Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Open with the city right now
Open HPD violations
1 total — 0 class C (immediately hazardous), 0 class B, 1 class A. Oldest open since 2026-05-11.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
89 service requests in the last three years. Most common: Illegal Parking (49) · Blocked Driveway (22) · Noise (4) · Consumer Complaint (3) · Abandoned Vehicle (2) · Water System (2).
Filed construction activity
$1,559,700 in permitted construction work filed since
2016 (30 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Registered with HPD — the names behind the building
Registered owner(s)
Marlinne Diaz
Last registered
2026-07-16
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$37,361,000
$16,812,450
2026
$38,412,000
$17,285,400
2027
$39,817,000
$17,917,650
The city's market estimate has risen
7% between tax years 2025 and 2027.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
89 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $9,545,904 on
2024-10-25 (lender: Deutsche Bank Trust Company Americas). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-10-25
Mortgage $9,545,905 — from 9TH STREET QB HOTEL LLC; 9TH STREET LIC LLC to DEUTSCHE BANK TRUST COMPANY AMERICAS
$9,545,905
2024-10-25
AL&R $65,000,000 — from 9TH STREET QB HOTEL LLC; 9TH STREET LIC LLC to DEUTSCHE BANK TRUST COMPANY AMERICAS
$65,000,000
2024-10-25
Agreement $65,000,000 — from 9TH STREET LIC LLC; 9TH STREET QB HOTEL LLC to DEUTSCHE BANK TRUST COMPANY AMERICAS
$65,000,000
2024-10-08
Mortgage $7,577,389 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA
$7,577,389
2024-10-08
Mortgage $13,702,611 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA
$13,702,611
2020-03-20
Mortgage $22,357,075 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA
$22,357,075
2020-03-20
Mortgage $12,362,925 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA
$12,362,925
2020-03-20
AL&R $34,720,000 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA
$34,720,000
2019-07-05
Mortgage $6,200,000 — from LGR 9TH STREET LLC; 9TH STREET LIC LLC to GOLDMAN SACHS BANK USA
$6,200,000
2019-07-05
AL&R $22,000,000 — from 9TH STREET LIC LLC; LGR 9TH STREET LLC to GOLDMAN SACHS BANK USA
$22,000,000
2019-07-05
Agreement $22,000,000 — from 9TH STREET LIC LLC; LGR 9TH STREET LLC to GOLDMAN SACHS BANK USA
$22,000,000
2018-08-03
Agreement $10,800,000 — from LGR 9TH STREET LLC; 9TH STREET LIC LLC to MIOF CREDIT 1 LLC
$10,800,000
2018-07-26
Sold for $995,000
$995,000
$995,000
2018-07-26
Sold for $7,005,000
$7,005,000
$7,005,000
2018-06-14
Mortgage $8,204,987 — from 9TH STREET LIC LLC; LGR 9TH STREET LLC to MIOF CREDIT 1 LLC
$8,204,987
Ten-year activity
100500
2017
87
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
11
5
10
2
0
28
2018
35
14
7
25
6
87
2019
23
24
8
9
11
75
2020
18
23
4
4
0
49
2021
26
20
5
0
6
57
2022
5
8
2
1
0
16
2023
8
1
36
0
2
47
2024
0
5
44
14
0
63
2025
0
0
28
2
1
31
2026
0
1
18
0
2
21
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-30
Elevator permit: REGROOVE TRACTION SHEAVE ON 3 ELEVATORS- All work to comply with ASME A17.1-2013, Part 8, Section 8.7.2.25 Safety Code for Elevato
2026-03-07
311: Blocked Driveway — No Access
2026-03-07
311: Elevator — Elevator - Multiple Devices On Property
2026-05-15311: Consumer Complaint — Hotel or Motel
2026-05-11HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-30Elevator permit: REGROOVE TRACTION SHEAVE ON 3 ELEVATORS- All work to comply with ASME A17.1-2013, Part 8, Section 8.7.2.25 Safety Code for Elevato$35,000
2026-03-07311: Blocked Driveway — No Access
2026-03-07311: Elevator — Elevator - Multiple Devices On Property
2024-10-25Mortgage assigned — from GOLDMAN SACHS BANK USA to DEUTSCHE BANK TRUST COMPANY AMERICAS
2024-10-25Mortgage assigned — from GOLDMAN SACHS BANK USA to DEUTSCHE BANK TRUST COMPANY AMERICAS
2024-10-25Mortgage assigned — from GOLDMAN SACHS BANK USA to DEUTSCHE BANK TRUST COMPANY AMERICAS
2024-10-25TL&R — from GOLDMAN SACHS BANK USA to 9TH STREET QB HOTEL LLC
2024-10-25Mortgage $9,545,905 — from 9TH STREET QB HOTEL LLC; 9TH STREET LIC LLC to DEUTSCHE BANK TRUST COMPANY AMERICAS$9,545,905
2024-10-25AL&R $65,000,000 — from 9TH STREET QB HOTEL LLC; 9TH STREET LIC LLC to DEUTSCHE BANK TRUST COMPANY AMERICAS$65,000,000
2024-10-25Mortgage assigned — from GOLDMAN SACHS BANK USA to DEUTSCHE BANK TRUST COMPANY AMERICAS
2024-10-25Agreement $65,000,000 — from 9TH STREET LIC LLC; 9TH STREET QB HOTEL LLC to DEUTSCHE BANK TRUST COMPANY AMERICAS$65,000,000
2024-10-08Mortgage $7,577,389 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA$7,577,389
2024-10-08Mortgage $13,702,611 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA$13,702,611
2024-10-03Agreement — from GOLDMAN SACHS BANK USA to 9TH STREET QB HOTEL LLC
2024-10-03Agreement — from GOLDMAN SACHS BANK USA to 9TH STREET QB HOTEL LLC
2024-10-01ECB CLASS - 1 violation: FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE COND
2024-09-25PREL — from GOLDMAN SACHS BANK USA to LGR 9TH STREET LLC; 9TH STREET LIC LLC
2024-09-25TL&R — from GOLDMAN SACHS BANK USA to 9TH STREET LIC LLC; LGR 9TH STREET LLC
2022-12-21Certificate of occupancy Renewal Without Change
2022-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-09-30Certificate of occupancy Renewal Without Change
2022-09-29SMIS — from LGR 9TH STREET LLC
2022-08-10311: Illegal Dumping — Removal Request
2022-08-10311: Illegal Dumping — Removal Request
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-11Certificate of occupancy Renewal Without Change
2022-06-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-04-13Permit Construction Fence — Signed-off
2022-04-11Certificate of occupancy Initial
2022-04-05FDNY inspection (CONSTR)
2022-01-19DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2022-01-19DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2022-01-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021
2021-10-21ECB CLASS - 1 violation: INSUFFICIENT WATER SUPPLY TO STAND PIPE AS PER BC 905& NFPA 14 CHAPTER 9.1-9.4. AT TIME OF INSPECTION I OBSERVED FULL WATER TANK W
2021-10-21ECB CLASS - 1 violation: INSUFFICIENT SOURCES OF WATER SUPPLY FOR SPRINKLER SYSTEM AS PER BC 903.3.5& NFPA 13 CHAPTER 15. AT TIME OF INSPECTION I OBSERVED
2021-10-13ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION ON THE ROOF INSIDE GRAVITY TANK I OBSERVED UNAPPROVED
2021-10-12DOB complaint, category ?
2021-10-04Elevator permit: Furnish and install three new overhead traction passenger elevator to comply with ASME A17.1 2000/2003, New York City Building Cod$920,000
2021-09-18Permit Sprinklers — Permit Issued
2021-09-18Permit NB — ISSUED
2021-09-09DOB complaint, category ?
2021-09-09ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.NOTED:AT TIME OF INSPECTION AT 16 STORY NEW BUILDING CONSTRUCTI
2021-09-01DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-08-26Job filed: No Work
2021-08-23Permit EW — ISSUED
2021-08-23Permit EW — ISSUED
2021-07-28Job filed: Alteration
2021-07-15ECB CLASS - 1 violation: WORK WITHOUT PERMIT.NOTE AT TIME OF INSPECTION AT A 2 STORY BUILDING,IOBSERVED BUILDING HAS BEEN TAKEN DOWN TO GRADE LEVEL.UPON SE$250
2021-07-06Permit PL — ISSUED
2021-07-06Permit PL — ISSUED
2021-06-30DOB complaint, category ?
2021-06-30ECB CLASS - 1 violation: BC3301.13.1 NOT SITE SAFETY PLAN (SSP).AT TIME OF INSPECTION OF THIS 2 STORY DEMOLISHED BUILDING I OSBSERVED ACTIVE WORKSITE WITH $625
2021-06-30ECB CLASS - 2 violation: BC3307.7 NO FENCE (EXP #2 AND 4)AT TIME OF INSPECTION OBSERVED ACTIVE WORKSITE AT DEMOLITION PHASE WITH LARGE PARTS OF CONSTRUCTIO$620
2021-06-15Permit Curb Cut — Signed-off
2021-06-15Permit Curb Cut — Signed-off
2021-06-15Permit Curb Cut — Signed-off
2021-06-15Permit Curb Cut — Signed-off
2021-06-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-06-09ECB CLASS - 1 violation: FAILURE TO PROVIDE SWS WHERE REQUIRED:ATOI @ACTIVE JOBSITE NB16STY,157'H,405 DWELLING UNITS HOTEL BLDG,IT WAS OBSERVED FAILURE TO $12,500
2021-06-09ECB CLASS - 2 violation: FAILURE TO PROVIDE/MAINTAIN ADEQUATE HOUSEKEEPING PER SEC REQUIREMENTS:ATOI@ACTIVE JOBSITE NB16STY HOTEL BLDG,IT WAS OBSERVED FAIL
2021-04-14Job filed: INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES TO USE,$15,000
2021-04-13Permit EW — ISSUED
2021-04-09Permit Construction Fence — Signed-off
2021-04-08Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH $5,000
2021-04-06Asbestos abatement: Removal — Alba Environmental Inc.
2021-04-06Asbestos abatement: Removal — Alba Environmental Inc.
2021-04-06Asbestos abatement: Removal — Alba Environmental Inc.
2021-04-06Asbestos abatement: Removal — Alba Environmental Inc.
2021-03-08ECB CLASS - 1 violation: BC2104.3 FAILURE TO IMPLEMENT COLD WEATHER CONST PROVISIONS WHEN AMBIENT TEMP FALLS BELOW 40DEGREESF.AS NOTED@TIME OF INSP FOR ACT$6,250
2021-03-08ECB CLASS - 2 violation: BC3301.7 FAILURE TO PROVIDE PE APPROVED DESIGN DRAWINGS AS NOTED:@TIMEOF INSP OF ACTIVE JOBSITE,16STYNB@BULKHEAD LEVE,OBSERVED:(1)
2021-03-01311: Illegal Parking — Blocked Sidewalk
2021-02-24311: Illegal Parking — Blocked Sidewalk
2021-02-23Permit NB — ISSUED
2021-02-16Elevator permit: Furnish and install three new overhead traction passenger elevator to comply with ASME A17.1 2000/2003, New York City Building Cod$920,000
2021-01-28311: Illegal Parking — Blocked Sidewalk
2021-01-28311: Illegal Parking — Blocked Sidewalk
2021-01-19Permit Sidewalk Shed — Signed-off
2020
2020-09-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-09-28DOB complaint, category ?
2020-09-24ECB CLASS - 2 violation: BC3307.7/2=GATE SWING OUT AT TIME OF MY INSPECTION OF A 16 STORY NB ACTIVE JOBSITE OBSERVED THE MAIN GATE AT EXP #1 APPROX 8 FEET
2020-09-24ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQAUTE HOUSEKEEPING PER SECTION REQUIREMENTS AT TIME OF INSPECTION ON A ACTIVE JOBSITE OF A 16 STORY AND O
2020-09-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-09-22DOB complaint, category ?
2020-09-15Permit Construction Fence — Signed-off
2020-09-04311: Noise - Residential — Loud Television
2020-08-25Permit EW — ISSUED
2020-08-25Permit EW — ISSUED
2020-08-21Permit EW — ISSUED
2020-08-04DOB complaint, category ?
2020-08-04ECB CLASS - 1 violation: 3314.5 FAILURE TO SAFEGUARD AND MAINTAIN SCAFFOLD WOR PLATFORM AT THE TIME OF MY ISNEPCTION OF 16 STORIES NB CONSTRUCTION SITE$2,500
2020-08-04ECB CLASS - 1 violation: 3314.8-FAILURE TO MAINTAIN SAFE NETTING SYSTEM. AT THE TIME OF MY INSPECRION OF A 16 STORY NB CONSTRUCTION SITE IN RESPONSE TO A $2,500
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-08Permit PL — ISSUED
2020-07-06Job filed: FILING FULL DEMOLITION OF 2 STORY BUILDING
2020-07-06Job filed: FILING FULL DEMOLITION OF 2 STORY BUILDING
2020-07-06Job filed: FILING FULL DEMOLITION OF 2 STORY BUILDING
2020-07-05311: Illegal Fireworks — N/A
2020-07-04DOB complaint, category ?
2020-07-04ECB CLASS - 1 violation: BC 3303.3 WATCH PERSON NOTE: @THE TIME OF MY INSPECTION OF A 16 STY ELECTED TO ROOF LVL SIDE CLOSED & THERE WERE NO CONSTRUCTION A
2020-06-30Job filed: HEREBY FILING FOR NE CURB CUT #2 FILED IN CONJUNCTION WITH NB# 421634020$1,000
2020-06-30Job filed: HEREBY FILING FOR NEW CURB CUT#3, FILED IN CONJECTION WITH NB# 421634020$1,000
2020-06-30Job filed: HEREBY FILING FOR NEW CURB CUT #1, FILED IN CONJUCTION WITH NB # 421634020,$1,000
2020-06-30Job filed: HEREBY FILING FOR NEW CURB CUT#4, FILED IN CONJUNCTION WITH NB# 421634020$1,000
2020-06-05Permit EQ — ISSUED
2020-05-30311: Blocked Driveway — No Access
2020-05-07Permit Supported Scaffold — Signed-off
2020-05-06Permit Construction Fence — Signed-off
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-04-02Permit Construction Fence — Signed-off
2020-03-24DOB complaint, category ?
2020-03-24DOB complaint, category ?
2020-03-23ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS NOTED: DURING MY INSPECTION @16 STY NEW BUILDING UNDER CONST @B$2,500
2020-03-23ECB CLASS - 1 violation: BC3310.8.4.1-RECORDING INSPECTIONS IN THE SITE SAFETY LOG. NOTED AT THE TIME OF MY INSPECTION ON A 16 STORY BUILDING UNDER CONSTRU
2020-03-23ECB CLASS - 1 violation: CONTRACTORS SHED & OFFICES. NOTED: @TIME OF MY INSPECTION IT WAS OBSERVED THAT CONTRACTOR'S SHANTY- SHED WAS INSTALLED @EXP#2 ALON$2,500
2020-03-23ECB CLASS - 1 violation: BC 3314.1 SCAFFOLD HAS NOT BEEN ERECTED & MAINTAINED IN AS AFE MANNER SO AS NOT TO ENDANG OR PUBLIC &POPERTY FROM FALLING MATERIAL$2,500
2020-03-23ECB CLASS - 1 violation: BC 3301.1.1 RESPONSIBILITY FOR SAFETY. NOTED: @TIME OF INSPECTION IT WAS OBSERVED AN 16 STY NB UNDER CONSTRUCTION WHERE IT WAS NOT$2,500
2020-03-23ECB CLASS - 1 violation: BC 3303.12.2 HOIST NOT IN A STATE OF READINESS. NOTED: @THE TIME OF MYINSPESCTION IT WAS OBSERVED A 16 STY NB UNDER CONSTRUCTION W$2,500
2020-03-20MLEA — from 9TH STREET LIC LLC to 9TH STREET QB HOTEL LLC
2020-03-20Mortgage $22,357,075 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA$22,357,075
2020-03-20Mortgage $12,362,925 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA$12,362,925
2020-03-20AL&R $34,720,000 — from 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA$34,720,000
2020-03-11ECB CLASS - 2 violation: FENESTATION U FACTOR DOES NOT MEET IN REQUIREMENT NB#421634020 ON AN ENERGY COMLIANCE INSPECTION I OBSERVED FENESTATIONS ARE BEING
2020-02-28Permit NB — ISSUED
2020-01-30ECB CLASS - 2 violation: AT THE TIME OF ENERGY CODE INSPECTION, I OBSERVED GAPS, AND MISSING FOUNDATION WALL INSULATION ON EXPOSURES #3 AND #4. INSULATION
2020-01-14Permit NB — ISSUED
2020-01-11FDNY inspection (CDA-90-DRILL)
2019
2019-09-28Elevator permit: Furnish and install three new overhead traction passenger elevator to comply with ASME A17.1 2000/2003, New York City Building Cod$920,000
2019-09-24Job filed: SUBSEQUENT FILING TO PERFORM EXCAVATION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2019-09-24Job filed: HEREBY FILING TO PERFORM SHORING AND EXCAVATION TO REPLACE THE CONTAMINATED SO IL TO BE .______BACKFILLED WITH NO INSTALLATION OF NEW FOUNDATION AS PE$1,100,000
2019-08-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-08-20Permit EW — ISSUED
2019-07-30DOB complaint, category ?
2019-07-30DOB complaint, category ?
2019-07-29ECB CLASS - 1 violation: NO GUARDRAILS AT LARGE OPENINGS THROUGHOUT SITE. AT TIME OF INSPECTIONON AN ACTIVE 16 STY NEW BLDG. NOTICE NUMEROUS AMOUNTS OF HOL$2,500
2019-07-29ECB CLASS - 1 violation: INADEQUATE HOUSEKEEPING. AT TIME OF INSPECTION ON AN ACTIVE 16 STY NEWBLDG,NOTICE GARVAGE/DEBRIS THROUGHOUT THE CONSTRUCTION SITE $625
2019-07-05Mortgage assigned — from MIOF CREDIT 1 LLC to GOLDMAN SACHS BANK USA
2019-07-05MLEA — from 9TH STREET LIC LLC to 9TH STREET QB HOTEL LLC
2019-07-05Mortgage $6,200,000 — from LGR 9TH STREET LLC; 9TH STREET LIC LLC to GOLDMAN SACHS BANK USA$6,200,000
2019-07-05TL&R — from MIOF CREDIT 1 LLC to MIDPIECE 9TH STREET LLC
2019-07-05TL&R — from MIOF CREDIT 1 LLC to LGR 9TH STREET LLC
2019-07-05Mortgage assigned — from MIOF CREDIT 1 LLC to GOLDMAN SACHS BANK USA
2019-07-05AL&R $22,000,000 — from 9TH STREET LIC LLC; LGR 9TH STREET LLC to GOLDMAN SACHS BANK USA$22,000,000
2019-07-05SAGE — from 9TH STREET LIC LLC; LGR 9TH STREET LLC; 9TH STREET QB HOTEL LLC to GOLDMAN SACHS BANK USA
2019-07-05Agreement $22,000,000 — from 9TH STREET LIC LLC; LGR 9TH STREET LLC to GOLDMAN SACHS BANK USA$22,000,000
2019-06-22Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE$8,000
2019-06-10311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-06-10311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-06-10DOB complaint, category ?
2019-06-10DOB complaint, category ?
2019-06-07ECB CLASS - 1 violation: BC3309.1 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OR DEMOLITION OPERATION. AT TIME OF IN$2,500
2019-06-07ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION. AT TIME OF IN SPECTION OF A NEW `16 STORY BUILDING UNDER CONSTRUCTION I OB$2,400
2019-06-07ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF OF INSPECITON OFA 16 SOTRY NEW BUI$2,500
2019-06-07ECB CLASS - 1 violation: FAILURE TO INSTITUTE SAFETY MEASURES OVERHEAD PROTECTION. AT TIME OF INSPECTION OF A NEW 16 STORY BUILDING UNDER CONSTRUCTION, I O$10,000
2019-06-07ECB CLASS - 1 violation: FAILURE TO INSTITUTE SAFETY MEASURES AT CONSTRUCTION SITE HOLES. AT TIME OF INSPECTION OF A NEW 16 STORY BUILDING UNDER CONSTRUC$10,000
2019-06-07ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT TIME OF INSPECTION OF A NEW 16 STORY BUILDING UNDER CONSTRUC$2,500
2019-06-07ECB CLASS - 1 violation: 3301.2 FAILURE TO MAINTAIN SAFE/PROPER EGRESS AT CONSTRUCTION SITE.ATTIME OF INSPECTION OF A 16 STORY NEW BLDG UNDER CONSTRUCTION
2019-06-07ECB CLASS - 1 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33. AT TIME OF INSPECTION, OF A 16 STOYR NEW BUILDING UNDER CONS$1,250
2019-06-07ECB CLASS - 1 violation: 3314.1 SUPPORTED SCAFFOLD UNSAFE/NOT AS PER CODE. AT TIME OF INSPECTION OF A 16 STORY NEW BUILDING UNDER CONSTRUCTION I OBSERVED $2,500
2019-06-04Elevator permit: Installation of a Single 6000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tes$10,000
2019-06-03311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-06-03DOB complaint, category ?
2019-06-03ECB CLASS - 1 violation: BLDG OR OPEN LOT OCCUPIED W/O A VALID CERT OF OCCUPANCY. AT THE TIME OF INSPECTION I OBSERVED THAT THE BLDG WAS OCCUPIED BY COMPAN$2,500
2019-05-23311: Sustainability Enforcement — Sustainability Enforcement Work Order
2019-05-23DOB complaint, category ?
2019-05-21ECB CLASS - 2 violation: SEC. 3308.5 NETTING. AT TIME OF INSPECTION OF NEW 16 STY BLDG ACTIVE JOBSITE W/ONGOING CONSTRUCTION WORK IN PROGRESS. BLDG AT 6TH
2019-05-21ECB CLASS - 2 violation: HOUSEKEEPING. AT TIME OF INSPECTION OF NEW 16 STORY BUILDING ACTIVE JOBSITE BUILDING AT 6TH STORY W/ WORK IN PROGRESS. I OBSERVED
2019-05-20Permit Construction Fence — Signed-off
2019-05-17Job filed: INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH NB #421634020.$4,000
2019-05-16Permit EQ — ISSUED
2019-05-15Job filed: INSTALLATION OF SINGLE 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33
2019-05-09Permit Supported Scaffold — Signed-off
2019-05-09Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE$8,000
2019-04-19FDNY inspection (CDA-90-DRILL)
2019-04-05Permit Construction Fence — Signed-off
2019-03-28Permit PL — ISSUED
2019-03-22311: BEST/Site Safety — Demolition Notification Received
2019-03-22DOB complaint, category ?
2019-03-21Permit DM — ISSUED
2019-03-19Permit Construction Fence — Permit Issued
2019-03-19Permit NB — ISSUED
2019-03-18Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHA$5,000
2019-03-07Permit Sidewalk Shed — Signed-off
2019-03-06Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-05Asbestos abatement: Removal — Alba Environmental Inc.
2019-03-04Job filed: HEREBY FILING FOR INSTALLATION OF NEW EMERGENCY GENERATOR IN CONJUNCTION WITH NB #421634020$1,000
2019-02-20Permit NB — ISSUED
2018
2018-12-28Permit Construction Fence — Signed-off
2018-12-19Permit Construction Fence — Signed-off
2018-11-08Job filed: FULL DEMOLITION OF TWO STORY HOUSE
2018-11-08Job filed: FULL DEMOLITION OF TWO STORY HOUSE
2018-10-31311: Construction Safety Enforcement — Excavation Tracking Complaint
2018-10-31DOB complaint, category ?
2018-10-31ECB CLASS - 2 violation: SEC. 3301.2 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION RESPONDING TO A
2018-10-18ZONE — from LGR 9TH STREET LLC
2018-10-18ZONE — from 9TH STREET LIC LLC
2018-10-18CERT — from FIRST NATIONWIDE TITLE AGENCY LLC
2018-10-17EASE — from 9TH STREET LIC LLC to LGR 9TH STREET LLC
2018-08-06Job filed: Filing herewith for temporary construction fence in conjunction with NB application 421634020$1,000
2018-08-03SMIS — from MIDPIECE 9TH STREET LLC; LGR 9TH STREET LLC; 9TH STREET LIC LLC
2018-08-03SMIS — from MIOF CREDIT 1 LLC
2018-08-03CERT — from FIDELITY NATIONAL TITLE INSURANCE COMPAN
2018-08-03SAGE — from MIDPIECE 9TH STREET LLC; 9TH STREET LIC LLC; LGR 9TH STREET LLC
2018-08-03Agreement $10,800,000 — from LGR 9TH STREET LLC; 9TH STREET LIC LLC to MIOF CREDIT 1 LLC$10,800,000
2018-08-03SMIS — from J & N DEVELOPMENT LLC
2018-08-03SMIS — from MANASSAKIS, IOANNIS
2018-08-03311: Construction Safety Enforcement — Best - DM Tracking Complaint
2018-08-03DOB complaint, category ?
2018-08-02ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. AT TIME OF INSPECTION, NOTED: AFTER REVIEW OF DEMO PLANS THAT EXP #4 SHO$2,500
2018-08-02ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. AT TIME OF INSPECTION AFTER REVIEW OF DEMO PLANS. NOTED: THAT STEEL REMO$2,500
2018-08-02ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION, NOTED: AT JOBSITE EXCESSIVE DEBRIS PILE$625
2018-08-01311: BEST/Site Safety — Demolition Notification Received
2018-08-01311: BEST/Site Safety — Demolition Notification Received
2018-08-01DOB complaint, category ?
2018-08-01DOB complaint, category ?
2018-08-01Permit DM — ISSUED
2018-08-01Permit DM — ISSUED
2018-07-26Sold for $995,000$995,000
2018-07-26Sold for $7,005,000$7,005,000
2018-07-19Permit Sidewalk Shed — Permit Issued
2018-07-18Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WI$5,000
2018-06-26Job filed: HEREBY FILING FOR SOE IN CONJUNCTION WITH NB#421634020
2018-06-26Job filed: HEREBY FILING FOR SOE IN CONJUNCTION WITH NB#421634020
2018-06-18Mortgage satisfied — from ANOROC REALTY, INC. to BIANCANIELLO, FRANK
2018-06-14Asbestos abatement: Removal — Alba Environmental Inc.
2018-06-14Asbestos abatement: Removal — Alba Environmental Inc.
2018-06-14Asbestos abatement: Removal — Alba Environmental Inc.
2018-06-14Asbestos abatement: Removal — Alba Environmental Inc.
2018-06-14Asbestos abatement: Removal — Alba Environmental Inc.
2018-06-14Asbestos abatement: Removal — Alba Environmental Inc.
2018-06-14Mortgage $8,204,987 — from 9TH STREET LIC LLC; LGR 9TH STREET LLC to MIOF CREDIT 1 LLC$8,204,987
2018-06-14Mortgage satisfied — from HAMIL STRATTEN PROPERTIES, LLC to BIANCANIELLO, FRANK
2018-06-14Agreement $10,800,000 — from LGR 9TH STREET LLC; 9TH STREET LIC LLC to MIOF CREDIT 1 LLC$10,800,000
2018-06-14CERT — from FIRST AMERICAN TITLE INSURANCE COMPANY
2018-06-14ZONE — from 9TH STREET LIC LLC
2018-06-14AL&R $10,800,000 — from LGR 9TH STREET LLC; 9TH STREET LIC LLC to MIOF CREDIT 1 LLC$10,800,000
2018-06-14Deed $10,150,000 — from HAMIL STRATTEN PROPERTIES, LLC to 9TH STREET LIC LLC$10,150,000
2018-06-14Permit Construction Fence — Signed-off
2018-06-14Permit Construction Fence — Signed-off
2018-06-13Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH CHA$5,000
2018-06-13Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH CHA$5,000
2018-06-12Job filed: HEREBY FILING FOR RELATED SPRINKLER & STANDPIPE SYSTEM IN CONJUCTION WITH NB# 421634020$2,000
2018-06-08Deed transfer (nominal price)
2018-06-08Sold for $10,150,000$10,150,000
2018-06-08Job filed: HEREBY FILING FOR INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATIONS/SMOKE PURGE AND$1,000
2018-06-08Job filed: HEREBY FILING FOR INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATIONS/SMOKE PURGE AND$1,000
2018-06-08Job filed: HEREBY FILING FOR INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATIONS/SMOKE PURGE AND$1,000
2018-05-23Job filed: FILING FOR FULL DEMOLITION OF A 1 STORY BUILDING
2018-05-23Job filed: FILING FOR FULL DEMOLITION OF A 1 STORY BUILDING
2018-05-23Job filed: FILING FOR FULL DEMOLITION OF A 1 STORY BUILDING
2018-05-22Job filed: HEREBY FILING FOR PLUMBING AND MECHANICAL RELATED WORK FOR NEW BUILDING
2018-05-22Job filed: HEREBY FILING FOR BUILDERS PAVING PLAN FILED IN CONJUNCTION WITH NB#421634020 & 420656347
2018-05-22Job filed: HEREBY FILING FOR TEMPORARY STANDPIPE ALARM SYSTEM AS PER LOCAL LAW 63&64 OF 2009. THIS APPLICATION IS FILED IN CONJUCTION WITH NB# 421634020$1,000
2018-05-22Job filed: HEREBY FILING FOR PLUMBING AND MECHANICAL RELATED WORK FOR NEW BUILDING
2018-05-22Job filed: HEREBY FILING FOR BUILDERS PAVING PLAN FILED IN CONJUNCTION WITH NB#421634020 & 420656347
2018-05-14Job filed: HEREBY FILING FOR STRUCTURAL RELATED WORK FOR PROPOSED NEW BUILDING
2018-05-14Job filed: HEREBY FILING FOR FOUNDATION WORK FOR PROPOSED NEW BUILDING.
2018-05-14Job filed: HEREBY FILING FOR STRUCTURAL RELATED WORK FOR PROPOSED NEW BUILDING
2018-05-14Job filed: HEREBY FILING FOR A NEW 16 STORY HOTEL R-1 BUILDING
2018-04-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017
2017-12-20Sold for $995,000$995,000
2017-10-27DOB complaint, category ?
2017-10-27ECB CLASS - 1 violation: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF MY INSPECTION I OBSERVED ADDITIONAL GAS PIPING INSTALLE$4,800
2017-08-03Permit EW — ISSUED
2017-08-03Permit PL — ISSUED
2017-07-13Permit EW — ISSUED
2017-06-20Permit PL — ISSUED
2017-06-08Job filed: APPLICATION FILED TO LEGALIZE NEW GAS PIPING AND TWO SPACE HEATERS IN ORDER TO COMPLY WITH ECB VIOLATION # 35204278R. NO CHANGE TO USE EGRESSOR OCCUPA$11,500
2017-03-31311: Non-Emergency Police Matter — Other (complaint details)
2017-03-31311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-03-25311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-02-06DTL — from THE BANK OF NEW YORK MELLON
2017-01-27Permit EQ — ISSUED
2017-01-27Permit FO — ISSUED
2017-01-27Permit FO — ISSUED
2017-01-27Permit AL — RE-ISSUED
2017-01-18Job filed: SP WORK TYPE FOR CONSTRUCT PARTIAL SECOND FLOOR VERTICAL ADDITION$21,600
2017-01-18Job filed: SP WORK TYPE FOR CONSTRUCT PARTIAL SECOND FLOOR VERTICAL ADDITION$21,600
2017-01-12ECB CLASS - 1 violation: WORK W/O A PERMIT.AT TIME OF INSPECTION 5:13PM AT ABOVE ADDRESS AND DATE I OBSERVED NEW GAS PIPING OVER 100;OF NEW GAS PIPING IN$1,600
2017-01-11311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-01-10311: Plumbing — Gas Utility Referral
2017-01-10DOB complaint, category ?
2016
2016-12-12Job filed: CONSTRUCT PARTIAL SECOND FLOOR VERTICAL ADDITION. INSTALL PARTITIONS AND PLUMBING FIXTURES.$150,000
2015-08-11311: Non-Emergency Police Matter — Other (complaint details)
2015-07-13311: Sidewalk Condition — Dumpster - Construction Waste
2015-07-13311: Other Enforcement — E10 Obstruction (Street/Sidewalk)
2015-05-12311: Blocked Driveway — No Access
2015-04-22311: Blocked Driveway — No Access
2015-03-08311: Snow — E9 Snow / Icy Sidewalk
2015-03-06311: Non-Emergency Police Matter — Other (complaint details)
2015-01-20311: Blocked Driveway — No Access
2015-01-09DTL — from THE BANK OF NEW YORK MELLON
2015-01-08DTL — from THE BANK OF NEW YORK MELLON
2014
2014-11-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-08-18DOB violation C: FAILURE TO MAINTAIN. 1/4"-1/2" VERTICAL CRACKS ARE VISIBLE ON EXTERIOR WALLS OF EXP 1 & 2 OF BLDG. THE CRACKS ALONG EXP 2 ARE AT R
2014-08-10Permit EQ — ISSUED
2014-08-07DOB violation IMEGNCY:
2014-08-05Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
2014-08-04FDNY inspection (STRUC_INT)
2014-08-04311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2014-08-04DOB complaint, category ?
2014-08-04ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL(S)OR APP:NOTE @ EXP 2(LEFT SIDE)BRICK WALL HAS A LARGE CRACK APPROX 1"-1"/2INCHES WHICH RUNS FROM GR$1,000
2014-06-26311: Derelict Vehicle — With License Plate
2014-05-09311: Street Condition — Pothole
2014-01-05311: Street Condition — Pothole
2013
2013-12-16311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2013-05-21Rodent inspection: Failed for Rat Activity
2013-05-14311: Non-Emergency Police Matter — Other (complaint details)
2013-04-19Rodent inspection: Passed
2013-04-19Rodent inspection: Failed for Other Reason
2013-03-13311: Curb Condition — Defacement
2012
2012-12-04311: Blocked Driveway — No Access
2012-11-30311: Blocked Driveway — Partial Access
2012-11-19311: Blocked Driveway — No Access
2012-09-12311: Blocked Driveway — No Access
2012-08-28TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012-05-24311: Blocked Driveway — No Access
2011
2011-11-30ATL — from THE BANK OF NEW YORK to THE BANK OF NEW YORK
2011-08-26Rodent inspection: Passed
2011-08-26Rodent inspection: Passed
2011-07-12311: Blocked Driveway — No Access
2011-02-16311: Sidewalk Condition — Blocked - Construction
2010
2010-06-23311: Blocked Driveway — Partial Access
2010-03-29Job filed: TO INSTALL 6' CONCRETE SILL ON GROUND FOR EXISTING STORAGE/MIXER ROOM . TO PUT CORRECT MEA # FOR EXISTING SPRAY BOOTH. TO SHOW AIR INLET AND OUTLET FO$5,000
2010-03-29Job filed: TO INSTALL 6" CONCRETE SILL ON GROUND FOR EXISTING STORAGE/MIXER ROOM . TO PUT CORRECT MEA # FOR EXISTING SPRAY BOOTH. TO SHOW AIR INLET AND OUTLET FO$5,000
2010-02-24311: Other Enforcement — E10 Obstruction (Street/Sidewalk)