Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
17 service requests in the last three years. Most common: Illegal Parking (6) · Noise (4) · Dirty Condition (2) · Standing Water (1) · Illegal Dumping (1) · General Construction/Plumbing (1).
Filed construction activity
$90,153 in permitted construction work filed since
2016 (14 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$7,611,000
$3,424,950
2026
$9,399,000
$4,229,550
2027
$9,454,000
$4,254,300
The city's market estimate has risen
24% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Queensboro Plaza — 7 N W · 650 ft straight-line (about a 3-minute walk) · station accessibility: full Court Sq — 7 E F G · 900 ft straight-line (about a 4-minute walk) · station accessibility: partial (Manhattan-bound only)
Bus
Nearest boarding stop: Jackson Av / 43 Av — Q101 · 500 ft
Citi Bike
27 St & Hunter St · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
17 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $5,000,000 on
2019-04-19 (lender: International Bank Of Chicago), covering 8 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2022-10-20
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2022-06-10
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2021-09-28
Agreement $5,000,000 — from ROYAL PC HOTEL HOLDINGS, L.P.; ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO; INTERNATIONAL BANK OF CHICAGO
$5,000,000
2021-09-28
Agreement $5,000,000 — from ROYAL PC HOTEL HOLDINGS, L.P.; ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO; INTERNATIONAL BANK OF CHICAGO
$5,000,000
2020-10-22
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS LP to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2019-10-07
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2019-07-17
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2019-04-19
Mortgage $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2019-04-03
Mortgage $9,000,000 — from ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$9,000,000
2019-01-23
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2018-08-16
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2018-05-31
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2018-01-26
Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2017-03-09
Mortgage $5,000,000 — from ROYAL HI HOTEL HOLDINGS., L.P.; ROYAL CP HOTEL HOLDINGS., L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
2017-03-09
AL&R $5,000,000 — from ROYAL CP HOTEL HOLDINGS., L.P.; ROYAL HI HOTEL HOLDINGS., L.P. to INTERNATIONAL BANK OF CHICAGO
$5,000,000
Ten-year activity
100500
2017
69
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
17
8
10
6
0
41
2018
8
32
26
3
0
69
2019
7
17
23
7
0
54
2020
6
4
0
1
0
11
2021
7
5
0
2
0
14
2022
4
4
8
2
1
19
2023
5
2
6
0
0
13
2024
19
0
7
0
0
26
2025
8
6
7
2
1
24
2026
3
0
2
0
0
5
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-09-04Certificate of occupancy Renewal Without Change
2025-07-08Restaurant inspection: SKY LOUNGE & BAR — grade N
2025-06-18Certificate of occupancy Initial
2025-06-04FDNY inspection (STRUC_INT_3)
2025-06-02311: Illegal Dumping — Removal Request
2025-05-09311: Illegal Parking — Blocked Sidewalk
2025-04-02Permit PL — ISSUED
2025-02-27Job filed: HEREWITH FILING TO INSTALL ONE FUEL STORAGE TANK IN CONNECTION WITH EMERGENCY GENERATOR.$5,000
2025-02-20ZONE — from ROYAL HI HOTEL HOLDINGS, L.P.
2025-02-20CERT — from FRANKLIN LAND SERVICES, INC.
2025-02-13Permit Mechanical Systems — Signed-off
2025-02-11FDNY inspection (CDA-90-DRILL)
2025-02-10FDNY inspection (RISK)
2025-02-10Permit Boiler Equipment — Signed-off
2025-01-30Job filed: INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C$3,000
2025-01-09DOB complaint, category ?
2025-01-09ECB CLASS - 2 violation: BC 3307.6.3-AREA TO BE PROTECTED-SWS///AT THE TIME OF MY INSPECTION I OBSERVED SUPPORTED SCAFFOLDS INSTALLED AT EXP#1 AND EXP#4 ON
2024
2024-12-20Permit NB — ISSUED
2024-12-11Permit Supported Scaffold — Signed-off
2024-12-11Job filed: INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C$3,000
2024-03-20311: Noise — Noise: Construction Equipment (NC1)
2024-03-13Permit Sidewalk Shed — Signed-off
2024-03-13Job filed: SIDEWALK SHED$2,000
2024-02-09Permit PL — ISSUED
2024-02-06Permit Supported Scaffold — Signed-off
2024-02-06Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$9,000
2022-07-26ECB CLASS - 2 violation: FAILURE TO PROVIDE INFORMATION PANEL CONSTRUCTION SITE.NOTED:AT TIME OF INSPECTION OF ACTIVE CONSTRUCTION SITE OBSERVED AT EXP #1
2022-07-20Permit EQ — ISSUED
2022-07-20Permit NB — ISSUED
2022-07-19Permit PL — ISSUED
2022-06-10Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2022-04-21311: Street Sign - Damaged — St Name - Attached to Pole
2022-02-11Elevator permit: Furnish and install Two (2) new Overhead Geared Traction elevators (PE1 and PE2) as per attached drawings. All work to comply wi$330,000
2021
2021-11-12Permit Sidewalk Shed — Signed-off
2021-10-18DOB complaint, category ?
2021-10-15ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ONSITE-EXPIRED SIDEWALK SHED PERMIT.AT TIME OF INSPECTION AT AN ACTIVE JOBSITE NB PROPOSED 9 STOR
2021-09-28Agreement $5,000,000 — from ROYAL PC HOTEL HOLDINGS, L.P.; ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO; INTERNATIONAL BANK OF CHICAGO$5,000,000
2021-09-28Agreement $5,000,000 — from ROYAL PC HOTEL HOLDINGS, L.P.; ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO; INTERNATIONAL BANK OF CHICAGO$5,000,000
2021-09-14FDNY inspection (CDA-90-DRILL)
2021-08-09Job filed: HEREWITH FILING TO INSTALL ONE 125KW EMERGENCY GENERATOR.$50,000
2021-08-09Job filed: HEREWITH FILING TO INSTALL ONE FUEL STORAGE TANK IN CONNECTION WITH EMERGENCY GENERATOR.$5,000
2021-07-15Permit PL — ISSUED
2021-07-14Permit NB — ISSUED
2021-06-18DOB complaint, category ?
2021-04-19Permit EQ — ISSUED
2021-03-17DOB complaint, category ?
2021-01-22Job filed: PROPOSED BUILDER'S PAVEMENT PLAN FILED WITH TOTAL OF 107.00 LINEAR FEET IN CONJUCTION W/ NB APPLICATION # 421410734
2020
2020-10-22Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS LP to INTERNATIONAL BANK OF CHICAGO$5,000,000
2020-08-26Permit Sidewalk Shed — Signed-off
2020-07-13Permit NB — ISSUED
2020-07-10Permit NB — ISSUED
2020-07-08Permit PL — ISSUED
2020-04-09Permit EQ — ISSUED
2020-04-09Permit NB — ISSUED
2020-01-25DOB complaint, category ?
2020-01-24ECB CLASS - 1 violation: FAILURE TO DESIGNATEED COMPETENT PERSON.AT THE TIME OF MY INSPECTION PROPOSED 7 STORY NB CURRENTLY AT ROOF LEVEL.CS WAS AT THE SIT$5,000
2020-01-24ECB CLASS - 1 violation: BC3301.12/FAILURE TO PROVIDE WORKERS SAFETY ORIENTATION LOGS AND SAFETY MEETING LOGS.AT THE TIME OF MY INSPECTION PROPOSED 7 STY N$625
2020-01-24ECB CLASS - 2 violation: BC3301.13.13/FAILURE TO MAINTAIN JOBSITE LOGS.AT THE TIME OF MY INSPECTION PROPOSED 7 STY NB CURRENTLY AT ROOF LEVEL.CS WAS AT SIT
2019
2019-12-27FDNY inspection (CDA-90-DRILL)
2019-12-24DOB complaint, category ?
2019-12-24DOB complaint, category ?
2019-12-23ECB CLASS - 2 violation: SIDEWALK SHED. AT TIME OF INSPECTION OF NEW BLDG UNDER CONSTRUCTION,I OBSERVED ALONG PERIMETER OF JOBSITE AT EXP'S#1&4 SIDEWALK SH$625
2019-12-23ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED DOCUMENTS AT TIME OF MY INSPECTION OF NEW BLDG UNDER CONSTRUCTION I OBSERVED WATERFILLED YODOCK $625
2019-12-23ECB CLASS - 1 violation: NO OVERHEAD PROTECTION. AT TIME OF MY INSPECTION OF NEW BLDG UNDER CONSTRUCTION-CONSTRUCTION AT ROOF LEVEL. I OBSERVED NO O.H.P. I$10,000
2019-12-23ECB CLASS - 2 violation: FAILURE TO PERFORM DUTIES AS PER CODE UPON REVIEW OF CONST. SUPERINTENDENTS DAILY LOG BOOK. AT TIME OF MY INSPECTION OF NEW BLDG U$5,000
2019-12-23ECB CLASS - 1 violation: SEC. 3308.6 HORIZONTAL NETTING. AT TIME OF MY INSPECTION OF NEW BLDG UNDER CONSTRUCTION. I OBSERVED MISSING HORIZONTAL SAFETY NETT$2,500
2019-12-23ECB CLASS - 1 violation: SEC. 3309.1 PROTECTION OF ADJOINING PROPERTIES. AT TIME OF INSPECTION I OBSERVED DAMAGE TO PARAPET WALL OF OCCUPIED ADJOINING PROP$2,500
2019-11-02DOB complaint, category ?
2019-10-07Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2019-09-10FDNY inspection (CDA-90-DRILL)
2019-07-25Permit Sidewalk Shed — Signed-off
2019-07-17Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2019-06-05311: Illegal Parking — Blocked Sidewalk
2019-06-04311: Illegal Parking — Blocked Sidewalk
2019-05-31Job filed: FIRE PROTECTION PLAN$100
2019-05-28311: Sustainability Enforcement — Sustainability Enforcement Work Order
2019-05-14DOB violation C: COMMISSIONER HAS ISSUED 15 DAY LETTER OF INTENT TO REVOKE PERMIT #421410734 JOB REQUIRES SUPERSEDING APPLICANT AS ORIGINAL
2019-05-13311: Borough Office — Construction Enforcement Work Order (DOB)
2019-05-13DOB complaint, category ?
2019-05-10311: Illegal Parking — Blocked Sidewalk
2019-05-08Permit PL — ISSUED
2019-05-05FDNY inspection (CDA-90-DRILL)
2019-04-19Mortgage $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2019-04-11Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM WITH ONE-WAY VOICE COMMUNICATION SYSTEM. THIS JOB IS FILED I$100
2019-04-11Job filed: FIRE PROTECTION PLAN$100
2019-04-04Permit EQ — ISSUED
2019-04-04Permit NB — RE-ISSUED
2019-04-03Mortgage $9,000,000 — from ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$9,000,000
2019-04-03REL — from INTERNATIONAL BANK OF CHICAGO to ROYAL CP HOTEL L.P.; ROYAL HI HOTEL HOLDINGS, L.P.
2019-04-03PREL — from INTERNATIONAL BANK OF CHICAGO to ROYAL CP HOTEL L.P.; ROYAL HI HOTEL HOLDINGS, L.P.
2019-03-20311: Illegal Parking — Blocked Sidewalk
2019-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-09311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-05FDNY inspection (CDA-90-DRILL)
2019-02-03311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-03311: Illegal Parking — Blocked Sidewalk
2019-02-03311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-26311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-23Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2019-01-19311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-17311: Illegal Parking — Blocked Sidewalk
2019-01-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-01-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-13DOB complaint, category ?
2019-01-06311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-01-06311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-06311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-06DOB complaint, category ?
2019-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018
2018-12-30311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-12-30DOB complaint, category ?
2018-12-23311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-23311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-23311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-23311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-12-23DOB complaint, category ?
2018-12-08311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-08311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-08311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-28DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-11-28DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-11-18311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-11-18311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-18DOB complaint, category ?
2018-11-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-11-17DOB complaint, category ?
2018-11-05Permit Sidewalk Shed — Signed-off
2018-10-25311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-25311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-10-25DOB complaint, category ?
2018-10-09Job filed: HEREWITH FILING SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION$1,000
2018-09-23FDNY inspection (CDA-90-DRILL)
2018-08-28311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2018-08-28DOB violation C:
2018-08-28DOB violation C:
2018-08-28DOB complaint, category ?
2018-08-28ECB CLASS - 1 violation: BC3301.7/DESIGN DRAWINGS MISSING.AT TIME OF INSPECTION ON AN ACTIVE JOSITE OF A 9 STORY BUILDNG CURRENTLY AT 2 STORY FORMWORK OBSE$2,500
2018-08-28ECB CLASS - 1 violation: SIDEWALK SHED WHERE REQUIRED.AT TIME OF INSPCTION ON AN ACTIVE JOBSITE OF A 9 STORY BUILDING CURRENTLY AT 2 STORY FORMWORK OBSERVE$10,000
2018-08-28ECB CLASS - 1 violation: 3301.13.1/SITE SAFETY PLAN MISSING.AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 9 STORY BUILDING CURRENTLY AT 2 STORY FORM WORK$2,500
2018-08-16Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2018-08-06311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-08-06311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-08-06DOB complaint, category ?
2018-08-06DOB complaint, category ?
2018-08-06ECB CLASS - 2 violation: LOGS. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, OBSERVED LOG BOOK NOT SIGNED BY SITE SUPER ON A DAILY BASIS.
2018-08-06ECB CLASS - 1 violation: CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. AS NOT ED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, OB$2,500
2018-07-30311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2018-07-30DOB complaint, category ?
2018-07-26ECB CLASS - 2 violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. @ TIME OF INSP OBSERVED ENTRY/EXIT DOOR TO SITE OPENED $5,000
2018-07-26ECB CLASS - 1 violation: 3303.14.2 NO PERMIT FOR DRAINAGE OF EXCAVATION INTO SEVEN UPON MY INSP OF A 9 STORY,NB WORK IN PROGRESS.I OBSERVED A BLACK HOSE CO
2018-07-26ECB CLASS - 1 violation: DESIGN DRAWINGS FOR ELEV SHAFT, @ TIME OF INSP OBSERVED PLATFORMS FOR 2 ELEVATOR SHAFTS LOCATED @ GRADE LEVEL. PLATFORMS WERE UNSE$6,250
2018-07-26ECB CLASS - 2 violation: SEC: BC 3303.7.2. FIRE EXTINGUISHERS. @ TIME OF INSP OBSERVED FIRE EXTINGUISHERS @ WORKING HEIGHTS & THAT THE EXTINGUISHERS OBSERV
2018-07-26ECB CLASS - 1 violation: INADEQUATE &/OR MISSING GUARD RAILS. @ TIME OF INSP OBSERVED GUARD RAILS HAD CAPS OF MORE THAN 6" @ COLUMNS & TOE BOARDS WERE NOT $2,500
2018-07-26ECB CLASS - 2 violation: SEC: BC 3307.2. PEDESTRIAN WALKWAY. @ TIME OF INSP OBSERVED PROTECTION OF PEDESTRIAN WALKWAY INADEQUATE PROTECTED WALKWAY WAS NOT $625
2018-07-24311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-07-24DOB complaint, category ?
2018-07-24ECB CLASS - 2 violation: BC3301.7 FAILURE TO PROVIDE PE APPROVED DESIGN DRAWINGS. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE. OBSERVED $1,250
2018-05-31Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2018-05-12FDNY inspection (CDA-90-DRILL)
2018-05-09Permit NB — ISSUED
2018-05-08Permit PL — ISSUED
2018-05-08Permit EW — ISSUED
2018-04-26311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-26311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-25311: Blocked Driveway — No Access
2018-04-17Permit FO — ISSUED
2018-04-17Permit FO — ISSUED
2018-04-17Permit EQ — ISSUED
2018-02-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-02-17DOB complaint, category ?
2018-02-16FDNY inspection (CDA-90-DRILL)
2018-02-08311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-02-08DOB complaint, category ?
2018-02-08ECB CLASS - 2 violation: SEC: 28-105.5. FORMS FILED W/ DOB DO NOT HAVE REQUIRED SIGNATURES. AS NOTED: @ TIME OF INSP ON AN ACTIVE CONSTRUCTION SITE. OBSERV$800
2018-01-26Agreement $5,000,000 — from ROYAL CP HOTEL HOLDINGS, L.P.; ROYAL HI HOTEL HOLDINGS, L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2018-01-24311: Blocked Driveway — No Access
2018-01-21311: Noise — Noise: Construction Equipment (NC1)
2017
2017-11-28311: Construction Safety Enforcement — Excavation Tracking Complaint
2017-11-28ECB CLASS - 2 violation: SEC. 3309.6 FAILURE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION ACTIVITIES. AT THE TIME OF IN$2,000
2017-11-28ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR DID NOT PER$6,000
2017-11-28ECB CLASS - 2 violation: CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER RULE.AT THE TIME OF INSPECTION CONSTRUCTION SUPER MASON CHEN WAS NOT O$5,000
2017-11-15FDNY inspection (CDA-90-DRILL)
2017-10-26311: Blocked Driveway — No Access
2017-10-19311: Blocked Driveway — No Access
2017-10-18311: Blocked Driveway — No Access
2017-10-16311: Blocked Driveway — No Access
2017-10-02311: Blocked Driveway — Partial Access
2017-09-20311: Blocked Driveway — No Access
2017-08-08FDNY inspection (CDA-90-DRILL)
2017-07-31311: Blocked Driveway — Partial Access
2017-07-08311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-06-12Job filed: INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR ALARM, AS PER LOCAL LAWS 63 & 64 OF 2008 IN CONJUNCTION WITH NB 421410734. NO CHANGE IN USE, EGRES$1,000
2017-06-12Job filed: INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR ALARM, AS PER LOCAL LAWS 63 & 64 OF 2008 IN CONJUNCTION WITH NB 421410734. NO CHANGE IN USE, EGRES$1,000
2017-05-24FDNY inspection (STRUC_INT)
2017-05-19Mortgage satisfied — from ROYAL REAL ESTATE MANAGEMENT LLC; ROYAL ONE REAL ESTATE LLC to ROSENTHAL & ROSENTHAL, INC.
2017-05-19Mortgage satisfied — from ROYAL ONE REAL ESTATE LLC to SHEFA FUNDING LLC
2017-05-03FDNY inspection (CONSTR)
2017-04-17Permit EQ — ISSUED
2017-04-17Permit FO — ISSUED
2017-04-17Permit FO — ISSUED
2017-03-21Job filed: HEREWITH FILED, MECHANICAL AND FUEL STORAGE FOR NEW BUILDING
2017-03-21Job filed: HEREWITH FILED, MECHANICAL AND FUEL STORAGE FOR NEW BUILDING
2017-03-21Job filed: HEREWITH FILING NEW BUILDING PLUMBING WORK
2017-03-21Job filed: HEREWITH FILED, SPRINKLER AND STANDPIPE PLANS
2017-03-21Job filed: HEREWITH FILING NEW BUILDING PLUMBING WORK
2017-03-09Mortgage $5,000,000 — from ROYAL HI HOTEL HOLDINGS., L.P.; ROYAL CP HOTEL HOLDINGS., L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2017-03-09AL&R $5,000,000 — from ROYAL CP HOTEL HOLDINGS., L.P.; ROYAL HI HOTEL HOLDINGS., L.P. to INTERNATIONAL BANK OF CHICAGO$5,000,000
2017-03-07Deed $7,582,882 — from ROYAL ONE REAL ESTATE, LLC to ROYAL HI HOTEL HOLDINGS, L.P.$7,582,882
2017-03-07RPTT&RET $34,390,294 — from ROYAL ONE REAL ESTATE, LLC; ROYAL REAL ESTATE MANAGEMENT LLC; CRABAPPLE CORP. to ROYAL ONE REAL ESTATE II, LLC$34,390,294
2017-03-01Job filed: PROPOSED BUILDER'S PAVEMENT PLAN FILED WITH TOTAL OF 107.00 LINEAR FEET IN CONJUCTION W/ NB APPLICATION # 421410734
2017-03-01Job filed: PROPOSED BUILDER'S PAVEMENT PLAN FILED WITH TOTAL OF 107.00 LINEAR FEET IN CONJUCTION W/ NB APPLICATION # 421410734
2014-12-24Mortgage satisfied — from ROYAL ONE REAL ESTATE LLC; ROYAL REAL ESTATE MANAGEMENT LLC to ROSENTHAL & ROSENTHAL, INC.
2014-12-24Mortgage assigned — from ROSENTHAL & ROSENTHAL, INC. to NEW FUND, LP; WESTLEAD BRIDGE LLC
2012
2012-02-09311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2012-02-09DOB complaint, category ?
2011
2011-11-29Rodent inspection: Failed for Other Reason
2011-11-29Rodent inspection: Failed for Other Reason
2011-10-11PREL — from ONE ROAYAL ONE REAL ESTATE LLC to ROSENTHAL & ROSENTHAL, INC.
2011-10-11Mortgage assigned — from ROSENTHAL & ROSENTHAL, INC. to SHEFA FUNDING LLC
2011-07-12Rodent inspection: Failed for Other Reason
2011-07-12Rodent inspection: Failed for Other Reason
2011-02-18Rodent inspection: Passed
2010
2010-12-02Rodent inspection: Passed
2010-12-02Rodent inspection: Failed for Other Reason
2010-02-19Rodent inspection: Passed
2010-02-19Rodent inspection: Passed
2010-02-05Rodent inspection: Failed for Other Reason
2010-02-05Rodent inspection: Failed for Other Reason
2009
2009-12-11Rodent inspection: Failed for Other Reason
2009-10-21Rodent inspection: Failed for Other Reason
2009-10-21Rodent inspection: Failed for Other Reason
2007
2007-11-28Job filed: NB
2007-11-07Mortgage $3,500,000 — from ROYAL ONE REAL ESTATE , LLC; ROYAL REAL ESTATE MANAGEMENT LLC to ROSENTHAL & ROSENTHAL, INC$3,500,000
2007-03-08SMIS — from CONNOISSEURS CONDOS COMPANY LLC to ROYAL ONE REAL ESTATE LLC
2006
2006-07-01Mortgage assigned — from MENDEL GROUP, INC. to ROSENTHAL & ROSENTHAL,INC.
2006-07-01M&CON $1,000,000 — from ROYAL ONE REAL ESTATE, LLC to ROSENTHAL & ROSENTHAL,INC.$1,000,000
2006-04-04Permit EQ — ISSUED
2006-04-04Permit EQ — ISSUED
2006-04-04Permit DM — ISSUED
2006-03-17Job filed: DM
2006-01-13Job filed: FILING HERWITH FOR BUILDERS PAVEMENT PLAN 107' ON CRESCENT STREET.
2006-01-13Job filed: FILING HERWITH FOR BUILDERS PAVEMENT PLAN 107' ON CRESCENT STREET.
2006-01-13Job filed: FILING HERWITH FOR BUILDERS PAVEMENT PLAN 107' ON CRESCENT STREET.
2006-01-09CERT — from LEGEND LAND ABSTRACT, LTD.
2006-01-09ZONE — from ROYAL ONE REAL ESTATE, LLC
2005
2005-08-10Mortgage $800,000 — from ROYAL ONE REAL ESTATE, LLC to MENDEL GROUP, INC$800,000
2005-08-10Deed $1,275,000 — from 42-59 CRESCENT REALTY CORP. to ROYAL ONE REAL ESTATE, LLC$1,275,000
2005-07-13Job filed: Filing herewith for Structural modification. No change in egress, use or occupancy.$1,000
2005-07-13Job filed: Filing herewith for Fire Alarm installation in conjunction with NB 402168827. No change in egress, use or occupancy.$1,500
2005-07-13Job filed: Filing herewith for Mechanical and Plumbing work in conjunction with NB 402168827. No change in egress, use or occupancy.$2,000
2005-07-13Job filed: Filing herewith for Fire Alarm installation in conjunction with NB 402168827. No change in egress, use or occupancy.$1,500
2005-07-12Job filed: Filing herewith for installation of sprinkler and standpipe in conjunction with NB 402168827. No change in egress use or occupancy.$3,000
2005-07-11Job filed: Filing herewith for Construction of New Building and Temporary Construction Fence.
1973
1973-07-23Deed — from FERNANDEZ LUIS M; FERNANDEZ ROSALIA to 42-59 CRESCENT REALTY CORP
1969
1969-11-14Mortgage assigned — from SCHILLING CHARLES A EXEC OF to MARGARET SCHILLING; ROBERT SCHILLING