Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
66 service requests in the last three years. Most common: Noise (12) · Illegal Parking (9) · Water System (5) · Street Condition (4) · Indoor Air Quality (4) · Street Light Condition (4).
Filed construction activity
$26,243,977 in permitted construction work filed since
2016 (30 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$34,773,000
$15,647,850
2026
$35,816,000
$16,117,200
2027
$36,890,000
$16,600,500
The city's market estimate has risen
6% between tax years 2025 and 2027.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
66 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
51
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
12
4
6
0
22
2018
2
5
6
1
14
2019
4
3
23
1
31
2020
0
0
42
0
42
2021
0
0
26
0
26
2022
11
1
21
4
37
2023
4
12
34
1
51
2024
4
4
19
4
31
2025
0
0
37
4
41
2026
19
0
6
16
41
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: GENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST-3RD, ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-08-18
Permit Plumbing — Permit Issued
2026-08-18
Permit Plumbing — Permit Issued
2026-08-12
Job filed: HEAVY DUTY SIDEWALK SHED DURING EXTERIOR WORK FILED UNDER APPLICATION # B01414263, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO
2026-08-12
Permit Sidewalk Shed — Permit Issued
2026-08-12
Permit Sprinklers — Permit Issued
2026-08-12
Permit Standpipe — Permit Issued
2026-08-12
Permit Supported Scaffold — Permit Issued
2026-08-11
Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2026-07-21
Permit General Construction — Permit Issued
2026-07-21
Permit General Construction — Permit Issued
2026-07-01
Permit Mechanical Systems — Permit Issued
2026-06-18
Job filed: GENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST-3RD, ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Job filed: SPRINKLER AND STANDPIPE MODIFICATIONS TAKING PLACE ON CEL, 1ST THRU 3RD FLS, & ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
2026-05-05
Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON CELLAR, 1ST THRU 4TH FLS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04
Asbestos abatement: Removal — WPS Contracting Group LLC
2026-03-31
311: Noise - Street/Sidewalk — Loud Music/Party
2026-03-31
311: Noise - Helicopter — Other
2026-03-30
Job filed: Plumbing Modifications taking place on floors Cellar, 001-003 as per plans filed herewith.
2026-03-27
311: Street Light Condition — Street Light Out
2026-03-27
Job filed: Modification of existing building to include General construction, facade and roof work as well as a change in use on the first floor.
2026-03-27
Job filed: Mechanical modifications taking place on floors CEL, 001-003, Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
2026-01-30
311: Animal-Abuse — Other (complaint details)
2025-12-28
311: Vendor Enforcement — Non-Food Vendor
2025-12-28
311: Vendor Enforcement — Non-Food Vendor
2025-12-15
311: Snow or Ice — Sidewalk
2025-11-25
311: Homeless Person Assistance — Non-Chronic
2025-11-25
311: Homeless Person Assistance — Non-Chronic
2025-11-25
311: Homeless Person Assistance — Chronic
2025-11-14
Boiler inspection
2025-11-14
Boiler inspection
The full timeline
2026
2026-10-14311: Noise — Construction
2026-10-02Job filed: Modification of existing building to include General construction, facade and roof work as well as a change in use on the first floor.$5,378,728
2026-08-20Job filed: GENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST-3RD, ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,378,728
2026-08-18Permit Plumbing — Permit Issued
2026-08-18Permit Plumbing — Permit Issued
2026-08-12Job filed: HEAVY DUTY SIDEWALK SHED DURING EXTERIOR WORK FILED UNDER APPLICATION # B01414263, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO$2,000
2026-08-11Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$2,000
2026-07-21Permit General Construction — Permit Issued
2026-07-21Permit General Construction — Permit Issued
2026-07-01Permit Mechanical Systems — Permit Issued
2026-06-18Job filed: GENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST-3RD, ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,378,728
2026-05-06Job filed: SPRINKLER AND STANDPIPE MODIFICATIONS TAKING PLACE ON CEL, 1ST THRU 3RD FLS, & ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$323,606
2026-05-05Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON CELLAR, 1ST THRU 4TH FLS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$861,356
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-05-04Asbestos abatement: Removal — WPS Contracting Group LLC
2026-03-30Job filed: Plumbing Modifications taking place on floors Cellar, 001-003 as per plans filed herewith.$469,136
2026-03-27311: Street Light Condition — Street Light Out
2026-03-27Job filed: Modification of existing building to include General construction, facade and roof work as well as a change in use on the first floor.$5,378,728
2026-03-27Job filed: Mechanical modifications taking place on floors CEL, 001-003, Roof as per plans filed herewith. No change in Use, Egress or Occupancy.$2,207,148
2026-01-30311: Animal-Abuse — Other (complaint details)
2023-01-17311: Illegal Parking — Blocked Bike Lane
2023-01-05311: Water System — Hydrant Leaking (WC1)
2022
2022-12-20311: Noise - Helicopter — Other
2022-12-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-12-19311: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-30311: Homeless Person Assistance
2022-11-21Asbestos abatement: Removal — GNP Environmental Inc.
2022-11-21Asbestos abatement: Removal — GNP Environmental Inc.
2022-11-21Asbestos abatement: Removal — GNP Environmental Inc.
2022-11-21Asbestos abatement: Removal — GNP Environmental Inc.
2022-11-16Permit Structural — Signed-off
2022-11-16Permit General Construction — Signed-off
2022-10-14311: Illegal Parking — Blocked Bike Lane
2022-10-11311: Illegal Parking — Blocked Bike Lane
2022-10-10311: Illegal Parking — Blocked Bike Lane
2022-09-30Permit General Construction — Signed-off
2022-09-29311: Homeless Person Assistance
2022-09-22311: Illegal Parking — Blocked Bike Lane
2022-09-21Job filed: PIER #2
2022-09-19311: Encampment — N/A
2022-09-19Job filed: PIER #2
2022-09-19Job filed: INSTALLATION OF TEMPORARY TENTS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$80,737
2022-09-08311: Homeless Person Assistance
2022-09-01Permit Sidewalk Shed — Signed-off
2022-09-01Permit Supported Scaffold — Signed-off
2022-08-31Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$9,000
2022-08-31Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 20$9,000
2022-08-25311: Maintenance or Facility — Rodent Sighting
2019-07-28311: Violation of Park Rules — Unlicensed Vendors
2019-07-15311: Animal in a Park — Wildlife Sighting
2019-07-09311: Violation of Park Rules — Obstructing Public Use
2019-06-30311: Violation of Park Rules — BBQ Outside Authorized Area
2019-05-20Job filed: REPLACEMENT OF FACP & ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM FOR GROUP A-2 (ASSEMBLY) WITH SSC/SPR/COC.$26,180
2019-04-12311: Animal Abuse — No Shelter
2019-04-11311: Animal Abuse — Neglected
2019-02-22FDNY inspection (RISK)
2019-01-04FDNY inspection (RISK)
2018
2018-11-08311: DPR Internal — Aided/Injury
2018-10-20Restaurant inspection: PILOT — grade A
2018-09-21Permit EW — ISSUED
2018-09-18Job filed: INSTALLATION OF TEMPORARY TENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED.$30,000
2018-08-06ECB CLASS - 1 violation: FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO# 35237593H ISSUED ON 12/7/17 & TO FILE A C OF C PURSUANT TO
2018-08-05311: Homeless Person Assistance
2018-07-26311: DPR Internal — Aided/Injury
2018-07-24311: New Tree Request — For One Address
2018-06-28311: Taxi Complaint — Driver Complaint
2018-06-23ECB CLASS - 1 violation: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35237593H ISSUED ON 12/07/17 AND TO FILE A CERTIFIC
2018-05-08ECB CLASS - 1 violation: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35237593H ISSUED ON 12/07/2017 AND TO FILE A CERTIF
2018-04-15311: Maintenance or Facility — Graffiti or Vandalism
2018-03-27DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
2018-02-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017
2017-12-02ECB CLASS - 1 violation: WORK W/OUT A PERMIT. @ TIME OF INSP OBSERVED CONSTRUCTED BURNING OVEN, WALK IN REFRIGERATOR, AWNINGS & FOOD EQUIPMENT BEEN BUILD O
2017-11-06Job filed: INSTALLATION OF TEMPORARY STRUCTURE AT EMPIRE FULTON FERRY LAWN, BROOKLYN BRIDGE PARK, DUMBO FOR ONE DAY EVENT. THE EVENT WILL TAKE PLACE ON NOVEMBER $9,000
2017-11-06Job filed: INSTALLATION OF TEMPORARY STRUCTURE AT EMPIRE FULTON FERRY LAWN, BROOKLYN BRIDGE PARK, DUMBO FOR ONE DAY EVENT. THE EVENT WILL TAKE PLACE ON NOVEMBER $9,000
2017-11-06Permit EW — ISSUED
2017-10-13FDNY inspection (SPECIAL-OTH)
2017-10-13311: Building/Use — Illegal Conversion Of Residential Building/Space
2017-10-13DOB complaint, category ?
2017-09-18Permit EW — ISSUED
2017-09-13Job filed: INSTALLATION OF TEMPORARY TENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED.$30,000
2017-09-07Permit EW — ISSUED
2017-06-19311: Broken Muni Meter — Out of Order
2017-06-19311: Broken Muni Meter — Out of Order
2017-05-27311: Noise - Park — Loud Music/Party
2017-04-23311: Noise - Park — Loud Music/Party
2017-04-18Job filed: FILING FOR TEMPORARY MODULAR TENT FOR EVENTS ON 4/21/17 AND 4/22/17. REQUIRED TPA TO BE FILED SEPARATELY.$5,000
2017-04-18Job filed: FILING FOR TEMPORARY MODULAR TENT FOR EVENTS ON 4/21/17 AND 4/22/17. REQUIRED TPA TO BE FILED SEPARATELY.$5,000
2017-04-18Permit AL — ISSUED
2017-04-17Job filed: FILING FOR ISNTALLATION OF TEMPORARY MODULAR TENT FOR EVENTS ON 4/21/17 AND 4/22/17. REQUIRED TPA TO BE FILED SEPARATELY.$5,000
2017-02-16DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016)
2017-01-27Permit AL — ISSUED
2017-01-27Permit AL — ISSUED
2017-01-12311: Noise — Noise: Construction Before/After Hours (NM1)
2016
2016-11-30Rodent inspection: Passed
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-10-13Rodent inspection: Bait applied
2016-09-25Rodent inspection: Failed for Rat Activity
2016-08-15ECB CLASS - 1 violation: ELECTRICAL WORK DOES NOT CONFORM TO APPROVED SUBMITTAL DOCUMENTS/AMENDMENTS.CONRACTOR FAIL TO FILE 1000KVA DRAWING FOR APPROVED PR$1,000
2016-08-02Job filed: INSTALLATION OF (2) NEW BOILERS FILED INCONJUNCTION WITH NB SBS#20151674 AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPA$1,000
2016-08-02Job filed: INSTALLATION OF (2) NEW BOILERS FILED INCONJUNCTION WITH NB SBS#20151674 AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPA$1,000
2016-05-07311: Broken Muni Meter — Coin or Card Did Not Register
2016-04-30311: Broken Muni Meter — Out of Order
2016-04-30311: Broken Muni Meter — Out of Order
2016-04-25FDNY inspection (RISK)
2016-04-25FDNY inspection (STRUC_INT)
2016-04-20Rodent inspection: Failed for Rat Activity
2016-03-14DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2015
2016-02-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-20311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015
2015-12-31Rodent inspection: Failed for Rat Activity
2015-12-02FDNY inspection (STRUC_INT)
2015-11-04311: Rodent — Rat Sighting
2015-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-10-07Permit EW — ISSUED
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-09-28Job filed: INSTALLATION OF TEMPORARY TENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED.$30,000
2015-09-03311: Noise - Park — Loud Music/Party
2015-08-31Job filed: EXTERIOR WORK AS SHOWN ON PLANS FILED HEREWITH.$15,000
2015-08-31Job filed: EXTERIOR WORK AS SHOWN ON PLANS FILED HEREWITH.$15,000
2015-08-31Permit EW — ISSUED
2015-08-27311: Street Light Condition — Lamppost Knocked Down
2015-08-26Job filed: FILING HEREWITH FOR A CURB CUT APPLICATION ON FURMAN STREET 26 FEET LONG (21 FEET WITH WITH 2.5 SPLAYS)AND 184 FEET TO MONTAGUE STREET. FILED INCONJUN
2015-08-25Job filed: FILING HEREWITH FOR A CURB CUT APPLICATION ON FURMAN STREET 30 FEET LONG (25 FEET WITH WITH 2.5 SPLAYS)AND 263 FEET TO MONTAGUE STREET. FILED INCONJUN
2015-08-10FDNY inspection (SPECIAL-OTH)
2015-08-06311: BEST/Site Safety — Demolition Notification Received
2015-08-06DOB complaint, category ?
2015-08-03Permit DM — ISSUED
2015-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-07-30Permit EQ — ISSUED
2015-07-07Job filed: REMOVAL OF SPRINKLER SYSTEM AS PER FDNY VARIANCE$3,000
2015-07-07Permit EW — ISSUED
2015-06-10311: Broken Muni Meter — Coin or Card Did Not Register
2015-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-04-17Job filed: ERRECTION OF TEMPORARY TENT #1 FOR THE AIRBNB BROOKLYN HALF PRE PARTY PRESENTED BY NEW BALANCE IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY PERMI$20,000
2015-04-17Job filed: ERECTION OF TEMPORARY TENT #2 FOR THE AIRBNB BROOKLYN HALF PRE PARTY PRESENTED BY NEW BALANCE IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY PERMIT$30,000
2015-04-17Job filed: ERECTION OF TEMPORARY TENT #1 FOR THE AIRBNB BROOKLYN HALF PRE PARTY PRESENTED BY NEW BALANCE IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY PERMIT$20,000
2015-04-16Job filed: ERECTION OF TEMPORARY TENT #1 IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY$20,000
2015-04-16Job filed: ERECTION OF TEMPORARY TENT #1 IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY$20,000
2015-04-16Job filed: ERECTION OF TEMPORARY TENT #1 IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY APPLICATION$20,000
2015-04-16Job filed: ERECTION OF TEMPORARY TENT #1 IN CONJUNCTION WITH A TEMPORARY PLACE OF ASSEMBLY APPLICATION$20,000
2015-04-06311: Noise - Helicopter — Other
2015-03-04311: Water System — Hydrant Defective (WC2)
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-02Job filed: DM
2014
2014-11-09311: Water System — Hydrant Running Full (WA4)
2014-10-01Permit EW — ISSUED
2014-09-26Job filed: INSTALLING TEMPORARY STRUCTURE (TENTS) AT THE BROOKLYN BRIDGE PARK. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2014-09-04Job filed: INSTALLING A TEMPORARY STRUCTURE (CARGO CONTAINERS) AT THE BROOKLYN BRIDGE PARK PIER 5 UPLAND. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLIC$30,000
2014-06-06DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2013
2013-11-27311: Noise — Noise: Construction Equipment (NC1)
2013-10-02Job filed: INSTALLING A TEMPORARY STRUCTURE (TENT) AT THE BROOKLYN BRIDGE PARK. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2013-10-02Job filed: INSTALLING A TEMPORARY STRUCTURE (TENT) AT THE BROOKLYN BRIDGE PARK. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2013-10-02Permit EW — ISSUED
2013-06-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011-07-14311: Emergency Response Team (ERT) — Lights From Parking Lot Shining On Building
2011-07-14ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS IN THAT THERE IS LIGHTING INSTALLED UNDERNEATH SIDEWALK SHED, BUT IS NOT ILLUMINAT$2,400
2011-07-14DOB complaint, category ?
2010
2010-10-27Permit EQ — ISSUED
2010-08-26SAGE — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
2010-08-09MLEA — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to BROOKLYN BRIDGE PARK CORPORATION D/B/A B
2010-08-09MLEA — from THE CITY OF NEW YORK to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
2010-03-24Rodent inspection: Passed
2009
2009-11-04Permit EQ — ISSUED
2009-03-03Permit EQ — ISSUED
2008
2008-04-08DOB complaint, category ?
2008-03-19EASE — from BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA to 360 BROOKLYN INVESTORS LLC
2008-03-19SMIS — from 360 BROOKLYN INVESTORS LLC to 360 BROOKLYN INVESTORS LLC
2008-03-05Permit EQ — ISSUED
2008-02-08DOB violation E:
2008-02-08DOB violation E:
2007
2007-12-28Permit EQ — ISSUED
2007-11-28ECB Hazardous violation: SIDEWALK SHED DOES NOT MEET BLDG CODE SPECIFICATION.NOTED:SIDEWALK SHED ERECTED AT THE NORTHEAST CORNERS OF JORALEMON & FURMAN ST
2007-07-16ECB Hazardous violation: SIDEWALK SHED DOES NOT MEET BLDG CODE SPECIFICATIONS NOTE: SIDEWALK SHED ERECTED AT NORTH EAST CORNEROF FURMAN STREET & JORALEMON $2,000
2007-07-16ECB Non-Hazardous violation: SIDEWALK SHED DOESN'T MEET BLDG CODE SPECIFICATIONS NOTE:SIDEWALK SHEDERECTED AT SOUTHWEST CORNER OF FURMAN ST & JORALEMON ST IS E
2007-04-12Permit EQ — ISSUED
2007-04-11Job filed: PROPOSED INSTALLATION OF 200 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91 & TPPN 9/1999.
2006
2006-06-20Deed — from PORT AUTHORITY OF NEW YORK AND NEW JERSE to BROOKLYN BRIDGE PARK DEVELOPMENT CORPORA
2002
2002-09-10ECB Hazardous violation: PLUMBING WORK WITHOUT A PEMIT. FIXTURE NEW INSTALLED IN APT 5B IN BOTH BATHROOMS. BATHUBS WATER CLOSET AND LAVATORIES. REMEDY; OBT
2000
2000-02-02Mortgage satisfied — from GLENN, EDWARD to CORRERA, NICHOLAS; CORRERA, ARMAND
1997
1997-03-21Mortgage satisfied — from GALLUZZI, ROSANNE; GALLUZZI, STEVEN; OCASIO, ROSEANNE / FKA to COUNTRYWIDE FUNDINGCORP