Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
4 heat or hot-water complaints in the last three years (winter 2023–24: 2 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.
2
’23–24
2
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
65 service requests in the last three years. Most common: Illegal Parking (18) · Noise (9) · Encampment (5) · Non (3) · Illegal Dumping (3) · General Construction/Plumbing (3).
Filed construction activity
$87,796,475 in permitted construction work filed since
2016 (353 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$65,447,000
$29,451,150
2026
$88,823,000
$39,970,350
2027
$89,519,000
$40,283,550
The city's market estimate has risen
37% between tax years 2025 and 2027.
1 food-poisoning report to 311 at this address in the last three years (1 with three or more people sick), shared by 9 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2025 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
36 St — D N R · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 3 Av / 33 St — B37 · 500 ft
Citi Bike
36 St & 3 Ave · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
65 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $4,988,429 on
2021-12-23 (lender: Bxmt 2020-Fl2, Ltd), covering 12 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2021-12-23
Mortgage $4,988,430 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD
$4,988,430
2021-12-23
Mortgage $72,439,609 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD
$72,439,609
2019-12-19
AL&R $39,209,696 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC
$39,209,696
2019-12-19
Mortgage $39,209,696 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC
$39,209,696
2019-12-19
AL&R $19,298,989 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC
$19,298,989
2019-12-19
Mortgage $19,298,989 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC
$19,298,989
2017-12-01
AL&R $62,969,799 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$62,969,799
2017-12-01
Mortgage $62,969,799 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$62,969,799
2017-12-01
AL&R $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$132,593,477
2017-12-01
Mortgage $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$132,593,477
2015-12-17
AL&R $31,829,268 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$31,829,268
2015-12-17
Mortgage $31,829,268 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$31,829,268
2015-12-17
AL&R $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$93,670,732
2015-12-17
Mortgage $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$93,670,732
2015-12-17
AL&R $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH
$197,500,000
Ten-year activity
2001000
2017
2018
200
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
135
18
8
4
0
165
2018
67
10
13
1
3
94
2019
144
19
19
14
4
200
2020
74
17
19
14
3
127
2021
28
15
21
2
3
69
2022
35
3
18
0
2
58
2023
42
29
25
1
3
100
2024
51
11
34
0
10
106
2025
39
8
12
0
7
66
2026
9
0
15
0
9
33
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-11-11311: Street Condition — Line/Marking - After Repaving
2025-10-31Certificate of occupancy Renewal Without Change
2025-10-29Permit Plumbing — Signed-off
2025-10-22Certificate of occupancy Renewal Without Change
2025-10-16Job filed: PLUMBING WORK AT 3RD FLOOR, UNIT 6-3-DD AS PER PLANS FILED HEREWITH$19,500
2025-10-09Restaurant inspection: TADAIMA — grade A
2025-09-26Permit General Construction — Signed-off
2025-09-22Certificate of occupancy Renewal Without Change
2025-09-19Job filed: PAA minor corrections to plans to correct the area of work.$25,000
2025-09-16Job filed: Interior Renovations at Suite 5-6-BSW as per plans herewith$87,500
2025-09-15Job filed: SPRINKLER WORK AT UNITS 5-6-C & BNE AS PER PLANS FILED HEREWITH$1,500
2025-09-10Permit Sprinklers — Signed-off
2025-09-03Permit Plumbing — Signed-off
2025-08-18Job filed: SPRINKLER WORK AT UNITS 5-6-C & BNE AS PER PLANS FILED HEREWITH$1,500
2025-08-18Job filed: PLUMBING WORK AS PER PLANS FILED HEREWITH$28,250
2025-08-13Job filed: PLUMBING WORK AT 3RD FLOOR, UNIT 6-3-DD AS PER PLANS FILED HEREWITH$19,500
2025-08-04Certificate of occupancy Renewal Without Change
2025-07-29Certificate of occupancy Renewal Without Change
2025-07-09311: Homeless Person Assistance — Non-Chronic
2025-07-09Permit General Construction — Signed-off
2025-07-07Job filed: FILING HEREWITH PLUMBING WORK TO INSTALL OUTDOOR HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,748
2025-06-30Certificate of occupancy Renewal Without Change
2025-06-27311: Building/Use — Illegal Conversion Of Residential Building/Space
2025-06-27DOB complaint, category ?
2025-06-13Boiler inspection
2025-06-13Boiler inspection
2025-06-13Permit Mechanical Systems — Signed-off
2025-06-11Certificate of occupancy Renewal Without Change
2025-06-11Job filed: Filing herewith for installation of HVAC equipment (IC-5-6-C)$75,000
2025-06-09Eviction executed (SUITE B636.BUILDING)
2025-06-03Permit Mechanical Systems — Signed-off
2025-05-30Job filed: Filing herewith for installation of HVAC Rooftop Unit (IC-6-6-D601)$30,000
2025-05-27311: Illegal Dumping — Removal Request
2025-04-28Certificate of occupancy Renewal Without Change
2025-04-17FDNY inspection (COM_OCPCY)
2025-04-16Job filed: INTERIOR RENOVATION AT UNIT 6-3-DD AS PER PLANS FILED HEREWITH$288,000
2025-04-11Permit General Construction — Signed-off
2025-04-03Certificate of occupancy Renewal With Change
2025-04-02311: Abandoned Vehicle — With License Plate
2025-03-26Permit Mechanical Systems — Signed-off
2025-03-25311: Sewer — Street Flooding (SJ)
2025-03-14FDNY inspection (COM_OCPCY)
2025-03-09311: Dirty Condition — Trash
2025-03-04Permit Plumbing — Permit Issued
2025-02-25FDNY inspection (COM_OCPCY)
2025-02-25FDNY inspection (COM_OCPCY)
2025-02-19Certificate of occupancy Renewal Without Change
2025-02-13FDNY inspection (COM_OCPCY)
2025-01-28Certificate of occupancy Renewal Without Change
2025-01-27Job filed: INSTALLATION OF NEW SPLIT HVAC SYSTEM ALONG WITH ASSOCIATED DUCTWORK & PIPING. INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM & MAKEUP AIR SYSTEM AS PER T$77,500
2025-01-24311: General Construction/Plumbing — Building Permit - None
2025-01-10311: Illegal Parking — Blocked Hydrant
2025-01-06Restaurant inspection: FRYING PAN BROOKLYN — grade A
2025-01-05311: Food Poisoning — 3 or More
2025-01-03311: Illegal Parking — Blocked Sidewalk
2025-01-02FDNY inspection (COM_OCPCY)
2025-01-02Job filed: HEREWITH FILING FOR MECHANICAL WORK FOR TENANT SPACE ( HAPIK) AS PER DETAILS ON PLANS.NO CHANGE IN USE EGRESS OR OCCUPPANCY WITH THIS FILING.$235,000
2024
2024-12-30Job filed: INSTALLATION OF NEW PLUMBING FIXTURES & COMMERCIAL GAS-FIRED COOKING EQUIPMENT AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B010644$48,000
2024-11-05Job filed: HEREWITH FILING FOR MECHANICAL WORK FOR TENANT SPACE ( HAPIK) AS PER DETAILS ON PLANS.NO CHANGE IN USE EGRESS OR OCCUPPANCY WITH THIS FILING.$235,000
2024-11-04Permit Structural — Signed-off
2024-11-04Certificate of occupancy Renewal Without Change
2024-10-27311: Water System — Hydrant Running Full (WA4)
2024-10-23311: Noise — Noise: Jack Hammering (NC2)
2024-10-17Rodent inspection: Failed for Other Reason
2024-10-17Permit General Construction — Signed-off
2024-10-10Job filed: HEREWITH FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH ARCHITECTURAL APPLICATIONWORK CONSISTS OF INSTALLING A NEW METAL STAIR BETWEEN THE FIRSTFLOOR $38,000
2024-08-20Certificate of occupancy Renewal With Change
2024-08-02Permit Plumbing — Signed-off
2024-07-29Job filed: INTERIOR RENOVATION AT 5-6-C AS PER PLANS FILED HEREWITH, TO ONLY INCLUDE NEW ADA BATHROOM, UTLITY CLOSET AND ELECTRICAL CLOSET$54,000
2024-07-02311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2024-07-02DOB complaint, category ?
2024-06-29311: Illegal Parking — Blocked Hydrant
2024-06-26Permit Mechanical Systems — Signed-off
2024-06-21Job filed: INSTALLATION OF NEW PLUMBING FIXTURES & COMMERCIAL GAS-FIRED COOKING EQUIPMENT AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B010644$48,000
2024-06-17Job filed: INTERIOR COMMERCIAL RENOVATION OF EXISTING COMMERCIAL SPACE, NEW FLOOR & WALL FINISHES AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OC$476,280
2024-06-14311: Street Condition — Rough, Pitted or Cracked Roads
2024-06-10Job filed: A1$1,000
2024-06-05311: Noise - Vehicle — Car/Truck Horn
2024-06-04Job filed: HEREWITH FILING FOR GENERAL CONSTRUCTION WORK FOR TENANT FIT OUT. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS FILING.$45,000
2024-03-29Permit General Construction — Signed-off
2024-03-28Permit Plumbing — Permit Issued
2024-03-27311: Illegal Parking — Blocked Hydrant
2024-03-26Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH THE GC APPLICATION #B00720797-I1 AS SHOWN ON THE DRAWINGS FILED HEREIN.$81,000
2024-03-25Permit Plumbing — Signed-off
2024-03-22FDNY inspection (COM_OCPCY)
2024-03-22FDNY inspection (COM_OCPCY)
2024-03-22Job filed: Filing structural work for demolition of partial slab between first and second floor at existing six-story building.$111,749
2024-03-21FDNY inspection (COM_OCPCY)
2024-03-21FDNY inspection (COM_OCPCY)
2024-03-14Job filed: New restrooms and plumbing fixtures at 1st floor and 2nd floor of existing 6 story building with cellar.$61,136
2024-03-14Job filed: Interior renovation and new plumbing fixtures at partial first and second floors$87,973
2024-03-12FDNY inspection (COM_OCPCY)
2024-03-12FDNY inspection (COM_OCPCY)
2024-03-08Restaurant inspection: CARREAU CLUB — grade A
2024-02-16Job filed: INSTALLATION OF NEW GAS-FIRED HIGH PRESSURE PROCESS BOILER AS INDICATED ON THE DRAWINGS FILED HEREIN. THIS APPLICATION IS FILED IN CONJUNCTION WITH BE$15,000
2024-02-02Permit Mechanical Systems — Signed-off
2024-02-02Permit General Construction — Signed-off
2024-01-30311: Illegal Dumping — Removal Request
2024-01-27311: HEAT/HOT WATER — APARTMENT ONLY
2024-01-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-01-26Boiler inspection
2024-01-26Boiler inspection
2024-01-26Restaurant inspection: TADAIMA — grade A
2024-01-18311: Blocked Driveway — No Access
2024-01-18Permit Plumbing — Signed-off
2024-01-17Job filed: Filing herewith for installation of kitchen ventilation exhaust equipment and hood. Filed in conjunction with GC-B00953868-I1$64,900
2024-01-16Job filed: Filing herewith for installation of new Plumbing fixtures. Filed in conjunction with GC application #B00953868-I1$65,000
2024-01-11Job filed: MECHANICAL WORK AT 3RD FLOOR AND ROOF AS PER PLANS FILED HEREWITH$95,000
2024-01-10Permit Plumbing — Signed-off
2024-01-10Permit Mechanical Systems — Signed-off
2024-01-10Permit Sprinklers — Signed-off
2024-01-08Job filed: Find herewith for installation of HVAC equipment (IC-5-6-B)$30,000
2024-01-05Air permit (CERTIFICATE TO OPERATE), fuel: ?
2024-01-05Air permit (CERTIFICATE TO OPERATE), fuel: NONE
2024-01-05Job filed: INTERIOR COMMERCIAL RENOVATION OF EXISTING COMMERCIAL SPACE, NEW FLOOR & WALL FINISHES AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OC$330,050
2023-12-19Job filed: PLUMBING WORK AT 3RD FLOOR AS PER PLANS FILED HEREWITH$32,000
2023-12-15Job filed: SPRINKLER SYSTEM INSTALLATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH$19,500
2023-12-12Job filed: ALTERATION OF EXISTING SPRINKLER SYSTEM INCLUDING THE RELCOATION & REPLACEMENT OF SPRINKER HEADS ALONG WITH THE REMOVAL AND NEW INSTALLATION OF SPRINK$51,000
2023-12-07311: Encampment — N/A
2023-11-28Permit General Construction — Signed-off
2023-11-17Elevator permit: FURNISH and INSTALL NEW GOVERNOR, SECTION 8.7.2.19. All work to comply with Safety Code for Elevators and Escalators ASME A17.1-20$15,000
2023-11-17Permit Boiler Equipment — Signed-off
2023-11-16Permit Sprinklers — Signed-off
2023-11-16Permit Structural — Signed-off
2023-11-14FDNY inspection (COM_OCPCY)
2023-11-14311: Water System — Hydrant Running (WC3)
2023-11-13Job filed: INSTALLATION OF NEW GAS-FIRED HIGH PRESSURE PROCESS BOILER AS INDICATED ON THE DRAWINGS FILED HEREIN. THIS APPLICATION IS FILED IN CONJUNCTION WITH BE$15,000
2023-11-13Job filed: INTERIOR RENOVATION AT PARTIAL 3RD FLOOR AS PER PLANS FILED HEREWITH.$260,000
2023-11-09Permit Mechanical Systems — Signed-off
2023-11-02Job filed: INSTALLATION OF NEW DUCTED VRF SYSTEMS, OUTSIDE AIR FANS, & EXHAUST FANS AS INDICATED ON THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B0072$78,000
2023-10-26Job filed: INSTALLATION OF NEW GAS-FIRED PROCESS BOILERS AS INDICATED ON THE DRAWINGS FILED HEREIN.$30,000
2023-10-17Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH THE GC APPLICATION #B00720797-I1 AS SHOWN ON THE DRAWINGS FILED HEREIN.$81,000
2023-10-12Certificate of occupancy Renewal Without Change
2023-10-11Job filed: INSTALLATION OF NEW GAS-FIRED PROCESS BOILERS AS INDICATED ON THE DRAWINGS FILED HEREIN.$30,000
2023-09-14Job filed: FILING HEREWITH PLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDOOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,750
2023-08-11Permit General Construction — Signed-off
2023-08-07Eviction executed (SPACE B515,BUILDING)
2023-08-07311: Elevator — Elevator - Multiple Devices On Property
2023-08-07Job filed: PARTIAL INTERIOR RENOVATION AT 4TH FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR. NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$110,000
2023-08-07ECB CLASS - 2 violation: ELIMINATE GAP AT BOTTOM OF RIGHT BRAKE PAD.
2023-08-07ECB CLASS - 2 violation: REMOVE SLACK FROM TILLER ROPE. SHORTEN GOVERNOR ROPE.
2023-08-07DOB complaint, category ?
2023-07-26Permit Plumbing — Signed-off
2023-07-17Certificate of occupancy Renewal Without Change
2023-07-13Permit Boiler Equipment — Signed-off
2023-07-12Permit General Construction — Signed-off
2023-07-12Job filed: INSTALLATION OF NEW PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION # B00809852-I1.$27,000
2023-06-30Job filed: PROPOSAL INTERIOR COMMERCIAL RENOVATION OF PARTITIONS ON A PORTION OF THE 1ST, 2ND, AND 3RD FLOORS IN AN EXISTING 6-STORY BUILDING AS PER THE DRAWINGS$975,000
2023-06-28Job filed: INSTALLATION OF A NEW SPLIT HVAC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN & TO OBTAIN THE NECESSARY CERTIFICATE OF COMPLIANCE ALONG WITH RELA$90,000
2023-06-27Job filed: INSTALLATION OF NEW GAS-FIRED PROCESS BOILERS AS INDICATED ON THE DRAWINGS FILED HEREIN.$30,000
2023-06-26Job filed: ALTERATION OF EXISTING SPRINKLER SYSTEM INCLUDING THE RELCOATION & REPLACEMENT OF SPRINKER HEADS ALONG WITH THE REMOVAL AND NEW INSTALLATION OF SPRINK$51,000
2023-06-15Job filed: NEW CONCRETE SLAB ON THE 1ST FLOOR ALONG WITH NEW CONCRETE PADS FOR EQUIPMENT & NEW STAIR OPENING BETWEEN THE 1ST & 2ND FLOORS AS INDICATED ON THE DRA$181,050
2023-06-14311: Elevator — Elevator - Multiple Devices On Property
2023-06-14ECB CLASS - 2 violation: SEAL HOIST MACHINE LEAKS.
2023-05-05Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH THE GC APPLICATION #B00720797-I1 AS SHOWN ON THE DRAWINGS FILED HEREIN.$81,000
2023-04-21Certificate of occupancy Renewal Without Change
2023-03-30FDNY inspection (COM_OCPCY)
2023-03-30FDNY inspection (COM_OCPCY)
2023-03-21FDNY inspection (RISK)
2023-03-21311: Consumer Complaint — Retail Store
2023-03-21311: Consumer Complaint — Retail Store
2023-03-20Job filed: INTERIOR RENOVATION OF EXISTING FACTORY & ANCILLARY SPACES INCLUDING THE INSTALLATION OF NON-LOAD BEARING PARTITIONS,DOORS, FLOOR & WALL FINISHES AS P$541,200
2023-03-13Job filed: INSTALLATION OF NEW PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #B00835124-I1.$15,000
2023-03-13Job filed: INSTALLATION OF NEW DUCTWORK CONNECTED TO AN EXISTING AIR HANDLER UIT & INSTALLATION OF NEW ERV UNIT AS INDICATED ON THE DRAWINGS FILED HEREIN.$15,000
2023-03-10311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2023-03-10Job filed: MINOR INTERIOR RENOVATION OF EXISTING UG17 MANUFACTURING SPACE INCLUDING THE INSTALLATION OF NEW COUNTERTOPS AND WALL FLOOR FINISHES AS INDICATED ON T$124,000
2023-03-08Permit General Construction — Signed-off
2022-05-24Job filed: PROPOSAL INTERIOR COMMERCIAL RENOVATION OF PARTITIONS ON A PORTION OF THE 1ST, 2ND, AND 3RD FLOORS IN AN EXISTING 6-STORY BUILDING AS PER THE DRAWINGS$975,000
2022-05-23311: Abandoned Vehicle — With License Plate
2022-05-23Permit General Construction — Signed-off
2022-05-19Job filed: Minor interior renovation on 3rd floor tenant bathrooms unit 6-3-BSW$15,000
2022-05-19Job filed: Filing Plumbing fixtures for bathrooms on 3rd Floor in conjunction with DOB NOW#B00741201-I1$23,000
2022-05-16Permit Plumbing — Signed-off
2022-05-06Job filed: Filing herewith plumbing work only for bathroom renovation. No change in use, egress or occupancy.$25,000
2022-04-28Job filed: INSTALLATION OF TOILETS, LAVATORIES, SERVICE SINK, AND WATER FOUNTAINS IN CONJUNCTION WITH THE GC APPLICATION #B00700966-I1.$25,500
2022-04-20Permit Mechanical Systems — Signed-off
2022-04-18Job filed: Filing herewith for installation of HVAC equipment$90,040
2022-04-05311: Street Condition — Pothole
2022-03-24311: Food Establishment — Ventilation
2022-03-24Permit EW — ISSUED
2022-03-24Job filed: INTERIOR COMMERCIAL RENOVATION INCLUDING THE INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREI$472,500
2022-02-09Permit General Construction — Signed-off
2022-02-08Permit Plumbing — Signed-off
2022-01-31Job filed: MINOR INTERIOR RENOVATION OF EXISTING UG6 COMMERCIAL SPACE INCLUDING THE INSTALLATION OF NEW COUNTERTOPS AND WALL FLOOR FINISHES AS INDICATED ON THE D$157,800
2022-01-24Job filed: PARTIAL INTERIOR RENOVATION AT 4TH FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR TENANT BUILD OUT UNIT 5-4-B SE$80,070
2022-01-21Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION W/ COMMERCIAL BUILDOUT FILED UNDER ALT II #322004380. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$27,000
2022-01-20Permit EW — ISSUED
2021
2021-12-28DOB violation E:
2021-12-28DOB violation E:
2021-12-23Mortgage $4,988,430 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD$4,988,430
2021-12-23Mortgage $72,439,609 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD$72,439,609
2021-12-01Permit Mechanical Systems — Signed-off
2021-11-29Job filed: Filing herewith for installation of HVAC Equipment (IC-6-2-C)$182,000
2021-11-26Permit Plumbing — Signed-off
2021-11-26Permit Plumbing — Permit Issued
2021-11-17Job filed: No Work
2021-10-29311: Broken Parking Meter — Out of Order
2021-10-22FDNY inspection (RISK)
2021-10-22311: Blocked Driveway — No Access
2021-09-21Permit Plumbing — Signed-off
2021-09-14311: Street Condition — Failed Street Repair
2021-08-24Job filed: Temporary use of Banquet or as Display and Sales area.
2021-08-15311: Illegal Parking — Blocked Hydrant
2021-08-09311: Animal-Abuse — Neglected
2021-08-05Job filed: PLUMBING PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$46,250
2021-07-29Job filed: No Work
2021-07-22311: Elevator — Elevator - Multiple Devices On Property
2021-07-22ECB CLASS - 2 violation: EXPIRED BRAKE MAINT TAG. WORN CAR SHOES. BEVEL LEDGE AT HOISTWAY ESCAPE DOOR$310
2021-07-22ECB CLASS - 2 violation: EXPIRED BRAKE MAINT TAG$310
2021-07-22ECB CLASS - 2 violation: RESTORE SERVICE TO DEVICE$310
2021-07-22ECB CLASS - 2 violation: EXPIRED BRAKE MAINT TAG$310
2021-07-22ECB CLASS - 2 violation: EXPIRED BRAKE MAINT TAG$310
2021-07-22DOB complaint, category ?
2021-07-21311: Elevator — Elevator - Multiple Devices On Property
2021-07-21ECB CLASS - 2 violation: SHORTEN GOV ROPE$310
2021-07-21ECB CLASS - 2 violation: ADJUST BRAKES$310
2021-07-21DOB complaint, category ?
2021-07-14Job filed: FILING HEREWITH FOR MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$1,200,000
2021-07-11311: Illegal Fireworks — N/A
2021-07-01Permit Plumbing — Signed-off
2021-06-24Job filed: Temporary use of Banquet or as Display and Sales area.
2021-06-21Job filed: FILING HEREWITH FOR PLUMBING WORK ON METERS AND GAS RISERS AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$180,000
2021-05-10ECB CLASS - 2 violation: CAR CAN NOT LIFT LOAD AND WENT ON SAFETY WITH LOAD IN CAR , NEED TO PERFORM A BALANCED LOAD TEST AND FULL LOAD LIFT TEST / NEED TO$310
2021-04-26311: Noise — Noise: Jack Hammering (NC2)
2021-04-21Permit Plumbing — Signed-off
2021-04-13Job filed: Filing herewith for sprinkler work as per plans. No change to use, egress, or occupancy.$150,000
2021-04-02DOB complaint, category ?
2021-03-31Permit Structural — Signed-off
2021-03-22Job filed: installation of new plumbing fixtures to partial 3rd floor as per plans filed herewith$52,500
2021-03-21311: Mass Gathering Complaint — Mass Gathering
2021-03-17Permit Sprinklers — Permit Issued
2021-03-15311: Street Condition — Pothole
2021-03-05Job filed: SPRINKLER PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$13,875
2021-03-03311: Illegal Parking — Blocked Sidewalk
2021-03-02311: Illegal Parking — Blocked Sidewalk
2021-03-02Permit EW — ISSUED
2021-03-02Job filed: MECHANICAL PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$175,750
2021-02-19311: Broken Parking Meter — Out of Order
2021-02-18Permit Sprinklers — Signed-off
2021-02-16Permit Sprinklers — Signed-off
2021-02-12Permit Plumbing — Signed-off
2021-02-07311: Street Condition — Pothole
2021-01-27Job filed: MECHANICAL PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$175,750
2021-01-22Permit EW — ISSUED
2021-01-19311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-12Certificate of occupancy Temporary
2021-01-07Elevator permit: DOOR LOCK MONITOR -All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17.10-03 as modified by Appendix K and C$6,200
2021-01-07Elevator permit: DOOR LOCK MONITOR -All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17.10-03 as modified by Appendix K and C$6,200
2021-01-07Elevator permit: DOOR LOCK MONITOR -All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17.10-03 as modified by Appendix K and C$6,200
2020-12-24Tenant complaint: OUTSIDE BUILDING — PORCH/BALCONY
2020-12-17Permit Structural — Permit Issued
2020-12-15Job filed: Installation of new plumbing fixtures.$7,000
2020-12-14Job filed: FILING HEREWTHPLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDOOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,750
2020-12-10Job filed: A2$175,000
2020-12-10Job filed: A2$175,000
2020-12-09Permit Mechanical Systems — Signed-off
2020-12-07Permit Plumbing — Signed-off
2020-11-20311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-19Job filed: FILING HEREWTHPLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDOOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,750
2020-11-19Job filed: FILING HEREWITH PLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDOOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,750
2020-11-17Boiler inspection
2020-11-17Boiler inspection
2020-11-12Permit Plumbing — Permit Issued
2020-11-12Permit Plumbing — Signed-off
2020-11-12Permit Plumbing — Signed-off
2020-11-12Permit EW — ISSUED
2020-11-11Job filed: INSTALLATION OF NEW PLUMBING FIXTURES AT PARTIAL 2ND FLOOR AS PER PLANS FILED HEREWITH$21,000
2020-11-04Permit Plumbing — Signed-off
2020-11-04Permit EW — ISSUED
2020-10-29Job filed: FILING HEREWITH PLUMBING WORK TO INSTALL OUTDOOR HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,748
2020-10-28Permit Mechanical Systems — Signed-off
2020-10-26Job filed: FILING HEREWTHPLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDOOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,750
2020-10-20Permit EW — ISSUED
2020-10-16Permit Sprinklers — Signed-off
2020-10-09311: Illegal Parking — Blocked Sidewalk
2020-10-07Job filed: FILING HEREWITH FOR MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$1,200,000
2020-10-05311: Elevator — Elevator - Multiple Devices On Property
2020-10-05Permit EW — ISSUED
2020-10-05ECB CLASS - 2 violation: ADJUST 4TH FLOOR DOOR LATCH. PROVIDE FLOOR NUMBERS WHERE MISSING
2020-10-05ECB CLASS - 2 violation: SHORTEN HOIST ROPES. REPAIR CAR PHONE$310
2020-10-05DOB complaint, category ?
2020-10-02Permit Sidewalk Shed — Permit Issued
2020-09-24Job filed: PLUMBING PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$46,250
2020-09-24Job filed: MECHANICAL PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$175,750
2020-09-22311: Elevator — Elevator - Multiple Devices On Property
2020-09-22311: NonCompliance with Phased Reopening — Business not in compliance
2020-09-22Job filed: SPRINKLER PORTION OF 4TH FLOOR COMMERCIAL OFFICE RENOVATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY ON THIS APPLICATION.$13,875
2020-09-22ECB CLASS - 2 violation: ADJUST 4 FLOOR DOOR LOCK LATCH. SEAL HOIST MACHINE LEAKS. EXPIRED BRAKE MAINT TAG
2020-09-22DOB complaint, category ?
2020-09-18Certificate of occupancy Temporary
2020-09-16311: Elevator — Elevator - Multiple Devices On Property
2020-09-16ECB CLASS - 2 violation: SEAL HOIST MACHINE LEAKS. ELIMINATE GAPS IN BRAKE PADS$312
2020-09-16ECB CLASS - 2 violation: INAUDIBLE STOP SWITCH. SEAL HOIST MACHINE LEAKS
2020-09-16ECB CLASS - 2 violation: PROVIDE MISSING BRAKE MAINT TAG
2020-09-16ECB CLASS - 2 violation: SEAL HOIST MACHINE LEAKS. REPAIR BOTTOM OF GATE
2020-09-16ECB CLASS - 2 violation: PROVIDE DESIGNATED LOBBY BRAILLE TAGS. REPAIR CAR PHONE. WATER IN PIT
2020-09-16DOB complaint, category ?
2020-09-10ECB CLASS - 2 violation: SEAL HOIST MACHINE LEAKS. PROVIDE CURRENT BRAKE MAINT TAG
2020-09-03311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-28311: Elevator — Elevator - Multiple Devices On Property
2020-08-28ECB CLASS - 2 violation: PROVIDE DESIGNATED LOBBY BRAILLE TAGS. PROVIDE IN CASE OF FIRE SIGNS. CRACKS IN BRAKE PADS, REPLACE, BRAKE MAINT TAG EXPIRED. ADJU
2020-08-28ECB CLASS - 2 violation: PROVIDE DESIGNATED LOBBY BRAILLE TAGS. PROVIDE IN CASE OF FIRE SIGNS.
2020-08-28DOB complaint, category ?
2020-08-27Permit Sprinklers — Signed-off
2020-08-27Job filed: Installation of plumbing fixtures as show on plans filed herewith.$17,500
2020-08-21Job filed: 4TH FLOOR COMMERCIAL OFFICE RENNVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$740,000
2020-08-21Job filed: 4TH FLOOR COMMERCIAL OFFICE RENNVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$740,000
2020-08-20Permit Mechanical Systems — Signed-off
2020-08-12Permit Plumbing — Signed-off
2020-08-10Permit Mechanical Systems — Signed-off
2020-08-03Job filed: Filing herewith for installation of HVAC equipment$29,991
2020-07-30Job filed: Filing herewith plumbing work only for bathroom renovation. No change in use, egress or occupancy.$25,000
2020-07-17Job filed: INSTALLATION OF NEW HVAC UNITS AS PER PLANS FILED HEREWITH.$15,000
2020-07-17Job filed: NEW PLUMBING FIXTURES FOR INTERIOR RENOVATION AT PARTIAL FIRST FLOOR AS PER PLANS FILED HEREWITH.$7,000
2020-07-17Job filed: Installation of plumbing fixtures as show on plans filed herewith.$17,500
2020-07-16Permit Plumbing — Signed-off
2020-07-13Job filed: APPLICATION IS FILED FOR REMOVAL OF 3 SPRINKLER HEADS & RELOCATION OF 10 SP HEADS AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OC$13,000
2020-07-05311: Illegal Fireworks — N/A
2020-06-25Job filed: INSTALLATION OF NEW GAS FORGE AND GAS METER IN PARTIAL CELLAR AND FIRST FLOOR.$20,000
2020-06-18Permit Plumbing — Signed-off
2020-06-10Job filed: FILING HEREWITH GENERAL CONSTRUCTION WORK ON THE 5TH FLOOR AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$125,000
2020-06-10Job filed: FILING HEREWITH GENERAL CONSTRUCTION WORK ON THE 5TH FLOOR AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$12,500,000
2020-06-04Certificate of occupancy Temporary
2020-06-04Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 5TH FLOOR AS PER PLANS FILED HEREWITH. MECHANICAL DOB NOW B00378754, PLUMBING DOB NOW B00361629$108,000
2020-06-03Job filed: FILING HEREWITH GENERAL CONSTRUCTION WORK ON THE 5TH FLOOR AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$12,500,000
2020-05-27Job filed: FILING HEREWITH FOR MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$1,200,000
2020-05-27Job filed: Filing herewith for sprinkler work as per plans. No change to use, egress, or occupancy.$150,000
2020-05-27Job filed: FILING HEREWITH FOR PLUMBING WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.$200,000
2020-05-26Job filed: FILING HEREWITH INTERIOR RENOVATION OF THE 5TH FLOOR AS PER PLANS.$1,100,000
2020-05-26Job filed: FILING HEREWITH INTERIOR RENOVATION OF THE 5TH FLOOR AS PER PLANS.$1,100,000
2020-05-04Job filed: FILING HEREWITH INTERIOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$85,000
2020-05-01Job filed: FILING HEREWITH INTERIOR RENOVATION OF THE 5TH FLOOR AS PER PLANS.$4,500,000
2020-04-30Job filed: APPLICATION IS FILED FOR INTERIOR ALTERATION INCLUDING BUT NOT LIMITED TO CONSTRUCTION OF TASTING BAR AND WHISKEY DISTILLERY AS PER PLANS FILED HEREWI$150,000
2020-04-30Job filed: APPLICATION IS FILED FOR INTERIOR ALTERATION INCLUDING BUT NOT LIMITED TO CONSTRUCTION OF TASTING BAR AND WHISKEY DISTILLERY AS PER PLANS FILED HEREWI$150,000
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-07311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2020-03-06Permit EW — ISSUED
2020-03-06Job filed: INSTALLATION OF PLUMBING FIXTURES AS PER PLANS.$70,000
2020-03-04Certificate of occupancy Temporary
2020-02-28Permit Plumbing — Signed-off
2020-02-27Permit Standpipe — Signed-off
2020-02-25Job filed: Temporary use of Banquet area on 2nd Floor
2020-02-24Job filed: FILING HEREWITH TO CHANGE USE ON PART OF 1ST FLOOR ONLY. ALL WORK TO BE FILED UNDER SEPARATE APPLICATIONS.$1,000
2020-02-24Job filed: FILING HEREWITH TO CHANGE USE ON PART OF 1ST FLOOR ONLY. ALL WORK TO BE FILED UNDER SEPARATE APPLICATIONS.$1,000
2020-02-19Job filed: Installation of exterior accessory stairs in existing courtyard. No change in occupancy, egress or use.$205,000
2020-02-07Job filed: MINOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH ACCESSORY EATING A ND DRINKING ESTABLISHMENT UG6 SPACE,INCLUDING THE INSTALLATION OF NEW C$292,600
2020-02-07Job filed: MINOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH ACCESSORY EATING A ND DRINKING ESTABLISHMENT UG6 SPACE,INCLUDING THE INSTALLATION OF NEW C$292,600
2020-02-04Permit Plumbing — Signed-off
2020-01-27Job filed: FILING POST APPROVAL AMENDMENT TO REVISE SRPINKLER DRAWINGS.$20,000
2020-01-27Job filed: MODIFICATION OF EXISTING AUTOMATIC SPRINKLER SYSTEM ON PARTIAL 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$11,500
2020-01-24Elevator permit: New hoist way doors and frames w/ door tracks, hanger rollers, closures, MCP interlocks on Basement floor rear landing on car 3P42$22,250
2020-01-17Permit EW — ISSUED
2020-01-07311: Illegal Parking — Blocked Sidewalk
2020-01-02Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 4TH FLOOR AS PER PLANS FILED HEREWITH$120,000
2019
2019-12-30Permit EW — ISSUED
2019-12-30Job filed: INSTALLATION OF NEW PLUMBING FIXTURES ON 4TH FLOOR AS PER PLANS FILED HEREWITH$45,500
2019-12-23311: Illegal Parking — Blocked Sidewalk
2019-12-20DOB violation E:
2019-12-20DOB violation E:
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AL&R $39,209,696 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$39,209,696
2019-12-19Mortgage $39,209,696 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$39,209,696
2019-12-19AL&R $19,298,989 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$19,298,989
2019-12-19Mortgage $19,298,989 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$19,298,989
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-18Permit Mechanical Systems — Signed-off
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-12Job filed: Filing herewith for installation of split HVAC system on 2nd Floor (5-2-B)$38,970
2019-12-06Job filed: INSTALLATION OF 2 NEW HOSE RACK CABINETS TO EXISTING STANDPIPE SYSTEM IN CONJUNCTION WITH SPRINKLER # 321549712 ASSOCIATED WITH BUILD OUT UNDER 321922$2,000
2019-11-29DOB complaint, category ?
2019-11-27Boiler inspection
2019-11-27Boiler inspection
2019-11-21Certificate of occupancy Temporary
2019-11-18Job filed: INSTALLATION OF NEW GAS FORGE AND GAS METER IN PARTIAL CELLAR AND FIRST FLOOR.$20,000
2019-11-14Job filed: TPA for maximum of 30 persons located on the second floor. Exhibit, sales, and banquet areas as conforming to uses in F-3 and alternate use as A-4.Hou
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-10-30Permit EW — ISSUED
2019-10-29Permit Sprinklers — Signed-off
2019-10-29Job filed: A2$70,000
2019-10-29Job filed: APPLICATION FILED FOR DEMOLITION OF EXISTING WINDOWS AND KNEE WALL TO BE REPLACED BY NEW FLOOR TO CEILING WINDOWS AS PER PLANS. NO CHANGE IN USE, EGRE$97,000
2019-10-29Job filed: A2$70,000
2019-10-29Job filed: APPLICATION FILED FOR DEMOLITION OF EXISTING WINDOWS AND KNEE WALL TO BE REPLACED BY NEW FLOOR TO CEILING WINDOWS AS PER PLANS. NO CHANGE IN USE, EGRE$97,000
2019-10-25Job filed: INSTALLATION OF NEW HVAC UNITS AS PER PLANS FILED HEREWITH.$15,000
2019-10-22Elevator permit: New hoist way doors and frame w/ door tracks, hanger rollers, closures, MCP interlocks on 4th floor. Filing this application to mo$27,000
2019-10-21311: Water System — Leak (Use Comments) (WA2)
2019-10-17Job filed: Filing herewith for installation of air cooled split condensing and heat pump HVAC system and related equipment and ductwork.$86,028
2019-10-12Job filed: Filing herewith for installation of HVAC Air Cooled Split Condensing unit and Ceiling mounted AC Unit.$34,741
2019-10-12Job filed: Filing herewith for installation of air cooled split condensing and heat pump HVAC system and related equipment and ductwork.$86,028
2019-10-02Elevator permit: New hoist way doors and frames w/ door tracks, hanger rollers, closures, MCP interlocks on 2nd, 4th, 5th and 6th floors. Filing th$89,000
2019-10-02Job filed: No Work
2019-09-25Job filed: PROPOSED PLUMBING FIXTURES FOR PARTIAL SECOND FLOOR$56,000
2019-09-17Permit Plumbing — Signed-off
2019-09-13Job filed: NEW PLUMBING FIXTURES FOR INTERIOR RENOVATION AT PARTIAL FIRST FLOOR AS PER PLANS FILED HEREWITH.$7,000
2019-09-09Permit EW — ISSUED
2019-09-09Permit EW — ISSUED
2019-09-09Permit EW — ISSUED
2019-09-09Permit EW — ISSUED
2019-09-09Permit EW — ISSUED
2019-09-05Permit EW — ISSUED
2019-09-05Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 1ST FLOOR AS PER PLANS FILED HEREWITH.$88,000
2019-08-19Job filed: INSTALLATION OF EXTERIOR CONVENIENCE STAIR AS PER PLANS$100,000
2019-08-15Permit EW — ISSUED
2019-08-09Job filed: INTERIOR RENOVATION TO PARTIAL 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH.$500,000
2019-08-05Job filed: HEREWITH FILING FOR EVENT SPACE TENANT FITOUT AS PER PLANS. NO CHANGE TO USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$400,000
2019-08-05Job filed: INSTALLATION OF PLUMBING FIXTURES AS PER PLANS.$70,000
2019-08-05Job filed: FILING POST APPROVAL AMENDMENT TO REVISE SRPINKLER DRAWINGS.$20,000
2019-08-01311: Noise — Noise: Construction Equipment (NC1)
2019-07-31Permit EW — ISSUED
2019-07-24Permit EW — ISSUED
2019-07-19Certificate of occupancy Temporary
2019-07-12Permit EW — ISSUED
2019-07-12Permit EW — ISSUED
2019-07-12Permit EW — ISSUED
2019-07-10Eviction executed (SUITE 5-1-C)
2019-07-10Permit EW — ISSUED
2019-07-05Permit PL — ISSUED
2019-06-28Job filed: STRUCTURAL DUNNAGE FOR COOLING TOWER FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION 321922416. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2019-06-27Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2019-06-27Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$65,000
2019-06-26Permit Sign — Signed-off
2019-06-26Permit Sign — Signed-off
2019-06-26Permit Sign — Signed-off
2019-06-26Permit Sign — Signed-off
2019-06-26Permit Sign — Signed-off
2019-06-26Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,170
2019-06-26Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,170
2019-06-25Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,170
2019-06-25Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,797
2019-06-25Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,170
2019-06-11Job filed: BUILD OUT RELATED TO NEW DISTILLERY & BAR (BUILDING 6) INCLUDING MECHANICAL & PLUMBING AS PER PLANS.$408,000
2019-06-10Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 4TH FLOOR FOR OFFICE SUITES 4A & 4B. NO CHANGE IN USE EGRESS OR OCCUPANCY$418,400
2019-06-07311: Noise — Noise: Construction Equipment (NC1)
2019-05-29Permit EW — ISSUED
2019-05-28311: Street Condition — Wear & Tear
2019-05-28311: Indoor Sewage — Sewage Odor
2019-05-22Job filed: INSTALLATION OF NEW BOILER AS PER PLANS FILED HEREWITH.$10,000
2019-05-22Job filed: HEREWITH FILING FOR THE DISTILLERY TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$875,000
2019-05-17311: Noise — Noise: Construction Before/After Hours (NM1)
2019-05-15Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FA SYSTEM AS PER PLANS.$19,000
2019-05-10Permit EW — ISSUED
2019-05-10Permit EW — ISSUED
2019-05-10Permit EW — ISSUED
2019-05-10Permit EW — ISSUED
2019-05-10Permit EW — ISSUED
2019-05-03Job filed: HEREWITH FILING TENANT PROTECTION AS PER PLANS.$1,000
2019-05-03Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS.$65,000
2019-05-03Job filed: HEREWITH FILING FOR WINDOW EXPANSION AND EXTERIOR STAIR MODIFICATION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$135,000
2019-05-01Certificate of occupancy Temporary
2019-04-29DOB complaint, category ?
2019-04-26Permit Sidewalk Shed — Permit Issued
2019-04-26Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2019-04-15Job filed: ADDITIONS MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM FOR OFFICE SUITE 4A & 4B. NO CHANGE IN USE, EGRESS OR OCCUPANCY$37,500
2019-04-11Permit EW — ISSUED
2019-04-10Permit PL — ISSUED
2019-04-10Job filed: HEREWITH FILING FOR TENANT PROTECTION AS PER PLANS.$1,000
2019-04-10Job filed: HEREWITH FILING FOR WINDOW EXPANSION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$690,000
2019-04-10Job filed: HEREWITH FILING FOR TENANT PROTECTION AS PER PLANS.$1,000
2019-04-10Job filed: HEREWITH FILING FOR FIRE ESCAPE REMOVAL AS PER PLANS. FILED IN CONJUNCTION WITH ALT I 3321356867. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS A$60,000
2019-04-10Job filed: HEREWITH FILING TENANT PROTECTION AS PER PLANS.$1,000
2019-04-10Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS.$310,000
2019-04-10Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS.$310,000
2019-04-08Permit EW — ISSUED
2019-04-08Permit EW — ISSUED
2019-04-08Permit EW — ISSUED
2019-04-08Permit EW — ISSUED
2019-04-08Permit PL — ISSUED
2019-04-05Permit PL — ISSUED
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-02Permit EW — ISSUED
2019-04-02Permit EW — ISSUED
2019-03-29Permit Sidewalk Shed — Permit Issued
2019-03-29Job filed: HEREWITH FILING FOR REMOVAL OF NON BEARING INTERIOR PARTITIONS AND BOILERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$40,000
2019-03-28Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2019-03-26Permit EW — ISSUED
2019-03-25Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$80,000
2019-03-22Permit PL — ISSUED
2019-03-19Permit EW — RE-ISSUED
2019-03-19Permit EW — RE-ISSUED
2019-03-19Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 4TH FLOOR AT EXISTING 6 STORY BUILDING WITH CELLAR.$477,000
2019-03-18Job filed: Exhibit and sales area
2019-03-18DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2018
2019-03-14Job filed: INSTALLATION OF NEW HVAC SYSTEM AND MODIFICATION/INSTALLATION PLUMBING FIXTURES.$1,095,000
2019-03-14Job filed: APPLICATION FILED HEREWITH FOR INTERIOR COMMERCIAL TENANT 4A & 4B(MODA OPERANDI)FIT OUT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$500,400
2019-03-14Job filed: INSTALLATION OF NEW HVAC SYSTEM AND MODIFICATION/INSTALLATION PLUMBING FIXTURES.$1,095,000
2019-03-08Permit EW — ISSUED
2019-03-05Permit PL — ISSUED
2019-03-05Permit EW — ISSUED
2019-03-05Permit EW — ISSUED
2019-03-04Job filed: SUBSEQUENT FILING TO ADD PARTIAL DEMOLITION TO INITIAL FILING. PARTIAL DEMO/REMOVAL OF EXISTING FLOOR SLAB TO ACCOMMODATE NEW CONVENIENCE STAIR INSTAL$20,000
2019-03-04Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW CONVENIENCE STAIR FOR AN EXISTING COMMERCIAL SPACE AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EG$50,000
2019-03-04Job filed: SUBSEQUENT FILING TO ADD STRUCTURAL TO INITIAL FILING. STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW CONVENIENCE STAIR INSTALLATION.$100,000
2019-03-04Job filed: SUBSEQUENT FILING TO ADD STRUCTURAL TO INITIAL FILING. STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW CONVENIENCE STAIR INSTALLATION.$100,000
2019-02-22Permit PL — ISSUED
2019-02-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF ONE (1) NEW PACKAGED 15 TONS SELF CONTAINED AIR COOLED AIR CONDITIONING UNIT TO PROVIDE AIR CON$22,500
2019-02-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF ONE (1) NEW PACKAGED 15 TONS SELF CONTAINED AIR COOLED AIR CONDITIONING UNIT TO PROVIDE AIR CON$22,500
2019-02-21Job filed: ADDITIONS / MODIFICATIONS TO EXISTING APPROVED MANUAL / AUTOMATIC SMOKE / HEAT DETECTION SYSTEM WITH CENTRAL OFFICE CONNECTION$16,478
2019-02-20Job filed: SUBSEQUENT FILING TO ADD PARTIAL DEMOLITION TO INITIAL FILING. PARTIAL DEMO/REMOVAL OF EXISTING FLOOR SLAB TO ACCOMMODATE NEW TENANT CONVENIENCE STAIR$10,000
2019-02-14Job filed: HEREWITH FILING FOR MAIL & TRASH ROOM RENOVATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$155,000
2019-02-11Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$39,600
2019-02-11Job filed: HEREWITH FILING FOR THE PORCELANOSA TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$225,400
2019-02-11Job filed: HEREWITH FILING FOR THE PORCELANOSA TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$225,400
2019-02-11Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$39,600
2019-02-07Job filed: INSTALLATION OF HVAC SPLIT SYSTEM AND DUCTWORK WORK AS SHOWN HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY OR USE.$35,000
2019-02-04Permit EW — ISSUED
2019-02-04Permit EW — ISSUED
2019-01-30Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321613697, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND GAS SHU$3,000
2019-01-30Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321613697, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND GAS SHU$3,000
2019-01-15DOB complaint, category ?
2019-01-10311: Non-Residential Heat — Inadequate or No Heat
2019-01-09311: Food Establishment — Facility Construction
2019-01-08Job filed: TPA - 400 persons use for exhibits, and sales area conforming to uses F-3.
2019-01-07311: Non-Residential Heat — Inadequate or No Heat
2019-01-07Job filed: STRUCTURAL MODIFICATION TO FACILITATE THE NEW CONVENIENCE STAIR INSTALLATION. TENANTS 5A & 6A.$115,000
2019-01-07Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR TENANT SPACES 5A AND 6A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$190,000
2019-01-07Job filed: APPLICATION FILED HEREWITH FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON 5 TH & 6TH FLOOR FOR TENANT SPACES 5A & 6A. NO CHANGE IN USE EGRE$60,000
2018
2018-12-28Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A HVAC SYSTEM AND PLUMBING FIXTURES.$680,000
2018-12-28Job filed: CREATION OF FIRE PROTECTION PLANS (FPP) IN ACCORDANCE WITH SUBSEQUENT(FDNY)FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2018-12-28Job filed: APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACES ON 5TH AND 6TH FLOORS (TENANT SPACES 5A & 6A). PROPOSED INSTALLA$2,000,000
2018-12-17Boiler inspection
2018-12-17Boiler inspection
2018-12-10Permit PL — ISSUED
2018-12-05Permit EW — ISSUED
2018-11-30Permit EW — ISSUED
2018-11-30Permit EW — ISSUED
2018-11-29311: Illegal Parking — Blocked Sidewalk
2018-11-29Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF ONE (1) NEW PACKAGED 15 TONS SELF CONTAINED AIR COOLED AIR CONDITIONING UNIT TO PROVIDE AIR CON$22,500
2018-11-28Job filed: PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR AT EXISTING 6 STORY BUILDING.$200,000
2018-10-17Elevator permit: New hoist way doors and frames w/ door tracks, hanger rollers, closures, MO interlocks. Filing this application to modernize of th$133,000
2018-10-17311: Noise — Noise: Construction Equipment (NC1)
2018-10-15Permit EW — ISSUED
2018-10-13Permit EW — ISSUED
2018-10-10Permit AL — ISSUED
2018-10-04Job filed: -PROPOSED NEW CONSTRUCTION OF INTERIOR PARTITIONS FOR TRASH ROOMS AND MAILROOMS AT PARTIAL FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$100,000
2018-10-04Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR TENANT SPACES 5A AND 6A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2018-10-04Job filed: -PROPOSED NEW CONSTRUCTION OF INTERIOR PARTITIONS FOR TRASH ROOMS AND MAILROOMS AT PARTIAL FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$100,000
2018-10-04Job filed: APPLICATION FILED HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR TENANT SPACES 5A AND 6A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2018-09-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-09-25311: Noise — Noise: Construction Equipment (NC1)
2018-09-25Job filed: APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACES ON 5TH AND 6TH FLOORS (TENANT SPACES 5A & 6A). PROPOSED INSTALLA$1,500,000
2018-09-18Permit EW — ISSUED
2018-09-18Job filed: FILING FOR EQUIPMENT USE CARDS FOR MECHANICAL ROOFTOP EQUIPMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$1,000
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (2) NEW PACKAGED AIR CONDITIONING UNITS. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTI$45,000
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (2) NEW AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF $12,000
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (1) NEW PACKAGED AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIF$45,000
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (2) NEW AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF $12,000
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (2) NEW AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF $12,000
2018-08-14Permit PL — ISSUED
2018-08-13311: Street Condition — Pothole
2018-08-09Permit Antenna — Signed-off
2018-07-31Permit EW — ISSUED
2018-07-24311: Lead — Lead Kit Request (Residential) (L10)
2018-07-24Permit EW — ISSUED
2018-07-24Permit EW — ISSUED
2018-07-23Permit EW — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-05Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT AND AIR HANDLERS UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$80,000
2018-07-05Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT AND AIR HANDLERS UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$80,000
2018-06-21311: Graffiti — Graffiti
2018-06-18Permit PL — ISSUED
2018-06-18Permit PL — ISSUED
2018-06-01Eviction executed (SUITE B230)
2018-06-01Permit EW — ISSUED
2018-04-27Permit EW — ISSUED
2018-04-25Permit AL — ISSUED
2018-04-24DOB complaint, category ?
2018-04-24DOB complaint, category ?
2018-04-24DOB complaint, category ?
2018-04-18Permit PL — ISSUED
2018-04-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-03-23Permit PL — ISSUED
2018-03-21Permit PL — ISSUED
2018-03-19Permit EW — ISSUED
2018-03-19Permit PL — ISSUED
2018-03-06Permit EW — ISSUED
2018-02-27Permit PL — ISSUED
2018-02-22Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING THE INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, PLUMBING FIXTURES, AND FLOOR AND WALL $163,350
2018-02-12ECB CLASS - 1 violation: FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35287558H ISSUED ON 9/26/17 & TO FILE A C OF C PURSU$400
2018-02-08Permit EW — ISSUED
2018-02-08Permit EW — ISSUED
2018-02-01Agreement — from BANK OF CHINA, NEW YORK BRANCH to NYU LANGONE HOSPITALS; 1-10 BUSH TERMINAL OWNER LP; NYU HOSPITALS CENTER
2018-01-30Permit PL — ISSUED
2018-01-30Permit EW — ISSUED
2018-01-26Permit EW — ISSUED
2018-01-19Permit EW — ISSUED
2018-01-18Job filed: Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Retrofit cabinets in the existing equipment ro$15,400
2018-01-17Permit EW — ISSUED
2018-01-17Permit EW — ISSUED
2018-01-16Job filed: HEREBY FILING FOR INSTALLATION OF NEW 6 VRF SPLIT AIR CONDITIONING CEILING MOUNTED UNITS CONNECTED TO OUTDOOR CONDENSER UNITS AND 1 100% ENERGY RECOVE$21,000
2018-01-16Job filed: HEREBY FILING FOR INSTALLATION OF NEW 13 VRF SPLIT AIR CONDITIONING CEILING MOUNTED UNITS CONNECTED TO 3 CONDENSER UNITS AND 1 ROOFTOP UNIT LOCATED ON$60,000
2018-01-10Permit AL — ISSUED
2018-01-05Permit PL — ISSUED
2018-01-05Job filed: PROPOSE NEW CONSTRUCTION OF PARTITIONS AND NEW BATHROOMS ON THE FIFTH FLOOR IN AN EXISTING 6 STORY BUILDING INCLUDING MECHANICAL DUCT WORK$260,000
2018-01-05Job filed: PROPOSE NEW CONSTRUCTION OF PARTITIONS AND NEW BATHROOMS ON THE FIFTH FLOOR IN AN EXISTING 6 STORY BUILDING INCLUDING MECHANICAL DUCT WORK$260,000
2017
2017-12-28Permit PL — ISSUED
2017-12-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-12-20Permit PL — ISSUED
2017-12-19311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2017-12-11Permit EW — ISSUED
2017-12-08DOB violation E:
2017-12-08DOB violation E:
2017-12-08DOB violation E:
2017-12-08DOB violation E:
2017-12-06DOB violation E:
2017-12-06DOB violation E:
2017-12-01AL&R $62,969,799 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$62,969,799
2017-12-01Mortgage $62,969,799 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$62,969,799
2017-12-01AL&R $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$132,593,477
2017-12-01Mortgage $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$132,593,477
2017-12-01Permit EW — ISSUED
2017-11-30Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SIXTH FLOOR AND NEW PLUMBING FIXTURES IN AN EXISTING 6 STORY BUILDING. NO CHANGE TO USE,EGRESS, OR OCCUPANCY$50,000
2017-11-28311: Non-Residential Heat — Inadequate or No Heat
2017-11-28Job filed: RELOCATE EXISTING GAS GENERATOR ON GRADE. RELATED PLUMBING UNDERGROUND. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$44,000
2017-11-28Job filed: RELOCATE EXISTING GAS GENERATOR ON GRADE. RELATED PLUMBING UNDERGROUND. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$44,000
2017-11-20Permit EW — ISSUED
2017-11-08Permit EW — ISSUED
2017-11-04Permit EW — ISSUED
2017-11-02Job filed: - INTERIOR RENOVATION AT PARTIAL SIXTH FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$305,000
2017-11-02Job filed: - INTERIOR RENOVATIONS AT PARTIAL SIXTH FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$126,000
2017-10-31Permit EW — ISSUED
2017-10-25Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 6TH FLOOR ONLY IN CONJUNCTION WITH ALT 2 APPLICATION # 321620484. NO CHANGE IN USE, EGRESS, OR OCCUP$26,000
2017-10-25Job filed: INTERIOR RENOVATIONS OF PARTITIONS AT PARTIAL 5TH FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$156,000
2017-10-25Job filed: INTERIOR RENOVATIONS OF PARTITIONS AT PARTIAL 5TH FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$156,000
2017-10-24Job filed: COLUMN REMOVAL$110,000
2017-10-24Job filed: COLUMN REMOVAL$110,000
2017-10-24Job filed: A3$18,000
2017-10-24Job filed: COLUMN REMOVAL$110,000
2017-10-23Job filed: INTERIOR RENOVATIONS OF PARTITIONS AT PARTIAL 3RD FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$125,000
2017-10-23Job filed: INTERIOR RENOVATIONS OF PARTITIONS AT PARTIAL 3RD FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$125,000
2017-10-18311: Water System — Dirty Water (WE)
2017-10-04Permit EW — ISSUED
2017-09-28DOB complaint, category ?
2017-09-27Permit EW — ISSUED
2017-09-27Permit EW — ISSUED
2017-09-26ECB CLASS - 1 violation: WORK WITHOUT A PERMIT. ACCESSORY BUSINESS SIGNS/AWNING NON ILLUMINATED APPROX 13'X4'X4' READS "MANUFACTER OF PIZZA OVENS-DOUGH MIX$400
2017-09-15Permit PL — ISSUED
2017-09-15Permit PL — ISSUED
2017-09-13Permit PL — ISSUED
2017-09-13Permit PL — ISSUED
2017-09-13Permit EW — ISSUED
2017-09-11Job filed: - PROPOSED INTERIOR RENOVATION AND NEW BATHROOMS AT PARTIAL THIRD FLOOR, IN AN EXISTING 6 STORY BUILDING$642,000
2017-09-11Job filed: - PROPOSED INTERIOR RENOVATION AND NEW BATHROOMS AT PARTIAL THIRD FLOOR, IN AN EXISTING 6 STORY BUILDING$642,000
2017-09-07Permit PL — ISSUED
2017-09-06Permit EW — ISSUED
2017-09-06Permit EW — ISSUED
2017-09-01Permit EW — ISSUED
2017-08-31Permit EW — ISSUED
2017-08-28Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SIXTH FLOOR AND NEW PLUMBING FIXTURES IN AN EXISTING 6 STORY BUILDING. NO CHANGE TO USE,EGRESS, OR OCCUPANCY$49,000
2017-08-25Permit EW — ISSUED
2017-08-22ECB CLASS - 2 violation: FAILURE TO CONDUCT A FILE A FINAL INSPECTION FOR COMPLETED WORK W/IN 1 YEAR OF PERMIT EXPIRATION ALT2JOB#320183573 WHICH EXPD 6/26$800
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-21DOB complaint, category ?
2017-08-17Permit EW — ISSUED
2017-08-17Permit EW — ISSUED
2017-08-17Job filed: A2$455,000
2017-08-10311: Street Sign - Missing — Other/Unknown
2017-08-04Permit PL — ISSUED
2017-08-04Job filed: PROPOSED MECHANICAL, PLUMBING AND SPRINKLER WORK IN A PARTIAL FIRST FLOOR BUILDING IN AN EXISTING 6 STORY BUILDING$330,000
2017-08-03Permit EW — ISSUED
2017-08-03Job filed: PA
2017-08-03Job filed: PA
2017-08-03ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS CONSTRUCTION DOCUMENTS AT JOBSITE AT TIME OF INSPECTION. AT TIME OF INSPECTION OBSERVE$1,250
2017-08-01Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$31,000
2017-07-31Job filed: HEREWITH FILING FOR THE NYU VETERANS LAB SUITE DS1 TENANT FITOUT FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLANS.$6,000
2017-07-31Job filed: HEREWITH FILING FOR THE NYU VETERANS LAB SUITE DS1 TENANT. MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE TO USE,EGRESS OR OCCUPA$4,000
2017-07-31Job filed: HEREWITH FILING FOR THE NYU VETERANS LAB SUITE DS1 TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$187,500
2017-07-31Job filed: HEREWITH FILING FOR THE NYU VETERANS LAB SUITE DS1 TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$187,500
2017-07-28Permit EW — ISSUED
2017-07-26Permit PL — ISSUED
2017-07-25Permit EW — ISSUED
2017-07-25Permit PL — ISSUED
2017-07-20Job filed: A2$114,000
2017-07-20Job filed: A2$114,000
2017-07-19Permit EW — ISSUED
2017-07-19Permit PL — ISSUED
2017-07-18Job filed: INTERIOR RENOVATION AS PER PLANS FILED HEREWITH AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$838,020
2017-07-18Job filed: PROPOSED TO INSTALL HVAC UNITS, MECHANICAL MODIFICATION,SPRINKLER AND PLUMBING WORK, ALL AS PER PLANS HEREWITH FILED$206,000
2017-07-18Job filed: MECHANICAL & PLUMBING WORK AS PER PLANS FILED HEREWITH.$461,509
2017-07-18Job filed: MECHANICAL & PLUMBING WORK AS PER PLANS FILED HEREWITH.$461,509
2017-07-18Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH.$11,954
2017-07-18Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH.$11,954
2017-07-17311: Blocked Driveway — No Access
2017-07-17Job filed: - INTERIOR RENOVATION ON PARTIAL FIRST FLOOR IN AN EXISTING 6 STORY BUILDING - FILED UNDER A SEPARATE APPLICATION ALT1 JOB #321356867$349,000
2017-07-17Job filed: ADDITIONAL/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM.$26,030
2017-07-17Job filed: - INTERIOR RENOVATION ON PARTIAL FIRST FLOOR IN AN EXISTING 6 STORY BUILDING - FILED UNDER A SEPARATE APPLICATION ALT1 JOB #321356867$349,000
2017-07-10311: Animal Abuse — Other (complaint details)
2017-07-10Permit EW — ISSUED
2017-07-07Job filed: - NEW CONSTRUCTION OF PARTITIONS AND BATHROOMS AT PARTIAL SIXTH FLOOR IN AN EXISTING 6 STORY BUILDING$800,000
2017-07-07Job filed: - NEW CONSTRUCTION OF PARTITIONS AND BATHROOMS AT PARTIAL SIXTH FLOOR IN AN EXISTING 6 STORY BUILDING$800,000
2017-07-06Permit EW — ISSUED
2017-07-05Job filed: NEW CONSTRUCTION OF PARTITIONS AND BATHROOMS AT FIRST FLOOR IN AN EXISTING 6 STORY BUILDING - FILED UNDER A SEPARATE APPLICATION ALT1 JOB #321356867$317,000
2017-06-28Job filed: NEW CONSTRUCTION OF PARTITIONS AND BATHROOMS AT FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$160,000
2017-06-28Job filed: A2$225,000
2017-06-22Job filed: INTERIOR RENOVATION OF MANUFACTURING SUITE TO CREATE ACCESSORY OFFICE IN UNIT C-37 ON PARTIAL 5TH FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANG$57,500
2017-06-22Job filed: INTERIOR RENOVATION OF MANUFACTURING SUITE TO CREATE ACCESSORY OFFICE IN UNIT C-37 ON PARTIAL 5TH FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANG$57,500
2017-06-19Permit EW — ISSUED
2017-06-19Permit EW — ISSUED
2017-06-19Job filed: MECHANICAL FILING FOR 3RD FLOOR, AS PER PLANS FILED HEREWITH$16,000
2017-06-15Permit EW — ISSUED
2017-06-15Job filed: A2$54,000
2017-06-15Job filed: A2$54,000
2017-06-11311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-06-11DOB complaint, category ?
2017-06-11DOB complaint, category ?
2017-06-11DOB complaint, category ?
2017-06-08Job filed: - INTERIOR RENOVATION OF FACTORY SPACE ON PARTIAL FIRST FLOOR AT EXISTING SIX STORY BUILDING FILED UNDER A SEPARATE APPLICATION: MECHANICAL$81,000
2017-05-30Permit PL — ISSUED
2017-05-29Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SECOND FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$455,000
2017-05-24Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SECOND FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$455,000
2017-05-24Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SECOND FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$455,000
2017-05-24Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SECOND FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$455,000
2017-05-24Job filed: NEW CONSTRUCTION OF PARTITIONS AT PARTIAL SECOND FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$455,000
2017-05-18Permit EW — ISSUED
2017-05-18Permit EW — ISSUED
2017-05-11Job filed: MECHANICAL FILING FOR 3RD FLOOR, AS PER PLANS FILED HEREWITH$16,000
2017-05-03Job filed: HVAC FILING FOR HEATING, COOLING, AND VENTALATION$60,000
2017-05-03Job filed: MECHANICAL FILING FOR 3RD FLOOR, AS PER PLANS FILED HEREWITH$16,000
2017-04-25DOB complaint, category ?
2017-04-25DOB complaint, category ?
2017-04-21Permit PL — ISSUED
2017-04-17DOB complaint, category ?
2017-04-14Permit EW — ISSUED
2017-04-14Job filed: A2$22,500
2017-04-12Permit PL — ISSUED
2017-04-04Permit EW — ISSUED
2017-03-31Job filed: INTERIOR RENOVATION OF PARTIAL 3RD FLOOR AS PER TENANT FIT-OUT , OT AND PL WORK PROPOSED , NO CHANGE IN USE, EGRESS OR OCCUPANCY .$164,480
2017-03-31Job filed: INTERIOR RENOVATION OF PARTIAL 3RD FLOOR AS PER TENANT FIT-OUT , OT AND PL WORK PROPOSED , NO CHANGE IN USE, EGRESS OR OCCUPANCY .$164,480
2017-03-31Job filed: INTERIOR RENOVATION OF PARTIAL 3RD FLOOR AS PER TENANT FIT-OUT , OT AND PL WORK PROPOSED , NO CHANGE IN USE, EGRESS OR OCCUPANCY .$164,480
2017-03-31Job filed: INTERIOR RENOVATION OF PARTIAL 3RD FLOOR AS PER TENANT FIT-OUT , OT AND PL WORK PROPOSED , NO CHANGE IN USE, EGRESS OR OCCUPANCY .$164,480
2017-03-10Permit PL — ISSUED
2017-03-03Permit EW — ISSUED
2017-03-03Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLANS.$15,000
2017-03-03Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLANS.$15,000
2017-03-03Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$135,000
2017-03-03Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$18,000
2017-03-02Job filed: ADDING ACCESSORY RESTROOMS TO EXISTING FACTORY SPACE NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$48,000
2017-03-02Job filed: ADDING ACCESSORY RESTROOMS TO EXISTING FACTORY SPACE NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$48,000
2017-03-02Job filed: ADDING ACCESSORY RESTROOMS TO EXISTING FACTORY SPACE NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$48,000
2017-03-02Job filed: ADDING ACCESSORY RESTROOMS TO EXISTING FACTORY SPACE NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$48,000
2017-03-01Job filed: INSTALLATION OF MANUAL/AUTOMATIC SMOKE DETECTION & FIRE SPRINKLER ALARM SYSTEM$348,580
2017-03-01Job filed: INSTALLATION OF MANUAL/AUTOMATIC SMOKE DETECTION & FIRE SPRINKLER ALARM SYSTEM$348,580
2017-02-24Permit EW — ISSUED
2017-02-24Job filed: HEREWITH FILING FOR INTERIOR RENOVATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$107,000
2017-02-22Permit EW — ISSUED
2017-02-15Job filed: ALTERATION TYPE II BEING FILED TO MODIFY TO EXISTING SPRINKLER SYSTEM FOR PART OF FIRST FLOOR. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY UNDER THIS $15,000
2017-02-14Permit PL — ISSUED
2017-02-08Permit EW — ISSUED
2017-02-03Permit EW — ISSUED
2017-01-30Job filed: INTERIOR RENOVATION OF PARTIAL 6TH FLOOR IN AN EXISTING 6 STORY BUILDING$81,000
2017-01-30Job filed: INTERIOR RENOVATION OF PARTIAL 6TH FLOOR IN AN EXISTING 6 STORY BUILDING$81,000
2017-01-24Permit PL — ISSUED
2017-01-17Permit EW — ISSUED
2017-01-11Permit EW — ISSUED
2017-01-09Job filed: INTERIOR RENOVATION OF PARTITIONS AT PARTIAL SECOND FLOOR IN AN EXISTING 6 STORY BUILDING ALSO MECHANICAL FILED HEREWITH$68,000
2017-01-09Job filed: INTERIOR RENOVATION OF PARTITIONS AT PARTIAL SECOND FLOOR IN AN EXISTING 6 STORY BUILDING ALSO MECHANICAL FILED HEREWITH$68,000
2016
2016-12-23Permit EW — ISSUED
2016-12-23Job filed: INTERIOR RENOVATION OF PARTITIONS AT PARTIAL SECOND FLOOR IN AN EXISTING 6 STORY BUILDING ALSO MECHANICAL FILED HEREWITH$68,000
2016-12-23Job filed: INTERIOR RENOVATION OF PARTITIONS AT PARTIAL SECOND FLOOR IN AN EXISTING 6 STORY BUILDING ALSO MECHANICAL FILED HEREWITH$68,000
2016-12-23Job filed: INTERIOR RENOVATION OF PARTITIONS AT PARTIAL SECOND FLOOR IN AN EXISTING 6 STORY BUILDING ALSO MECHANICAL FILED HEREWITH$68,000
2016-12-22Job filed: A2$42,000
2016-12-15Job filed: PROPOSED INTERIOR RENOVATION AT PARTIAL SECOND FLOOR, SECTION C IN AN EXISTING 6 STORY BUILDING$57,000
2016-12-15Job filed: PROPOSED INTERIOR RENOVATION AT PARTIAL SECOND FLOOR, SECTION C IN AN EXISTING 6 STORY BUILDING$57,000
2016-12-15Job filed: PROPOSED INTERIOR RENOVATION AT PARTIAL SECOND FLOOR, SECTION C IN AN EXISTING 6 STORY BUILDING$57,000
2016-11-23Agreement — from BANK OF CHINA, NEW YORK BRANCH to CREATIVE I.C., L.P.
2016-11-21Job filed: INSTALLATION OF MANUAL & AUTOMATIC,SMOKE/HEAT/DETECTION & SPRINKLER FIRE ALARM SYSTEM.$334,580
2016-11-21Job filed: INSTALLATION OF MANUAL & AUTOMATIC,SMOKE/HEAT/DETECTION & SPRINKLER FIRE ALARM SYSTEM.$334,580
2016-11-15Permit EW — ISSUED
2016-11-15Permit EW — ISSUED
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-08Job filed: INTERIOR RENOVATION WITH MECHANICAL VENTALATION AT PARTIAL 1ST FLOOR AT EXISTING 6 STORY BUILDING$122,000
2016-11-08Job filed: INTERIOR RENOVATION WITH MECHANICAL VENTALATION AT PARTIAL 1ST FLOOR AT EXISTING 6 STORY BUILDING$50,000
2016-11-04Job filed: HEREWITH FILING FOR MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$104,000
2016-10-28DOB violation E:
2016-10-28Job filed: HEREWITH FILING FOR GENERAL CONSTRUCTION, MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$72,000
2016-10-27Permit PL — ISSUED
2016-10-27DOB violation E:
2016-10-19Permit EW — ISSUED
2016-10-19Permit EQ — ISSUED
2016-09-30Job filed: HEREWITH FILING FOR THE INSTALLATION OF A SCULPTURE IN THE COURTYARD AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$129,600
2016-09-30Job filed: HEREWITH FILING FOR THE INSTALLATION OF A SCULPTURE IN THE COURTYARD AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$129,600
2016-09-30Job filed: HEREWITH FILING FOR THE INSTALLATION OF A SCULPTURE IN THE COURTYARD AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$129,600
2016-09-29Permit EW — ISSUED
2016-09-26Job filed: INTERIOR RENOVATION AT PARTIAL 4TH FLOOR AT EXISTING 6 STORY BUILDING, WORK INCLUDES NEW BATHROOMS AND NEW MECH VENTS$200,000
2016-09-26Job filed: INTERIOR RENOVATION AT PARTIAL 4TH FLOOR AT EXISTING 6 STORY BUILDING, WORK INCLUDES NEW BATHROOMS AND NEW MECH VENTS$200,000
2016-09-14Permit EW — ISSUED
2016-09-12Permit EW — ISSUED
2016-09-06311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2016-09-01Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$199,935
2016-08-30311: Elevator — Elevator - Defective/Not Working
2016-08-30ECB CLASS - 1 violation: 05X10,12X10,17H11,70209,42X10,52E01,59T07,16B11. CEASE USE ITEM. 05X- ZONE LOCK RESTRUCTED.17H-WHERE NEEDED.70Q-SUMP PUMP.92X-DOOR$1,000
2016-08-30ECB CLASS - 1 violation: UNLICENSED ACTIVITY ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITHOUT REQUIRED LICENSE OR AUTHORIZTION ELEVATOR COMP. LIFT$6,250
2016-08-30DOB complaint, category ?
2016-08-29Permit EW — ISSUED
2016-08-29Permit EW — ISSUED
2016-08-11Permit EW — ISSUED
2016-08-11Permit EW — ISSUED
2016-08-11Permit EW — ISSUED
2016-08-05Permit PL — ISSUED
2016-08-04Permit EW — ISSUED
2016-08-04Permit EW — ISSUED
2016-07-29Permit EW — ISSUED
2016-07-29Job filed: HEREWITH FILING FOR ELECTRICAL DISTRIBUTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLCIATION$500,000
2016-07-29Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$200,000
2016-07-29Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$200,000
2016-07-29Job filed: HEREWITH FILING FOR ELECTRICAL DISTRIBUTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$500,000
2016-07-27Permit EW — ISSUED
2016-07-27Permit EW — ISSUED
2016-07-27Job filed: FILING FOR INTERIOR RENOVATION FOR NEW SPRAY BOOTH ON THIRD FLOOR IN CONJUNCTION WITH APPLICATION NO. 320767274. NO CHANGE IN USE, EGREE OR OCCUPANCY.$25,000
2016-07-25Job filed: RELOCATE EXISTING GAS GENERATOR FROM GRADE(OSP) TO ROOF. RELATED STEEL PLATFORM. RELATED PLUMBING IN BASEMENT, UNDERGROUND(UDG), OSP AND ROOF.NO CHAN$58,000
2016-07-25Job filed: RELOCATE EXISTING GAS GENERATOR FROM GRADE(OSP) TO ROOF. RELATED STEEL PLATFORM. RELATED PLUMBING IN BASEMENT, UNDERGROUND(UDG), OSP AND ROOF.NO CHAN$58,000
2016-07-25Job filed: RELOCATE EXISTING GAS GENERATOR FROM GRADE(OSP) TO ROOF. RELATED STEEL PLATFORM. RELATED PLUMBING IN BASEMENT, UNDERGROUND(UDG), OSP AND ROOF.NO CHAN$58,000
2016-07-14Job filed: INSTALLATION OF MANUAL / AUTOMATIC SMOKE DETECTION SYSTEM$2,503
2016-07-14Job filed: INSTALLATION OF MANUAL / AUTOMATIC SMOKE DETECTION SYSTEM$2,503
2016-06-21Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$800,000
2016-06-16Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$800,000
2016-06-15311: Water System — Request To Open A Hydrant (WC4)
2016-05-06Job filed: HEREBY FILING FOR REPLACEMENT OF EXISTING AIR COOLED CONDENSERS WITH A NEW IN KIND AIR COOLED CONDENSERS INCLUDING. NO CHANGES IN USE, EGRESS OR OCCUP$45,000
2016-05-06Job filed: HEREBY FILING FOR REPLACEMENT OF EXISTING AIR COOLED CONDENSERS WITH A NEW IN KIND AIR COOLED CONDENSERS INCLUDING. NO CHANGES IN USE, EGRESS OR OCCUP$45,000
2016-05-05Permit EW — ISSUED
2016-05-05Permit EW — ISSUED
2016-05-04Permit EW — ISSUED
2016-04-21Job filed: MECHANICAL WORK AS PER PLANS FILED.$30,000
2016-04-21Job filed: MECHANICAL WORK AS PER PLANS FILED.$30,000
2016-04-15Job filed: FILING HEREWITH FOR CHANGE OF USE ON THE 1ST FLOOR. FILING FOR GENERAL CONSTRUCTION AS PER PLANS SUBMITTED.$1,946,000
2016-04-07311: Street Condition — Pothole
2016-04-04Permit PL — ISSUED
2016-03-23Job filed: MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. RELOCATING ANTENNAS AND REPLACE RELATED RRH UNITS ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHA$8,000
2016-03-14Job filed: COURTYARD IMPROVEMENTS AS PER PLANS. NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$350,000
2016-03-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-03-11DOB complaint, category ?
2016-03-07ECB CLASS - 2 violation: 59T07,99T15,39D06,70O02. 59T-BRAKE MAINTENANCE TAG; 39T-SECURE DOME AREA.
2016-03-07ECB CLASS - 2 violation: 59T07,99BB15,76J01,39R09. 59T-BRAKE MAINTENANCE TAG; 76J-EXCESS TILLER ROPE; 39R-PREVENT BUILDING PERSONNEL FROM PUTTING MATERIAL
2016-03-07ECB CLASS - 2 violation: 59T07,40R07. 59T-BRAKE MAINTENANCE TAG; 40R-PREVENT NON AUTHORIZED PERSONNEL FROM USING ELECTRICAL OUTLETS IN MACHINE ROOM.
2016-02-10Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$20,000
2016-02-10Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$20,000
2016-02-10Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$20,000
2016-02-01Permit EW — ISSUED
2016-02-01Permit EW — ISSUED
2016-01-28Permit EW — ISSUED
2016-01-15Job filed: FILING HEREWITH GENERAL CONSTRUCTION AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$88,700
2016-01-15Job filed: FILING HEREWITH GENERAL CONSTRUCTION AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$88,700
2016-01-15Job filed: FILING HEREWITH PLUMBING WORK AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$10,500
2016-01-15Job filed: FILING HEREWITH FIRE ALARM MODIFICATIONS AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2016-01-15Job filed: FILING HEREWITH MECHANICAL WORK AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$35,000
2016-01-15Job filed: FILING HEREWITH FIRE ALARM MODIFICATIONS AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2016-01-15Job filed: FILING HEREWITH GENERAL CONSTRUCTION AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$88,700
2016-01-15Job filed: FILING HEREWITH MECHANICAL WORK AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$35,000
2016-01-14Job filed: FILING HEREWITH SPRINKLER MODIFICATIONS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2016-01-14Job filed: FILING HEREWITH SPRINKLER MODIFICATIONS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2015
2015-12-18Permit EW — ISSUED
2015-12-17AL&R $31,829,268 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$31,829,268
2015-12-17Mortgage $31,829,268 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$31,829,268
2015-12-17AL&R $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$93,670,732
2015-12-17Mortgage $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$93,670,732
2015-12-17AL&R $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$197,500,000
2015-12-17Agreement $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$197,500,000
2015-12-17Mortgage assigned — from SAF WATERFRONT LLC; EIGHT PLACE LLC; FBE BUSH LLC; FED SECOND AVE. LLC to BANK OF CHINA, NEW YORK BRANCH
2015-12-17Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION to EIGHT PLACE LLC; FED SECOND AVE LLC; FBE BUSH LLC; SAF WATERFRONT LLC
2015-12-15Permit PL — ISSUED
2015-11-29Permit EW — ISSUED
2015-11-24Permit EW — ISSUED
2015-11-12Permit PL — ISSUED
2015-11-10Permit PL — ISSUED
2015-11-09Permit EW — ISSUED
2015-11-02ECB CLASS - 2 violation: 80M07 MISSING SIGNAGE ON ALL FLOORS.
2015-10-28Job filed: INTERIOR RENOVATION AT PARTIAL 3RD FLOOR AT EXISTING 6 STORY BUILDING. NO CHANGE IN OCCUPANCY, USE, AND EGRESS. NO INCREASE IN BULK.$486,600
2015-10-23Permit EW — ISSUED
2015-10-19Permit EW — ISSUED
2015-10-18Job filed: FILING TO CREATE MANUFACTURING WORKSHOP ON THE SECOND FLOOR, NO CHANGE TO USE OCCUPANCY OR EGRESS.$498,850
2015-10-14Permit EW — ISSUED
2015-10-14Permit EW — ISSUED
2015-10-14Permit EW — ISSUED
2015-10-09Job filed: BUILDOUT OF PARTITIONS AS PER PLANS. NO CHANGE IN EGRESS OR OCCUPANCY. C-404-406$30,000
2015-10-09Job filed: BUILDOUT OF PARTITIONS AS PER PLANS. NO CHANGE IN EGRESS OR OCCUPANCY. C-404-406$30,000
2015-09-30Permit EW — ISSUED
2015-09-02Permit EW — ISSUED
2015-08-20FDNY inspection (OTHER)
2015-08-19Job filed: FILING TO CREATE MANUFACTURING WORKSHOP ON THE SECOND FLOOR, NO CHANGE TO USE OCCUPANCY OR EGRESS.$498,850
2015-08-17Permit EW — ISSUED
2015-08-17Permit EW — ISSUED
2015-07-22Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH$125,000
2015-07-22Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH.$125,000
2015-07-21DOB violation E:
2015-07-20DOB violation E:
2015-07-20DOB violation E:
2015-07-20DOB violation E:
2015-07-20DOB violation E:
2015-07-05Permit AL — ISSUED
2015-06-25Job filed: FIRE ALARM INSTALLATION AS PER PLANS FILED HEREWITH.$5,722
2015-06-25Job filed: INSTALLATION OF FIRE ALARM AS PER PLANS FILED HEREWITH$5,722
2015-06-25Job filed: FIRE ALARM INSTALLATION AS PER PLANS FILED HEREWITH.$5,722
2015-06-25Job filed: SPRINKLER FILING FOR 4TH FLOOR, AS PER PLANS FILED HEREWITH.$24,000
2015-06-24Permit PL — ISSUED
2015-06-24Job filed: SPRINKLER FILING FOR 6TH FLOOR, AS PER PLANS FILED HEREWITH.$24,000
2015-06-21Permit PL — ISSUED
2015-06-18Permit EW — ISSUED
2015-06-18Permit EW — ISSUED
2015-06-18Permit EW — ISSUED
2015-06-17Permit PL — ISSUED
2015-06-16FDNY inspection (STRUC_INT)
2015-06-16Permit EW — ISSUED
2015-06-15Job filed: INSTALLATION OF ADDITIONAL CABINET IN EXISTING TELECOMMUNICATIONS ROOM ON 6TH FLOOR. REPLACEMENT OF ANTENNAS WITH INSTALLATION OF RRH UNITS ON ROOF. $15,000
2015-06-11Permit EW — ISSUED
2015-06-10Job filed: MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH.$106,500
2015-06-10Job filed: MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH.$106,500
2015-06-10Job filed: MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH.$106,500
2015-06-09Job filed: BUILD-OUT OF FACTORY SPACE FOR FOOD PRODUCTION BUSINESS. NEW ELECTRICAL AND PLUMBING. NEW BATHROOM AT EXISTING LOCATION. NO CHANGE IN USE, EGRESS, OR $40,000
2015-06-09Job filed: ARCHITECTURAL WORK AS PER PLANS FILED HEREWITH.$144,000
2015-06-09Job filed: BUILD-OUT OF FACTORY SPACE FOR FOOD PRODUCTION BUSINESS. NEW ELECTRICAL AND PLUMBING. NEW BATHROOM AT EXISTING LOCATION. NO CHANGE IN USE, EGRESS, OR $40,000
2015-06-08311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-06-08DOB complaint, category ?
2015-06-01Permit EW — ISSUED
2015-05-27Job filed: ARCHITECTURAL WORK AS PER PLANS FILED HEREWITH.$110,000
2015-05-27Job filed: MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH$95,000
2015-05-27Job filed: ARCHITECTURAL WORK AS PER PLANS FILED HEREWITH.$110,000
2015-05-25311: Overgrown Tree/Branches — Dead Branches in Tree
2015-05-21Permit EW — ISSUED
2015-05-21Permit EW — ISSUED
2015-05-21Permit EW — ISSUED
2015-05-14Permit EW — ISSUED
2015-05-14Permit EW — ISSUED
2015-05-13Job filed: REVISED AS BUILT PLANS AND PW-1B. INTERIOR RENOVATIONS FOR OFFICE AND WORK SP ACE. NO CHANGE TO EGRESS, ZONING, OR COO. REVISED PW-1B$8,000
2015-04-16Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$300,000
2015-04-16Job filed: RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AND LOBBY RENOVATIONS INCLUDING CHANGE IN EGRESS AS PER PLANS FILE$250,000
2015-04-15Job filed: INSTALLATION PAINT SPRAY BOOTH ON 6TH FLOOR WITH EXTENSION PIPING OF SPRINKLER SYSTEM WITH SP HEADS. NO GAS HEAT. NO CHANGE TO EGRESS, COO OR ZONING.$10,000
2015-03-27311: Street Condition — Pothole
2015-03-25Job filed: RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AND LOBBY RENOVATIONS INCLUDING CHANGE IN EGRESS AS PER PLANS FILE$100,000
2015-03-24Permit EW — ISSUED
2015-03-23Job filed: INTERIOR IMPROVEMENTS AS PER PLANS FILED HEREWITH.$150,000
2015-03-12Job filed: INTERIOR RENOVATION AS PER PLANS$175,000
2015-03-12Job filed: INTERIOR RENOVATION AS PER PLANS$175,000
2015-03-12Job filed: INTERIOR RENOVATION AS PER PLANS$175,000
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2015-02-18Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$42,750
2015-02-18Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$14,500
2015-02-18Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$42,750
2015-02-18Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$42,750
2015-02-18Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$14,500
2015-02-11Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OR OCCUPANCY UNDER THIS APPLICATION.$122,000
2015-02-11Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM IN BUILDINGS 5 AND 6 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OR OCCUPANCY UNDER THIS APPLICATION.$122,000
2015-02-11Job filed: STRUCTURAL MODIFICATIONS INCLUDING NEW ELEVATED CONCRETE SLAB-ON-GRADE AND ALTERATION OF EXISTING EXTERNAL FIRE ESCAPES IN BUILDINGS 5 AND 6 AS PER PL$200,000
2015-02-11Job filed: INTERIOR RENOVATIONS INCLUDING NEW INTERIOR DEMISING WALLS AND FINISHES AND NEW STORE FRONTS AND EXTERIOR COURTYARD AND EXTERIOR STOREFRONT IN BUILDIN$200,000
2015-01-13Permit EW — ISSUED
2015-01-13Permit EW — ISSUED
2014
2014-12-30Job filed: RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AND LOBBY RENOVATIONS INCLUDING CHANGE IN EGRESS AS PER PLANS FILE$250,000
2014-12-30Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$300,000
2014-11-26Permit PL — ISSUED
2014-11-21Job filed: APPLICATION FILE TO INSTALL A NEW GAS METER TO EXISTING GAS LINE. LAY GAS LINE TO DRYERS AND PROVIDE FLUE$58,000
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-07311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2014-06-20311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2014-06-20DOB complaint, category ?
2014-06-11Permit EW — ISSUED
2014-06-11Permit EW — ISSUED
2014-06-03DOB complaint, category ?
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-04-10Job filed: FILING FOR INTERIOR RENOVATION, MECHANICAL AND PLUMBING WORK TO INSTALL PANTRY SINK AND SERVICE SINK, SPRINKLER WORK IS FOR RELOCATION AND ADDITION OF$585,752
2014-04-10Job filed: FILING FOR INTERIOR RENOVATION, MECHANICAL AND PLUMBING WORK TO INSTALL PANTRY SINK AND SERVICE SINK, SPRINKLER WORK IS FOR RELOCATION AND ADDITION OF$585,752
2013-09-03Job filed: INSTALL SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE, CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-08-30ASPM $300,000,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to U.S. BANK NATIONAL ASSOCIATION$300,000,000
2013-08-30Deed — from 1-10 INDUSTRY ASSOCIATES LLC
2013-08-30Deed — from 1-10 INDUSTRY ASSOCIATES LLC to 1-10 INDUSTRY ASSOCIATES LLC
2013-08-30ECB CLASS - 2 violation: 28.304.7 100R. THE OWNER SHALL HAVE A MAINTENANCE CONTRACTS WITH AN APPROVED TO PERFORM MAINTAN AND REPAIR WORK ON ELEVATION. RE$800
2013-08-27Permit EW — ISSUED
2013-08-27Permit EW — ISSUED
2013-08-26Permit EW — ISSUED
2013-08-26Permit EW — ISSUED
2013-07-11Permit EQ — ISSUED
2013-07-11Permit EW — ISSUED
2013-07-11Permit EW — ISSUED
2013-07-09Job filed: REMOVE EXISTING PARTITIONS ON PORTION OF 5TH FLOOR. PROVIDE NEW PARTITIONS, FINISHES AND SANITARY FACILITIES AS PER PLANS FILED NO CHANGE IN USE OCCUP$132,000
2013-07-09Job filed: REMOVE EXISTING PARTITIONS ON PORTION OF 5TH FLOOR. PROVIDE NEW PARTITIONS, FINISHES AND SANITARY FACILITIES AS PER PLANS FILED NO CHANGE IN USE OCCUP$132,000
2013-07-09Job filed: REMOVE EXISTING PARTITIONS ON PORTION OF 5TH FLOOR. PROVIDE NEW PARTITIONS, FINISHES AND SANITARY FACILITIES AS PER PLANS FILED NO CHANGE IN USE OCCUP$132,000
2013-07-09Job filed: REMOVE EXISTING PARTITIONS ON PORTION OF 4TH 5TH & 6TH FLOORS. PROVIDE NEW PARTITIONS, FINISHES AND SANITARY FACILITIES AS PER PLANS FILED NO CHAN$246,000
2013-07-04Job filed: REMOVE EXISTING PARTITIONS ON PORTION OF 3RD 4TH & 5TH FLOOR. PROVIDE NEW PARTITIONS, FINISHES AND SANITARY FACILITIES AS PER PLANS FILED NO CHANG$373,250
2013-07-04Job filed: REMOVE EXISTING PARTITIONS ON PORTION OF 3RD 4TH & 5TH FLOOR. PROVIDE NEW PARTITIONS, FINISHES AND SANITARY FACILITIES AS PER PLANS FILED NO CHANG$373,250
2013-07-01Permit EQ — ISSUED
2013-07-01Permit EW — ISSUED
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-17DOB violation E:
2013-06-12Permit AL — ISSUED
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-11DOB violation E:
2013-06-05311: Street Condition — Pothole
2013-06-03311: Street Condition — Pothole
2013-05-31Permit EQ — ISSUED
2013-05-22Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2013-05-22Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2013-05-21Job filed: INSTALLATION AND REPLACEMENT OF ANTENNAS ON ROOF. INSTALLATION OF CABINET IN EXISTING TELECOM ROOM ON THE 2ND FLOOR. ALL WORK IN COMPLIANCE WITH TPPN $30,000
2013-05-21Job filed: INSTALLATION AND REPLACEMENT OF ANTENNAS ON ROOF. INSTALLATION OF CABINET IN EXISTING TELECOM ROOM ON THE 2ND FLOOR. ALL WORK IN COMPLIANCE WITH TPPN $30,000
2013-05-10Permit EQ — ISSUED
2013-05-10Permit EQ — ISSUED
2013-05-01Job filed: INSTALLATION OF FENCE
2013-05-01Job filed: INSTALLATION OF FENCE
2013-04-25Job filed: INSTALLATION OF FENCE
2013-04-25Job filed: INSTALLATION OF FENCE
2013-04-24Job filed: INSTALLATION OF SIDEWALK BRIDGE.
2013-04-24Job filed: INSTALLATION OF SIDEWALK SHED
2013-04-24Job filed: INSTALLATION OF SIDEWALK SHED
2013-04-16Permit EW — ISSUED
2013-04-02FDNY inspection (FORTH)
2013-03-28FDNY inspection (SPECIAL-OTH)
2013-03-13Permit EW — ISSUED
2013-03-13Permit PL — ISSUED
2013-02-21Job filed: INSTALLATION OF ONE (1) H.P. GAS BOILER ON 4TH FLOOR.$20,000
2012
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-19DOB violation E:
2012-12-19DOB violation E:
2012-12-19DOB violation E:
2012-12-19DOB violation E:
2012-12-19DOB violation E:
2012-12-19DOB violation E:
2012-12-19DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-18DOB violation E:
2012-12-15311: Broken Muni Meter — No Receipt
2012-11-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2012-11-29DOB complaint, category ?
2012-11-14311: General Construction/Plumbing — Site Conditions Endangering Workers
2012-11-14DOB complaint, category ?
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-08-09311: Street Condition — Defective Hardware
2012-07-05311: Food Establishment — Plumbing
2012-06-11Mortgage assigned — from GCCFC 2007-GG11 BROOKLYN INDUSTRIAL, LLC to U.S. BANK NATIONAL ASSOCIATION
2012-04-23Agreement $300,000,000 — from GCCFC 2007-GG11 BROOKLYN INDUSTRIAL, LLC to 1-10 INDUSTRY ASSOCIATES LLC; 19-20 INDUSTRY CITY ASSOCIATES LLC$300,000,000
2010-08-20Job filed: INSTALLATION OF 1435 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF SIDEWALK SHED SHALL COMPLY
2010-08-20Job filed: INSTALLATION OF 1435 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF SIDEWALK SHED SHALL COMPLY
2010-06-09Job filed: INSTALLATION OF 1840 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY
2010-06-09Job filed: INSTALLATION OF 1840 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY
2010-02-09ECB CLASS - 3 violation: 50A/50B/FULTON V.T. BOILER 10HP,NB35471,GAS 1978/50A-DETERIORATED LOWER HANDHOLE PORT SLEEVE.REPLACE METAL SLEEVE & SEAL OPENING.5$500
2009-05-29ECB CLASS - 3 violation: VIOLATING CONDITION 36,32A$500
2009-05-28DOB complaint, category ?
2009-05-14DOB complaint, category ?
2009-04-22Permit EW — ISSUED
2009-04-09Permit EW — ISSUED
2009-04-09Permit EW — ISSUED
2009-04-03Job filed: INSTALL KITCHEN FIRE SUPPRESSION SYSTEM .$6,000
2009-03-17Job filed: INSTALL HIGH PRESSURE STEAM BOILER ENCLOSURE INSTALL 2 UNIT HEATERS$53,500
2009-03-17Job filed: INSTALL HIGH PRESSURE STEAM BOILER ENCLOSURE INSTALL 2 UNIT HEATERS$53,500
2009-02-27DOB violation LL1081:
2009-01-30ECB CLASS - 2 violation: 12Q03.98BB05.$500
2009-01-30ECB CLASS - 2 violation: 54H11.98BB05.$500
2009-01-14ECB CLASS - 2 violation: 76J01,76O02,77D06,52BB12,55B12,53O02,60Q03,56D06,61B15,56B15,32H11,16H11,98BB05. 76-JO. REDUCE SLACK & CLEAN FOR PROPER INSPECTION$500
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2008
2008-12-15ECB CLASS - 1 violation: 45X10/52B12/12Q03/03I10/100M07/CEASE USE 45-X-10-INOPERATIVE GOVERNOR(CEASE USE ITEM). 52-B-12-RESHAKEL BOTH ENDS OF HOIST & (AMP $1,000
2008-12-15ECB CLASS - 2 violation: 11B10.40Z10.56Y13.56O02.59Y11.45Y02.100M07.98BB05.100BB05.58H10.11 CAR HANDLE STICKS DOESN'T RETURN TO STOPPER POSITION 56 HOIST M$500
2008-12-15ECB CLASS - 2 violation: 100M07.12Q03.16J01.100I10.49D06.56Y02.56O02.98BB05.100BB05.100 TOE GUARD MISSING 16 ADJUST 5 FL DOOR 100 CAR DAMAGED 49 SECURE WIR$500
2008-12-15ECB CLASS - 2 violation: 32H10/100I10/56Y13/52B12/ 32-H-10 TO MUCH PLAY ON CAR SHOES. 100-I-10-TOE GUARD DAMAGED. 52-B-12 RESHACKLE BOTH ENDS OF HOIST & OU$500
2008-12-03ECB CLASS - 1 violation: SS 28-201.1. 97##. CLASS 1 UNLAWFUL ACTS, FAILURE TO COMPLY WITH COMMISSIONERS ORDER SET FORTH IN NOV# 38192520J & NOV# 38198534H $1,000
2008-12-01ECB CLASS - 1 violation: SS 28-201.1. 97##. UNLAWFUL ACT. FAILURE TO COMPLY WITH COMMISSIONERSORDER SET FORTH IN NOV# 38192520J BY CONTINUING TO USE DEVIC$1,600
2008-11-03Permit EW — ISSUED
2008-11-03ECB CLASS - 1 violation: CU 16##.47##.100I10.77I10.32M07.76I11.76D06.21L10.21D06.21A01.70O02.70Z09.60L10.60Q03.77M07.16T07.12Q03.39O02.98BB05.100BB05.62O02$1,800
2008-11-03ECB CLASS - 2 violation: 67A07.98BB05.100BB05.56Y13.56H11.59Y11.70O02.21I10.05I10.11.11L10.64 PROVIDE CORRECT NYC DEVICE # 100 EXP.2YR TAG 56 GLAND PACKING$500
2008-11-03ECB CLASS - 1 violation: CUI. 06N10.27X10.56Y1360B10.98BB05.100BB05.05I10.70O02.73O02.74O07.73D05.74D06. CU 06 GATE S.W. BYPASSED & BLOCKED IS NMADE POSITI$1,000
2008-11-03ECB CLASS - 2 violation: 98BB05.100BB05.56O02.37O02.97O02.34P16.70P16.03P16.98 5YR 100 2YR 56 CLEAN MAIN MACHINE 37 CLEAN SHEAVES 97 CLEAN BED PAN 34 NO AC$500
2008-10-27ECB CLASS - 2 violation: 98BB05.100BB05.56Y13.02.56H11.59Y11.62I10.77K10.76D06.100M07.73O02.74O02.73D06.74D06.33O02.52B12.55B12.70O02.100 EXPIRED 2YR TAG 5$500
2008-10-27ECB CLASS - 2 violation: 16R05. 16R05-INSTALLED NEW LOWER LOBBY HOISTWAY DOOR FILE & PERFORM TEST.$500
2008-10-27ECB CLASS - 2 violation: 98BB05.100U05.52O02.55O02.62O02.60Q03.32H11.77M07.39D06.16D06.76A01.97I10.55B12.4OO02.96 5YR EXP. 100 2YR TEST 56 CLEAN HOIST CABL$500
2008-10-24Job filed: ERECT NON BEARING PARTITION BETWEEN CONCRETE FLOOR SLABS ON FIRST FLOOR AND INSTALL CERAMIC FLOOR TILES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUP$11,000
2008-10-22ECB CLASS - 2 violation: 98BB05.100BB05.37O02.56Y13.02.56H11.100M08.74O02.73O02.73D06.33O02.80B14.31J01.52B12.55B12.100 EXPIRED 2 YR TAG 37 OVERHEAD SHEAVE$500
2008-10-07ECB CLASS - 1 violation: 73D06.16I10.16D06.56O02.98BB05.100BB05.52H11.55H11.70O02.34O02.40D06.39D06.12Q03.16R01.01L10.97L10. CUI 73 PROPERLY SECURE CAR RAI$1,000
2008-10-07ECB CLASS - 1 violation: 51X10.46X10.16D06.73D06.98BB05.100BB05.62H10.70O02.21B10.68M07.11L10.34R10.56B07.52B12.39O02.77Q03.32H10.06J10.60Q03.61I10.34O02.5$1,000
2008-10-07ECB CLASS - 1 violation: 01L10.02T07.98BB05.16D10.73D06.27L10.60Q03.16T07.32H10.21Q03.56B07.39O02.52B12.31D06.68M07.100BB05.61I10.47B07.34Q07.42L11.52B1470$1,000
2008-08-21Job filed: INSTALLING A GAS-FIRED GENERATOR ON A CONCRETE PAD WITH FENCE ON GRADE. RELATED PLUMBING ON GRADE AND IN THE BASEMENT. NO CHANGE IN USE, EGRESS, OR O$18,000
2008-03-04ECB Hazardous violation: 05I1016M0716H1039O0241H1144O0255O0259Q0385BB0586BB0538O0231H1039O0253BB1254BB1256O0255B0762B1171M0784O02. CEASE USE (05I10) REPAIR$800
2008-03-04ECB Non-Hazardous violation: CU.50X10.85BB05.86BB05.55#10.#O02.41#11.39D06.51O02.44J10.39O02.59Q03.39#06.58O02.33B16.CEASE USE 50X10 SLACK CABLE SWITCH INOPERA$800
2008-03-03ECB Hazardous violation: 66O02.33O02.39P16.83P16. 2ND OFFENSE 66O02.33O02.2ND OFFENSE 39P16 PROVIDE ACCESS TO MACHINE ROOM 83O16 NO ALLOW TO CAR$1,000
2008-03-03ECB Hazardous violation: CEASE USE ITEM.16I10,21I10.2ND OFFENSE ITEM-12Q03,66Z09,66O02,71M07,16I10,21I10,26I10,51BB12,06E10,84I10,37H11,57D06,57H10,84M08,3$800
2008-03-03ECB Non-Hazardous violation: 16I10.51B12.71M07.16B10.66O02.39P16. CEASE USE ITEM 16I 6TH FL DOOR OTHER ITEMS 71M COVEERS 16B OVERHAUL ALL DOORS & LOCKS 39P PRO$800
2008-03-03ECB Hazardous violation: CU-16I10.38D06.2ND OFF.39P16.33M07.16B10.38O02.51B14.54B14. CEASE USE 16 BASEMENT HOISTWAY DOOR DAMAGED 38 CAR TOP UNSECURED 2ND O$800
2008-03-03ECB Hazardous violation: 83P16.83-PROVIDE ACCESS TO ENTIRE DEVICE.$350
2008-02-01DOB violation E:
2008-02-01DOB violation E:
2008-02-01DOB violation E:
2008-02-01DOB violation E:
2008-02-01DOB violation E:
2008-02-01DOB violation E:
2008-01-31DOB violation E:
2008-01-31DOB violation E:
2008-01-31DOB violation E:
2008-01-31DOB violation E:
2008-01-31DOB violation E:
2008-01-31DOB violation E:
2008-01-31DOB violation E:
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-30DOB violation E:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-12-27Job filed: BHC MEETING HALL
2007-12-27Job filed: BHC MEETING HALL
2007-12-21Job filed: Filing to show existing layout of space to be used as Meeting Hall for letter of no objection and Place of Assembly application. Filing as non directi$5,000
2007-10-24TL&R — from NORTH FORK BANK to 1-10 INDUSTRY ASSOCIATES, LLC
2007-10-24M&CON $300,000,000 — from 19-20 INDUSTRY CITY ASSOCIATES, LLC; 1-10 INDUSTRY ASSOCIATES LLC to MERS$300,000,000
2007-10-24Mortgage assigned — from NORTH FORK BANK to GOLDMAN SACHS COMMERCIAL MORTGAGE CAPITA
2007-10-01ECB Non-Hazardous violation: 85BB05,86BB05,44O02,55O02,62H11,48D07,59B10,38M10,12O07,51BB12,84M07,37X10.62H11-HOIST MOTOR BRUSHES VERY LOW REPLACE.48D07-MISSIN$180
2007-10-01ECB Non-Hazardous violation: 85BB05,86BB05,44O02,55Y13,55O02,01B10,57BB12,54BB12,16R09,17H11,84M07,71M07,71K11,21M07,21L10.01B10-ALARM BELL DOESN'T WORK ALONG $180
2007-08-21ECB Non-Hazardous violation: 55Y13/55O2/39O2/59Q3/85U5/86U5/44O2/66O2/66Z9/67O2/68O2/16#10/16H10/83L10/71D6/38D6/.55-SEAL OIL LEAK.55-CLEAN MAIN MACHINE.39-CLE$180
2007-08-21ECB Non-Hazardous violation: 55Y13/55O2/39O2/59Q3/85U5/86U6/44O2/41H11/16#10/16H7/66O2/66Z9/67O2/68O2/71D6/83L10/.55-SEAL OIL LEAK.55-CLEAN MAIN MACHINE.39-CLE$180
2007-08-21ECB Non-Hazardous violation: 85BB5/86BB5/55O2/41H11/56O2/59Q3/44O2/24L10/21M10/16L10/66O2/38O2/2137/.85BB5-5YR TEST EXPIRED.86BB5-2 YR TEST EXPIRED.55O2-CLEAN $180
2007-08-21ECB Non-Hazardous violation: 55O2/85BB5/86BB5/41H11/55O2/59Q3/39O2/44O2/21O2/16O2/16M7/66O2/.55O2-CLEAN DOWN HOIST MACHINE.85BB5-5YR TEST EXPIRED.86BB5-2YR TES$180
2007-08-20Permit EW — ISSUED
2007-08-20Permit PL — ISSUED
2007-08-17Job filed: Installation of process boiler to existing gas service, piping with new meter. No change in use, occupancy or egress.$17,000
2007-06-26Permit EW — ISSUED
2007-06-26Permit EW — ISSUED
2007-06-25DOB complaint, category ?
2007-06-20Job filed: Interior renovation, partition and ceiling work as indicated on plans filed herewith. No change in use, egress or occupancy.$50,000
2007-06-20Job filed: Interior renovation, partition and ceiling work as indicated on plans filed herewith. No change in use, egress or occupancy.$50,000
2007-06-20Job filed: Interior renovation, partition and ceiling work as indicated on plans filed herewith. No change in use, egress or occupancy.$50,000
2007-04-03DOB complaint, category ?
2007-04-02DOB violation LL1081:
2007-03-16Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 480 FT LONG AT 82-06 34TH STREET. DURING REMEDIAL REPAIRS. Work shall comply with LL33/91. No change in u
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-11-16DOB violation E:
2006-10-06Permit EW — ISSUED
2006-10-03ECB Non-Hazardous violation: 50A/ 50B/ 48A/ FULTON V.T. BOILER 15HP NB 57459, GAS, 1989 50(A) NO DISCHARGE PIPE ON THE SAFETY VALVE. 50(B) STEAM PRESSURE GAUGE$2,500
2006-10-03ECB Hazardous violation: CEASE USE 50A/ 51/ B4B/ FULTON V.T. BOILER, 10HP, NB 57285, GAS 1989 50(A) BURNT OUT CONVECTION PASS SLEEVE AT LOWER LEFT HAND HOL$2,500
2006-09-26Job filed: INTERIOR PARTITION ALTERATION. NO CHANGE IN OCCUPANCY, USE OR EGRESS$24,800
2006-09-13ECB Non-Hazardous violation: 50A,B. FUCTON V.T BOILER,10HP,NB35471,GAS,1978.50A-DETERIORATED CONVECTION PASS SEALS AT LOWER HANDHOLE OPENINGS OF THE BOILER,PER
2006-02-10DOB violation E:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-05Permit EW — ISSUED
2005
2005-12-09Permit EW — ISSUED
2005-11-01Permit EW — ISSUED
2005-10-31Permit PL — ISSUED
2005-10-27Permit EW — ISSUED
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-24DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-01DOB violation LL1081:
2005-10-01DOB violation LL1081:
2005-10-01DOB violation LL1081:
2005-09-30Permit EW — ISSUED
2005-09-29Permit EW — ISSUED
2005-08-31Permit EW — ISSUED
2005-08-22Job filed: Installation of HVAC, plumbing and electrical systems for chocolate processing and packaging company in existing manufacturing / warehouse space. No$60,000
2005-08-22Job filed: Installation of chocolate processing and packaging facility in existing manufacturing / warehouse building. No change to use egress or occupancy. Plu$140,000
2005-08-22Job filed: Installation of HVAC, plumbing and electrical systems for chocolate processing and packaging company in existing manufacturing / warehouse space. No$60,000
2005-08-01Permit EW — ISSUED
2005-08-01Job filed: REMOVE EXISTING CONDENSER ON THE ROOF AND REPLACE WITH 2 NEW CONDENSERS REMOVE EXISTING AIR HANDLER ON THE 6THFLOOR AND REPLACE WITH 2 NEW AIR HANDLER$25,000
2005-08-01Job filed: REMOVE EXISTING CONDENSER ON THE ROOF AND REPLACE WITH 2 NEW CONDENSERS REMOVE EXISTING AIR HANDLER ON THE 6THFLOOR AND REPLACE WITH 2 NEW AIR HANDLER$25,000
2005-07-18Job filed: INSTALLING ADDITIONAL ANTENNAS ON ROOFINTITIAL INSTALLATION APPROVED U NDER APPLICATION #300293974 ALL WORKIN CONFORMANCE WITH TPPN#5/98 NO CHANGE IN $5,000
2005-07-18Job filed: INSTALLING ADDITIONAL ANTENNAS ON ROOFINTITIAL INSTALLATION APPROVED U NDER APPLICATION #300293974 ALL WORKIN CONFORMANCE WITH TPPN#5/98 NO CHANGE IN $5,000
2005-05-19Permit EW — ISSUED
2005-04-21Permit EW — ISSUED
2005-04-21Permit PL — ISSUED
2005-03-09Job filed: THIS APPLICATION IS FILED TO ANSWER FIRE DEPARTMENT OBJECTIONS FOR AN E ISTING FURNITURE SPRAY BOOTH THE SPRAY B OOTH WAS ORIGINALLY APPROVED PERMITT$1,000
2005-03-09Job filed: THIS APPLICATION IS FILED TO ANSWER FIRE DEPARTMENT OBJECTIONS FOR AN E ISTING FURNITURE SPRAY BOOTH THE SPRAY B OOTH WAS ORIGINALLY APPROVED PERMITT$1,000
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-21Permit PL — ISSUED
2005-01-21Permit EW — ISSUED
2004
2004-12-14Job filed: LEGALIZE INSTALLATION OF 2 GAS FIRED HOT WATER HEATERS AND 2 GAS FIRED UNIT HEATERS CONNECTED TO EXISTING GAS PIPING ON THE 3RD. FLOOR.$11,000
2004-11-24AL&R — from NORTH FORK BANK to 1-10 INDUSTRY ASSOCIATES, LLC
2004-11-24Agreement $90,000,000 — from 1-10 INDUSTRY ASSOCIATES, LLC to NORTH FORK BANK$90,000,000
2004-11-24Mortgage $51,593,303 — from 1-10 INDUSTRY ASSOCIATES, LLC to NORTH FORK BANK$51,593,303
2004-11-24Mortgage assigned — from LASALLE BANK NATIONAL ASSOCIATION to NORTH FORK BANK
2004-11-24Mortgage assigned — from GENERAL ELECTRIC CAPITAL CORPORATION to LASALLE BANK NATIONAL ASSOCIATION
2004-11-24DEEDO — from INDUSTRY CITY ASSOCIATES to 1-10 INDUSTRY ASSOCIATES LLC
2004-11-19DOB violation LL1081:
2004-11-11Tenant complaint: HEATING — HEAT RELATED
2004-11-02DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-11-01DOB violation E:
2004-10-25DOB violation E:
2004-10-25DOB violation E:
2004-10-25DOB violation E:
2004-10-25DOB violation E:
2004-10-25DOB violation E:
2004-10-25DOB violation E:
2004-10-25DOB violation E:
2004-10-22DOB violation E:
2004-10-22DOB violation E:
2004-10-22DOB violation E:
2004-06-25Permit EW — ISSUED
2004-06-23DOB violation E:
2004-06-18Air permit (CERTIFICATE TO OPERATE), fuel: ?
2004-06-17Job filed: INSTALLATION OF PAINT BOOTH INSTALL (4) SPRINKLER HEADS IN SPRAY BOOTH C ONNECTED TO EXTISTING BUILDING SPRINKLER SYSTEM NO CHANGE IN USE EGRESS OR $3,500
2004-06-17Job filed: INSTALLATION OF PAINT BOOTH INSTALL (4) SPRINKLER HEADS IN SPRAY BOOTH C ONNECTED TO EXTISTING BUILDING SPRINKLER SYSTEM NO CHANGE IN USE EGRESS OR $3,500
2004-06-15Job filed: INSTALLATION OF PROCESS EQUIPMENT, EVAPO RATOR TO TREAT PROCESS WASTE WA NATURAL GAS USED AS FUEL. EXISTING GAS R ISER TO BE USED. METER TO BE ON THIR$6,000
2004-05-24Job filed: Installation of antenna and associated equipment at a telecommunication facility in compliance with TPPN #5/98 with no change to occupancy, use or egr$10,000
2004-05-24Job filed: Installation of antenna and associated equipment at a telecommunication facility in compliance with TPPN #5/98 with no change to occupancy, use or egr$10,000
2004-04-21DOB violation LL1081:
2004-04-13Permit EW — ISSUED
2004-04-13Permit PL — ISSUED
2004-04-13Permit PL — ISSUED
2004-04-13Permit EW — ISSUED
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-02-13Job filed: INSTALL GAS FIRED HIGH PRESSURE BOILER AND NEW BOILER ROOM ENCLOSURE. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION$14,000
2004-02-13DOB violation LL6291:
2004-01-13Job filed: REMOVAL OF GRAVITY TANK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2003
2003-11-25ECB Hazardous violation: 21,N,10 21N10 CEASE USE DEVICE 3F1248 DOOR INTERLOCK BY PASSED HAZARDOUS 2 OFFENSE CALL 212 566 5544 TO MAKE APPOINTMENT SO THIS D$1,250
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-12DOB violation E:
2003-11-07Permit EW — ISSUED
2003-11-07Permit EW — ISSUED
2003-11-07Permit PL — ISSUED
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-09-25ECB Non-Hazardous violation: 21R09/05R09/85BB05 21/R ALL HOISTWAY INTERLOCKS JUMPED ELEVATOR WORKING WITH HOISTWAY DOORS OPEN 05/R CAR GATES SW JUMPED ELEVATOR$500
2003-06-20Permit EW — ISSUED
2003-06-20Permit EW — ISSUED
2003-06-20Permit PL — ISSUED
2003-06-20Permit EW — ISSUED
2003-06-12Permit EW — ISSUED
2003-06-12Permit EW — ISSUED
2003-04-30Job filed: INSTALL (2) GAS HIGH PRESSURE BOILERS IN NEW BOILER ROOM ENCLOSURE AND (1) GAS UNIT HEATER. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICA$34,000
2003-03-10Job filed: INSTALL 2 TWO GAS FIRED PACKAGE BOILERS NEW GAS METER AND PIPING AND TWO 2 BOILER ROOM ENCLOSURES NO CHANGE IN E GRESS OCCUPANCY OR USE UNDER THIS AP$28,610
2003-01-29Job filed: INSTALLATION OF PAINT SPRAY BOOTH. INSTALL 1 SPRINKLER HEAD IN SPRAY BOOTH CONNECTED TO EXISTING BUILDING SPRINKLER SYSTEM. "NO CHANGE IN EGRESS OR OC$2,000
2003-01-17ECB Non-Hazardous violation: CEASE USE 05M12/ 19N11/ CEASE USE UNTIL (05) AND (19) IS COMPLIED WITH$500
2003-01-16DOB violation E:
2003-01-16DOB violation E: 3F1233
2003-01-16DOB violation E: 3F1239
2003-01-16DOB violation E: 3F1234
2003-01-16DOB violation E: 3F1236
2003-01-15DOB violation E: 3F1230
2003-01-15DOB violation E: 3F1243
2003-01-15DOB violation E: 3F1240
2003-01-15DOB violation E: 3P4251
2002
2002-04-11Permit EW — ISSUED
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-21DOB violation E: 3P4251
2002-03-21DOB violation E: 3F1243
2002-03-21DOB violation E: 3F1237
2002-03-21DOB violation E: 3P4250
2002-03-20DOB violation E: 3F1248
2002-03-20DOB violation E: 3F1240
2002-03-20DOB violation E: 3F1246
2002-03-20DOB violation E: 3P4038
2002-03-20DOB violation E: 3F1244
2002-03-20DOB violation E: 3P4281
2002-03-18DOB violation E: 3F1230
2002-03-18DOB violation E: 3P4252
2002-03-18DOB violation E: 3F1239
2002-03-18DOB violation E: 3F1236
2002-03-18DOB violation E: 3F1233
2002-03-18DOB violation E: 3F1234
2002-02-19DOB violation LL1081:
2002-02-19DOB violation LL1081:
2002-02-19DOB violation LL1081:
2002-02-12Job filed: INSTALLO TWO SPLIT SYSTEM AIR CONDITIONE RS AS PER NO CHANGE IN USE,EGRE S,OR OCCUPANCY$60,000
2002-02-12Job filed: INSTALLO TWO SPLIT SYSTEM AIR CONDITIONE RS AS PER NO CHANGE IN USE,EGRE S,OR OCCUPANCY$60,000
2002-01-28Permit EW — ISSUED
2002-01-28Permit PL — ISSUED
2002-01-17Permit EW — ISSUED
2002-01-14Permit EW — ISSUED
2002-01-14Permit PL — ISSUED
2001
2001-12-31Job filed: REARRANGE INTERIOR PARTITIONS ON FIRST F LOOR AND CELLAR. INSTALL FOOD REPARATION EQUIPMENT ON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$88,000
2001-12-28Job filed: INSTALLING ADDITIONAL TELECOMMUNIATION C ABINETS IN EXITING EQUIPMENT RO M ON 6TH FLOOR REPLACE ANTENNA ON ROOF.I NITIAL INSTALLATION APPROVED UNDER 3$15,000
2001-12-28Job filed: INSTALL FIRE SUPPRESSION SYSTEM. NO CHA NGE IN USE OF EGRESS, OR OCCUPA CY$2,000
2001-12-28Job filed: INSTALL FIRE SUPPRESSION SYSTEM. NO CHA NGE IN USE OF EGRESS, OR OCCUPA CY$2,000
2001-12-28Job filed: INSTALLING ADDITIONAL TELECOMMUNIATION C ABINETS IN EXITING EQUIPMENT RO M ON 6TH FLOOR REPLACE ANTENNA ON ROOF.I NITIAL INSTALLATION APPROVED UNDER 3$15,000
2001-08-29DOB violation E: 3F1231
2001-08-29DOB violation E: 3F1232
2001-08-29DOB violation E: 3F1232
2001-08-28DOB violation E: 3P4039
2001-08-28DOB violation E: 3F1242
2001-08-27DOB violation E: 3F1237
2001-08-27DOB violation E: 3P4251
2001-06-25DOB violation C: WORK W/O PERMIT. NOTED: AT 2ND FLOOR AREA YORK VENTURE INC HAS CREATED OFFICE SPACE WITH PARTITIONS. NEW WALLS AND DOORS NOTED WIT
2001-06-25ECB Non-Hazardous violation: WORK WITHOUT A PERMIT: WORK NOTED: AT 2ND FLOOR AREA YORK VENTURE INC 2ND FLOOR HAS CREATED OFFICE SPACE WITH PARTITION'S & NEW WA$500
2001-06-22DOB complaint, category ?
2001-03-08DOB violation LL1081:
2001-02-28DOB violation E: 3F1244
2001-02-28DOB violation E: 3F1240
2001-02-28DOB violation E: 3F1243
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation E: 3F1236
2001-02-27DOB violation E: 3F1236
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2000
2000-03-10DOB violation LL1081:
2000-03-10DOB complaint, category ?
2000-02-28Permit EW — ISSUED
2000-02-15Job filed: Install vent hood for apparel spray operation. No changes to uses, egress or occupancy.$3,000
2000-02-15Job filed: Install vent hood for apparel spray operation. No changes to uses, egress or occupancy.$3,000
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
1999
1999-12-23DOB violation E: 3F1248
1999-12-20DOB violation E: 3F1236
1999-12-20DOB violation E: 3P4250
1999-12-20DOB violation E: 3F1234
1999-12-20DOB violation E: 3F1239
1999-12-20DOB violation E: 3F1243
1999-12-20DOB violation E: 3P4252
1999-12-20DOB violation E: 3F1233
1999-12-20DOB violation E: 3F1230
1999-12-20DOB violation E: 3F1240
1999-12-17DOB violation E: 3P4038
1999-12-17DOB violation E: 3F1244
1999-12-17DOB violation E: 3F1246
1999-12-17DOB violation E: 3P4281
1999-07-09DOB complaint, category ?
1999-06-29Permit EW — ISSUED
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1999-03-15DOB violation E: 3P4250
1999-03-15DOB violation E: 3F1240
1999-03-12DOB violation E: 3P4251
1999-03-12DOB violation E: 3F1236
1999-03-12DOB violation E: 3F1232
1999-03-12DOB violation E: 3F1239
1999-01-20DOB violation LL1081:
1999-01-20DOB violation LL1081:
1999-01-20DOB violation LL1081:
1998
1998-12-07Mortgage assigned — from NORTH FORK BANK to GENERAL ELECTRIC CAPITAL CORPORAITON
1998-12-07Mortgage satisfied — from INDUSTRY CITY ASSOCIATES to FBE LIMITED
1998-12-07Mortgage satisfied — from INDUSTRY CITY ASSOCIATES to SAFRIN, JOSHUA
1998-12-07SAGE — from NORTH FORK BANK
1998-12-07Deed — from INDUSTRY CITY ASSOCIATES to 1-10 INDUSTRY ASSOCIATES LLC
1998-12-07Mortgage assigned — from 1-10 INDUSTRY ASSOCIATES LLC to GENERAL ELECTRIC CAPITAL CORPORATION
1998-12-07Mortgage satisfied — from INDUSTRY CITY ASSOCIATES to SIKRAN FUNDING COMPANY LLC
1998-12-07Mortgage assigned — from NORTH FORK BANK to GENERAL ELECTRIC CAPITAL CORPORATION
1998-12-07SAGE — from NORTH FORK BANK
1998-12-07Mortgage $26,782,238 — from 1-10 INUSTRY ASSOCIATES LLC to GENERAL ELECTRIC CAPITAL CORPORATION$26,782,238
1998-12-07Mortgage assigned — from 1-10 INDUSTRY ASSOCIATES LLC to GENERAL ELECTRIC CAPITAL CORPORATION
1998-08-06DOB complaint, category ?
1998-08-05DOB violation C:
1998-08-05ECB Hazardous violation: USE OF PROHIBITED DOORS AT REAR LEADING THROUGH FACTORY TO 35TH ST WHICH IS AN INSWINGING 10'X10' BARN DOOR REMEDY: PROVIDE AP$5,500
1998-07-29ECB Non-Hazardous violation: 50,Y,14,57,Z,09,73,0,02 50-SEAL OIL LEAK AT MACHINE 57-REMOVE WATER FROM PIT 73-CLEAN DOWN ENTIRE DEVICE.
1997-05-20ECB Non-Hazardous violation: 05L,30O,74O, 74 CLEAN CAR TOP$100
1997-05-20ECB Non-Hazardous violation: 74O,30O,. 74- CLEAN CAR TOP$100
1997-05-19ECB Non-Hazardous violation: 42L11, 30O2 42) NOISE COMING FROM DRUM.
1997-05-19ECB Non-Hazardous violation: 30O2, 36T# 36-MARK MACHINE ROOM DOOR - ELEVATOR MACHINE ROOM
1997-05-19ECB Non-Hazardous violation: 30O,.$100
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to SAFRIN, JOSHUA
1996-07-10Mortgage assigned — from INDUSTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Mortgage $100,000 — from INDUSTRY CITY ASSOC to SAFRIN, JOSHUA$100,000
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Mortgage $2,464,737 — from INDUSTRY CITY ASSOC to FBE LIMITED$2,464,737
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to FBE LIMITED
1996-07-10Mortgage assigned — from INDEPENDENCE SAVINGSBANK to NORTH FORK BANK
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to SIKRAN FUNDING COMPANY L.L.C.
1996-07-10Mortgage $259,446 — from INDUSTRY CITY ASSOC to SAFRIN, JOSHUA$259,446
1996-07-10Mortgage $10,051,513 — from INDUSTRY CITY ASSOC to SIKRAN FUNDING CO LLC$10,051,513
1996-07-10Mortgage assigned — from INDUSTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10SAGE — from INDEPENDENCE SAVINGSBANK
1996-07-10Mortgage $1,058,054 — from INDUSTRY CITY ASSOC to SAFRIN, JOSHUA$1,058,054
1996-07-10Mortgage assigned — from SAFRIN, JOSHUA to NORTH FORK BANK
1996-07-10Mortgage $950,000 — from INDUSTRY CITY ASSOC to SIKRAN FUNDING CO LLC$950,000
1996-07-10Mortgage $2,464,737 — from INDUSTRY CITY ASSOC to SIKRAN FUNDING CO LLC$2,464,737
1996-07-10Mortgage $10,051,513 — from INDUSTRY CITY ASSOC to FBE LIMITED$10,051,513
1996-07-10Mortgage assigned — from FBE LIMITED to NORTH FORK BANK
1996-07-10Mortgage assigned — from SIKRAN FUNDING CO LLC to NORTH FORK BANK
1996-07-10Agreement — from INDSUTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Mortgage assigned — from SARFIN, JOSHUA to NORTH FORK BANK
1996-07-10Mortgage assigned — from SIKRAN FUNDING COMPANY L.L.C. to NORTH FORK BANK
1996-07-10Mortgage $950,000 — from INDUSTRY CITY ASSOC to FBE LIMITED$950,000
1996-07-10Mortgage assigned — from FBE LIMITED to NORTH FORK BANK
1996-03-21Permit EW — ISSUED
1996-03-21Permit EW — ISSUED
1995
1995-12-18DOB complaint, category ?
1995-08-10Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to NARKIS FUNDING COMPANY LLC
1995-08-08Agreement — from INDUSTRY CITY ASSOCIATES to INDEPENDENCE SAVINGSBANK
1995-07-20Mortgage assigned — from NARKIS FUNDING COMPANY L.L.C. to MARK SCHRON FAMILY TRUST; MIRIAM SCHER FAMILYTRUST; AVI SCHRON FAMILY TRUST; SAMUEL SCHRON
1995-07-20Mortgage assigned — from ELI SCHRON FAMILY TRUST; MARK SCHRON FAMILY TRUST; SAMUEL SCHRON FAMILYTRUST; BRACHA ROTHS to SIKRAN FUNDING COMPANY L.L.C.
1995-06-27Agreement — from NEW YORK SMSA LIMITED PARTNERSHIP; INDUSTRY CITY ASSOCIATES to INDEPENDENCE SAVINGSBANK
1995-04-04Mortgage $13,466,250 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$13,466,250
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from INDUSTRY CITY ASSOCIATES to INDEPENDENCE SAVINGSBANK
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to NARKIS FUNDING COMPANY LLC; LEIFER, MURRAY
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Agreement — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION
1995-04-04Mortgage $13,466,250 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$13,466,250
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage $8,000,000 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$8,000,000
1995-04-04Mortgage $1,417,500 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$1,417,500
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to INDEPENDENCE SAVINGSBANK
1995-04-04Agreement — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to FBE LIMITED
1995-04-04SAGE — from PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to SAFRIN, JOSHUA
1994
1994-12-14ECB Non-Hazardous violation: OPERATION OF PA WITHOUT A CURRENT PERMIT. DRINKING ESTABLISHMENT WITHOCCUPANCY OF 285 PERSONS IN FIRST FLOOR. REMEDY: OBTAIN PE$200