Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

584 4 Avenue · Brooklyn · BBL 3010510039 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP93
Structural & safetyDOB violations, ECB/OATH violations by class8
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 51% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 22. In ZIP 11215, 70% of residential buildings hold an A and 4% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations11 total — 1 class C (immediately hazardous), 3 class B, 7 class A. Oldest open since 2026-05-13.

status snapshot refreshed weekly from HPD records

Patterns

7 heat or hot-water complaints in the last three years (winter 2024–25: 3 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.

3
’24–25
2
’25–26

No bedbug-infested units reported in the last three years of filings.

$6,250 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

70 service requests in the last three years. Most common: Encampment (16) · Illegal Parking (11) · Dirty Condition (6) · Special Projects Inspection Team (SPIT) (4) · PLUMBING (4) · Noise (3).

Filed construction activity

$421,480 in permitted construction work filed since 2016 (25 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

NoBuilt before 1974 (2022)
YesSix or more residential units (46)
Yes421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)4TH AVENUE QOZB LLC
Head officerTOM ROSENBERG
Managing agentTOM ROSENBERG
Last registered2026-06-25

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$10,374,000 $4,668,300
2026$11,357,000 $5,110,650
2027$11,540,000 $5,193,000

The city's market estimate has risen 11% between tax years 2025 and 2027.

Tax exemptions on the roll: 421A 35YR WITH AFF HOUSING PCT

Restaurants in this building

RestaurantCuisineGradeNotes
Ellie's Cafe BY O' Rita's RoastersCoffee/TeaNot yet graded—
No Filter CoffeeCoffee/TeaA—
Pure GreenJuice, Smoothies, Fruit SaladsA—

Report to 311: Food poisoning · Food safety complaint

3 restaurants · 0 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayProspect Av — R · 200 ft straight-line (about a 1-minute walk) · station accessibility: none
4 Av-9 St — F G R · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: none
BusNearest boarding stop: 3 Av / 16 St — B37 · 700 ft
Citi Bike4 Ave & 17 St · 100 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 295. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

584 4 Avenue

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

70 311 service requests from this address in the last three years — 3 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $5,000,000 on 2024-07-05 (lender: Banco Popular North America and Popular Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2024-07-05Mortgage $5,000,000 — from 4TH AVENUE QOZB LLC to BANCO POPULAR NORTH AMERICA; POPULAR BANK $5,000,000
2024-07-05Agreement $24,000,000 — from POPULAR BANK to 4TH AVENUE QOZB LLC $24,000,000
2024-07-05AL&R $24,000,000 — from 4TH AVENUE QOZB LLC to POPULAR BANK $24,000,000
2022-08-22Mortgage $16,251,550 — from 4TH AVENUE QOZB LLC to POPULAR BANK $16,251,550
2022-08-22AL&R $16,251,550 — from 4TH AVENUE QOZB LLC to POPULAR BANK $16,251,550
2022-08-22Mortgage $2,748,450 — from 4TH AVENUE QOZB LLC to POPULAR BANK $2,748,450
2022-08-22AL&R $2,748,450 — from 4TH AVENUE QOZB LLC to POPULAR BANK $2,748,450
2022-06-27Deed $5,794,986 — from 4TH AVENUE LLC; KINGS 24 LLC; ASSOULINE, SIMON to 4TH AVENUE QOZB LLC $5,794,986
2022-06-03Sold for $5,794,986 $5,794,986 $125,978
2009-11-18Agreement $3,154,789 — from 2333 BEDFORD LLC; METROPOLITAN LLC; STUPHIN BOULEVARD LLC; EAST 98TH STREET LLC; 797 PENNS to NORTH FORK BANK; CAPITAL ONE, N.A., $3,154,789
2007-12-05Mortgage $630,211 — from EAST 98TH STREET LLC; NORTHERN BOULEVARD LLC; 2333 BEDFORD LLC; 4TH AVENUE LLC; 2-12 SUTTE to NORTH FORK BANK $630,211
2007-12-05Mortgage $3,154,789 — from 2-12 SUTTER LLC; METROPOLITAN LLC; 797 PANNSYLVANIA LLC; SUTPHIN BOULEVARD LLC; NORTHERN B to NORTH FORK BANK $3,154,789
2007-12-05Agreement $3,785,000 — from BOERUM PLACE LLC; EAST 98TH STREET LLC; 2333 BEDFORD LLC; SUTPHIN BOULEVARD LLC; 2-12 SUTT to NORTH FORK BANK $3,785,000
2006-05-01Mortgage $3,785,000 — from BOERUM PLACE LLC; BEDFORD AVENUE LLC; KNAPP LLC; 2-12 SUTTER LLC; 1940 LINDEN LLC; 86TH ST to NORTH FORK BANK $3,785,000
2006-05-01Mortgage $9,215,000 — from 86TH STREET LLC; ROCKAWAY AVENUE LLC; 113 HAMILTON AVENUE LLC; BOERUM PLACE LLC; SPRINGFIE to NORTH FORK BANK $9,215,000

Ten-year activity

100500
2017
2018
2019
2020
2021
86
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201700290029
20184090215
201951190025
202011040015
202112180021
20223720197386
202317591335
2024148415371
202555120123
202602600264
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 71 records

DateRecord
2026-09-18311: Graffiti — Graffiti
2026-09-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-08-20311: PLUMBING — BASIN/SINK
2026-08-20Tenant complaint: PLUMBING — BASIN/SINK
2026-07-31Restaurant inspection: ELLIE'S CAFE BY O' RITA'S ROASTERS — grade N
2026-07-09311: Sidewalk Condition — Defective Hardware
2026-07-06311: PLUMBING — TOILET
2026-07-06Tenant complaint: PLUMBING — TOILET
2026-07-02311: PLUMBING — TOILET
2026-07-02Tenant complaint: PLUMBING — TOILET
2026-06-14HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEAVY DUTY LOCKSET AT BUILIDNG ENTRANCE DOOR
2026-06-14HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF ELECTROMAGNETIC LOCK INSTALLED AT BUILDING ENTRANCE DOOR
2026-06-08311: Dirty Condition — Trash
2026-05-26311: Graffiti — Police Report Not Requested
2026-05-25311: Dirty Condition — Trash
2026-05-20HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET ASSEMBLY OF THE DOOR HANDLE AT THE NORTH ENTRANCE DOOR TO COMPAC
2026-05-20HPD class A: §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WIT
2026-05-20HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-05-20HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-05-20HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET ASSEMBLY OF THE DOOR HANDLE AT THE NORTH ENTRANCE DOOR TO COMPAC
2026-05-20HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-05-20HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING , THE WIDE ANGLE HINGES DOOR CLOSER INSTALLED AND OBSTRUCTED
2026-05-20HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-20HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-05-20HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDERS KEY OPERATED LOCK INSTALLED AT THE WEST ENTRANCE DOOR TO
2026-05-20HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-20HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDERS KEY OPERATED LOCK INSTALLED AT THE BUILDING FRONT ENTRANC
2026-05-20HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2026-05-19311: HEAT/HOT WATER — APARTMENT ONLY
2026-05-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-05-13HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2026-05-13HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-05-13HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-05-13HPD class A: §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISS
2026-05-13HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-05-13HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-05-13HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-05-12311: DOOR/WINDOW — DOOR
2026-05-12311: DOOR/WINDOW — DOOR
2026-05-12311: DOOR/WINDOW — DOOR
2026-05-12Tenant complaint: DOOR/WINDOW — DOOR
2026-05-12Tenant complaint: DOOR/WINDOW — DOOR
2026-05-12Tenant complaint: DOOR/WINDOW — DOOR
2026-05-09311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2026-05-09DOB complaint, category ?
2026-04-26311: Traffic — Congestion/Gridlock
2026-04-19311: Indoor Air Quality — Ventilation
2026-04-18311: Residential Disposal Complaint — Storage Area Not Provided
2026-04-17311: Indoor Air Quality — Human Feces
2026-03-09311: GENERAL — JANITOR/SUPER
2026-03-09311: GENERAL — SIGNAGE MISSING
2026-03-09Tenant complaint: GENERAL — SIGNAGE MISSING
2026-03-09Tenant complaint: GENERAL — JANITOR/SUPER
2026-03-07311: Illegal Parking — Blocked Hydrant
2026-03-07311: Illegal Parking — Blocked Hydrant
2026-02-26311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-26311: PLUMBING — WATER SUPPLY
2026-02-26Tenant complaint: PLUMBING — WATER SUPPLY
2026-02-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-23311: Residential Disposal Complaint — Waste Not Separated
2026-02-22311: Dirty Condition — Trash
2026-02-12Restaurant inspection: PURE GREEN — grade A
2026-01-27311: Noise — Noise: Construction Equipment (NC1)
2026-01-06ECB CLASS - 2 violation: AT THE TIME OF INSPECTION, OBSERVED ILLUMINATED WALL AND PROJECTING SIGNS INSTALLED ON THE BUILDING FACADE, APPROXIMATELY 6 FT BY
2025-12-24311: Illegal Parking — Blocked Crosswalk
2025-12-22Bedbug filing: 0 infested units
2025-12-12Restaurant inspection: NO FILTER COFFEE — grade A
2025-12-10311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2025-12-10DOB complaint, category ?
2025-11-26ECB CLASS - 2 violation: WORK WITHOUT PERMIT. NOTED: ILLUMINATED SIGN READS:"DISPO" SIGN IS APPROX: 10'X 3' AND IS MOUNTED TO THE FACADE WITH GREEN LETTERI
2025-11-19311: Illegal Parking — Blocked Hydrant

The full timeline

2026
2026-09-18311: Graffiti — Graffiti
2026-09-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-08-20311: PLUMBING — BASIN/SINK
2026-08-20Tenant complaint: PLUMBING — BASIN/SINK
2026-07-31Restaurant inspection: ELLIE'S CAFE BY O' RITA'S ROASTERS — grade N
2026-07-09311: Sidewalk Condition — Defective Hardware
2026-07-06311: PLUMBING — TOILET
2026-07-06Tenant complaint: PLUMBING — TOILET
2026-07-02311: PLUMBING — TOILET
2026-07-02Tenant complaint: PLUMBING — TOILET
2026-06-14HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEAVY DUTY LOCKSET AT BUILIDNG ENTRANCE DOOR
2026-06-14HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF ELECTROMAGNETIC LOCK INSTALLED AT BUILDING ENTRANCE DOOR
2026-06-08311: Dirty Condition — Trash
2026-05-26311: Graffiti — Police Report Not Requested
2026-05-25311: Dirty Condition — Trash
2026-05-20HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET ASSEMBLY OF THE DOOR HANDLE AT THE NORTH ENTRANCE DOOR TO COMPAC
2026-05-20HPD class A: §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WIT
2026-05-20HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-05-20HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-05-20HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET ASSEMBLY OF THE DOOR HANDLE AT THE NORTH ENTRANCE DOOR TO COMPAC
2026-05-20HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-05-20HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING , THE WIDE ANGLE HINGES DOOR CLOSER INSTALLED AND OBSTRUCTED
2026-05-20HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-20HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-05-20HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDERS KEY OPERATED LOCK INSTALLED AT THE WEST ENTRANCE DOOR TO
2026-05-20HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-20HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDERS KEY OPERATED LOCK INSTALLED AT THE BUILDING FRONT ENTRANC
2026-05-20HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2026-05-19311: HEAT/HOT WATER — APARTMENT ONLY
2026-05-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-05-13HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2026-05-13HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-05-13HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-05-13HPD class A: §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISS
2026-05-13HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-05-13HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-05-13HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-05-12311: DOOR/WINDOW — DOOR
2026-05-12311: DOOR/WINDOW — DOOR
2026-05-12311: DOOR/WINDOW — DOOR
2026-05-12Tenant complaint: DOOR/WINDOW — DOOR
2026-05-12Tenant complaint: DOOR/WINDOW — DOOR
2026-05-12Tenant complaint: DOOR/WINDOW — DOOR
2026-05-09311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2026-05-09DOB complaint, category ?
2026-04-26311: Traffic — Congestion/Gridlock
2026-04-19311: Indoor Air Quality — Ventilation
2026-04-18311: Residential Disposal Complaint — Storage Area Not Provided
2026-04-17311: Indoor Air Quality — Human Feces
2026-03-09311: GENERAL — JANITOR/SUPER
2026-03-09311: GENERAL — SIGNAGE MISSING
2026-03-09Tenant complaint: GENERAL — SIGNAGE MISSING
2026-03-09Tenant complaint: GENERAL — JANITOR/SUPER
2026-03-07311: Illegal Parking — Blocked Hydrant
2026-03-07311: Illegal Parking — Blocked Hydrant
2026-02-26311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-26311: PLUMBING — WATER SUPPLY
2026-02-26Tenant complaint: PLUMBING — WATER SUPPLY
2026-02-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-23311: Residential Disposal Complaint — Waste Not Separated
2026-02-22311: Dirty Condition — Trash
2026-02-12Restaurant inspection: PURE GREEN — grade A
2026-01-27311: Noise — Noise: Construction Equipment (NC1)
2026-01-06ECB CLASS - 2 violation: AT THE TIME OF INSPECTION, OBSERVED ILLUMINATED WALL AND PROJECTING SIGNS INSTALLED ON THE BUILDING FACADE, APPROXIMATELY 6 FT BY
2025
2025-12-24311: Illegal Parking — Blocked Crosswalk
2025-12-22Bedbug filing: 0 infested units
2025-12-12Restaurant inspection: NO FILTER COFFEE — grade A
2025-12-10311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2025-12-10DOB complaint, category ?
2025-11-26ECB CLASS - 2 violation: WORK WITHOUT PERMIT. NOTED: ILLUMINATED SIGN READS:"DISPO" SIGN IS APPROX: 10'X 3' AND IS MOUNTED TO THE FACADE WITH GREEN LETTERI$6,250
2025-11-19311: Illegal Parking — Blocked Hydrant
2025-10-13311: Dirty Condition — Trash
2025-07-28311: Illegal Parking — Blocked Sidewalk
2025-07-12311: Illegal Parking — Blocked Hydrant
2025-05-07Job filed: Renovation of an existing commercial space on 1st floor. No change in use, occupancy or exit. PAA to indicate as built condition of 1st fl$93,500
2025-04-17HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL AT BATHTUB IN THE BATHROOM LOCATED AT APT
2025-04-17HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT LOCK SET AT THE ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH LOCATED
2025-04-01311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2025-04-01Job filed: Renovation of an existing commercial space on 1st floor. No change in use, occupancy or exit. PAA to add work in cellar$93,500
2025-04-01DOB complaint, category ?
2025-03-29311: Illegal Parking — Blocked Hydrant
2025-03-19Job filed: PL is subsequently filed.$2,500
2025-02-25Permit Plumbing — Signed-off
2025-02-25Permit Plumbing — Signed-off
2025-02-24DOB complaint, category ?
2025-02-04311: Illegal Parking — Blocked Crosswalk
2025-02-04DOB complaint, category ?
2024
2024-12-26Bedbug filing: 0 infested units
2024-12-24DOB complaint, category ?
2024-12-18Permit General Construction — Signed-off
2024-12-18Permit General Construction — Signed-off
2024-12-09Restaurant inspection: PURE GREEN — grade A
2024-12-09Job filed: PL is subsequently filed.$2,500
2024-12-06311: Noise — Noise: Construction Equipment (NC1)
2024-12-05Job filed: Renovation of an existing commercial space on 1st floor. No change in use, occupancy or exit. PAA to indicate as built condition of 1st fl$93,500
2024-10-30311: Litter Basket Request — New Basket
2024-10-26HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM NOR
2024-10-26HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 903, 9th STORY, 1st APARTMENT FROM EAS
2024-10-26HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
2024-10-25311: HEAT/HOT WATER — APARTMENT ONLY
2024-10-25311: ELECTRIC — POWER OUTAGE
2024-10-25Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-10-25Tenant complaint: ELECTRIC — POWER OUTAGE
2024-10-24311: Encampment — N/A
2024-10-24311: Encampment — N/A
2024-10-22311: Encampment — N/A
2024-10-22311: Encampment — N/A
2024-10-17FDNY inspection (RISK)
2024-09-24311: Non-Emergency Police Matter — Other (complaint details)
2024-09-18311: Illegal Dumping — Removal Request
2024-09-11Restaurant inspection: NO FILTER COFFEE — grade A
2024-09-11DOB complaint, category ?
2024-09-10311: Dirty Condition — Trash
2024-09-07311: Illegal Parking — Blocked Hydrant
2024-09-05Permit Plumbing — Signed-off
2024-09-05Permit Plumbing — Signed-off
2024-08-22311: Encampment — N/A
2024-08-22311: Encampment — N/A
2024-08-17311: Encampment — N/A
2024-08-17311: Homeless Person Assistance
2024-08-08Job filed: RENOVATION OF EXISTING RETAIL/COMMERCIAL SPACE. MINOR CHANGES TO NON-LOADBEARING PARTITIONS AND FINISHESNO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS$47,500
2024-08-05311: Encampment — N/A
2024-08-05311: Encampment — N/A
2024-08-03311: Encampment — N/A
2024-08-03311: Encampment — N/A
2024-07-29311: Encampment — N/A
2024-07-23Restaurant inspection: NO FILTER COFFEE
2024-07-14311: Smoking or Vaping — Allowed in Smoke Free Area
2024-07-11311: Encampment — N/A
2024-07-11311: Encampment — N/A
2024-07-05Mortgage $5,000,000 — from 4TH AVENUE QOZB LLC to BANCO POPULAR NORTH AMERICA; POPULAR BANK$5,000,000
2024-07-05Agreement $24,000,000 — from POPULAR BANK to 4TH AVENUE QOZB LLC$24,000,000
2024-07-05AL&R $24,000,000 — from 4TH AVENUE QOZB LLC to POPULAR BANK$24,000,000
2024-07-05TL&R — from POPULAR BANK to 4TH AVENUE QOZB LLC
2024-07-05TL&R — from POPULAR BANK to 4TH AVENUE QOZB LLC
2024-06-30311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2024-06-30DOB complaint, category ?
2024-06-17Bedbug filing: 0 infested units
2024-06-17311: Encampment — N/A
2024-06-17311: Encampment — N/A
2024-06-15311: Illegal Parking — Blocked Hydrant
2024-06-10311: Dirty Condition — Trash
2024-05-29Permit General Construction — Signed-off
2024-05-29Permit General Construction — Signed-off
2024-05-25311: Graffiti — Graffiti
2024-05-20Job filed: RENOVATION OF EXISTING RETAIL/COMMERCIAL SPACE. MINOR CHANGES TO NON-LOADBEARING PARTITIONS AND FINISHESNO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS$47,500
2024-05-20Job filed: NEW PLUMBING FIXTURES IN RETAIL UNIT B. IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION B01049353-I1.$17,500
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-05-01FDNY inspection (CONSTR)
2024-05-01FDNY inspection (STRUC_INT_6)
2024-04-23Certificate of occupancy Final
2024-04-23Certificate of occupancy Final
2024-04-18HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-17311: Illegal Parking — Blocked Bike Lane
2024-03-14FDNY inspection (CONSTR)
2024-03-01311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2024-02-07311: Noise - Residential — Loud Music/Party
2024-01-02Certificate of occupancy Renewal Without Change
2023
2023-12-29SMIS — from 4TH AVENUE QOZB LLC
2023-11-01311: Traffic — Congestion/Gridlock
2023-10-12Certificate of occupancy Initial
2023-10-05311: Litter Basket Request — New Basket
2023-09-07311: Urinating in Public — N/A
2023-08-02Job filed: sprinklers and standpipe systems in conjunction with nb application 321598838$1,000
2023-08-02Job filed: Plumbing system in conjunction with NB application 321598838$1,000
2023-07-21Elevator permit: FandI 3 "MRL elevators to comply w/ A17.1s -2005 Part 2 and as modified by NYC BC 2014 Appendix K, Chapter K4. PAA- P1: Amend to r$662,000
2023-06-16311: Noise — Noise: Construction Equipment (NC1)
2023-06-14Permit Mechanical Systems — Signed-off
2023-06-14Permit Mechanical Systems — Signed-off
2023-06-13311: Traffic — Congestion/Gridlock
2023-06-06Permit Construction Fence — Signed-off
2023-06-06Permit Supported Scaffold — Signed-off
2023-06-06Permit Supported Scaffold — Signed-off
2023-06-06Permit Construction Fence — Signed-off
2023-06-05Permit NB — ISSUED
2023-05-23Permit Sidewalk Shed — Signed-off
2023-05-23Permit Sidewalk Shed — Signed-off
2023-05-19311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2023-04-25Elevator permit: FandI 3 "MRL elevators to comply w/ A17.1s -2005 Part 2 and as modified by NYC BC 2014 Appendix K, Chapter K4. PAA- P1: Amend to r$662,000
2023-04-18DOB complaint, category ?
2023-03-24311: Noise — Noise: Construction Equipment (NC1)
2023-03-23311: Noise — Noise: Construction Equipment (NC1)
2023-02-01Elevator permit: Furnish and install three (3) new "MachineRoomLess" passenger elevators to comply with A17.1s -2005 Part 2 and as modified by NYC $662,000
2023-01-26311: Dirty Condition — Trash
2023-01-23Permit Sprinklers — Signed-off
2023-01-23Permit Standpipe — Signed-off
2023-01-23Permit Standpipe — Signed-off
2023-01-23Permit Sprinklers — Signed-off
2023-01-17DOB complaint, category ?
2023-01-17DOB complaint, category ?
2023-01-13ECB CLASS - 2 violation: FAILURE TO PERFORM SPECIAL INSPECTIONS & VERIFICATION FOR CONCRETE CONSTRUCTION AS REQUIRED BY SECTION & TABLE 1704.4.AS NOTED:AT
2023-01-13ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AS NOTED:AT TIME OF INSPECTION OBSERVED CONCRE$620
2023-01-10Permit NB — ISSUED
2022
2022-12-28Permit Standpipe — Signed-off
2022-12-28Permit Standpipe — Signed-off
2022-12-12311: Noise — Noise: Construction Equipment (NC1)
2022-11-19311: General Construction/Plumbing — Debris - Excessive
2022-11-19DOB complaint, category ?
2022-11-16Permit Plumbing — Signed-off
2022-11-16Permit Plumbing — Signed-off
2022-11-15DOB complaint, category ?
2022-11-11311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2022-11-11DOB complaint, category ?
2022-11-07311: General Construction/Plumbing — Debris - Excessive
2022-11-07DOB complaint, category ?
2022-11-05DOB complaint, category ?
2022-11-03311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2022-10-20311: Illegal Parking — Double Parked Blocking Vehicle
2022-10-20311: Illegal Parking — Double Parked Blocking Vehicle
2022-10-06Permit Construction Fence — Signed-off
2022-10-06Permit Construction Fence — Signed-off
2022-09-25FDNY inspection (CDA-90-DRILL)
2022-09-23311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-09-23DOB complaint, category ?
2022-09-12DOB complaint, category ?
2022-09-09Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-09-09Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-09-08ECB CLASS - 1 violation: FAILED TO NOTIFY DEPT OF INCIDENT THAT RESULTED IN FATALITY OR INJURY.NOTED:3 WORKERS INJURED WHEN TWO SECTIONS OF SCAFFOLDING FRA$1,250
2022-08-31Elevator permit: PROPOSED INSTALLATION OF SINGLE 7000 LBS. ALIMAK SCANDO HOIST AS PER PLANS IN CONJUNCTION WITH DOB JOB #321598838 WHICH IS FOR PRO$10,000
2022-08-22Mortgage $16,251,550 — from 4TH AVENUE QOZB LLC to POPULAR BANK$16,251,550
2022-08-22AL&R $16,251,550 — from 4TH AVENUE QOZB LLC to POPULAR BANK$16,251,550
2022-08-22Mortgage $2,748,450 — from 4TH AVENUE QOZB LLC to POPULAR BANK$2,748,450
2022-08-22AL&R $2,748,450 — from 4TH AVENUE QOZB LLC to POPULAR BANK$2,748,450
2022-08-19Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-08-10ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONST OPS.ATO MYINSP OF 9STYNB UNDER CONST,CURRENTLY THIS BLDG@6FL W/FORMWOR
2022-08-10ECB CLASS - 1 violation: AT TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING UNDER CONSTRUCTION, CURRENTLY THIS BUILDING IS AT 6TH FLOOR WITH FORMWORK OPERA
2022-08-10ECB CLASS - 1 violation: AT TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, CURRENTLY AT 6 FLOOR WITH FORMWORK OPERATIONS AND 71 FEET IN HEIGHT WITH 53 WO
2022-08-10ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONST OPS.ATO MYINSP OF 9STYNB,CURRENTLY@6FL W/FORMWORK OPS&71' IN HT W/53WO
2022-08-10DOB complaint, category ?
2022-07-30FDNY inspection (CONSTR)
2022-07-14Elevator permit: FandI 3 "MRL elevators to comply w/ A17.1s -2005 Part 2 and as modified by NYC BC 2014 Appendix K, Chapter K4. PAA- P1: Amend to r$662,000
2022-07-14Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-07-11Elevator permit: PROPOSED INSTALLATION OF SINGLE 7000 LBS. ALIMAK SCANDO HOIST AS PER PLANS IN CONJUNCTION WITH DOB JOB #321598838 WHICH IS FOR PRO$10,000
2022-07-07Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-07-01Permit Protection and Mechanical Methods — Signed-off
2022-07-01Permit Protection and Mechanical Methods — Signed-off
2022-06-30Job filed: INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-06-27Deed — from 4TH AVENUE LLC to KINGS 24 LLC; 4TH AVENUE LLC; ASSOULINE, SIMON
2022-06-27Deed $5,794,986 — from 4TH AVENUE LLC; KINGS 24 LLC; ASSOULINE, SIMON to 4TH AVENUE QOZB LLC$5,794,986
2022-06-15Permit Protection and Mechanical Methods — Signed-off
2022-06-15Permit Supported Scaffold — Signed-off
2022-06-15Permit Protection and Mechanical Methods — Signed-off
2022-06-15Permit Protection and Mechanical Methods — Signed-off
2022-06-15Permit Protection and Mechanical Methods — Signed-off
2022-06-15Permit Protection and Mechanical Methods — Signed-off
2022-06-15Permit Supported Scaffold — Signed-off
2022-06-15Permit Protection and Mechanical Methods — Signed-off
2022-06-14Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-06-14Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-06-14Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-06-14Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-06-03Sold for $5,794,986$5,794,986
2022-05-27Permit Sidewalk Shed — Signed-off
2022-05-27Permit Sidewalk Shed — Signed-off
2022-05-26Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-05-04311: Noise - Street/Sidewalk — Loud Talking
2022-04-14FDNY inspection (CONSTR)
2022-04-11311: Encampment — N/A
2022-04-11311: Encampment — N/A
2022-03-15311: Illegal Dumping — Removal Request
2022-03-14311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-24311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-17311: Noise — Noise: Construction Equipment (NC1)
2022-02-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-15311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2022-02-15311: General Construction/Plumbing — Adjacent Buildings Not Protected
2022-02-15311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2022-02-15DOB complaint, category ?
2022-02-15DOB complaint, category ?
2022-02-15DOB complaint, category ?
2022-01-25Permit Plumbing — Signed-off
2022-01-25Permit Standpipe — Signed-off
2022-01-25Permit Plumbing — Signed-off
2022-01-25Permit Standpipe — Signed-off
2022-01-25Permit Sprinklers — Signed-off
2022-01-25Permit Sprinklers — Signed-off
2022-01-14Permit NB — ISSUED
2022-01-14Permit NB — ISSUED
2022-01-11FDNY inspection (CONSTR)
2021
2021-12-30Permit NB — ISSUED
2021-12-28Permit Standpipe — Signed-off
2021-12-28Permit Standpipe — Signed-off
2021-12-27Job filed: Temporary standpipe installation in conjunction with NB application321598838$10,000
2021-11-04311: Encampment — N/A
2021-11-01Permit Construction Fence — Signed-off
2021-11-01Permit Construction Fence — Signed-off
2021-10-12Job filed: structural systems in conjunction with nb application 321598838 (except for SOE, foundations, stairs and roofs structure systems - filed as a subseque$1,000
2021-08-26Job filed: sprinklers and standpipe systems in conjunction with nb application 321598838$1,000
2021-07-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-07-12Job filed: Plumbing system in conjunction with NB application 321598838$1,000
2021-05-21Job filed: mechanical systems in conjunction with nb application 321598838$1,000
2021-05-11Job filed: INSTALL NEW SIDEWALKS, CURBS & ROADWAY FOR A LENGTH OF 178 LINEAL FEET
2021-05-11Job filed: INSTALL NEW SIDEWALKS, CURBS & ROADWAY FOR A LENGTH OF 178 LINEAL FEET
2021-05-03311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2021-03-30311: General Construction/Plumbing — Fence - None/Inadequate
2021-03-30311: Vacant Lot — 8 Request to Clean Vacant Lot
2021-03-30DOB complaint, category ?
2021-03-10311: Noise — Noise: Construction Before/After Hours (NM1)
2021-03-07311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2021-02-24311: Dirty Conditions — E12 Illegal Dumping Surveillance
2020
2020-12-27311: Street Sign - Dangling — Detour
2020-12-09Job filed: STRUCTURAL AND FOUNDATIONS SYSTEM DRAWINGS
2020-12-09Job filed: SOE SYSTEM DRAWINGS
2020-12-09Job filed: STRUCTURAL AND FOUNDATIONS SYSTEM DRAWINGS
2020-11-13Permit Construction Fence — Signed-off
2020-11-13Permit Construction Fence — Signed-off
2020-11-12Job filed: PROPOSED NEW 9 STORIES WITH CELLAR MIXED USE (COMMERCIAL/RESIDENTIAL) BUILDING. RELATED DOB NOW APPLICATIONS: B00510816 (ST); B00510802 (SP/SD); B0051
2020-11-12Job filed: PROPOSED NEW 9 STORIES WITH CELLAR MIXED USE (COMMERCIAL/RESIDENTIAL) BUILDING. RELATED DOB NOW APPLICATIONS: B00510816 (ST); B00510802 (SP/SD); B0051
2020-11-06311: Noise — Noise: Construction Before/After Hours (NM1)
2020-06-15Permit Construction Fence — Signed-off
2020-06-15Permit Construction Fence — Signed-off
2020-06-04Permit Construction Fence — Signed-off
2020-06-04Permit Construction Fence — Signed-off
2020-05-21311: Dirty Conditions — E3A Dirty Area/Alleyway
2020-04-26311: Homeless Street Condition — N/A
2019
2019-12-13311: Homeless Encampment — N/A
2019-11-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-23311: Illegal Parking — Blocked Bike Lane
2019-11-05311: Dirty Conditions — E1 Improper Disposal
2019-10-22311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-09-09311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-07-12311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-06-17311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-06-07311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-06-04Permit Construction Fence — Signed-off
2019-06-04Permit Construction Fence — Signed-off
2019-05-25311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-05-17311: Illegal Parking — Posted Parking Sign Violation
2019-05-14311: Blocked Driveway — No Access
2019-05-07Job filed: Proposed construction fence. No change to use, egress or occupancy under this application$160
2019-04-30311: BEST/Site Safety — Demolition Notification Received
2019-04-30DOB complaint, category ?
2019-04-29Permit DM — ISSUED
2019-04-03311: Street Condition — Pothole
2019-03-25311: Street Condition — Defective Hardware
2019-03-23311: Street Condition — Maintenance Cover
2019-03-07Job filed: Proposed construction fence. No change to use, egress or occupancy under this application$160
2019-02-21311: Street Condition — Pothole
2019-01-28311: Vacant Lot — 8 Request to Clean Vacant Lot
2019-01-08311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018
2018-10-15Permit Construction Fence — Signed-off
2018-10-15Permit Construction Fence — Signed-off
2018-09-24Job filed: Proposed construction fence. No change to use, egress or occupancy under this application$160
2018-08-27311: Illegal Parking — Blocked Sidewalk
2018-07-24311: Dirty Conditions — E3A Dirty Area/Alleyway
2018-06-05Rodent inspection: Passed
2018-05-09Rodent inspection: Failed for Other Reason
2018-05-05311: Illegal Parking — Commercial Overnight Parking
2018-04-17Job filed: DEMOLITION OF A 1 STORY BUILDING
2018-03-21311: Sewer — Manhole Cover Broken/Making Noise (SB)
2018-01-16311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-01-08311: Snow — E9 Snow / Icy Sidewalk
2018-01-05311: Snow — E9 Snow / Icy Sidewalk
2018-01-03311: Industrial Waste — Chemical Spill (IAC)
2018-01-03311: Hazardous Materials — Chemical Spill/Release (HA1)
2017
2017-12-29311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-12-18311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-12-18311: Noise - Commercial — Banging/Pounding
2017-10-26311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2017-10-19311: Noise - Commercial — Banging/Pounding
2017-10-18311: Industrial Waste — Oil Spill Into Basin/Sewer - Large (IABL)
2017-10-18311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2017-10-18311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2017-10-18311: Hazardous Materials — Chemical Spill/Release (HA1)
2017-10-16311: Derelict Vehicles — Derelict Vehicles
2017-07-23311: Noise - Commercial — Banging/Pounding
2017-07-13311: Dirty Conditions — E3 Dirty Sidewalk
2017-07-10311: Hazardous Materials — Chemical Spill/Release (HA1)
2017-06-07311: Homeless Encampment — N/A
2017-05-16311: Illegal Parking — Blocked Sidewalk
2017-05-12311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-05-09311: Homeless Person Assistance — N/A
2017-05-09311: Noise - Commercial — Banging/Pounding
2017-05-03311: Homeless Encampment — N/A
2017-05-03311: Noise - Commercial — Banging/Pounding
2017-04-22311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2017-04-21311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2017-04-21311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2017-03-29311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-03-13311: Noise - Commercial — Banging/Pounding
2017-02-21311: Street Condition — Cave-in
2017-02-10311: Snow — E9 Snow / Icy Sidewalk
2017-01-30311: Blocked Driveway — No Access
2017-01-10311: Snow — E9 Snow / Icy Sidewalk
2016
2016-09-29311: Blocked Driveway — Partial Access
2016-06-30311: Homeless Person Assistance — N/A
2016-06-27311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2016-02-20311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2015
2015-10-24311: DOOR/WINDOW — DOOR
2015-10-24311: ELECTRIC — NO LIGHTING
2015-10-24Tenant complaint: ELECTRIC — NO LIGHTING
2015-10-24Tenant complaint: DOOR/WINDOW — DOOR
2015-10-10311: Derelict Vehicle — With License Plate
2014
2014-05-28311: Dirty Conditions — E1 Improper Disposal
2014-04-14Permit EW — ISSUED
2014-04-14Permit EQ — ISSUED
2014-02-10311: Snow — E9 Snow / Icy Sidewalk
2013
2013-11-25Permit EQ — ISSUED
2013-11-25Permit EW — RE-ISSUED
2013-11-18Job filed: INSTALL TEMPORARY CHAIN LINK FENCING AROUND CONSTRUCTION AREA. EXCAVATE APPROXIMATELY 975 SQUARE FEET OF CONTAMINATED SOIL. AFTER EXCAVATION, BACKFI$321,000
2013-11-18Job filed: INSTALL TEMPORARY CHAIN LINK FENCING AROUND CONSTRUCTION AREA. EXCAVATE APPROXIMATELY 975 SQUARE FEET OF CONTAMINATED SOIL. AFTER EXCAVATION, BACKFI$321,000
2013-10-24311: Street Light Condition — Glassware Hanging
2013-10-24311: Dirty Conditions — E3 Dirty Sidewalk
2011
2011-07-26PREL — from CAPITAL ONE, N.A. to 4TH AVENUE LLC
2011-07-26REL — from CAPITAL ONE, N.A. to 4TH AVENUE LLC
2010
2010-02-25Permit EW — ISSUED
2010-02-24Job filed: PROPOSE TO INSTALL CHAIN LINK FENCE AROUND PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,208
2009
2009-11-18Agreement $3,154,789 — from 2333 BEDFORD LLC; METROPOLITAN LLC; STUPHIN BOULEVARD LLC; EAST 98TH STREET LLC; 797 PENNS to NORTH FORK BANK; CAPITAL ONE, N.A.,$3,154,789
2009-06-17CERT — from RIDGE ABSTRACT CORP
2009-06-17ZONE — from 4TH AVENUE, LLC
2007
2007-12-14PREL — from METROPOLITAN LLC; SUTPHIN BOULEVARD LLC; 797 PENNSYLVANIA LLC; EAST 98TH STREET LLC; 113 H to NORTH FORK BANK
2007-12-05Mortgage $630,211 — from EAST 98TH STREET LLC; NORTHERN BOULEVARD LLC; 2333 BEDFORD LLC; 4TH AVENUE LLC; 2-12 SUTTE to NORTH FORK BANK$630,211
2007-12-05Mortgage $3,154,789 — from 2-12 SUTTER LLC; METROPOLITAN LLC; 797 PANNSYLVANIA LLC; SUTPHIN BOULEVARD LLC; NORTHERN B to NORTH FORK BANK$3,154,789
2007-12-05Agreement $3,785,000 — from BOERUM PLACE LLC; EAST 98TH STREET LLC; 2333 BEDFORD LLC; SUTPHIN BOULEVARD LLC; 2-12 SUTT to NORTH FORK BANK$3,785,000
2007-01-05Job filed: DM
2007-01-05DOB complaint, category ?
2006
2006-05-01REL — from ROCKAWAY AVENUE LLC; HEMPSTEAD LLC; SUTPHIN BOULEVARD LLC; METROPOLITAN LLC; NORTHERN BOUL to NORTH FORK BANK
2006-05-01Mortgage $3,785,000 — from BOERUM PLACE LLC; BEDFORD AVENUE LLC; KNAPP LLC; 2-12 SUTTER LLC; 1940 LINDEN LLC; 86TH ST to NORTH FORK BANK$3,785,000
2006-05-01Mortgage $9,215,000 — from 86TH STREET LLC; ROCKAWAY AVENUE LLC; 113 HAMILTON AVENUE LLC; BOERUM PLACE LLC; SPRINGFIE to NORTH FORK BANK$9,215,000
2006-05-01SMIS $13,000,000 — from 2333 BEDFORD LLC; NORTHERN BOULEVARD LLC; SUTTER AVENUE LLC; 2-12 SUTTER LLC; SPRINGFIELD to NORTH FORK BANK$13,000,000
2005
2005-06-06CORRM $10,000,000 — from FLATLANDS AVENUE LLC; 2478 CONEY ISLAND AVENUE LLC; 805 PENNSYLVANIA LLC; 4TH AVENUE LLC; to NORTH FORK BANK$10,000,000
2005-06-03AL&R $13,000,000 — from NORTH FORK BANK to 805 PENNSYLVANIA LLC; ROCKAWAY AVENUE LLC; EAST 98TH STREET LLC; 86TH STREET LLC; 4TH AVEN$13,000,000
2005-06-03M&CON $13,000,000 — from HEMPSTEAD LLC; 1940 LINDEN LLC; ROCKAWAY AVENUE LLC; NORTHERN BOULEVARD LLC; 5262 KINGS HI to NORTH FORK BANK$13,000,000
2005-05-23AL&R — from NORTH FORK BANK to ROCKAWAY AVENUE LLC; 797 PENNSYLVANIA LLC; SUTTER AVENUE LLC; HEMPSTEAD LLC; 86TH STREET L
2005-01-25AL&R — from NORTH FORK BANK to SPRINGFIELD BOULEVARD LLC; STUPHIN BOULEVARD LLC; 797 PENNSYLVANIA LLC; 805 PENNSYLVANIA L
2004
2004-07-05Mortgage $10,000,000 — from 4TH AVENUE LLC; 2-12 SUTTER LLC; 797 PENNSYLVANIA LLC; ROCKAWAY AVENUE LLC; 2478 CONEY ISL to NORTH FORK BANK$10,000,000
2004-04-08Deed — from MORBEN PROPERTIES, INC. to 4TH AVENUE LLC
2003
2003-02-22Permit EQ — ISSUED
2003-01-30Permit EW — ISSUED
2003-01-06Job filed: remove existing (5) 4,000 gallon underground gasoline storage tanks and dispose of in a legal manner. No change to use, zone, occupancy or egress her$20,000
2002
2002-10-16Permit NB — ISSUED
2002-10-15Permit EQ — ISSUED
2001
2001-10-03DOB violation C: WORK WITHOUT A PERMIT: WORK NOTED: BUILT 40' X 25' X 18' CONCRETE BLOCK EXTENSION TO REAR OF BUILDING WITH ROOF ENCLOSURE
2001-05-23Permit NB — ISSUED
2001-05-23Permit EQ — ISSUED
1997
1997-05-14Permit EW — ISSUED
1997-03-28Permit EW — ISSUED
1997-03-28Permit EW — ISSUED
1997-03-28Permit EW — ISSUED
1997-01-08ECB Non-Hazardous violation: OPERATING AN AIR CONDITIONING INSTALLED IN THE ROOF WITHOUT AN EQUIPMENT USE PERMIT REMEDY OBTAIN AN EQUIPMENT USE PERMIT$175
1996
1996-08-16Permit EW — ISSUED
1996-08-16Permit EW — ISSUED
1996-05-30DOB complaint, category ?
1993
1993-08-26DOB complaint, category ?

Support this site Back to the building page