Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

1501 Pitkin Avenue · Brooklyn · BBL 3034920001 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

15 service requests in the last three years. Most common: Food Establishment (7) · Consumer Complaint (2) · Sewer (1) · Street Light Condition (1) · Food Poisoning (1) · Derelict Vehicles (1).

Filed construction activity

$1,530,200 in permitted construction work filed since 2016 (12 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$30,506,000 $13,727,700
2026$30,960,000 $13,932,000
2027$31,724,000 $14,275,800

The city's market estimate has risen 4% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)B — ENERGY STAR score 72/100 (2022 disclosure cycle)

Restaurants in this building

RestaurantCuisineGradeNotes
Pizza HutPizzaA—
SubwaySandwichesA—

Report to 311: Food poisoning · Food safety complaint

2 restaurants · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick), shared by 2 restaurants
7 Food Establishment complaints to 311 at this address in the last three years (most often: Food Spoiled, Food Contaminated, Food Worker Hygiene), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

2 street-flooding or sewer-backup complaints at this address since 2024 (2 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwaySutter Av-Rutland Rd — 3 · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: none
BusNearest boarding stop: Pitkin Av / Legion St — B14 · 150 ft
Citi BikePitkin Ave & Grafton St · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

1501 Pitkin Avenue

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

15 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $22,485,000 on 2024-07-24 (lender: Equitable Facilities Funds, INC.), covering 6 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2025-09-29AL&R $49,000,000 — from PITKIN TERRACE LLC to CUSTOMERS BANK $49,000,000
2025-09-29M&CON $49,000,000 — from PITKIN TERRACE LLC to CUSTOMERS BANK $49,000,000
2024-07-24Mortgage $22,485,000 — from FRIENDS OF ASCEND CHARTER SCHOOLS. INC.; ASCEND CHARTER SCHOOLS to EQUITABLE FACILITIES FUNDS, INC. $22,485,000
2022-11-15AL&R $50,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK $50,000,000
2022-11-15Agreement $50,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK $50,000,000
2022-11-15Mortgage $6,824,213 — from PITKIN TERRACE LLC to SIGNATURE BANK $6,824,213
2022-01-12AL&R $6,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK $6,000,000
2022-01-12Mortgage $6,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK $6,000,000
2019-11-06Mortgage $2,500,000 — from ASCEND CHARTER SCHOOLS, INC. to NONPROFIT FINANCE FUND $2,500,000
2019-11-06AL&R $2,500,000 — from ASCEND CHARTER SCHOOLS, INC. to NONPROFIT FINANCE FUND $2,500,000
2018-01-05AL&R $40,000,000 to SIGNATURE BANK LLC $40,000,000
2018-01-05Agreement $40,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK LLC $40,000,000
2018-01-05Mortgage $8,700,000 — from PITKIN TERRACE LLC to SIGNATURE BANK $8,700,000
2018-01-05Deed $53,000,000 — from 1501 PITKIN OWNERS LLC to PITKIN TERRACE LLC $53,000,000
2017-12-26Sold for $53,000,000 $53,000,000 $5,300,000

Ten-year activity

100500
2017
71
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201775323855
20185921132371
20191212331040
20203340717
202122100620
202210971027
202307110624
202482181029
202592851034
20266240618
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 31 records

DateRecord
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Permit Suspended Scaffold — Permit Issued
2026-08-20Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg
2026-08-11Job filed: Suspended Scaffold outrigger installation for Facade repair works
2026-07-26311: Food Establishment — Rodents/Insects/Garbage
2026-07-05311: Illegal Fireworks — N/A
2026-05-09311: Food Establishment — Food Spoiled
2026-04-23FDNY inspection (RISK)
2026-04-23Permit Suspended Scaffold — Signed-off
2026-04-15DOB complaint, category ?
2026-04-01Permit General Construction — Permit Issued
2026-01-23311: Food Establishment — Sign
2026-01-02Permit Sidewalk Shed — Permit Issued
2025-12-12Cooling tower inspection
2025-12-12Cooling tower inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-11-28Restaurant inspection: SUBWAY — grade A
2025-11-24311: Food Establishment — Food Contaminated
2025-11-18Permit Sidewalk Shed — Permit Issued
2025-10-29Restaurant inspection: PIZZA HUT — grade A
2025-10-21311: Obstruction — Trash or Recycling

The full timeline

2026
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Boiler inspection
2026-08-27Permit Suspended Scaffold — Permit Issued
2026-08-20Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,500
2026-08-11Job filed: Suspended Scaffold outrigger installation for Facade repair works
2026-07-26311: Food Establishment — Rodents/Insects/Garbage
2026-07-05311: Illegal Fireworks — N/A
2026-05-09311: Food Establishment — Food Spoiled
2026-04-23FDNY inspection (RISK)
2026-04-23Permit Suspended Scaffold — Signed-off
2026-04-15DOB complaint, category ?
2026-04-01Permit General Construction — Permit Issued
2026-01-23311: Food Establishment — Sign
2026-01-02Permit Sidewalk Shed — Permit Issued
2025
2025-12-12Cooling tower inspection
2025-12-12Cooling tower inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-12-04Boiler inspection
2025-11-28Restaurant inspection: SUBWAY — grade A
2025-11-24311: Food Establishment — Food Contaminated
2025-11-18Permit Sidewalk Shed — Permit Issued
2025-10-29Restaurant inspection: PIZZA HUT — grade A
2025-10-21311: Obstruction — Trash or Recycling
2025-10-06Permit Sidewalk Shed — Permit Issued
2025-09-29AL&R $49,000,000 — from PITKIN TERRACE LLC to CUSTOMERS BANK$49,000,000
2025-09-29TL&R — from SIG CRE 2023 VENTURE LLC to PITKIN TERRACE LLC
2025-09-29M&CON $49,000,000 — from PITKIN TERRACE LLC to CUSTOMERS BANK$49,000,000
2025-09-29Mortgage assigned — from SIG CRE 2023 VENTURE LLC to CUSTOMERS BANK
2025-09-25311: Derelict Vehicles — Derelict Vehicles
2025-09-22311: Food Poisoning — 1 or 2
2025-09-04Job filed: INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
2025-09-02FDNY inspection (EDU)
2025-08-27Permit Suspended Scaffold — Signed-off
2025-08-14Permit Suspended Scaffold — Signed-off
2025-08-11Job filed: INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
2025-07-25Job filed: LIMITED FACADE REPAIRS INCLUDING REPLACEMENT OF DAMAGED STONE. RECONSTRUCTION OF AN ADDITIONAL TWO CORNERS. REPLACEMENT OF THE DAMAGED BRICKS AT ALL $76,750
2025-04-10Permit Suspended Scaffold — Signed-off
2025-04-06311: Food Establishment — Food Worker Hygiene
2025-03-31Permit General Construction — Permit Issued
2025-03-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2025-02-06311: Street Light Condition — Flood Light Lamp Out
2025-01-28311: Consumer Complaint — Bodega, Deli, or Convenience Store
2025-01-28311: Consumer Complaint — Tobacco Sales
2025-01-06Mortgage assigned — from EQUITABLE SCHOOL REVOLVING FUND, LLC, to U.S. BANK TRUST COMPANY, NATIONAL ASSOCI
2024
2024-12-31Mortgage assigned — from EQUITABLE FACILITIES FUNDS, INC. to EQUITABLE SCHOOL REVOLVING FUND, LLC
2024-12-26Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,500
2024-10-25AALR — from IN ITS CAPACITY AS RECEIVER FOR; SIGNATURE BRIDGE BANK, N.A.; FEDERAL DEPOSIT INSURANCE CO to SIG CRE 2023 VENTURE LLC
2024-10-25AALR — from FEDERAL DEPOSIT INSURANCE CORPORATION; IN ITS CAPACITY AS RECEIVER FOR; SIGNATURE BANK, NE to SIGNATURE BRIDGE BANK, N.A.
2024-10-25Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BRIDGE BANK, N.A.; IN ITS CAPACITY AS REC to SIG CRE 2023 VENTURE LLC
2024-10-25Mortgage assigned — from SIGNATURE BANK, NEW YORK, NEW YORK; IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSUR to SIGNATURE BRIDGE BANK, N.A.
2024-10-24Permit Suspended Scaffold — Signed-off
2024-10-16Permit General Construction — Permit Issued
2024-10-12Job filed: INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
2024-10-10Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,500
2024-10-10Permit Sidewalk Shed — Permit Issued
2024-10-01ECB CLASS - 1 violation: FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPEC
2024-09-11Job filed: LIMITED FACADE REPAIRS INCLUDING REPLACEMENT OF DAMAGED STONE. RECONSTRUCTION OF AN ADDITIONAL TWO CORNERS. REPLACEMENT OF THE DAMAGED BRICKS AT ALL $76,750
2024-08-07Cooling tower inspection
2024-08-07Cooling tower inspection
2024-08-06TL&R — from NONPROFIT FINANCE FUND to ASCEND CHARTER SCHOOLS, INC.
2024-07-24Mortgage satisfied — from ASCEND CHARTER SCHOOLS to NONPROFIT FINANCE FUND
2024-07-24Mortgage $22,485,000 — from FRIENDS OF ASCEND CHARTER SCHOOLS. INC.; ASCEND CHARTER SCHOOLS to EQUITABLE FACILITIES FUNDS, INC.$22,485,000
2024-06-14311: Sewer — Sewer Backup (Use Comments) (SA)
2024-04-19Restaurant inspection: SUBWAY — grade A
2024-04-01FDNY inspection (RISK)
2024-02-07Job filed: APPLICATION FILED HEREWITH TO UPGRADE EXISTING GAS VALVE BEHIND PIZZA OVEN FOR EXISTING ANSUL SYSTEM,$1,500
2024-01-30Boiler inspection
2024-01-30Boiler inspection
2024-01-30Boiler inspection
2024-01-30Boiler inspection — defects found
2024-01-30Boiler inspection
2024-01-30Boiler inspection
2024-01-05Restaurant inspection: PIZZA HUT — grade A
2023
2023-12-26311: Food Establishment — Food Spoiled
2023-12-26311: Food Establishment — Food Spoiled
2023-10-12311: Food Establishment — Permit/License/Certificate
2023-10-11ECB CLASS - 1 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-00421/021323C23-00421,DATED 2/13/2023.RESPONDENT WAS REQUIR$2,500
2023-09-29311: Overgrown Tree/Branches — Dead Branches in Tree
2023-09-07311: Electrical — Electrical Wiring Defective/Exposed
2023-09-07DOB complaint, category ?
2023-07-14FDNY inspection (EDU)
2023-07-04311: Noise — Noise: Alarms (NR3)
2023-03-07Boiler inspection
2023-03-07Boiler inspection
2023-03-07Boiler inspection
2023-03-07Boiler inspection
2023-03-07Boiler inspection — defects found
2023-03-07Boiler inspection
2023-02-13DOB complaint, category ?
2023-02-13DOB violation C: AT TIME OF INSPECTION, OBSERVED VERTICAL CRACKS ON THE MASONRY FA ADE APPROXIMATELY 28LF @ EXPOSURE 2. CORNER OF PITKIN AVE & LEGI
2023-02-10DOB complaint, category ?
2023-02-02311: Dead Animal — Dog
2023-02-02311: Dead Animal — Dog
2023-02-02311: Dead Animal — Dog
2023-01-20FDNY inspection (RISK)
2023-01-19311: Illegal Parking — Posted Parking Sign Violation
2023-01-18311: Illegal Parking — Posted Parking Sign Violation
2022
2022-12-29Restaurant inspection: SUBWAY — grade A
2022-11-15AL&R $50,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK$50,000,000
2022-11-15Agreement $50,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK$50,000,000
2022-11-15TL&R — from SIGNATURE BANK LLC to PITKIN TERRACE LLC
2022-11-15TL&R — from SIGNATURE BANK LLC to PITKIN TERRACE LLC
2022-11-15Mortgage $6,824,213 — from PITKIN TERRACE LLC to SIGNATURE BANK$6,824,213
2022-11-04311: Illegal Parking — Blocked Sidewalk
2022-07-27311: Food Poisoning — 1 or 2
2022-06-22311: Sidewalk Condition — Broken Sidewalk
2022-06-13Boiler inspection — defects found
2022-05-05311: Damaged Tree — Tree Leaning/Uprooted
2022-05-05311: Sidewalk Condition — Broken Sidewalk
2022-05-05311: Sidewalk Condition — Broken Sidewalk
2022-05-05311: New Tree Request — For One Address
2022-03-07Boiler inspection
2022-03-07Boiler inspection — defects found
2022-03-07Boiler inspection
2022-03-07Boiler inspection
2022-03-07Boiler inspection
2022-03-07Boiler inspection
2022-02-02311: Illegal Parking — Posted Parking Sign Violation
2022-01-31311: Street Condition — Crash Cushion Defect
2022-01-28Cooling tower inspection
2022-01-28Cooling tower inspection
2022-01-12AL&R $6,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK$6,000,000
2022-01-12Mortgage $6,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK$6,000,000
2022-01-07Job filed: No Work
2021
2021-10-20311: Water System — Dirty Water (WE)
2021-10-17311: Dead Animal — Cat
2021-10-01FDNY inspection (RISK)
2021-09-14311: Private or Charter School Reopening — N/A
2021-08-23311: Noise - Vehicle — Car/Truck Music
2021-08-10311: Food Establishment — Food Spoiled
2021-07-23311: Street Condition — Pothole
2021-06-29311: Broken Parking Meter — Out of Order
2021-06-26FDNY inspection (EDU)
2021-05-17311: Street Condition — Pothole
2021-04-06311: Street Condition — Pothole
2021-01-26311: Blocked Driveway — Partial Access
2021-01-13Job filed: No Work
2021-01-08Job filed: No Work
2021-01-04Boiler inspection
2021-01-04Boiler inspection
2021-01-04Boiler inspection
2021-01-04Boiler inspection
2021-01-04Boiler inspection
2021-01-04Boiler inspection
2020
2020-12-12311: Illegal Parking — Blocked Hydrant
2020-10-17311: Noise - Residential — Loud Music/Party
2020-10-02Elevator permit: Provide Door Lock Position Monitoring System as per requirements of ASME A17.3 of 2002, as modified by chapter K3 of 2014 NYC buil$22,900
2020-10-02DOB complaint, category ?
2020-10-02ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER$1,250
2020-07-16311: Traffic — Congestion/Gridlock
2020-05-14311: Consumer Complaint — Other
2020-04-13Boiler inspection
2020-04-13Boiler inspection
2020-04-13Boiler inspection
2020-04-13Boiler inspection
2020-04-13Boiler inspection
2020-04-13Boiler inspection
2020-03-23Certificate of occupancy Final
2020-03-16Permit EW — ISSUED
2020-02-14FDNY inspection (RISK)
2020-02-07Certificate of occupancy Temporary
2019
2019-11-26Certificate of occupancy Temporary
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-06Mortgage $2,500,000 — from ASCEND CHARTER SCHOOLS, INC. to NONPROFIT FINANCE FUND$2,500,000
2019-11-06AL&R $2,500,000 — from ASCEND CHARTER SCHOOLS, INC. to NONPROFIT FINANCE FUND$2,500,000
2019-11-06MLEA — from PITKIN TERRACE LLC to ASCEND CHARTER SCHOOLS, INC.
2019-10-02Cooling tower inspection
2019-10-02Cooling tower inspection — violation AH8Q
2019-10-02Cooling tower inspection — violation AH8C
2019-10-02Cooling tower inspection — violation AH8R
2019-09-20Certificate of occupancy Temporary
2019-07-22311: Blocked Driveway — No Access
2019-07-22Permit PL — ISSUED
2019-07-18Certificate of occupancy Temporary
2019-07-11Permit EW — ISSUED
2019-07-02Permit EW — ISSUED
2019-07-02Permit EW — ISSUED
2019-06-27Job filed: INTERIOR RENOVATION OF EXISTING SCHOOL ON THE FIRST FLOOR. NEW PARTITIONS, FINISHES, AND LIGHTING PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, $755,900
2019-06-27Job filed: PLUMBING AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$282,800
2019-06-27Job filed: PLUMBING AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$282,800
2019-06-27Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$37,300
2019-06-24311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-04-12ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS. &/OR AMENDMENTS.PREMISES UNDER ALT2 JOB #320862447.LOC FOLDER.@ TIME OF INSPE$1,250
2019-04-09DOB complaint, category ?
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-27Certificate of occupancy Temporary
2019-03-07311: Graffiti — Graffiti
2019-01-17FDNY inspection (RISK)
2019-01-17FDNY inspection (EDU)
2018
2018-12-21Boiler inspection
2018-12-21Boiler inspection
2018-12-21Boiler inspection
2018-12-21Boiler inspection
2018-12-21Boiler inspection
2018-12-21Boiler inspection
2018-12-19311: FLOORING/STAIRS — FLOOR
2018-12-19311: PLUMBING — TOILET
2018-12-19311: UNSANITARY CONDITION — MOLD
2018-12-19311: UNSANITARY CONDITION — MOLD
2018-12-19311: PLUMBING — BASIN/SINK
2018-12-19311: PLUMBING — BATHTUB/SHOWER
2018-12-19Tenant complaint: FLOORING/STAIRS — FLOOR
2018-12-19Tenant complaint: PLUMBING — BASIN/SINK
2018-12-19Tenant complaint: PLUMBING — TOILET
2018-12-19Tenant complaint: UNSANITARY CONDITION — MOLD
2018-12-19Tenant complaint: PLUMBING — BATHTUB/SHOWER
2018-12-19Tenant complaint: UNSANITARY CONDITION — MOLD
2018-12-06Certificate of occupancy Temporary
2018-10-29311: Sewer — Sewer Odor (SA2)
2018-10-29311: Sewer — Sewer Odor (SA2)
2018-10-26311: Sewer — Sewer Odor (SA2)
2018-09-04Certificate of occupancy Temporary
2018-08-09FDNY inspection (RISK)
2018-08-09Rodent inspection: Passed
2018-06-28Cooling tower inspection — violation AH8C
2018-06-28Cooling tower inspection — violation AH8Q
2018-06-28Cooling tower inspection — violation AH8E
2018-06-28Cooling tower inspection — violation AH8Q
2018-06-28Cooling tower inspection — violation AH8T
2018-06-28Cooling tower inspection — violation AH8C
2018-06-28Cooling tower inspection — violation AH8E
2018-06-28Cooling tower inspection — violation AH8S
2018-06-28Cooling tower inspection — violation AH9C
2018-06-28Cooling tower inspection — violation AH8X
2018-06-28Cooling tower inspection — violation AH9C
2018-06-28Cooling tower inspection — violation AH8L
2018-06-28Cooling tower inspection — violation AH8S
2018-06-28Cooling tower inspection — violation AH8M
2018-06-28Cooling tower inspection — violation AH8T
2018-06-27Rodent inspection: Failed for Other Reason
2018-05-10311: Consumer Complaint — Non-Delivery Goods/Services
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-05311: Consumer Complaint — Overcharge
2018-03-19Permit EW — ISSUED
2018-03-19Permit EW — ISSUED
2018-03-09FDNY inspection (SPECIAL-OTH)
2018-02-26Permit EW — ISSUED
2018-02-17311: Graffiti — Graffiti
2018-02-15FDNY inspection (RISK)
2018-01-25311: Street Sign - Missing — Bus Stop
2018-01-08TERL — from 1501 PITKIN OWNERS LLC to 1501 PITKIN REHAB CREDIT MT LLC
2018-01-08TERL — from 1501 PITKIN OWNERS LLC to HERMAN HOLDINGS LLC
2018-01-08TERA — from GSUIG REAL ESTATE MEMBER LLC to 1501 PITKIN OWNERS LLC
2018-01-05Mortgage assigned — from NFF NEW MARKETS FUND VII, LLC to SIGNATURE BANK
2018-01-05Mortgage assigned — from CARVER CDC-SUBSIDIARY CDE 18, LLC to SIGNATURE BANK
2018-01-05Agreement — from SIGNATURE BANK LLC to ASCEND CHARTER SCHOOLS; PITKIN TERRACE LLC
2018-01-05AL&R $40,000,000 to SIGNATURE BANK LLC$40,000,000
2018-01-05Agreement $40,000,000 — from PITKIN TERRACE LLC to SIGNATURE BANK LLC$40,000,000
2018-01-05Mortgage $8,700,000 — from PITKIN TERRACE LLC to SIGNATURE BANK$8,700,000
2018-01-05Deed $53,000,000 — from 1501 PITKIN OWNERS LLC to PITKIN TERRACE LLC$53,000,000
2018-01-05Mortgage assigned — from GSUIG REAL ESTATE MEMBER LLC to SIGNATURE BANK
2018-01-05Mortgage assigned — from ROSE URBAN GREEN SUB-CDE I, LLC to SIGNATURE BANK
2018-01-05Mortgage assigned — from EMPOWERMENT REINVESTMENT FUND XIV, LLC to SIGNATURE BANK
2018-01-03311: Street Sign - Damaged — Bus Stop
2018-01-02311: Non-Residential Heat — Inadequate or No Heat
2017
2017-12-26Sold for $53,000,000$53,000,000
2017-11-28ECB CLASS - 2 violation: 25M7,41B7,71X11,25M7-25M7)IN CASE OF FIRE SIGNS MISSING. 41B7)M/R DOOR LOCK NOT SELF LOCKING OR SELF CLOSING. 71X11)PIT LIGHT INOP$1,250
2017-11-28ECB CLASS - 2 violation: 25M7,68B7,68M7,42M7,18M7-25M7)IN CASE OF FIRE SIGNS MISSING. 68B7)BRAKE MAINTENANCE NOT IN LOG BOOK. 68M7)MCD MISSING. 42M7)PRINTS$1,250
2017-11-22Certificate of occupancy Temporary
2017-10-18311: Street Sign - Missing — Bus Stop
2017-09-28Cooling tower inspection — violation AH8Q
2017-09-28Cooling tower inspection — violation AH8S
2017-09-28Cooling tower inspection — violation AH8D
2017-09-28Cooling tower inspection — violation AH8V
2017-09-28Cooling tower inspection — violation AH8E
2017-09-28Cooling tower inspection — violation AH8T
2017-09-28Cooling tower inspection — violation AH8Q
2017-09-28Cooling tower inspection — violation AH8D
2017-09-28Cooling tower inspection — violation AH8G
2017-09-28Cooling tower inspection — violation AH9C
2017-09-28Cooling tower inspection — violation AH8Z
2017-09-28Cooling tower inspection — violation AH8X
2017-09-28Cooling tower inspection — violation AH8W
2017-09-28Cooling tower inspection — violation AH8G
2017-09-28Cooling tower inspection — violation AH9C
2017-09-28Cooling tower inspection — violation AH8X
2017-09-28Cooling tower inspection — violation AH8S
2017-09-28Cooling tower inspection — violation AH8W
2017-09-28Cooling tower inspection — violation AH8R
2017-09-28Cooling tower inspection — violation AH8B
2017-09-28Cooling tower inspection — violation AH8B
2017-09-28Cooling tower inspection — violation AH8R
2017-09-28Cooling tower inspection — violation AH8C
2017-09-28Cooling tower inspection — violation AH8E
2017-09-28Cooling tower inspection — violation AH8Z
2017-09-28Cooling tower inspection — violation AH8C
2017-09-28Cooling tower inspection — violation AH8T
2017-09-28Cooling tower inspection — violation AH8V
2017-09-13Permit PL — ISSUED
2017-09-13Permit EW — ISSUED
2017-09-07Certificate of occupancy Temporary
2017-08-30311: Sidewalk Condition — Sidewalk Violation
2017-07-06311: Food Poisoning — 1 or 2
2017-06-26MCON — from 1501 PITKIN OWNERS LLC to HERMAN HOLDINGS LLC
2017-06-13Certificate of occupancy Temporary
2017-05-25Certificate of occupancy Temporary
2017-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-02-28Certificate of occupancy Temporary
2017-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-01-19Cooling tower inspection — violation AH8Q
2017-01-19Cooling tower inspection — violation AH9C
2017-01-19Cooling tower inspection — violation AH8C
2017-01-19Cooling tower inspection — violation AH8R
2017-01-19Cooling tower inspection — violation AH8E
2017-01-19Cooling tower inspection — violation AH8D
2017-01-19Cooling tower inspection — violation AH8F
2017-01-19Cooling tower inspection — violation AH8T
2017-01-19Cooling tower inspection — violation AH8B
2017-01-19Cooling tower inspection — violation AH8X
2017-01-10FDNY inspection (EDU)
2016
2016-12-27311: Food Poisoning — 1 or 2
2016-12-27311: Food Poisoning — 1 or 2
2016-12-02Certificate of occupancy Temporary
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-17FDNY inspection (RISK)
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-11-01AL&R $600,000 — from ASCEND CHARTER SCHOOLS to NONPROFIT FINANCE FUND$600,000
2016-11-01Mortgage $600,000 — from ASCEND CHARTER SCHOOLS to NONPROFIT FINANCE FUND$600,000
2016-11-01MLEA — from 1501 PITKIN REHAB CREDIT MT LLC to ASCEND CHARTER SCHOOLS
2016-09-16311: Food Poisoning — 1 or 2
2016-09-02Certificate of occupancy Temporary
2016-08-24Permit EW — ISSUED
2016-08-12Permit AL — ISSUED
2016-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-08-01Permit EQ — ISSUED
2016-08-01Permit EQ — ISSUED
2016-07-13311: Sidewalk Condition — Sidewalk Violation
2016-07-07Agreement — from BROWNSVILLE ASCEND CARTER SCHOOL; 1501 PITKIN REHAB CREDIT MT LLC; 1501 PITKIN OWNERS LLC; to GSUIG REAL ESTATE MEMBER LLC
2016-07-06Certificate of occupancy Temporary
2016-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-03-18Certificate of occupancy Temporary
2016-03-16Job filed: PA
2016-03-16Job filed: PA
2016-03-15Mortgage $382,500 — from ARG DEVELOPMENT, LLC to YUM! CAPITAL FUNDING CORP.$382,500
2016-03-07311: Street Condition — Pothole
2016-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-01-27Job filed: RELOCATE 8 SPRINKLER HEADS (DROPPED DOWN PASS CEILING) AND INSTALL 2 NEW SPK HEADS ON EXISTING SPRINKLER SYSTEM$7,900
2016-01-13Job filed: ADDITION/ MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EG RESS OR OCCUPANCY.$1,000
2016-01-06Permit PL — ISSUED
2015
2015-12-19DOB violation E:
2015-12-19DOB violation E:
2015-12-19DOB violation E:
2015-12-16Permit EW — ISSUED
2015-12-10Job filed: SUBSEQUENT FILING TO TAKE RESPONSIBILITY FOR PLUMBING AND MECHANICAL WORK ON THE BASEMENT AND FIFTH FLOOR TO ACCOMMODATE THE EXPANSION OF A K - 12 CHA$50,000
2015-12-10Job filed: INTERIOR CONSTRUCTION AND EXPANDED MECHANICAL/ELECTRICAL/PLUMBING/FIRE PROTECTION SYSTEMS FOR THE BASEMENT AND FIFTH FLOOR TO ACCOMMODATE THE EXPANSIO$150,000
2015-12-10Job filed: SUBSEQUENT FILING TO TAKE RESPONSIBILITY FOR PLUMBING AND MECHANICAL WORK ON THE BASEMENT AND FIFTH FLOOR TO ACCOMMODATE THE EXPANSION OF A K - 12 CHA$50,000
2015-12-10Job filed: INTERIOR CONSTRUCTION AND EXPANDED MECHANICAL/ELECTRICAL/PLUMBING/FIRE PROTECTION SYSTEMS FOR THE BASEMENT AND FIFTH FLOOR TO ACCOMMODATE THE EXPANSIO$150,000
2015-12-08Certificate of occupancy Temporary
2015-12-01Permit EW — ISSUED
2015-11-30Permit EW — ISSUED
2015-11-20Permit PL — ISSUED
2015-11-16Permit SG — ISSUED
2015-11-16Permit SG — ISSUED
2015-11-12Job filed: FILING FOR A FIRE SUPPRESSION SYSTEM. GAS VALVE WAS FILED UNDER APPL#321137275. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2015-11-12Job filed: FILING FOR A FIRE SUPPRESSION SYSTEM. GAS VALVE WAS FILED UNDER APPL#321137275. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2015-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-10-29Permit PL — ISSUED
2015-10-29Permit EW — ISSUED
2015-10-21Permit PL — ISSUED
2015-09-21ECB CLASS - 2 violation: 28-317.3 FAILURE TO REGISTER COOLING TOWER. RMDY: COMPLY W/CODE.$4,000
2015-09-10Certificate of occupancy Temporary
2015-09-03FDNY inspection (ANNUL-K-12)
2015-08-20FDNY inspection (OTHER)
2015-08-18Permit EW — ISSUED
2015-08-07Permit EW — ISSUED
2015-08-07Permit EW — ISSUED
2015-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-07-28Job filed: FILING FOR INTERIOR PARTITION WORK ON 5TH FLOOR IN CONJUNCTION WITH ALT2# 321154941 NO CHANGE IN EGRESS USE OR OCCUPANCY.$1,000
2015-07-28Job filed: FILING FOR INTERIOR PARTITION WORK ON 5TH FLOOR IN CONJUNCTION WITH ALT2# 321154941 NO CHANGE IN EGRESS USE OR OCCUPANCY.$1,000
2015-07-02Job filed: FILING FOR PARTIAL PLUMBING WORK FOR ROUGHING ON FIFTH FLOOR. NO CHANGE IN EGRESS USE OR OCCUPANCY.$200,000
2015-06-11Job filed: GENERAL CONSTRUCTION: INTERIOR RENOVATION OF EXISTING RESTAURANT SPACE. NEW FINISHES, COUNTERS, CABINETRY, PARTITIONS FLOORING. NEW PLUMBING AND MECHA$240,000
2015-06-11Job filed: GENERAL CONSTRUCTION: INTERIOR RENOVATION OF EXISTING RESTAURANT SPACE. NEW FINISHES, COUNTERS, CABINETRY, PARTITIONS FLOORING. NEW PLUMBING AND MECHA$240,000
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-03-02FDNY inspection (SPECIAL-OTH)
2015-02-26Certificate of occupancy Temporary
2014
2014-11-10311: Street Light Condition — Street Light Out
2014-11-05Certificate of occupancy Temporary
2014-11-01311: Broken Muni Meter — No Receipt
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-28Job filed: FILING THE EMERGENCY GENERATOR APPLICATION IN CONJUNCTION WITH ALTERATION #320157744. NO CHANGES IN EGRESS USE OR OCCUPANCY.$50,000
2014-10-10Certificate of occupancy Temporary
2014-09-05FDNY inspection (ANNUL-K-12)
2014-08-25311: Dead Tree — Dead/Dying Tree
2014-07-16Certificate of occupancy Temporary
2014-05-13311: Street Condition — Pothole
2014-04-14Job filed: PA
2014-04-14Job filed: PA
2014-04-14Job filed: PA
2014-04-07Certificate of occupancy Temporary
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-02-19Permit EW — ISSUED
2014-02-19Permit PL — ISSUED
2014-02-06Permit EW — ISSUED
2014-02-06Permit EW — ISSUED
2014-01-31Certificate of occupancy Temporary
2014-01-28Job filed: SUBSEQUENT FILING FOR BOILER, MECHANICAL, PLUMBING AND SPRINKLER WORK FOR THE 6TH FLOOR FIT OUT. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$223,695
2014-01-28Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK FOR INTERIOR FIT OUT OF 6TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$212,030
2014-01-28Job filed: SUBSEQUENT FILING FOR BOILER, MECHANICAL, PLUMBING AND SPRINKLER WORK FOR THE 6TH FLOOR FIT OUT. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$223,695
2014-01-28Job filed: A2$678,496
2014-01-24Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$35,000
2014-01-08DOB complaint, category ?
2014-01-02Mortgage $6,500,000 — from 1501 PITKIN OWNERS LLC to GSUIG REAL ESTATE MEMBER LLC$6,500,000
2014-01-02Agreement — from 1501 PITKIN OWNERS LLC to GSUIG REAL ESTATE MEMBER LLC
2013
2013-12-04Certificate of occupancy Temporary
2013-11-04Certificate of occupancy Temporary
2013-10-31DOB violation E:
2013-10-24FDNY inspection (ANNUL-K-12)
2013-10-03Certificate of occupancy Temporary
2013-09-09Permit PL — ISSUED
2013-09-03Certificate of occupancy Temporary
2013-08-22Certificate of occupancy Temporary
2013-08-13Job filed: FILING FPP IN CONJUNCTION WITH ALT1# 320157744. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2013-08-09Permit EW — ISSUED
2013-08-08Permit EW — ISSUED
2013-07-29ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS. PREMISES UNDER P.C. 320777673, L.O.C. FOLD
2013-07-26Permit PL — ISSUED
2013-07-23Permit EW — ISSUED
2013-07-17DOB complaint, category ?
2013-07-02Permit EW — ISSUED
2013-07-02Permit EW — ISSUED
2013-07-01Job filed: FILING TO SUBDIVIDE LOT 1 INTO EIGHT (8) CONDOMINIUM TAX LOTS: 1101-1108
2013-06-24Permit SG — ISSUED
2013-06-17Job filed: INSTALLATION OF (2) NEW ROOFTOP UNITS WITH NEW GAS PIPING AND METERS. DUCTWORK WILL BE FILED UNDER SEPARATE APPLICATION. THERE WILL BE NO CHANGE IN U$85,000
2013-06-05Job filed: MODIFICATION TO AN EXISTING SPRINKLER ALARM SMOKE DETECTION SYSTEM FOR 2ND FLOOR SCHOOL FILL OUT APPLICATION IN CONJUNCTION WITH ALT.2 #320698982. NO$19,250
2013-06-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2013-06-03Certificate of occupancy Temporary
2013-05-31FDNY inspection (SPECIAL-OTH)
2013-04-24Permit PL — ISSUED
2013-04-19FDNY inspection (EDU)
2013-04-10Job filed: INTERIOR RENOVATION OF EXISTING STORE FOR PROPOSED SUBWAY SANDWICH STORE. INSTALL NON-LOAD BEARING PARTITIONS, PLUMBING, FIXTURES AND MECHANICAL VENTI$80,960
2013-04-10Job filed: INTERIOR RENOVATION OF EXISTING STORE FOR PROPOSED SUBWAY SANDWICH STORE. INSTALL NON-LOAD BEARING PARTITIONS, PLUMBING, FIXTURES AND MECHANICAL VENTI$80,960
2013-04-10Job filed: INTERIOR RENOVATION OF EXISTING STORE FOR PROPOSED SUBWAY SANDWICH STORE. INSTALL NON-LOAD BEARING PARTITIONS, PLUMBING, FIXTURES AND MECHANICAL VENTI$80,960
2013-04-10Permit EW — ISSUED
2013-04-10Permit EW — ISSUED
2013-04-09ECB CLASS - 3 violation: 97R05 - NO RECORD OF APPLICATION OR SIGN-OFF FOR THE REMOVAL OF DEVICE#3P2031.$200
2013-04-03Permit PL — ISSUED
2013-04-01Permit EW — ISSUED
2013-04-01Permit PL — ISSUED
2013-04-01Permit EW — ISSUED
2013-03-19Permit EW — ISSUED
2013-03-19Permit EW — ISSUED
2013-03-13Permit EW — ISSUED
2013-03-13Permit EW — ISSUED
2013-03-13Certificate of occupancy Temporary
2013-02-27Job filed: INSTALLATION OF 3 NEW ROOFTOP UNITS WITH GAS PIPING RELATED. DUCTWORK WILL BE FILED UNDER SEPARATE APPLICATION. THERE WILL BE NO CHANGE IN USE EGRESS$135,000
2013-01-24311: HEATING — HEAT
2013-01-24311: PLUMBING — WATER-SUPPLY
2013-01-24Tenant complaint: PLUMBING — WATER SUPPLY
2013-01-24Tenant complaint: HEATING — HEAT RELATED
2013-01-17Job filed: SUBSEQUENT FILING FOR MEP WORK INCLUDING NEW PLUMBING FIXTURES, SPRINKLER HEADS, STANDPIPE AND BOILER AND MECHANICAL FOR FIT OUT OF CHARTER SCHOOL ON $130,556
2013-01-17Job filed: FILING FOR THE INTERIOR FIT OUT OF CHARTER SCHOOL ON SECOND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$335,736
2013-01-17Job filed: FILING FOR THE INTERIOR FIT OUT OF CHARTER SCHOOL ON SECOND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$335,736
2013-01-03Permit PL — ISSUED
2013-01-03Certificate of occupancy Temporary
2012
2012-12-19Permit PL — ISSUED
2012-12-17Permit EW — ISSUED
2012-12-12Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # 320157744. NO C$55,573
2012-12-12Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # 320157744. NO C$55,573
2012-12-07Job filed: FENCE
2012-12-07Permit EQ — ISSUED
2012-12-07Permit EW — ISSUED
2012-12-07Permit SG — ISSUED
2012-12-07Permit EW — ISSUED
2012-12-07Permit SG — ISSUED
2012-12-03Permit EW — ISSUED
2012-11-27Certificate of occupancy Temporary
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-10-01Permit PL — ISSUED
2012-09-26Certificate of occupancy Temporary
2012-09-19311: Traffic — Congestion/Gridlock
2012-08-27Certificate of occupancy Temporary
2012-08-16Job filed: PA
2012-08-16Job filed: PA
2012-08-16Job filed: PA
2012-08-15Job filed: FILING TENANT PROTECTION PLAN FOR ALL WORK BEING CONDUCTED AT PREMISES. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2012-08-15Job filed: INTERIOR RENOVATION, NEW FINISHES, NEW LIGHTING, NEW TOILETS, NEW MANAGER'S OF FICE, NEW ACT CEILING, REPLACEMENT OF EXISTING EXIT DOORS$624,045
2012-08-15Job filed: INTERIOR RENOVATION, NEW FINISHES, NEW LIGHTING, NEW TOILETS, NEW MANAGER'S OF FICE, NEW ACT CEILING, REPLACEMENT OF EXISTING EXIT DOORS$624,045
2012-08-15Job filed: FILING TENANT PROTECTION PLAN FOR ALL WORK BEING CONDUCTED AT PREMISES. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2012-08-14Job filed: FILING FOR MECHANICAL, PLUMBING AND SPRINKLER WORK FOR TENANT FIT OUT ASCEND EXPANSION APPLICATION IN CONJUNCTION WITH ALT2# 320488931. NO CHANGE IN E$72,350
2012-08-10Job filed: PA
2012-08-10Job filed: PA
2012-08-01Permit EW — ISSUED
2012-07-25Permit PL — ISSUED
2012-07-25Permit EW — ISSUED
2012-07-25Permit EW — ISSUED
2012-07-24Permit EW — ISSUED
2012-07-09Job filed: FILING FPP IN CONJUNCTION WITH ALT1# 320157744. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2012-07-09Job filed: FILING FPP IN CONJUNCTION WITH ALT1# 320157744. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2012-06-06Job filed: A2$100,000
2012-06-04311: Water System — Leak (Use Comments) (WA2)
2012-05-18Permit EW — ISSUED
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-04-11311: Building/Use — Illegal Conversion Of Residential Building/Space
2012-04-11DOB complaint, category ?
2012-04-03Permit EQ — ISSUED
2012-04-02Permit EW — ISSUED
2012-04-02Permit EQ — ISSUED
2012-04-02Permit AL — ISSUED
2012-04-02Permit AL — ISSUED
2012-03-19Permit EQ — ISSUED
2012-03-16Permit EQ — ISSUED
2012-01-18Permit EW — ISSUED
2012-01-18Permit PL — ISSUED
2012-01-13Job filed: PROVIDE 9 SUSPENDED UNIT HEATERS IN CONJUNCTION WITH JOB #320157744.NO CHANGE IN USE,OCCUPANCY OR MEANS OF EGRESS.$90,000
2011
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-10-04Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM AND PURGE SYSTEM, AND COC FOR SCHOOL SPACE IN CONJUCTION WITH J$141,000
2011-10-04Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION AND PURGE SYSTEM, AND COC FOR RETAIL SPACE IN CONJUNCTION WITH JOB #320157744.$97,200
2011-08-27DOB complaint, category ?
2011-07-05Job filed: TO ERECT A PERSONNEL/MATERIAL HOIST ALIMAK 20/30. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
2011-07-05Permit EW — ISSUED
2011-07-05Permit EW — ISSUED
2011-07-05Permit EW — ISSUED
2011-06-27Permit EQ — ISSUED
2011-06-23Permit PL — ISSUED
2011-06-21Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2011-06-07Job filed: NEW 30' CURB CUT ON SOUTH SIDE OF EAST NEW YORK AVENUE - 68' WEST OF SARATOGA AVENUE
2011-06-07Job filed: NEW 30' CURB CUT ON SOUTH SIDE OF EAST NEW YORK AVENUE - 68' WEST OF SARATOGA AVENUE
2011-06-03311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2011-06-03311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2011-06-03DOB complaint, category ?
2011-06-03DOB complaint, category ?
2011-03-29Permit EQ — ISSUED
2011-03-29Permit AL — ISSUED
2011-03-29Permit AL — ISSUED
2011-03-24Job filed: NEW MECHANICAL SYSTEM, PLUMBING THROUGHOUT AS PER PLANS FILED HEREWITH. FILED IN CONJ. WITH ALT. I #320157744. NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,207,000
2011-03-24Job filed: INSTALL NEW SPRINKLER AND STANDPIPE SYSTEM THROUGHOUT AS INDICATED ON PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$400,000
2011-03-22Permit EQ — ISSUED
2011-03-16311: Sidewalk Condition — Blocked - Construction
2011-03-16Permit EQ — ISSUED
2011-03-09311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2011-03-09DOB complaint, category ?
2011-03-08311: General Construction/Plumbing — Safety Netting/Guard Rails - Damaged/Inadequate/None (6 Stories/75 Feet Or Less)
2011-03-08311: General Construction/Plumbing — Site Conditions Endangering Workers
2011-03-08DOB complaint, category ?
2011-03-08DOB complaint, category ?
2011-02-04Permit AL — ISSUED
2011-02-02Job filed: STRUCTURAL AND FOUNDATION PLANS FILED IN CONJ. WITH ALT I #320157744. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000
2011-02-02Job filed: STRUCTURAL AND FOUNDATION PLANS FILED IN CONJ. WITH ALT I #320157744. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000
2011-01-31311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2011-01-31DOB complaint, category ?
2011-01-31ECB CLASS - 2 violation: DAILURE TO PROVIDE APPROVED/ACCEPTED PLANS @ JOBSITE @ TIME OF INSPECTION UPON INSPECTION CONTRACTOR FAILED TO PROVIDE APPRVED PLA
2011-01-31ECB CLASS - 2 violation: (MISC)BC3303.1.3CONTRACTOR SHED OFFICE OR SHANTY WITHIN 30FT OF NEW CONSTRUCTION FENCE UPON CONTRACTOR SHED MADE OF COMBUSTIBLE MA
2011-01-31ECB CLASS - 2 violation: (MISC)28-104.7.7FAILURE TO FILE TRI FORM & DESIGNATE OPERATION SUBJECT TO CONTROLLED INSPECTION ON PLANS PRIOR TO THE COMMENCEMENT
2011-01-13MLEA — from 1501 PITKIN OWNERS LLC to 1501 PITKIN REHAB CREDIT MT LLC
2011-01-13SMIS — from 1501 PITKIN REHAB CREDIT MT LLC; 1501 PITKIN OWNERS LLC to GSUIG REAL ESTATE MEMBER LLC; CHEVRON U.S.A. INC.
2010
2010-12-22311: General Construction/Plumbing — Failure To Maintain
2010-12-22DOB complaint, category ?
2010-12-01Job filed: BNP 10-300,680' FRONTAGE,ALT-I# 320157744
2010-10-19311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-10-19311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-10-19DOB complaint, category ?
2010-10-19DOB complaint, category ?
2010-10-08DOB violation VCAT1:
2010-09-13Permit AL — ISSUED
2010-07-27Permit AL — ISSUED
2010-07-26Job filed: FILING FOR MECHANICAL DEMOLITION PERMIT FOR THE USE OF BOBCAT SKID-STEER LOADERS, MINI-EXCAVATORS, HAND TOOLS AND A 40000 POUND TELESCOPING LIFT AS SH$9,000
2010-07-26Job filed: FILING FOR MECHANICAL DEMOLITION PERMIT FOR THE USE OF BOBCAT SKID-STEER LOADERS, MINI-EXCAVATORS, HAND TOOLS AND A 40000 POUND TELESCOPING LIFT AS SH$9,000
2010-07-14Permit EQ — RE-ISSUED
2010-07-12Job filed: INSTALLATION OF A 473 FT LONG SCAFFOLD. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2010-07-12Job filed: INSTALLATION OF A 473 FT LONG SCAFFOLD. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2010-07-08Mortgage satisfied — from ZTI CORP. to 1501 PITKIN OWNERS LLC
2010-07-08Deed $7,984,438 — from ZTI CORP. to 1501 PITKIN OWNERS LLC$7,984,438
2010-07-08Mortgage $1,687,500 — from 1501 PITKIN OWNERS LLC to CARVER CDC - SUBSIDIARY CDE 18, LLC$1,687,500
2010-07-08Mortgage $1,687,500 — from 1501 PITKIN OWNERS LLC to EMPOWERMENT REINVESTMENT FUND XIV, LLC$1,687,500
2010-07-08Mortgage $1,687,500 — from 1501 PITKIN OWNERS LLC to NFF NEW MARKETS FUND VII, LLC$1,687,500
2010-07-08Mortgage $1,196,221 — from 1501 PITKIN OWNERS LLC to EMPOWERMENT REINVESTMENT FUND XIV, LLC$1,196,221
2010-07-08Mortgage $6,386,919 — from 1501 PITKIN OWNERS LLC to NFF NEW MARKETS FUND VII, LLC$6,386,919
2010-07-08Mortgage $4,656,686 — from 1501 PITKIN OWNERS LLC to ROSE URBAN GREEN SUB-CDE I, LLC$4,656,686
2010-07-08SMIS — from 1501 PITKIN OWNERS LLC; 1501 PITKIN RETAIL LLC to ROSE URBAN GREEN SUB-CDE I, LLC; NFF NEW MARKETS FUND VII, LLC; CARVER CDC-SUBSIDIARY CDE
2010-07-08SMIS — from BROWNSVILLE ASCEND CHARTER SCHOOL; 1501 PITKIN OWNERS LLC to NFF NEW MARKETS FUND VII, LLC; ROSE URBAN GREEN SUB-CDE I, LLC; CARVER CDC-SUBSIDIARY CDE
2010-07-08Mortgage $1,687,500 — from 1501 PITKIN OWNERS LLC to ROSE URBAN GREEN SUB-CDE I, LLC$1,687,500
2010-07-08Mortgage $5,810,174 — from 1501 PITKIN OWNERS LLC to CARVER CDC - SUBSIDIARY CDE 18, LLC$5,810,174
2010-07-08Job filed: INSTALLATION OF A 672 FT LONG SIDEWALK SHED. SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS.
2010-07-08Job filed: INSTALLATION OF A 672 FT LONG SIDEWALK SHED. SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS.
2010-07-08Permit EQ — ISSUED
2010-06-16Permit EQ — ISSUED
2010-06-16Permit AL — ISSUED
2010-06-07CERT — from ALL NEW YORK TITLE AGENCY, INC
2010-06-07ZONE — from ZTI CORP.
2010-04-29Job filed: FILE STRUCTURAL DRAWINGS FOR PROPOSED 5 STORY ADDITION TO EXISTING 1 STORY BUILDING.
2010-04-29Job filed: A1$7,124,092
2010-04-29Job filed: A1$7,124,092
2009
2009-02-27DOB violation LL1081:
2008
2008-10-07Mortgage $1,000,000 — from ZTI CORP. to 1501 PITKIN OWNERS LLC$1,000,000
2008-10-01ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. DEFECT IS: AT REAR OF CEILING LEAKING WATER DUE TO ACCUMULATING WATER ON THE RO$5,000
2008-08-20DOB complaint, category ?
2008-07-28Permit EW — ISSUED
2008-07-28Permit EQ — ISSUED
2008-07-08Job filed: NON STRUCTURAL RENOVATION TO THE EXISTING FIRST FLOOR AND BASEMENT SPACES; WITH NEW STOREFRONTS, NEW MECHANICAL, NEW ELECTRICAL, NEW PLUMBING, NEW FIR$10,100,000
2008-03-21DOB violation LL1081:
2007
2007-04-02DOB violation LL1081:
2007-01-30DOB complaint, category ?
2007-01-29DOB violation UB:
2007-01-23ECB Hazardous violation: FAILURE TO MAINTAIN BLDG-HAZ NOTED: 60'- H X 125'- L VACANT THEATER ISIN EXCESSIVE DISREPAIR WITH 60 PERCENT OF ROOF SURFACE GONE $2,500
2007-01-22DOB complaint, category ?
2006
2006-11-29DOB violation E:
2006-07-28Permit EQ — ISSUED
2006-07-28Permit EW — ISSUED
2006-06-22DOB violation UB:
2006-06-22ECB Hazardous violation: FAILURE TO MAINTAIN. DEFECT NOTED: FIRE ESCAPE AT NORTH SIDE (E NEW YORK AVE) IS MISSING METAL RAILING ALONG 2ND FL, MISSING TREAD$10,000
2006-02-26ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL. DEFECT IS: METAL FIRE ESCAPE LOCATED AT REAR OF BLDG ON EAST NEW YORK AVE. IS DEFECTIVE. T$2,500
2005
2005-12-27Job filed: REMOVAL OF RUBBLE AND REFUSE FROMEXISTING BUILDING REMOVAL OF LIMITED NON LOAD BEARING BUILDINGELEMENTS AS DESCRIBED IN THE RENOVATION PLANS AND NARRA$150,000
2005-12-27Job filed: REMOVAL OF RUBBLE AND REFUSE FROMEXISTING BUILDING REMOVAL OF LIMITED NON LOAD BEARING BUILDINGELEMENTS AS DESCRIBED IN THE RENOVATION PLANS AND NARRA$150,000
2005-11-29Permit EW — ISSUED
2005-11-29Permit EW — ISSUED
2005-11-17Permit EW — ISSUED
2005-10-01DOB violation LL1081:
2005-04-20Job filed: REPLACE HIGH PRESSURE OIL IFRED BOILER. (NYC BOILER NO. H94956-01) AND INSTALL NEW BOILER ROOM ENCLOSURE. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER $2,000
2005-04-04Job filed: Roof restoration: existing roofing system over existing steel struss to be replaced with new system. No change in bulk, occupancy or egress.$100,000
2005-01-15ECB Non-Hazardous violation: 50A/B4B/51/18AB/50B/50C/50D/50E FUCTION VT BOILER 10HP NB22519 OR 197050A)COMBUSTION CHAMBER COLLASPED AND FLAME WITH FLUE GAS EMI$400
2004
2004-11-19DOB violation LL1081:
2004-04-21DOB violation LL1081:
2003
2003-08-12DOB violation E:
2003-07-15CDEC — from THE PITKIN CONDOMINIUM
2003-07-15MAPS — from THE PITKIN CONDOMINIUM
2003-06-10Permit AL — ISSUED
2003-06-10Permit EQ — ISSUED
2003-06-03Job filed: SC
2003-03-21DOB violation LL1081:
2002
2002-11-15Job filed: BUILDERS PAVING PLAN 681 LF
2002-08-23Job filed: A1$1,350,000
2002-02-19DOB violation LL1081:
2001
2001-09-26Permit EW — ISSUED
2001-09-21Job filed: CONVERT THEATER TO STORE, U.G. = 10. PLU MBING AND PARTITION WORK AS PER PLAN. NO CHANGE IN BULK, LOT COVERAG E.$40,000
2001-09-21Job filed: CONVERT THEATER TO STORE, U.G. = 10. PLU MBING AND PARTITION WORK AS PER PLAN. NO CHANGE IN BULK, LOT COVERAG E.$40,000
2001-09-14Job filed: NEW ALUMINUM AND GLASS STOREFRONT TO RE- PLACE EXISTING. REMVE INTERIOR TAIRS & CLOSE FLOOR OPENINGS TO MATCH EXISTING. NO CHANGE IN USE, OCCUPANC$25,000
2001-03-08DOB violation LL1081:
2000
2000-08-09Permit EW — ISSUED
2000-06-15Job filed: REMOVE EXISTING NON-LOADING PARTITIONS. REMOVE ALL SEATING AND RUBBISH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$20,000
2000-06-15Job filed: REMOVE EXISTING NON-LOADING PARTITIONS. REMOVE ALL SEATING AND RUBBISH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$20,000
2000-03-24DOB complaint, category ?
2000-03-24ECB Hazardous violation: WORK NOTED A PERMIT. HAZARDOUS WORKK NOTED INTERIOR REMO OF MOVIE THEATER. REMOVED OF OLD BOILER PIPING (NO ASBESTORY TESTING)$800
2000-03-24DOB violation C: WORK WITHOUT A PERMIT/HAZARDOUS WORK NOTED/INTERIOR DEMO OF MOVIE THEATER. REMOVAL OF OLD BOILER PIPING (NO ASBESTOS TESTING).
2000-03-10DOB violation LL1081:
1999
1999-12-01Deed — from TRIEX LLC to ZTI CORP
1999-08-20Permit EW — ISSUED
1999-08-20Permit EW — ISSUED
1998
1998-12-22Mortgage assigned — from BANCO POPULAR DE PUERTO RICO to ZTI CORP
1997
1997-07-26ECB Non-Hazardous violation: 16$175
1997-04-23DOB complaint, category ?
1995
1995-04-17DOB violation LL1081:
1995-04-17Permit EW — ISSUED
1995-04-17Permit EW — ISSUED
1995-03-23ECB Non-Hazardous violation: FAILURE TO MAINTAIN BUILDING: RE: ROOF TANK STRUCTURAL SUPPORT ROOF REAR. IN THAT MATERAL/DEBRIS RESULTING FROM A FIRE THAT GUT
1995-03-17Agreement — from BANCO POPULAR DE PUERTO RICO to TRIEX EQUITIES ASSOCIATES
1995-02-08DOB complaint, category ?
1994
1994-01-25ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL DEFECT IS METAL FRAME WORK OF FORMER VERTICAL SIGN IS LOOSE DEFECTIVE & IN DANGER OF COLLAP
1993
1993-06-28DOB violation LL1081: 1
1993-05-04DOB violation P:
1993-04-28DOB complaint, category ?
1992
1992-07-14Agreement — from TRIEX EQUITIES ASSOCIATE to BANCO POPULAR DE PUERTO
1992-04-07DOB violation LL1081: 1
1991
1991-05-09ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O 59635 IS FOR THEATER SPACE NOW OCCUPIED AS FURNITURE STORE FIRST FLOOR SOUTH SIDE$1,000
1991-04-25DOB violation LL1081: 3
1991-01-18DOB complaint, category ?
1990
1990-06-29DOB violation LL1081: 3
1988
1988-10-20DOB violation E: RESTORE DISMANTLE OR REMOVE ELEVATOR
1988-10-20DOB violation E: 51)RESTORE DISMANTLE OR REMOVE ELEVATOR
1988-10-20DOB violation E: 51)RESTORE DISMANTLE OR REMOVE ELEVATOR
1988-09-30Mortgage satisfied — from TRIEX EQUITIES INC to CITY OF NEW YORK
1988-04-14Mortgage $750,000 — from TRIEX EQUITIES ASSOCS to BANCO DE PONCE$750,000
1988-04-14Mortgage assigned — from TRIEX EQUITIES ASSOCS to BANCO DE PONCE
1986
1986-06-25Deed — from TRIEX EQUITIES INC to TRIEX EQUITIES ASSOC
1982
1982-03-08Deed — from NEW YORK CITY to TRIEX EQUITIES INC.
1982-03-08Mortgage $40,500 — from TRIEX EQUITIES INC. to NEW YORK CITY$40,500
1976
1976-09-16Deed — from IVAN E. IRIZARRY; FINANCE ADMIN OF THE CITY OF NY to THE CITY OF NEW YORK
1972
1972-10-05LEAS — from GOSPEL TABERNACLE CHURCH OF GOD IN CHRIS to KEY LOCATIONS CORP
1972-01-31Deed — from PITKIN ASSOCIATES to GOSPEL TABERNACLE CHURCH OF GOD IN CHRIS
1971
1971-08-18SAGE — from LOEWS THEATRE & RLTY CORP; PITKIN ASSOCIATES

Support this site Back to the building page