Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$4,680 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
86 service requests in the last three years. Most common: Illegal Parking (38) · Street Condition (7) · Consumer Complaint (6) · Noise (6) · For Hire Vehicle Complaint (4) · Elevator (4).
Filed construction activity
$2,710,150 in permitted construction work filed since
2016 (15 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$75,521,000
$33,984,450
2026
$77,346,000
$34,805,700
2027
$81,246,000
$36,560,700
The city's market estimate has risen
8% between tax years 2025 and 2027.
3 Food Establishment complaints to 311 at this address in the last three years (most often: Kitchen/Food Prep Area, Food Spoiled) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
25 Av — D · 0.7 mi straight-line (about a 19-minute walk) · station accessibility: none
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
86 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $23,000,000 on
2017-03-08 (lender: Signature Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-10-21
RPTT $2,864,911 — from QUILVEST USA PARTNERS, LLC; QS DONUTS, LLC; METRO FRANCHISING BAKERY, LLC to BP WILDCATS LLC
$2,864,911
2019-10-01
Agreement $40,150,000 — from LHL SHORE PARKWAY, LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
$40,150,000
2019-10-01
Deed $73,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to LHL SHORE PARKWAY, LLC
$73,000,000
2019-09-25
Sold for $73,000,000
$73,000,000
$73,000,000
2017-03-08
AL&R $45,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK
$45,000,000
2017-03-08
Mortgage $23,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK
$23,000,000
2017-03-08
Agreement $45,000,000 — from SIGNATURE BANK to THOR SHORE PARKWAY DEVELOPERS, LLC
$45,000,000
2016-12-01
Deed $225,000 — from STATE OF NEW YORK to THOR SHORE PARKWAY DEVELOPERS, LLC
$225,000
2016-11-18
Sold for $225,000
$225,000
$225,000
2015-07-30
AL&R $22,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK
$22,000,000
2015-07-30
Agreement $22,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK
$22,000,000
2015-07-30
Mortgage $1,699,002 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK
$1,699,002
2014-01-09
Agreement $13,312,669 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II
$13,312,669
2014-01-09
Agreement $3,659,331 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II
$3,659,331
2012-07-25
Mortgage $13,312,669 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II (CO
$13,312,669
Ten-year activity
50250
2017
2018
2019
44
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
6
6
3
4
0
19
2018
6
12
16
0
0
34
2019
6
6
4
5
0
21
2020
1
4
36
1
2
44
2021
0
7
26
0
0
33
2022
0
1
23
1
0
25
2023
0
3
32
0
1
36
2024
0
2
33
1
1
37
2025
1
10
32
0
1
44
2026
4
1
18
0
0
23
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-07-01ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. CLASS 2 ITEMS: 1) POSITION INDICATORS INSIDE THE CAR INOPERATIVE, REPAIR. 2$310
2025-07-01ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. CLASS 2 ITEMS: 1) MOTOR ROOM DOOR IN DISREPAIR 9NOT SELF LOCKING), REPLACE $310
2025-07-01ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. REMEDY: RESTORE $310
2025-06-21311: Elevator — Elevator - Multiple Devices On Property
2025-06-21DOB complaint, category ?
2025-05-23311: Illegal Parking — Blocked Bike Lane
2025-05-12311: Consumer Complaint — Garage or Parking Lot
2020-07-01311: Non-Emergency Police Matter — Face Covering Violation
2020-06-29311: Consumer Complaint — Retail Store
2020-06-22311: Food Poisoning — 3 or More
2020-06-15DOB violation E:
2020-06-15DOB violation E:
2020-06-15DOB violation E:
2020-06-15DOB violation E:
2020-06-09311: Non-Emergency Police Matter — Face Covering Violation
2020-06-08311: Non-Emergency Police Matter — Social Distancing
2020-06-08311: Non-Emergency Police Matter — Social Distancing
2020-05-24311: Non-Emergency Police Matter — Social Distancing
2020-05-23311: Consumer Complaint — Retail Store
2020-05-20311: Non-Emergency Police Matter — Face Covering Violation
2020-05-19311: Consumer Complaint — Retail Store
2020-05-17311: Non-Emergency Police Matter — Face Covering Violation
2020-05-09311: Non-Emergency Police Matter — Face Covering Violation
2020-05-06Elevator permit: Work to be done includes the following: Furnish and install one (1) new door lock monitoring system. This work is to be in complia$60,696
2020-05-01311: Consumer Complaint — Other
2020-04-25311: Non-Emergency Police Matter — Social Distancing
2020-04-24311: Consumer Complaint — Retail Store
2020-04-16311: Non-Emergency Police Matter — Social Distancing
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
2017-12-28Job filed: THIS APPLICATION IS BEING FILED FOR MECHANICAL WORK AND OBTAINING EQUIPMENT USE PERMITS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCU$12,000
2017-03-13Job filed: MODIFICATIONS TO EXISTING CLASS E FIRE ALARM SYSTEM$10,000
2017-03-08TL&R — from SIGNATURE BANK
2017-03-08AL&R $45,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK$45,000,000
2017-03-08Mortgage $23,000,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to SIGNATURE BANK$23,000,000
2017-03-08Agreement $45,000,000 — from SIGNATURE BANK to THOR SHORE PARKWAY DEVELOPERS, LLC$45,000,000
2017-02-07Job filed: FILING HEREWITH STRUCTURAL WORK TYPE PERTAINING TO INTERIOR WHOLESALE BUILD OUT.$15,000
2017-02-07Job filed: FILING HEREWITH APPLICATION FOR INTERIOR BUILD OUT OF BJ'S WHOLESALE AS PER DRAWINGS SUBMITTED HEREWITH.$40,000
2017-02-07Job filed: FILING HEREWITH APPLICATION FOR INTERIOR BUILD OUT OF BJ'S WHOLESALE AS PER DRAWINGS SUBMITTED HEREWITH.$40,000
2017-02-07Job filed: PLUMBING/PIPING SYSTEMS ARE EXISTING. SCOPE OF WORK CONSISTS OF RELOCATING/RER OUTING PIPING TO ACHIEVE GREATER HEAD-ROOM CLEARANCE. NO NEW PLUMBING/P$15,000
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-01Deed $225,000 — from STATE OF NEW YORK to THOR SHORE PARKWAY DEVELOPERS, LLC$225,000
2016-11-27311: Consumer Complaint — Overcharge
2016-11-18Sold for $225,000$225,000
2016-11-11311: Blocked Driveway — No Access
2016-10-05Permit PL — ISSUED
2016-09-21311: Water System — Leak (Use Comments) (WA2)
2016-09-07Permit EW — ISSUED
2016-08-24Job filed: PROPOSED INTERIOR RENOVATION AT EXISTING RETAIL SPACE WITH MINOR PARTITION, FINISHES AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUP$44,500
2016-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-07-13FDNY inspection (RISK)
2016-06-06DOB violation E:
2016-06-06DOB violation E:
2016-06-06DOB violation E:
2016-06-06DOB violation E:
2016-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-15Permit SG — ISSUED
2014-10-15Permit SG — ISSUED
2014-10-15Permit SG — ISSUED
2014-10-14Certificate of occupancy Temporary
2014-10-14Certificate of occupancy Temporary
2014-09-29FDNY inspection (SPECIAL-OTH)
2014-09-26FDNY inspection (CONSTR)
2014-09-11Certificate of occupancy Temporary
2014-09-11Certificate of occupancy Temporary
2014-08-31FDNY inspection (CONSTR)
2014-08-25Permit PL — ISSUED
2014-08-13Job filed: HEREWITH FILING CURB CUT (3) APPLICAITON IN CONJUNCTION WITH NEW BUILDING #320426758
2014-08-13Job filed: HEREWITH FILING CURB CUT (3) APPLICAITON IN CONJUNCTION WITH NEW BUILDING #320426758
2014-08-13Job filed: FILING HEREWITH CURB CUT (#5) WORK IN CONJUNCTION WITH NEW BUILDING #320426758.
2014-08-04FDNY inspection (CONSTR)
2014-08-01Permit NB — ISSUED
2014-07-31Permit EQ — ISSUED
2014-07-31Permit EQ — ISSUED
2014-07-17Permit EW — ISSUED
2014-07-11Permit PL — ISSUED
2014-07-10Job filed: FILING HEREWITH FIRE PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING #320426767$1,000
2014-07-09FDNY inspection (CONSTR)
2014-06-23311: Investigations and Discipline (IAD) — Complaince Inspection
2014-06-23DOB complaint, category ?
2014-06-18311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2014-06-18311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-06-18DOB complaint, category ?
2014-06-09FDNY inspection (CONSTR)
2014-06-03Air permit (REGISTRATION), fuel: NONE
2014-05-27Air permit (REGISTRATION), fuel: NONE
2014-05-15Permit EW — ISSUED
2014-05-12FDNY inspection (CONSTR)
2014-05-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2014-05-05ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROP AFFECTED BY CONST OPER.@ THE TIME OF MY INSP I WAS RESPONDING TO COMPLAINT #3477865.AS PER$2,400
2014-05-05DOB complaint, category ?
2014-04-30Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM. GAS VALVES AND COOKING EQUIPMENT WERE FILED UNDER APPL # 320426758. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2014-04-30Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM. GAS VALVES AND COOKING EQUIPMENT WERE FILED UNDER APPL # 320426758. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2014-04-28Job filed: INSTALL (2) EMERGENCY DIESEL GENERATORS AND STORAGE TANKS PER PLANS. ALL GENERAL CONSTRUCTION FILED UNDER # 320426758.$150,000
2014-04-28Permit EW — ISSUED
2014-04-11FDNY inspection (CONSTR)
2014-04-03311: Investigations and Discipline (IAD) — Complaince Inspection
2014-04-03DOB complaint, category ?
2014-04-01Permit SG — ISSUED
2014-04-01Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-25Permit SG — ISSUED
2014-03-14FDNY inspection (CONSTR)
2014-02-14FDNY inspection (CONSTR)
2014-02-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-02-14ECB CLASS - 1 violation: SEC. 3303.4.1 MAINTENANCE- UPON INSP. JOB SITE WORKING BUT SNOW AND ICE HAS NOT BEEN REMOVED FROM SIDEWALK ENTIRE FRONTAGE ALONG$1,600
2014-02-14ECB CLASS - 1 violation: NO SITE SAFETY MGR PRESENT AT SITE UPON INSPECTION WORKERS WORKING ON SITE NO SITE SAFETY MGR ON SITE DURING ONGOING CONSTRUCTION $1,200
2014-02-14DOB complaint, category ?
2014-02-10Permit EW — ISSUED
2014-01-20FDNY inspection (CONSTR)
2014-01-09Agreement $13,312,669 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II$13,312,669
2014-01-09Agreement $3,659,331 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II$3,659,331
2013
2013-12-20FDNY inspection (CONSTR)
2013-12-20Permit EW — ISSUED
2013-11-08Job filed: NEW MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH SMOKE PURGE AND CENTRAL OFFICE COMMUNICATION IN CONJUNCTION WITH NB 3204267$1,000
2013-11-08Job filed: NEW MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH SMOKE PURGE AND CENTRAL OFFICE COMMUNICATION IN CONJUNCTION WITH NB 3204267$1,000
2013-11-04FDNY inspection (CONSTR)
2013-10-09FDNY inspection (CONSTR)
2013-09-13Permit EW — ISSUED
2013-09-06FDNY inspection (CONSTR)
2013-08-22Permit PL — ISSUED
2013-08-22Permit PL — ISSUED
2013-08-07FDNY inspection (CONSTR)
2013-08-07311: Noise — Noise: Jack Hammering (NC2)
2013-07-29Permit EQ — ISSUED
2013-07-29Permit NB — ISSUED
2013-07-29Permit EQ — ISSUED
2013-07-29Permit NB — RE-ISSUED
2013-07-12FDNY inspection (CONSTR)
2013-06-17FDNY inspection (CONSTR)
2013-06-13Permit PL — ISSUED
2013-05-17Permit NB — ISSUED
2013-05-10FDNY inspection (CONSTR)
2013-05-07Permit NB — RE-ISSUED
2013-05-07Permit NB — RE-ISSUED
2013-04-18311: Construction Safety Enforcement — Excavation Tracking Complaint
2013-04-18DOB complaint, category ?
2013-04-15FDNY inspection (CONSTR)
2013-03-29Permit NB — ISSUED
2013-03-27311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2012-09-10Job filed: HEREWITH FILING SUPPORTIVE EXCAVATION DRAWINGS AS PER ATTACHED DOCUMENTS.
2012-09-10Job filed: HEREWITH FILING SUPPORTIVE EXCAVATION DRAWINGS AS PER ATTACHED DOCUMENTS.
2012-09-06Job filed: HEREWITH FILING SUPPORTIVE EXCAVATION DRAWINGS AS PER ATTACHED DOCUMENTS.
2012-07-25Mortgage $13,312,669 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II (CO$13,312,669
2012-07-25Mortgage $3,659,331 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II (CO$3,659,331
2012-07-25SAGE — from THOR SHORE PARKWAY DEVELOPERS, LLC
2012-07-25TL&R — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2012-07-25Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to MESA WEST REAL ESTATE INCOME FUND II (CO
2012-07-25SAGE — from MESA WEST REAL ESTATE INCOME FUND II (CO
2012-07-25SAGE — from THOR EQUITIES LLC
2012-07-25Agreement $12,250,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to MESA WEST REAL ESTATE INCOME FUND II (CO$12,250,000
2012-07-25Agreement — from MESA WEST REAL ESTATE INCOME FUND II (CO to BJ'S WHOLESALE CLUB, INC
2012-07-12Permit PL — ISSUED
2012-07-09Permit EW — ISSUED
2012-06-26Job filed: HEREWITH FILING INSTALLATION OF NEW STANDPIPE SYSTEM IN CONJUNCTION WITH NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.$3,000
2012-06-26Job filed: HEREWITH FILING INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NEW 1 STORY RETAIL DEPARTMENT STORE.$3,000
2012-06-26Job filed: HEREWITH FILING INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NEW 1 STORY RETAIL DEPARTMENT STORE.$3,000
2012-06-12Job filed: HEREWITH FILING MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH NEW ONE (1) STORY RETAIL DEPARTMENT STORE.
2012-06-11Job filed: HEREWITH FILING STRUCTURAL WORK FILED SUBSEQUENT TO NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.
2012-06-11Job filed: HEREWITH FILING STRUCTURAL WORK FILED SUBSEQUENT TO NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.
2012-06-08Job filed: HEREWITH FILING STRUCTURAL WORK FILED SUBSEQUENT TO NEW 1-STORY W/MEZZANINE LEVEL RETAIL DEPARTMENT STORE.
2012-06-08Job filed: HEREWITH FILING FOUNDATION WORK FILED SUBSEQUENT TO NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.
2012-06-08Job filed: CURB CUT WORK FILED SUBEQUENT TO NEW 1-STORY W/ MEZZANINE LEVEL RETAIL DEPARTMENT STORE.
2012-06-08Job filed: FILING HEREWITH CURB CUT WORK IN CONJUNCTION WITH NEW BUILDING #320426758.
2012-06-08Job filed: HEREWITH FILING STRUCTURAL WORK FILED SUBSEQUENT TO NEW 1-STORY W/MEZZANINE LEVEL RETAIL DEPARTMENT STORE.
2012-06-08Job filed: FILING HEREWITH CURB CUT WORK IN CONJUNCTION WITH NEW BUILDING #320426758.
2012-06-08Job filed: HEREWITH FILING FOUNDATION WORK SUBSEQUENT TO NEW 1 STORY W/MEZZANINE LEVER RETAIL DEPARTMENT STORE.
2012-06-08Job filed: FILING HEREWITH CURB CUT WORK IN CONJUNCTION WITH NEW BUILDING #320426758.
2012-06-08Job filed: CURB CUT WORK FILED SUBEQUENT TO NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.
2012-06-05Job filed: HEREWITH FILING MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.
2012-06-05Job filed: HEREWITH FILING MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH NEW THREE (3) LEVEL PUBLIC ACCESSORY PARKING GARAGE.
2012-05-15CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2012-05-15ZONE — from THOR SHORE PARKWAY DEVELOPERS, LLC
2012-04-11CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2012-04-11SMIS — from JP MORGAN CHASE BANK, NATIONAL ASSOCIATI
2012-04-11SMIS — from THOR SHORE PARKWAY DEVELOPERS, LLC
2012-04-11Job filed: APPLICATION FILED HEREWITH FOR EXCAVATION CONSISTING OF GRADING AND FILLING SITE AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,633,400
2012-04-11Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF UNDERGROUND STORM PIPING FOR OPEN AREAS OF PIPE AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS OR $428,000
2012-04-11Job filed: APPLICATION FILED HEREWITH FOR EXCAVATION CONSISTING OF GRADING AND FILLING SITE AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,633,400
2012-04-11Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF UNDERGROUND STORM PIPING FOR OPEN AREAS OF PIPE AS PER PLANS. THERE IS NO CHANGE IN USE, EGRESS OR $428,000
2012-03-07Job filed: APPLICATION FILED HEREWITH FOR BUILDERS PAVEMENT PLAN OF 350 LINEAR FEET .
2012-03-07Job filed: APPLICATION FILED HEREWITH FOR BUILDERS PAVEMENT PLAN OF 350 LINEAR FEET .
2012-02-08MLEA — from THOR SHORE PARKWAY DEVELOPERS, LLC to BJ'S WHOLESALE CLUB, INC
2012-02-08AALR — from ANGLO IRISH BANK CORPORATION LIMITED; IRISH BANK RESOLUTION CORPORATION LIMITE; ANGLO IRIS to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2012-02-08Mortgage assigned — from IRISH BANK RESOLUTION CORPORATION LIMITE; ANGLO IRISH BANK CORPORATION LIMITED; ANGLO IRIS to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2012-02-08Job filed: NB
2012-02-08Job filed: NB
2012-02-08Job filed: NB
2012-02-08Job filed: NB
2012-01-24311: Derelict Vehicle — With License Plate
2012-01-12311: BEST/Site Safety — Demolition Notification Received
2012-01-12311: BEST/Site Safety — Demolition Notification Received
2012-01-12DOB complaint, category ?
2012-01-12DOB complaint, category ?
2012-01-10Permit DM — ISSUED
2012-01-10Permit EQ — ISSUED
2012-01-10Permit DM — ISSUED
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-11-02Job filed: DEMOLITION- MEACHANICAL MEANS REQUESTED- THIS IS THE 2CD STRUCTURE- FENCE FILED UNDER LEAD APPLICATION
2011-11-02Job filed: DEMOLITION- MEACHANICAL MEANS REQUESTED- THIS IS THE 2CD STRUCTURE- FENCE FILED UNDER LEAD APPLICATION
2011-11-01Job filed: FULL DEMOLITION- MECHANICAL MEAN REQUESTED- LEAD APPLICATION
2011-11-01Job filed: FULL DEMOLITION- MECHANICAL MEAN REQUESTED- LEAD APPLICATION
2011-02-14Job filed: DEMOLITION OF NON-LOAD BEARING PARTITIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$20,000
2011-02-14Job filed: DEMOLITION OF NON-LOAD BEARING PARTITIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$20,000
2011-02-04311: Illegal Parking — Unauthorized Bus Layover
2010
2010-12-30Agreement $13,500,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to ANGLO IRISH BANK CORPORATION LIMITED$13,500,000
2010-09-20311: Damaged Tree — Branch or Limb Has Fallen Down
2010-05-26311: Water System — Hydrant Running (WC3)
2010-05-22311: Water System — Hydrant Running Full (WA4)
2010-05-20311: Water System — Hydrant Defective (WC2)
2010-02-24311: Air Quality — Air: Smoke, Vehicular (AA4)
2009
2009-12-31DOB violation LBLVIO:
2007
2007-12-31MLEA — from THOR SHORE PARKWAY DEVELOPERS, LLC to BJ'S WHOLESALE CLUB, INC
2006
2006-04-26AL&R $13,500,000 — from ANGLO IRISH BANK CORPORATION PLC to THOR SHORE PARKWAY DEVELOPERS, LLC$13,500,000
2006-04-26Mortgage $13,500,000 — from THOR SHORE PARKWAY DEVELOPERS, LLC to ANGLO IRISH BANK CORPORATION PLC$13,500,000
2006-01-12Deed $10,000,000 — from BONNIE HEIGHTS REALTY CORP. to THOR SHORE PARKWAY DEVELOPERS, LLC$10,000,000
2006-01-12Mortgage satisfied — from B. TURECAMO CONTRACTING CO., INC. to TURECAMO COASTAL & HARBOR TOWING CORP.
2006-01-12Mortgage assigned — from MORAN TOWING CORPORATION to TM2, LLC,
2006-01-12Mortgage satisfied — from BONNIE HEIGHTS REALTY CORP to BLANDFORD LAND CLEARING CORP.
1997
1997-09-16DOB violation LL6291:
1995
1995-08-29DOB violation LL6291:
1994
1994-06-01DOB violation LL6291:
1993
1993-08-16DOB violation LL6291:
1993-06-01DOB violation LL6291:
1993-01-19ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPARTMENT RECORDS STORAGE IN CELLAR CHANGED TO LOCKER ROOMS AND DRIVERS PICK U$1,000
1992
1992-12-17DOB complaint, category ?
1976
1976-03-31Mortgage assigned — from BONNIE HEIGHTS REALTY CORP to KINNEY MOTORS INC
1974
1974-01-03Mortgage — from BONNIE HEIGHTS RLTY CORP to BLANDFORD LAND CLEARING CORP
1973
1973-08-20SAGE — from BONNIE HEIGHTS REALTY CORP; TRUMP FRED C
1973-08-06Deed — from TURECAMO BARTHOLOMEW V AS EXEX OF & INDI; TURECAMO ENTERPRISES INC; DWYER FRANCES T; TUREC to BONNIE HEIGHTS RLTY CORP
1972
1972-12-28Deed — from B TURECAMO CONTRACTING CO INC; TURECAMO BARTHOLOMEW INDIVIDUALLY & AS E; TURECAMO BARTHOLD to BONNIE HEIGHTS RLTY CORP
1970
1970-05-27Mortgage — from B TURECANIO CONTRACTING CO INC to TURECAMO COASTAL & HARBOR TOWING CORP