561 President Street · Brooklyn · BBL 3004410042
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
29 service requests in the last three years. Most common: Illegal Parking (13) · Street Condition (5) · Dirty Condition (4) · Blocked Driveway (2) · Noise (1) · New Tree Request (1).
Filed construction activity
$43,950 in permitted construction work filed since
2016 (9 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$24,413,000
$10,985,850
2026
$26,121,000
$11,754,450
2027
$28,902,000
$13,005,900
The city's market estimate has risen
18% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
In the city's stormwater flood map for a moderate storm at today's
sea levels — modeled ponding of 4 inches or more in a heavy cloudburst (2.13 in/hr). Only
0.25% of NYC lots carry this flag; basement and ground-floor spaces are most at risk.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Union St — R · 300 ft straight-line (about a 1-minute walk) · station accessibility: none Bergen St — 2 3 · 0.5 mi straight-line (about a 14-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 3 Av / Union St — B37 · 450 ft
Citi Bike
President St & 4 Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
29 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,501,832 on
2021-06-09 (lender: State Bank Of Texas). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2022-09-14
CMTG $3,981,000 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$3,981,000
2021-06-09
Mortgage $1,501,833 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$1,501,833
2021-06-09
Agreement $21,455,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$21,455,000
2021-06-09
AL&R $21,455,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$21,455,000
2021-06-09
Agreement $2,145,000 — from PRESIDENT SAI, LLC; PRESIDENT SAI II, LLC; BHAGIA, RAJESH to STATE BANK OF TEXAS
$2,145,000
2020-08-18
Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI LLC; PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$4,100,000
2020-07-15
CMTG $3,086,483 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$3,086,483
2020-07-15
AL&R $3,086,483 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$3,086,483
2020-07-15
Mortgage $3,086,483 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$3,086,483
2020-07-15
CMTG $2,488,517 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$2,488,517
2020-07-15
AL&R $2,488,517 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$2,488,517
2020-07-15
Mortgage $2,488,517 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$2,488,517
2020-07-15
Agreement $3,653,167 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$3,653,167
2020-07-15
Agreement $1,900,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$1,900,000
2020-07-15
Agreement $8,825,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$8,825,000
Ten-year activity
100500
2017
2018
59
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
8
13
6
0
1
28
2018
15
20
9
0
0
44
2019
11
32
8
8
0
59
2020
20
14
6
10
0
50
2021
10
6
17
4
1
38
2022
4
5
9
1
1
20
2023
0
2
12
0
1
15
2024
0
0
14
0
1
15
2025
0
0
6
0
0
6
2026
0
5
8
0
1
14
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
DOB violation C: PARTIAL VACATE ORDER. HAZ CONDITIONS WERE OBSVD AT WALL DIRECTLY ADJ PARKING LOT IN REAR OF HOTEL. WALL IS IN STATE OF DISREPAIR,
2026-08-06
ECB CLASS - 3 violation: VIOLATION OF THE ZONING RESOLUTION .AT TIME OF INSPECTION I OBSERVED AT FRONT EXPO.1 A GRAY VEHICLE WITH LICENSE PLATE #LVX 7635 P
2026-08-04
DOB complaint, category ?
2026-05-24
311: Street Condition — Cave-in
2026-05-13
311: Illegal Parking — Blocked Sidewalk
2026-05-07
311: Illegal Parking — Blocked Sidewalk
2026-05-07
311: Illegal Parking — Paper License Plates
2026-03-15
311: Street Condition — Cave-in
2026-03-09
311: Illegal Parking — Blocked Hydrant
2026-03-03
311: Posting Advertisement — Vehicle
2026-01-30
Restaurant inspection: TOWNEPLACE SUITES BY MARRIOTT — grade A
The full timeline
2026
2026-10-09311: Illegal Parking — Blocked Sidewalk
2026-09-22DOB complaint, category ?
2026-09-22DOB complaint, category ?
2026-09-22DOB violation C: PARTIAL VACATE ORDER. HAZ CONDITIONS WERE OBSVD AT WALL DIRECTLY ADJ PARKING LOT IN REAR OF HOTEL. WALL IS IN STATE OF DISREPAIR,
2026-08-06ECB CLASS - 3 violation: VIOLATION OF THE ZONING RESOLUTION .AT TIME OF INSPECTION I OBSERVED AT FRONT EXPO.1 A GRAY VEHICLE WITH LICENSE PLATE #LVX 7635 P
2026-08-04DOB complaint, category ?
2026-05-24311: Street Condition — Cave-in
2026-05-13311: Illegal Parking — Blocked Sidewalk
2026-05-07311: Illegal Parking — Blocked Sidewalk
2026-05-07311: Illegal Parking — Paper License Plates
2026-03-15311: Street Condition — Cave-in
2026-03-09311: Illegal Parking — Blocked Hydrant
2026-03-03311: Posting Advertisement — Vehicle
2026-01-30Restaurant inspection: TOWNEPLACE SUITES BY MARRIOTT — grade A
2025
2025-10-09311: Street Condition — Cave-in
2025-10-02311: Illegal Parking — Blocked Sidewalk
2025-09-30311: Illegal Parking — Blocked Sidewalk
2025-09-23311: Street Condition — Cave-in
2025-03-04311: Street Condition — Plate Condition - Noisy
2023-07-18Restaurant inspection: TOWNEPLACE SUITES BY MARRIOTT
2023-07-01311: Consumer Complaint — Shipping Company
2023-06-09311: Dirty Condition — Trash
2023-05-15311: Dead/Dying Tree — Planted Less Than 2 Years Ago
2023-04-18311: Water System — Hydrant Defective (WC2)
2023-04-12311: Noise - Commercial — Loud Talking
2023-03-28FDNY inspection (RISK)
2023-02-16311: Illegal Parking — Blocked Sidewalk
2023-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023-01-12311: Blocked Driveway — Partial Access
2022
2022-12-15311: Dirty Condition — Trash
2022-12-09Certificate of occupancy Final
2022-12-09Certificate of occupancy Final
2022-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-09-14CMTG $3,981,000 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$3,981,000
2022-08-21DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-20Certificate of occupancy Renewal Without Change
2022-06-02311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2022-05-10Rodent inspection: Passed
2022-04-26311: Illegal Parking — Blocked Sidewalk
2022-04-25311: Illegal Parking — Blocked Sidewalk
2022-04-04311: Illegal Parking — Blocked Sidewalk
2022-03-20311: Rodent — Signs of Rodents
2022-03-08311: Illegal Parking — Blocked Sidewalk
2022-02-17311: Illegal Parking — Blocked Sidewalk
2022-01-23311: Illegal Parking — Blocked Sidewalk
2022-01-18FDNY inspection (RISK)
2022-01-11Certificate of occupancy Renewal Without Change
2021
2021-11-12311: Illegal Parking — Blocked Sidewalk
2021-11-03311: Illegal Parking — Blocked Sidewalk
2021-11-02311: Illegal Parking — Blocked Sidewalk
2021-11-02311: Illegal Parking — Blocked Sidewalk
2021-11-02311: Illegal Parking — Blocked Sidewalk
2021-10-28311: Illegal Parking — Blocked Sidewalk
2021-10-28311: Illegal Parking — Blocked Sidewalk
2021-10-27311: Illegal Parking — Blocked Sidewalk
2021-10-27311: Illegal Parking — Blocked Sidewalk
2021-10-27311: General Construction/Plumbing — Curb Cut/Driveway/Carport - Illegal
2021-10-27311: Curb Condition — Defacement
2021-10-27DOB complaint, category ?
2021-10-26311: Illegal Parking — Blocked Sidewalk
2021-10-26311: Illegal Parking — Blocked Sidewalk
2021-10-26311: Illegal Parking — Blocked Sidewalk
2021-10-01311: Non-Emergency Police Matter — Other (complaint details)
2021-09-29Certificate of occupancy Initial
2021-09-13Permit PL — ISSUED
2021-08-26Permit Sidewalk Shed — Signed-off
2021-08-23Permit Boiler Equipment — Signed-off
2021-06-09Mortgage $1,501,833 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$1,501,833
2021-06-09Agreement $21,455,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$21,455,000
2021-06-09AL&R $21,455,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$21,455,000
2021-06-09Agreement $2,145,000 — from PRESIDENT SAI, LLC; PRESIDENT SAI II, LLC; BHAGIA, RAJESH to STATE BANK OF TEXAS$2,145,000
2021-06-09Permit NB — ISSUED
2021-06-09ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTE: AT TIME OF INSPECTION OF 5 STY NEW BLDG UNDER FINISHES A
2021-06-09ECB CLASS - 2 violation: BC3307.21 OBSTRUCTION OF STREETS OR SIDEWAK.NOTE:AT TIME OF INSPECTION OF 5 STORY NEW BUILDING OBSERVED JOBSITE IS CLOSING THE SID
2021-06-07FDNY inspection (CONSTR)
2021-06-07Permit NB — ISSUED
2021-06-02DOB complaint, category ?
2021-05-14Elevator permit: Furnish and install two (2) new MRL elevator as per attached drawings. All work to comply with ASME A17.1-2005S, as modified by A$360,000
2020-11-02311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2020-11-02DOB complaint, category ?
2020-10-08Permit EQ — ISSUED
2020-09-29Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2020-09-29Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2020-09-21Permit EQ — ISSUED
2020-09-16Permit Sign — Signed-off
2020-09-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-09-15Permit Sign — Signed-off
2020-09-14Permit Sign — Signed-off
2020-08-19311: Blocked Driveway — No Access
2020-08-18Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI LLC; PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$4,100,000
2020-08-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-08-13DOB complaint, category ?
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-15CMTG $3,086,483 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS$3,086,483
2020-07-15AL&R $3,086,483 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$3,086,483
2020-07-15Mortgage $3,086,483 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$3,086,483
2020-07-15CMTG $2,488,517 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS$2,488,517
2020-07-15AL&R $2,488,517 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$2,488,517
2020-07-15Mortgage $2,488,517 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$2,488,517
2020-07-15Agreement $3,653,167 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$3,653,167
2020-07-15Agreement $1,900,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$1,900,000
2020-07-15Agreement $8,825,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$8,825,000
2020-07-08311: Noise — Noise: Construction Equipment (NC1)
2020-06-29Permit EW — ISSUED
2020-06-29Permit EW — ISSUED
2020-06-25ECB CLASS - 2 violation: PROVISION OF LAW:3314.FAILURE TO MAINTAIN SUPPORTED SCAFFOLD ON SITE AS PER CODE.AT TIME OF INSPECTION ON AN ACTIVE 5 STORY NB CON$620
2020-06-25DOB complaint, category ?
2020-06-25ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS AND/OR APPROVE AMENDMENTS. @TIME OF INSPECTION ON AN ACTIVE 5 STY NB CONST SITE,$2,500
2020-05-26Permit EQ — ISSUED
2020-05-26Permit NB — ISSUED
2020-05-26Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2020-05-26Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2020-05-08DOB complaint, category ?
2020-05-08DOB violation C: THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #320915943 DUE TO CONTRACTOR WITHDRAWAL
2020-05-08DOB violation C: THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #320915943 DUE TO CONTRACTOR WITHDRAWAL
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-05-01311: COVID-19 Non-essential Construction — Construction
2020-05-01DOB complaint, category ?
2020-04-02Permit Supported Scaffold — Signed-off
2020-04-02Permit Sidewalk Shed — Signed-off
2020-03-19DOB complaint, category ?
2020-03-19ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT TIME OF INSPECTION ACTIVE JOB SITE INTERIOR$3,125
2020-02-25Permit PL — ISSUED
2020-02-24Job filed: INSTALL NON - ILLUMINATED WALL SIGN (TOWNEPLACE SUITES BY MARRIOTT)$3,650
2020-02-24Job filed: INSTALL ILLUMINATED WALL SIGN (TOWNEPLACE SUITES BY MARRIOTT)$1,650
2020-01-16Permit EQ — ISSUED
2019
2019-12-14DOB complaint, category ?
2019-12-14ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE JOBSITE FENC$1,000
2019-12-02Permit NB — ISSUED
2019-11-25Agreement $1,900,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$1,900,000
2019-11-25Agreement $8,825,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$8,825,000
2019-11-25Agreement $3,653,167 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$3,653,167
2019-10-22Permit EQ — ISSUED
2019-10-03FDNY inspection (CONSTR)
2019-09-26ECB CLASS - 1 violation: UNLAWFULLY CONTINUED WORK WHILE UNDER NOTICE OF STOP WORK ORDER. AT TIME OF POSTING SERVICE FOR VIO#35449400R I FOUND AN ACTIVE JO$12,500
2019-09-26DOB complaint, category ?
2019-09-26DOB complaint, category ?
2019-09-24ECB CLASS - 1 violation: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. AT TIME OF INSPECTION,SITE UNDER PARTIAL SWO INCLUDING EXPLICT INSTR$5,000
2019-09-20ECB CLASS - 1 violation: DESIGN DRAWING.NOTE:AT TIME OF MY INSPECTION OF A 5TH STORY BLDG,UNDERCONSTRUCTION AT 5TH STORY LEEL BLDG,UNDER CONSTRUCTION AT 5T$6,250
2019-09-20ECB CLASS - 1 violation: GUARD RAILS MISSING NOTE AT TIME OF MY INSEPCTION OF A5 STORY BUILDINGUNDER CONSTRUCTION AT 5 STORY STAGE CONSTRUCTION AT 5 STORY $5,000
2019-09-20ECB CLASS - 1 violation: BC3307.4/WORK AND STORAGE ZONE.NOTE:AT TIME OF MY INSPECTION OF A STORY BLDG.AT 5TH FLOOR LEVEL CONSTRUCTION WORK IN PROGRESS I OB$2,500
2019-09-20ECB CLASS - 2 violation: FLOOR AND EXIT SIGNS MISSING NOTE:AT TIME OF MY INSPECTION OF A 5 STORY BUILDING UNDER CONSTRUCTION AT 5TH STORY LEVEL CONSTRUCTIO
2019-09-20ECB CLASS - 1 violation: HOUSEKEEPING.NOTE:AT TIME OF MY INSPECTION OF A 5TH STORY BUILDING UNDER CONSTRUCTION AT 5TH STORY LEVEL I OBSERVED EXCESSIVE CONS$2,500
2019-09-20ECB CLASS - 1 violation: 3308.5 NETTING. NOTE:AT TIME OF MY INSPECTION OF A 5 STORY BUILDING UNDER CONSTRUCTION AT 5 STORY LEVEL CONSTRUCTION WORK IN PROGR$6,250
2019-09-20DOB complaint, category ?
2019-09-20ECB CLASS - 1 violation: STANDING WATER 3' OR MORE NOTE AT TIME OF MY INSPECTION OF A 5TH STORY BUILDING UNDER CONSTRUCTION AT 5TH STORY STAGE I OBSERVED L$2,500
2019-09-04ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING AT THE TIME OF MY INSPECTION 5 STY NB UP TO ROOF LEVEL WORK IN PROGRESS OBSERVED TO ADEQ
2019-09-04ECB CLASS - 2 violation: 3307.6:FAILURE TO MAINATIN SWS(SIDEWALK SHED) AT THE TIME OF MY INSPECTION 5 STY NB UP TO ROOF LEVEL WORK IN PROGRESS OBSERVED SWS
2019-09-04Job filed: INSTALLATION OF EMERGENCY GENERATOR (FS) IN CONJUNCTION WITH NB#320915943.$1,000
2019-08-02DTL — from THE BANK OF NEW YORK MELLON
2019-06-13FDNY inspection (CONSTR)
2019-05-30Permit NB — ISSUED
2019-05-22311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-05-08Permit NB — ISSUED
2019-04-29Job filed: HEREWITH FILE SPRINKLER AND STANDPIPE TO SUPERSEDE EXPIRED APPLICATION#340204861 IN CONJUNCTION WITH NEW BUILDING APPLICATION#320915943, NO CHANGE OF $2,000
2019-04-16311: Construction Safety Enforcement — CSE - Sweep
2019-04-16DOB complaint, category ?
2019-04-15ECB CLASS - 1 violation: 28-407.1 FAILURE TO HAVE LICENSE DOB WELDER. AT TIME OF INSPECTION OBSERVED WORKER ON SUPPORTED SCAFFOLD AT 3RD FL LEVEL DOING STR$2,500
2019-04-15ECB CLASS - 1 violation: SEC. 3314.1 SCAFFOLD NOT MAINTAINED AS PER CODE. AT TIME OF INSPECTIONOBSERVED WORKERS DOING STRUCTURE STEEL WELDING @ EXP#1 3RD F$2,500
2019-04-15ECB CLASS - 1 violation: SEC. 3309.10 PROTECTION OF ADJ ROOFS. AT TIME OF INSPECTION OF AN ACTIVE 5 STY SITE W/STRUCTURAL STEEL WORK BEING DONE APPROX 30 F$2,500
2019-04-15ECB CLASS - 1 violation: SEC.3301.2 FAILURE TO INSTITUTE SAFETY MEASURES. AT TIME OF INSPECTIONOF AN ACTIVE 5 STY WORK SITE OBSERVED NO GUARDRAIL SYSTEM IN$2,500
2019-04-15ECB CLASS - 1 violation: SEC. 3301.7 DOCUMENTS TO BE KEPT ON SITE. AT TIME OF INSPECTION ASKED COMPETENT PERSON TO PROVIDE ENGINERED DESIGN DRAWING FOR APP$2,500
2019-04-15ECB CLASS - 1 violation: SEC. 3301.2 SAFETY MEASURES. AT TIME OF INSPECTION OF AN ACTIVE 5 STY WORK SITE CURRENTLY @ ROOF LEVEL OBSERVED 2PCS OF STRUCTURAL$2,500
2019-04-15ECB CLASS - 1 violation: SEC. 3301.2 SAFETY MEASURES. AT TIME OF INSPECTION OBSERVED VERTICAL NETTING ON ROOF LEVEL DID NOT HAVE ZENO CABLE DOWN TO GROUND.$2,500
2019-04-11AL&R $1,900,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$1,900,000
2019-04-11Mortgage $1,900,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$1,900,000
2019-04-11Agreement $8,825,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$8,825,000
2019-04-11Agreement $3,653,167 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$3,653,167
2019-03-29Permit Sidewalk Shed — Signed-off
2019-03-29Permit Supported Scaffold — Signed-off
2019-03-27311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-03-07311: Construction Safety Enforcement — CSE - Sweep
2019-03-07311: Construction Safety Enforcement — CSE - Sweep
2019-03-07Permit PL — ISSUED
2019-03-07DOB complaint, category ?
2019-03-07DOB complaint, category ?
2019-03-07ECB CLASS - 2 violation: FAILURE TO MAINTAIN DOCUMENTS ON SITE AT TIME OF INSPECTION ON AN ACTIVE JOB SITE OF A 5 STORY BUILDING I OBSERVED HOME MADE/FABRI$625
2019-02-01Permit EQ — ISSUED
2019-01-30Permit PL — ISSUED
2019-01-25311: General Construction/Plumbing — Working Contrary To Stop Work Order
2018-12-18311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-12-18311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-12-18DOB complaint, category ?
2018-12-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-12-17DOB complaint, category ?
2018-12-17ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION,I OBSERVED INADEQUATE HOUSEKEEPING AT EX$625
2018-12-17ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARDRAILS #BC3301.2. AT TIME OF INSPECTION,I$5,000
2018-12-17ECB CLASS - 1 violation: SEC. 3303.14 FAILURE TO PROVIDE ADEQUATE DRAINAGE TO PREVENT WATER ACCUMULATION AT CONSTRUCTION,DEMOLITION &/OR EXCAVATION SITE. A$625
2018-12-17ECB CLASS - 1 violation: SEC. 3308.5 FAILURE TO INSTALL OR MAINTAIN VERTICAL SAFETY NETTING SYSTEM AS REQUIRED. AT TIME OF INSPECTION I OBSERVED THE VERTIC$2,500
2018-12-10311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-12-10DOB complaint, category ?
2018-12-08311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-12-08DOB complaint, category ?
2018-11-28Permit Supported Scaffold — Signed-off
2018-11-27Permit Sidewalk Shed — Signed-off
2018-11-24ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35360279N ISSUED ON 07/20/18 AND TO FILE A CERTIFI
2018-11-10311: General Construction/Plumbing — Debris - Excessive
2018-11-10DOB complaint, category ?
2018-11-01FDNY inspection (CONSTR)
2018-10-29Permit EQ — ISSUED
2018-10-23Permit Supported Scaffold — Signed-off
2018-10-23Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-10-22Job filed: INSTALLATION OF NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-10-22Job filed: INSTALLATION OF NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-09-01311: Noise — Noise: Construction Before/After Hours (NM1)
2018-07-30FDNY inspection (CONSTR)
2018-07-20ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATION-NOTED: AT THE TIME OF INSPECTION OBSERVED CONSTRUC$10,000
2018-07-20ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS NOTED: AT THE TIME OF INSPECTION OBSERVED AT CELLAR LEVEL, E$625
2018-07-02Permit Sidewalk Shed — Signed-off
2018-07-02Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2018-06-23DOB complaint, category ?
2018-06-04Permit EW — ISSUED
2018-05-22FDNY inspection (CONSTR)
2018-05-22Permit NB — ISSUED
2018-05-17Permit NB — ISSUED
2018-04-19311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-03-19FDNY inspection (CONSTR)
2018-03-16Permit NB — ISSUED
2018-03-16Permit EQ — ISSUED
2018-02-06Permit PL — ISSUED
2018-01-25DOB complaint, category ?
2018-01-16FDNY inspection (CONSTR)
2017
2017-12-11311: Snow — E9 Snow / Icy Sidewalk
2017-12-08Permit EW — ISSUED
2017-12-07Permit EW — ISSUED
2017-11-30DOB complaint, category ?
2017-11-20311: Sustainability Enforcement — Sustainability Enforcement Work Order
2017-11-20DOB complaint, category ?
2017-11-09FDNY inspection (CONSTR)
2017-09-21311: General Construction/Plumbing — Working Contrary To Stop Work Order
2017-05-31DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-05-11Permit EQ — ISSUED
2017-05-11Permit NB — ISSUED
2017-05-08Job filed: SUBSEQUENT FILE FOR FOUNDATION WORK$1,000
2017-05-08Job filed: SUBSEQUENT FILE FOR FOUNDATION WORK$1,000
2017-04-27Job filed: FILING FOR THE SOE IN CONJUNCTION WITH NEW BUILDING NUMBER 320915943. IN ORDER TO REMOVE VIOLATION GIVEN FOR BEST SQUAD.$10,000
2017-04-10FDNY inspection (CONSTR)
2017-03-01311: Construction Safety Enforcement — Excavation Tracking Complaint
2017-03-01DOB complaint, category ?
2017-02-28311: Construction Safety Enforcement — Excavation Tracking Complaint
2017-02-28DOB complaint, category ?
2017-02-27ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. @ TIME OF INSP CONTRACTOR FAILED TO SAFEGUARD ALL$5,000
2017-02-25ECB CLASS - 2 violation: CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER RULE. @ TIME OF INSP CONSTRUCTION SUPER MICHAEL BENZ FAILED TO PERFORM HI$400
2017-02-20Job filed: FILING FOR THE FOUNDATION IN CONJUNCTION WITH NEW BUILDING NUMBER 320915943$20,000
2017-01-03FDNY inspection (CONSTR)
2016
2016-12-23311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2016-12-23DOB complaint, category ?
2016-11-29Mortgage $8,825,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$8,825,000
2016-11-29AL&R $8,825,000 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$8,825,000
2016-11-29AL&R $3,653,167 — from PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$3,653,167
2016-11-29Agreement $3,653,167 to STATE BANK OF TEXAS$3,653,167
2016-11-16311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2016-11-16DOB complaint, category ?
2016-10-31FDNY inspection (CONSTR)
2016-08-29FDNY inspection (CONSTR)
2016-08-22311: Blocked Driveway — No Access
2016-06-20FDNY inspection (CONSTR)
2016-05-25Permit NB — ISSUED
2016-05-24Permit EQ — ISSUED
2016-05-03Permit NB — ISSUED
2016-04-21FDNY inspection (CONSTR)
2016-03-15311: General Construction/Plumbing — Fence - None/Inadequate
2015-10-06311: Vacant Lot — 8 Request to Clean Vacant Lot
2015-10-05FDNY inspection (CONSTR)
2015-09-21FDNY inspection (CONSTR)
2015-09-10FDNY inspection (CONSTR)
2015-08-31FDNY inspection (CONSTR)
2015-08-21Permit EQ — ISSUED
2015-08-21Permit NB — ISSUED
2015-07-15ECB CLASS - 2 violation: JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. NOTED: FENCE ATCONSTRUCTION SITE UNDER PERMIT JOB #321159429-01-EQ-FN EXPIR$400
2015-07-13311: General Construction/Plumbing — Material Storage - Unsafe
2015-02-04Job filed: SHORING & EXCAVATION PLANS FILED IN CONJUNCTION WITH NEW BUILDING # 320915943. NO CHANGE IN BUILDING USE, OCCUPANCY AND/OR EGRESS.$1,000
2015-01-23Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH SMOKE PURGE IN CONJUNCTION WITH NB #320915943$1,000
2015-01-20Job filed: HEREWITH FILE STRUCTURE PLANS FOR NEW BUILDING.
2014
2014-11-14Job filed: NB
2014-11-12311: Illegal Parking — Blocked Sidewalk
2014-11-07Job filed: HEREWITH FILE SPRINKLER AND STANDPIPE IN CONJUNCTION_WITH NEW BUILDING APPLICATION # 320915943$4,000
2014-11-06Permit EQ — ISSUED
2014-11-05Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-11-04Job filed: FILING STRUCTURAL PLANS FOR NEW BUILDING$700,000
2014-10-30311: BEST/Site Safety — Demolition Notification Received
2014-10-30DOB complaint, category ?
2014-10-29311: Noise — Noise: Jack Hammering (NC2)
2014-10-24Permit DM — ISSUED
2014-10-14311: Illegal Parking — Blocked Sidewalk
2014-08-19DOB complaint, category ?
2014-08-15Job filed: FILING FOR DEMOLITION
2014-08-15Job filed: FILING FOR DEMOLITION
2014-08-06Permit EQ — ISSUED
2014-08-01Job filed: FILING FOR FENCE FOR THE SAFETY OF THE PUBLIC.
2014-07-16TL&R — from 561 PRESIDENT REALTY LLC to HSBC BANK, NATIONAL ASSOCIATION, SUCCESS
2014-07-16Mortgage satisfied — from 561 PRESIDENT REALTY LLC to HSBC BANK USA, NATIONAL ASSOCIATION, SUC
2014-06-26Job filed: INSTALL 22'-0" CURBCUT INCLUDING (2) 2'-6" SPLAYS 340' FROM INTERSECTION OF UNION STREET AND 3RD AVENUE IN CONJUNCTION WITH NEW BUILDING # 320915943.
2014-06-26Job filed: INSTALL 30' CURBCUT, INCLUDING (2) 2'-6' SPLAYS 298' FROM THE INTERSECTION OF PRESIDENT STREET AND FOURTH AVENUE IN CONJUNCTION WITH NEW BUILDING # 32
2014-06-26Job filed: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING # 320915943. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
2014-06-26Job filed: INSTALL 30' CURBCUT, INCLUDING (2) 2'-6" SPLAYS 298' FROM THE INTERSECTION OF PRESIDENT STREET AND FOURTH AVENUE IN CONJUNCTION WITH NEW BUILDING # 32
2014-06-18AL&R $4,000,000 — from PRESIDENT SAI II LLC to STATE BANK OF TEXAS$4,000,000
2014-06-18Agreement $4,000,000 — from PRESIDENT SAI II LLC to STATE BANK OF TEXAS$4,000,000
2014-06-18CERR $4,000,000 — from PRESIDENT SAI II LLC to STATE BANK OF TEXAS$4,000,000
2014-06-18TL&R — from STATE BANK OF TEXAS to PRESIDENT SAI II LLC
2014-06-18AALR — from UNITED CENTRAL BANK, AS ASSIGNEE OF MUTU to STATE BANK OF TEXAS
2014-06-18Mortgage assigned — from UNITED CENTRAL BANK, AS ASSIGNEE OF MUTU to STATE BANK OF TEXAS
2014-05-08Job filed: NB
2014-05-08Job filed: NB
2014-01-15311: Graffiti — Graffiti
2013
2013-03-05311: Sidewalk Condition — Blocked - Construction
2013-01-09311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2012
2012-12-27311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2009-06-26Job filed: FILING A FOUNDATION APPLICATION IN CONJUNCTION WITH NEW BUILDING.
2009-06-26Job filed: FILING A FOUNDATION APPLICATION IN CONJUNCTION WITH NEW BUILDING.
2009-03-18ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY EFFECTED BY DEMO OPERATIONS. NOTED: PART OF ROOF REMOVED & SOME INTERIOR DEMO PROVIDED. NO $6,000
2009-03-18ECB CLASS - 1 violation: FAILURE TO PROVIDE 24HR NOTICE. NOTED: PART OF ROOF DEMOLISHED & (ZONE) INTERIOR DEMO PROVIDED. NO 24HR NOTICE PRIOR TO START OF D$6,000
2009-03-18DOB complaint, category ?
2009-02-27DOB violation LL1081:
2009-02-24Tenant complaint: HEATING — HEAT RELATED
2008
2008-07-30Permit DM — ISSUED
2008-07-30Permit EQ — ISSUED
2008-03-21DOB violation LL1081:
2008-03-10Job filed: DEMOLITION OF STRUCTURE
2008-01-04TL&R — from PRESIDENT DEVELOPMENT LLC to BROOKLYN FEDERAL SAVINGS BANK
2008-01-04AL&R $4,650,000 — from PRESIDENT SAI II, LLC to MUTUAL BANK$4,650,000
2008-01-04Agreement $4,650,000 — from PRESIDENT SAI II, LLC to MUTUAL BANK$4,650,000
2008-01-04Mortgage $1,610,459 — from PRESIDENT SAI II, LLC to MUTUAL BANK$1,610,459
2008-01-04Mortgage assigned — from BFS REIT, INC. to MUTUAL BANK
2008-01-04Deed $6,200,000 — from PRESIDENT DEVELOPERS LLC to PRESIDENT SAI II , LLC$6,200,000
2007
2007-04-02DOB violation LL1081:
2005
2005-08-10Deed $4,200,000 — from 561 PRESIDENT REALTY LLC to PRESIDENT DEVELOPERS LLC$4,200,000
2005-08-10AL&R — from BROOKLYN FEDERAL SAVINGS BANK to PRESIDENT DEVELOPERS LLC
2005-08-10Mortgage $3,150,000 — from PRESIDENT DEVELOPERS LLC to BROOKLYN FEDERAL SAVINGS BANK$3,150,000
2005-08-10Mortgage assigned — from BROOKLYN FEDERAL SAVINGS BANK to BFS REIT, INC.
2004
2004-07-27CORRD — from 561 PRESIDENT REALTY LLC to 561 PRESIDENT REALTY LLC
2004-02-13CERT — from NYC DEPARTMENT OF FINANCE
2003
2003-08-25ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. NOTED: TEMPORARY CERTIFICATE OF OCCUPANCY #300914973 01 DATED $350
2003-07-30DOB complaint, category ?
2001
2001-06-19Mortgage $797,225 — from 561 PRESIDENT REALTYLLC to HSBC BANK USA$797,225
2001-06-19Mortgage assigned — from 561 PRESIDENT REALTYLLC to HSBC BANK USA
2001-03-08DOB violation LL1081:
2001-01-30ECB Non-Hazardous violation: 57Y15.$180
2000
2000-03-30Permit PL — ISSUED
2000-03-06Permit EQ — ISSUED
2000-03-06Permit AL — ISSUED
1999
1999-12-13Mortgage satisfied — from 545 PRESIDENT ST CORP to STATEN ISLAND SAVOINGS BANK
1999-11-18Mortgage satisfied — from 545 PRESIDENT ST CORP to STATEN ISLAND SAVINGS BANK
1999-10-27DOB complaint, category ?
1999-09-01Mortgage $700,000 — from 561 PRESIDENT REALTYLLC to REPUBLIC NATIONAL BANK OF NEW YORK$700,000
1999-09-01Mortgage assigned — from 561 PRESIDENT REALTYLLC to REPUBLIC NATIONAL BANK OF NEW YORK
1999-09-01Deed — from 545 PRESIDENT STREETCORP to 561 PRESIDENT REALTYLLC
1999-07-21Permit EQ — RE-ISSUED
1999-07-21Permit AL — RE-ISSUED
1998
1998-02-11Permit NB — ISSUED
1998-01-23Permit AL — RE-ISSUED
1998-01-21Permit EW — ISSUED
1998-01-21Permit PL — ISSUED
1997
1997-12-16Permit NB — ISSUED
1997-12-05Mortgage $300,000 — from 545 PRESIDENT ST CORP to STATEN ISLAND SAVINGS BANK$300,000
1997-11-28Permit PL — ISSUED
1997-11-25STP — from 545 PRESIDENT ST CORP
1997-05-08Permit NB — ISSUED
1997-04-03Permit EQ — ISSUED
1997-04-03Permit EQ — ISSUED
1996
1996-09-12Mortgage satisfied — from 545 PRESIDENT STREETCORP. to COLONIAL MIRROR ANDGLASS CORP.
1993
1993-11-17Mortgage assigned — from COLONIAL MIRROR & GLASS to WEINER, BENJAMIN
1993-04-02MAPS — from NYC DEPT ENVIRON/PROTECT
1993-02-19MAPS — from NYC DEPT ENVIRON PROTECT
1992
1992-12-01Deed — from 545 PRESIDENT ST CORP to ARLORO, ISABELLA; ARLORO, LUIGI
1992-11-05Deed — from MESSINA, SALVATORE JR to 545 PRESIDENT ST CORP
1992-11-05Deed — from MESSINA, PATSY to 545 PRESIDENT ST CORP
1992-11-05Deed — from MESSINA, JOAN to 545 PRESIDENT ST CORP
1992-09-15Deed — from 545 PRESIDENT ST CORP to MESSINA, SALVATORE JR
1992-08-28Deed — from 545 PRESIDENT ST CORP to MESSINA, PATSY
1992-08-28Deed — from 545 PRESIDENT ST CORP to MESSINA, SALVATORE JR
1992-08-28Deed — from 545 PRESIDENT ST CORP to MESSINA, JOAN
1991
1991-04-18REL — from J HENRY SCHRODER BK&TR; IBJ SCHRODER BK &TR/NKA to COLONIAL MIRROR &GLASS C
1991-04-18Deed — from COLONIAL MIRROR&GLASS CP to 545 PRESIDENT ST CORP
1991-04-18Mortgage assigned — from 545 PRESIDENT ST CORP to COLONIAL MIRROR &GLASS C
1991-04-18Mortgage $210,000 — from 545 PRESIDENT ST CORP to COLONIAL MIRROR &GLASS C$210,000
1988
1988-09-12Mortgage satisfied — from COLONIAL MIRROR & GLASS to USA SMALL BUS.ADMIN
1979
1979-11-09Mortgage — from COLONIAL MIRROR & GLASS CORP to ADMINISTRATOR OF SMALL BUSINESS ADMINIST
1979-11-07Mortgage — from COLONIAL MIRROR AND GLASS CORP to SOHRODER HENRY J; SCHRODER HENRY J AND BANK AND TRUST COMP; SCHRODER HENRY J; BANK AND TRU
1979-06-15Deed — from AMERICAN CONSUMER INDUSTRIES INC; AMERICAN ICE CO to COLONIAL MIRROR & GLASS CORP
1975
1975-04-09Deed — from AMERICAN CONSUMER INDUSTRIES INC to BROOKMONT RLTY CORP
1967
1967-06-30Mortgage — from AMERICAN CONSUMER INDUSTRIES INC to SECURITY NATIONAL BANK OF LONG ISLAND