Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

607 2 Avenue · Brooklyn · BBL 3006910001 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

39 service requests in the last three years. Most common: Illegal Parking (9) · Consumer Complaint (9) · Noise (4) · Derelict Vehicles (3) · Street Condition (2) · Non (2).

Filed construction activity

$56,771,916 in permitted construction work filed since 2016 (312 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$79,282,000 $35,676,900
2026$94,856,000 $42,685,200
2027$104,426,000 $46,991,700

The city's market estimate has risen 32% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Restaurants in this building

RestaurantCuisineGradeNotes
Baolala / UluhuluhChineseA—
GyuyaNot yet graded—
HachiJapaneseNot yet graded—
JtunesNot yet graded—
ObentoyasanJapaneseA—
PanyaNot yet graded—
Waku WakuJapaneseA—

Report to 311: Food poisoning · Food safety complaint

7 restaurants · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick), shared by 7 restaurants
2 Food Establishment complaints to 311 at this address in the last three years (most often: Food Contains Foreign Object), shared by 7 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

In the FEMA 1%-annual-chance floodplain (2015 preliminary flood maps) — lenders typically require flood insurance here.

Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

1 street-flooding or sewer-backup complaints at this address since 2026 (1 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway36 St — D N R · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: none
BusNearest boarding stop: 3 Av / 37 St — B37 B70 · 550 ft
Citi Bike36 St & 3 Ave · 400 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 024. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

607 2 Avenue

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

39 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $4,988,429 on 2021-12-23 (lender: Bxmt 2020-Fl2, Ltd), covering 12 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2021-12-23Mortgage $4,988,430 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD $4,988,430
2021-12-23Mortgage $72,439,609 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD $72,439,609
2019-12-19AL&R $19,298,989 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC $19,298,989
2019-12-19Mortgage $19,298,989 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC $19,298,989
2019-12-19AL&R $39,209,696 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC $39,209,696
2019-12-19Mortgage $39,209,696 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC $39,209,696
2017-12-01Mortgage $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $132,593,477
2017-12-01Mortgage $62,969,799 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $62,969,799
2017-12-01AL&R $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $132,593,477
2017-12-01AL&R $62,969,799 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $62,969,799
2015-12-17Agreement $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $197,500,000
2015-12-17Mortgage $31,829,268 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $31,829,268
2015-12-17AL&R $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $93,670,732
2015-12-17Mortgage $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $93,670,732
2015-12-17AL&R $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH $197,500,000

Ten-year activity

2001000
2017
152
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201710330448149
2018110261123152
2019100213149147
202038281714198
2021119182242
202232350444
20231522161458
2024528110374
202539890763
202651140929
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 36 records

DateRecord
2026-10-13Restaurant inspection: HACHI — grade N
2026-09-12311: Consumer Complaint — Other Store (Non-Food)
2026-08-26Restaurant inspection: BAOLALA / ULUHULUH — grade A
2026-08-20311: Sewer Maintenance — Flooding on Street
2026-08-16311: Illegal Parking — Double Parked Blocking Vehicle
2026-07-31Restaurant inspection: OBENTOYASAN — grade A
2026-07-19311: Consumer Complaint — Supermarket or Grocery Store
2026-07-19311: Consumer Complaint — Supermarket or Grocery Store
2026-07-08311: Derelict Vehicles — Derelict Vehicles
2026-07-03311: Consumer Complaint — Supermarket or Grocery Store
2026-07-03311: Consumer Complaint — Supermarket or Grocery Store
2026-07-02Job filed: One of several global locations celebrating the 10th anniversary of the Pokemon GO game app. Free and open to the public.
2026-06-02Cooling tower inspection — violation AHK0
2026-06-02Cooling tower inspection — violation AH8S
2026-06-02Cooling tower inspection — violation AHK2
2026-06-01Permit General Construction — Signed-off
2026-05-26Job filed: Herewith filing for minor interior demo of partitions and installation of new and interior renovation of the 6th floor only as per the drawings. No ch
2026-05-15311: Noise - Vehicle — Car/Truck Horn
2026-04-13311: Derelict Vehicles — Derelict Vehicles
2026-04-08311: Derelict Vehicles — Derelict Vehicles
2026-03-24FDNY inspection (RISK)
2026-03-04Restaurant inspection: HACHI
2026-02-21311: Illegal Parking — Blocked Hydrant
2026-02-20Permit General Construction — Signed-off
2026-01-30Boiler inspection
2026-01-22Restaurant inspection: WAKU WAKU — grade A
2026-01-15311: Noise - Commercial — Banging/Pounding
2026-01-08Job filed: INSTALLATION OF NEW SPLIT HVAC SYSTEM ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B0118294
2026-01-07311: Street Sign - Missing — No Parking, Standing, Stopping
2025-12-31311: Illegal Parking — Posted Parking Sign Violation
2025-12-30Permit Mechanical Systems — Permit Issued
2025-12-29Job filed: REPLACEMENT OF TWO 25 TON PACKAGED SYSTEMS ON THE GROUND FLOOR MER AND THE SECOND FLOOR MER WITH A TOTAL CAPACITY OF 50 TONS. NO CHANGE TO EGRESS, USE
2025-12-05Permit Plumbing — Signed-off
2025-12-01Restaurant inspection: OBENTOYASAN
2025-11-17311: Tattooing — Dirty/Inadequate Eqp/Facility
2025-11-13Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS

The full timeline

2026
2026-10-13Restaurant inspection: HACHI — grade N
2026-09-12311: Consumer Complaint — Other Store (Non-Food)
2026-08-26Restaurant inspection: BAOLALA / ULUHULUH — grade A
2026-08-20311: Sewer Maintenance — Flooding on Street
2026-08-16311: Illegal Parking — Double Parked Blocking Vehicle
2026-07-31Restaurant inspection: OBENTOYASAN — grade A
2026-07-19311: Consumer Complaint — Supermarket or Grocery Store
2026-07-19311: Consumer Complaint — Supermarket or Grocery Store
2026-07-08311: Derelict Vehicles — Derelict Vehicles
2026-07-03311: Consumer Complaint — Supermarket or Grocery Store
2026-07-03311: Consumer Complaint — Supermarket or Grocery Store
2026-07-02Job filed: One of several global locations celebrating the 10th anniversary of the Pokemon GO game app. Free and open to the public.
2026-06-02Cooling tower inspection — violation AHK0
2026-06-02Cooling tower inspection — violation AH8S
2026-06-02Cooling tower inspection — violation AHK2
2026-06-01Permit General Construction — Signed-off
2026-05-26Job filed: Herewith filing for minor interior demo of partitions and installation of new and interior renovation of the 6th floor only as per the drawings. No ch$50,000
2026-05-15311: Noise - Vehicle — Car/Truck Horn
2026-04-13311: Derelict Vehicles — Derelict Vehicles
2026-04-08311: Derelict Vehicles — Derelict Vehicles
2026-03-24FDNY inspection (RISK)
2026-03-04Restaurant inspection: HACHI
2026-02-21311: Illegal Parking — Blocked Hydrant
2026-02-20Permit General Construction — Signed-off
2026-01-30Boiler inspection
2026-01-22Restaurant inspection: WAKU WAKU — grade A
2026-01-15311: Noise - Commercial — Banging/Pounding
2026-01-08Job filed: INSTALLATION OF NEW SPLIT HVAC SYSTEM ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B0118294$25,000
2026-01-07311: Street Sign - Missing — No Parking, Standing, Stopping
2025
2025-12-31311: Illegal Parking — Posted Parking Sign Violation
2025-12-30Permit Mechanical Systems — Permit Issued
2025-12-29Job filed: REPLACEMENT OF TWO 25 TON PACKAGED SYSTEMS ON THE GROUND FLOOR MER AND THE SECOND FLOOR MER WITH A TOTAL CAPACITY OF 50 TONS. NO CHANGE TO EGRESS, USE$175,000
2025-12-05Permit Plumbing — Signed-off
2025-12-01Restaurant inspection: OBENTOYASAN
2025-11-17311: Tattooing — Dirty/Inadequate Eqp/Facility
2025-11-13Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2025-09-24311: Illegal Dumping — Removal Request
2025-08-13Job filed: Interior non-structural demolition and installation of new partitions, doors and finishes per plans.$550,400
2025-08-12Job filed: Interior non-structural demolition and installation of new partitions, doors and finishes per plans.$550,400
2025-07-30Permit Plumbing — Signed-off
2025-07-28Permit Mechanical Systems — Signed-off
2025-07-22Permit General Construction — Signed-off
2025-07-01Permit General Construction — Permit Issued
2025-06-30Job filed: Filing herewith for installation of HVAC equipment (IC-46-BW)$81,300
2025-06-30Job filed: INTERIOR RENOVATION AT UNIT 4-4-A ON THE 4TH FLOOR, AS PER PLANS FILED HEREWITH.$284,160
2025-06-24311: Encampment — N/A
2025-06-22311: Consumer Complaint — Restaurant
2025-06-22311: Consumer Complaint — Restaurant
2025-06-18Permit Mechanical Systems — Signed-off
2025-06-13Boiler inspection
2025-06-11Job filed: INSTALLATION OF NEW SPLIT HVAC SYSTEM ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B0118294$25,000
2025-06-11Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH THE TENANT FITOUT FILED UNDER GC #B01182942-I1 AS PER THE DRAWINGS FILED HEREIN.$21,000
2025-06-06Job filed: INTERIOR RENOVATON OF EXISTING COMMERCIAL SPACE INCLUDING THE INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOOR & WALL FINISHES AS INDICATED ON T$569,961
2025-06-05Elevator permit: Remove Service to the 6th floor, Land and Pin 6th floor hall door. All work to comply with ASME A17.1-2013, Part 8 Section 8.7.2.$3,000
2025-06-05Permit Mechanical Systems — Signed-off
2025-06-05Permit General Construction — Signed-off
2025-06-05Job filed: Filing herewith for replacement of HVAC equipment (IC-3-6-CC)$50,000
2025-06-04Restaurant inspection: WAKU WAKU
2025-06-03Permit Mechanical Systems — Signed-off
2025-06-03Job filed: Filing herewith for installation of HVAC equipment (IC-3-1-B)$81,000
2025-05-28Permit Plumbing — Signed-off
2025-05-23Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH GC #B01196421-I1 AS PER THE DRAWINGS FILED HEREIN.$81,000
2025-05-22Job filed: Filing herewith for installation of HVAC equipment (IC-46-BW)$81,300
2025-05-22Job filed: Filing herewith for installation of Plumbing Fixtures (IC-4-6-BW)$27,500
2025-05-21Permit Mechanical Systems — Signed-off
2025-05-19Job filed: Filing herewith for installation of HVAC equipment (IC-4-6-BW)$55,000
2025-05-13Job filed: FILING HEREWITH PLUMBING WORK TO INSTALL HEATERS FOR OUTDDOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,803
2025-05-06Job filed: TENANT BUILDOUT OF EXISTING COMMERCIAL SPACE ON THE 6TH FLOOR INCLUDING THE INSTALLATION OF NEW FLOOR & WALL FINISHES AS INDICATED ON THE DRAWINGS FIL$525,000
2025-05-05Permit Mechanical Systems — Signed-off
2025-04-30Job filed: Filing herewith for installation of HVAC equipment (IC-3-6-BW)$119,000
2025-04-10Job filed: TENANT BUILDOUT OF EXISTING COMMERCIAL SPACE ON THE 6TH FLOOR INCLUDING THE INSTALLATION OF NEW FLOOR & WALL FINISHES AS INDICATED ON THE DRAWINGS FIL$682,500
2025-04-07DOB complaint, category ?
2025-04-03311: Consumer Complaint — Restaurant
2025-03-30311: Food Establishment — Food Contains Foreign Object
2025-03-28FDNY inspection (COM_OCPCY)
2025-03-28FDNY inspection (COM_OCPCY)
2025-03-26Job filed: Gas piping for barbeque restaurant including four commercial cooking appliances (under hood), three direct-vent make-up air furnaces, twenty tabletop $54,000
2025-03-25FDNY inspection (COM_OCPCY)
2025-03-25FDNY inspection (COM_OCPCY)
2025-03-25FDNY inspection (RISK)
2025-03-20Job filed: Gas piping for barbeque restaurant including four commercial cooking appliances (under hood), three direct-vent make-up air furnaces, twenty tabletop $54,000
2025-03-12Permit Plumbing — Permit Issued
2025-03-12Permit Plumbing — Signed-off
2025-03-04Permit Plumbing — Signed-off
2025-02-27FDNY inspection (COM_OCPCY)
2025-02-27FDNY inspection (COM_OCPCY)
2025-02-25Restaurant inspection: BAOLALA / ULUHULUH — grade A
2025-02-25Job filed: Installation of air handling units on 2nd Floor. Installation of A/C Condenser unit on Roof.$30,000
2025-02-03Job filed: Amend existing sprinkler head layout to conform to new partitioning. Install new sprinkler heads per plans.$21,112
2025-01-27311: Food Poisoning — 1 or 2
2025-01-09Restaurant inspection: BAOLALA / ULUHULUH
2025-01-03Job filed: Gas piping for barbeque restaurant including four commercial cooking appliances (under hood), three direct-vent make-up air furnaces, twenty tabletop $54,000
2024
2024-12-31FDNY inspection (COM_OCPCY)
2024-12-30Job filed: Filing herewith for installation of HVAC equipment (IC-IC 4-6-A)$22,000
2024-12-28311: Noise - Residential — Loud Music/Party
2024-12-27311: Food Establishment — Food Contains Foreign Object
2024-12-27Permit Mechanical Systems — Permit Issued
2024-12-21Job filed: Amend existing sprinkler head layout to conform to new partitioning.$16,200
2024-12-13FDNY inspection (COM_OCPCY)
2024-12-08311: Street Condition — Pothole
2024-12-05Permit Mechanical Systems — Signed-off
2024-12-04Job filed: Installation of air handling units on 2nd Floor. Installation of A/C Condenser unit on Roof.$30,000
2024-12-01Job filed: Gas piping for two commercial kitchens (two hoods) with seven gas appliances (total) and four ceiling-suspended direct-vent make-up air furnaces (two $47,500
2024-11-27FDNY inspection (COM_OCPCY)
2024-11-14Permit General Construction — Signed-off
2024-11-06Job filed: Herewith filing for minor interior demo of partitions and installation of new and interior renovation of the 2nd floor only as per the drawings. No ch$150,000
2024-11-06Job filed: Rollerskating rink and lounge. For ticketed guests only, with concessions served.
2024-10-25Permit General Construction — Permit Issued
2024-10-09311: Noise - Commercial — Banging/Pounding
2024-10-07Restaurant inspection: HACHI
2024-10-05311: Illegal Parking — Posted Parking Sign Violation
2024-10-01FDNY inspection (COM_OCPCY)
2024-10-01FDNY inspection (COM_OCPCY)
2024-10-01FDNY inspection (COM_OCPCY)
2024-09-30Permit Mechanical Systems — Signed-off
2024-09-30Permit EW — ISSUED
2024-09-26Job filed: Filing herewith for installation of HVAC equipment (IC-IC 4-6-A)$22,000
2024-09-24FDNY inspection (RISK)
2024-09-13Permit General Construction — Signed-off
2024-09-10Permit Mechanical Systems — Permit Issued
2024-09-06311: Illegal Parking — Blocked Hydrant
2024-09-06Permit Mechanical Systems — Signed-off
2024-09-06Job filed: PARTIAL INTERIOR RENOVATION AT 6TH FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR. no change to use, egress or occupancy$205,300
2024-09-02Job filed: Filing herewith for installation of HVAC units (IC-3-6-C)$150,978
2024-08-27Job filed: Relocate three (3) existing 10' range hoods and associated ductwork. Install ventilation and air conditioning systems for karaoke bar and rooms. INST$225,200
2024-08-21Permit Plumbing — Signed-off
2024-08-20Permit General Construction — Signed-off
2024-07-30Job filed: INSTALLLATION OF NEW PLUMBING FIXTURES AS PER DRAWINGS FILED HEREIN. FILEDIN CONJUNCTION WITH GC #B01068620-I1$33,000
2024-07-25Job filed: Gas piping for two commercial kitchens (two hoods) with seven gas appliances (total) and four ceiling-suspended direct-vent make-up air furnaces (two $47,500
2024-07-22Permit Sprinklers — Permit Issued
2024-07-15Job filed: TENANT BUILDOUT OF EXISTING COMMERCIAL SPACE ON THE 6TH FLOOR INCLUDING THE INSTALLATION OF NEW FLOOR & WALL FINISHES AS INDICATED ON THE DRAWINGS FIL$525,000
2024-07-11Permit Plumbing — Signed-off
2024-07-08Job filed: Amend existing sprinkler head layout to conform to new partitioning. Install new sprinkler heads per plans.$21,112
2024-06-26Permit Plumbing — Signed-off
2024-06-12Elevator permit: Alteration to add 1 front entrance at the 6th floor. All work to comply with Safety Code for Elevators and Escalators ASME A17.1-$31,000
2024-06-07Permit AL — ISSUED
2024-06-06311: Lead — Lead Kit Request (Residential) (L10)
2024-05-23Job filed: INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #B01026728-I1$12,000
2024-05-20Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING THE REMOVAL & INSTALLATION OF EXISTING NON-LOAD BEARING PARTITIONS, FLOOR & WALL FINISHES A$384,650
2024-05-13311: Non-Emergency Police Matter — Trespassing
2024-05-10Job filed: Rollerskating rink and lounge. For ticketed guests only, with concessions served.
2024-05-02Permit General Construction — Signed-off
2024-04-25Job filed: JOB FILED EXIST. COMMERCIAL STORE TO REPLACE COOKING EQUIPMENT AND PLUMBING FIXTURE AS PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP$21,000
2024-04-17Permit Mechanical Systems — Signed-off
2024-04-17Permit General Construction — Signed-off
2024-04-16Permit Mechanical Systems — Signed-off
2024-04-16Job filed: Filing herewith for installation of HVAC equipment (IC-4-3-C)$200,350
2024-04-15Permit Plumbing — Permit Issued
2024-04-15Permit Plumbing — Signed-off
2024-04-10Job filed: Interior work only at existing 6th Floor commercial office 6-3-B NE. Minor partition work. No change to use, occupancy or exits under this applicatio$26,000
2024-04-03Job filed: Filing herewith for installation of HVAC equipment (IC-4-4-A)$59,800
2024-04-01Job filed: JOB FILED EXIST. COMMERCIAL STORE TO REPLACE COOKING EQUIPMENT AND PLUMBING FIXTURE AS PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP$21,000
2024-03-28Permit Plumbing — Signed-off
2024-03-28Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING THE REMOVAL & INSTALLATION OF EXISTING NON-LOAD BEARING PARTITIONS, FLOOR & WALL FINISHES A$384,650
2024-03-11Permit General Construction — Permit Issued
2024-03-06DOB violation C: EMER WRK:OBSRVD CMU LOAD BEARNG WAL(CEILNG COVRNGS OBSTRCTD FRAMING), APROX 20'H,COMPRMSD DUE2CONS ACTVTY@750 5AV.CMU WAL OUT OF P
2024-03-02Job filed: Gas piping for two commercial kitchens (two hoods) with seven gas appliances (total) and four ceiling-suspended direct-vent make-up air furnaces (two $47,500
2024-02-29Job filed: INTERIOR RENOVATION AT UNIT 4-4-A ON THE 4TH FLOOR, AS PER PLANS FILED HEREWITH.$284,160
2024-02-22311: Illegal Parking — Blocked Crosswalk
2024-02-08311: Non-Emergency Police Matter — Other (complaint details)
2024-01-26Boiler inspection
2024-01-17311: Illegal Parking — Double Parked Blocking Vehicle
2024-01-10Permit General Construction — Signed-off
2024-01-08Job filed: SUBGRADE WASTE & DRAINAGE PIPING FOR NEW RETAIL SPACES INCLUDING NEW AND RELOCATED BATHROOMS AND COMMERCIAL KITCHENS$60,000
2024-01-03Permit Plumbing — Permit Issued
2024-01-03Job filed: Annual silent auction fundraising event for Yeshivah of Flatbush. For invited guests only with food and beverage served.
2023
2023-12-27Job filed: Filing herewith plumbing work for temporary heaters for outdoor dining as per plans. No change in use, egress or occupancy.$31,250
2023-12-22Job filed: SUBGRADE WASTE & DRAINAGE PIPING FOR NEW RETAIL SPACES INCLUDING NEW AND RELOCATED BATHROOMS AND COMMERCIAL KITCHENS$60,000
2023-12-21311: Illegal Parking — Double Parked Blocking Traffic
2023-12-21Permit Plumbing — Signed-off
2023-12-20Permit General Construction — Permit Issued
2023-12-03311: Street Condition — Pothole
2023-11-17311: Consumer Complaint — Home Improvement Contractor
2023-11-16Permit General Construction — Signed-off
2023-11-16Permit Mechanical Systems — Signed-off
2023-11-03Job filed: JOB FILED EXIST. COMMERCIAL STORE TO REPLACE COOKING EQUIPMENT AND PLUMBING FIXTURE AS PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP$21,000
2023-11-03Job filed: JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND EQUIPMENT, INSTALL SPLIT AC UNITS AND MODIFICATION OF EXISTING KITCHEN HOO$94,000
2023-10-28311: Illegal Parking — Blocked Crosswalk
2023-10-23311: Elevator — Elevator - Multiple Devices On Property
2023-10-23ECB CLASS - 2 violation: EXPIRED BRAKE MAINTENANCE TAG. INOPERATIVE CAR PHONE.
2023-10-23DOB complaint, category ?
2023-10-16311: Illegal Posting — Poster or Sign
2023-10-11Restaurant inspection: OBENTOYASAN — grade A
2023-09-28Restaurant inspection: WAKU WAKU — grade A
2023-09-27311: Consumer Complaint — Home Improvement Contractor
2023-09-20Job filed: Interior design show room. Open to the public with monitored entry.
2023-09-11Job filed: TENANT BUILDOUT OF EXISTING COMMERCIAL SPACE ON THE 4TH FLOOR INCLUDING THE INSTALLATION OF NEW FLOOR & WALL FINISHES AS INDICATED ON THE DRAWINGS FIL$100,700
2023-09-08311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2023-09-08DOB complaint, category ?
2023-09-03311: Illegal Parking — Double Parked Blocking Vehicle
2023-08-04Job filed: Interior non-structural demolition and installation of new partitions, doors and finishes per plans.$550,400
2023-08-02Permit General Construction — Signed-off
2023-07-14Job filed: Alteration to existing staff break room and new supply closet at existing packing and shipping tenant.$200,000
2023-06-30Eviction executed (BUILDING #4,WEST B S)
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
2023-06-30DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
2023-06-27311: Elevator — Elevator - Multiple Devices On Property
2023-06-27ECB CLASS - 2 violation: EXPIRED BRAKE MAINTENANCE TAG.
2023-06-27ECB CLASS - 2 violation: MISSING BRAKE MAINTENANCE TAG. PREVENT CHRONIC WATER CONDITION IN PIT.
2023-06-27ECB CLASS - 2 violation: EXPIRED RESHACKLE TAG. EXPIRED BRAKE MAINTENANCE TAG. ADJUST TILLER ROPE. ADJUST SLACK CABLE SWITCH.
2023-06-27ECB CLASS - 2 violation: WATER CONDITION IN PIT RESULTED IN SHUTDOWN; MAKE NECCESARY REPAIRS TO PREVENT RECURRING WATER CONDITION IN PIT.
2023-06-27ECB CLASS - 2 violation: EXPIRED BRAKE MAINTENANCE TAG. KINK IN GOVERNOR ROPE; REPLACE.
2023-06-27DOB complaint, category ?
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
2023-05-22311: Hazardous Materials — Chemical Odor (HD1)
2023-05-22311: Hazardous Materials — Chemical Odor (HD1)
2023-05-18Cooling tower inspection
2023-05-09Boiler inspection
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-03-24311: Food Establishment — Food Temperature
2023-02-01Permit Plumbing — Signed-off
2023-02-01Permit Plumbing — Signed-off
2023-01-17FDNY inspection (RISK)
2023-01-13SUBM — from BXMT 2020-FL2, LTD., AS ISSUER to 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP
2023-01-13311: Abandoned Vehicle — With License Plate
2023-01-10FDNY inspection (COM_OCPCY)
2023-01-10FDNY inspection (COM_OCPCY)
2023-01-09311: Non-Residential Heat — Inadequate or No Heat
2022
2022-12-16Permit General Construction — Permit Issued
2022-11-29FDNY inspection (RISK)
2022-11-15Job filed: PARTIAL INTERIOR RENOVATION AT 4TH FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR - UNIT 4-4-A N EQUINOR - NO CHANGE IN USE, EGRESS OR OCCUPANCY$155,000
2022-11-02311: Dumpster Complaint — Blocking Sidewalk or Street
2022-10-27311: Consumer Complaint — Bodega/Deli/Supermarket
2022-10-21Permit Mechanical Systems — Signed-off
2022-10-19Permit Plumbing — Signed-off
2022-10-19Job filed: FILING HEREWITH NO WORK MECHANICAL APPLICATION FOR ISSUANCE OF EQUIPMENT USE PERMITS UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WO$1,000
2022-10-18Permit General Construction — Permit Issued
2022-10-17Permit Mechanical Systems — Signed-off
2022-10-17DOB complaint, category ?
2022-10-13Job filed: Filing herewith for installation of HVAC equipment$70,800
2022-10-13Job filed: Filing herewith for installation of HVAC equipment$83,700
2022-10-11Job filed: temporary tent as per plans$10,000
2022-10-04Job filed: Temporary event "Camp David" for the Food and wine festival 2022
2022-09-28Job filed: Filing herewith for installation of HVAC equipment$78,700
2022-09-19Cooling tower inspection
2022-09-07Permit General Construction — Signed-off
2022-08-29Job filed: INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH THE GC APPLICATION #B00773973-I1$36,000
2022-08-18Permit Mechanical Systems — Signed-off
2022-08-12Job filed: Filing herewith for installation of HVAC equipment$83,700
2022-08-10Job filed: PARTIAL INTERIOR RENOVATION AT 4TH FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR - UNIT 4-4-A N EQUINOR - NO CHANGE IN USE, EGRESS OR OCCUPANCY$155,000
2022-08-08Elevator permit: Alterations to add new entrance and service at the rear 6th floor landing for the #10 Car (3P4253) at building #4. All work to c$9,000
2022-08-02Job filed: INTERIOR COMMERCIAL RENOVATION INCLUDING THE INSTALLATION OF NON-LOAD BEARING PARTITIONS,DOORS, FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN$651,000
2022-07-20Permit Mechanical Systems — Signed-off
2022-07-18Job filed: Filing herewith for installation of HVAC equipment$80,000
2022-07-11DOB complaint, category ?
2022-06-03Air permit (CERTIFICATE TO OPERATE), fuel: NONE
2022-06-03Air permit (CERTIFICATE TO OPERATE), fuel: ?
2022-04-15311: Broken Parking Meter — No Receipt
2022-04-15311: Broken Parking Meter — No Receipt
2022-03-21Permit General Construction — Signed-off
2022-03-10Job filed: Interior non-structural demolition and installation of new partitions, doors and finishes per plans.$550,400
2022-03-09Job filed: Interior renovation of partial 5th floor workshop.$45,000
2022-03-03Permit General Construction — Signed-off
2022-02-15Permit Plumbing — Signed-off
2022-02-07Permit EW — ISSUED
2022-02-07Permit EW — ISSUED
2022-02-07Permit EW — ISSUED
2022-02-07Job filed: INSTALL PLUMBING FISTURES AND WATER HEATERSFOR TWO BATHROOMS AND ONE KITCHEN. NO GAS WORK.$38,750
2022-01-26Permit Mechanical Systems — Signed-off
2022-01-24Job filed: Filing herewith for installation of HVAC equipment$60,048
2022-01-20Job filed: PARTIAL INTERIOR RENOVATION AT 4TH FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR - UNIT 4-4-A N EQUINOR - NO CHANGE IN USE, EGRESS OR OCCUPANCY$155,000
2022-01-18311: Illegal Parking — Posted Parking Sign Violation
2021
2021-12-23Mortgage $4,988,430 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD$4,988,430
2021-12-23Mortgage $72,439,609 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BXMT 2020-FL2, LTD$72,439,609
2021-12-16311: Industrial Waste — Grease In Sewer/Catch Basin (IDG)
2021-12-07FDNY inspection (RISK)
2021-12-07Job filed: Installation of two HVAC as per plans$215,000
2021-11-26Permit Plumbing — Signed-off
2021-11-26Permit Plumbing — Signed-off
2021-11-22Permit Mechanical Systems — Signed-off
2021-11-15Job filed: Installation of two HVAC as per plans$215,000
2021-11-02311: Broken Parking Meter — Out of Order
2021-10-20Permit Mechanical Systems — Permit Issued
2021-10-15311: Broken Parking Meter — Coin or Card Did Not Register
2021-10-07311: Food Establishment — Food Spoiled
2021-09-20Cooling tower inspection
2021-08-15311: Illegal Parking — Blocked Sidewalk
2021-08-14311: Illegal Parking — Posted Parking Sign Violation
2021-08-09311: Street Condition — Cave-in
2021-08-08311: Illegal Parking — Posted Parking Sign Violation
2021-08-06311: Food Poisoning — 1 or 2
2021-07-19311: Elevator — Elevator - Multiple Devices On Property
2021-07-19DOB complaint, category ?
2021-07-15311: Elevator — Elevator - Multiple Devices On Property
2021-07-15ECB CLASS - 2 violation: ADJUST CAR GATES. SEAL HOIST MACHINE LEAKS$310
2021-07-15ECB CLASS - 2 violation: INOPERATIVE PHONE$310
2021-07-15ECB CLASS - 2 violation: SEAL HOIST MACHINE LEAKS. KINK IN GOV ROPE. MISSING PARKING DEVICE. INSTALL GUARDS OVER DEFLECTOR SHEAVE IN MACHINE ROOM$310
2021-07-15ECB CLASS - 2 violation: INOPERATIVE PHONE. INSTALL GUARDS OVER DEFLECTOR SHEAVE IN MACHINE ROOM$310
2021-07-15ECB CLASS - 2 violation: INOPERATIVE PHONE. INSTALL GUARDS OVER DEFLECTOR SHEAVE IN MACHINE ROOM$310
2021-07-15ECB CLASS - 2 violation: WORN CAR SHOES. ADD BEVEL TO HOISTWAY ACCESS DOOR AT TOP OF SHAFT$310
2021-07-15DOB complaint, category ?
2021-06-28311: Illegal Parking — Blocked Sidewalk
2021-06-08Permit Sign — Signed-off
2021-05-01311: Consumer Complaint — Retail Store
2021-04-13Job filed: INSTALLATION OF STYRENE TEMPLATE AND PAINTED ACCESSORY BUSINESS SIGN ON WALL. SIGN ON 2ND AVE ELEVATION FOR WEST ELMOUTLET. NO CHANGE IN USE, EGRESS$2,160
2021-02-26Elevator permit: DOOR LOCK MONITOR -All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17.10-03 as modified by Appendix K and C$6,200
2021-02-26Permit EW — ISSUED
2021-02-10311: Illegal Parking — Commercial Overnight Parking
2021-02-05311: Illegal Parking — Commercial Overnight Parking
2021-02-04Permit Mechanical Systems — Signed-off
2021-01-29Job filed: Filing herewith for installation of HVAC equipment (6-6-D 602)$56,003
2021-01-15311: Mass Gathering Complaint — Mass Gathering
2021-01-14311: Food Poisoning — 1 or 2
2021-01-06311: Consumer Complaint — Home Improvement Contractor
2020
2020-12-15DOB violation E:
2020-12-15DOB violation E:
2020-12-14Job filed: FILING HEREWITH PLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDDOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$31,118
2020-12-13311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-12DOB violation E:
2020-12-11Job filed: Filing herewith plumbing work for temporary heaters for outdoor dining as per plans. No change in use, egress or occupancy.$31,250
2020-12-07Job filed: Filing herewith for installation of HVAC equipment$79,125
2020-11-24Permit Plumbing — Signed-off
2020-11-23Permit Plumbing — Signed-off
2020-11-19Job filed: Filing herewith plumbing work for temporary heaters for outdoor dining as per plans. No change in use, egress or occupancy.$31,250
2020-11-19Job filed: FILING HEREWITH PLUMBING WORK FOR TEMPORARY HEATERS FOR OUTDDOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$31,118
2020-11-17Boiler inspection
2020-11-17Permit Mechanical Systems — Signed-off
2020-11-09311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-04Permit Plumbing — Signed-off
2020-11-03Job filed: Filing herewith for installation of HVAC equipment (Location 4-3-D North)$55,981
2020-10-29Permit EW — ISSUED
2020-10-28Permit EW — ISSUED
2020-10-27Job filed: FILING HEREWITH PLUMBING WORK TO INSTALL HEATERS FOR OUTDDOR DINING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,803
2020-10-27DOB complaint, category ?
2020-10-23Job filed: Filing herewith plumbing work for temporary heaters for outdoor dining as per plans. No change in use, egress or occupancy.$31,250
2020-10-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-16311: Elevator — Elevator - Single Device On Property/No Alternate Service
2020-10-16Permit PL — ISSUED
2020-10-16ECB CLASS - 2 violation: PROVIDE IN CASE OF FIRE SIGNS
2020-10-16DOB complaint, category ?
2020-10-15Permit Plumbing — Signed-off
2020-10-09Permit Sprinklers — Signed-off
2020-10-06Permit Mechanical Systems — Signed-off
2020-10-01Permit EW — ISSUED
2020-09-25311: Elevator — Elevator - Multiple Devices On Property
2020-09-25ECB CLASS - 2 violation: INOPERATIVE PHONE. MISSING IN CASE OF FIRE SIGNS. PROVIDE CORRECT DEVICE NUMBER ON CAR STATION
2020-09-25ECB CLASS - 2 violation: WORN CAR SHOES. GOV MISSING SEALS. SEAL HOIST MACHINE LEAKS
2020-09-25ECB CLASS - 2 violation: INOPERATIVE PHONE. PROVIDE IN CASE OF FIRE SIGNS. SHORTEN HOIST ROPES.
2020-09-25DOB complaint, category ?
2020-09-24311: Elevator — Elevator - Multiple Devices On Property
2020-09-24311: Elevator — Elevator - Multiple Devices On Property
2020-09-24ECB CLASS - 2 violation: REPAIR PHONE. PROVIDE IN CASE OF FIRE SIGNS. SHORTEN HOIST ROPES. SELF RESETTING ESCAPE HATCH SWITCHES PROHIBITED. MAIN LINE CAN B$310
2020-09-24ECB CLASS - 2 violation: REPAIR PHONE. PROVIDE IN CASE OF FIRE SIGNS
2020-09-24ECB CLASS - 2 violation: REPAIR PHONE. PROVIDE IN CASE OF FIRE SIGNS
2020-09-24Job filed: FILING HEREWITH FOR THE SPRINKLER PORTION OF COMMERCIAL FIT OUT OF 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$24,900
2020-09-24Job filed: FILING HEREWITH FOR THE PLUMBING PORTION OF COMMERCIAL FIT OUT OF 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$22,400
2020-09-24DOB complaint, category ?
2020-09-24DOB complaint, category ?
2020-09-23311: Elevator — Elevator - Multiple Devices On Property
2020-09-23ECB CLASS - 2 violation: SUMP PUMP PLUGGED INTO GFI. PROVIDE MISSING INTERLOCK COVERS. EXPIRED BRAKE MAINT TAG
2020-09-23ECB CLASS - 2 violation: SHORTEN HOIST ROPES. MISSING IN CASE OF FIRE SIGNS. PROVIDE ESCAPE HATCH SWITCH PER CODE. ADJUST CWT SHOES. EXPIRED BRAKE MAINT TA$310
2020-09-23ECB CLASS - 2 violation: REPAIR CAR PHONE. MISSING IN CASE OF FIRE SIGNS. PROVIDE ESCAPE HATCH SWITCH PER CODE. EXPIRED BRAKE MAINT TAG. MAIN LINE CAN BE O$625
2020-09-23Job filed: FILING HEREWITH FOR THE MECHANICAL PORTION OF COMMERCIAL FIT OUT OF 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$230,000
2020-09-23ECB CLASS - 2 violation: EXPIRED BRAKE MAINT TAG
2020-09-23DOB complaint, category ?
2020-09-21311: Elevator — Elevator - Multiple Devices On Property
2020-09-21ECB CLASS - 2 violation: ADJUST SAFETY/TILLER ROPE. 6 FL INTERLOCK COVER MISSING
2020-09-21ECB CLASS - 2 violation: ADJUST SLACK IN SAFETY/TILLER ROPE
2020-09-21DOB complaint, category ?
2020-09-16Job filed: FILING HEREWITH FOR OT PORTION OF HELLO FRESH FIT OUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$720,000
2020-09-16Job filed: FILING HEREWITH FOR OT PORTION OF HELLO FRESH FIT OUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.$720,000
2020-09-14Job filed: Installation of new plumbing fixtures as per plans filed herewith$52,500
2020-09-01Permit EW — ISSUED
2020-08-28311: Street Condition — Pothole
2020-08-10Permit Mechanical Systems — Signed-off
2020-08-05Job filed: Filing herewith for installation of HVAC equipment$79,125
2020-07-29Job filed: NEW PLUMBING FIXTURES FOR INTERIOR RENOVATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH.$49,000
2020-07-17311: Consumer Complaint — Retail Store
2020-07-16Permit Plumbing — Signed-off
2020-07-15Job filed: Plumbing work on partial 4th floor as per plans filed herewith.$56,000
2020-07-15Job filed: Installation of new plumbing fixtures as per plans filed herewith$52,500
2020-07-15ECB CLASS - 2 violation: 28-104.7.1-CONSTRUCTION DOCUMENTS SHALL BE COMPLETE AND OF (EFFICIENT) TO INDICATE THE REQUIREMENTS FOR SUCH APPLICATION PREMISES
2020-07-15ECB CLASS - 2 violation: 28-104.7.1-CONSTRUCTION DOCUMENTS SHALL BE COMPLETE OUT OF SUFFICIENT DURING TO INDICATE THE REQUIREMENTS FOR EACH APPLICATION PRE
2020-07-10311: Homeless Street Condition — N/A
2020-07-06Job filed: INTERIOR RENOVATION TO PARTIAL 4TH FLOOR AS PER PLANS FILED HEREWITH.$400,000
2020-07-01Job filed: INTERIOR RENOVATION TO PARTIAL 3RD FLOOR AS PER PLANS FILED HEREWITH.$464,000
2020-07-01Job filed: INTERIOR RENOVATION TO PARTIAL 3RD FLOOR AS PER PLANS FILED HEREWITH.$464,000
2020-06-08311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2020-05-29311: Consumer Complaint — Retail Store
2020-04-25311: Non-Emergency Police Matter — Social Distancing
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20AALR — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-20Mortgage assigned — from PARLEX 5 FINCO, LLC to BXMT 2020-FL2, LTD.
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-06Job filed: FITNESS CENTER EXPANSION$225,000
2020-02-03Permit EW — ISSUED
2020-02-03Permit EW — ISSUED
2020-01-17DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2020-01-09311: Food Poisoning — 1 or 2
2020-01-02311: Broken Parking Meter — Out of Order
2019
2019-12-20DOB complaint, category ?
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AL&R $19,298,989 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$19,298,989
2019-12-19Mortgage $19,298,989 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$19,298,989
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19Mortgage assigned — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AALR — from BANK OF CHINA, NEW YORK BRANCH to PARLEX 5 FINCO, LLC
2019-12-19AL&R $39,209,696 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$39,209,696
2019-12-19Mortgage $39,209,696 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to PARLEX 5 FINCO, LLC$39,209,696
2019-12-18DOB violation E:
2019-12-18DOB violation E:
2019-12-18DOB violation E:
2019-11-27Boiler inspection
2019-11-20DOB complaint, category ?
2019-11-20DOB complaint, category ?
2019-11-14Elevator permit: Modernize 3P4255 per Device Job Description.$79,348
2019-11-08Permit EW — ISSUED
2019-10-31Job filed: MINOR PARTITION WORK IN ACCESSORY OFFICE SPACE C 559 BUILD OUT ON 5TH FLOOR. A LL AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,864
2019-10-30Cooling tower inspection — violation AH8S
2019-10-30311: Curb Condition — Defacement
2019-10-29Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH. ASSOCIATED FILINGS B00312654-I1 & 321972610. NO CHANGE OF USE, EGRE$200,000
2019-10-29Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH. ASSOCIATED FILINGS B00312654-I1 & 321972610. NO CHANGE OF USE, EGRE$200,000
2019-10-29Job filed: PROPOSED PARTIAL INTERIOR RENOVATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH. ASSOCIATED FILINGS B00312654-I1 & 321972610. NO CHANGE OF USE, EGRE$200,000
2019-10-24Elevator permit: DOOR LOCK MONITOR -All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17.10-03 as modified by Appendix K and C$12,400
2019-10-23Job filed: EATING AND DRINKING ESTABLISHMENT
2019-10-22Permit Mechanical Systems — Permit Issued
2019-10-17Elevator permit: Modernize 3P4255 per Device Job Description.$79,348
2019-10-11Permit EW — ISSUED
2019-10-11Permit EW — ISSUED
2019-10-11Permit EW — ISSUED
2019-10-11Permit EW — ISSUED
2019-10-10Permit EW — ISSUED
2019-10-10Permit EW — ISSUED
2019-10-10Permit EW — ISSUED
2019-09-27Job filed: MINOR PARTITION WORK IN OFFICE SPACE C559 BUILD OUT ON 5TH FLOOR ALL AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2019-09-27Job filed: MINOR PARTITION WORK IN OFFICE SPACE C559 BUILD OUT ON 5TH FLOOR ALL AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2019-09-20DOB complaint, category ?
2019-09-13311: Blocked Driveway — Partial Access
2019-09-12Job filed: Eating & drinking establishment
2019-09-11ECB CLASS - 2 violation: FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35415938N ISSUED ON 07-27-19 & TO FILE A C OF C PURSUANT TO 28-201.1
2019-09-05Elevator permit: Convert existing Freight elevator #3F1218 to new Passenger Elevator, as per "Device Job Description". All work to comply with ASME$338,146
2019-09-05Elevator permit: Modernize 3P4255 per Device Job Description.$79,348
2019-09-04Permit EW — ISSUED
2019-09-04Permit EW — ISSUED
2019-08-29Job filed: Install new 52 ton split-system air conditioning system with three new rooftop condensers on dunnage, thirteen new suspended air handlers and six new $212,500
2019-07-30DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-07-30DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-07-29Permit PL — ISSUED
2019-07-29Permit PL — ISSUED
2019-07-27ECB CLASS - 1 violation: WORK AFTER HOURS W/O A VARIANCE PERMIT CONTRARY TO 28-105.12.5 NOTE: OBSERVED DURING INSPECTION APPRX 20 WORKMEN OF VARIOUS TRADE$1,250
2019-07-27DOB complaint, category ?
2019-07-05Permit EW — ISSUED
2019-07-05Permit EW — ISSUED
2019-07-05Permit EW — ISSUED
2019-07-01Permit EW — ISSUED
2019-07-01Permit PL — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY$50,000
2019-06-26Job filed: A2$426,000
2019-06-26Job filed: A2$400,000
2019-06-21Permit EW — ISSUED
2019-06-17Permit EW — ISSUED
2019-06-13Permit EW — ISSUED
2019-06-13Permit EW — ISSUED
2019-06-10Permit PL — ISSUED
2019-06-06Job filed: HEREWITH FILING FOR MECHANICAL WORK AS PER PLANS.$14,500
2019-06-06Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM IN THE CONDE NAST SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS $5,000
2019-06-06Job filed: HEREWITH FILING FOR THE CONDE NAST TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$83,800
2019-06-05Permit EW — ISSUED
2019-06-05Permit EW — ISSUED
2019-06-05Permit EW — ISSUED
2019-06-04Job filed: INSTALL NEW TWO NEW BATHROOMS. INSTALL HVAC SYSTEM. NOT CHANGE TO USE, OCCUPANCY OR MEANS OF EGRESS.$317,500
2019-06-04Job filed: FILING HEREWITH MECHANICAL PLANS FOR THE NEW INSTALLATION OF HVAC UNITS, NO CHANGE IN USE, EGRESS AND OR OCCUPANCY .$85,000
2019-06-04Job filed: FILING HEREWITH MECHANICAL PLANS FOR THE NEW INSTALLATION OF HVAC UNITS, NO CHANGE IN USE, EGRESS AND OR OCCUPANCY .$85,000
2019-05-30311: Food Establishment — Food Temperature
2019-05-29Elevator permit: New REAR LOBBY and BASEMENT hoist way doors and frames w/ door tracks, hanger rollers, closures, MO interlocks. Filing this applic$37,000
2019-05-29Permit EW — ISSUED
2019-05-28Permit EW — ISSUED
2019-05-28Job filed: A2$21,116
2019-05-22Job filed: HEREWITH FILING FOR BATHROOM FITOUT WORK AS PER PLANS. NO CHANGE TO USE EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$200,000
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-15Job filed: Restaurant and bar.
2019-05-07Job filed: Dinning and drinking
2019-04-30Permit AL — ISSUED
2019-04-29Job filed: Eating and drinking at Japan Village
2019-04-26Permit PL — ISSUED
2019-04-25Permit EW — ISSUED
2019-04-25Permit EW — ISSUED
2019-04-25Permit EW — ISSUED
2019-04-24Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM FOR THE WHAT IF TENANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS $25,000
2019-04-23Job filed: INSTALLATION OF TEMPORARY TENT AND STAGE IN CONJUNCTION WITH TPA #B00155826.$1,000
2019-04-19Elevator permit: The following work be performed in compliance with ASME A17.1/2003,as modified by Appendix "K".On completion,work will be tested I$4,500
2019-04-18FDNY inspection (STRUC_INT_3)
2019-04-17Job filed: Lecture use
2019-04-17Job filed: Meeting,drinking, and display area.
2019-04-12Job filed: MODIFICATION TO FIRE ALARM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$32,700
2019-04-10DOB complaint, category ?
2019-04-05DOB complaint, category ?
2019-04-03Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS.$55,000
2019-04-03Job filed: HEREWITH FILING TENANT PROTECTION AS PER PLAN.$1,000
2019-04-03Job filed: HEREWITH FILING FOR WINDOW EXPANSION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$137,000
2019-04-03Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS.$55,000
2019-04-03Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$280,000
2019-04-03Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS.$5,000
2019-04-03Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2019-04-03Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS.$150,000
2019-04-03Job filed: HEREWITH FILING FOR THE ESSENCE TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$500,000
2019-04-01Permit AL — ISSUED
2019-03-28Job filed: STRUCTURAL MODIFICATION FOR NEW INTER-FLOOR STAIRCASE AND STRUCTURAL SUPPORT FOR FOLDING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR$250,000
2019-03-28Job filed: STRUCTURAL MODIFICATION FOR NEW INTER-FLOOR STAIRCASE AND STRUCTURAL SUPPORT FOR FOLDING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR$250,000
2019-03-28Job filed: MODIFICATION TO HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE. EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$955,000
2019-03-28DOB complaint, category ?
2019-03-27Permit PL — ISSUED
2019-03-27Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$3,000,000
2019-03-27Job filed: A2$160,000
2019-03-25Permit Sidewalk Shed — Permit Issued
2019-03-25Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2019-03-21Job filed: Skating rink
2019-03-18Job filed: Dancing, Drinking and party use.
2019-03-13Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321729377, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE SUPP SHUTOFF VALVE AND COOKIN$2,300
2019-03-13Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321729377, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE SUPP SHUTOFF VALVE AND COOKIN$2,300
2019-03-06Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE TO USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$49,200
2019-02-28DOB complaint, category ?
2019-02-26DOB complaint, category ?
2019-02-22Permit EW — ISSUED
2019-02-12Permit EW — ISSUED
2019-02-12Job filed: HEREWITH FILING FOR MAIL & TRASH ROOM RENOVATION AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$155,000
2019-02-07Permit EW — ISSUED
2019-02-07Job filed: FILING HEREWITH FOR INSTALLATION OF (3) HVAC CONDENSING UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$80,000
2019-02-07Job filed: FILING HEREWITH FOR INSTALLATION OF (3) HVAC CONDENSING UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$80,000
2019-01-25Permit EW — ISSUED
2019-01-25Permit EW — ISSUED
2019-01-25Permit EW — ISSUED
2019-01-23Job filed: Temporary Place of Assembly for 256 Persons.
2019-01-22Job filed: Restaurant with existing, approved and inspected, PA #321807817 awaiting TCO. Sprinklers and General Construction signed-off under Job #340580963. R
2019-01-09Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$35,000
2019-01-08Job filed: TPA for skating rink (400)people
2019-01-07DOB complaint, category ?
2018
2018-12-28311: Food Establishment — Toilet Facility
2018-12-17Boiler inspection
2018-12-15311: For Hire Vehicle Complaint — Car Service Company Complaint
2018-12-14Elevator permit: Furnish and install one new set of 1 1/2 hr B label Kalamein swing and slide doors complete with G.A.L. track and rollers, B.B hal$20,000
2018-12-04DOB violation E:
2018-12-04DOB violation E:
2018-12-04DOB violation E:
2018-12-04DOB violation E:
2018-12-04DOB violation E:
2018-12-04DOB violation E:
2018-11-29DOB complaint, category ?
2018-11-29DOB complaint, category ?
2018-11-28311: Food Poisoning — 1 or 2
2018-11-28Permit PL — ISSUED
2018-11-23311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2018-11-23DOB complaint, category ?
2018-11-23DOB complaint, category ?
2018-11-23DOB complaint, category ?
2018-11-21Permit EW — ISSUED
2018-11-21Permit EW — ISSUED
2018-11-21DOB violation E:
2018-11-21DOB violation E:
2018-11-14Job filed: SUBSEQUENT FILING TO ADD PARTIAL DEMOLITION TO INITIAL FILING. PARTIAL DEMO/REMOVAL OF EXISTING FLOOR SLAB TO ACCOMMODATE NEW CONVENIENCE STAIR INSTA$10,000
2018-11-14Job filed: SUBSEQUENT FILING TO ADD STRUCTURAL TO INITIAL FILING. STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW CONVENIENCE STAIR INSTALLATION.$80,000
2018-11-14Job filed: HEREWITH FILING FOR THE SAHADI'S TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$102,000
2018-11-14Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$616,180
2018-11-14Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW CONVENIENCE STAIR FOR AN EXISTING COMMERCIAL SPACE AS SHOWN ON DRAWINGS. NO CHANGE IN USE, E$35,000
2018-11-14Job filed: HEREWITH FILING FOR THE SAHADI'S TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$102,000
2018-11-14Job filed: SUBSEQUENT FILING TO ADD STRUCTURAL TO INITIAL FILING. STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW CONVENIENCE STAIR INSTALLATION.$80,000
2018-11-13Job filed: CREATION OF FIRE PROTECTION PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2018-11-09DOB violation C:
2018-11-08DOB complaint, category ?
2018-10-26Permit PL — ISSUED
2018-10-25Job filed: HEREWITH FILING PLUMBING WORK AS PER PLANS.$30,000
2018-10-25Job filed: HEREWITH FILING PLUMBING WORK AS PER PLANS.$30,000
2018-10-25Job filed: HEREWITH FILING FOR THE WORK ASSOCIATED WITH THE GAS LANTERN INSTALLATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$20,000
2018-10-25Job filed: HEREWITH FILING PLUMBING WORK AS PER PLANS.$30,000
2018-10-24Cooling tower inspection
2018-10-19Permit EW — ISSUED
2018-10-15Permit PL — ISSUED
2018-10-13Job filed: A2$46,000
2018-10-10Job filed: PA
2018-10-09DOB complaint, category ?
2018-10-04Permit EW — ISSUED
2018-10-01Permit EW — ISSUED
2018-10-01Job filed: A2$74,000
2018-09-19Permit PL — ISSUED
2018-09-19Permit PL — ISSUED
2018-09-14Permit EW — ISSUED
2018-09-14Permit EW — ISSUED
2018-09-14Job filed: THE APPLICATION IS FILED FOR REPLACING 6TH FLOOR WINDOWS AND RESTROOMS RENOVATION AS PER PLANS INDICATED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$116,500
2018-09-14Job filed: THE APPLICATION IS FILED FOR REPLACING 6TH FLOOR WINDOWS AND RESTROOMS RENOVATION AS PER PLANS INDICATED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$116,500
2018-09-06Permit EW — ISSUED
2018-08-31Permit EW — ISSUED
2018-08-31Permit EW — ISSUED
2018-08-23Permit EW — ISSUED
2018-08-23DOB complaint, category ?
2018-08-22Permit EW — ISSUED
2018-08-22Permit EW — ISSUED
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (1) NEW SPLIT AIR COOLED CONDENSER ON THE ROOF AND (1) AIR HANDLER ON THE 2ND FLOOR. THIS APPLI$18,750
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (11) NEW PACKAGED AIR COOLED CONDENSER ON THE ROOF TO PROVIDE HEATING & COOLING TO THE 4TH $156,000
2018-08-22Job filed: FILING HEREWITH DRAWINGS INDICATING AN INSTALLATION OF (1) NEW SPLIT AIR COOLED CONDENSER ON THE ROOF AND (1) AIR HANDLER ON THE 2ND FLOOR. THIS APPLI$18,750
2018-08-17Permit PL — ISSUED
2018-08-15Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SPLIT SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2018-08-15Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SPLIT SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2018-08-14Permit PL — ISSUED
2018-08-07Job filed: MANUAL, AUTOMATIC / SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM .$21,869
2018-08-06Permit EW — ISSUED
2018-08-06Permit EW — ISSUED
2018-08-02DOB complaint, category ?
2018-08-01Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM FOR THE WHAT IF TENANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS $25,000
2018-08-01Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING SPRINKLER/STANDPIPE SYSTEM FOR THE WHAT IF TENANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UN$11,000
2018-08-01Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM FOR THE WHAT IF TENANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS $25,000
2018-08-01Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$170,000
2018-08-01Job filed: HEREWITH FILING FOR THE WHAT IF TENANT FITOUT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000,000
2018-07-31Permit Sidewalk Shed — Signed-off
2018-07-27Permit EW — ISSUED
2018-07-26Job filed: HEREWITH FILING TO CHANGE AND OCCUPANCY ON THE 1ST FLOOR ONLY. ALL WORK TO BE FILED UNDER SEPARATE ALT II APPLICATIONS.$1,000
2018-07-23311: Street Condition — Pothole
2018-07-23Job filed: PA
2018-07-23Job filed: PA
2018-07-18DOB complaint, category ?
2018-07-18DOB complaint, category ?
2018-07-12Permit PL — ISSUED
2018-07-10Permit EW — ISSUED
2018-07-10Permit EW — ISSUED
2018-07-10DOB complaint, category ?
2018-07-06Permit EW — ISSUED
2018-07-05Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SPLIT SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2018-07-05Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SPLIT SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2018-06-27Permit EW — ISSUED
2018-06-12Job filed: HEREWITH FILING DEAN & DELUCA TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$260,000
2018-06-12Job filed: HEREWITH FILING SPRINKLER MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$6,000
2018-06-12Job filed: HEREWITH FILING DEAN & DELUCA TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$260,000
2018-06-12Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$210,000
2018-06-12Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$210,000
2018-06-12Job filed: HEREWITH FILING SPRINKLER MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$6,000
2018-06-12Job filed: HEREWITH FILING DEAN & DELUCA TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$260,000
2018-06-08Permit PL — ISSUED
2018-06-05Job filed: - PROPOSE NEW CONSTRUCTION OF PARTITIONS AT PARTIAL FOURTH FLOOR IN AN EXISTING 6 STORY BUILDING$400,000
2018-06-01Permit EW — ISSUED
2018-05-31Job filed: FILING HEREWITH DRAWINGS INDICATING A REPLACEMENT OF ROOFTOP UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE $30,000
2018-05-31Job filed: FILING HEREWITH DRAWINGS INDICATING A REPLACEMENT OF ROOFTOP UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE $30,000
2018-05-28311: Noise - Residential — Loud Music/Party
2018-05-21Permit Sidewalk Shed — Signed-off
2018-05-17Permit PL — ISSUED
2018-05-15Permit EW — ISSUED
2018-05-15Permit EW — ISSUED
2018-05-08Job filed: PLUMBING & MECHANICAL PORTIONS OF JOB IN CONJUNCTION WITH ALT2 340586752$110,000
2018-05-01Job filed: A2$435,000
2018-04-24Permit EW — ISSUED
2018-03-30Permit EW — ISSUED
2018-03-27Permit EW — ISSUED
2018-03-23Permit EW — ISSUED
2018-03-16Job filed: PROPOSE TO REMOVE EXISTING FIRE ESCAPE STAIRCASE AT EXISTING 6 STORY BUILDING, BUILDING 3$100,000
2018-03-16Job filed: PROPOSE TO REMOVE EXISTING FIRE ESCAPE STAIRCASE AT EXISTING 6 STORY BUILDING, BUILDING 3$100,000
2018-03-15311: Derelict Vehicle — With License Plate
2018-03-14311: Derelict Vehicle — With License Plate
2018-03-14Job filed: A2$127,500
2018-03-13311: Derelict Vehicle — With License Plate
2018-03-09DOB complaint, category ?
2018-03-07Permit EW — ISSUED
2018-03-07Job filed: PROPOSED NEW CONSTRUCTION OF PARTITIONS AT PARTIAL FIFTH FLOOR AND NEW BATHROOMS IN AN EXISTING 6 STORY BUILDING$350,000
2018-03-06Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#340552342 AND 340539206, AS SHOWN ON PLAN. COOKING EQUIPMENT AND FIRE SUPP SHUTOFF$35,600
2018-03-02SAGE — from 1-10 BUSH TERMINAL OWNER L.P.
2018-03-01Permit EW — ISSUED
2018-02-26Job filed: PARTIAL RENOVATION OF 5TH FLOOR OFFICE SPACE$180,000
2018-02-21311: Noise - Commercial — Banging/Pounding
2018-02-16ECB CLASS - 1 violation: 44L17 TRACTION IS SLIPPING, FAIL TO HOLD REQUIRED LOAD FOR BRAKE/ROPEGRIPPER TEST. VERIFY CAR CAPACITY.$1,000
2018-02-15311: Elevator — Elevator - Multiple Devices On Property
2018-02-15ECB CLASS - 1 violation: *42X10, *05X10, *52H11, *53J01, *59I11, 39Q03, 70P07,42G11,69B11,67L10*CEASE USE ITEMS 42X-DOOR POSITIONING MONITOR; 05X-REAR ZONE$1,000
2018-02-15DOB complaint, category ?
2018-02-12Permit EW — ISSUED
2018-02-12Permit EW — ISSUED
2018-02-06Job filed: PROPOSE TO REPLACE EXISTING WINDOWS WITH NEW FLOOR TO CEILING WINDOWS AND ADJUST EXISTING FIRE ESCAPE PLATFORM AND ROOF AT THE 6TH FLOOR IN AN EXISTIN$120,000
2018-02-06Job filed: PROPOSE TO REPLACE EXISTING WINDOWS WITH NEW FLOOR TO CEILING WINDOWS AND ADJUST EXISTING FIRE ESCAPE PLATFORM AND ROOF AT THE 6TH FLOOR IN AN EXISTIN$120,000
2018-02-02Permit EW — ISSUED
2018-02-01Agreement — from BANK OF CHINA, NEW YORK BRANCH to NYU LANGONE HOSPITALS; 1-10 BUSH TERMINAL OWNER LP; NYU HOSPITALS CENTER
2018-01-31Permit EW — ISSUED
2018-01-31Permit EW — ISSUED
2018-01-31Permit EW — ISSUED
2018-01-31Permit EW — ISSUED
2018-01-31Job filed: A2$566,350
2018-01-31Job filed: A2$45,000
2018-01-31Job filed: A2$566,350
2018-01-31Job filed: A2$45,000
2018-01-30Permit EW — ISSUED
2018-01-24Permit EW — ISSUED
2018-01-24Permit PL — ISSUED
2018-01-11Permit Sidewalk Shed — Signed-off
2018-01-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS.$7,000
2018-01-02DOB complaint, category ?
2017
2017-12-20Permit EW — ISSUED
2017-12-20Permit EW — ISSUED
2017-12-19Permit EW — ISSUED
2017-12-18ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. PREMISES UNDER ALT 2 JOB #340374534 LOC FOLDE$500
2017-12-15DOB complaint, category ?
2017-12-12DOB violation E:
2017-12-12DOB violation E:
2017-12-12DOB violation E:
2017-12-12DOB violation E:
2017-12-12DOB violation E:
2017-12-07311: Non-Residential Heat — Inadequate or No Heat
2017-12-04Permit EW — ISSUED
2017-12-01Mortgage $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$132,593,477
2017-12-01Mortgage $62,969,799 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$62,969,799
2017-12-01AL&R $132,593,477 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$132,593,477
2017-12-01AL&R $62,969,799 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$62,969,799
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-12-01DOB violation E:
2017-11-29Job filed: PROPOSE NEW CONSTRUCTION OF PARTITIONS ON THE FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$100,000
2017-11-20Permit PL — ISSUED
2017-11-20Job filed: A2$5,000
2017-11-17Permit Supported Scaffold — Signed-off
2017-11-15Permit EW — ISSUED
2017-11-08Permit EQ — ISSUED
2017-11-01Permit EW — ISSUED
2017-11-01Permit EW — ISSUED
2017-10-26Permit Supported Scaffold — Signed-off
2017-10-25Permit EW — ISSUED
2017-10-25Permit EW — ISSUED
2017-10-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2017-10-23Permit PL — ISSUED
2017-10-20Job filed: CONNECT NEW GAS METER IN EXISTING GAS METER ROOM IN CELLAR RUN 2 1/2,GAS PIPIN G IN THE OPEN CELLAR TO 2 1/2 GAS PIPING RISER FROM CELLAR THE BUILDING$10,000
2017-10-20Job filed: CONNECT NEW GAS METER IN EXISTING GAS METER ROOM IN CELLAR RUN 2 1/2,GAS PIPIN G IN THE OPEN CELLAR TO 2 1/2 GAS PIPING RISER FROM CELLAR THE BUILDING$10,000
2017-10-20DOB complaint, category ?
2017-10-16Permit EW — ISSUED
2017-10-12Job filed: INSTALL FIRE SUPPRESSION SYSTEM. COOKING EQUIPMENT, GAS VALVE, HOOD AND DUCT WERE FILED UNDER APPL# 321418765. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2017-10-08Job filed: A2$410,000
2017-10-08Job filed: A2$410,000
2017-09-28Permit PL — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-21Cooling tower inspection — violation AH8E
2017-09-21Cooling tower inspection — violation AH8W
2017-09-21Cooling tower inspection — violation AH8B
2017-09-21Cooling tower inspection — violation AH8L
2017-09-21Cooling tower inspection — violation AH8U
2017-09-21Cooling tower inspection — violation AH8M
2017-09-21Cooling tower inspection — violation AH8X
2017-09-15Job filed: STRUCTURAL MODIFICATION AND REPAIR TO THE EXISTING FIRE ESCAPE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2017-09-13Job filed: - PROPOSE NEW BATHROOMS ON SIXTH FLOOR IN AN EXISTING SIX STORY BUILDING$106,500
2017-09-13Job filed: - PROPOSE NEW BATHROOMS ON SIXTH FLOOR IN AN EXISTING SIX STORY BUILDING$106,500
2017-09-06Permit EW — ISSUED
2017-09-01Permit EW — ISSUED
2017-09-01Permit EW — ISSUED
2017-08-31Job filed: CREATION OF FIRE PROTECTION PLANS (FPP) IN ACCORDANCE WITH SUBSEQUENT (FDNY)FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2017-08-30Permit EW — ISSUED
2017-08-29Job filed: A2$404,800
2017-08-29Job filed: A2$404,800
2017-08-28Permit EW — ISSUED
2017-08-24Permit PL — ISSUED
2017-08-24Permit PL — ISSUED
2017-08-23Job filed: -PROPOSE TO REPLACE EXISTING WINDOWS AND DOORS AND ADDING NEW DOOR IN A FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$200,000
2017-08-23Job filed: -PROPOSE TO REPLACE EXISTING WINDOWS AND DOORS AND ADDING NEW DOOR IN A FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$200,000
2017-08-23Job filed: -PROPOSE TO REPLACE EXISTING WINDOWS AND DOORS AND ADDING NEW DOOR IN A FIRST FLOOR IN AN EXISTING 6 STORY BUILDING$200,000
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-21Permit EW — ISSUED
2017-08-11Permit EW — ISSUED
2017-08-11Permit EW — ISSUED
2017-08-11Job filed: MECHANICAL WORK AND ASSOCIATED CUTTING & PATCHING FOR TWO RESTAURANTS AND TWO STORES. WORK INCLUDES INSTALLATION OF ROOFTOP A/C CONDENSERS, EXHAUS$896,750
2017-08-10FDNY inspection (FORTH)
2017-08-10FDNY inspection (SPECIAL-OTH)
2017-08-10Permit EW — ISSUED
2017-08-10Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2017-08-10Job filed: MODIFICATION TO THE FIRE ALARM SYSTEM TO THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2017-08-10Job filed: FILING FOR SPRINKLER MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2017-08-10Job filed: FILING FOR INTERIOR RENOVATIONS, DEMOLITION OF WALLS, FLOORS,CONSTRUCTION OF WALLS, FLOORS, CEILINGS AND REPLACEMENT OF FINISHES TO THE 6TH FLOOR AS P$275,000
2017-08-09Permit EW — ISSUED
2017-08-08FDNY inspection (FORTH)
2017-08-04ECB CLASS - 2 violation: FAILURE TO CONDUCT OR FILE FINAL INSP FOR COMPLETED WORK W/IN 1 YEAR OF PERMIT EXPIRATION. ALT JOB# 320179686 WHICH EXPIRED 6/26/1
2017-08-04ECB CLASS - 2 violation: FAILURE TO CONDUCT OR FILE A FINAL INSP FOR COMPLETED WORK W/IN 1 YEAROF PERMIT EXPIRATION ALT2 JOB# 320179695 WHICH EXPIRED 6/26/
2017-08-03DOB complaint, category ?
2017-08-03DOB complaint, category ?
2017-07-31Job filed: INSTALLATION OF AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH APPLICATION #321558961.,#321089816,#321626638. NO CHANGE IN USE,EGRESS OR OCCU$5,000
2017-07-31DOB violation C:
2017-07-27Permit EW — ISSUED
2017-07-27Permit EW — ISSUED
2017-07-26Job filed: APPLICATION FILED FOR INSTALLATION OF NEW FIVE (5) MINI SPLIT AIR CONDITIONING WALL MOUNTED UNITS CONNECTED TO ONE (1) 12 TON CONDENSER UNIT ON THE RO$18,000
2017-07-26Job filed: APPLICATION FILED FOR INSTALLATION OF NEW FIVE (5) MINI SPLIT AIR CONDITIONING WALL MOUNTED UNITS CONNECTED TO ONE (1) 12 TON CONDENSER UNIT ON THE RO$18,000
2017-07-24Permit PL — ISSUED
2017-07-24Job filed: FILE MECHANICAL AND SPRINKLER WORK TYPE IN CONJUNCTION WITH ALT 2 JOB #321558961. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$80,000
2017-07-24Job filed: FILE MECHANICAL AND SPRINKLER WORK TYPE IN CONJUNCTION WITH ALT 2 JOB #321558961. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$80,000
2017-07-21Job filed: HEREWITH FILING FOR BOB WILLIAMS STORE FITOUT-SPACE 1A . NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$105,000
2017-07-21Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$120,000
2017-07-21Job filed: HEREWITH FILING FOR BOB WILLIAMS STORE FITOUT-SPACE 1A . NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$105,000
2017-07-21Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$120,000
2017-07-20Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM IN BOB WILLIAMS STORE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS A$25,000
2017-07-19Permit EW — ISSUED
2017-07-19Permit EW — ISSUED
2017-07-18Permit EW — ISSUED
2017-07-17Permit EW — ISSUED
2017-07-14Job filed: HEREWITH FILING FOR PRE-BUILT SPACE TENANT FITOUT. NO CHANGE TO USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$300,000
2017-07-06Job filed: PROPOSED CONSTRUCTION OF PARTITIONS IN AN EXISTING 6 STORY BUILDING$50,000
2017-07-06Job filed: PROPOSED CONSTRUCTION OF PARTITIONS IN AN EXISTING 6 STORY BUILDING$50,000
2017-07-06Job filed: PROPOSED CONSTRUCTION OF PARTITIONS IN AN EXISTING 6 STORY BUILDING$50,000
2017-06-28Permit EW — ISSUED
2017-06-13Permit PL — ISSUED
2017-06-07Permit EW — ISSUED
2017-05-31Job filed: HEREWITH FILING NO WORK APPLICATION SOLELY TO OBTAIN EQUIPMENT USE PERMITS. ALL WORK WAS FILED, APPROVED AND PERMITTED UNDER APPLICATION 321309268. $1,000
2017-05-23Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE DETECTION & SPRINKLER FIRE ALARM SYSTEM.$25,000
2017-05-05DOB complaint, category ?
2017-05-01DOB complaint, category ?
2017-04-25DOB complaint, category ?
2017-04-21Permit PL — ISSUED
2017-04-18Permit EW — ISSUED
2017-04-17Job filed: INTERIOR RENOVATION FOR RESTAURANT ON 1ST FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$260,000
2017-04-17Job filed: INTERIOR RENOVATION FOR RESTAURANT ON 1ST FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$260,000
2017-04-14Permit EW — ISSUED
2017-04-14Job filed: A2$75,000
2017-04-05Permit PL — ISSUED
2017-03-31Permit PL — ISSUED
2017-03-29Permit EW — ISSUED
2017-03-29Job filed: PLANS AND APPLICATIONS FILED HEREWITH FOR AN INTERIOR RENOVATION TO AN EXISTING BUILDING. ALL WORK TO BE LOCATED ON 4TH FLOOR SUITE 4-4B AND 4-4C. N$997,000
2017-03-29Job filed: PLANS AND APPLICATIONS FILED HEREWITH FOR AN INTERIOR RENOVATION TO AN EXISTING BUILDING. ALL WORK TO BE LOCATED ON 4TH FLOOR SUITE 4-4B AND 4-4C. N$997,000
2017-03-21311: Street Condition — Pothole
2017-03-13311: Smoking — Smoking Violation
2017-03-06311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-02-24Permit EW — ISSUED
2017-02-17FDNY inspection (STRUC_INT)
2017-02-14Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2017-01-27Permit EW — ISSUED
2017-01-26Job filed: MODIFIDCATION OF MECAHNICAL SYSTEM. MODIFICATION OF PLUMBING SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$100,000
2017-01-26Job filed: MODIFIDCATION OF MECAHNICAL SYSTEM. MODIFICATION OF PLUMBING SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$100,000
2017-01-06Permit PL — ISSUED
2017-01-06Permit PL — ISSUED
2017-01-04Permit EW — ISSUED
2017-01-04Permit EW — ISSUED
2017-01-04Permit EW — ISSUED
2016
2016-12-22Job filed: A2$42,000
2016-12-22Job filed: A2$42,000
2016-12-22Job filed: A2$42,000
2016-12-16Job filed: FIRE ALARM FILED HEREWITH TO MAKE ADDITIONS/MODIFICATIONS TO THE EXISTING SYTEM$15,000
2016-12-16Job filed: FIRE ALARM FILED HEREWITH TO MAKE ADDITIONS/MODIFICATIONS TO THE EXISTING SYTEM$15,000
2016-12-15Job filed: A2$387,840
2016-12-07Permit EW — ISSUED
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-29Permit EW — ISSUED
2016-11-23Agreement — from BANK OF CHINA, NEW YORK BRANCH to CREATIVE I.C., L.P.
2016-11-14Permit EQ — ISSUED
2016-11-14Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON 6TH FLOOR.$8,000
2016-11-14Job filed: INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS FOR NEW BUILDING. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOL
2016-11-04Permit EW — ISSUED
2016-11-04Permit EW — ISSUED
2016-11-01DOB violation E:
2016-11-01DOB violation E:
2016-10-31DOB violation E:
2016-10-31DOB violation E:
2016-10-28311: Street Condition — Pothole
2016-10-28Permit EW — ISSUED
2016-10-27Job filed: RENOVATION OF TENANT SPACE ON 6TH FLOOR. INSTALLATION PLUMBING AND KITCHEN FIXTURES, NEW MECHANICAL EXHAUST SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUP$59,500
2016-10-27Job filed: RENOVATION OF TENANT SPACE ON 6TH FLOOR. INSTALLATION OF PARTITIONS, HUNG CEIL INGS, WALL AND FLOOR FINISHES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UN$18,000
2016-10-27Job filed: RENOVATION OF TENANT SPACE ON 6TH FLOOR. INSTALLATION PLUMBING AND KITCHEN FIXTURES, NEW MECHANICAL EXHAUST SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUP$59,500
2016-10-20Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$149,600
2016-10-20Job filed: HEREWITH FILING MECHANICAL AND PLUMBING WORK AS PER PLANS.$280,500
2016-10-20Job filed: A2$491,200
2016-10-19Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM IN THE EVERGREEN E ARCHECTURAL SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$107,200
2016-10-19Job filed: HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM IN THE EVERGREEN E ARCHECTURAL SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$107,200
2016-10-19Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$18,500
2016-10-18Rodent inspection: Passed
2016-10-14Permit EW — ISSUED
2016-10-14Job filed: REPAIR OF 4TH FLOOR PEDESTRIAN BRIDGE AS PER PLANS. NO CHANGE IN EGRESS OR OCCUPANCY$50,000
2016-10-07311: Dirty Conditions — E1 Improper Disposal
2016-09-28311: Rodent — Condition Attracting Rodents
2016-09-27Permit PL — ISSUED
2016-09-22Permit EW — ISSUED
2016-09-12Permit EW — ISSUED
2016-09-12Permit EW — ISSUED
2016-09-12Permit EW — ISSUED
2016-09-12Permit EW — ISSUED
2016-09-05Job filed: INTERIOR RENOVATION AT PARTIAL 2ND FLOOR AT EXISTING 6 STORY BUILDING, WORK INCLUDES NEW BATHROOMS AND NEW MECH VENTS$200,000
2016-09-05Job filed: INTERIOR RENOVATION AT PARTIAL 2ND FLOOR AT EXISTING 6 STORY BUILDING, WORK INCLUDES NEW BATHROOMS AND NEW MECH VENTS$200,000
2016-08-29Permit EW — ISSUED
2016-08-29Permit EW — ISSUED
2016-08-24Air permit (WORK PERMIT), fuel: NONE
2016-08-24311: Illegal Parking — Commercial Overnight Parking
2016-08-24Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$199,935
2016-08-24Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$199,935
2016-08-23Permit PL — ISSUED
2016-08-17Permit EW — ISSUED
2016-08-16Permit EW — ISSUED
2016-07-27Permit EW — ISSUED
2016-07-27Permit EW — ISSUED
2016-07-26Permit PL — ISSUED
2016-07-26Permit EW — ISSUED
2016-07-25Permit EW — ISSUED
2016-07-22Permit EW — ISSUED
2016-07-22Permit EW — ISSUED
2016-07-22Permit EW — ISSUED
2016-07-22Permit EW — ISSUED
2016-07-22Permit EW — ISSUED
2016-07-22Permit EW — ISSUED
2016-07-21Job filed: APPLICATION FILED FOR INSTALLATION OF ONE (1) NEW PACKAGED AIR COOLED AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIF$45,000
2016-07-21Job filed: APPLICATION FILED FOR INSTALLATION OF ONE (1) NEW PACKAGED AIR COOLED AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFIC$30,000
2016-07-21Job filed: APPLICATION FILED FOR INSTALLATION OF ONE (1) NEW PACKAGED AIR COOLED AIR CONDITIONING UNIT. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIF$30,000
2016-07-21Job filed: INSTALL FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2016-07-14Job filed: INSTALLATION OF MANUAL / AUTOMATIC SMOKE DETECTION SYSTEM$2,503
2016-07-14Job filed: MANUAL, AUTOMATIC, SMOKE DETECTION AND SRPINKLER FIRE ALARM SYSTEM$276,000
2016-07-14Job filed: INSTALLATION OF MANUAL / AUTOMATIC SMOKE DETECTION SYSTEM$2,503
2016-07-14Job filed: INSTALLATION OF MANUAL / AUTOMATIC SMOKE DETECTION SYSTEM$2,503
2016-07-12Permit PL — ISSUED
2016-07-12Permit EW — ISSUED
2016-07-12Permit EW — ISSUED
2016-07-11Permit EW — ISSUED
2016-07-11Permit EW — ISSUED
2016-07-11Job filed: PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH.$234,750
2016-07-11Job filed: PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH.$234,750
2016-07-11Job filed: PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH.$234,750
2016-07-08Permit EW — ISSUED
2016-07-08Permit EW — ISSUED
2016-07-08Permit EW — ISSUED
2016-07-08Permit EW — ISSUED
2016-07-08Permit EW — ISSUED
2016-07-08Permit EW — ISSUED
2016-07-05FDNY inspection (STRUC_INT)
2016-06-22Permit PL — ISSUED
2016-06-22Permit EW — ISSUED
2016-06-16Permit EW — ISSUED
2016-06-15Permit EW — RE-ISSUED
2016-06-15Permit EW — RE-ISSUED
2016-06-14Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$200,000
2016-06-14Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$200,000
2016-06-14Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$200,000
2016-06-14Job filed: HEREWITH FILING FOR ELECTRICAL DISTRIBUTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$500,000
2016-06-14Job filed: HEREWITH FILING FOR ELECTRICAL DISTRIBUTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$500,000
2016-06-14Job filed: HEREWITH FILING FOR ELECTRICAL DISTRIBUTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$500,000
2016-06-14Job filed: HEREWITH FILING STRUCTURAL WORK AS PER PLANS.$200,000
2016-06-09Agreement — from BANK OF CHINA, NEW YORK BRANCH to THE GAP, INC.
2016-06-06Permit EW — ISSUED
2016-06-03Job filed: RENOVATION OF TENANT SPACE LOCATED ON THE 004 FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$720,000
2016-06-03Job filed: RENOVATION OF TENANT SPACE LOCATED ON THE 004 FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$720,000
2016-06-03Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF TENANT SPACE LOCATED ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$59,000
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-05-31Job filed: WE ARE REQUESTING TO AMEND SECTION 22 TO STATE #3243547. THANK YOU IN ADVANCE.$93,500
2016-05-31Job filed: WE ARE REQUESTING TO AMEND SECTION 22 TO STATE #3243547. THANK YOU IN ADVANCE.$93,500
2016-05-25Job filed: #7691A - SUBSEQUENT APPLICANT FILING FOR LIGHTING MODIFICATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$125,000
2016-05-25Job filed: #7691A - SUBSEQUENT APPLICANT FILING FOR MECHANICAL AND PLUMBING MODIFICATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$82,584
2016-05-25Job filed: #7691A - SUBSEQUENT APPLICANT FILING FOR STRUCTURAL MODIFICATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$65,000
2016-05-25Job filed: A2$603,417
2016-05-16Permit EW — ISSUED
2016-05-16Permit EW — ISSUED
2016-05-12Permit EW — ISSUED
2016-05-12Permit EW — ISSUED
2016-05-10Permit PL — ISSUED
2016-05-10Permit EQ — ISSUED
2016-05-06Job filed: ADDITION OF MANUAL/AUTOMATIC AND WATERFLOW TO THE EXISTING BASE BUILDING FIRE ALARM SYSTEM, NO CHANGE TO OCCUPANCY USE OR EGRESS$14,250
2016-05-05Permit EW — ISSUED
2016-05-05Permit EW — ISSUED
2016-04-25Permit PL — ISSUED
2016-04-21Permit EW — ISSUED
2016-04-21Permit PL — ISSUED
2016-04-21Permit EW — ISSUED
2016-04-21Job filed: A2$107,000
2016-04-21Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$486,000
2016-04-21Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$486,000
2016-04-15Permit EW — ISSUED
2016-04-14Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED$72,500
2016-04-14Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED$72,500
2016-04-12DOB violation C:
2016-04-11Job filed: PLANS AND APPLICATIONS FILED HEREWITH FOR AN INTERIOR RENOVATION TO AN EXISTING BUILDING. ALL WORK TO BE LOCATED ON 4TH FLOOR SUITE 4-4BE. NO CHANGE$334,000
2016-04-08DOB complaint, category ?
2016-03-25Job filed: PA
2016-03-25Job filed: PA
2016-03-09Permit PL — ISSUED
2016-03-08Permit EW — ISSUED
2016-03-08Permit EW — ISSUED
2016-03-08Job filed: IN CONJUNCTION WITH DOB# 321229318 & 321273484. FILING IS FOR INSTALLATION OF OPEN FACE PAINT SPRAY BOOTH, LOCATED ON 4TH FLOOR OF BUILDING, NO HE$25,000
2016-03-08Job filed: IN CONJUNCTION WITH DOB# 321229318 & 321273484. FILING IS FOR INSTALLATION OF OPEN FACE PAINT SPRAY BOOTH, LOCATED ON 4TH FLOOR OF BUILDING, NO HE$25,000
2016-03-04Permit EW — ISSUED
2016-03-04Permit EW — ISSUED
2016-03-04Permit PL — ISSUED
2016-03-04Permit EW — ISSUED
2016-03-04Permit EW — ISSUED
2016-03-04Permit EW — ISSUED
2016-03-02Agreement — from BANK OF CHINA to NYU HOSPITALS CENTER; 1-10 BUSH TERMINAL OWNER LP
2016-02-24Permit EW — ISSUED
2016-02-23Permit EW — ISSUED
2016-02-22Permit EW — ISSUED
2016-02-22Permit EW — ISSUED
2016-02-22Permit EW — ISSUED
2016-02-19Permit EW — ISSUED
2016-02-10Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$85,000
2016-02-09Job filed: FILING HEREWITH GENERAL CONSTRUCTION AS PER SUBMITTED PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$3,795,000
2016-02-09Job filed: FILING HEREWITH STRUCTURAL WORK AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$35,000
2016-02-09Job filed: FILING HEREWITH MECHANICAL AND PLUMBING WORK AS NOTED ON PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,064,000
2016-02-09Job filed: FILING HEREWITH SPRINKLER WORK AS PER SUBMITTED PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$224,250
2016-02-09Job filed: FILING HEREWITH SPRINKLER WORK AS PER SUBMITTED PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$20,250
2016-02-09Job filed: FILING HEREWITH SPRINKLER WORK AS PER SUBMITTED PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$20,250
2016-02-09Job filed: ADDITION/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM.$35,000
2016-02-08Job filed: FILING HEREWITH MECHANICAL AND PLUMBING WORK AS NOTED ON PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$365,000
2016-02-08Job filed: FILING HEREWITH STRUCTURAL WORK AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$38,000
2016-02-08Job filed: FILING HEREWITH GENERAL CONSTRUCTION AS PER SUBMITTED PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,100,000
2016-02-08Job filed: ADDITIONS/ MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$12,000
2016-02-01Permit PL — ISSUED
2016-01-22Job filed: PLUMBING, MECHANICAL, AND SPRINKLER PLANS BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION TO REMODEL EXISTING MANUFACTURING SPACE ON THE THIR$213,500
2016-01-21Permit EW — ISSUED
2016-01-21Permit EW — ISSUED
2016-01-21Job filed: INSTALLATION OF COL-MET PAINT SPRAY BOOTH. INSTALL (2) SPRINKLER HEADS IN SPRAY BOOTH CONNECTED TO EXISTING BUILDING SPRINKLER SUPPLY.$28,000
2016-01-21Job filed: INSTALLATION OF COL-MET PAINT SPRAY BOOTH. INSTALL (2) SPRINKLER HEADS IN SPRAY BOOTH CONNECTED TO EXISTING BUILDING SPRINKLER SUPPLY.$28,000
2016-01-12311: Consumer Complaint — Damaged/Defective Goods
2015
2015-12-29Permit EW — ISSUED
2015-12-17Agreement $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$197,500,000
2015-12-17Mortgage $31,829,268 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$31,829,268
2015-12-17AL&R $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$93,670,732
2015-12-17Mortgage $93,670,732 — from 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$93,670,732
2015-12-17AL&R $197,500,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$197,500,000
2015-12-17AL&R $31,829,268 — from 1-10 BUSH TERMINAL OWNER LP; 19-20 BUSH TERMINAL OWNER LP to BANK OF CHINA, NEW YORK BRANCH$31,829,268
2015-12-17Mortgage assigned — from SAF WATERFRONT LLC; EIGHT PLACE LLC; FBE BUSH LLC; FED SECOND AVE. LLC to BANK OF CHINA, NEW YORK BRANCH
2015-12-17Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION to EIGHT PLACE LLC; FED SECOND AVE LLC; FBE BUSH LLC; SAF WATERFRONT LLC
2015-12-15Permit AL — ISSUED
2015-12-08Permit EW — ISSUED
2015-12-07Permit EW — ISSUED
2015-12-01Permit EW — ISSUED
2015-12-01Permit EW — ISSUED
2015-12-01Permit EW — ISSUED
2015-12-01Permit EW — ISSUED
2015-11-24Permit EW — ISSUED
2015-11-24Permit EW — ISSUED
2015-11-16Job filed: MODIFY/RECONFIGURE EXISTING SPRINKLER SYSTEM AT THE 4TH FLOOR IN CONJUNCTION WITH INTERIOR RENOVATION OF 4TH FLOOR INDUSTRIAL TENANT SPACE DOB # 32122$65,518
2015-11-16Job filed: MODIFY/RECONFIGURE EXISTING SPRINKLER SYSTEM AT THE 4TH FLOOR IN CONJUNCTION WITH INTERIOR RENOVATION OF 4TH FLOOR INDUSTRIAL TENANT SPACE DOB # 32122$65,518
2015-11-16Job filed: MODIFY/RECONFIGURE EXISTING SPRINKLER SYSTEM AT THE 4TH FLOOR IN CONJUNCTION WITH INTERIOR RENOVATION OF 4TH FLOOR INDUSTRIAL TENANT SPACE DOB # 32122$65,518
2015-11-11Job filed: INTERIOR RENOVATION AT PARTIAL 2ND FLOOR AT EXISTING 6 STORY BUILDING$87,000
2015-10-22Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$26,000
2015-10-21Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$16,000
2015-10-19Job filed: HEREWITH FILING INSTALLATION OF EXTERIOR STAIR IN CONJUNCTION WITH ALT I# 321089816 NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$100,000
2015-10-14Permit EW — ISSUED
2015-10-14Permit EW — ISSUED
2015-10-14Permit EW — ISSUED
2015-10-13Permit EW — ISSUED
2015-10-13Permit EW — ISSUED
2015-10-13Permit PL — ISSUED
2015-10-06Permit EW — ISSUED
2015-10-06Permit EW — ISSUED
2015-10-06Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$490,000
2015-10-06Job filed: MODIFICATIONS TO HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$100,000
2015-09-23311: Food Poisoning — 3 or More
2015-09-22Job filed: MANUAL / AUTOMATIC SMOKE DETECTION & SPRINKLER FIRE ALARM SYSTEM.$248,000
2015-09-22Job filed: MANUAL / AUTOMATIC SMOKE DETECTION & SPRINKLER FIRE ALARM SYSTEM.$248,000
2015-09-15Permit EW — ISSUED
2015-09-11Permit EW — ISSUED
2015-09-11Permit PL — ISSUED
2015-09-11Permit EW — ISSUED
2015-09-11Permit EW — ISSUED
2015-09-10311: Elevator — Elevator - Defective/Not Working
2015-09-10DOB complaint, category ?
2015-09-04Permit EW — ISSUED
2015-09-03Job filed: NEW CONSTRUCTION OF INTERIOR PARTITIONS AT PARTIAL 3RD FLOOR AT EXISTING 6 STORY BUILDING. NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION$31,900
2015-09-02Job filed: INTERIOR RENOVATION TO EXISTING 4TH FLOOR INDUSTRIAL TENANT SPACE. GENERAL CONSTRUCTION OF PARTITIONS, DOORS, FINISHES. NO CHANGE TO USE EGRESS OR OCC$541,000
2015-09-02Job filed: MECHANICAL AND PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING 4TH FLOOR INDUSTRIAL TENANT SPACE. NO CHANGE TO USE, EGRESS OR $99,000
2015-08-20FDNY inspection (OTHER)
2015-08-19Job filed: REPLACE (2) EXISTING LOW PRESSURE BOILERS AND (2) GAS/OIL BURNERS. CONNECT BURNERS TO EXISTING GAS PIPING. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. $4,000
2015-08-14311: Derelict Vehicle — With License Plate
2015-08-12Permit PL — ISSUED
2015-07-22DOB violation E:
2015-07-22DOB violation E:
2015-07-22DOB violation E:
2015-07-22DOB violation E:
2015-07-22DOB violation E:
2015-07-22Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH$125,000
2015-07-22Job filed: ADDITIONS/ MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM, IN CONJUNCTION WITH ALTERATION TYPE 2. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$10,000
2015-07-20Permit PL — ISSUED
2015-07-20Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH.$125,000
2015-07-13Job filed: PLUMBING, MECHANICAL, AND SPRINKLER PLANS BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION TO REMODEL EXISTING MANUFACTURING SPACE ON THE THIR$213,500
2015-07-10Permit EW — ISSUED
2015-07-09Job filed: RENOVATE OFFICE SPACE ON THIRD FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$630,000
2015-07-09Job filed: RENOVATE OFFICE SPACE ON THIRD FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$630,000
2015-06-30FDNY inspection (SPECIAL-OTH)
2015-06-30Permit EW — ISSUED
2015-06-26Job filed: ARCHITECTURAL WORK DONE TO TIOLET ROOMS IN COURTYARD OF BUILDING 4, AS PER PLANS FILED HEREWITH.$58,750
2015-06-26Job filed: INSTALLATION OF NEW BATHROOMS IN COURT YARD OF BUILDING 4 AS PER ATTACHED PALNS$28,750
2015-06-26Job filed: ARCHITECTURAL WORK DONE TO TIOLET ROOMS IN COURTYARD OF BUILDING 4, AS PER PLANS FILED HEREWITH.$58,750
2015-06-26Job filed: ARCHITECTURAL WORK DONE TO TIOLET ROOMS IN COURTYARD OF BUILDING 4, AS PER PLANS FILED HEREWITH.$58,750
2015-06-26Job filed: INSTALLATION OF TOILET ROOMS IN COURTYARD BUILDING 3 AS PER PLANS FILED HEREWITH.$28,750
2015-06-24Permit EW — ISSUED
2015-06-24Permit EW — ISSUED
2015-06-24Permit EW — ISSUED
2015-06-24Job filed: ARCHITECTURAL WORK AS PER PLANS FILED HEREWITH.$58,750
2015-06-15ECB CLASS - 2 violation: 16R07,67X10. 16R-PROVIDE SW ON REAR H.W. DOOR IN THE TOP OF THE H.W.; 67X-REPAIR PHONE SYSTEM IN THE CAR.
2015-06-09311: Street Condition — Pothole
2015-05-28Permit EQ — ISSUED
2015-05-28Job filed: NETTING SYSTEM PROPOSED INSTALLATION OF NETTING SYSTEM AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
2015-05-27Permit EW — ISSUED
2015-05-27Permit EW — ISSUED
2015-05-21Permit PL — ISSUED
2015-05-19Permit SG — ISSUED
2015-05-19Permit SG — ISSUED
2015-05-19Permit SG — ISSUED
2015-05-19Permit SG — ISSUED
2015-05-13Permit EW — ISSUED
2015-05-12311: Consumer Complaint — Exchange/Refund/Return
2015-05-07FDNY inspection (SPECIAL-OTH)
2015-05-04Job filed: NEW CONSTRUCTION OF INTERIOR PARTITIONS AT PARTIAL 3RD FLOOR AT EXISTING 6 STORY BUILDING. NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION$62,000
2015-04-28Permit EW — ISSUED
2015-04-08Job filed: MODIFICATIONS TO EXISTING SPRINKLER ALARM AND COC TO INCLUDE CONNECTION TO EXI STING MONITORING PANEL AND ADD POWER SUPPLY PANEL TO DRIVE AUDIBLE/VISU$20,000
2015-03-26Permit EW — ISSUED
2015-03-25Permit PL — ISSUED
2015-03-24Job filed: RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AND LOBBY RENOVATIONS INCLUDING CHANGE IN EGRESS AS PER PLANS FILE$365,000
2015-03-24Job filed: RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AND LOBBY RENOVATIONS INCLUDING CHANGE IN EGRESS AS PER PLANS FILE$365,000
2015-03-19Permit PL — ISSUED
2015-03-17Job filed: LANDSCAPE IMPROVEMENTS FOR COURTYARD 3 & 4 AS PER PLANS FILED HEREWITH.$350,000
2015-03-16Permit EW — ISSUED
2015-03-16Permit EW — ISSUED
2015-03-11Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$186,000
2015-03-11Job filed: 3RD FLOOR MECHANICAL/PLUMBING WORK AS PER PLANS FILED HEREWITH.$47,500
2015-03-11Job filed: INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH.$186,000
2015-03-11Job filed: 3RD FLOOR MECHANICAL/PLUMBING WORK AS PER PLANS FILED HEREWITH.$47,500
2015-03-05Permit EW — ISSUED
2015-03-05Permit EW — ISSUED
2015-03-05Job filed: FILING HEREWITH FOR CHANGE OF USE ON THE THIRD FLOOR AS PER PLANS$321,141
2015-03-05Job filed: FILING HEREWITH FOR CHANGE OF USE ON THE THIRD FLOOR AS PER PLANS$321,141
2015-03-04Permit EW — ISSUED
2015-03-04Job filed: PROPOSED TENANT BUILDOUT TO AN EXISTING FACTORY SPACE. THERE IS NO CHANGE TO OCCUPANCY USE OR EGRESS.$1,000,000
2015-03-04Job filed: GENERAL PLUMBING MECHANICAL AND SPRINKLER MODIFICATIONS IN SUPPORT OF PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED. THERE IS NO$155,000
2015-03-04Job filed: STRUCTURAL FRAMING IN SUPPORT OF PROPOSED RENOVATION OF EXISTING FACTORY SPACE AS PER PLANS FILED. THERE IS NO CHANGE TO OCCUPANCY USE OR EGRESS.$45,000
2015-03-03Permit EW — ISSUED
2015-03-03Permit EW — ISSUED
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-02Permit EW — ISSUED
2015-03-02Permit PL — ISSUED
2015-03-02Permit EW — ISSUED
2015-02-27Permit EW — ISSUED
2015-02-23Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON FLOOR 006 ALL AS PER PLAN. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$54,000
2015-02-23Job filed: INTERIOR RENOVATION TO EXISTING INDUSTRIAL SPACE. INTERIOR PARTITION ALTERATIONS MINOR PLUMBING, MECHANICAL AND STRUCTURAL, ALL AS PER PLAN. NO CHANGE$269,000
2015-02-23Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON FLOOR 006 ALL AS PER PLAN. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$54,000
2015-02-20Job filed: INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321008501.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2015-02-20Job filed: INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#321008501.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2015-02-18311: Blocked Driveway — No Access
2015-02-18Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM IN BUILDINGS 3 AND 4 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$14,500
2015-02-18Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN BUILDINGS 3 AND 4 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$46,000
2015-02-18Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN BUILDINGS 3 AND 4 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$46,000
2015-02-13Job filed: GENERAL PLUMBING MECHANICAL AND SPRINKLER MODIFICATIONS IN SUPPORT OF PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED
2015-02-13Job filed: GENERAL PLUMBING MECHANICAL AND SPRINKLER MODIFICATIONS IN SUPPORT OF PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED
2015-02-13Job filed: GENERAL PLUMBING MECHANICAL AND SPRINKLER MODIFICATIONS IN SUPPORT OF PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED
2015-02-13Job filed: INTERIOR RENOVATIONS INCLUDING NEW INTERIOR DEMISING WALLS AND FINISHES AND NEW STORE FRONTS AND EXTERIOR WINDOWS AND COURTYARD CONSTRUCTION IN BUILDI$200,000
2015-02-13Job filed: STRUCTURAL MODIFICATIONS INCLUDING NEW ELEVATED CONCRETE SLAB-ON-GRADE AND ALTERATION OF EXISTING EXTERNAL FIRE ESCAPES IN BUILDINGS 3 AND 4 AS PER PL$200,000
2015-02-13Job filed: PROPOSED TENANT BUILDOUT TO EXISTING COMMERICAL SPACE AS PER PLANS$1,200,000
2015-02-13Job filed: STRUCTURAL FRAMING IN SUPPORT OF PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED
2015-02-13Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OR OCCUPANCY UNDER THIS APPLICATION.$122,000
2015-02-04311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-02-04DOB complaint, category ?
2015-01-29311: Blocked Driveway — No Access
2015-01-28Permit EW — ISSUED
2015-01-23311: Blocked Driveway — No Access
2015-01-22Job filed: INSTALL INTERIOR NON-BEARING PARTITIONS, PLUMBING AND HVAC AS PER PLANS FOR 5TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$85,000
2015-01-22Job filed: INSTALL INTERIOR NON-BEARING PARTITIONS, PLUMBING AND HVAC AS PER PLANS FOR 5TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$85,000
2015-01-13Permit EW — ISSUED
2015-01-13Permit EW — ISSUED
2015-01-09Permit EW — ISSUED
2015-01-09Permit EW — ISSUED
2014
2014-12-31Permit PL — ISSUED
2014-12-30Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AS PER PLANS FILED HEREWI$300,000
2014-12-30Job filed: RENOVATION OF EXISTING AND CONSTRUCTION OF NEW ELEVATED LOADING DOCKS AND PLATFORMS AND LOBBY RENOVATIONS INCLUDING CHANGE IN EGRESS AS PER PLANS FILE$250,000
2014-12-26Job filed: 3RD FLOOR MECHANICAL/PLUMBING WORK AS FILED HEREWITH.$47,500
2014-12-18Permit EW — ISSUED
2014-12-18Permit PL — ISSUED
2014-12-16Permit EW — ISSUED
2014-12-12Job filed: MECHANICAL WORK (AS PER PLANS)$15,000
2014-12-12Job filed: STRUCTURAL WORK AS PER PLANS FILED HEREWITH$20,000
2014-12-09Job filed: INTERIOR/EXTERIOR RENOVATIONS AS PER PLANS$225,000
2014-12-09Job filed: INTERIOR/EXTERIOR RENOVATIONS AS PER PLANS$225,000
2014-12-05Job filed: 3RD FLOOR ARCHITECTURAL WORK AS PER PLANS FILED HEREWITH.$186,000
2014-12-02Job filed: GROUND FLOOR MECHANICAL (AS PER PLANS)$15,000
2014-11-13Permit EW — ISSUED
2014-11-10Job filed: INSTALLATION OF NEW SINK, REFRIG, ELECT. HWH AND WATER PIPING.$3,800
2014-11-10Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH REMOVING AND INSTALLING NON-BEARING PARTITIONS.$64,000
2014-11-10ECB CLASS - 2 violation: 67X10 REPAIR EMERGENCY PHONE.
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-29Permit EW — ISSUED
2014-10-29Permit EW — ISSUED
2014-10-29Permit EW — ISSUED
2014-10-17Job filed: A2$52,000
2014-10-17Job filed: A2$52,000
2014-10-17Job filed: GENERAL CONSTRUCTION AND INTERIOR NON-LOAD BEARING PARTITION WORK AT THE FIRST FLOOR BUILDING 4 SECTION C. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPA$400,000
2014-10-17Job filed: INSTALLATION OF STRUCTURAL STEEL FRAMING AT ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$13,000
2014-10-17Job filed: GENERAL CONSTRUCTION AND INTERIOR NON-LOAD BEARING PARTITION WORK AT THE FIRST FLOOR BUILDING 4 SECTION C. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPA$400,000
2014-10-17Job filed: INSTALLATION OF NEW HVAC UNITS WITH DUCT WORK, CHANGES TO INTERIOR LIGHTING FIXTURE AND/OR CONTROLS, AND INSTALLATION OF PLUMBING FIXTURES AS PER ACCO$427,000
2014-10-03311: Traffic — Congestion/Gridlock
2014-10-03311: Blocked Driveway — No Access
2014-09-24ECB CLASS - 2 violation: 16B07 - PROVIDE A SWITCH AND SEAL SHUT THE TOP REAR H.W. DOOR.
2014-07-08Permit EW — ISSUED
2014-07-07DOB violation E:
2014-07-07DOB violation E:
2014-07-07DOB violation E:
2014-07-07DOB violation E:
2014-07-07DOB violation E:
2014-07-07DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-07-03DOB violation E:
2014-06-26Permit PL — ISSUED
2014-06-24Permit EW — ISSUED
2014-06-09Permit EW — ISSUED
2014-05-30Job filed: INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-23FDNY inspection (RISK)
2014-05-09Job filed: MECH FILING IN CONJUNCTION WITH ALT 2 FILING, JOB NUMBER 340133572$40,000
2014-05-09Job filed: MECH FILING IN CONJUNCTION WITH ALT 2 FILING, JOB NUMBER 340133572$40,000
2014-05-05Permit PL — ISSUED
2014-05-05Job filed: DEMOLITION AND INSTALLATION OF INTERIOR PARTITIONS, RELOCATE, REPLACE AND CAP PLUMBING FIXTURES AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPAN$65,000
2014-04-28Permit EW — ISSUED
2014-04-07Job filed: INTERIOR FIT OUT OF EXISTING MANUFACTURING USE FOR THE USE OF A CHOCOLATE FACTORY.$76,600
2014-04-07Job filed: INTERIOR FIT OUT OF EXISTING MANUFACTURING USE FOR THE USE OF A CHOCOLATE FACTORY.$76,600
2014-02-26Permit EQ — ISSUED
2014-02-26Permit EQ — ISSUED
2014-01-24311: HEATING — HEAT
2014-01-24Tenant complaint: HEATING — HEAT RELATED
2013
2013-12-19311: General Construction/Plumbing — Facade - Defective/Cracking (Ll11/98)
2013-12-19DOB complaint, category ?
2013-12-16311: Blocked Driveway — No Access
2013-12-05311: Noise — Noise: Construction Equipment (NC1)
2013-12-05311: General Construction/Plumbing — Adjacent Buildings Not Protected
2013-12-05DOB complaint, category ?
2013-12-03Permit EQ — ISSUED
2013-11-25Permit EQ — ISSUED
2013-11-22Permit EQ — ISSUED
2013-11-20Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-11-20Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-11-20Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-11-20Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-11-15311: Street Condition — Pothole
2013-08-30ASPM $300,000,000 — from 19-20 BUSH TERMINAL OWNER LP; 1-10 BUSH TERMINAL OWNER LP to U.S. BANK NATIONAL ASSOCIATION$300,000,000
2013-08-30Deed — from 1-10 INDUSTRY ASSOCIATES LLC
2013-08-30Deed — from 1-10 INDUSTRY ASSOCIATES LLC to 1-10 INDUSTRY ASSOCIATES LLC
2013-07-12Permit EQ — ISSUED
2013-07-05Permit EW — ISSUED
2013-07-01Permit EQ — ISSUED
2013-07-01Permit EW — ISSUED
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-18DOB violation E:
2013-06-12DOB violation E:
2013-06-12DOB violation E:
2013-06-12DOB violation E:
2013-06-12DOB violation E:
2013-06-12DOB violation E:
2013-06-12DOB violation E:
2013-06-12DOB violation E:
2013-06-11Permit EQ — ISSUED
2013-05-21Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2013-05-21Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2013-05-10Permit EQ — ISSUED
2013-05-10Permit EQ — ISSUED
2013-05-09FDNY inspection (SPECIAL-OTH)
2013-04-26Job filed: INSTALLATION OF SIDEWALK BRIDGE.
2013-04-26Job filed: INSTALLATION OF FENCE
2013-04-26Job filed: INSTALLATION OF SIDEWALK BRIDGE.
2013-04-26Job filed: INSTALLATION OF FENCE
2013-04-26Job filed: INSTALLATION OF SIDEWALK BRIDGE.
2013-04-25Permit EW — ISSUED
2013-04-25Job filed: INSTALLATION OF FENCE
2013-04-25Job filed: INSTALLATION OF SIDEWALK BRIDGE.
2013-04-25Job filed: INSTALLATION OF SIDEWALK BRIDGE.
2013-04-25Job filed: INSTALLATION OF FENCE
2013-04-16Permit EW — ISSUED
2013-04-11FDNY inspection (SPECIAL-OTH)
2013-02-05311: Blocked Driveway — No Access
2012
2012-12-21DOB violation E:
2012-12-21DOB violation E:
2012-12-21DOB violation E:
2012-12-21DOB violation E:
2012-12-21DOB violation E:
2012-12-21DOB violation E:
2012-12-21DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-12-20DOB violation E:
2012-11-23311: HEATING — HEAT
2012-11-23Tenant complaint: HEATING — HEAT RELATED
2012-09-04311: Blocked Driveway — No Access
2012-08-31Rodent inspection: Passed
2012-08-23311: Street Condition — Pothole
2012-08-17311: Rodent — Rat Sighting
2012-07-11DOB complaint, category ?
2012-06-23311: Consumer Complaint — Non-Delivery Goods/Services
2012-06-11Mortgage assigned — from GCCFC 2007-GG11 BROOKLYN INDUSTRIAL, LLC to U.S. BANK NATIONAL ASSOCIATION
2012-06-11311: Consumer Complaint — Non-Delivery Goods/Services
2012-04-23Agreement $300,000,000 — from GCCFC 2007-GG11 BROOKLYN INDUSTRIAL, LLC to 1-10 INDUSTRY ASSOCIATES LLC; 19-20 INDUSTRY CITY ASSOCIATES LLC$300,000,000
2012-03-26311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2012-03-26ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL OR APPURTENANCES. NOTED: AT ROOF LEVEL STEEL BRACKET CONSISTING OF STEEL ANGLE IRON DEFECTIVE STEEL$1,000
2012-03-26DOB complaint, category ?
2012-02-01ECB CLASS - 2 violation: 76H11,05J01: 76H;REPLACE TILLER/TAIL ROPE. 05J;LUBE GATE GUIDES
2012-01-23311: Non-Residential Heat — Inadequate or No Heat
2012-01-17311: Consumer Complaint — Non-Delivery Goods/Services
2012-01-09ECB CLASS - 1 violation: 100B07- FAILURE TO PROPERLY SAFEGUARD ALL PERSONS. UNSAFE USE OF ELEVATOR. FAILURE TO SAFELY BARRICADE HOISTWAY ENTRANCES. THIS IS$2,400
2012-01-06DOB complaint, category ?
2011
2011-12-31311: Blocked Driveway — No Access
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-12311: Consumer Complaint — Non-Delivery Goods/Services
2011-09-22Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to GCCFC 2007-GG11 BROOKLYN INDUSTRAIL, LLC
2011-09-22311: Consumer Complaint — Non-Delivery Goods/Services
2011-09-19311: Consumer Complaint — Non-Delivery Goods/Services
2011-09-06ECB CLASS - 2 violation: 67M07 70O02 77M07 100M07. 67M-CAR EMER PHONE. 77M-TOE GUARD. 100M-PROVIDE COUNTER WEIGHT GUARD.$500
2011-08-08311: Consumer Complaint — Non-Delivery Goods/Services
2011-07-27Permit EW — ISSUED
2011-07-27Permit EW — ISSUED
2011-07-27Permit PL — ISSUED
2011-07-13311: Consumer Complaint — Non-Delivery Goods/Services
2011-07-13Job filed: INSTALL GAS FIRED PACKAGE BOILER, NEW GAS PIPING AND NEW GAS METER, AND BOILER ROOM ENCLOSURE.$15,000
2011-07-13Job filed: INSTALL GAS FIRED PACKAGE BOILER, NEW GAS PIPING AND NEW GAS METER, AND BOILER ROOM ENCLOSURE.$15,000
2011-04-20311: Street Condition — Pothole
2011-04-12DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-11DOB violation E:
2011-04-08DOB violation E:
2011-04-08DOB violation E:
2011-04-08DOB violation E:
2011-03-24311: Street Condition — Pothole
2011-02-27311: Noise - Residential — Loud Music/Party
2010
2010-12-22311: Street Condition — Pothole
2010-06-29Permit EW — RE-ISSUED
2010-06-29Permit EW — ISSUED
2010-06-28Job filed: FACADE REPAIR$150,000
2010-06-28Job filed: FACADE REPAIR$150,000
2010-06-11Permit EQ — ISSUED
2010-06-11Permit EQ — ISSUED
2010-06-09Job filed: INSTALLATION OF 965 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2010-06-09Job filed: INSTALLATION OF 965 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2010-06-09Job filed: INSTALLATION OF 715 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2010-04-27ECB CLASS - 2 violation: 56Y13,32H11,52V01,33V01. *RECURRING CONDITION PREVIOUSLY CITED IN NOV #38191962M 56Y-SEAL LEAKS* 32H-WORN CAR SHOES 52,33J-ADJUST
2010-04-27ECB CLASS - 2 violation: 70O02,21Q03,81M07. 70O02-REMOVE WATER FROM THE PIT. 21Q03-PROVIDE COVER FOR BSMT INTERLOCK.
2009
2009-12-31DOB violation LBLVIO:
2009-12-17DOB violation E:
2009-12-17DOB violation E:
2009-12-17DOB violation E:
2009-12-17DOB violation E:
2009-12-17DOB violation E:
2009-12-17DOB violation E:
2009-12-16DOB violation E:
2009-12-16DOB violation E:
2009-12-16DOB violation E:
2009-02-13ECB CLASS - 2 violation: 32H11.98BB05.42G11.53B14.27P16.70Z02.21M07.21H10.32H WORN GUIDE SHOES 98BB EXPIRED 5YR 42G UNREADABLE 53B SHORTEN 27 PROVIDE ACCES$500
2009-02-13ECB CLASS - 2 violation: 16M07.03I04.100P17.05I10.02B01.16J01.39O02.32H11.76J01.98BB05.42G11.97X10.16M PROVIDE STRAPS WHERE NEEDED 03I PATCH SMALL HOLES 10$500
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2008
2008-12-01ECB CLASS - 1 violation: SS 28-201.1. 97##. UNLAWFUL ACT. FAILURE TO COMPLY WITH COMMISSIONERS ORDER SET FORTH IN NOV# 38191963Y BY CONTINUIING TO USE DEV$1,600
2008-10-07ECB CLASS - 1 violation: 06E10.98BB05.99BB05.40D06.60B07.61G11.61D06.60Q03.56B07.42H11.52BB12.70Z10.75H11.77M05.70O02.39O02.100B10.98,99 BB05 5YR & 2YR 40D$1,000
2008-10-07ECB CLASS - 2 violation: 68M07.98BB05.100BB05.56Y13.16B10.32H10.73D06.98BB PERFORM & FILE CURRENT 5YR TEST 100BB PERFORM & FILE CURRENT 2YR TEST 16B REPAIR$500
2008-10-07ECB CLASS - 1 violation: 98BB05.100BB05.60B07.61B11.61D06.56Y13.67B10.41I10.73D06.16B10.80B14.70Z09.98BB PERFORM & FILE CURRENT 5YR TAG 100BB PERFORM & FIL$1,000
2008-10-07ECB CLASS - 2 violation: 98BB05.99BB05.61M07.56B07.62O02.59O.H11.63H11.60Q03.68M07.77M07.100B10.16B10.52BB12.100X10. 98.99BB05 5YR & 2YR EXPIRED 61M07 GRNG$500
2008-10-06ECB CLASS - 1 violation: 53I11.76I11.16D06.98BB05.100V05.56Y13.56O02.60Q03.71Q03.54B14.11R11.61G11.97L10.CUI 53 GOVERNOR CABLE DAMAGED KINKED 76 TAIL ROPE $1,000
2008-10-06ECB CLASS - 2 violation: 97## OPERATION OF A ELEVATOR W/O EQUIPMENT USE PERMIT$500
2008-10-06ECB CLASS - 3 violation: 60Q03.56Y13.56O02.100O02.61R11.60 GUARD MOTOR RM LIGHT 56 OIL LEAK MAIN MACHINE SEAL 56 CLEAN MAIN MACHINE 100 CLEAN BED PAN 61 RE$200
2008-10-06ECB CLASS - 1 violation: CEASE USE.21I10,16B10,100I10 CEASE USE.98BB05,100M05,56Y13,56O02,41H11.CU ITEMS 21-5TH INTERLOCK DAMAGED REPAIR.16-5FL DOOR PANELS$1,000
2008-10-06ECB CLASS - 2 violation: 32H10.42H11.56O02.60Q03.61M15.68M07.69M07. 42H11 COPPER ON CONTROLLER WORN 61M15 CITY ID # MISSING$500
2008-10-06ECB CLASS - 2 violation: 38I11.42H11.56O02.60Q03.61M15.68M07.69M07.76D06.78O02.42H11 COPPER ON CONTROLLER 56O02 CLEAN DIRTY MACHINE & DRIP PANS 61M15 CITY $500
2008-10-06ECB CLASS - 2 violation: 100M05,98BB05,56Y13,56O02,41H11,61G07,32H11,100D06,27J06,52B12,100X10,16B06,39I10.100-2YR TAG MISSING.41-REPLACE WORN CONTACT ON C$500
2008-09-24ECB CLASS - 1 violation: 97 # #. (97 # #) DEVICE # JF1215 RUNNING UNDER CEASE USE ORDER.$1,000
2008-09-24ECB CLASS - 2 violation: 56Y13.100BB05.98BB05.39O02.16B0170Z09.39B12.56Y REPAIR & SEAL GLASS PACKING 100BB PERFORM & FILE CURRENT 2YR TEST 98BB PERFORM &$500
2008-09-24ECB CLASS - 1 violation: 53B11.70Z09.63H10.56O02.98BB05.100U05.54H11.77M07.55B14.05I10.75K11.100K11.C.U 53 REPLACE 7/16 GOVERNOR CABLE TO CORRECT SIZE 3/8 $1,000
2008-09-24ECB CLASS - 2 violation: 98BB05.100U05.42H11.62O0270Z09.40I10.97O02.98 5YR TEST 100 2YR TEST 42 REPLACE WORN FUSES 62 CLEAN COMMUTATOR 70 REEMOVE WATER PIT$500
2008-09-24ECB CLASS - 1 violation: CU16I10,CU21I11,76K11,76I10,44H08,70O02,98BR05,100M05. {CEASE USE(16-I-10) 1ST & 6TH FL DOWN (DOWERED) (21-I-11) LOCK ON 1ST FL DO$1,000
2008-09-18DOB complaint, category ?
2008-05-05ECB Non-Hazardous violation: 05##SO55Y13SO55O02SO50B01SO41G1112X1084X1058Y0259Q0338X1038Q0370H1152H1171D0666O02. (WWP05#) GATE INSTALLED W/O PERMIT SECOND OFFE$10,000
2008-04-11DOB violation E:
2008-04-11DOB violation E:
2008-04-11DOB violation E:
2008-03-04ECB Non-Hazardous violation: CUR10.39D06.16I10.66O02.38O02.70K11.31H11.21Q03.16M07.40T07.59Q03.39O02.41#11.55Y13.58O02.58Q07.33O02.51K11.85BB05.86BB05.33306.#R$2,000
2008-03-03ECB Hazardous violation: 84X10.85BB05.86M05.39Q03.55Y13.55O02.16H10.21M07.71M07.54B14.41G11. 2ND OFF. ITEMS 84 ANNUNCIATOR INOPERATIVE 85 5YR 86 2 YR 39 LI$1,000
2008-03-03ECB Hazardous violation: 33O02.33M07.38O02.55O02.66Z02.69K11.85BB05.86U05.12Q03.16H10.31H10.36O02.41G11.52Y11.56O02.83BB12.60X10.55O02.70D06.74B14.84X10.84$1,000
2008-03-03ECB Non-Hazardous violation: 16I1066Z0971M0769K1121B0138O0285U0586U0555O0252O0251A1233O0284M0705I1084I1002X1016I1021M0741G1141H1161AA0259X1060D0670I11. CEASE U$800
2008-02-28ECB Non-Hazardous violation: 21N0984M0738O0221O0216O0285BB0555O0271M0737I1161AA0255Y1358Y1141H1141G1121M0759Q0339I1150B0138O0241D0684L1031H1070D0651B14. CEASE $2,000
2008-02-28ECB Non-Hazardous violation: 21R1038O0259Q0339O0284#0655#1055Y1386M0585BB0562H1161H1055#1044O0241O0263M0731H1070D0612Q0371#84X1083E0133#0655#02. CEASE USE 3RD $2,000
2008-02-28ECB Non-Hazardous violation: 21R1055Y0985BB0586BB0559Q0339O0241G1141#1158O0262H1161AA0255#1155#0744O0263M0738O0231H1039#1055#0946#0239#0646#0239#0733O02. CEASE$2,000
2008-02-28ECB Hazardous violation: CEASE USE.16D10,50L10,12Q03,16M07,16H10,33M07,38O02,41H11,55O02,61AA02,85BB05,86M05,16I10,21M07,31H10,34Q03,36O02,39O02,41O02,44H1$2,000
2008-02-28ECB Hazardous violation: 83##. 85U0586U0555Y1355O0250B0161AA0241G1141H11. 83 CEASE USE FAILURE TO PROTECT. BEFORE RETURN TO SERVICE CONTACT THIS DEPT FOR R$800
2008-02-28ECB Non-Hazardous violation: CEASE USE.16I10,55Y13,55O02,85U05,38O02,39O02,16B10,44O02,59Q03,31H10,38B09,83L10,61I10,41H11,41G11,50B01,51B12,21M07,33M07.CEASE $2,000
2008-02-28ECB Non-Hazardous violation: 37I1038O0244O0255O0271M0785U0586U0503#1036O0253BB1256O0241O0259Q0361AA0270D0671S1084O02. SECOND OFFENCE 37I10 REPAIR DAMAGED TRAVE$1,000
2008-02-27ECB Hazardous violation: CEASE USE ITEMS (26L1052O11) 2ND OFFENSE(85M0586M0855Y1355O0231I10) 51BB1351B1432E1070J1025D0558O11. CEASE USE ITEMS 25 RELEASE CA$2,000
2008-02-27ECB Hazardous violation: CEASE USE (67D0637I1021D06) SECOND (85U0586U0555O0266O0231H1153B14) 55Y1336O0259Q0339M0771M0721M0726L10. CEASE USE ITEMS 67 CAR RA$2,000
2008-02-27ECB Non-Hazardous violation: CU26L1012Q0316C1038O0241G1155O0256O0258O0285U0586U0516D0621M0736O0237H1139O0266Z0266I1071I10. CEASE USE (26L10) GOVERNOR RELEASE C$2,000
2008-02-27ECB Hazardous violation: CU44L1052I1116D0616110 SECOND (38O0255Y1355O0285U0586U05) 59Q0341G1139M0731H1053B1471M0721M0786L10. CEASE USE ITEMS: 44 GOVERNOR D$2,000
2008-02-27ECB Hazardous violation: 2ND OFFENSE (70L10) CEASE USE (21I1026L10) 2ND OFFENSE (37I1116I1084M0755Y1355Y0238O0222Q0366O0248I10) 41H1160G1141G1184I10. CEASE$2,000
2008-02-27ECB Non-Hazardous violation: 85U05.86U05.55Y13.59Q03.05I10.61H10.44J10.58D02.05J01.31H10.40W07.52H11.70O02.24I10.38#11.38O02.32E10.66O02.17H11.25D06.39#06.33O0$1,000
2008-02-06DOB violation E:
2008-02-06DOB violation E:
2008-02-05DOB violation E:
2008-02-05DOB violation E:
2008-02-05DOB violation E:
2008-02-05DOB violation E:
2008-02-05DOB violation E:
2008-02-05DOB violation E:
2008-02-05DOB violation E:
2008-02-04DOB violation E:
2008-02-04DOB violation E:
2008-02-04DOB violation E:
2008-02-04DOB violation E:
2008-02-04DOB violation E:
2008-02-04DOB violation E:
2008-02-01DOB violation E:
2008-01-30DOB violation E:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-10-24TL&R — from NORTH FORK BANK to 1-10 INDUSTRY ASSOCIATES, LLC
2007-10-24M&CON $300,000,000 — from 19-20 INDUSTRY CITY ASSOCIATES, LLC; 1-10 INDUSTRY ASSOCIATES LLC to MERS$300,000,000
2007-10-24Mortgage assigned — from NORTH FORK BANK to GOLDMAN SACHS COMMERCIAL MORTGAGE CAPITA
2007-09-20DOB complaint, category ?
2007-09-18ECB Non-Hazardous violation: 66Z9/38O2/84K11/59Q3/85U5/55O2/33O2/16H11/33M7/33D6/.66-REMOVE WATER IN PIT.38-CLEAN CAR TOP & REMOVE WOOD.84-REPLACE RUSTED BUFFE$180
2007-09-18ECB Non-Hazardous violation: 66Z9/71M7/69K11/21B1/21M7/38O2/38Q3/5A1/59Q3/85U5/86U5/55O2/44O2/52O2/51A12/33O2/.66-WATER LEAK REMOVE WATER PIT.71-PROVIDE ALL MI$180
2007-09-17ECB Non-Hazardous violation: 74B14/21M7/71M7/66O2/33O2/12Q3/3D6/84X10/3#10/16H10/38O2/53K11/55O2/55B1/86M5/85BB5/41D6/61H10/41G11/41H11/62O2/71K10/.CEASE USE I$800
2007-09-17ECB Non-Hazardous violation: 16D10/16I10/12Q3/71D6/16H10/71K9/33M7/33D6/55B1/16L11/33O2/66O2/38O2/53K11/85BB5/86M5/55Y13/41H11/61O2/62O2/39M7/.CU:CEASE USE ITE$800
2007-09-17ECB Non-Hazardous violation: 6L10/5I10/33D6/61H10/55B1/16I10/16H10/38O2/66O2/33O2/37I11/53K11/55Y13/55O2/85BB5/86M5/86M5/39O2/41H11/84X10/41D6/39Q3/62O2/58I10/$800
2007-09-17ECB Non-Hazardous violation: 05I11,06A09,53K11,55O02,55B10,85BB05,55Y13,41G11,41H11,48H01,55O02,39M07, CUI 05I11,REPLACE DAMAGED CAR GATES 06A09,REMOVE BLOCKS $800
2007-08-23ECB Non-Hazardous violation: 74B14,85M05,85M05,55Y13,55O02,41H11,39I10,39D06,39#10,56O02,38O02,16#10,05I10,38Q06,#R09,83O02,CEASE USE ITEM 74B SHORTEN CABLES 4$800
2007-08-23ECB Non-Hazardous violation: CEASE USE, HAZARDOUS:16I10,85BB05,86M05,55Y13,55O02,38O02,39O02,83O02,41H11,41G11,16#10,03M10,03M10,52O02,56O02,#R09:CEASE USE 16-$800
2007-08-23ECB Non-Hazardous violation: CU:6L10/85U5/86U5/59Q3/16B10/41B11/83L10/56O2/.CEASE USE:6-CAR GATE SWITCHES JUMPED CALL 212-566-5529 FOR REINSPECTION.85-5 YR TES$800
2007-08-23ECB Non-Hazardous violation: CU:58Y11/CU:3I10/55Y13/55O2/12Q3/59Q3/16B10/38D6/85U5/41H11/41A11/84D6/56D2/83A1/.CEASE USE ITEMS:58-OIL SOAKED BRAKE SHOES.3-CAB $800
2007-08-22ECB Hazardous violation: 52I11/39D6/16I10/69I11/16I10/66O2/21M7/38R9/55H10/85BB5/86BB5/41H11/55O2/39O2/39#9/39Q3/39D6/.CEASE USE ITEM:16I-1ST FL DOOR TRACK$800
2007-08-22ECB Hazardous violation: CU:21L10/CU:70L11/37I11/3I11/48L10/16H11/84H11/55Y10/55O2/48I11/38O2/12Q3/66O2/84L10/.CU:21L10-REPAIR BSMT DOOR LOCK HAS JUMPER.CU$800
2007-08-22ECB Non-Hazardous violation: 16B10/21B10/31H10/37H10/54B14/55O2/85BB5/86M5/66O2/.16B10-REPAIR/OVERHAUL ALL HOISTWAY DOORS LUBRICATE CHAINS.21B10-REPAIR PROPERL$180
2007-08-20ECB Hazardous violation: 11D6/55Y9/85BB5/86BB5/63M7/58Y2/59D6/84M7/34D6/23L10/.CEASE USE:11D6-PROPERLY SECURE CAR STATION NONE CEASE USE ITEM-55Y9-SEAL OIL$800
2007-08-20ECB Non-Hazardous violation: CU:6L10/CU:5I10/CU:53B14/CU:3I10/38O2/38M7/71M7/66O2/85U5/86U5/44O2/39O2/59Q3/55O2/33O2/83I10/84D6/.CEASE USE ITEMS:6-REPAIR DEFEC$800
2007-08-20ECB Non-Hazardous violation: 55Y13/55O2/85U5/86U5/66O2/38O2/44O2/39O2/16B10/12Q3/59Q3/33O2/31H10/38B9/83L10/.55-SEAL OIL LEAK.55-CLEAN MAIN MACHINE.85-PERFORM $180
2007-08-20ECB Non-Hazardous violation: 84M7/38O2/66O2/21O2/16O2/31H10/85BB5/86BB5/55O2/.84M7-PROVIDE STRAPS ON ALL HATCH DOORS.38O2-CLEAN CAR TOP.REMOVE ALL WORD.66O2-CL$180
2007-07-10Permit EW — ISSUED
2007-06-26Permit EW — ISSUED
2007-06-20Job filed: Interior renovation, partition and ceiling work as indicated on plans filed herewith. No change in use, egress or occupancy.$50,000
2007-06-20Job filed: Interior renovation, partition and ceiling work as indicated on plans filed herewith. No change in use, egress or occupancy.$50,000
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-11-02DOB violation E:
2006-11-02DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-31DOB violation E:
2006-10-25DOB violation E:
2006-10-25DOB violation E:
2006-10-25DOB violation E:
2006-10-25DOB violation E:
2006-10-25DOB violation E:
2006-10-25DOB violation E:
2006-10-25DOB violation E:
2006-10-04ECB Non-Hazardous violation: 50A/ 50B/ 50C/ 36/ FULTON V.T. BOILER, 15 HP, NB 76526, GAS 1996 50(A)NO DISCHARGE PIPE ON THE SAFETY VALVE 50(B) IMPROPER ARRANGE$2,500
2006-10-02ECB Hazardous violation: 18A/B/ 50 FULTON V.T. BOILER, 15HP, NB 65377, GAS 1992 18(A)(B) ACTIVE CORROSION & EVIDENCE OF LEAKAGE @ HAND HOLE OPENING. CLEAN
2006-01-06DOB violation LL6291:
2005
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-21DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-10-20DOB violation E:
2005-01-31DOB violation LL6291:
2004
2004-11-24AL&R — from NORTH FORK BANK to 1-10 INDUSTRY ASSOCIATES, LLC
2004-11-24Agreement $90,000,000 — from 1-10 INDUSTRY ASSOCIATES, LLC to NORTH FORK BANK$90,000,000
2004-11-24Mortgage $51,593,303 — from 1-10 INDUSTRY ASSOCIATES, LLC to NORTH FORK BANK$51,593,303
2004-11-24Mortgage assigned — from LASALLE BANK NATIONAL ASSOCIATION to NORTH FORK BANK
2004-11-24Mortgage assigned — from GENERAL ELECTRIC CAPITAL CORPORATION to LASALLE BANK NATIONAL ASSOCIATION
2004-11-24DEEDO — from INDUSTRY CITY ASSOCIATES to 1-10 INDUSTRY ASSOCIATES LLC
2004-11-15Tenant complaint: HEATING — HEAT RELATED
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-29DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-26DOB violation E:
2004-10-25DOB violation E:
2004-02-13DOB violation LL6291:
2004-01-08Job filed: REMOVAL OF GRAVITY TANKS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2004-01-08Job filed: REMOVAL OF GRAVITY TANKS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2003
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-07DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-11-06DOB violation E:
2003-03-19DOB violation LL6291:
2003-01-28DOB violation E: 3F1215
2003-01-28DOB violation E: 3F1223
2003-01-27DOB violation E: 3F1213
2003-01-27DOB violation E: 3P4043
2003-01-27DOB violation E: 3F1226
2003-01-27DOB violation E: 3P4282
2003-01-27DOB violation E: 3P4254
2003-01-27DOB violation E: 3P4283
2002
2002-12-30ECB Non-Hazardous violation: 7K11-62Z11-81#16-48B13-80##. 81-# TAG DOES NOT HAVE PROPER IN FORMATION ON IT. 48-B-ONE SHACKLE ON CAB DOESN'T HAVE PROPER AMOUNT $350
2002-12-30DOB complaint, category ?
2002-12-30DOB complaint, category ?
2002-10-21Permit EW — ISSUED
2002-10-21Permit EW — ISSUED
2002-10-21Permit PL — ISSUED
2002-10-16Permit PL — ISSUED
2002-10-16Permit EW — ISSUED
2002-10-11Job filed: REPLACE GAS FIRED HIGH PRESSURE BOILER AND INSTALL BOILER ROOM ENCLOSURE. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.$12,000
2002-09-24Job filed: Installation of 2 natural gas fired process boilers. No change in use, occupancy or egress.$11,000
2002-03-26DOB violation LL6291:
2002-03-19DOB violation E: 3P4282
2002-03-19DOB violation E: 3F1218
2002-03-19DOB violation E: 3P4255
2002-03-19DOB violation E: 3F1213
2002-03-19DOB violation E: 3P4043
2002-03-19DOB violation E: 3F1216
2002-03-19DOB violation E: 3F1215
2002-03-18DOB violation E: 3F1223
2002-03-18DOB violation E: 3F1228
2002-03-18DOB violation E: 3F1231
2002-03-18DOB violation E: 3P4040
2002-03-18DOB violation E: 3F1221
2002-03-18DOB violation E: 3F1224
2002-03-18DOB violation E: 3P4253
2002-03-18DOB violation E: 3P4283
2002-03-18DOB violation E: 3F1226
2002-03-18DOB violation E: 3F1222
2002-02-19DOB violation LL10/81:
2002-02-19DOB violation LL1081:
2002-02-19DOB violation LL1081:
2001
2001-09-19ECB Non-Hazardous violation: FAILURE TO HAVE CERTICATE OF OCCUPANCY POSTED OR AVAILABLE FOR INSPECTION AT TIME OF INSPECTION.REMEDY:HAVE CERTIFICATE OF OCCUPAN$400
2001-09-19DOB violation C: ECB
2001-08-29DOB violation E: 3P4254
2001-06-08DOB complaint, category ?
2001-06-01DOB complaint, category ?
2001-05-14Permit PL — ISSUED
2001-05-14Permit EW — ISSUED
2001-05-14DOB violation C: WORK WITHOUT A PERMIT. NOTED: INSTALLATION OF A WIRE METAL FENCE IN PUBLIC STAIR CASE AT 5TH AND 6TH STORIES. FENCE HAS ILLEGAL
2001-05-14ECB Hazardous violation: WORK WITHOUT A PERMIT.NOTED:INSTALLATIONOF A VIRE METAL FENCE IN PUBLIC STAIR CASE AT FIFTH AND SIXTH STORY FENCE HAS ILLEGAL PAD $2,500
2001-05-11DOB violation C: WORK WITHOUT A PERMIT. WORK NOTED: INSTALLATION OF SHEETROCK PARTITION ON 3RD & 5TH FLOORS, CREATING ADDITIONAL ROOMS
2001-05-11ECB Hazardous violation: FAILURE TO MAINTAIN BLDG,HAZARDOUS DEFECTS:WEST FIRE EXIT STIARS TOWER LOCKED ON 3 AND 5FL.EXIT BALCONY AT STAIR TOWER HAS RUSTED $2,500
2001-05-11ECB Hazardous violation: WORK WITHOUT A PERMIT.WORK NOTED:INSTALLATION OF SHEETROCK PARTITIONS ON 3RD AND 5TH FLOOR,CREATING ADDITONAL ROOMS.REMEDY:OBTAIN $2,500
2001-05-11DOB violation C: HAZARDOUS
2001-05-10Permit EW — ISSUED
2001-03-16Job filed: INSTALL FAS FIRED PACKAGE BOILER INSTALL NEW GAS METER AND GAS PIPING C NNECTED TO EXISITING GAS SERVICE INSTALL BOILER ROOM ENCLOSURE NO CAHNGE IN $9,000
2001-03-16Job filed: INSTALL FAS FIRED PACKAGE BOILER INSTALL NEW GAS METER AND GAS PIPING C NNECTED TO EXISITING GAS SERVICE INSTALL BOILER ROOM ENCLOSURE NO CAHNGE IN $9,000
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2001-02-27DOB violation E: 3P4255
2001-02-26DOB violation E: 3F1222
2001-02-26DOB violation E: 3F1224
2000
2000-07-28DECL — from CITY OF NEW YORK
2000-03-14ECB Non-Hazardous violation: 01X11,02X11,57O02,05X11,06N11, CEASE USE UNTIL ITEMS 01,05,06 REPAIREDCALL 212 312-8740 BEFORE RETURNING TO SERVICE SO A FULL INSP$500
2000-02-10Job filed: WALL STRUCTURE FOR ILLUMINATED FLEX FACE SIGN$5,000
2000-02-10Job filed: WALL STRUCTURE FOR ILLUMINATED FLEX FACE SIGN$5,000
2000-02-07DOB violation LL6291:
1999
1999-12-23DOB violation E: 3P4255 CEASE USE
1999-12-23DOB violation E: 3P4255
1999-12-21DOB violation E: 3F1221
1999-12-21DOB violation E: 3F1213
1999-12-21DOB violation E: 3F1218
1999-12-21DOB violation E: 3P4283
1999-12-21DOB violation E: 3F1224
1999-12-21DOB violation E: 3P4043
1999-12-21DOB violation E: 3F1228
1999-12-21DOB violation E: 3F1216
1999-12-21DOB violation E: 3P4254
1999-12-21DOB violation E: 3P4253
1999-12-21DOB violation E: 3F1215
1999-12-21DOB violation E: 3F1222
1999-12-21DOB violation E: 3P4040
1999-12-21DOB violation E: 3F1223
1999-12-21DOB violation E: 3F1226
1999-11-22DOB complaint, category ?
1999-04-08ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING. DEFECT IS MASONRY CONCRETE BROKEN MISSING AND CALAPSE ONTO SIDE WALK AND WALK WAYS FROM OBO$800
1999-04-08DOB complaint, category ?
1999-03-16DOB violation LL6291:
1999-03-11DOB violation E: 3F213
1999-03-11DOB violation E: 3F1216
1999-01-20DOB violation LL1081:
1999-01-20DOB violation LL1081:
1998
1998-12-07Mortgage assigned — from NORTH FORK BANK to GENERAL ELECTRIC CAPITAL CORPORAITON
1998-12-07Mortgage satisfied — from INDUSTRY CITY ASSOCIATES to SAFRIN, JOSHUA
1998-12-07Mortgage $26,782,238 — from 1-10 INUSTRY ASSOCIATES LLC to GENERAL ELECTRIC CAPITAL CORPORATION$26,782,238
1998-12-07Mortgage satisfied — from INDUSTRY CITY ASSOCIATES to FBE LIMITED
1998-12-07SAGE — from NORTH FORK BANK
1998-12-07Deed — from INDUSTRY CITY ASSOCIATES to 1-10 INDUSTRY ASSOCIATES LLC
1998-12-07Mortgage assigned — from 1-10 INDUSTRY ASSOCIATES LLC to GENERAL ELECTRIC CAPITAL CORPORATION
1998-12-07Mortgage satisfied — from INDUSTRY CITY ASSOCIATES to SIKRAN FUNDING COMPANY LLC
1998-12-07SAGE — from NORTH FORK BANK
1998-12-07Mortgage assigned — from 1-10 INDUSTRY ASSOCIATES LLC to GENERAL ELECTRIC CAPITAL CORPORATION
1998-10-08ECB Non-Hazardous violation: WORK WITHOUT A PERMIT, WORK NOTED; INSTALLATION OF A WIRE METAL FENCE IN PUBLIC STAIR CASE AT FIFTH AND SIXTH STORY. FENCE HAS ILL$2,500
1998-10-08DOB violation C: WORK WITHOUT A PERMIT WORK NOTED INSTALLATION OF A WIRE METAL FIRE FEN CE IN PUBLIC STAIRCASE AT FIFTH AND SIXTH STORY FORTH STORY
1998-09-01DOB violation C: HAZARDOUS
1998-09-01ECB Hazardous violation: FAILURE TO MAINTAIN DEFECT IS: 1-WEST FIRE EXIT STAIRS TOWER LOCKED DOWN ALL FLOORS. 2-EXITT BALCONY AT STAIR TOWER HAS RUSTED O$800
1998-08-28DOB complaint, category ?
1998-08-07DOB complaint, category ?
1998-08-06DOB complaint, category ?
1998-08-03DOB complaint, category ?
1998-07-28ECB Non-Hazardous violation: 05,I,11,50,Y,14 05-REPAIR CAR GATE 50-SEAL OIL LEAK AT MACHINE.
1998-07-21Permit PL — ISSUED
1998-07-21Permit PL — ISSUED
1998-07-21Permit EW — ISSUED
1998-07-21Permit EW — ISSUED
1998-05-04DOB violation LL6291:
1998-01-16Permit PL — ISSUED
1998-01-16Permit EW — ISSUED
1998-01-16Permit EW — ISSUED
1998-01-07DOB complaint, category ?
1997
1997-04-23ECB Non-Hazardous violation: 30 O 57 O 74 57 Z (74) CLEAN CAR TO SIDE OF CAR (57) REPAIR WATER LEAKIN PIT
1997-04-23ECB Non-Hazardous violation: 30 O 57 O 74 O (74) CLEAN CAR TOP SIDE OF CAR
1997-04-21ECB Non-Hazardous violation: 30 O 57 O 74 O 74-CLEAN CAR TOP SIDES OF CAR
1997-04-18ECB Non-Hazardous violation: 30 O 57 O 74 O
1997-03-27Permit EW — ISSUED
1997-03-27Permit PL — ISSUED
1997-03-27Permit EW — ISSUED
1997-03-20Permit EW — ISSUED
1997-03-20Permit EW — ISSUED
1997-03-20Permit PL — ISSUED
1996
1996-07-10Mortgage assigned — from FBE LIMITED to NORTH FORK BANK
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to SAFRIN, JOSHUA
1996-07-10Mortgage assigned — from INDUSTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Mortgage assigned — from INDUSTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Mortgage assigned — from INDEPENDENCE SAVINGSBANK to NORTH FORK BANK
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to FBE LIMITED
1996-07-10Agreement — from INDUSTRY CITY ASSOCIATES to SIKRAN FUNDING COMPANY L.L.C.
1996-07-10Mortgage $259,446 — from INDUSTRY CITY ASSOC to SAFRIN, JOSHUA$259,446
1996-07-10Mortgage $10,051,513 — from INDUSTRY CITY ASSOC to SIKRAN FUNDING CO LLC$10,051,513
1996-07-10Mortgage $100,000 — from INDUSTRY CITY ASSOC to SAFRIN, JOSHUA$100,000
1996-07-10Mortgage assigned — from SIKRAN FUNDING CO LLC to NORTH FORK BANK
1996-07-10Mortgage $950,000 — from INDUSTRY CITY ASSOC to SIKRAN FUNDING CO LLC$950,000
1996-07-10SAGE — from INDEPENDENCE SAVINGSBANK
1996-07-10Mortgage assigned — from FBE LIMITED to NORTH FORK BANK
1996-07-10Mortgage assigned — from SAFRIN, JOSHUA to NORTH FORK BANK
1996-07-10Mortgage assigned — from SARFIN, JOSHUA to NORTH FORK BANK
1996-07-10Mortgage $1,058,054 — from INDUSTRY CITY ASSOC to SAFRIN, JOSHUA$1,058,054
1996-07-10Mortgage $10,051,513 — from INDUSTRY CITY ASSOC to FBE LIMITED$10,051,513
1996-07-10Agreement — from INDSUTRY CITY ASSOCIATES to NORTH FORK BANK
1996-07-10Mortgage assigned — from SIKRAN FUNDING COMPANY L.L.C. to NORTH FORK BANK
1996-07-10Mortgage $950,000 — from INDUSTRY CITY ASSOC to FBE LIMITED$950,000
1996-07-10Mortgage $2,464,737 — from INDUSTRY CITY ASSOC to FBE LIMITED$2,464,737
1995
1995-10-25Agreement — from INDUSTRY CITY ASSOCIATES; INDEPENDENCE SAVINGSBANK to VIRGINIA DARE EXTRACT CO INC
1995-08-29DOB violation LL6291:
1995-08-10Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to NARKIS FUNDING COMPANY LLC
1995-08-08Agreement — from INDUSTRY CITY ASSOCIATES to INDEPENDENCE SAVINGSBANK
1995-07-20Mortgage assigned — from NARKIS FUNDING COMPANY L.L.C. to MARK SCHRON FAMILY TRUST; MIRIAM SCHER FAMILYTRUST; AVI SCHRON FAMILY TRUST; SAMUEL SCHRON
1995-07-20Mortgage assigned — from ELI SCHRON FAMILY TRUST; MARK SCHRON FAMILY TRUST; SAMUEL SCHRON FAMILYTRUST; BRACHA ROTHS to SIKRAN FUNDING COMPANY L.L.C.
1995-06-27Agreement — from NEW YORK SMSA LIMITED PARTNERSHIP; INDUSTRY CITY ASSOCIATES to INDEPENDENCE SAVINGSBANK
1995-04-17DOB violation LL1081:
1995-04-05Permit PL — ISSUED
1995-04-05Permit EW — ISSUED
1995-04-04Agreement — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION
1995-04-04Mortgage assigned — from INDUSTRY CITY ASSOCIATES to INDEPENDENCE SAVINGSBANK
1995-04-04Mortgage $13,466,250 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$13,466,250
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to FBE LIMITED
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to NARKIS FUNDING COMPANY LLC; LEIFER, MURRAY
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to SAFRIN, JOSHUA
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage $13,466,250 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$13,466,250
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage $8,000,000 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$8,000,000
1995-04-04Agreement — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from MITSUBISHI TRUST ANDBANKING CORPORATION to PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage assigned — from PORTFOLIO HOLDING GROUP CORP to INDEPENDENCE SAVINGSBANK
1995-04-04SAGE — from PORTFOLIO HOLDING GROUP CORP
1995-04-04Mortgage $1,417,500 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST ANDBANKING CORPORATION$1,417,500
1994
1994-06-01DOB violation LL6291:
1994-06-01DOB violation LL6291:
1994-05-31DOB violation LL1081:
1994-05-31DOB violation LL1081:
1994-01-12Agreement — from L.M. RABINOWITZ & COINC to MITSUBISHI TRUST & BANKING CORPORATION
1993
1993-12-06DOB complaint, category ?
1993-09-27Agreement — from IDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST&BKGCRP
1993-09-27Agreement — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TRUST&BKGCRP
1993-09-03EASE — from INDUSTRY CITY ASSOCIATES to FGP BUSH TERMINAL INC
1993-08-16DOB violation LL6291:
1993-08-16DOB violation LL6291:
1993-08-16DOB violation LL6291:
1993-06-28DOB violation LL1081: 1
1993-06-28DOB violation LL1081: 1
1993-06-01DOB violation LL6291:
1993-06-01DOB violation LL6291:
1993-04-09Permit PL — ISSUED
1993-03-17Permit EW — ISSUED
1992
1992-04-07DOB violation LL1081: 1
1992-04-07DOB violation LL1081: 8
1991
1991-09-26Permit EW — ISSUED
1991-09-26Permit PL — ISSUED
1991-04-25DOB violation LL1081: 4
1990
1990-04-26DOB violation E:
1990-04-26DOB violation E:
1990-04-25DOB violation E:
1990-04-25DOB violation E:
1990-04-25DOB violation E:
1990-04-25DOB violation E:
1990-04-25DOB violation E:
1990-04-25DOB violation E:
1989
1989-03-30ECB Non-Hazardous violation: MUST INSTALL CHECK VALVE IN WATER TUBING SUPPLY TO ELECTRIC BOILER.$75
1989-03-20Mortgage assigned — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TR & BNKNG CP
1989-03-20Mortgage $6,350,000 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TR & BNKNG CP$6,350,000
1989-03-20Mortgage assigned — from CITIBANK NA to MITSUBISHI TR & BNKNG CP
1989-03-20Mortgage assigned — from CITIBANK NA to MITSUBISHI TR & BNKNG CP
1989-03-20Agreement — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TR &BANKNG CP
1989-03-20Mortgage assigned — from INDUSTRY CITY ASSOCS to MITSUBISHI TR &BANKNG/CP
1989-03-20Mortgage $2,650,000 — from INDUSTRY CITY ASSOCIATES to MITSUBISHI TR & BNKNG CP$2,650,000
1988
1988-12-07DOB violation E: MUST REPAIR OR RENEW CAR GATES FRONT AND BACK
1988-12-06DOB violation E: REPAIR MAIN MACHINE MOTOR AND RETURN TO SERVICE
1988-12-06DOB violation E: REPAIR BRAKE AND RENEW BRAKES LINGINGS. THEN RETURN TO SERVICE
1988-12-06DOB violation E: REPAIR OR RENEW ELEVATOR BACK PANEL OF ELEVATOR #2 AND ATTAIN PRO PER CLEARENCE TO CWT
1988-12-05DOB violation E: REPAIR OR RENEW CWT BRACKETS AND RENEW ELEVATOR TO SERVICE
1987
1987-08-12Mortgage assigned — from NATIONAL WESMINSTERBANK to CITIBANK NA
1987-08-12Agreement — from INDUSTRY CITY ASSOC to CITIBANK NA
1987-08-12MISC — from NATIONAL WESTMINSTERBK
1987-08-12MISC — from NATIONAL WESTMINSTERBK
1986
1986-09-03Mortgage $3,000,000 — from INDUSTRY CITY ASSOCIATES to NATIONAL WESTMINSTERBK$3,000,000
1986-09-03Mortgage assigned — from INDUSTRY CITY ASSOCIATES to NATIONAL WESTMINSTERBK
1986-03-14Mortgage assigned — from REALTY REFUND TRUST to GRANCENT CORP
1986-03-14MISC — from BOWERY SAVS BANK
1986-03-14Mortgage $21,643,813 — from INDUSTRY CITY ASSOC to CITIBANK NA$21,643,813
1986-03-14Mortgage assigned — from INDUSTRY CITY ASSOCS to NATIONAL WESTMINSTERBK
1986-03-14Mortgage assigned — from BOWERY SAVS BANK to CITIBANK NA
1986-03-14Mortgage assigned — from BUSH ASSISTANCE CO to CITIBANK NA
1986-03-14Mortgage assigned — from REALTY REFUND TRUST to CITIBANK NA
1986-03-14Deed — from HELMSLEY, HARRY B; WIEN, LAWRENCE A to INDUSTRY CITY ASSOCS
1986-03-14Mortgage $7,000,000 — from INDUSTRY CITY ASSOCIATES to NATIONAL WESTMINSTERBK$7,000,000
1984
1984-06-28LEAS — from MADEMOISELLE KNITWEAR IN to SLT WAREHOUSE COMPANY
1982
1982-08-03Mortgage $2,500,000 — from GRANCENT CORP to GOLENBERG, GLENN TR; KENNARD, FRANK L TR; BERICK, JAMES H TR; KRAUSE, ALAN M TR; REALTY R$2,500,000
1982-08-03Deed — from WIEN, LAWRENCE A; HELMSLEY, HARRY B to GRANCENT CORP
1982-08-03Deed — from GRANCENT CORP to WIEN, LAWRENCE A; HELMSLEY, HARRY B
1982-05-27Deed — from GRANCENT CORP to WIEN, LAWRENCE A.; HELMSLEY, HARRY B.
1982-05-27Mortgage $1,000,000 — from GRANCENT CORP to BERICK, JAMES H; REALTY REFUND TRUST; LUBY, CHESTER J; KENNARD, FRANK L; GOLENBERG, GLENN;$1,000,000
1982-05-27Deed — from HELMSLEY, HARRY B.; WIEN, LAWRENCE A. to GRANCENT CORP
1980
1980-04-04SAGE — from HELMSLEY HARRY B'; WIEN LAWRENCE A
1978
1978-10-03SAGE — from BUSH ASSISTANCE CO; RLTY REFUND TRUST; REALTY REFUND TRUST
1978-10-03Mortgage — from HELMSELY HARRY B; BUSH TERMINAL ASSOCIATES; WIEN LAWRENCE; HELMSLEY HARRY B; WIEN LAWRENCE to BUSH ASSISTANCE CO
1978-08-01SAGE — from THE BOWERY SAVINGS BANK; HELMSLEY HARRY B; WIEN LAWRENCE A; BOWERY SAVINGS BANK
1978-05-31Deed — from GRANCENT CORP; THE CITY OF NEW YORK to SHELTON IRETTER CO; WIEN LAWRENCE A; HELMSLEY HARRY B
1978-05-26Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B to GRANCENT CORP
1978-04-13Deed — from GRANCENT CORP to HELMSLEY HARRY B; HELMSELY HARRY B; WIEN LAWRENCE A
1978-04-10Deed — from WIEN LAWRENCE; WIEN LAWRENCE A; HELMSLEY HARRY B to GRANCENT CORP
1978-04-06Deed — from GRANCENT CORP to WIEN LAWRENCE A; HELMSLEY HARRY B; WIEN LAWRENCE
1978-04-04Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1978-03-14Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A
1978-03-10Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B; WIEN LAWRENCE to GRANCENT CORP
1978-02-23Deed — from GRANCENT CORP to WIEN LAWRENCE A; HELMSLEY HARRY B
1978-02-16Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B; HELMSLEY HARRY; WIEN LAWRENCE; WIEN LAWRENCE HELMSLEY H to GRANCENT CORP
1978-01-11Deed — from GRANCENT CORP to WIEN LAWRENCE A; HELMSLEY HARRY B; WIEN LAWRENCE CORP
1978-01-10Mortgage — from GRANCENT CORP to REALTY REFUND CORP TRUSTEE OF; REALTY REFUND TRUST TRUSTEES OF; REALTY REFUND TRUST CORP T
1978-01-10Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1977
1977-12-19Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A
1977-12-15Mortgage — from GRANCENT CORP to REALTY REFUND TRUST TRUSTEE OF; REALTY REFUND TRUST TRUSTEES OF; TRUST REALTY REFUND TRUST
1977-12-09Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1977-08-23Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A
1977-08-09Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1977-07-13Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A
1977-07-11Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1977-06-13Deed — from GRANCENT CORP to WIEN LAWRENCE; WIEN LAWRENCE A; HELMSELY HARRY B; HELMSLEY HARRY B
1977-06-10Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B to GRANCENT CORP
1977-05-11Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A
1977-05-09Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP; HELMSLEY HARRY B
1977-04-13Deed — from GRANCENT CORP to WIEN LAWRENCE; HELMSLEY HARRY B; WIEN LAWRENCE A
1977-04-08Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B to GRANCENT CORP
1977-03-11Deed — from GRANCENT CORP to WIEN LAWRENCE A; HELMSLEY HARRY B
1977-03-08Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1977-02-11Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A
1977-02-09Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1977-01-11Deed — from GRANCENT CORP to WIEN LAWRENCE A; HELMSLEY HARRY B
1977-01-10Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A to GRANCENT CORP
1976
1976-12-15Deed — from GRANCENT CORP to WIEN LAWRENCE A; HELMSLEY HARRY B; HELMSELY HARRY B
1976-12-09Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B to GRANCENT CORP
1976-12-08Deed — from MICHEL CLIFFORD L; LOEB JOHN L to HELMSLEY HARRY B
1976-11-17Deed — from GRANCENT CORP to HELMSLEY HARRY B; MICHEL CLIFFORD L; WIEN LAWRENCE A; LOEB JOHN L; MICHEL CLIFFORD W
1976-11-10Deed — from MICHEL CLIFFORD L; HELMSLEY HARRY B; WIEN LAWRENCE A; LOEB JOHN L; MICHEL CLIFFORD W to GRANCENT CORP
1976-10-14Deed — from GRANCENT CORP to HELMSLEY HARRY B; MICHEL CLIFFORD W; MICHEL CLIFFORD L; WIEN LAWRENCE A; LOEB JOHN L
1976-10-12Deed — from WIEN LAWRENCE; LOEB JOHN L; HELMSLEY HARRY B; MICHEL CLIFFORD W; WIEN LAWRENCE A; MICHEL C to GRANCENT CORP
1976-09-15Deed — from GRANCENT CORP to LOEB JOHN L; HELMSLEY HARRY B; MICHEL CLIFFORD L; WIEN LAWRENCE A; MICHEL CLIFFORD W
1976-09-09Deed — from MICHEL CLIFFORD; MICHEL CLIFFORD W; HELMSLEY HARRY B; LOEB JOHN L; MICHEL CLIFFORD L; WIEN to GRANCENT CORP
1976-09-08Agreement — from BUSH TERMINAL ASSOC LANDLOARD; BUSH TERMINAL ASSOC LANDLORD to FEDERATED DEPT STORES TENANT
1976-08-10Deed — from GRANCENT CORP to WIEN LAWRENCE A; LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWERNCE A; HELMSLEY HARRY; HELMSLEY
1976-08-09Deed — from HELMSLEY HARRY B; LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWRENCE A; MICHEL CLIFFORD L to GRANCENT CORP
1976-08-03Deed — from GRANCENT CORP to HELMSLEY HARRY B; MICHEL CLIFFORD W; LOEB JOHN L; HELMSELY HARRY B; MICHEL CLIFFORD L; WIE
1976-07-26Deed — from MICHEL CLIFFORD L; LOEB JOHN L; MICHEL CLIFFORD W; HELMSELY HARRY B; WIEN LAWRENCE A; HELM to GRANCENT CORP
1976-07-12Deed — from GRANCENT CORP to MICHEL CLIFFORD W; HELMSLEY HARRY B; MICHAEL CLIFFORD L; HELMSELY HARRY B; LOEB JOHN L; WI
1976-07-08Deed — from MICHEL CLIFFORD L; HELMSELY HARRY B; WIEN LAWRENCE; WIEN LAWRENCE A; MICHEL CLIFFORD W; HE to GRANCENT CORP
1976-07-08Deed — from COMFORT GEORGE V to HELMSLEY HARRY B
1976-06-02Deed — from GRANCENT CORP to HELMSLEY HARRY B; COMFORT GEORGE V; MICHEL CLIFFORD L; MICHEL CLIFFORD W; LOEB JOHN L; WIE
1976-05-27Deed — from MICHEL CLIFFORD L; WIEN LAWRENCE A; LOEB JOHN L; HELMSLEY HARRY B; MICHEL CLIFFORD W; HELM to GRANCENT CORP
1976-05-05Deed — from GRANCENT CORP to COMFORT GEORGE V; HELMSELY HARRY B; LOEB JOHN L; HELMSLEY HARRY B; MICHEL CLIFFORD W; WIEN
1976-04-30Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A; LOEB JOHN L; WIEN LAWERNCE A; COMFORT GEORGE V; MICHEL to GRANCENT CORP
1976-04-02Deed — from GRANCENT CORP to MICHEL CLIFFORD L; HELMSLEY HARRY B; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; MICHE
1976-03-30Deed — from WIEN LAWERNCE A; MICHEL CLIFFORD L; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; MICHEL to GRANCENT CORP
1976-03-03Deed — from GRANCENT CORP to LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWRENCE A; COMFORT GEORGE V; HELMSLEY HARRY B
1976-02-19Deed — from LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWRENCE A; COMFORT GEORGE V; COMFORT GEORGE W; HELMS to GRANCENT CORP
1976-02-04Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A; COMFORT GEORGE V; MICHEL CLIFFORD W; LOEB JOHN L
1976-02-02Deed — from COMFORT GEORGE V; HELMSLEY HARRY B; LOEB JOHN L; WIEN LAWRENCE A; MICHEL CLIFFORD W to GRANCENT CORP
1976-01-07Deed — from GRANCENT CORP to LOEB JOHN L; WIEN LAWRENCE A; WEIN LAWRENCE A; HELMSLEY AHRRY B; HELMSLEY HARRY B; COMFORT
1976-01-02Deed — from COMFORT GEORGE V; LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWRENCE A; HELMSLEY HARRY B; WEIN to GRANCENT CORP
1975
1975-12-02Deed — from GRANCENT CORP to HELMSLEY HARRY B; MICHEL CLIFFORD W; COMFORT GEORGE; WIEN LAWRENCE A; COMFORT GEORGE V; LO
1975-12-01Deed — from COMFORT GEORGE V; LOEB JOHN L; MICHEL CLIFFORD V; WIEN LAWRENCE B; MICHEL CLIFFORD W; WIEN to GRANCENT CORP
1975-11-05Deed — from GRANCENT CORP to LOEB JOHN L; MICHEL CLIFFORD V; MICHEL CLIFFORD W; HELMSLEY HARRY B; COMFORT GEORGE V; WIE
1975-11-03Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A; MICHEL CLIFFORD W; LOEB JOHN L; COMFORT GEORGE V to GRANCENT CORP
1975-10-02Deed — from GRANCENT CORP to COMFORT GEORGE V; MICHEL CLIFFORD W; WIEN LAWRENCE A; LOEB JOHN L; HELMSLEY HARRY B; WIEN
1975-10-01Deed — from MICHEL CLIFFORD W; WIEN LAWRENCE A; LOEB JOHN L; COMFORT GEORGE V; WEIN LAWRENCE A; HELMSL to GRANCENT CORP
1975-09-04Deed — from GRANCENT CORP to WEIN LAWRENCE A; HELMSLEY HARRY B; COMFORT GEORGE V; MICHEL CLIFFORD A; MICHEL CLIFFORD W;
1975-09-03Deed — from COMFORT GEORGE V; MICHEL CLIFFORD W; WIEN LAWRENCE A; HELMSLEY HARRY B; WEIN LAWRENCE A; L to GRANCENT CORP
1975-08-04Deed — from GRANCENT CORP to MICHEL CLIFFORD W; WIEN LAWRENCE A; COMFORT GEORGE V; WEIN LAWRENCE A; HELMSLEY HARRY B; L
1975-08-01Deed — from COMFORT GEORGE V; WEIN LAWRENCE A; LOEB JOHN L; MICHEL CLIFFORD W; HELMSLEY HARRY B; WIEN to GRANCENT CORP
1975-07-02Deed — from GRANCENT CORP to HELMSLEY HARRY B; WIEN LAWRENCE A; MICHEL CLIFORD W; HELMSLEY HARRY; MICHEL CLIFFORD W; LO
1975-07-01Deed — from HELMSLEY HARRY B; WIEN LAWRENCE A; LOEB JOHN L; MICHEL CLIFFORD W; COMFORT GEORGE V; HELMS to GRANCENT CORP
1975-06-03Deed — from GRANCENT CORP to COMFORT GEORGE V; HELMSLEY HARRY B; WIEN LAWRENCE A; HEMSLEY HARRY B; LOEB JOHN L; MICHEL
1975-06-02Deed — from WIEN LAWRENCE A; COMFORT GEORGE V; LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWERNCE A; HELMSL
1975-05-02Deed — from GRANCENT CORP to LOEB JOHN L; WIEN LAWRENCE A; WIEN LAWRENCE W; HELMSLEY HARRY B; COMFORT GEORGE V; MICHEL
1975-05-01Deed — from COMFORT GEORGE V; MICHEL CLIFFORD W; LOEB JOHN L; WIEN LAWRENCE A to GRANCENT CORP
1975-04-03Deed — from GRANCENT CORP to WIEN LAWRENCE A; COMFORT GEORGE V; MICHEL CLIFFORD W; HELMSLEY HARRY B; LOEB JOHN L
1975-04-01Deed — from HELMSELY HARRY B; WIEN LAWRENCE A; HELMSLEY HARRY B; COMFORG GEORGE V; WIEN LAWERNCE A; CO to GRANCENT CORP
1975-03-04Deed — from GRANCENT CORP to COMFORT GEORGE V; MICHEL CLIFFORD W; WIEN LAWRENCE A; HELMSLEY HARRY B; LOEB JOHN L
1975-03-03Deed — from LOEB JOHN L; WIEN LAWRENCE W; WIEN LAWRENCE A; COMFORT GEORGE V; WIEN LAWERNCE A; HELMSLEY to GRANCENT CORP
1975-02-04Deed — from GRANCENT CORP to MICHEL CLIFFORD W; COMFORT GEORGE V; WIEN LAWRENCE A; LOEB JOHN L; HELMSLEY HARRY B
1975-02-03Deed — from LOEB JOHN L; WIEN LAWRENCE A; HELMSLEY HARRY B; MICHEL CLIFFORD W; COMFORT GEORGE V to GRANCENT CORP
1975-01-06Deed — from GRANCENT CORP to MICHEL CLIFFORD W; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; HELMSLEY HARRY B
1975-01-02Deed — from MICHEL CLIFFORD W; LOEB JOHN L; WIEN LAWRENCE A; WIEN LAWRENCE; COMFORT GEORGE V; HELMSLEY to GRANCENT CORP
1974
1974-12-03Deed — from GRANCENT CORP to MICHEL CLIFFORD W; LOEB JOHN L; MICHAEL CLIFFORD W; COMFORT GEORGE V; HELMSLEY HARRY B; WI
1974-12-02Deed — from LOEB JOHN L; COMFORT GEORGE V; HELMSLEY HARRY B; MICHEL CLIFFORD W; WIEN LAWRENCE A to GRANCENT CORP
1974-11-04Deed — from GRANCENT CORP to HELMSLEY HARRY B; COMFORT GEORGE V; WIEN LAWRENCE A; LOEB JOHN L; HELMSLEY HARRY A; MICHEL
1974-11-01Deed — from WIEN LAWRENCE A; HELMSLEY HARRY B; COMFORT GEORGE V; LOEB JOHN L; MICHEL CLIFFORD W to GRANCENT CORP
1974-10-08Deed — from GRANCENT CORP to WIEN LAWRENCE A; COMFORT GEORGE V; HELMSLEY HARRY B; MICHEL CLIFFORD W; LOEB JOHN L
1974-09-30Deed — from COMFORT GEORGE V; WIEN LAWRENCE A; HELMSLEY HARRY B; LOEB JOHN L; MICHEL CLIFFORD A; MICHE to GRANCENT CORP
1974-09-04Deed — from GRANCENT CORP to HELMSLEY HARRY B; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; MICHEL CLIFFORD W
1974-09-03Deed — from HELMSLEY HARRY B; MICHEL CLIFFORD W; COMFORT GEORGE V; WIEN LAWRENCE A; LOEB JOHN L to GRANCENT CORP
1974-08-02Deed — from GRANCENT CORP to HELMSLEY HARRY B; COMFORT GEORGE V; MICHEL CLIFFORD W; LOEB JOHN L; WIEN LAWRENCE A; WIEN
1974-08-01Deed — from WIEN LAWERNCE; LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWRENCE A; COMFORT GEORGE V; HELMSLEY to GRANCENT CORP
1974-07-02Deed — from GRANCENT CORP to COMFORT GEORGE V; LOEB JOHN L; WIEN LAWERNCE A; HELMSLEY HARRY B; MICHEL CLIFFORD W; WIEN
1974-07-01Deed — from HELMSLEY HARRY B; COMFORT GEORGE W; WIEN LAWRENCE A; COMFORT GEORGE V; LOEB JOHN L; WIEN L to GRANCENT CORP
1974-06-03Deed — from GRANCENT CORP to MICHEL CLIFFORD W; MICHEL CLIFFORD; COMFORT GEORGE V; HELMSLEY HARRY B; WEIN LAWRENCE A; W
1974-05-31Deed — from COMFORT GEORGE B; LOEB JOHN L; COMFORT GEORGE V; COMFORT GEORGE; WIEN LAWERNCE A; WIEN LAW to GRANCENT CORP
1974-05-02Deed — from GRANCENT CORP to MICHEL CLIFFORD W; HELMSLEY HARRY B; LOEB JOHN L; WIEN LAWRENCE A; COMFORT GEORGE V
1974-05-01Deed — from COMFORT GEORGE V; WIEN LAWERNCE A; MICHEL CLIFFORD W; WIEN LAWRENCE A; LOEB JOHN L; HELMSL to GRANCENT CORP
1974-04-02Deed — from GRANCENT CORP to MICHEL CLIFORD W; WIEN LAWRENCE A; HELMSLEY HARRY B; MICHEL CLIFFORD W; COMFORT GEORGE V;
1974-04-01Deed — from LOEB JOHN L; WIEN LAWERNCE A; MICHEL CLIFFORD W; HELMSLEY HARRY B; COMFORT GEORGE V; WIEN to GRANCENT CORP
1974-03-04Deed — from GRANCENT CORP to WIEN LAWRENCE A; COMFORT GEORGE V; LOEB JOHN L; HELMSLEY HARRY B; MICHEL CLIFFORD W; WIEN
1974-03-01Deed — from LOEB JOHN L; MICHEL CLIFFORD W; WIEN LAWERENCE A; COMFORT GEORGE V; WIEN LAWRENCE A; HELMS to GRANCENT CORP
1974-02-06Deed — from GRANCENT CORP to HELMSLEY HARRY B; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; MICHEL CLIFFORD W
1974-02-01Deed — from WIEN LAWRENCE A; LOEB JOHN L; HELMSLEY HARRY B; WIEN LAWERENCE A; MICHEL CLIFFORD W; COMFO to GRANCENT CORP
1974-01-03Deed — from GRANCENT CORP to MICHEL CLIFFORD W; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; HELMSLEY HARRY B
1974-01-02Deed — from WIEN LAWERENCE A; WIEN LAWRENCE A; HELMSLEY HARRY B; LOEB JOHN L; MICHEL CLIFFORD W; COMFO to GRANCENT CORP
1973
1973-12-04Deed — from GRANCENT CORP to MICHEL CLIFFORD W; HELMSLEY HARRY B; COMFORT GEORGE V; WIEN LAWRENCE A; LOEB JOHN L; MICHA
1973-11-30Deed — from LOEB JOHN L; COMFORT GEORGE; MICHEL CLIFORD W; WIEN LAWRENCE A; MICHEL CLIFFORD W; COMFORT to CRANCENT CORP; GRANCENT CORP
1973-11-29Deed — from GRANCENT CORP; CRANCENT CORP to HELMSLEY HARRY B; WIEN LAWERENCE A; LOEB JOHN L; MICHEL CLIFFORD W; COMFORT GEORGE V; WIEN
1973-11-02Deed — from COMFORT GEORGE V; MICHEL CLIFFORD W; HELMSLEY HARRY B; LOEB JOHN L; WIEN LAWRENCE A; MICHA to GRANCENT CORP
1973-11-01Deed — from HELMSLEY HARRY B; COMFORT GEORGE V; LOEB JOHN L; WIEN LAWRENCE A; MICHEL CLIFFORD W to GRANCENT CORP
1973-10-16Deed — from GRANCENT CORP to COMFORT GEORGE V; MICHEL CLIFFORD W; COMFORT GEORGE; LOEB JOHN L; WIEN LAWRENCE A; WEIN LA
1973-09-06Deed — from GRANCENT CORP to LOEB JOHN L; WIEN LAWRENCE A; WIEN LAWERENCE A; COMFORT GEORGE V; MICHEL CLIFFORD W; HELMS
1973-09-04Deed — from MICHEL CLIFFORD W; WIEN LAWRENCE A; HELMSLEY HARRY B; WIEN LAWERENCE A; COMFORT GEORGE V; to GRANCENT CORP; GRANCET CORP
1973-08-06Deed — from GRANCET CORP; GRANCENT CORP to MICHEL CLIFFORD W; HELMSLEY HARRY B; COMFORT GEORGE V; WEIN LAWERENCE A; WIEN LAWRENCE A;
1973-08-01Deed — from MICHEL CLIFFORD W; COMFORT GEORGE V; HELMSLEY HARRY B; LOEB JOHN L; WIEN LAWRENCE A to GRANCET CORP; GRANCENT CORP
1973-07-03Deed — from GRANCENT CORP to COMFORT GEORGE V; MICHEL CLIFFORD W; WEIN LAWRENCE A; LOEB JOHN L; WIEN LAWRENCE A; HELMSL
1973-07-02Deed — from MICHEL CLIFFORD W; MICHEL CLIFORD W; COMFORT GEORGE V; HELMSLEY HARRY B; WIEN LAWRENCE A; to GRANCENT CORP
1973-06-15Deed — from GRANCENT CORP to COMFORT GEORGE V; WIEN LAWRENCE A; LOEB JOHN L; LOEB JOHN J; MICHEL CLIFFORD W; HELMSLEY H
1973-06-01Deed — from HELMSLEY HARRY B; MICHEL CLIFFORD W; LOEB JOHN L; COMFORT GEORGE V; WIEN LAWRENCE A to GRANCENT CORP
1973-05-03Deed — from GRANCENT CORP to WEIN LAWRENCE A; COMFORT GEORGE V; WIEN LAWRENCE A; LOEB JOHN L; MICHEL CLIFFORD W; HELMSL
1973-05-02Deed — from HELMSLEY HARRY B; MICHEL CLIFFORD W; WEIN LAWRENCE A; COMFORT GEORGE V; LOEB JOHN L; WIEN to GRANCENT CORP
1973-05-02Deed — from GRANCENT CORP to MICHEL CIFFORD W; MICHEL CLIFFORD W; LOEB JOHN L; WIEN LAWRENCE A; COMFORT GEORGE V; HELMS
1973-05-02Mortgage assigned — from GRANCENT CORP to LEVNER ALFRED; RLTY REFUNDING TRUST; KRAUSE ALAN M; GOLENBERG I GLENN; STONE IRVING I TRUS
1973-05-02Mortgage — from GRANCENT CORP to LEVNEY ALFRED; GOLENBERG GLENN; KRAUSE ALAN M; RLTY REFUNDINTG TRUST; SALTZMAN MAURKE; STO
1973-05-02Deed — from LOEB JOHN L; COMFORT GEORGE V; WIEN LAWRENCE A; MICHEL CLIFFORD W; WIEN LAWRENCE W; HELMSL to GRANCENT CORP
1966
1966-01-18Mortgage assigned — from KIRKEBY NATUS CORP; KIRKEBY NATUO CORP; KIRKETY-NATUS CORP to INCITY ASSOCS CORP; INCITY ASSOCIATES CORP; INCITY ASSOCIATE CORP
1900
1900-01-01Restaurant inspection: GYUYA
1900-01-01Restaurant inspection: JTUNES
1900-01-01Restaurant inspection: PANYA

Support this site Back to the building page