Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

210 Joralemon Street · Brooklyn · BBL 3002667501 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

1 heat or hot-water complaints in the last three years (winter 2023–24: 1).

No bedbug-infested units reported in the last three years of filings.

$18,710 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

80 service requests in the last three years. Most common: Noise (19) · Illegal Parking (12) · Consumer Complaint (7) · Homeless Person Assistance (5) · Street Condition (4) · Water System (4).

Filed construction activity

$2,083,562,166 in permitted construction work filed since 2016 (121 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$96,084,000 $43,237,800
2026$100,533,000 $45,239,850
2027$17,226,000 $7,751,700

The city's market estimate has fallen 82% between tax years 2025 and 2027.

Tax exemptions on the roll: DEPT REAL EST (DCAS)

Building systems

Heating fuelNATURALGAS
Facade (Local Law 11)SAFE (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
QdobaTex-MexA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

4 street-flooding or sewer-backup complaints at this address since 2016 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayBorough Hall — 2 3 4 5 R · 100 ft straight-line (under a minute) · station accessibility: partial
Jay St-MetroTech — A C F R · 800 ft straight-line (about a 4-minute walk) · station accessibility: full
BusNearest boarding stop: Joralemon St / Adams St — B103 · 200 ft
Citi BikeFulton St & Adams St · 300 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 261 Zipporiah Mills. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

210 Joralemon Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

80 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2025-05-14Agreement $24,000,000 — from 210 MUNI, LLC to METROPOLITAN COMMERCIAL BANK $24,000,000
2022-04-13AL&R $24,000,000 — from 210 MUNI, LLC to SIGNAUTRE BANK $24,000,000
2022-04-13Agreement $24,000,000 — from 210 MUNI, LLC to SIGNATURE BANK $24,000,000
2022-04-13Mortgage $406,485 — from 210 MUNI, LLC to SIGNATURE BANK $406,485
2014-10-15Mortgage $26,000,000 — from 210 MUNI, LLC to NEW YORK COMMUNITY BANK $26,000,000
2012-05-30Deed $10,000,000 — from NEW YORK CITY ECONOMIC DEVELOPMENT CORPO to 210 MUNI, LLC $10,000,000
2012-05-30Deed $10,000,000 — from THE CITY OF NEW YORK to NEW YORK CITY ECONOMIC DEVELOPMENT CORPO $10,000,000

Ten-year activity

5002500
2017
2018
2019
2020
2021
259
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017152441055135
2018161093062181
20191413105026158
20201120212862
20211124160758
20227528107445259
2023421457039152
2024361226447125
2025651626313123
2026491624011100
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 130 records

DateRecord
2026-10-06311: Street Sign - Missing — Bus Stop
2026-10-06Certificate of occupancy Renewal Without Change
2026-09-30311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-09-30DOB complaint, category ?
2026-09-27DOB complaint, category ?
2026-09-27ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED: AT EXPO# 4 STAIR TOWER WITH INADEQUATE LOOSE NETTING DEBRIS AND TEAR APART NOT MAINTAINED CONTRARY
2026-09-25DOB complaint, category ?
2026-09-24311: Graffiti — Graffiti
2026-09-21Permit Protection and Mechanical Methods — Permit Issued
2026-09-18Permit Protection and Mechanical Methods — Permit Issued
2026-09-17311: Consumer Complaint — Tow Truck Company
2026-09-17Permit Construction Fence — Permit Issued
2026-09-16Permit Sidewalk Shed — Permit Issued
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-01311: Lost Property — Electronics/Phones
2026-08-28Permit Plumbing — Permit Issued
2026-08-27311: Water Maintenance — Fire Hydrant Leaking
2026-08-27311: Water Maintenance — Fire Hydrant Running
2026-08-13Job filed: REPLACEMENT OF EXTERNAL ELEVATOR AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPNACY
2026-08-05311: Homeless Person Assistance — Chronic
2026-08-03311: Illegal Dumping — Removal Request
2026-08-03311: Water Maintenance — Fire Hydrant Leaking
2026-07-31311: Water Maintenance — Fire Hydrant Running
2026-07-24DOB complaint, category ?
2026-07-24ECB CLASS - 1 violation: UPON INSPECTION OF A FACADE/ROOF ALT I OBSERVED WORK CONTRARY TO THE APPROVED SITE SAFETY PLAN. NO 20FT SIDEWALK SHED EXTENSION PR
2026-07-24DOB complaint, category ?
2026-07-24ECB CLASS - 2 violation: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 WITH AN INADEQUATE SIZE (NOT 3FTX6FT) SIDEWALK SHED PROJECT INFO
2026-07-24ECB CLASS - 2 violation: SIDEWALK SHED INSTALLED AT EXPOS 1 & 4 CONTRARY TO CODE. MULTIPLE BEAMS AT EXPOS 1 PLACED WITHIN 18IN FROM THE FACE OF THE CURB (3
2026-07-24DOB complaint, category ?
2026-07-22Certificate of occupancy Renewal Without Change
2026-07-21311: Water System — Hydrant Running (WC3)
2026-07-08Permit Sidewalk Shed — Permit Issued
2026-07-08Permit Sidewalk Shed — Permit Issued
2026-06-30Permit Boiler Equipment — Permit Issued
2026-06-18Job filed: Filing General Constructon work under Alt 2 Non-Directive per Commissioner direction.
2026-06-11Job filed: INSTALLATION OF PIPE SCAFFOLD AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER
2026-06-05Job filed: Removal of existing boilers and installation of new boiler as per plans filed herewith
2026-06-05Job filed: Installation of 3 new boilers as per plans filed herewith filed in conjunction with B00632209-I1.
2026-05-20Permit General Construction — Permit Issued
2026-05-19Certificate of occupancy Renewal Without Change
2026-05-19Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-06Permit Boiler Equipment — Signed-off
2026-04-30Permit Suspended Scaffold — Permit Issued
2026-04-21DOB complaint, category ?
2026-04-21Permit General Construction — Permit Issued
2026-04-20Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR THE RESTORATION WORK AT 210 JORALEMON STREET, BROOKLYN, NY 11201
2026-04-17311: Consumer Complaint — Tow Truck Company
2026-04-14Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UN
2026-04-14Job filed: INSTALLATION OF PIPE SCAFFOLD AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER
2026-04-08Permit Sidewalk Shed — Permit Issued
2026-04-04FDNY inspection (CDA-90-DRILL)
2026-04-03311: Graffiti — Graffiti
2026-04-03Permit Supported Scaffold — Permit Issued
2026-04-03Permit Supported Scaffold — Permit Issued
2026-04-01311: Consumer Complaint — Booting Company
2026-03-26Air permit (WORK PERMIT), fuel: NATURALGAS
2026-03-25311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-23311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-10Permit Mechanical Systems — Permit Issued
2026-03-10Permit Mechanical Systems — Permit Issued
2026-03-10Permit Mechanical Systems — Permit Issued
2026-03-05311: Illegal Parking — Blocked Sidewalk
2026-03-05Job filed: Filing for modification to existing Structural Application
2026-03-04Elevator permit: MODERNIZATION OF 6 ELEVATORS PE7-PE12 HIGH RISE 1P5696- 1P5701 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All wor
2026-03-04Elevator permit: MODERNIZATION OF 6 ELEVATORS - Low rise cars PE1-PE6 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All work to compl
2026-03-01311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-03-01DOB complaint, category ?
2026-02-20Permit General Construction — Signed-off
2026-02-19Permit Plumbing — Signed-off
2026-02-19Permit Sprinklers — Signed-off
2026-02-17Permit Mechanical Systems — Signed-off
2026-02-16Job filed: MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
2026-02-16Job filed: PLUMBING MODIFICATIONS ON ASSOCIATED PIPING, AS SHOWN ON PLANS FILED HEREWITH

showing the 80 most recent

The full timeline

showing the 2,000 most recent of 2,214 events

2026
2026-10-06311: Street Sign - Missing — Bus Stop
2026-10-06Certificate of occupancy Renewal Without Change
2026-09-30311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-09-30DOB complaint, category ?
2026-09-27DOB complaint, category ?
2026-09-27ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED: AT EXPO# 4 STAIR TOWER WITH INADEQUATE LOOSE NETTING DEBRIS AND TEAR APART NOT MAINTAINED CONTRARY$2,500
2026-09-25DOB complaint, category ?
2026-09-24311: Graffiti — Graffiti
2026-09-21Permit Protection and Mechanical Methods — Permit Issued
2026-09-18Permit Protection and Mechanical Methods — Permit Issued
2026-09-17311: Consumer Complaint — Tow Truck Company
2026-09-17Permit Construction Fence — Permit Issued
2026-09-16Permit Sidewalk Shed — Permit Issued
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-15Asbestos abatement: Removal — P & K Contracting, Inc.
2026-09-01311: Lost Property — Electronics/Phones
2026-08-28Permit Plumbing — Permit Issued
2026-08-27311: Water Maintenance — Fire Hydrant Leaking
2026-08-27311: Water Maintenance — Fire Hydrant Running
2026-08-13Job filed: REPLACEMENT OF EXTERNAL ELEVATOR AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPNACY$375,000
2026-08-05311: Homeless Person Assistance — Chronic
2026-08-03311: Illegal Dumping — Removal Request
2026-08-03311: Water Maintenance — Fire Hydrant Leaking
2026-07-31311: Water Maintenance — Fire Hydrant Running
2026-07-24DOB complaint, category ?
2026-07-24ECB CLASS - 1 violation: UPON INSPECTION OF A FACADE/ROOF ALT I OBSERVED WORK CONTRARY TO THE APPROVED SITE SAFETY PLAN. NO 20FT SIDEWALK SHED EXTENSION PR$2,500
2026-07-24DOB complaint, category ?
2026-07-24ECB CLASS - 2 violation: UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&4 WITH AN INADEQUATE SIZE (NOT 3FTX6FT) SIDEWALK SHED PROJECT INFO$1,250
2026-07-24ECB CLASS - 2 violation: SIDEWALK SHED INSTALLED AT EXPOS 1 & 4 CONTRARY TO CODE. MULTIPLE BEAMS AT EXPOS 1 PLACED WITHIN 18IN FROM THE FACE OF THE CURB (3$2,430
2026-07-24DOB complaint, category ?
2026-07-22Certificate of occupancy Renewal Without Change
2026-07-21311: Water System — Hydrant Running (WC3)
2026-07-08Permit Sidewalk Shed — Permit Issued
2026-07-08Permit Sidewalk Shed — Permit Issued
2026-06-30Permit Boiler Equipment — Permit Issued
2026-06-18Job filed: Filing General Constructon work under Alt 2 Non-Directive per Commissioner direction.$7,493,138
2026-06-11Job filed: INSTALLATION OF PIPE SCAFFOLD AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER $10,000
2026-06-05Job filed: Removal of existing boilers and installation of new boiler as per plans filed herewith$3,000
2026-06-05Job filed: Installation of 3 new boilers as per plans filed herewith filed in conjunction with B00632209-I1.$3,000
2026-05-20Permit General Construction — Permit Issued
2026-05-19Certificate of occupancy Renewal Without Change
2026-05-19Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-18Asbestos abatement: Removal — P & K Contracting, Inc.
2026-05-06Permit Boiler Equipment — Signed-off
2026-04-30Permit Suspended Scaffold — Permit Issued
2026-04-21DOB complaint, category ?
2026-04-21Permit General Construction — Permit Issued
2026-04-20Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR THE RESTORATION WORK AT 210 JORALEMON STREET, BROOKLYN, NY 11201
2026-04-17311: Consumer Complaint — Tow Truck Company
2026-04-14Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UN$10,000
2026-04-14Job filed: INSTALLATION OF PIPE SCAFFOLD AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER $10,000
2026-04-08Permit Sidewalk Shed — Permit Issued
2026-04-04FDNY inspection (CDA-90-DRILL)
2026-04-03311: Graffiti — Graffiti
2026-04-03Permit Supported Scaffold — Permit Issued
2026-04-03Permit Supported Scaffold — Permit Issued
2026-04-01311: Consumer Complaint — Booting Company
2026-03-26Air permit (WORK PERMIT), fuel: NATURALGAS
2026-03-25311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-23311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-10Permit Mechanical Systems — Permit Issued
2026-03-10Permit Mechanical Systems — Permit Issued
2026-03-10Permit Mechanical Systems — Permit Issued
2026-03-05311: Illegal Parking — Blocked Sidewalk
2026-03-05Job filed: Filing for modification to existing Structural Application$8,304,532
2026-03-04Elevator permit: MODERNIZATION OF 6 ELEVATORS PE7-PE12 HIGH RISE 1P5696- 1P5701 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All wor$2,100,000
2026-03-04Elevator permit: MODERNIZATION OF 6 ELEVATORS - Low rise cars PE1-PE6 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All work to compl$2,100,000
2026-03-01311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-03-01DOB complaint, category ?
2026-02-20Permit General Construction — Signed-off
2026-02-19Permit Plumbing — Signed-off
2026-02-19Permit Sprinklers — Signed-off
2026-02-17Permit Mechanical Systems — Signed-off
2026-02-16Job filed: MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$85,000
2026-02-16Job filed: PLUMBING MODIFICATIONS ON ASSOCIATED PIPING, AS SHOWN ON PLANS FILED HEREWITH$80,000
2026-02-16Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM, INCLUDING CAP/REMOVAL OF EXISTING SPRINKLER HEADS,REMOVAL OF EXISTING PIPING, AND INSTALLATION OF NEW PIPIN$80,000
2026-02-13Certificate of occupancy Renewal Without Change
2026-02-13Job filed: INTERIOR RENOVATION AT 2ND FLOOR RELATED TO CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS AND CEILING AS INDICATED ON PLANS FILED HEREWITH, NO CHAN$430,000
2026-01-26311: Water System — Leak (Use Comments) (WA2)
2026-01-26Permit General Construction — Permit Issued
2026-01-26Permit General Construction — Permit Issued
2026-01-26Permit Structural — Permit Issued
2026-01-26Permit General Construction — Permit Issued
2026-01-25Permit Sprinklers — Permit Issued
2026-01-21Job filed: Filing for Alt 1 to establish use and occupancy on all floors and new PA spaces.$187,118,400
2026-01-12311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2026-01-12DOB complaint, category ?
2026-01-09Job filed: Interior removal & build out for HVAC system & related piping as shown on drawings. Full EN package filed in BIS, application # 340725941. No change $187,328,440
2026-01-07Job filed: FILING STANDPIPE APPLICATION FOR REPLACEMENT OF ALL FIRE HOSE VALVES ON SUB CELLER 1, 2, AND FLOORS 1-15, FIRE PUMP, REMOVAL OF TANKS AS SHOWN HEREWIT$100,000
2026-01-03311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2026-01-03311: Indoor Sewage — Sewage Leak
2026-01-03311: Indoor Air Quality — Sewage Odor
2026-01-03DOB complaint, category ?
2026-01-02FDNY inspection (ALT)
2026-01-02Certificate of occupancy Renewal Without Change
2025
2025-12-17Permit General Construction — Permit Issued
2025-12-16Permit Mechanical Systems — Permit Issued
2025-12-16Permit Mechanical Systems — Permit Issued
2025-12-16Permit Mechanical Systems — Permit Issued
2025-12-08Permit General Construction — Signed-off
2025-12-05Job filed: Installation of 3 new boilers as per plans filed herewith filed in conjunction with B00632209-I1.$3,000
2025-12-04Job filed: Removal of existing boilers and installation of new boiler as per plans filed herewith$3,000
2025-12-03311: Consumer Complaint — Street Fair Vendor
2025-12-03Job filed: REMOVAL OF EXISTING PARTITIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OF OCCUPANCY UNDER THIS APPLICATION$25,000
2025-11-26Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UN$10,000
2025-11-26Permit Plumbing — Permit Issued
2025-11-25Rodent inspection: Passed
2025-11-20311: Consumer Complaint — Booting Company
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2025-11-14DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2025-11-06Job filed: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CH$20,000
2025-10-29311: Noise — Noise: Construction Equipment (NC1)
2025-10-28Elevator permit: Installation of a Dual 7000 LB Capacity Personnel Hoist during building alteration, filed separately. Installations and Tests as p$20,000
2025-10-28311: Noise — Noise: Construction Before/After Hours (NM1)
2025-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2025-10-23311: Street Condition — Unsafe Worksite
2025-10-23311: Street Condition — Unsafe Worksite
2025-10-22FDNY inspection (CDA-90-DRILL)
2025-10-22Restaurant inspection: QDOBA — grade A
2025-10-21311: Illegal Parking — Double Parked Blocking Traffic
2025-10-15Certificate of occupancy Renewal Without Change
2025-10-10Permit Plumbing — Permit Issued
2025-10-07311: Noise — Noise: Jack Hammering (NC2)
2025-10-03Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2025-10-02311: Homeless Person Assistance — Non-Chronic
2025-10-01Cooling tower inspection
2025-10-01311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2025-10-01DOB complaint, category ?
2025-09-26311: Noise — Noise: Construction Before/After Hours (NM1)
2025-09-26311: Noise — Noise: Construction Before/After Hours (NM1)
2025-09-26311: Illegal Parking — Blocked Sidewalk
2025-09-26311: Illegal Parking — Blocked Sidewalk
2025-09-26Permit Protection and Mechanical Methods — Permit Issued
2025-09-25311: Illegal Parking — Blocked Sidewalk
2025-09-25Permit Construction Fence — Permit Issued
2025-09-25Permit Protection and Mechanical Methods — Permit Issued
2025-09-18Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2025-09-15Job filed: Cooper & Setback Roof repairs: Repairs & Coating of an existing copper roof system. Removal & replacement of existing roof membrane, flashings, mastic$3,205,040
2025-09-11Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UN$10,000
2025-09-10Job filed: PLUMBING WORK RELATING TO FIXTURES AND PIPING ON EXISTING RESTAURANT RENOVATION AS INDICATED ON PLANS$125,000
2025-09-08Job filed: Interior removal & build out for HVAC system & related piping as shown on drawings. Full EN package filed in BIS, application # 340725941. No change $187,328,440
2025-09-08Permit Standpipe — Permit Issued
2025-08-25Job filed: Modification to existing Sprinkler systems and installation of temporary loop system as per plans filed herewith.$4,563,030
2025-08-20Job filed: Cooper & Setback Roof repairs: Repairs & Coating of an existing copper roof system. Removal & replacement of existing roof membrane, flashings, mastic$3,205,040
2025-08-19Job filed: Sprinkler Modifications as indicated on Cellar and 1st Floor$90,000
2025-08-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2025-08-11Permit Boiler Equipment — Signed-off
2025-08-06Job filed: Cooper & Setback Roof repairs: Repairs & Coating of an existing copper roof system. Removal & replacement of existing roof membrane, flashings, mastic$3,205,040
2025-08-01FDNY inspection (CDA-90-DRILL)
2025-07-30Job filed: removal and installation of non bearing partitions and related finishes as per plans filed here with. No change in use egress or occupancy$259,020
2025-07-30Job filed: Modifications to existing plumbing system. No change in use egress or occupancy$5,000
2025-07-10Job filed: FILING STANDPIPE APPLICATION FOR REPLACEMENT OF ALL FIRE HOSE VALVES ON SUB CELLER 1, 2, AND FLOORS 1-15, FIRE PUMP, REMOVAL OF TANKS AS SHOWN HEREWIT$100,000
2025-06-21Job filed: PLUMBING WORK RELATING TO FIXTURES AND PIPING ON EXISTING RESTAURANT RENOVATION AS INDICATED ON PLANS$125,000
2025-06-19311: Noise — Noise: Construction Equipment (NC1)
2025-06-13Permit Supported Scaffold — Permit Issued
2025-06-13Permit Sidewalk Shed — Permit Issued
2025-06-12Job filed: Filing for Alt 1 to establish use and occupancy on all floors and new PA spaces.$187,118,400
2025-06-12Job filed: INSTALLATION OF PIPE SCAFFOLD AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER $10,000
2025-06-12Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UN$10,000
2025-06-12ECB CLASS - 1 violation: AT THE TIME OF INSPECTION IT WAS OBSERVED, THAT THE CONTRACTOR FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS$10,030
2025-06-11DOB complaint, category ?
2025-06-09311: Noise — Noise: Construction Before/After Hours (NM1)
2025-06-04311: Residential Disposal Complaint — Trash or Recycling Not Secure
2025-06-03311: Vendor Enforcement — Food Vendor
2025-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2025-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2025-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2025-05-21311: Illegal Parking — Blocked Crosswalk
2025-05-14Agreement $24,000,000 — from 210 MUNI, LLC to METROPOLITAN COMMERCIAL BANK$24,000,000
2025-05-14Mortgage assigned — from SIG CRE 2023 VENTURE LLC to METROPOLITAN COMMERCIAL BANK
2025-05-14TL&R — from SIG CRE 2023 VENTURE LLC to 210 MUNI, LLC
2025-05-09Permit Boiler Equipment — Permit Issued
2025-05-07Elevator permit: MODERNIZATION OF 6 ELEVATORS - Low rise cars PE1-PE6 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All work to compl$2,100,000
2025-05-07Elevator permit: MODERNIZATION OF 6 ELEVATORS PE7-PE12 HIGH RISE 1P5696- 1P5701 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All wor$2,100,000
2025-05-05DOB complaint, category ?
2025-05-05ECB CLASS - 1 violation: AT TIME OF INSPECTION IN RESPOND TO AN INCIDENT THAT OCCURRED ON 05-02-2025 WHERE A WORKER INJURED HIS FINGER DURING CONSTRUCTION
2025-05-05Permit Sprinklers — Permit Issued
2025-05-02DOB complaint, category ?
2025-04-30Certificate of occupancy Renewal Without Change
2025-04-28Permit Plumbing — Signed-off
2025-04-15311: Illegal Parking — Blocked Sidewalk
2025-04-11Permit Mechanical Systems — Signed-off
2025-04-11Permit General Construction — Signed-off
2025-04-10Job filed: removal and installation of non bearing partitions and related finishes as per plans filed here with. No change in use egress or occupancy$259,020
2025-04-09311: Vendor Enforcement — Non-Food Vendor
2025-04-09Job filed: Modifications to existing plumbing system. No change in use egress or occupancy$5,000
2025-04-09Job filed: Modifications to existing mechanical systems. No change in use egress or occupancy.$13,400
2025-03-28311: Illegal Parking — Blocked Sidewalk
2025-03-26Permit Mechanical Systems — Permit Issued
2025-03-25Rodent inspection: Passed
2025-03-24Job filed: Sprinkler Modifications as indicated on Cellar and 1st Floor$90,000
2025-03-19Elevator permit: MODERNIZATION OF 6 ELEVATORS - Low rise cars PE1-PE6 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All work to compl$2,100,000
2025-03-12Permit Plumbing — Signed-off
2025-03-10Permit Mechanical Systems — Permit Issued
2025-03-05Elevator permit: MODERNIZATION OF 6 ELEVATORS PE7-PE12 HIGH RISE 1P5696- 1P5701 (CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT) All wor$2,100,000
2025-02-26Certificate of occupancy Renewal Without Change
2025-02-21FDNY inspection (CDA-90-DRILL)
2025-02-21Permit General Construction — Signed-off
2025-02-21Permit General Construction — Permit Issued
2025-02-20Job filed: PLUMBING WORK RELATING TO FIXTURES AND PIPING ON EXISTING RESTAURANT RENOVATION AS INDICATED ON PLANS$125,000
2025-02-20Job filed: MECHANICAL WORK FOR RESTAURANT RENOVATION. NO CHANGE IN USE OR EGRESS OR OCCUPANCY ON THIS APPLICAITON$140,000
2025-02-18Permit General Construction — Signed-off
2025-02-13Job filed: No Work
2025-02-11Job filed: RENOVATION OF EXISTING RESTAURANT AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY ON THIS APPLICATION$150,000
2025-02-04Permit General Construction — Permit Issued
2025-02-04Permit Structural — Permit Issued
2025-02-04Permit General Construction — Permit Issued
2025-01-30Certificate of occupancy Renewal Without Change
2025-01-28Certificate of occupancy Renewal With Change
2025-01-19311: Food Poisoning — 1 or 2
2025-01-16Permit Sprinklers — Permit Issued
2025-01-11311: Homeless Person Assistance
2025-01-08Job filed: Herewith filing for replacement of elevator cabs and equip. Also replacement of elevator motors and equip. in elev. mach. rms. Install new partitions $17,006,560
2024
2024-12-30Job filed: installation of the foam system. as shown herewith. No changes to egress, occupancy or use.$112,500
2024-12-26FDNY inspection (ALT)
2024-12-26Job filed: FILING STANDPIPE APPLICATION FOR REPLACEMENT OF ALL FIRE HOSE VALVES ON SUB CELLER 1, 2, AND FLOORS 1-15, FIRE PUMP, REMOVAL OF TANKS AS SHOWN HEREWIT$100,000
2024-12-24311: Homeless Person Assistance
2024-12-23311: Homeless Person Assistance
2024-12-17Permit Mechanical Systems — Permit Issued
2024-12-16Permit Mechanical Systems — Permit Issued
2024-12-10Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2024-12-03311: Consumer Complaint — Street Fair Vendor
2024-11-13Air permit (REGISTRATION), fuel: NATURALGAS
2024-11-12311: Noise — Noise: Construction Equipment (NC1)
2024-11-08Permit Plumbing — Permit Issued
2024-11-06311: Noise — Noise: Construction Before/After Hours (NM1)
2024-11-04311: Noise — Noise: Construction Before/After Hours (NM1)
2024-10-31311: Noise — Noise: Construction Before/After Hours (NM1)
2024-10-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-22311: Sidewalk Condition — Broken Sidewalk
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-16Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-10-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-09-26Permit Construction Fence — Permit Issued
2024-09-26Permit Protection and Mechanical Methods — Permit Issued
2024-09-25Permit Protection and Mechanical Methods — Permit Issued
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2024-09-23Job filed: Filing for modification to existing Structural Application$8,304,532
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2024-09-18Permit Standpipe — Permit Issued
2024-08-29Certificate of occupancy Renewal Without Change
2024-08-23Job filed: Herewith filing for THE INSTALLATION of a small wall mounted ERV-1 unit and motorized shut off dampers and ductwork as per the drawings. No change in$228,000
2024-08-21Permit Boiler Equipment — Signed-off
2024-08-21Permit Boiler Equipment — Permit Issued
2024-08-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-08-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-08-09AALR — from FEDERAL DEPOSIT INSURANCE CORPORATION; IN ITS CAPACITY AS RECEIVER FOR; SIGNATURE BRIDGE B to SIG CRE 2023 VENTURE LLC
2024-08-09AALR — from SIGNATURE BANK, NEW YORK, NEW YORK; IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSUR to SIGNATURE BRIDGE BANK, N.A.
2024-08-09Mortgage assigned — from SIGNATURE BRIDGE BANK, N.A.; IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSURANCE CO to SIG CRE 2023 VENTURE LLC
2024-08-09Mortgage assigned — from IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BANK, NE to SIGNATURE BRIDGE BANK, N.A.
2024-08-07DOB complaint, category ?
2024-08-01311: Lost Property — Electronics/Phones
2024-08-01DOB complaint, category ?
2024-07-30Job filed: Temporary Sidewalk/ Roadway shed without decking to be used to hang noise reduction blanket around the existing temporary chiller.$6,500
2024-07-08311: Water System — Possible Water Main Break (Use Comments) (WA1)
2024-07-08Job filed: Temporary Sidewalk/ Roadway shed without decking to be used to hang noise reduction blanket around the existing temporary chiller.$6,500
2024-07-08Permit Sidewalk Shed — Signed-off
2024-07-02Job filed: FILING STANDPIPE APPLICATION FOR REPLACEMENT OF ALL FIRE HOSE VALVES ON SUB CELLER 1, 2, AND FLOORS 1-15, FIRE PUMP, REMOVAL OF TANKS AS SHOWN HEREWIT$100,000
2024-07-01311: Water System — Leak (Use Comments) (WA2)
2024-06-07Certificate of occupancy Renewal With Change
2024-05-16311: Noise — Noise: Jack Hammering (NC2)
2024-05-16311: Noise — Noise: Construction Before/After Hours (NM1)
2024-05-16311: Noise — Noise: Construction Before/After Hours (NM1)
2024-05-08Job filed: Filing General Constructon work under Alt 2 Non-Directive per Commissioner direction.$7,493,138
2024-05-08Job filed: Filing for Alt 1 to establish use and occupancy on all floors and new PA spaces.$187,118,400
2024-05-06311: Noise — Noise: Construction Before/After Hours (NM1)
2024-04-26311: Street Condition — Pothole
2024-04-15311: Illegal Parking — Posted Parking Sign Violation
2024-04-11311: Illegal Parking — Parking Permit Improper Use
2024-04-11DOB complaint, category ?
2024-04-01Rodent inspection: Passed
2024-03-29311: Consumer Complaint — Other Store (Non-Food)
2024-03-29Job filed: Modification to existing Sprinkler systems and installation of temporary loop system as per plans filed herewith.$4,563,030
2024-03-27Job filed: Filing General Constructon work under Alt 2 Non-Directive per Commissioner direction.$7,493,138
2024-03-25Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3-2015, as modi$20,000
2024-03-25Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3-2015, as modi$20,000
2024-03-22Permit General Construction — Signed-off
2024-03-20Job filed: Filing for Alt 1 to establish use and occupancy on all floors and new PA spaces.$187,118,400
2024-03-12Rodent inspection: Passed
2024-03-12Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2024-03-11Permit Structural — Permit Issued
2024-03-11Permit General Construction — Permit Issued
2024-03-11Permit General Construction — Permit Issued
2024-03-07Permit Mechanical Systems — Permit Issued
2024-03-07Permit Mechanical Systems — Permit Issued
2024-03-04Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-03-04Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-02-23311: Illegal Parking — Blocked Bike Lane
2024-02-06Permit Plumbing — Permit Issued
2024-02-01311: Asbestos — N/A
2024-01-24Permit Sprinklers — Permit Issued
2024-01-23Permit General Construction — Permit Issued
2024-01-22Job filed: Underpinning as pre-plans. No change in egress or occupancy$100,000
2024-01-21311: Boilers — Boiler - Defective/Inoperative/No Permit
2024-01-21DOB complaint, category ?
2024-01-15311: Rodent — Rat Sighting
2024-01-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-01-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-01-12Asbestos abatement: Cleanup — A.S.A.R. International Corp.
2024-01-12Asbestos abatement: Cleanup — A.S.A.R. International Corp.
2024-01-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-01-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2024-01-10311: Street Condition — Blocked - Construction
2024-01-03Facade (LL11) filing, cycle 9: SAFE
2024-01-02311: Illegal Parking — Double Parked Blocking Vehicle
2023
2023-12-18311: Non-Residential Heat — Inadequate or No Heat
2023-12-15Job filed: Renovation as per plans$50,000
2023-12-11311: Noise — Noise: Construction Before/After Hours (NM1)
2023-12-06Facade (LL11) filing, cycle 9: SAFE
2023-11-02311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2023-11-02DOB complaint, category ?
2023-10-31311: Animal-Abuse — Other (complaint details)
2023-10-04311: Homeless Person Assistance — Non-Chronic
2023-10-03311: Illegal Parking — Posted Parking Sign Violation
2023-10-03311: Illegal Parking — Posted Parking Sign Violation
2023-09-29Asbestos abatement: Removal — P.A.L. Environmental Safety Corp. dba PAL Environm
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-27Permit Supported Scaffold — Signed-off
2023-09-27Permit Construction Fence — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-20Job filed: Herewith filing for replacement of elevator cabs and equip. Also replacement of elevator motors and equip. in elev. mach. rms. Install new partitions $17,006,560
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-15Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-09-05311: Consumer Complaint — Clothing, Shoe, or Accessories Store
2023-09-04311: Homeless Person Assistance
2023-08-25311: Illegal Parking — Double Parked Blocking Traffic
2023-08-22Permit Boiler Equipment — Signed-off
2023-08-22Permit Boiler Equipment — Permit Issued
2023-08-17Permit Sprinklers — Signed-off
2023-08-16Permit Supported Scaffold — Signed-off
2023-08-15Job filed: TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP$75,000
2023-08-10311: Illegal Parking — Paper License Plates
2023-08-04311: Illegal Parking — Double Parked Blocking Vehicle
2023-08-02311: Noise — Noise: Jack Hammering (NC2)
2023-08-02311: Noise — Noise: Construction Equipment (NC1)
2023-08-01Permit Construction Fence — Permit Issued
2023-07-27Permit Protection and Mechanical Methods — Permit Issued
2023-07-26Job filed: Filing for Alt 1 to establish use and occupancy on all floors and new PA spaces.$187,118,400
2023-07-18Permit Sidewalk Shed — Permit Issued
2023-07-18Permit Protection and Mechanical Methods — Permit Issued
2023-07-18Permit Supported Scaffold — Permit Issued
2023-07-17311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-07-17DOB complaint, category ?
2023-07-15311: Vendor Enforcement — Food Vendor
2023-07-14311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2023-06-25311: Mobile Food Vendor — Food Source/Protection
2023-06-24311: Mobile Food Vendor — Food Source/Protection
2023-06-24311: Vendor Enforcement — Food Vendor
2023-06-23311: Noise — Noise: Jack Hammering (NC2)
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-06-12Permit Sign — Signed-off
2023-05-26311: Obstruction — Merchandise
2023-05-18311: Obstruction — Merchandise
2023-05-17311: Dirty Condition — Trash
2023-05-12311: Sidewalk Condition — Blocked - Construction
2023-05-12311: Noise — Noise: Construction Equipment (NC1)
2023-05-02Permit General Construction — Signed-off
2023-05-01Cooling tower inspection
2023-05-01311: Noise - Residential — Loud Talking
2023-04-26311: Noise - Commercial — Banging/Pounding
2023-04-24311: Consumer Complaint — Booting Company
2023-04-20311: Urinating in Public — N/A
2023-04-15311: Water System — Leak (Use Comments) (WA2)
2023-04-14Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$28,000
2023-04-14Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 210 JORALEMON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UN$10,000
2023-04-14Permit Sidewalk Shed — Permit Issued
2023-04-10Elevator permit: Dismantle Elevator Section 8.11.1.4.1.1. All work to comply with ASME A17.1-2013, Part 8, as modified by Chapter K1 of Appendix K $5,000
2023-04-07311: Noise — Noise: Construction Equipment (NC1)
2023-04-07311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-04-07DOB complaint, category ?
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-31Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-03-29Elevator permit: Dismantle Elevator Section 8.11.1.4.1.1. All work to comply with ASME A17.1-2013, Part 8, as modified by Chapter K1 of Appendix K $3,000
2023-03-29Permit General Construction — Signed-off
2023-03-28Job filed: NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - AMBITION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$900
2023-03-28Job filed: INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - AMBITION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$450
2023-03-24Permit General Construction — Permit Issued
2023-03-24Permit General Construction — Permit Issued
2023-03-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-03-20311: General Construction/Plumbing — Failure To Maintain
2023-03-20DOB complaint, category ?
2023-03-17Job filed: MECHANICAL DUCTWORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$91,000
2023-03-17Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$28,000
2023-03-17Permit Mechanical Systems — Permit Issued
2023-03-17Permit Mechanical Systems — Permit Issued
2023-03-16311: Asbestos — Asbestos Complaint (B1)
2023-03-15Job filed: FILING FOR INTERIOR IMPROVEMENTS TO AN EXISTING FITNESS ESTABLISHMENT. THE PROJECT INCLUDES WORK ON THEGROUND FLOOR AND CELLAR FLOOR. NO CHANGE TO USE$725,046
2023-03-11Permit Structural — Permit Issued
2023-03-10Permit Structural — Permit Issued
2023-03-08311: Noise — Noise: Construction Equipment (NC1)
2023-03-07311: Asbestos — Asbestos Complaint (B1)
2023-02-24311: Urinating in Public — N/A
2023-02-21311: Consumer Complaint — Booting Company
2023-02-18311: Noise — Noise: Construction Equipment (NC1)
2023-02-16311: Noise — Noise: Construction Before/After Hours (NM1)
2023-02-15Rodent inspection: Passed
2023-02-15311: Noise — Noise: Construction Equipment (NC1)
2023-02-15311: Non-Residential Heat — Inadequate or No Heat
2023-02-14Certificate of occupancy Renewal Without Change
2023-02-13Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-02-13Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-02-13Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-02-13Asbestos abatement: Removal — A.S.A.R. International Corp.
2023-02-10Permit General Construction — Permit Issued
2023-02-10Permit General Construction — Permit Issued
2023-02-09Permit General Construction — Permit Issued
2023-02-06Permit Plumbing — Permit Issued
2023-02-05311: Noise - Commercial — Banging/Pounding
2023-02-04311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-02-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-02-04311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-02-04DOB complaint, category ?
2023-01-30Permit General Construction — Permit Issued
2023-01-27Permit Sprinklers — Permit Issued
2023-01-24DOB complaint, category ?
2023-01-24ECB CLASS - 1 violation: AT TIME OF INSPECTION OBSERVED STORAGE ZONES AT THE BUILDINGS EXPOSURE 4, NOT FOLLOWING MANUFACTURERS SPECIFICATIONS PLASTIC BARRI$2,500
2023-01-24ECB CLASS - 1 violation: INSPECTION WERE A WORKER WAS PERFORMING ELEVATED DEMOLITION OPERATION VIA A LADDER WHILE NOT MAINTAINING THREE POINTS OF CONTACT
2023-01-24ECB CLASS - 1 violation: AT THE TIME OF INSPECTION, OBSERVED STORAGE ZONES AT THE BUILDINGS EXPOSURE 3 & 4. CYCLONE FENCE PANELS INSTALLED ON TOO OF THE PL$2,500
2023-01-23DOB complaint, category ?
2023-01-21311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-01-21DOB complaint, category ?
2023-01-20311: Asbestos — Asbestos Complaint (B1)
2023-01-13311: Consumer Complaint — Tow Truck Company
2023-01-11311: Consumer Complaint — Booting Company
2023-01-09311: Noise — Noise: Construction Before/After Hours (NM1)
2023-01-04311: Noise — Noise: Construction Before/After Hours (NM1)
2023-01-04311: Noise — Noise: Construction Before/After Hours (NM1)
2023-01-04311: Noise — Noise: Construction Before/After Hours (NM1)
2023-01-04311: Noise — Noise: Construction Equipment (NC1)
2023-01-03Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$28,000
2022
2022-12-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-22311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-21311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-21311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-20311: Noise — Noise: Construction Equipment (NC1)
2022-12-20311: Noise — Noise: Construction Equipment (NC1)
2022-12-20311: Noise — Noise: Jack Hammering (NC2)
2022-12-20311: Noise — Noise: Jack Hammering (NC2)
2022-12-20Job filed: STRUCTURAL WORK AS SHOWN ON PLANS FILED HEREWITH, INCLUDING BUT NOT LIMITED TO FRAMING WORK RELATED TO PROPOSED FREIGHT ELEVATOR FOR RETAIL TENANT USE$55,000
2022-12-20Permit Protection and Mechanical Methods — Permit Issued
2022-12-19Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-12-19Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-12-19Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-12-19Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-12-19Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-12-15311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-15311: Noise - Residential — Banging/Pounding
2022-12-15311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-12-15311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-15311: Noise - Residential — Banging/Pounding
2022-12-15311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-15DOB complaint, category ?
2022-12-15Permit Plumbing — Signed-off
2022-12-13Boiler inspection
2022-12-13Boiler inspection — defects found
2022-12-13Boiler inspection — defects found
2022-12-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-13311: Noise — Noise: Construction Equipment (NC1)
2022-12-13Permit Sprinklers — Signed-off
2022-12-12Permit General Construction — Signed-off
2022-12-12Permit Mechanical Systems — Signed-off
2022-12-10DOB complaint, category ?
2022-12-07311: Noise - Commercial — Banging/Pounding
2022-12-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-05311: Illegal Parking — Paper License Plates
2022-12-05Job filed: FILING FOR INTERIOR IMPROVEMENTS TO AN EXISTING FITNESS ESTABLISHMENT. THE PROJECT INCLUDES WORK ON THEGROUND FLOOR AND CELLAR FLOOR. NO CHANGE TO USE$725,046
2022-12-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-02311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-12-01311: Noise — Noise: Construction Before/After Hours (NM1)
2022-12-01311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-30Job filed: GENERAL CONSTRUCTION WORK RELATED TO INSTALLATION OF NEW ELEVATOR, SERVICING 1ST FLOOR & 2ND FLOOR RETAIL TENANT. NO CHANGE IN USE, EGRESS OR OCCUPANC$25,000
2022-11-30Job filed: MECHANICAL DUCTWORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$91,000
2022-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-18311: Illegal Parking — Double Parked Blocking Vehicle
2022-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-17311: Noise — Noise: Construction Equipment (NC1)
2022-11-17Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$28,000
2022-11-17Job filed: SPRINKLER WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$6,000
2022-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-16311: Noise — Noise: Construction Equipment (NC1)
2022-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-16311: PLUMBING — WATER SUPPLY
2022-11-16Certificate of occupancy Temporary
2022-11-16Certificate of occupancy Renewal Without Change
2022-11-10311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-10311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-09Rodent inspection: Passed
2022-11-09311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-09311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-04311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-04311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-04311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-04Job filed: INSTALLATION OF TEMPORARY 6" GAS PIPING TO CONNECT THE EXISTING GAS SERVICE IN THE GAS METER ROOM TO A TEMPORARY MOBILE BOILER TRAILER LOCATED AT COU$30,000
2022-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-28311: Non-Residential Heat — Inadequate or No Heat
2022-10-27ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION OF A 15 STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1 AND WITH THE FOLLOWING OBJEC
2022-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2022-10-26DOB complaint, category ?
2022-10-25Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2022-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-24Job filed: Modification to existing Sprinkler systems and installation of temporary loop system as per plans filed herewith.$4,597,740
2022-10-24Job filed: Filing General Constructon work under Alt 2 Non-Directive per Commissioner direction.$7,493,138
2022-10-19311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-19311: Noise — Noise: Construction Equipment (NC1)
2022-10-18311: HEAT/HOT WATER — ENTIRE BUILDING
2022-10-18311: Non-Residential Heat — Inadequate or No Heat
2022-10-17311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-10-17DOB complaint, category ?
2022-10-15Permit Mechanical Systems — Permit Issued
2022-10-14311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-14311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-14311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-14Job filed: Interior removal & build out for HVAC system & related piping as shown on drawings. Full EN package filed in BIS, application # 340725941. No change $187,118,400
2022-10-13311: Noise — Noise: Construction Equipment (NC1)
2022-10-12311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-12311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-11311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-11311: Rodent — Rat Sighting
2022-10-11Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2022-10-10311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-10Job filed: INSTALLATION OF TEMPORARY CHIMNEY, 8" STEAM, 2.5" CONDENSATE, AND 1"MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER TRAILER AND EXISTING HEATI$30,000
2022-10-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-04311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-30FDNY inspection (RISK)
2022-09-27311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-26311: Street Condition — Pothole
2022-09-22Boiler inspection
2022-09-22Boiler inspection
2022-09-22Boiler inspection
2022-09-22311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-21Boiler inspection
2022-09-21Boiler inspection
2022-09-21Boiler inspection
2022-09-17311: Sidewalk Condition — Broken Sidewalk
2022-09-08ECB CLASS - 1 violation: FAILURE TO NOTIFY DEPT OF ACCIDENT/INCIDENT THAT RESULTED IN FATALITY OR INJURY.NOTED:WORKER FELL TOWARDS HATCH OF HOIST SUFFERED $5,000
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-09-06Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-08-31Cooling tower inspection
2022-08-29ECB CLASS - 2 violation: AT TIME OF INSPECTION RESPONDING TO COMPLAINT THAT ONE WORKER GOT INJURIE HIS HAND WHILE INSTALLING TEMPORARY HOIST INSTALLATION. $5,000
2022-08-29ECB CLASS - 1 violation: AT TIME OF MY INSPECTION RESPONDING TO COMPLAINT THAT ONE WORKER GOT INJURIE HIS HAND DURING TEMPORARY HOIST INSTALLATION OPERATIO$5,000
2022-08-29DOB complaint, category ?
2022-08-29DOB complaint, category ?
2022-08-29ECB CLASS - 1 violation: AT TIME OF MY INSPECTION RESPONDING TO COMPLAINT THAT ONE WORKER GOT INJURIE HIS HAND DURING TEMPORARY HOIST INSTALLATION OPERATIO$5,000
2022-08-26Permit Protection and Mechanical Methods — Permit Issued
2022-08-26Permit Construction Fence — Permit Issued
2022-08-25Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$10,000
2022-08-25Job filed: INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$5,000
2022-08-24Job filed: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CH$20,000
2022-08-22Elevator permit: Installation of a Dual 7000 LB Capacity Personnel/Material Hoist during building alteration, filed separately. Installations and T$20,000
2022-08-15311: Sanitation Worker or Vehicle Complaint — Noise
2022-08-11311: Illegal Parking — Posted Parking Sign Violation
2022-08-09Certificate of occupancy Renewal Without Change
2022-08-05FDNY inspection (RISK)
2022-08-05Permit Plumbing — Signed-off
2022-08-03311: Street Light Condition — Street Light Out
2022-08-02Job filed: INSTALLATION OF TEMPORARY 6" GAS PIPING TO CONNECT THE EXISTING GAS SERVICE IN THE GAS METER ROOM TO A TEMPORARY MOBILE BOILER TRAILER LOCATED AT COU$30,000
2022-08-01Permit Boiler Equipment — Permit Issued
2022-07-29Elevator permit: Installation of a Dual 7000 LB Capacity Personnel Hoist during building alteration, filed separately. Installations and Tests as p$20,000
2022-07-29Job filed: 210 JORALEMON STREET, INSTALLATION OF A 10,000 GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION $20,000
2022-07-25311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2022-07-25DOB complaint, category ?
2022-07-13Permit Protection and Mechanical Methods — Permit Issued
2022-07-13Permit Sidewalk Shed — Permit Issued
2022-07-13Permit Supported Scaffold — Permit Issued
2022-07-05Permit EW — ISSUED
2022-06-28Elevator permit: Installation of door lock monitoring for device# 3P14261. All work to comply with ASME A17.3 -2002, as modified by Chapter K3 of 2$6,000
2022-06-27Job filed: Modification to existing Sprinkler systems and installation of temporary loop system as per plans filed herewith.$4,597,740
2022-06-27Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2022-06-21Job filed: No Work
2022-06-20Job filed: No Work
2022-06-18Job filed: No Work
2022-06-18Job filed: No Work
2022-06-18Job filed: No Work
2022-06-18Job filed: No Work
2022-06-18Job filed: No Work
2022-06-18Job filed: No Work
2022-06-18Job filed: No Work
2022-06-08Permit Boiler Equipment — Signed-off
2022-06-03Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OC$260,000
2022-06-03Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE$51,190
2022-05-27Certificate of occupancy Renewal Without Change
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-05-14311: Street Sign - Dangling — Stop
2022-05-10311: Consumer Complaint — Vendor
2022-05-10311: Obstruction — Merchandise
2022-05-10311: Consumer Complaint — Retail Store
2022-05-10311: Consumer Complaint — Other
2022-04-26311: Noise - Commercial — Banging/Pounding
2022-04-19311: Elevator — Elevator - Multiple Devices On Property
2022-04-19ECB CLASS - 2 violation: SHORTEN GOV ROPE. SHORTEN COMP ROPES. SELF RESETTING ESCAPE HATCH SWITCHES PROHIBITED.
2022-04-19DOB complaint, category ?
2022-04-19ECB CLASS - 2 violation: SELF RESETTING ESCAPE HATCHES PROHIBITED.
2022-04-19ECB CLASS - 2 violation: SHORTEN GOV ROPE. REPAIR EMERGENCY LIGHTING. SELF RESETTING ESCAPE HATCH SWITCHES PROHIBITED. SHORTEN COMP ROPES. CAR SHUT DOWN DU
2022-04-19ECB CLASS - 2 violation: SHORTEN GOV ROPE. REPAIR EMERGENCY LIGHTING. SELF RESETTING ESCAPE HATCH SWITCHES PROHIBITED.
2022-04-19ECB CLASS - 2 violation: SHORTEN GOV ROPE. REPAIR EMERGENCY LIGHTING. SELF RESETTING ESCAPE HATCH SWITCHES PROHIBITED. SHORTEN COMP ROPES. ELIMINATE GAP AT
2022-04-19ECB CLASS - 2 violation: SHORTEN GOV ROPE. REPAIR EMERGENCY LIGHTING. SELF RESETTING ESCAPE HATCH SWITCHES PROHIBITED.
2022-04-18311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-14Job filed: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $25,000
2022-04-13AL&R $24,000,000 — from 210 MUNI, LLC to SIGNAUTRE BANK$24,000,000
2022-04-13Agreement $24,000,000 — from 210 MUNI, LLC to SIGNATURE BANK$24,000,000
2022-04-13Mortgage $406,485 — from 210 MUNI, LLC to SIGNATURE BANK$406,485
2022-04-13Mortgage assigned — from NEW YORK COMMUNITY BANK to SIGNATURE BANK
2022-04-12ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS-PIPE SCAFFOLD EXPO 3 & SETBACKS PLANS E4 & E5.004 & E-9
2022-04-12DOB complaint, category ?
2022-04-12ECB CLASS - 1 violation: FAILURE TO COMPLY/MAINTAIN TO MANUFACTURER SPECIFICATIONS-CUT/MODIFIEDPIPE SCAFFOLD FRAMES EXPO 3.AT TIME OF INSPECTION AT A 15 ST$2,500
2022-04-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-04-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-04-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-04-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-04-05Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-04-05Permit General Construction — Signed-off
2022-03-31Permit Sidewalk Shed — Permit Issued
2022-03-31Permit Protection and Mechanical Methods — Permit Issued
2022-03-31Permit Supported Scaffold — Permit Issued
2022-03-30311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-28311: Sidewalk Condition — Broken Sidewalk
2022-03-25Permit Mechanical Systems — Permit Issued
2022-03-22311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-22Permit Supported Scaffold — Permit Issued
2022-03-18FDNY inspection (COMPLAINT)
2022-03-18FDNY inspection (RISK)
2022-03-16Job filed: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $25,000
2022-03-14Permit Structural — Permit Issued
2022-03-11311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-11311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-11311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-10311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-10311: Noise - Vehicle — Car/Truck Music
2022-03-10Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE$51,190
2022-03-10Permit Sidewalk Shed — Permit Issued
2022-03-10Permit Protection and Mechanical Methods — Permit Issued
2022-03-09Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OC$260,000
2022-03-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-03-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-03-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-03-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-03-02Permit PL — ISSUED
2022-03-02Permit PL — ISSUED
2022-02-28Permit Protection and Mechanical Methods — Permit Issued
2022-02-25Job filed: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CH$20,000
2022-02-22311: Noise - Residential — Banging/Pounding
2022-02-22Permit General Construction — Permit Issued
2022-02-22Permit General Construction — Permit Issued
2022-02-18311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-16Facade (LL11) filing, cycle 9: SAFE
2022-02-16DOB violation FISPHAZ: CYCLE 9A UNSAFE REPORT FILED
2022-02-16DOB violation FISPHAZ: CYCLE 9A UNSAFE REPORT FILED
2022-02-16Permit Plumbing — Permit Issued
2022-02-14Certificate of occupancy Renewal Without Change
2022-02-07Permit Mechanical Systems — Permit Issued
2022-02-05311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-01Permit General Construction — Permit Issued
2022-02-01Permit General Construction — Permit Issued
2022-01-26Permit Sprinklers — Permit Issued
2022-01-18311: Face Covering Violation — Mandate Not Enforced
2021
2021-12-20Job filed: Brooklyn Municipal Bldg, FISP related exterior facade & exterior roof level repairs as per the plans filed including: Repair/removal/replacement of cr$1,605,665
2021-12-03311: Consumer Complaint — Booting Company
2021-12-03Job filed: Interior removal & build out for HVAC system & related piping as shown on drawings. Full EN package filed in BIS, application # 340725941. No change $187,328,440
2021-12-03Job filed: Filing General Constructon work under Alt 2 Non-Directive per Commissioner direction.$7,493,138
2021-12-03Job filed: Filing for modification to existing Structural Application$8,304,532
2021-12-03Job filed: Removal of existing boilers and installation of new boiler as per plans filed herewith$3,000
2021-11-26Job filed: Modification to existing Sprinkler systems and installation of temporary loop system as per plans filed herewith.$4,563,030
2021-11-26Job filed: Installation of new plumbing fixtures and systems as per plans filed herewith.$7,809,000
2021-11-22311: Illegal Parking — Double Parked Blocking Vehicle
2021-11-12311: Illegal Parking — Double Parked Blocking Traffic
2021-10-28311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2021-10-18FDNY inspection (RISK)
2021-10-08311: Noise - Street/Sidewalk — Loud Music/Party
2021-10-08ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT
2021-10-07DOB complaint, category ?
2021-10-07ECB CLASS - 2 violation: UNAPPROVED,UNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT,DEVICES,APPARATUS,APPLIANCES,MATERIALS OR WIRING IN USE.DETERIORATED DEEP PAN AB
2021-10-06DOB complaint, category ?
2021-10-04311: Consumer Complaint — Scale Dealer/Repairer
2021-09-30Cooling tower inspection — violation AH8D
2021-09-30Cooling tower inspection — violation AH8J
2021-09-23311: Illegal Parking — Parking Permit Improper Use
2021-09-21Job filed: Filing for Alt 1 to establish use and occupancy on all floors and new PA spaces.$187,118,400
2021-08-25Boiler inspection
2021-08-25Boiler inspection
2021-08-25311: General Construction/Plumbing — Failure To Maintain
2021-08-25ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER.AT TIME OF INSPECTION,OBSERVED EVIDENCE OF LEAKING AT EXPOSURE 3 STAIRWELL
2021-08-25DOB complaint, category ?
2021-08-21311: Homeless Person Assistance
2021-08-09Boiler inspection
2021-08-05311: Water System — No Water (WNW)
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04DOB violation E:
2021-08-04Permit EW — ISSUED
2021-08-03DOB violation E:
2021-08-03DOB violation E:
2021-08-03DOB violation E:
2021-08-03DOB violation E:
2021-08-03DOB violation E:
2021-08-03DOB violation E:
2021-08-03DOB violation E:
2021-07-09311: Consumer Complaint — Other
2021-06-09Permit General Construction — Signed-off
2021-06-07Job filed: TWO NON ILLUMINATED NON ADVERTISING ACCESSORY AWNINGS - ALL DAY BAKERY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$2,000
2021-06-02311: Noise - Helicopter — Other
2021-04-26311: Noise — Noise: Construction Before/After Hours (NM1)
2021-03-09FDNY inspection (STRUC_INT_3)
2021-01-13311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-06Cooling tower inspection
2021-01-05Cooling tower inspection
2021-01-04311: Consumer Complaint — Process Server
2021-01-01311: Street Light Condition — Street Light Dayburning
2020
2020-12-21311: Street Sign - Dangling — Stop
2020-12-19311: Street Sign - Dangling — Stop
2020-11-09Certificate of occupancy Temporary
2020-10-27Permit EW — ISSUED
2020-10-26Permit EW — ISSUED
2020-10-12Boiler inspection
2020-09-24311: Building Condition — Bikes in Buildings
2020-09-15311: Missed Collection (All Materials) — 1R Missed Recycling-All Materials
2020-09-09Boiler inspection
2020-09-09Boiler inspection
2020-08-18311: Noise - Commercial — Banging/Pounding
2020-08-14Job filed: INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
2020-08-14Permit Supported Scaffold — Signed-off
2020-08-06311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-04311: Street Condition — Pothole
2020-07-31Asbestos abatement: Removal — ABC Construction Contracting Inc.
2020-07-31Asbestos abatement: Removal — ABC Construction Contracting Inc.
2020-07-30311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-28LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-07-28LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-06-19DOB violation E:
2020-05-31311: Sidewalk Condition — Sidewalk Collapsed
2020-05-24311: Homeless Street Condition — N/A
2020-05-21Certificate of occupancy Temporary
2020-04-29311: COVID-19 Non-essential Construction — Construction
2020-04-29DOB complaint, category ?
2020-04-24Job filed: FILED HEREWITH NYCECC- ENERGY ANALYSIS AS SHOWN ON DRAWINGS. MECHANICAL APPLIC ATION FILED SEPARATELY IN DOB NOW. #B00450211-I1. NO CHANGE IN USE, EGR$1,000
2020-04-24Job filed: FILED HEREWITH NYCECC- ENERGY ANALYSIS AS SHOWN ON DRAWINGS. MECHANICAL APPLIC ATION FILED SEPARATELY IN DOB NOW. #B00450211-I1. NO CHANGE IN USE, EGR$1,000
2020-04-11311: Non-Emergency Police Matter — Social Distancing
2020-03-20311: Consumer Complaint — Retail Store
2020-03-19Boiler inspection
2020-03-19Boiler inspection
2020-03-19Boiler inspection — defects found
2020-03-19Permit EW — ISSUED
2020-03-19Permit EW — ISSUED
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-10311: Vending — In Prohibited Area
2020-03-03311: Sidewalk Condition — Broken Sidewalk
2020-02-25311: Vending — In Prohibited Area
2020-02-10311: Vending — Unlicensed
2020-02-07Permit PL — ISSUED
2020-02-06311: Vending — Unlicensed
2020-01-29311: Street Light Condition — Lamppost Damaged
2020-01-03311: Vending — Unlicensed
2020-01-02311: Street Sign - Damaged — One Way
2019
2019-12-22311: Green Taxi Complaint — Driver Complaint - Passenger
2019-12-06311: Illegal Parking — Posted Parking Sign Violation
2019-12-06Permit EW — ISSUED
2019-12-06Permit PL — ISSUED
2019-12-03Boiler inspection
2019-12-03311: Illegal Parking — Posted Parking Sign Violation
2019-12-02311: Vending — Unlicensed
2019-11-23311: Sidewalk Condition — Broken Sidewalk
2019-11-22Rodent inspection: Failed for Rat Activity
2019-11-21311: Sidewalk Condition — Broken Sidewalk
2019-11-18311: Vending — Unlicensed
2019-11-15311: Rodent — Rat Sighting
2019-11-15ECB CLASS - 2 violation: A.C 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPA
2019-10-30311: Vending — Unlicensed
2019-10-29311: Vending — Unlicensed
2019-10-23Permit EW — ISSUED
2019-10-21311: Homeless Person Assistance — N/A
2019-10-18311: Vending — Unlicensed
2019-10-16311: Vending — Unlicensed
2019-10-15311: Vending — Unlicensed
2019-10-11311: Vending — Unlicensed
2019-10-04311: Vending — Unlicensed
2019-10-03311: Vending — Unlicensed
2019-09-30311: Vending — Unlicensed
2019-09-27311: Vending — Unlicensed
2019-09-25311: Vending — Unlicensed
2019-09-23Boiler inspection
2019-09-23311: Vending — Unlicensed
2019-09-11311: Vending — Unlicensed
2019-09-10311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-04311: Vending — Unlicensed
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-09-03DOB complaint, category ?
2019-09-02311: Vending — Unlicensed
2019-08-29311: Vending — Unlicensed
2019-08-27311: Vending — Unlicensed
2019-08-26311: Vending — Unlicensed
2019-08-22311: Vending — Unlicensed
2019-08-22311: Vending — Unlicensed
2019-08-21311: Vending — Unlicensed
2019-08-20311: Vending — Unlicensed
2019-08-19311: Vending — Unlicensed
2019-08-19311: Vending — Unlicensed
2019-08-18311: Noise — Noise: Construction Before/After Hours (NM1)
2019-08-16311: Vending — Unlicensed
2019-08-15311: Mold — Public Complaint - Comm Location
2019-08-15311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2019-08-15DOB complaint, category ?
2019-08-14311: Vending — Unlicensed
2019-08-14311: Vending — Unlicensed
2019-08-12311: Vending — Unlicensed
2019-08-09311: Vending — Unlicensed
2019-08-06311: Noise - Street/Sidewalk — Loud Music/Party
2019-08-01311: Noise — Noise: air condition/ventilation equipment (NV1)
2019-08-01311: Homeless Person Assistance — N/A
2019-07-26311: Vending — Unlicensed
2019-07-26311: Street Sign - Damaged — No Parking, Standing, Stopping
2019-07-26Permit Plumbing — Signed-off
2019-07-24311: Noise — Noise: air condition/ventilation equipment (NV1)
2019-07-23311: Noise — Noise: Construction Before/After Hours (NM1)
2019-07-22311: Consumer Complaint — Process Server
2019-07-21311: Consumer Complaint — Retail Store
2019-07-19Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-07-19Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-07-19Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-07-19Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-07-19Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-07-19Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-07-19311: Vending — Unlicensed
2019-07-19311: Vending — Unlicensed
2019-07-18311: Noise — Noise: Construction Before/After Hours (NM1)
2019-07-18311: Bridge Condition — American Flag
2019-07-11311: Noise — Noise: air condition/ventilation equipment (NV1)
2019-07-11311: Noise — Noise: air condition/ventilation equipment (NV1)
2019-07-10311: Taxi Complaint — Driver Complaint - Passenger
2019-07-10Certificate of occupancy Temporary
2019-07-10Certificate of occupancy Temporary
2019-07-09311: Consumer Complaint — Newsstand
2019-07-06311: Dirty Conditions — E3 Dirty Sidewalk
2019-07-03311: Vending — In Prohibited Area
2019-06-30311: Consumer Complaint — Retail Store
2019-06-30311: Sidewalk Condition — Broken Sidewalk
2019-06-29311: Noise — Noise: Construction Before/After Hours (NM1)
2019-06-29311: Consumer Complaint — Retail Store
2019-06-29311: Consumer Complaint — Retail Store
2019-06-28311: Mobile Food Vendor — Permit/License/Certificate
2019-06-25311: Vending — Unlicensed
2019-06-24DOB violation E:
2019-06-24DOB violation E:
2019-06-24DOB violation E:
2019-06-24DOB violation E:
2019-06-24DOB violation E:
2019-06-24DOB violation E:
2019-06-18Job filed: Filing for underground detention tank and storm piping in relation to job filing# 321645519.$30,000
2019-06-07311: Mobile Food Vendor — Permit/License/Certificate
2019-06-06311: Mobile Food Vendor — Permit/License/Certificate
2019-05-31Cooling tower inspection — violation AH8Q
2019-05-31311: Mobile Food Vendor — Permit/License/Certificate
2019-05-30Cooling tower inspection — violation AH8Q
2019-05-30311: Homeless Person Assistance
2019-05-24311: Mobile Food Vendor — Permit/License/Certificate
2019-05-22311: Mobile Food Vendor — Permit/License/Certificate
2019-05-22Permit EW — ISSUED
2019-05-21311: Mobile Food Vendor — Permit/License/Certificate
2019-05-20Boiler inspection
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18Asbestos abatement: Removal — ABC Construction Contracting Inc.
2019-05-18311: Noise — Noise: Construction Before/After Hours (NM1)
2019-05-17311: Vending — Unlicensed
2019-05-10311: Vending — Unlicensed
2019-05-08311: Mobile Food Vendor — Permit/License/Certificate
2019-05-07311: Mobile Food Vendor — Permit/License/Certificate
2019-05-07311: Asbestos — Asbestos Complaint (B1)
2019-05-03311: Lead — Lead Kit Request (Residential) (L10)
2019-05-02311: Mobile Food Vendor — Permit/License/Certificate
2019-04-26311: Vending — Unlicensed
2019-04-26Permit EW — ISSUED
2019-04-25Permit EW — ISSUED
2019-04-24311: Mobile Food Vendor — Permit/License/Certificate
2019-04-24311: Mobile Food Vendor — Permit/License/Certificate
2019-04-23311: Vending — Unlicensed
2019-04-20311: Water System — No Water (WNW)
2019-04-18311: Vending — Unlicensed
2019-04-17Permit EW — ISSUED
2019-04-12311: Mobile Food Vendor — Permit/License/Certificate
2019-04-10311: Mobile Food Vendor — Permit/License/Certificate
2019-04-10311: Vending — Unlicensed
2019-04-05311: Vending — Unlicensed
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-01Permit EW — ISSUED
2019-04-01Permit EW — ISSUED
2019-03-27311: Noise - Street/Sidewalk — Loud Talking
2019-03-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-03-21311: Vending — Unlicensed
2019-03-14311: Asbestos — Asbestos Complaint (B1)
2019-03-14Permit EW — ISSUED
2019-02-22311: Food Establishment — Food Spoiled
2019-02-16DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-02-14311: Vending — Unlicensed
2019-02-14311: Vending — Unlicensed
2019-02-06311: Illegal Parking — Posted Parking Sign Violation
2019-02-05Boiler inspection
2019-02-05Boiler inspection
2019-02-05Boiler inspection
2019-01-29311: Vending — Unlicensed
2019-01-23311: Vending — Unlicensed
2019-01-08311: Vending — Unlicensed
2019-01-03311: Street Sign - Damaged — Other/Unknown
2018
2018-12-24311: Noise — Noise: Jack Hammering (NC2)
2018-12-22311: Noise - Commercial — Loud Music/Party
2018-12-21311: Noise — Noise: Construction Equipment (NC1)
2018-12-19311: Noise — Noise: Construction Equipment (NC1)
2018-12-15311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-13311: Noise — Noise: Construction Equipment (NC1)
2018-12-13Permit EW — ISSUED
2018-12-12311: Noise — Noise: Jack Hammering (NC2)
2018-12-06Permit EW — ISSUED
2018-12-06Permit EW — ISSUED
2018-12-02311: General Construction/Plumbing — Building Permit - None
2018-12-02311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-02DOB complaint, category ?
2018-11-24311: Sewer — Sewer Backup (Use Comments) (SA)
2018-11-19311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-19311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-19Permit PL — ISSUED
2018-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-17311: Noise - Commercial — Banging/Pounding
2018-11-14DOB complaint, category ?
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-10Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-09Asbestos abatement: Removal — ABC Construction Contracting Inc.
2018-11-07Rodent inspection: Bait applied
2018-10-31311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-31311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-31311: Vending — In Prohibited Area
2018-10-30311: Vending — Unlicensed
2018-10-29Asbestos abatement: Removal — JVN Restoration Inc.
2018-10-29Asbestos abatement: Removal — JVN Restoration Inc.
2018-10-29Asbestos abatement: Removal — JVN Restoration Inc.
2018-10-29Asbestos abatement: Removal — JVN Restoration Inc.
2018-10-29Asbestos abatement: Removal — JVN Restoration Inc.
2018-10-26311: Noise — Noise: Construction Equipment (NC1)
2018-10-24311: Vending — In Prohibited Area
2018-10-23Permit EW — ISSUED
2018-10-19311: Mobile Food Vendor — Permit/License/Certificate
2018-10-17Rodent inspection: Bait applied
2018-10-11311: Noise — Noise: Construction Equipment (NC1)
2018-10-11311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-10311: Vending — In Prohibited Area
2018-10-09Boiler inspection — defects found
2018-10-02DOB complaint, category ?
2018-10-01311: Mobile Food Vendor — Smoke/Odor
2018-09-19311: Mobile Food Vendor — Permit/License/Certificate
2018-09-18311: Vending — Unlicensed
2018-09-14311: Consumer Complaint — Illegal/Unfair Booting
2018-09-13311: Noise — Noise: Construction Before/After Hours (NM1)
2018-09-12311: Street Condition — Defective Hardware
2018-09-12311: Noise — Noise: Construction Before/After Hours (NM1)
2018-09-12311: Noise — Noise: Construction Before/After Hours (NM1)
2018-09-11Boiler inspection — defects found
2018-09-11311: Street Condition — Maintenance Cover
2018-09-11Permit EW — ISSUED
2018-09-11Permit EW — ISSUED
2018-09-11Permit EW — ISSUED
2018-09-07Rodent inspection: Monitoring visit
2018-09-07Certificate of occupancy Temporary
2018-09-07Permit EW — ISSUED
2018-09-07Permit EW — ISSUED
2018-09-01311: Mobile Food Vendor — Permit/License/Certificate
2018-08-31Rodent inspection: Bait applied
2018-08-29311: Vending — In Prohibited Area
2018-08-22311: Vending — In Prohibited Area
2018-08-20Permit EW — ISSUED
2018-08-17311: Vending — Unlicensed
2018-08-17311: Mobile Food Vendor — Permit/License/Certificate
2018-08-16311: Mobile Food Vendor — Permit/License/Certificate
2018-08-16311: Mold — Public Complaint - Comm Location
2018-08-15311: Vending — Unlicensed
2018-08-15311: Mobile Food Vendor — Permit/License/Certificate
2018-08-15311: Vending — Unlicensed
2018-08-10311: Mobile Food Vendor — Permit/License/Certificate
2018-08-10311: Vending — Unlicensed
2018-08-05311: Mold — Public Complaint - Comm Location
2018-08-03311: Mobile Food Vendor — Permit/License/Certificate
2018-08-03311: Mold — Public Complaint - Comm Location
2018-08-02311: Mobile Food Vendor — Permit/License/Certificate
2018-08-02311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2018-08-02311: Rodent — Signs of Rodents
2018-08-02311: Rodent — Signs of Rodents
2018-08-01311: Mobile Food Vendor — Permit/License/Certificate
2018-08-01311: Mobile Food Vendor — Permit/License/Certificate
2018-08-01ECB CLASS - 2 violation: FAILURE TO FILL ACCEPTABLE AMENDED CYCLE 8A REPORT INDICATING CORRECT ON OF UNSAFE CONDITIONS DESCRIBED IN INTIAL REPORT REQUIRED $1,250
2018-07-31311: Mobile Food Vendor — Permit/License/Certificate
2018-07-31311: General Construction/Plumbing — Failure To Maintain
2018-07-31DOB complaint, category ?
2018-07-30311: Vending — In Prohibited Area
2018-07-27311: Mobile Food Vendor — Permit/License/Certificate
2018-07-27311: Vending — Unlicensed
2018-07-26311: Vending — Unlicensed
2018-07-24311: Consumer Complaint — Door Open with Air Conditioning On
2018-07-17311: Mobile Food Vendor — Permit/License/Certificate
2018-07-16Permit PL — ISSUED
2018-07-10311: Consumer Complaint — Door Open with Air Conditioning On
2018-07-09311: Vending — In Prohibited Area
2018-07-02311: Consumer Complaint — Door Open with Air Conditioning On
2018-07-02311: Vending — In Prohibited Area
2018-06-25DOB violation E:
2018-06-25DOB violation E:
2018-06-25DOB violation E:
2018-06-22Rodent inspection: Failed for Rat Activity
2018-06-22311: Mobile Food Vendor — Permit/License/Certificate
2018-06-22DOB violation E:
2018-06-19Boiler inspection
2018-06-06Rodent inspection: Failed for Rat Activity
2018-06-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018-06-05311: Noise - Vehicle — Car/Truck Horn
2018-06-05311: Vending — Unlicensed
2018-06-05311: Vending — Unlicensed
2018-06-04Certificate of occupancy Temporary
2018-05-31Cooling tower inspection — violation AH8R
2018-05-31Cooling tower inspection — violation AH8L
2018-05-31Cooling tower inspection — violation AH8Z
2018-05-31Cooling tower inspection — violation AH8X
2018-05-31Cooling tower inspection — violation AH8M
2018-05-31Cooling tower inspection — violation AH8S
2018-05-31Cooling tower inspection — violation AH8W
2018-05-31Cooling tower inspection — violation AH8S
2018-05-31Cooling tower inspection — violation AH8Z
2018-05-31Cooling tower inspection — violation AH8V
2018-05-31Cooling tower inspection — violation AH8M
2018-05-31Cooling tower inspection — violation AH8F
2018-05-31Cooling tower inspection — violation AH8X
2018-05-31Cooling tower inspection — violation AH8R
2018-05-31Cooling tower inspection — violation AH8F
2018-05-31Cooling tower inspection — violation AH8L
2018-05-31Cooling tower inspection — violation AH8W
2018-05-31311: Vending — Unlicensed
2018-05-29311: Vending — Unlicensed
2018-05-25311: Vending — Unlicensed
2018-05-22Permit PL — ISSUED
2018-05-21311: Vending — In Prohibited Area
2018-05-15311: Vending — In Prohibited Area
2018-05-11311: Vending — In Prohibited Area
2018-05-07311: Vending — In Prohibited Area
2018-05-05311: Taxi Complaint — Driver Complaint
2018-05-03311: Vending — Unlicensed
2018-05-03311: Vending — Unlicensed
2018-04-26311: Vending — Unlicensed
2018-03-23311: Vending — Unlicensed
2018-03-19Boiler inspection — defects found
2018-03-19Boiler inspection — defects found
2018-03-19Boiler inspection — defects found
2018-03-19311: Vending — In Prohibited Area
2018-03-15311: Vending — Unlicensed
2018-03-13311: Sidewalk Condition — Broken Sidewalk
2018-03-13311: Vending — In Prohibited Area
2018-03-07311: Vending — In Prohibited Area
2018-03-01311: Vending — Unlicensed
2018-02-28Certificate of occupancy Temporary
2018-02-20311: Vending — In Prohibited Area
2018-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2018-01-17Rodent inspection: Bait applied
2018-01-12311: Vending — Unlicensed
2018-01-03Rodent inspection: Bait applied
2017
2017-12-26Rodent inspection: Bait applied
2017-12-19Rodent inspection: Bait applied
2017-12-05311: Vending — Unlicensed
2017-11-27Rodent inspection: Failed for Rat Activity
2017-11-22Certificate of occupancy Temporary
2017-11-14311: Street Light Condition — Street Light Out
2017-11-13311: Vending — Unlicensed
2017-11-09311: Street Light Condition — Lamppost Wire Exposed
2017-11-09311: Sidewalk Condition — Broken Sidewalk
2017-11-02Rodent inspection: Bait applied
2017-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-11-01Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2017-10-27Rodent inspection: Bait applied
2017-10-24311: Vending — Unlicensed
2017-10-23311: Vending — In Prohibited Area
2017-10-21311: Sidewalk Condition — Broken Sidewalk
2017-10-19Boiler inspection
2017-10-18Rodent inspection: Bait applied
2017-10-18311: Rodent — Rat Sighting
2017-10-18311: Rodent — Rat Sighting
2017-10-12Permit EW — ISSUED
2017-10-11Rodent inspection: Bait applied
2017-10-04Permit EW — ISSUED
2017-09-27311: Vending — In Prohibited Area
2017-09-22Rodent inspection: Failed for Rat Activity
2017-09-21Boiler inspection
2017-09-21Boiler inspection
2017-09-20311: Vending — In Prohibited Area
2017-09-19311: Vending — Unlicensed
2017-09-15311: Vending — Unlicensed
2017-09-15311: Vending — Unlicensed
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-11Job filed: STRUCTURAL WORK INVOLVES INSTALLING CONCRETE PADS FOR AC UNITS, REPLACING OF HATCHES AND SLAB REMOVAL AND WATERPROOFING RELATED TO COURTYARD WORK AS S$275,000
2017-09-11Job filed: STRUCTURAL WORK INVOLVES INSTALLING CONCRETE PADS FOR AC UNITS, REPLACING OF HATCHES AND SLAB REMOVAL AND WATERPROOFING RELATED TO COURTYARD WORK AS S$275,000
2017-09-08Job filed: SEE SECTION 24$170,000
2017-09-08Job filed: SEE SECTION 24$170,000
2017-09-07311: Vending — In Prohibited Area
2017-09-07Job filed: MODIFICATIONS TO EXISITNG HVAC SYSTEM, AND INSTALLATION OF NEW EMERGENCY GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL$1,530,945
2017-09-07Job filed: SEE COMMENTS SECTION 24.$1,765,581
2017-08-25Job filed: FILING FOR REHABILITATION OF REAR COURTYARD INVOLVING REMOVAL, REPAIRS AND REPLACE ASPHALT AND INSTALLATION OF PEDESTRIAN AND VEHICULAR SWING GATES AS$470,000
2017-08-24311: Rodent — Condition Attracting Rodents
2017-08-24311: Rodent — Rat Sighting
2017-08-24311: Rodent — Rat Sighting
2017-08-24311: Rodent — Condition Attracting Rodents
2017-08-23311: Rodent — Rat Sighting
2017-08-23311: Rodent — Rat Sighting
2017-08-23311: Rodent — Rat Sighting
2017-08-23311: Rodent — Rat Sighting
2017-08-23311: Rodent — Rat Sighting
2017-08-22311: Rodent — Rat Sighting
2017-08-18Rodent inspection: Failed for Rat Activity
2017-08-15Certificate of occupancy Temporary
2017-08-09311: Noise - Street/Sidewalk — Loud Music/Party
2017-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-07-31Rodent inspection: Failed for Rat Activity
2017-07-31311: Vending — Unlicensed
2017-07-29311: Street Light Condition — Street Light Out
2017-07-28311: Blocked Driveway — Partial Access
2017-07-18311: Rodent — Rat Sighting
2017-07-17FDNY inspection (SPECIAL-OTH)
2017-07-05Boiler inspection
2017-06-30311: Vending — Unlicensed
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-23DOB violation HBLVIO:
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-20DOB complaint, category ?
2017-05-25DOB violation E:
2017-05-25DOB violation E:
2017-05-25DOB violation E:
2017-05-25DOB violation E:
2017-05-25DOB violation E:
2017-05-25DOB violation E:
2017-05-25DOB violation E:
2017-05-24DOB violation E:
2017-05-24DOB violation E:
2017-05-24DOB violation E:
2017-05-09Certificate of occupancy Temporary
2017-05-05Cooling tower inspection — violation AH8Z
2017-05-05Cooling tower inspection — violation AH8R
2017-05-05Cooling tower inspection — violation AH8B
2017-05-05Cooling tower inspection — violation AH8T
2017-05-05Cooling tower inspection — violation AH8F
2017-05-05Cooling tower inspection — violation AH8Q
2017-05-05Cooling tower inspection — violation AH8Q
2017-05-05Cooling tower inspection — violation AH8L
2017-05-05Cooling tower inspection — violation AH8T
2017-05-05Cooling tower inspection — violation AH8S
2017-05-05Cooling tower inspection — violation AH8Z
2017-05-05Cooling tower inspection — violation AH8G
2017-05-05Cooling tower inspection — violation AH8T
2017-05-05Cooling tower inspection — violation AH8R
2017-05-05Cooling tower inspection — violation AH8H
2017-05-05Cooling tower inspection — violation AH8L
2017-05-05Cooling tower inspection — violation AH8B
2017-05-05Cooling tower inspection — violation AH8K
2017-05-05Cooling tower inspection — violation AH8S
2017-05-05Cooling tower inspection — violation AH8F
2017-05-05Cooling tower inspection — violation AH8Q
2017-05-05Cooling tower inspection — violation AH8M
2017-05-05Cooling tower inspection — violation AH8Z
2017-05-05Cooling tower inspection — violation AH8F
2017-05-05Cooling tower inspection — violation AH8M
2017-05-05Cooling tower inspection — violation AH8X
2017-05-05Cooling tower inspection — violation AH8W
2017-05-05Cooling tower inspection — violation AH8S
2017-05-05Cooling tower inspection — violation AH8G
2017-05-05Cooling tower inspection — violation AH8G
2017-05-05Cooling tower inspection — violation AH8X
2017-05-05Cooling tower inspection — violation AH8L
2017-05-05Cooling tower inspection — violation AH8B
2017-05-05Cooling tower inspection — violation AH8R
2017-05-05Cooling tower inspection — violation AH8X
2017-05-05Cooling tower inspection — violation AH8W
2017-05-05Cooling tower inspection — violation AH8M
2017-05-05Cooling tower inspection — violation AH8W
2017-05-02Rodent inspection: Failed for Rat Activity
2017-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-04-27311: Vending — Unlicensed
2017-04-22311: Taxi Complaint — Driver Complaint
2017-04-17311: Sidewalk Condition — Broken Sidewalk
2017-04-11311: Consumer Complaint — Non-Delivery Goods/Services
2017-04-11311: Indoor Air Quality — Ventilation
2017-03-24Rodent inspection: Failed for Rat Activity
2017-03-21Permit EW — ISSUED
2017-03-15311: Snow — E9 Snow / Icy Sidewalk
2017-03-15311: Rodent — Rat Sighting
2017-02-15Rodent inspection: Failed for Rat Activity
2017-02-06Certificate of occupancy Temporary
2017-02-02311: Illegal Parking — Double Parked Blocking Traffic
2017-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-01-03311: Taxi Report — Driver Report
2016
2016-12-22Facade (LL11) filing, cycle 8: SAFE
2016-12-22DOB violation FISP:
2016-12-20311: Broken Muni Meter — No Receipt
2016-12-20Permit PL — ISSUED
2016-12-15311: Recycling Enforcement — ER4 City Agency (Inst. Recycling)
2016-12-06311: Vending — Unlicensed
2016-12-06Certificate of occupancy Temporary
2016-12-01311: Water System — NO WATER - WNW
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-14311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-09311: Sewer — Catch Basin Sunken/Damaged/Raised (SC1)
2016-11-03311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2016-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-10-29311: Vending — Unlicensed
2016-10-26Rodent inspection: Failed for Rat Activity
2016-10-25311: Vending — Unlicensed
2016-10-24311: Consumer Complaint — Exchange/Refund/Return
2016-10-13311: Street Light Condition — Street Light Out
2016-10-11Permit EW — ISSUED
2016-10-06Permit EW — ISSUED
2016-10-06Permit EW — ISSUED
2016-10-03311: Consumer Complaint — Illegal/Unfair Booting
2016-10-02311: General Construction/Plumbing — Fence - None/Inadequate
2016-09-26311: Consumer Complaint — Illegal/Unfair Booting
2016-09-22311: Vending — Unlicensed
2016-09-08311: Consumer Complaint — Illegal/Unfair Booting
2016-08-16311: Consumer Complaint — Door Open with Air Conditioning On
2016-08-11311: Consumer Complaint — Door Open with Air Conditioning On
2016-08-04311: Consumer Complaint — Illegal/Unfair Booting
2016-08-04ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG FACADE.NORTH ELEVATION (NORTH/EAST CORNER) EXP#1, OBSERVE VERTICAL HAIR LINE CRACKS AT 4TH FLR
2016-08-03311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2016-08-03Job filed: MINOR GENERAL CONSTRUCTION WORK TO INCLUDE ALTERATIONS TO EXISTING COMMERCIAL SPACE ON 1ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OC$5,000
2016-08-03DOB complaint, category ?
2016-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-07-19311: Vending — In Prohibited Area
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-15DOB violation E:
2016-06-14DOB violation E:
2016-06-14DOB violation E:
2016-06-14DOB violation E:
2016-06-14DOB violation E:
2016-06-14DOB violation E:
2016-06-14DOB violation E:
2016-06-14DOB violation E:
2016-06-09311: Consumer Complaint — Illegal/Unfair Booting
2016-06-07Rodent inspection: Failed for Rat Activity
2016-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-05-16ECB CLASS - 2 violation: 05B10,97X10. 05B10-DOOR WILL NOT OPEN ON THE 6TH FLR AND OTHERS; 97X10-REPAIR THIS DEVICE AND RESTORE TO SERVICE.$500
2016-04-27DOB violation C:
2016-04-26DOB complaint, category ?
2016-04-22Rodent inspection: Failed for Rat Activity
2016-04-22311: Rodent — Rat Sighting
2016-03-29311: Bike Rack Condition — Bike Rack Repair
2016-03-23DOB complaint, category ?
2016-03-22311: Food Establishment — Bare Hands in Contact w/ Food
2016-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-01-19311: General Construction/Plumbing — Failure To Maintain
2016-01-19DOB complaint, category ?
2016-01-15311: Street Sign - Damaged — Stop
2016-01-15311: Electrical — Electrical Wiring Defective/Exposed
2016-01-15DOB complaint, category ?
2016-01-14311: Electrical — Electrical Wiring Defective/Exposed
2016-01-05311: Taxi Report — Driver Report
2015
2015-12-29Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM$5,000
2015-12-29Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM$5,000
2015-12-22311: Elevator — Elevator - Defective/Not Working
2015-12-22DOB complaint, category ?
2015-12-22Permit EW — ISSUED
2015-12-15311: Illegal Parking — Double Parked Blocking Vehicle
2015-12-08Job filed: PA
2015-12-08Job filed: PA
2015-12-03Permit PL — ISSUED
2015-11-27311: Elevator — Elevator - Defective/Not Working
2015-11-27DOB complaint, category ?
2015-11-11311: Elevator — Elevator - Defective/Not Working
2015-11-11DOB complaint, category ?
2015-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-10-14Job filed: ADDITION/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM.$5,000
2015-10-13Rodent inspection: Failed for Rat Activity
2015-10-08Permit EW — ISSUED
2015-10-07Permit EW — ISSUED
2015-10-06Permit EW — ISSUED
2015-10-05311: Rodent — Rat Sighting
2015-10-01Permit EW — ISSUED
2015-09-23Permit EW — ISSUED
2015-09-11Rodent inspection: Failed for Rat Activity
2015-09-09Agreement — from NEW YORK COMMUNITY BANK to SOULCYCLE 210 JORALEMON STREET, LLC; 210 MUNI, LLC
2015-09-01Job filed: A2$10,000
2015-09-01Job filed: MINOR STRUCTURAL ALTERATIONS TO 1ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$10,000
2015-09-01Permit PL — ISSUED
2015-08-18311: Street Condition — Pothole
2015-08-18Permit EW — ISSUED
2015-08-17Job filed: ALTERATIONS TO EXISTING COMMERCIAL SPACE ON THE CELLAR AND 1ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$274,995
2015-08-17Job filed: ALTERATIONS TO EXISTING COMMERCIAL SPACE ON THE SUB CELLAR, CELLAR AND 1ST FLOOR FOR NEW PLUMBING FIXTURES,HVAC EQUIPMENT, AND DUCT WORK AS PER PLANS $234,000
2015-08-17Job filed: ALTERATIONS TO EXISTING COMMERCIAL SPACE ON THE CELLAR AND 1ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$274,995
2015-08-17Job filed: ALTERATIONS TO EXISTING COMMERCIAL SPACE ON THE SUB CELLAR, CELLAR AND 1ST FLOOR FOR NEW PLUMBING FIXTURES,HVAC EQUIPMENT, AND DUCT WORK AS PER PLANS $234,000
2015-08-17Permit EW — ISSUED
2015-08-12311: Illegal Parking — Blocked Hydrant
2015-08-12Permit EW — ISSUED
2015-08-11Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$73,800
2015-08-06311: Non-Emergency Police Matter — Other (complaint details)
2015-08-04Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$16,000
2015-08-04Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$16,000
2015-08-03Permit PL — ISSUED
2015-08-03Permit PL — ISSUED
2015-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-07-30311: Consumer Complaint — Door Open with Air Conditioning On
2015-07-29311: Rodent — Signs of Rodents
2015-07-20Job filed: INTERIOR NON STRUCTURAL DEMOLITION TO EXISTING COMMERCIAL SPACE ON THE CELLAR AND 1ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPAN$52,380
2015-07-20Permit EW — ISSUED
2015-07-13DOB complaint, category ?
2015-07-01311: Noise — Noise: Alarms (NR3)
2015-06-26311: Consumer Complaint — Non-Delivery Goods/Services
2015-06-05311: Consumer Complaint — Illegal/Unfair Booting
2015-05-12311: Non-Emergency Police Matter — Other (complaint details)
2015-05-04FDNY inspection (RISK)
2015-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-04-20DOB violation E:
2015-04-20DOB violation E:
2015-04-20DOB violation E:
2015-04-20DOB violation E:
2015-04-20DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-17DOB violation E:
2015-04-16DOB violation E:
2015-04-16DOB violation E:
2015-04-16DOB violation E:
2015-04-16DOB violation E:
2015-04-16DOB violation E:
2015-03-24311: Sidewalk Condition — Broken Sidewalk
2015-03-12ECB CLASS - 2 violation: UNAPPROVED UNSAFE UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARTUS MATERIALS APPLIANCES OR WIRING IN USE. EXPOSE WIRING IN LOBBY N$4,000
2015-03-11311: Electrical — Electrical Wiring Defective/Exposed
2015-03-11DOB complaint, category ?
2015-03-04311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2015-03-04DOB complaint, category ?
2015-02-27Permit EW — ISSUED
2015-02-27Permit EW — ISSUED
2015-02-27Permit EW — ISSUED
2015-02-18311: Street Light Condition — Street Light Out
2015-02-11DOB complaint, category ?
2015-02-11DOB complaint, category ?
2015-02-11DOB complaint, category ?
2015-02-11DOB complaint, category ?
2015-02-11DOB complaint, category ?
2015-02-06Permit EW — ISSUED
2015-02-06Permit EW — ISSUED
2015-02-03Permit PL — ISSUED
2015-02-03Permit EW — ISSUED
2015-02-03Permit EW — ISSUED
2015-01-30Permit EW — ISSUED
2015-01-26Permit EQ — ISSUED
2015-01-23Permit EW — ISSUED
2015-01-21Permit EW — ISSUED
2014
2014-12-31311: Street Condition — Pothole
2014-12-29Job filed: FILING HEREWITH MODIFICATIONS TO EXISITNG HVAC SYSTEM, AND INSTALLATION OF NEW EMERGENCY GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$1,548,945
2014-12-23Job filed: FILING HEREWITH FOR REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS SPECIFIC TO ELECTRIC CLOSETS, AND INSTALLATION OF RELATED FINISHES AS PER $1,765,581
2014-12-23Job filed: FILING HEREWITH FOR STRUCTURAL MODIFICATIONS WITH SPECIFICS TO INSTALLATION OF SUPPORT DUNNAGE FOR EMERGENCY GENERATOR INSTALLATION AS PER PLANS. NO C$170,000
2014-12-19Job filed: FILING HEREWITH FOR MODIFICATIONS TO EXISITNG CLASS E FIRE ALARM SYSTEM AS PER PLANS. ADDITIONAL SMOKE DETECTORS BEING ADDED TO EXISTING SYSTEM AS PER$21,200
2014-12-19Job filed: FILING HEREWITH FOR MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,200
2014-12-19Job filed: FILING HEREWITH FOR MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,200
2014-12-16311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2014-12-16DOB complaint, category ?
2014-12-08Permit PL — ISSUED
2014-11-17Permit EW — ISSUED
2014-11-17Permit EW — ISSUED
2014-11-17Permit EW — ISSUED
2014-11-13Permit EW — ISSUED
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-30Job filed: RENOVATION TO EXISTING RETAIL SPACE ON THE CELLAR AND FIRST FLOOR. ARCHITECTURAL WORK. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$222,000
2014-10-30Job filed: SPRINKLER WORK FILED IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING RETAIL SPACE ON CELLAR, SC1, AND FIRST FLOOR. NO CHANGE TO USE, OCCUPANCY, OR E$53,000
2014-10-30Job filed: MECHANICAL AND PLUMBING FILED IN CONJUNCTION WITH THE RENOVATION OF EXISTING RETAIL ON CELLAR, SUB-CELLAR AND FIRST FLOOR. NO CHANGE TO USE, OCCUPANCY$187,000
2014-10-30Job filed: STRUCTURAL WORK FILED IN CONJUNCTION WITH THE RENOVATION OF EXISTING RETAIL SPACE ON THE CELLAR AND FIRST FLOOR. NO CHANGE TO USE, OCCUPANCY, OR EGRES$12,000
2014-10-30Job filed: SPRINKLER WORK FILED IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING RETAIL SPACE ON CELLAR, SC1, AND FIRST FLOOR. NO CHANGE TO USE, OCCUPANCY, OR E$53,000
2014-10-30Job filed: MECHANICAL AND PLUMBING FILED IN CONJUNCTION WITH THE RENOVATION OF EXISTING RETAIL ON CELLAR, SUB-CELLAR AND FIRST FLOOR. NO CHANGE TO USE, OCCUPANCY$187,000
2014-10-15Mortgage $26,000,000 — from 210 MUNI, LLC to NEW YORK COMMUNITY BANK$26,000,000
2014-10-09311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2014-10-09DOB complaint, category ?
2014-10-07Permit EW — ISSUED
2014-09-30Permit EW — ISSUED
2014-09-30Permit EW — ISSUED
2014-09-29Permit SG — ISSUED
2014-09-08Permit EW — ISSUED
2014-09-08Permit EW — ISSUED
2014-09-08Permit EW — ISSUED
2014-09-02Permit SG — ISSUED
2014-09-02Permit SG — ISSUED
2014-09-02Permit SG — ISSUED
2014-08-29Permit PL — ISSUED
2014-08-29Permit SG — ISSUED
2014-08-29Permit AL — ISSUED
2014-08-28Permit PL — ISSUED
2014-08-13MAPS — from 210 JORALEMON STREET CONDOMINIUM
2014-08-13ADEC — from 210 JORALEMON STREET CONDOMINIUM
2014-08-13MAPS — from 210 JORALEMON STREET CONDOMINIUM
2014-08-13ADEC — from 210 JORALEMON STREET CONDOMINIUM
2014-08-13Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNINGS ON THE STOREFRONT ENTRANCE, LPC DOCKET #136939, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,750
2014-08-13Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNINGS ON THE STOREFRONT ENTRANCE, LPC DOCKET #136939, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,750
2014-08-01Permit EW — ISSUED
2014-08-01Permit EW — ISSUED
2014-08-01Permit EW — ISSUED
2014-07-31311: Consumer Complaint — Sidewalk Blocked
2014-07-07Permit PL — ISSUED
2014-07-07Permit EW — ISSUED
2014-07-02Permit EW — ISSUED
2014-06-06DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-06-02ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. NOTE: 2 REVOLVING DOORS AT FRONT ENTRANCE TO BLDG, GLASS BROKEN & MISSING & IS
2014-06-02Job filed: REMOVAL OF EXISTING NON BEARING INTERIOR PARTITIONS AND DOORS. INSTALLATION OF NEW TEMPERED GLASS INTERIOR STORE FRONT PARTITION SYSTEM AND RECEPTION $200,000
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-29Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2014-05-29Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$290,000
2014-05-29Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2014-05-29Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$290,000
2014-05-29Job filed: MODIFICATIONS TO EXISTING SPRINKLER AND STANDPIPE SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$107,000
2014-05-29Job filed: STORE RENOVATION WORK TO INCLUDE PARTITION, CEILING AND DOOR WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$620,000
2014-05-29Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2014-05-23311: Non-Emergency Police Matter — Other (complaint details)
2014-05-22DOB complaint, category ?
2014-05-22DOB complaint, category ?
2014-05-19Facade (LL11) filing, cycle 7: SWARMP
2014-05-07311: General Construction/Plumbing — Failure To Maintain
2014-05-07DOB complaint, category ?
2014-04-22DOB complaint, category ?
2014-04-21Permit PL — ISSUED
2014-04-08Agreement — from THE CITY OF NEW YORK, DEPARTMENT OF CITY to BOARD OF MANAGERS OF THE 210 JORALEMON S
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-04-04DOB violation E:
2014-04-04DOB violation E:
2014-04-04DOB violation E:
2014-04-04DOB violation E:
2014-04-04DOB violation E:
2014-04-04DOB violation E:
2014-04-03Permit EW — ISSUED
2014-04-02Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING- 'YOGA WORKS'. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, $2,214
2014-04-02Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING- "YOGA WORKS". NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, $2,214
2014-04-02Permit AL — ISSUED
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-28Job filed: RESPECTFULLY REQUESTING TO MODIFY AIR DUCT AND AIR GRILLES. INSTALL 3 NEW SPRINKLER HEADS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$2,000
2014-03-27Job filed: MODIFY EXISTING CLASS E FIRE ALARM SYSTEM. NO CHANGE OCCUPANY, USE, OR CHANGE OF EGRESS UNDER THIS APPLICATION.$2,000
2014-03-10Job filed: HEREBY FILING THIS APPLICATION FOR A LEGALIZATION OF THE EXISTING CLASS E SYST EM AS PER FDNY VARIANCE LETTER DATED 08/16/2014 F.P. INDEX 1408053. NO $250,000
2014-03-07Job filed: A2$85,000
2014-03-03Job filed: SPRINKLER MODIFICATIONS ON CELLAR AND FIRST FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2014-02-26Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCU$2,214
2014-02-26Permit SG — ISSUED
2014-02-26Permit AL — ISSUED
2014-02-26Permit SG — ISSUED
2014-02-25311: Sidewalk Condition — Broken Sidewalk
2014-02-25311: Water Conservation — Wasting Faucets,Sinks,Flushometer,Urinal,Etc. - Other (CWO)
2014-02-25Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCU$2,214
2014-02-25Permit AL — ISSUED
2014-02-21311: Consumer Complaint — Illegal/Unfair Booting
2014-02-12Permit PL — ISSUED
2014-02-06311: Illegal Parking — Posted Parking Sign Violation
2014-01-31Permit EW — ISSUED
2014-01-16311: Consumer Complaint — Overcharge
2014-01-15Permit EW — ISSUED
2014-01-02Permit PL — ISSUED
2013
2013-12-30Job filed: MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,350
2013-12-30Job filed: PARTITION, CEILING MODIFICATIONS AND RELATED COSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRES OR OCCUPANCY.$70,000
2013-12-30Job filed: MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,350
2013-12-30Permit EW — ISSUED
2013-12-30Permit EW — ISSUED
2013-12-19Job filed: MINOR INTERIOR RENOVATION AND GENERAL CONSTRUCTION ON FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$65,000
2013-12-19Job filed: INTERIOR RENOVATION & GENERAL CONSTRUCTION ON CELLAR FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MH-PL WORK FILED UN$275,000
2013-12-12311: Asbestos — N/A
2013-12-02311: Consumer Complaint — Illegal/Unfair Booting
2013-12-02Permit SG — ISSUED
2013-12-02Permit SG — ISSUED
2013-12-02Permit SG — ISSUED
2013-12-02Permit SG — ISSUED
2013-12-02Permit SG — ISSUED
2013-12-02Permit SG — ISSUED
2013-11-26Permit EW — ISSUED
2013-11-26Permit EW — ISSUED
2013-11-26Permit EQ — ISSUED
2013-11-26Permit EW — ISSUED
2013-11-26Permit EW — ISSUED
2013-11-26Permit EW — ISSUED
2013-11-13Permit EW — ISSUED
2013-11-07Job filed: ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM$250,000
2013-10-29Job filed: INSTALLATION OF FABRIC AWNING (D). NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2013-10-29Job filed: INSTALLATION OF FABRIC AWNING (D). NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2013-10-29Job filed: INSTALLATION OF FABRIC AWNING (B) WITH LETTERING 'SEPHORA' NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2013-10-29Job filed: INSTALLATION OF FABRIC AWNING (A) WITH LETTERING 'SEPHORA" NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2013-10-29Job filed: INSTALLATION OF FABRIC AWNING (B) WITH LETTERING 'SEPHORA" NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2013-10-29Job filed: INSTALLATION OF FABRIC AWNING (C). NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2013-10-29Permit EW — ISSUED
2013-10-29Permit EW — ISSUED
2013-10-29Permit EW — ISSUED
2013-10-29Permit EW — ISSUED
2013-10-11311: Broken Muni Meter — Timer Defect - Fast/Fail
2013-10-10311: Sidewalk Condition — Broken Sidewalk
2013-10-01Job filed: MODIFY EXISTING SPRINKLER SYSTEM FILED IN CONJ. W/320512637$49,000
2013-10-01Job filed: MODIFY EXISTING SPRINKLER SYSTEM FILED IN CONJ. W/320512637$49,000
2013-10-01Job filed: MODIFY EXISTING SPRINKLER SYSTEM FILED IN CONJ. W/320512637$49,000
2013-10-01Permit EW — ISSUED
2013-09-24Permit EQ — ISSUED
2013-09-24Permit EQ — ISSUED
2013-09-24Permit EQ — ISSUED
2013-08-14ADEC — from 210 JORALEMON STREET CONDOMINIUM
2013-08-14ADEC — from 210 JORALEMON STREET CONDOMINIUM
2013-08-02Permit EW — ISSUED
2013-07-23311: Street Condition — Blocked - Construction
2013-07-12Permit PL — ISSUED
2013-07-11311: Consumer Complaint — Exchange/Refund/Return
2013-07-11Permit PL — ISSUED
2013-07-02Job filed: FILE TO INSTALL A MANUAL, SMOKE/DUCT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH PURGE IN SUB-CELLAR AND CENTRAL OFFICE CONNECTION AS PER PLANS SUB$100,000
2013-06-27Permit EW — ISSUED
2013-06-27Permit EW — ISSUED
2013-06-25Permit EQ — ISSUED
2013-06-25Permit EW — ISSUED
2013-06-17SMIS — from NEW YORK CITY ECONOMIC DEVELOPMENT CORPO to 210 MUNI, LLC
2013-06-12Job filed: MECHANCIAL AND PLUMBING WORK ASSOCIATED WITH TENANT BUILD OUT FOR SEPHORA. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$160,000
2013-06-12Job filed: REMOVE/INSTALL NON LOAD BEARING PARTITIONS, FLOORING, CEILING, FINISHES AND FIXTURES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN EGRESS, USE OR OCC$429,200
2013-06-12Job filed: STRUCTURAL WORK ASSOCIATED WITH TENANT BUILD OUT FOR SEPHORA...WORK TO INCLUDE DUNNAGE FOR HVAC UNITS AND WALL FRAMING AS PER PLANS SUBMITTED HEREWITH$60,000
2013-06-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2013-05-14311: Water System — Leak (Use Comments) (WA2)
2013-05-13311: Noise — Noise: Construction Equipment (NC1)
2013-04-30Permit EW — ISSUED
2013-04-30Permit EW — ISSUED
2013-04-30Permit EW — RE-ISSUED
2013-04-30Permit EQ — ISSUED
2013-04-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-04-13DOB complaint, category ?
2013-04-12ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET BLDG CODE SPECIFICATIONS. SIDEWALK SHED LIGHTING NOT OPERATING ON JORALEMON STREET & COURT STREET SIDE
2013-04-05311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-04-05DOB complaint, category ?
2013-04-03Permit EW — ISSUED
2013-04-03Permit EW — ISSUED
2013-03-21311: Building/Use — Illegal Conversion Of Residential Building/Space
2013-03-21DOB complaint, category ?
2013-03-14Permit AL — ISSUED
2013-03-11311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-03-11DOB complaint, category ?
2013-03-06311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-03-06DOB complaint, category ?
2013-03-05311: Consumer Complaint — Damaged/Defective Goods
2013-03-05DOB violation E:
2013-03-05DOB violation E:
2013-03-05DOB violation E:
2013-03-05DOB violation E:
2013-03-05DOB violation E:
2013-03-05DOB violation E:
2013-03-05DOB violation E:
2013-02-25Rodent inspection: Passed
2013-02-14Permit PL — ISSUED
2013-02-01Job filed: FILING HEREWITH FOR STRUCTURAL MODIFICATIONS WITH SPECIFICS TO INSTALLATION OF SUPPORT DUNNAGE FOR EMERGENCY GENERATOR INSTALLATION AS PER PLANS. NO C$170,000
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2013-01-31Job filed: FILING HEREWITH FOR MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2013-01-31Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$104,800
2013-01-31Job filed: FILING HEREWITH MODIFICATIONS TO EXISITNG HVAC SYSTEM, AND INSTALLATION OF NEW EMERGENCY GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$1,345,695
2013-01-31Job filed: FILING HEREWITH FOR REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS SPECIFIC TO ELECTRIC CLOSETS, AND INSTALLATION OF RELATED FINISHES AS PER $1,492,260
2013-01-28DOB complaint, category ?
2013-01-09311: Sidewalk Condition — Broken Sidewalk
2013-01-08Permit EW — ISSUED
2012
2012-12-30311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-12-30DOB complaint, category ?
2012-12-12Permit EW — RE-ISSUED
2012-12-12Permit EW — RE-ISSUED
2012-12-12Permit EW — ISSUED
2012-12-04311: Noise — Noise: Construction Before/After Hours (NM1)
2012-12-03311: Noise — Noise: Construction Before/After Hours (NM1)
2012-12-03Permit EW — ISSUED
2012-11-15Job filed: MODIFICATION OF SPRINKLER SYSTEM ON EIXST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$238,025
2012-11-15Job filed: STRUCTURAL MODIFICATION TO EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$618,865
2012-11-15Job filed: MODIFICATION OF EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,094,325
2012-11-15Job filed: MECHANICAL AND PLUMBING MODIFICATION TO EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,332,940
2012-11-15Job filed: MODIFICATION OF EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,094,325
2012-11-15Job filed: MECHANICAL AND PLUMBING MODIFICATION TO EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,332,940
2012-11-15Job filed: BNP 12-324,244'FRONTAGE,ALT-1# 320447370
2012-11-15Job filed: MODIFICATION OF SPRINKLER SYSTEM ON EIXST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$238,025
2012-11-15Job filed: BNP 12-324,244'FRONTAGE,ALT-1# 320447370
2012-11-15Job filed: STRUCTURAL MODIFICATION TO EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$618,865
2012-11-15Job filed: MECHANICAL AND PLUMBING MODIFICATION TO EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,332,940
2012-11-15Job filed: MODIFICATION OF EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,094,325
2012-11-15Job filed: STRUCTURAL MODIFICATION TO EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$618,865
2012-11-12311: Street Condition — Pothole
2012-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2012-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2012-10-24ECB CLASS - 2 violation: WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5 IN THAT WRKRS IN PROCESS OF DEMOLISHING INTERIOR PARTITIONS ON 2ND FL$400
2012-10-22311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-10-22DOB complaint, category ?
2012-10-19311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2012-10-19DOB complaint, category ?
2012-10-16Permit EW — ISSUED
2012-10-12311: Noise — Noise: Construction Before/After Hours (NM1)
2012-10-11311: Noise — Noise: Private Carting Noise (NQ1)
2012-10-03Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-09-25311: General Construction/Plumbing — Adjacent Buildings Not Protected
2012-09-25DOB complaint, category ?
2012-09-19311: Noise - Commercial — Car/Truck Horn
2012-09-18Permit EQ — ISSUED
2012-09-16311: Sidewalk Condition — Broken Sidewalk
2012-09-11Permit EQ — ISSUED
2012-09-10Job filed: PROPOSED INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-09-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-09-10Job filed: PROPOSED INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-09-10Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-09-10Permit EQ — ISSUED
2012-09-07Facade (LL11) filing, cycle 7: SWARMP
2012-09-07DOB violation LL11/98: CYCLE 7 REPORT FILED UNSAFE
2012-08-28DOB violation E: PVT STATES 208 JORALEMON STREET - DOB HAS 210 JORALEMON STREET - SEE B IS
2012-08-27311: Consumer Complaint — Non-Delivery of Papers
2012-08-27Permit EW — ISSUED
2012-08-27DOB violation E:
2012-08-27DOB violation E:
2012-08-27DOB violation E: PVT STATES 208 JORALEMON STREET - DOB HAS 210 JORALEMON STREET - SEE B IS
2012-08-27DOB violation E:
2012-08-27DOB violation E: PVT STATES 208 JORALEMON STREET - DOB HAS 210 JORALEMON STREET - SEE B IS
2012-08-23311: Sidewalk Condition — Broken Sidewalk
2012-08-21Permit EW — ISSUED
2012-07-25Job filed: TEST$150,000
2012-07-24Job filed: INSTALLATION OF FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$10,000
2012-07-24Job filed: MODIFICATION TO EXIST'G MECHANICAL AND PLUMBING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$95,000
2012-07-24Job filed: INTERIOR RENOVATION OF EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2012-07-24Job filed: INSTALLATION OF FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$10,000
2012-07-24Job filed: SPRINKLER MODIFICATION OF EXISTING BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,800
2012-07-24Job filed: SPRINKLER MODIFICATION OF EXISTING BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,800
2012-07-24Job filed: INTERIOR RENOVATION OF EXIST'G BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2012-07-15311: Noise — Noise: Construction Equipment (NC1)
2012-07-06Job filed: DEMOLITION OF NON-LOAD BEARING PARTITIONS AS INDIACTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2012-07-06Job filed: DEMOLITION OF NON-LOAD BEARING PARTITIONS AS INDIACTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2012-07-06DOB complaint, category ?
2012-07-06Job filed: DEMOLITION OF NON-LOAD BEARING PARTITIONS AS INDIACTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2012-06-28311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-06-28311: Noise — Noise: Construction Equipment (NC1)
2012-06-28DOB complaint, category ?
2012-06-26311: Noise — Noise: Construction Equipment (NC1)
2012-06-13Tenant complaint: NONCONST — RUBBISH
2012-06-13Tenant complaint: PLUMBING — WATER-LEAKS
2012-06-13Tenant complaint: GENERAL — STAIRS
2012-06-13Tenant complaint: GENERAL — DOORS
2012-06-13Tenant complaint: GENERAL — MAILBOX
2012-06-13Tenant complaint: GENERAL — DOORS
2012-06-13DOB violation C: STOP ALL WORK MAKE SITE SAFE CONTACT DOB
2012-06-12Permit EW — ISSUED
2012-06-07DOB complaint, category ?
2012-05-31Permit EW — ISSUED
2012-05-31Permit PL — ISSUED
2012-05-30PAT — from 210 MUNI, LLC to 210 JORALEMON STREET CONDOMINIUM
2012-05-30Deed $10,000,000 — from NEW YORK CITY ECONOMIC DEVELOPMENT CORPO to 210 MUNI, LLC$10,000,000
2012-05-30Deed $10,000,000 — from THE CITY OF NEW YORK to NEW YORK CITY ECONOMIC DEVELOPMENT CORPO$10,000,000
2012-05-30PAT — from THE CITY OF NEW YORK to 210 JORALEMON STREET CONDOMINIUM
2012-05-30Deed — from THE CITY OF NEW YORK to THE CITY OF NEW YORK
2012-05-30Permit EW — ISSUED
2012-05-30Permit EW — ISSUED
2012-04-24MAPS — from 210 JORALEMON STREET CONDOMINIUM
2012-04-24CDEC — from 210 JORALEMON STREET CONDOMINIUM
2012-04-24CDEC — from 210 JORALEMON STREET CONDOMINIUM
2012-04-24MAPS — from 210 JORALEMON STREET CONDOMINIUM
2012-03-29Job filed: FILING HEREWITH CONDOMINIUM SUBDIVISION. BLOCK:286 LOT:30 CONDO# 3197 TAX LOTS:1001 & 1002
2012-03-17DOB complaint, category ?
2012-03-13Job filed: TI INCLUDE EATING AND DRINKING ESTABLISHMANT ON 1ST FLOOR & STORAGE ACCESSORY USE TO EATING AND DRINKING ESTABLISHMENT ON CELLAR FLOOR AS INDICATE$3,000
2012-02-01Job filed: REMOVAL AND INTERIOR RENOVATION OF MECHANICAL & PLUMBING FIXTURES AT 1ST AND 2ND FLOOR.$770,000
2012-02-01Job filed: MODIFICATION TO EXISTING SPRINKLER ALARM SYSTEM ON PORTIONS OF THE 1ST AND 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2012-02-01Job filed: INTERIOR RENOVATION FOR PORTIONS OF THE 1ST AND 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,390,000
2012-02-01Job filed: STRUCTURAL WORK AT THE 1ST AND 2ND FLOOR.$10,000
2012-02-01Job filed: STRUCTURAL WORK AT THE 1ST AND 2ND FLOOR.$10,000
2012-02-01Job filed: INTERIOR RENOVATION FOR PORTIONS OF THE 1ST AND 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,390,000
2012-02-01Job filed: INTERIOR RENOVATION FOR PORTIONS OF THE 1ST AND 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,390,000
2012-02-01Job filed: STRUCTURAL WORK AT THE 1ST AND 2ND FLOOR.$10,000
2012-02-01Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM ON PORTIONS OF THE 1ST AND 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. "PROPOSED PLANS MUST BE REVIEWE$50,750
2011
2011-10-11Permit EW — ISSUED
2011-09-22Permit EW — ISSUED
2011-09-09Job filed: MODIFY EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,250
2011-09-09Job filed: MODIFY EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,250
2011-08-11Job filed: REPLACEMENT OF EXISTING FAN CONTROL UNITS ON FLOOR 1-11 AND 13. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,500,000
2011-08-04Job filed: REPAIR EXISTING PARTITIONS, CONSTRUCT NEW PARTITION, REPAIR CEILING.$13,061
2011-06-02DOB complaint, category ?
2011-05-09Permit EW — ISSUED
2011-04-06Permit EW — ISSUED
2010
2010-12-28Permit PL — ISSUED
2010-10-06Facade (LL11) filing, cycle 6: SAFE
2010-08-16Job filed: STRUCTURAL WORK ASSOCIATED WITH NEW CATWALKS AND LADDERS$200,000
2010-08-16Job filed: REMOVAL OF MECHANICAL EQUIPMENT$50,000
2010-08-16Job filed: STRUCTURAL WORK ASSOCIATED WITH NEW CATWALKS AND LADDERS$200,000
2010-08-16Job filed: INSTALL OF CATWALKS AND LADDERS TO SERVICE MECHANICAL EQUIPMENT$600,000
2010-08-16Job filed: INSTALL OF CATWALKS AND LADDERS TO SERVICE MECHANICAL EQUIPMENT$600,000
2010-07-21Permit EW — ISSUED
2010-06-17Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2010-06-17Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2010-06-08Permit EW — ISSUED
2010-06-02Job filed: REPLACE FAN COIL UNITS AND INSTALL NEW HVAC SYSTEMS TO SERVICE TESTING CENTERS ON 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,000
2010-05-04DOB violation E:
2010-05-04DOB violation E:
2010-05-04DOB violation E:
2010-03-29Permit EW — ISSUED
2010-03-23DOB complaint, category ?
2010-01-27ECB CLASS - 2 violation: FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BAT
2009
2009-12-31DOB violation LBLVIO:
2009-11-06ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT
2009-11-05DOB complaint, category ?
2009-09-22Permit PL — ISSUED
2009-09-11Permit EW — ISSUED
2009-07-10Job filed: MODIFY EXISTING SPRINKLER SYSTEM ON 3RD FLR.$20,000
2009-07-10Job filed: MODIFY EXISTING SPRINKLER SYSTEM ON 3RD FLR.$20,000
2009-06-25Permit EQ — ISSUED
2009-06-25Job filed: PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMIDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2009-06-22Permit EW — ISSUED
2009-06-19Job filed: MINOR INTERIOR RENOVATION CONSISTING OF NEW FINISHES$100,000
2009-06-19Job filed: MINOR INTERIOR RENOVATION CONSISTING OF NEW FINISHES$100,000
2009-06-19Job filed: HVAC MODIFICATIONS$5,500
2009-06-05Permit EW — ISSUED
2009-05-22ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT
2009-04-15Permit EW — ISSUED
2009-04-14DOB complaint, category ?
2009-04-13Permit EW — ISSUED
2009-04-10DOB complaint, category ?
2009-02-23Permit EW — ISSUED
2009-02-12DOB violation E:
2009-02-12DOB violation E:
2009-02-12DOB violation E:
2009-02-12DOB violation E:
2009-02-12DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-02-11DOB violation E:
2009-01-21Permit EW — ISSUED
2009-01-14Permit EW — ISSUED
2009-01-01DOB violation LL6291:
2008
2008-12-19DOB complaint, category ?
2008-12-11Permit EW — ISSUED
2008-12-01Job filed: STRUCTURAL WORK ON THE 3RD & 4TH FLRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,000
2008-11-19ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS IN THAT LIGHTING FIXTURES THAT WERE INSTALLED UNDERNEATH HAVE A SECTION THAT HAD C$10,000
2008-11-14DOB complaint, category ?
2008-11-07ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT
2008-10-29DOB complaint, category ?
2008-10-24ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. LIGHTS ARE NOT ILLUMINATED 845PM. REMEDY: CONFORM SHED TO CODE SPECIFICATIONS.
2008-10-24ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATION.NOTED:SHED ERECTED AS PER 302304566 IS DEFECTIVE IN THAT LIGHTS NOT LIT & ON METAL
2008-10-21DOB complaint, category ?
2008-10-07Job filed: A2$1,022,250
2008-10-07Permit EW — ISSUED
2008-10-07Permit EW — ISSUED
2008-09-29Permit PL — ISSUED
2008-09-24Permit EW — ISSUED
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-23DOB violation E:
2008-09-22DOB violation E:
2008-09-22DOB violation E:
2008-09-22DOB violation E:
2008-09-22DOB violation E:
2008-09-22DOB violation E:
2008-09-09DOB complaint, category ?
2008-08-29Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 4TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.$200,000
2008-08-29Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 4TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.$200,000
2008-08-29Job filed: REPLACE FANCOIL UNITS AND INSTALL NEW HVAC SYSTEMS TO SERVICE TESTING CENTERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,215,000
2008-08-29Job filed: REPLACE FANCOIL UNITS AND INSTALL NEW HVAC SYSTEMS TO SERVICE TESTING CENTERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,215,000
2008-08-28DOB violation C:
2008-08-25DOB complaint, category ?
2008-08-15Job filed: REPLACEMENT OF BATHROOMS ON THE 3RD AND 4TH FLRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000,000
2008-05-27Permit EQ — ISSUED
2008-05-17ECB Hazardous violation: WORK W.OUT PERMIT, EXPIRED PERMIT-SHED UP AND PERMIT 3302304556 WAS EXP ON 05-01-08. SIDE WALK SHED DOESN'T MEET, BUILDING CODE SP$2,250
2008-05-04DOB complaint, category ?
2008-04-30DOB complaint, category ?
2008-04-03Permit EW — ISSUED
2008-04-01DOB complaint, category ?
2008-03-31DOB violation LL2604E:
2008-03-28ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT
2008-03-12Permit EW — ISSUED
2008-02-29Job filed: DEMOLITION OF HUNG CEILING, WALL PARTITIONS, LIGHT FIXTURES AND SOME MECHANICA L, ELECTRICAL, AND HVAC$150,000
2008-02-29Job filed: DEMOLITION OF HUNG CEILING, WALL PARTITIONS, LIGHT FIXTURES AND SOME MECHANICA L, ELECTRICAL, AND HVAC$150,000
2008-02-12DOB violation E:
2008-02-12DOB violation E:
2008-02-12DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:
2008-02-11DOB violation E:

Support this site Back to the building page