The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 0. In ZIP 11215, 70% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
10 service requests in the last three years. Most common: Illegal Parking (4) · For Hire Vehicle Complaint (2) · Noise (1) · Non (1) · Abandoned Vehicle (1) · Derelict Vehicles (1).
Filed construction activity
$112,025 in permitted construction work filed since
2016 (11 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2022)
Yes
Six or more residential units (101)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$7,620,000
$3,429,000
2026
$12,385,000
$5,573,250
2027
$14,322,000
$6,444,900
The city's market estimate has risen
88% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
In the city's stormwater flood map only under the extreme-storm
scenario (3.66 in/hr cloudburst with 2080 sea levels) — an Ida-scale event.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Union St — R · 500 ft straight-line (about a 2-minute walk) · station accessibility: none 4 Av-9 St — F G R · 0.5 mi straight-line (about a 14-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 3 Av / Union St — B37 · 250 ft
Citi Bike
3 Ave & Carroll St · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
10 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $3,981,000 on
2022-09-14 (lender: State Bank Of Texas). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-07-25
AL&R $14,753,290 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$14,753,290
2025-07-25
Agreement $14,753,290 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$14,753,290
2022-09-14
AL&R $3,981,000 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$3,981,000
2022-09-14
Mortgage $3,981,000 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$3,981,000
2022-09-14
AL&R $3,719,456 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$3,719,456
2022-09-14
Mortgage $3,719,456 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$3,719,456
2022-09-14
Agreement $7,052,834 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$7,052,834
2022-09-14
AL&R $7,052,834 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$7,052,834
2022-09-14
Mortgage $3,578,591 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS
$3,578,591
2022-02-28
Agreement $4,100,000 — from PRESIDENT SAI, LLC; BHAGIA, RAJESH to STATE BANK OF TEXAS
$4,100,000
2020-08-18
Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI LLC to STATE BANK OF TEXAS
$4,100,000
2020-08-18
Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI LLC; PRESIDENT SAI II, LLC to STATE BANK OF TEXAS
$4,100,000
2020-07-15
CMTG $2,488,517 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$2,488,517
2020-07-15
CMTG $3,086,483 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$3,086,483
2019-04-11
CMTG $1,900,000 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS
$1,900,000
Ten-year activity
50250
2017
2018
2019
2020
2021
49
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
13
12
8
1
0
34
2018
8
9
11
0
0
28
2019
8
18
5
2
0
33
2020
8
2
1
4
0
15
2021
12
11
2
0
0
25
2022
9
14
16
9
1
49
2023
17
18
2
1
3
41
2024
6
2
1
0
1
10
2025
0
1
4
2
2
9
2026
0
0
5
0
1
6
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-06-06311: Illegal Parking — Paper License Plates
2024-05-31Certificate of occupancy Renewal Without Change
2024-03-18Restaurant inspection: TRU BY HILTON HOTEL
2024-02-07Certificate of occupancy Initial
2024-02-02Permit Curb Cut — Signed-off
2024-01-29FDNY inspection (CONSTR)
2023
2023-12-28Elevator permit: Furnish and install Two (2) new MRL elevators as per attached drawings - Gen 3 Edge. Plan # N1AR67 (Elev1) and N1AR68 (Elev2) . $415,000
2023-12-22Permit Boiler Equipment — Signed-off
2023-10-26FDNY inspection (CONSTR)
2023-10-17Elevator permit: Furnish and install Two (2) new MRL elevators as per attached drawings - Gen 3 Edge. Plan # N1AR67 (Elev1) and N1AR68 (Elev2) . $415,000
2023-10-12Permit NB — ISSUED
2023-10-12Permit EQ — ISSUED
2023-10-02Permit PL — ISSUED
2023-09-14Permit Sign — Signed-off
2023-09-14Permit Sign — Signed-off
2023-09-14Permit Sign — Signed-off
2023-09-11Job filed: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING # 320862161. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
2023-09-05Job filed: INDIRECTLY ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - TRU BY HILTON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$3,150
2023-09-05Job filed: ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - TRU BY HILTON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$700
2023-09-05Job filed: NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - TRU BY HILTON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$375
2023-09-05Job filed: ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - HOTEL PARKING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$800
2023-08-17FDNY inspection (CONSTR)
2023-08-14Job filed: Propose 24 feet curb cut includes (2) 2'-6" splays in conjunction with NB#320862161.$1,000
2023-08-13311: New Tree Request — For One Address
2023-08-10FDNY inspection (CONSTR)
2023-07-12DOB complaint, category ?
2023-07-12ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS: A NOTED AT TIME OF MY INSPECTION OBSERVED INADEQUATE HOUSEKEEP$625
2023-07-12ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS: AS NOTED AT TIME OF MY INSPECTION OBSERVED (1) $5,000
2023-07-06DOB complaint, category ?
2023-07-06ECB CLASS - 2 violation: TIME OF INSPECTION AT 5 STORY NEW BUILDING EXTERIOR AND INTERIOR WORK IN PROGRESS OBSERVED AT EXPOSURE 1 MATERIALS ON STREET CLOSE$2,400
2023-06-29FDNY inspection (CONSTR)
2023-06-16FDNY inspection (CONSTR)
2023-05-28FDNY inspection (CONSTR)
2023-05-18ECB CLASS - 2 violation: AT TIME OF INSPECTION ON A 5 STORY NB ACTIVE SITE, I OBSERVED A SIDEWALK SHED INSTALLED AT EXE 1. THE RESPONDENT FAILED TO PROVIDE$625
2023-05-17DOB complaint, category ?
2023-04-18Job filed: INSTALL FUEL OIL STORAGE TANK FOR GENERATOR SERVICING NEW BUILDING IN CONJUNCTION WITH NB# 320862161.$45,000
2023-03-21Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$15,000
2023-03-17FDNY inspection (CONSTR)
2023-03-08SMIS — from PRESIDENT SAI, LLC
2023-03-03Elevator permit: Furnish and install Two (2) new MRL elevators as per attached drawings - Gen 3 Edge. Plan # N1AR67 (Elev1) and N1AR68 (Elev2) . $415,000
2023-02-02Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$15,000
2023-01-26FDNY inspection (CONSTR)
2023-01-12ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OBSERVED NEEDLE BEAM AT EXP#4 ON 3 FLOOR. AFTER REVIEW APPROVED PLANS REVEAL THAT NEEDLE BEAM INSTALL$625
2023-01-12ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OBSERVED SUPPORTED SCAFFOLD AT EXP#1,2 AND 3 WITH FOLLOWING VIOLATION CONDITIONS: 1. WORKING LEVELS N
2023-01-11311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-01-11Job filed: Propose 24 feet curb cut includes (2) 2'-6" splays in conjunction with NB#320862161.$1,000
2023-01-11DOB complaint, category ?
2022
2022-12-14Permit NB — ISSUED
2022-11-01Permit PL — ISSUED
2022-10-31FDNY inspection (CONSTR)
2022-10-27311: Industrial Waste — Concrete In Catch Basin (IEA)
2022-10-25Permit Supported Scaffold — Signed-off
2022-10-21Permit NB — ISSUED
2022-10-21Permit EQ — ISSUED
2022-10-21Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$15,000
2022-10-14311: Sidewalk Condition — Blocked - Construction
2022-10-13Elevator permit: Furnish and install Two (2) new MRL elevators as per attached drawings - Gen 3 Edge. Plan # N1AR67 (Elev1) and N1AR68 (Elev2) . $415,000
2022-10-07311: Blocked Driveway — No Access
2022-09-22311: Sidewalk Condition — Blocked - Construction
2022-09-21311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-21311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-09-21311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-21311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-21DOB complaint, category ?
2022-09-17311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-17311: AHV Inspection Unit — After Hours Work - With An AHV Permit
2022-09-17DOB complaint, category ?
2022-09-14AL&R $3,981,000 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$3,981,000
2022-09-14Mortgage $3,981,000 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$3,981,000
2022-09-14AL&R $3,719,456 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$3,719,456
2022-09-14Mortgage $3,719,456 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$3,719,456
2022-09-14Agreement $7,052,834 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$7,052,834
2022-09-14AL&R $7,052,834 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$7,052,834
2022-09-14Mortgage $3,578,591 — from PRESIDENT SAI LLC to STATE BANK OF TEXAS$3,578,591
2022-09-13311: Dirty Condition — Trash
2022-09-07Permit Sidewalk Shed — Signed-off
2022-09-06ECB CLASS - 2 violation: AT TIME OF INSPECTION OF CLOSED SITE THE FOLLOWING WAS OBSERVED, UPON INSPECTION OF SITE FROM OUTSIDE, SWS WAS INSTALLED AT EXPS.
2022-09-06ECB CLASS - 2 violation: AT TIME OF INSPECTION THE FOLLOWING WAS OBSERVED, UPON INSPECTING PERIMETER OF SITE I NOTICE STORAGE ZONE AREA EXP.1 WAS NOT FULLY
2022-09-02DOB complaint, category ?
2022-08-09311: Noise — Noise: Jack Hammering (NC2)
2022-08-05FDNY inspection (CONSTR)
2022-08-04Permit Sidewalk Shed — Signed-off
2022-08-03Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE$15,000
2022-07-20311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-21FDNY inspection (CONSTR)
2022-02-28Agreement $4,100,000 — from PRESIDENT SAI, LLC; BHAGIA, RAJESH to STATE BANK OF TEXAS$4,100,000
2022-02-02ECB CLASS - 1 violation: BC3307.4.3 YODOKS NOT MAINTAINED/VEHICULAR TRAFFIC.AT TIME OF INSPECTION OF PROPOSED 5 STORY NEW BUILDING AT FOUNDATION INACTIVE J
2022-02-02ECB CLASS - 2 violation: BC3307.2.1 FAILURE TO COMPLY WITH DOT REGULATIONS.AT TIME OF INSPECTION OF PROPOSED 5 STORY NEW BUILDING INACTIVE JOBSITE OBSERVED
2022-02-02ECB CLASS - 2 violation: MIRRORS AT BLINDSPOTS.AT TIME OF INSPECTION OF PROPOSED 5 STORY NEW BUILDING OBSERVED SIDEWALK AT EXP #1 ENCLOSED WITH YODOKS AND $2,400
2022-02-02ECB CLASS - 2 violation: CONSTRUCTION FENCE NOT MAINTAINED.AT TIME OF INSPECTOIN OF PROPOSED 5 STORY NEW BUILDING AT FOUNDATION INACTIVE JOBSITE OBSERVED C
2022-02-01DOB complaint, category ?
2022-01-05311: Sidewalk Condition — Blocked - Construction
2022-01-04311: Sidewalk Condition — Blocked - Construction
2022-01-03FDNY inspection (CONSTR)
2021
2021-12-21Permit FO — ISSUED
2021-12-21Permit FO — ISSUED
2021-12-21Permit NB — ISSUED
2021-12-21Permit EQ — ISSUED
2021-12-13311: Noise — Noise: Construction Before/After Hours (NM1)
2021-12-01DOB complaint, category ?
2021-11-24Permit PL — ISSUED
2021-10-27Permit FO — ISSUED
2021-10-27Permit FO — ISSUED
2021-10-27Permit NB — ISSUED
2021-09-30FDNY inspection (CONSTR)
2021-07-13FDNY inspection (CONSTR)
2021-06-09ECB CLASS - 2 violation: BC3307.2.1 OBSTRUCTION OF STREETS OR SIDEWALK.NOTE:AT TIME OF INSPECTION OF 5 STORY NEW BUILDING OBSERVED NO ACTIVITY AT JOBSITE.A
2021-02-22ECB CLASS - 2 violation: BC 3307.2.6=REQUIREMENTS FOR TEMPORARY WALKWAYS AND PATHWAYS AT THE TIME FO MY INSPECTION I OBSERVED THAT THE TEMPORARY PEDESTRIAN
2021-01-28FDNY inspection (CONSTR)
2020
2020-12-02DOB complaint, category ?
2020-10-15311: Sidewalk Condition — Blocked - Construction
2020-09-24Permit NB — ISSUED
2020-09-24Permit FO — ISSUED
2020-09-24Permit FO — ISSUED
2020-08-18Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI LLC to STATE BANK OF TEXAS$4,100,000
2020-08-18Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI LLC; PRESIDENT SAI II, LLC to STATE BANK OF TEXAS$4,100,000
2020-07-15CMTG $2,488,517 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS$2,488,517
2020-07-15CMTG $3,086,483 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS$3,086,483
2020-06-10Permit PL — ISSUED
2020-03-16Permit EQ — ISSUED
2020-03-13Permit FO — ISSUED
2020-03-13Permit FO — ISSUED
2020-03-13Permit NB — ISSUED
2020-03-12DOB complaint, category ?
2019
2019-11-18FDNY inspection (CONSTR)
2019-10-25Permit FO — ISSUED
2019-10-25Permit FO — ISSUED
2019-10-25Permit NB — ISSUED
2019-10-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-10-10311: Sidewalk Condition — Blocked - Construction
2019-09-22DOB violation C: STOP ALL WORK IMMEDIATELY CONTACT BOROUGH COMMISSIONER OFFICE AT 718 8 02-3677
2019-09-22DOB violation C: STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE CONTACT BOROUGH COMMISSIO NER 718 802-3677
2019-09-21DOB complaint, category ?
2019-09-09FDNY inspection (CONSTR)
2019-07-23DOB complaint, category ?
2019-07-23ECB CLASS - 1 violation: FAILURE TO PROVIDE PROTECTION AT SIDES AT EXCAVATION I OBSERVED FROM SIDEWALK THROUGH FENCE VISION PANEL.AT TIME OF INSPECTION OBS
2019-04-11CMTG $1,900,000 — from PRESIDENT SAI, LLC to STATE BANK OF TEXAS$1,900,000
2019-04-04311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-04DOB complaint, category ?
2019-04-03ECB CLASS - 2 violation: SITE SAFETY PLAN FOR JOBS THAT REQUIRE A PRIMARY CONSTRUCTION SUPER. @TIME OF INSPECTION ON ACTIVE JOBSITE OF 5 STY BLDG,CURRENTLY$2,500
2019-04-03ECB CLASS - 1 violation: CONSTRUCTION SUPER DAILY LOG BOOK. AT TIME OF INSPECTION ON ACTIVE JOBSITE,CURRENTLY AT EXCAVATION FOUNDATION PHASE UPON REQUEST T
2019-04-03ECB CLASS - 1 violation: FAILURE TO DESIGNATE COMPETENT PERSON AT TIME OF INSPECTION ON ACTIVE JOBSITE,CURRENTLY AT EXCAVATION/FOUNDATION PHASE,IT WAS OBSE
2019-03-27Agreement $4,100,000 — from BHAGIA, RAJESH; RPESIDENT SAI LLC to STATE BANK OF TEXAS$4,100,000
2019-03-05FDNY inspection (CONSTR)
2019-02-25311: Investigations and Discipline (IAD) — Investigative Inspection
2019-02-25DOB complaint, category ?
2019-02-25ECB CLASS - 1 violation: FAILURE TO PRODUCE THE DAILY LOG FOR INSPECTION. NOTED: AT THE TIME OFINSPECTION CONSTRUCTION SUPERINTENDENT CHRISTOPHER DEPOMPO D$625
2019-02-14311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-05FDNY inspection (CONSTR)
2018
2018-12-27Permit FO — ISSUED
2018-12-27Permit EQ — ISSUED
2018-12-27Permit NB — ISSUED
2018-12-27Permit FO — ISSUED
2018-11-01FDNY inspection (CONSTR)
2018-09-21311: Street Condition — Blocked - Construction
2018-06-26311: Sustainability Enforcement — Sustainability Enforcement Work Order
2018-06-26DOB complaint, category ?
2018-06-22311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-06-22ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.AS NOTED:AT TIME OF INSPECTION ON AN ACTIVE CO$625
2018-06-22DOB complaint, category ?
2018-06-09311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-06-09311: Noise — Noise: Construction Before/After Hours (NM1)
2018-06-09311: Noise — Noise: Construction Before/After Hours (NM1)
2018-06-09311: Noise — Noise: Construction Before/After Hours (NM1)
2018-06-09DOB complaint, category ?
2018-05-31311: Blocked Driveway — No Access
2018-05-22FDNY inspection (CONSTR)
2018-05-18Permit NB — ISSUED
2018-05-18Permit FO — ISSUED
2018-05-18Permit FO — ISSUED
2018-05-18Permit EQ — ISSUED
2018-03-19FDNY inspection (CONSTR)
2018-01-16FDNY inspection (CONSTR)
2017
2017-12-11311: Snow — E9 Snow / Icy Sidewalk
2017-11-28ECB CLASS - 2 violation: JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. OBSERVED CENTRAL SECTION OF CONSTRUCTION FENCE APPROX 20' WIDE COLLAPSED W/$400
2017-11-24311: General Construction/Plumbing — Fence - None/Inadequate
2017-04-27Agreement $4,100,000 — from BHAGIA, RAJESH; PRESIDENT SAI, LLC to STATE BANK OF TEXAS$4,100,000
2017-04-27Permit EQ — ISSUED
2017-03-26311: General Construction/Plumbing — Fence - None/Inadequate
2017-03-26DOB complaint, category ?
2016
2016-04-21ECB CLASS - 3 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED 8FT WOODENFENCE AROUND STALLED SITE AT 529 PRESIDENT ST W/PLYWOOD BOAR
2016-03-16311: General Construction/Plumbing — Fence - None/Inadequate
2016-03-16DOB complaint, category ?
2016-03-09Agreement $4,100,000 — from PRESIDENT SAI, LLC; BHAGIA, RAJESH to STATE BANK OF TEXAS$4,100,000
2016-03-09Deed — from BHAGIA, RAJESH to PRESIDENT SAI, LLC
2015
2015-08-25TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2015-06-04Job filed: HEREWITH PROVIDE SPRINKLER AND STANDPIPE FOR NEW BUILDING.
2015-06-04Job filed: HEREWITH PROVIDE SPRINKLER AND STANDPIPE FOR NEW BUILDING.
2015-05-26Job filed: HEREWITH SUBMIT PLUMBING AND MECHANICAL FOR NEW BUILDING
2015-05-26Job filed: HEREWITH SUBMIT PLUMBING AND MECHANICAL FOR NEW BUILDING
2015-05-26Job filed: NEW BUILDING
2015-04-30Job filed: HEREWITH FILE STRUCTURE FOR NEW BUILDING
2015-04-28ECB CLASS - 2 violation: FAILURE TO COMPLY W/ THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/ DOB FOR ECB VIO#34853847L.REM:FILE A CERT OF CORRECTION$800
2015-04-17Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM IN CONJUNCTION WITH NEW BUILDING #320862161.$1,000
2015-03-18311: General Construction/Plumbing — Fence - None/Inadequate
2015-03-18DOB complaint, category ?
2015-02-02311: Sidewalk Condition — Blocked - Construction
2014
2014-06-12Job filed: INSTALL 15'-0" CURBCUT, INCLUDING (2) 2'-6" SPLAYS 124' FROM INTERSECTION OF 3RD AVENUE AND PRESIDENT STREET. IN CONJUNCTION WITH NEW BUILDING # 32086
2014-06-12Job filed: INSTALL 19'-0" CURBCUT, INCLUDING (2) 2'-5" SPLAYS, 85' FROM INTERSECTION OF 3RD AVENUE AND PRESIDENT STREET. APPLICATION FILED IN CONJUNCTION WITH N
2014-06-12Job filed: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING # 320862161. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
2014-06-12Job filed: INSTALL 15'-0' CURBCUT, INCLUDING (2) 2'-6' SPLAYS 124' FROM INTERSECTION OF 3RD AVENUE AND PRESIDENT STREET. IN CONJUNCTION WITH NEW BUILDING # 32086
2014-01-27Job filed: NEW BUILDING
2014-01-27Job filed: NEW BUILDING
2013
2013-07-11ECB CLASS - 2 violation: PERMIT NOT POSTED. NOTED: CONSTRUCTION FENCE IN PLACE AT ABOVE ADDRESS. NO FN PERMIT POSTED. REMEDY: POST PERMIT.$4,000
2013-06-19Job filed: FILING HEREWITH TO CONSTRUCT A 5 STORY NEW HOTEL.
2013-02-26ECB CLASS - 2 violation: EXPIRED PERMIT. NOTED: CONSTRUCTION FENCE IN PLACE AT ABOVE LOCATION. F.N. PERMIT #302409267 EXPIRED ON 5-1-09. REMEDY: RENEW PERM$4,000
2012
2012-02-07ECB CLASS - 2 violation: EXPIRED PERMIT. NOTED: CONSTRUCTION FENCE IN PLACE AT ABOVE LOCATION: FN PERMIT #302409267 EXPIRED ON 5.1.09. REMEDY: RENEW PERMIT$800
2011
2011-10-26Rodent inspection: Passed
2011-09-30Rodent inspection: Failed for Other Reason
2011-01-04ECB CLASS - 2 violation: VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT NOTE THREE VEHICLES ARE BEING STORED AT VACANT LOT ONE W/ LICENSE PLATE$4,000
2010
2010-10-25311: Stalled Sites — Stalled Construction Site
2010-10-25DOB complaint, category ?
2010-08-19ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION NOTE AT FRONT OF SITE APPX 8LF OF JOBSITE FENCE HAS FALLEN UNTO SIDEWALK LEAV
2010-07-24311: General Construction/Plumbing — Fence - None/Inadequate
2010-07-24DOB complaint, category ?
2010-07-01311: Sidewalk Condition — Blocked - Construction
2010-06-29311: General Construction/Plumbing — Fence - None/Inadequate
2010-06-29DOB complaint, category ?
2010-06-24311: General Construction/Plumbing — Site Conditions Endangering Workers
2010-06-24ECB CLASS - 2 violation: JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION.OBSERVED @ THE TIME OF INSPECTION,ON THE PRESIDENT ST ELEVATION,8'0"SECTION $4,000
2010-06-24DOB complaint, category ?
2010-06-22ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION NOTED AT FRONT OFPREMISES AN 8'SECTION OF PLYWOOD CONSTRUCTION SITE FENCE FEL$4,000
2010-06-22ECB CLASS - 3 violation: WORK W/O A PERMIT NOTE NO PERMIT ON FILE FOR CONSTRUCTION EQUIPMENT FENCE ERECTOR OF PERIMETER OF VACANT LOT REM: OBTAIN PERMIT$500
2010-05-26ECB CLASS - 2 violation: JOB SITE FENCE NOT CONST PURSUANT TO SUBSECTION IN THAT WOODEN CONST FENCE AT FRONT SITE IS IN DISREPAIR SECTION OF FENCE HAD COLL$4,000
2010-05-24311: General Construction/Plumbing — Fence - None/Inadequate
2010-05-24DOB complaint, category ?
2010-05-20311: General Construction/Plumbing — Fence - None/Inadequate
2010-05-20DOB complaint, category ?
2010-05-11311: General Construction/Plumbing — Fence - None/Inadequate
2010-05-11DOB complaint, category ?
2009
2009-04-10Job filed: STANDPIPE WORK
2009-04-10Job filed: STANDPIPE WORK
2008
2008-10-22Job filed: INSTALL 164' BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB310188169.
2008-10-22Job filed: INSTALL 164' BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB310188169.
2008-10-10DOB complaint, category ?
2008-10-08DOB violation C:
2008-09-16DOB complaint, category ?
2008-09-16ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSON & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. AS NOTED: AT THE TIME OF INSPECTION ONE STORY BLDG $2,400
2008-09-16ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY DEMOLITION OPERATIONS AS NOTED AT THE TIME OF INSPECTION 1 STY BLDG DOWN. DEMO $2,400
2008-08-14Job filed: NB
2008-08-14Job filed: NB
2008-08-14Job filed: NB
2008-07-25ZONE — from BHAGIA, RAJESH
2008-07-25CERT — from FIDELITY NATIONAL TITLE INSURANCE COMPAN
2008-07-18Permit DM — ISSUED
2008-07-18Permit EQ — ISSUED
2008-06-19Job filed: DM
2007
2007-12-06Deed $4,800,000 — from DAH LEE TRADING CORP. to PRESIDENT SAI LLC$4,800,000
2007-12-06Mortgage $4,100,000 — from PRESIDENT SAI LLC to REPUBLIC BANK OF CHICAGO$4,100,000
2005
2005-10-26Mortgage satisfied — from DAH LEE TRADING CORP. to THE GREEN POINT SAVINGS BANK
1990
1990-05-18Deed — from AMERICAN PISTACHIO CORP to DAH LEE TRADING CORP
1990-05-18Mortgage $450,000 — from DAH LEE TRADING CORP to GREEN POINT SAVS BANK$450,000
1990-05-18Mortgage satisfied — from IDEAL BAG CORP to PFLANZER, HILDA; PFLANZER, WILLIAM
1990-05-18Mortgage satisfied — from COUSSA, FRANK to IDEAL BAG CORP
1990-05-18Deed — from AMERICAN PISTACHIO CORP to DAH LEE TRADING CORP
1989
1989-12-29Deed — from COUSSA, FRANK to AMERICAN PISTACHIO CORP
1985
1985-11-26Mortgage assigned — from PFLANZER, HILDA/INDIV; PFLANZER, WILLIAM/EST OF to PFLANZER, HILDA
1985-11-26Mortgage assigned — from IDEAL BAG CORP to PFLANZER, HILDA
1980
1980-06-13Mortgage — from COUSSA FRANK to IDEAL BAG CORP
1980-06-13SAGE — from PFLANZER WILLIAM; PFLANZER HILDA; IDEAL BAG CORP
1980-06-13Deed — from IDEAL BAG CORP to COUSSA FRANK
1979
1979-12-31Mortgage — from IDEAL BAG CORP to PFLANZER WILLIAM; PFLANZER HILDA
1979-12-31Deed — from PFLANZER WILLIAM to PFLANZER WILLIAM; PFLANZER HILDA
1979-12-31Deed — from PFLANZER HILDA; PFLANZER WILLIAM to IDEAL BAG CORP
1973
1973-05-21Mortgage assigned — from ASKIN ETHEL I; ASKIN DAVID J JR to ASKIN ETHEL I
1972
1972-03-01RTXL — from ASKIN TRUCKING CO INC
1971
1971-04-02Deed — from ASKIN DAVID J JR; ASKIN ETHEL I to PFLANZER WILLIAM
1971-04-02Mortgage — from PFLANZER WILLIAM to ASKIN ETHEL I; ASKIN DAVID V
1970
1970-11-04Deed — from ASKIN TRUCKING CO INC to ASKIN DAVID J; ASKIN ETHEL I
1970-11-04Mortgage — from ASKIN ETHEL I; ASKIN DAVID J JR to FEINBERG IRVING H; KIEFER CLARA C