Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

632 Gateway Drive · Brooklyn · BBL 3044520535 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

1 heat or hot-water complaints in the last three years (winter 2025–26: 1).

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

9 service requests in the last three years. Most common: Food Establishment (3) · Food Poisoning (3) · Noise (1) · Illegal Parking (1) · Non (1).

Filed construction activity

$1,000 in permitted construction work filed since 2016 (1 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$4,551,000 $2,047,950
2026$4,585,000 $2,063,250
2027$4,459,000 $2,006,550

The city's market estimate has fallen 2% between tax years 2025 and 2027.

Restaurants in this building

RestaurantCuisineGradeNotes
Buffalo Wild WingsChickenGrade PendingMice evidence

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 1 with mice evidence · See them on the Mice Map

3 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick)
3 Food Establishment complaints to 311 at this address in the last three years (most often: Rodents/Insects/Garbage) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

BusNearest boarding stop: Erskine St / Gateway Pl — B13 Q8 · 650 ft
School zones (2024–25 map)Elementary: P.S. 224 Hale A. Woodruff
Middle: Van Siclen Community Middle School. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

632 Gateway Drive

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

9 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $1,000,000 on 2015-12-09 (lender: General Electric Capital Corporation). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2024-10-28AL&R $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to BANK OF AMERICA, N.A. $300,000,000
2024-10-28Agreement $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to BANK OF AMERICA, N.A. $300,000,000
2015-12-09Mortgage $1,000,000 — from FOUR M FOOD SERVICE OF GATEWAY, LLC to GENERAL ELECTRIC CAPITAL CORPORATION $1,000,000
2014-09-05Mortgage $75,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION $75,000,000
2014-09-05Agreement $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to GERMAN AMERICAN CAPITAL CORPORATION; WELLS FARGO BANK, NATIONAL ASSOCIATION $300,000,000
2014-09-05AL&R $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION $300,000,000

Ten-year activity

20100
2017
2018
2019
2020
2021
2022
2023
12
2024
2025
2026
Housing & tenantsOwnership & moneyHealth & systems
Show as table
YearHousing & tenantsOwnership & moneyHealth & systemsTotal
20173205
20183003
20191001
20207007
20214105
20223003
20233003
202474112
20250213
20262024
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 4 records

DateRecord
2026-09-22Restaurant inspection: BUFFALO WILD WINGS — grade Z · mice evidence
2026-08-04Restaurant inspection: BUFFALO WILD WINGS
2026-03-02311: Non-Residential Heat — Inadequate or No Heat
2026-02-23311: Food Poisoning — 1 or 2

The full timeline

2026
2026-09-22Restaurant inspection: BUFFALO WILD WINGS — grade Z · mice evidence
2026-08-04Restaurant inspection: BUFFALO WILD WINGS
2026-03-02311: Non-Residential Heat — Inadequate or No Heat
2026-02-23311: Food Poisoning — 1 or 2
2025
2025-04-16Mortgage assigned — from BANK OF AMERICA, N.A. to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2025-04-07AALR — from BANK OF AMERICA, N.A. to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2025-01-06Restaurant inspection: BUFFALO WILD WINGS — grade A
2024
2024-11-14311: Illegal Parking — Double Parked Blocking Traffic
2024-10-28Mortgage assigned — from WILMINGTON TRUST, NATIONAL ASSOCIATION to BANK OF AMERICA, N.A.
2024-10-28TL&R — from WILMINGTON TRUST, NATIONAL ASSOCIATION to GATEWAY CENTER PROPERTIES PHASE II OWNER
2024-10-28AL&R $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to BANK OF AMERICA, N.A.$300,000,000
2024-10-28Agreement $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to BANK OF AMERICA, N.A.$300,000,000
2024-10-25311: Food Poisoning — 1 or 2
2024-10-24311: Food Poisoning — 1 or 2
2024-07-24Restaurant inspection: BUFFALO WILD WINGS
2024-02-19311: Food Establishment — Rodents/Insects/Garbage
2024-02-17311: Food Establishment — Rodents/Insects/Garbage
2024-02-16311: Food Establishment — Rodents/Insects/Garbage
2024-01-06311: Noise - Residential — Banging/Pounding
2023
2023-09-15311: Food Establishment — Rodents/Insects/Garbage
2023-07-29311: Food Establishment — Rodents/Insects/Garbage
2023-03-21311: Food Establishment — Kitchen/Food Prep Area
2022
2022-05-31311: Food Establishment — Food Contaminated
2022-04-12311: Consumer Complaint — Restaurant
2022-01-17311: Food Establishment — Food Temperature
2021
2021-10-28311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-05-07311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2021-04-16311: NonCompliance with Phased Reopening — Business not in compliance
2021-04-06311: Food Establishment — Pesticide
2021-01-27RPTT&RET — from FOUR M FOOD SERVICE OF GATEWAY, LLC to GATEWAY CENTER PROPERTIES PHASE II OWNER
2020
2020-11-16311: Food Establishment — Pesticide
2020-11-16311: Food Establishment — Rodents/Insects/Garbage
2020-11-16311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2020-11-08311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2020-05-01311: Non-Emergency Police Matter — Social Distancing
2020-04-14311: Non-Emergency Police Matter — Social Distancing
2020-04-14311: Non-Emergency Police Matter — Social Distancing
2019
2019-09-02311: Sidewalk Condition — Broken Sidewalk
2018
2018-10-30311: Food Establishment — Food Contaminated
2018-10-04311: Food Establishment — Toilet Facility
2018-09-04311: Food Poisoning — 1 or 2
2017
2017-07-26TL&R — from FOUR M FOOD SERVICE OF GATEWAY, LLC to STERLING NATIONAL BANK F/K/A PROVIDENT B
2017-07-22311: Food Establishment — Food Spoiled
2017-05-24311: Food Establishment — Dishwashing/Utensils
2017-03-27311: Food Establishment — Dishwashing/Utensils
2017-02-09Mortgage assigned — from GENERAL ELECTRIC COMPANY to STERLING NATIONAL BANK
2016
2016-12-29311: Food Establishment — Rodents/Insects/Garbage
2016-12-19311: Food Poisoning — 1 or 2
2016-09-08FDNY inspection (1935-10-01T00:00:00.000)
2016-08-17311: Food Establishment — Letter Grading
2016-08-08FDNY inspection (OTHER)
2016-07-23311: Food Establishment — Food Preparation Location
2016-07-07Certificate of occupancy Final
2016-06-23Certificate of occupancy Temporary
2016-06-16Job filed: IT IS PROPOSED TO FILE FOR A FIRE PROTECTION PLAN AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2016-05-18Agreement — from GATEWAY CENTER PROPERTIES PHASE II OWNER to GATEWAY CENTER PROPERTIES PHASE II OWNER
2016-05-05Deed transfer (nominal price)
2016-03-25Certificate of occupancy Temporary
2015
2015-12-09Mortgage $1,000,000 — from FOUR M FOOD SERVICE OF GATEWAY, LLC to GENERAL ELECTRIC CAPITAL CORPORATION$1,000,000
2015-12-09MLEA — from GATEWAY CENTER PROPERTIES PHASE II OWNER to FOUR M FOOD SERVICE OF GATEWAY, LLC
2015-10-20Certificate of occupancy Temporary
2015-06-22Certificate of occupancy Temporary
2015-06-10CERT — from THE CITY OF NEW YORK
2015-04-07FDNY inspection (CONSTR)
2015-03-17FDNY inspection (RISK)
2015-03-16Certificate of occupancy Temporary
2015-03-09FDNY inspection (CONSTR)
2015-02-24AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2015-02-24Mortgage assigned — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FARGO BANK, NATIONAL ASSOCIATION to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2015-02-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-02-10FDNY inspection (CONSTR)
2015-01-15FDNY inspection (CONSTR)
2014
2014-12-15Certificate of occupancy Temporary
2014-12-02Permit AL — ISSUED
2014-12-01Permit AL — ISSUED
2014-11-19Job filed: TWO NON ILLUMINATED NON ADVERTISING ACCESSORY AWNINGS - NO LETTERING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$11,184
2014-11-19Job filed: TWO NON ILLUMINATED NON ADVERTISING ACCESSORY AWNINGS - NO LETTERING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$11,184
2014-11-14Permit SG — ISSUED
2014-11-14Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY AWNING - NO LETTERING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$6,757
2014-11-13Permit SG — ISSUED
2014-11-13Permit SG — ISSUED
2014-11-10311: Special Projects Inspection Team (SPIT) — Sign - In Danger Of Falling
2014-11-10DOB complaint, category ?
2014-11-10ECB CLASS - 1 violation: WORK W/O PERMIT.NOTE:GENERAL CONSTRUCTION DONE UNDER RPP #320960260.OBS @EXTERIOR OF BLDG IN PROCESS INSTALLATION OF COMMERCIAL AW$1,630
2014-11-03Job filed: PA
2014-10-27FDNY inspection (CONSTR)
2014-10-23Permit EW — ISSUED
2014-09-30Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FARGO BANK, NATIONAL ASSOCIATION to GC APPLE LLC; GATEWAY CENTER PROPERTIES PHASE II OWNER
2014-09-29FDNY inspection (CONSTR)
2014-09-18Permit EW — ISSUED
2014-09-08Job filed: INSTALL FIRE SUPPRESSION SYSTEM. GAS VALVE AND COOKING EQUIPMENT WERE FILED UNDER APPL # 320960260. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2014-09-05Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FAGO BANK, NATIONAL ASSOCIATION to NORDSTROM, INC; GATEWAY CENTER PROPERTIES PHASE II OWNER
2014-09-05Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FAGO BANK, NATIONAL ASSOCIATION to TSA STORES, INC
2014-09-05Agreement — from GATEWAY CENTER PROPERTIES PHASE II, LLC to GATEWAY CENTER PROPERTIES PHASE OWNER I
2014-09-05Mortgage assigned — from GATEWAY CENTER PROPERTIES PHASE II, LLC to GATEWAY CENTER PROPERTIES PHASE II OWNER
2014-09-05Mortgage assigned — from BANK OF AMERICA, N.A. to WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION
2014-09-05Mortgage assigned — from BANK OF AMERICA, N.A. to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-09-05Mortgage $75,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION$75,000,000
2014-09-05Agreement $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to GERMAN AMERICAN CAPITAL CORPORATION; WELLS FARGO BANK, NATIONAL ASSOCIATION$300,000,000
2014-09-05AL&R $300,000,000 — from GATEWAY CENTER PROPERTIES PHASE II OWNER to WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION$300,000,000
2014-09-05Agreement — from WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION to RAYMOURS FURNITURE COMPANY, INC; GATEWAY CENER PROPERTIES PHASE II OWNER,
2014-09-05Agreement — from WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION to PIER I IMPORTS (U.S.),
2014-09-05Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FAGO BANK, NATIONAL ASSOCIATION to FIVE BELOW, INC
2014-09-05Agreement — from J.C. PENNY PROPERTIES, INC to WELLS FAGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION
2014-09-05Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FAGO BANK, NATIONAL ASSOCIATION to FOUR M FOOD SERVICE OF GATEWAY, LLC
2014-09-05Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FAGO BANK, NATIONAL ASSOCIATION to DSW SHOE WAREHOUSE INC
2014-09-05SMIS — from GATEWAY CENTER PROPERTIES PHASE II, LLC to GATEWAY CENTER PROPERTIES PHASE OWNER I
2014-09-05Deed — from GATEWAY CENTER PROPERTIES PHASE II, LLC to GATEWAY CENTER PROPERTIES PHASE II OWNER
2014-09-05Agreement — from GERMAN AMERICAN CAPITAL CORPORATION; WELLS FAGO BANK, NATIONAL ASSOCIATION to WAKEFERN FOOD CORP; GATEWAY CENTER PROPERTIES PHASE II OWNER
2014-09-05Agreement — from WELLS FAGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION to THE TJX COMPANIES, INC
2014-09-03Permit NB — ISSUED
2014-09-03Permit EQ — ISSUED
2014-09-02FDNY inspection (CONSTR)
2014-08-29Permit PL — ISSUED
2014-08-14Permit EW — ISSUED
2014-08-14Permit EW — ISSUED
2014-08-05FDNY inspection (CONSTR)
2014-06-17FDNY inspection (CONSTR)
2014-05-20FDNY inspection (CONSTR)
2014-05-09Job filed: PLUMBING AND MECHANICAL WORK.$355,000
2014-05-09Job filed: TENANT BUILD OUT IN CONJUNCTION WITH NB #320586718. INCLUDES PLUMBING, MECHANICAL AND GENERAL CONSTRUCTION.$386,500
2014-05-01Job filed: SPRINKLER SYSTEM MODIFICATIONS FOR TENANT BUILD OUT AS PER PLANS SUBMITTED.$47,500
2014-05-01Job filed: FIRE ALARM SYSTEM MODIFICATIONS FOR TENANT BUILD OUT AS PER PLANS SUBMITTED.$35,000
2014-04-22FDNY inspection (CONSTR)
2014-03-24FDNY inspection (CONSTR)
2014-03-07Permit PL — ISSUED
2014-02-18FDNY inspection (CONSTR)
2014-01-15CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2014-01-13FDNY inspection (CONSTR)
2013
2013-12-20Permit NB — ISSUED
2013-12-20Permit EQ — ISSUED
2013-12-17FDNY inspection (CONSTR)
2013-11-04FDNY inspection (CONSTR)
2013-10-08FDNY inspection (CONSTR)
2013-10-04Permit EW — ISSUED
2013-09-19Job filed: FILING HEREWITH PLANS INDICATING THE INSTALLATION OF A NEW SPRINKLER SYSTEM FOR BUILDING H. FILED IN CONJUNCTION WITH NB APPLICATION 320586718. NO CHA$100
2013-09-19Job filed: FILING HEREWITH PLANS INDICATING THE INSTALLATION OF A NEW SPRINKLER SYSTEM FOR BUILDING H. FILED IN CONJUNCTION WITH NB APPLICATION 320586718. NO CHA$100
2013-09-10FDNY inspection (CONSTR)
2013-08-15FDNY inspection (CONSTR)
2013-07-15FDNY inspection (CONSTR)
2013-06-11FDNY inspection (CONSTR)
2013-05-13FDNY inspection (CONSTR)
2013-04-15FDNY inspection (CONSTR)
2013-03-18Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE DETECTION & SPRINKLER FIRE ALARM SYSTEM$1,000
2013-03-18Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE DETECTION & SPRINKLER FIRE ALARM SYSTEM$1,000
2013-03-11Permit PL — ISSUED
2013-01-25Permit NB — ISSUED
2013-01-25Permit EQ — ISSUED
2012
2012-12-11Job filed: SUBSEQUENT FILING FOR A CURB CUT AS SHOWN ON PLANS.
2012-12-03Job filed: SUBSEQUENT FILING FOR SITE/CIVIL WORK AS SHOWN ON PLANS.
2012-12-03Job filed: SUBSEQUENT FILING FOR SITE/CIVIL WORK AS SHOWN ON PLANS.
2012-12-03Job filed: SUBSEQUENT FILING FOR SITE/CIVIL WORK AS SHOWN ON PLANS.
2012-09-19Job filed: SUBSEQUENT FILING FOR STRUCTURAL AND FOUNDATION WORK AS SHOWN ON PLANS.
2012-09-19Job filed: SUBSEQUENT FILING FOR STRUCTURAL AND FOUNDATION WORK AS SHOWN ON PLANS.
2012-09-19Job filed: NB
2012-09-19Job filed: SUBSEQUENT FILING FOR THE SUBSLAB DEPRESSURIZATION SYSTEM AS SHOWN ON PLANS.
2012-09-19Job filed: SUBSEQUENT FILING FOR MECHANICAL, PLUMBING AND SPRINKLER WORK AS SHOWN ON PLANS.

Support this site Back to the building page