNDERGROUND PLUMBING WORK ASSOCIATED WITH NEW BUILDING
2012-11-15Job filed: UNDERGROUND PLUMBING WORK ASSOCIATED WITH NEW BUILDING
2012-11-15Job filed: SHEETING & SHORING WORK FOR SUPPORT OF EXCAVATION ASSOCIATED WITH NEW BUILDING
2012-07-06Agreement — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN PIER RESIDENTIAL OWNER, L.P.; BROOKLYN BRIDGE PARK CORPORATION
2012-07-06Agreement — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN PIER 1 HOTEL OWNER, L.P.
2012-07-06Agreement — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN PIER 1 HOTEL OWNER, L.P.
2012-07-06EASE — from BROOKLYN PIER 1 HOTEL OWNER, L.P.
2012-07-06EASE — from BROOKLYN PIER 1 HOTEL OWNER, L.P. to BROOKLYN BRIDGE PARK CORPORATION
2012-07-06MLEA $9,657,187 — from BROOKLYN BRIDGE PARK CORPORATION to BROOKLYN PIER 1 HOTEL OWNER, L.P.$9,657,187
2012-07-06MLEA — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN BRIDGE PARK CORPORATION
2010
2010-05-05DOB complaint, category ?
2009
2009-12-09DOB complaint, category ?
2009-07-22Job filed: INSTALLATION OF 506 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED OUTSIDE 66 FURMAN STREET, BROOKLYN. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. W
2009-07-22Job filed: INSTALLATION OF 506 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED OUTSIDE 66 FURMAN STREET, BROOKLYN. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. W
2009-07-22Job filed: INSTALLATION OF 95,250 SF OF HEAVY DUTY PIPE SCAFFOLD AROUND 66 FURMAN STREET, BROOKLYN. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL
2007
2007-05-11Job filed: PROPOSED INSTALLATION OF 485 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91 & TPPN 9/1999.
2002
2002-04-18Job filed: INSTALLATION OF STEEL PIPE SCAFFOLD, 60' HIGH BY 28' LONG, FOR ALTERATION PROJ. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
2002-04-18Job filed: INSTALLATION OF STEEL DEBRIS CHUTE, 60' HIGH, FOR ALTERATION PROJ. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
1995
1995-06-16ECB Non-Hazardous violation: FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS. CRACKED BRICKWORK FIRST STORY TO ROOF AT TEH NORTH EAST CORNER AND AT VARIOUS LOCATI$1,000