Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

2660 East 18 Street · Brooklyn · BBL 3074620031 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP3
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 78% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 3.8. In ZIP 11235, 80% of residential buildings hold an A and 3% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations5 total — 0 class C (immediately hazardous), 3 class B, 2 class A. Oldest open since 1982-07-20.

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

2 service requests in the last three years. Most common: Illegal Parking (2).

Filed construction activity

No permitted work with a declared cost filed in the last decade. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1938)
YesSix or more residential units (8)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)Gozo Properties 18 Street LLC
Head officerGEORGE J GOZO
Managing agentGOZO MANAGEMENT ASSOC., INC
Last registered2025-09-04

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$730,000 $328,500
2026$876,000 $394,200
2027$1,051,000 $472,950

The city's market estimate has risen 44% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Flood exposure

In the FEMA 1%-annual-chance floodplain (2015 preliminary flood maps) — lenders typically require flood insurance here.

Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.

In the city's stormwater flood map only under the extreme-storm scenario (3.66 in/hr cloudburst with 2080 sea levels) — an Ida-scale event.

1 street-flooding or sewer-backup complaints at this address since 2018 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwaySheepshead Bay — B Q · 750 ft straight-line (about a 4-minute walk) · station accessibility: full
BusNearest boarding stop: Sheepshead Bay Rd / Voorhies Av — B4 B49 · 500 ft
School zones (2024–25 map)Elementary: P.S. 254 Dag Hammarskjold
Middle: J.H.S. 014 Shell Bank. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

2660 East 18 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

2 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by GOZO MANAGEMENT ASSOC., INC — 5 buildings, 40 units. Grades across the portfolio: A5. See the whole portfolio

BuildingBoroughUnitsGrade
2664 East 18 Street BK8 A
2666 East 18 Street BK8 A
2660 East 18 Street BK8 A
2670 East 18 Street BK8 A
2668 East 18 Street BK8 A

Ten-year activity

50250
45
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Housing & tenantsOwnership & moneyHealth & systems
Show as table
YearHousing & tenantsOwnership & moneyHealth & systemsTotal
2017450045
2018250126
20194015
20205117
20211113
20223014
20234015
20242013
20253003
20260011
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 2 records

DateRecord
2026-06-09Boiler inspection
2025-12-19Bedbug filing: 0 infested units

The full timeline

2026
2026-06-09Boiler inspection
2025
2025-12-19Bedbug filing: 0 infested units
2025-04-10311: Illegal Parking — Posted Parking Sign Violation
2025-04-10311: Illegal Parking — Posted Parking Sign Violation
2024
2024-12-17Bedbug filing: 0 infested units
2024-09-20Boiler inspection
2024-01-18Bedbug filing: 0 infested units
2023
2023-12-08Boiler inspection
2023-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-04-13Bedbug filing: 0 infested units
2023-03-22HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-01-06311: New Tree Request — For One Address
2022
2022-11-14HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-19Boiler inspection
2022-03-31311: New Tree Request — For One Address
2022-01-18Bedbug filing: 0 infested units
2021
2021-12-27Boiler inspection
2021-03-13Bedbug filing: 0 infested units
2021-03-04Deed — from GOZO, NICHOLAS J JR to GOZO PROPERTIES 18 STREET LLC
2020
2020-12-28Deed transfer (nominal price)
2020-10-27Boiler inspection
2020-10-12311: HEAT/HOT WATER — APARTMENT ONLY
2020-10-12Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-09-22311: UNSANITARY CONDITION — PESTS
2020-09-22Tenant complaint: UNSANITARY CONDITION — PESTS
2020-01-25Bedbug filing: 0 infested units
2019
2019-11-21Boiler inspection
2019-02-25Bedbug filing: 0 infested units
2019-01-28311: Noise - Residential — Banging/Pounding
2019-01-28311: Noise - Residential — Banging/Pounding
2019-01-28311: Blocked Driveway — No Access
2018
2018-12-06Boiler inspection
2018-10-27311: Sewer — Sewer Backup (Use Comments) (SA)
2018-06-05311: Noise - Residential — Banging/Pounding
2018-05-22311: Noise - Residential — Loud Music/Party
2018-05-21311: Noise - Residential — Loud Music/Party
2018-05-21311: Noise - Residential — Loud Music/Party
2018-05-21311: Noise - Residential — Loud Music/Party
2018-05-21311: Noise - Residential — Loud Music/Party
2018-05-11311: Noise - Residential — Loud Music/Party
2018-05-09311: Noise - Residential — Loud Music/Party
2018-04-14311: Noise - Residential — Banging/Pounding
2018-04-10311: Noise - Residential — Banging/Pounding
2018-04-09311: Noise - Residential — Banging/Pounding
2018-04-03311: Noise - Residential — Banging/Pounding
2018-04-02311: Noise - Residential — Banging/Pounding
2018-03-20311: Noise - Residential — Banging/Pounding
2018-03-19311: Noise - Residential — Banging/Pounding
2018-03-13311: Noise - Residential — Banging/Pounding
2018-03-13311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-07311: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-05311: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-02311: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017
2017-12-25311: Noise - Residential — Banging/Pounding
2017-12-25311: Noise - Residential — Banging/Pounding
2017-12-23HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDING THE MAXIMUM TEMPERTURE OF 130 DEGREES AT HOTWATER FIXTU
2017-12-22311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-17311: Noise - Residential — Banging/Pounding
2017-12-16311: Water Quality — Cloudy Or Milky Water (QB1)
2017-12-16311: DOOR/WINDOW — WINDOW FRAME
2017-12-16311: DOOR/WINDOW — WINDOW FRAME
2017-12-16311: FLOORING/STAIRS — FLOOR
2017-12-16311: Noise - Residential — Banging/Pounding
2017-12-16Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2017-12-16Tenant complaint: FLOORING/STAIRS — FLOOR
2017-12-16Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2017-12-15311: Noise - Residential — Banging/Pounding
2017-12-14311: Noise - Residential — Banging/Pounding
2017-12-12311: Noise - Residential — Banging/Pounding
2017-12-09311: Noise - Residential — Banging/Pounding
2017-12-09311: Noise - Residential — Banging/Pounding
2017-12-07311: Noise - Residential — Banging/Pounding
2017-12-07311: Noise - Residential — Banging/Pounding
2017-12-05311: Noise - Residential — Banging/Pounding
2017-11-28311: Noise - Residential — Banging/Pounding
2017-11-21HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-11-08311: Noise - Residential — Banging/Pounding
2017-11-07311: Noise - Residential — Loud Music/Party
2017-07-20311: Noise - Residential — Loud Music/Party
2017-07-09311: Noise - Residential — Loud Music/Party
2017-07-06311: Noise - Residential — Loud Music/Party
2017-06-25311: Noise - Residential — Banging/Pounding
2017-06-01311: Noise - Residential — Loud Music/Party
2017-05-21311: Noise - Residential — Banging/Pounding
2017-04-23311: Noise - Residential — Banging/Pounding
2017-04-16311: Noise - Residential — Banging/Pounding
2017-04-04311: Noise - Residential — Banging/Pounding
2017-04-02311: Noise - Residential — Banging/Pounding
2017-04-02311: Noise - Residential — Loud Talking
2017-03-31311: Noise - Residential — Banging/Pounding
2017-03-29311: Noise - Residential — Banging/Pounding
2017-03-15311: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-04311: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-03311: Noise - Residential — Banging/Pounding
2017-01-02311: Noise - Residential — Loud Music/Party
2016
2016-10-27311: Noise - Residential — Banging/Pounding
2016-10-13311: Noise - Residential — Banging/Pounding
2016-10-10311: Noise - Residential — Banging/Pounding
2016-09-24311: Noise - Residential — Banging/Pounding
2016-09-22311: Noise - Residential — Banging/Pounding
2016-09-11311: Noise - Residential — Banging/Pounding
2016-09-08311: Noise - Residential — Banging/Pounding
2016-06-11311: Blocked Driveway — No Access
2016-04-07311: New Tree Request — For One Address
2015
2015-11-30311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2015-11-30DOB complaint, category ?
2015-10-08HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2014
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2013
2013-03-13HPD litigation: Heat and Hot Water
2012
2012-12-26311: HEATING — HEAT
2012-12-26Tenant complaint: HEATING — HEAT RELATED
2012-12-26HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO CELLAR LOCKED AT PUBLIC HALL, 1st STORY
2012-12-26HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT
2012-12-26HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORT
2012-12-26HPD class B: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT
2012-12-24311: HEATING — HEAT
2012-12-24311: GENERAL CONSTRUCTION — GAS
2012-12-24Tenant complaint: GENERAL — COOKING GAS
2012-12-24Tenant complaint: HEATING — HEAT RELATED
2012-12-05311: HEATING — HEAT
2012-12-05Tenant complaint: HEATING — HEAT RELATED
2012-11-05311: HEATING — HEAT
2012-11-05Tenant complaint: HEATING — HEAT RELATED
2012-11-03311: HEATING — HEAT
2012-11-03Tenant complaint: HEATING — HEAT RELATED
2011
2011-12-24311: HEATING — HEAT
2011-12-24Tenant complaint: HEATING — HEAT RELATED
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-11-18HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCAT
2011-11-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST
2011-11-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM NORTH AT WE
2011-11-16311: PAINT - PLASTER — CEILING
2011-11-16311: PAINT - PLASTER — CEILING
2011-11-16311: PLUMBING — WATER-LEAKS
2011-11-16Tenant complaint: PLUMBING — WATER-LEAKS
2011-11-16Tenant complaint: PAINT/PLASTER — CEILING
2011-11-16Tenant complaint: PAINT/PLASTER — CEILING
2009
2009-12-31DOB violation LBLVIO:
2009-11-13ECB CLASS - 3 violation: WORK W/O PERMIT. ILLEGAL WORK NOTED: @ FRONT OF PROPERTY AN APPROX 10 FT LONG SECTION OF CURB CUT BEEN CUT FOR VEHICLE ACCESS TO T$200
2009-10-26DOB complaint, category ?
2007
2007-10-02Tenant complaint: GENERAL — VENTILATION SYSTEM
2007-09-24Tenant complaint: GENERAL — VENTILATION SYSTEM
2007-09-24Tenant complaint: GENERAL — VENTILATION SYSTEM
2007-05-18Tenant complaint: GENERAL — VENTILATION SYSTEM
2007-05-18Tenant complaint: GENERAL — VENTILATION SYSTEM
2006
2006-08-01Tenant complaint: GENERAL — VENTILATION SYSTEM
2006-06-26Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2006-01-18Tenant complaint: GENERAL — VENTILATION SYSTEM
2005
2005-09-14Tenant complaint: GENERAL — VENTILATION SYSTEM
2004
2004-02-13DOB violation LL6291:
2004-01-11Tenant complaint: HEATING — HEAT-PLANT
2001
2001-10-01Mortgage satisfied — from E 18 SHEEPSHEAD CORP to HOME FEDERAL SAVINGSAND LOAN
2000
2000-10-31ECB Non-Hazardous violation: 19B.
1997
1997-02-07Deed — from ILENE GARTENSTEIN TRUST; DAVID GARTENSTEIN TRUST; STEVEN GARTENSTEIN TRUST; GARTENSTEIN, V to GOZO, NICHOLAS F
1997-01-24Agreement — from GOZO, NICHOLAS to HOME FEDERAL SAVINGSBANK
1996
1996-11-29Deed — from E 18 SHEEPSHEAD COMPANY to ILENE GARTENSTEIN TRUST; DAVID GARTENSTEIN TRUST; GOZO, NICHOLAS F; GARTENSTEIN, VICTOR/
1987
1987-09-01Air permit (REGISTRATION), fuel: NATURALGAS
1982
1982-07-30Deed — from E. 18 SHEEPSHEAD CORP to E. 28 SHEEPSHEAD COMPANY
1982-07-20HPD class A: D26-21.03 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS ON WALL AT OR NEAR STAIRS ALL STYS PUB HALL.
1982-07-20HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
1977
1977-10-12Mortgage — from E 18 SHEEPSHEAD CORP to HOME FEDERAL SAVS AND LOAN ASSOC
1977-10-12Mortgage — from E 18 SHEEPSHEAD CORP to HOME FEDERAL SAVS AND LOAN ASSOC
1977-10-12SAGE — from HOME FEDERAL SAVS AND LOAN ASSOC; 2668 EAST 18TH STREET REALTY CO; E 18 SHEEPSHEAD CORP
1977-05-20SAGE — from 2668 EAST 18TH ST RLTY CO
1977-05-20SAGE — from E 18 SHEEPSHEAD CORP
1977-04-11Deed — from YUHAS OLGA to E 18 SHEEPSHEAD CORP

Support this site Back to the building page