36-03 Prince Street · Queens · BBL 4049717504
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
2 heat or hot-water complaints in the last three years (winter 2025–26: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
55 service requests in the last three years. Most common: Illegal Parking (22) · Consumer Complaint (6) · Water System (5) · Street Condition (4) · Noise (2) · Blocked Driveway (2).
Filed construction activity
$6,736,156 in permitted construction work filed since
2016 (75 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$250,158
$112,571
2026
$28,175,000
$12,678,750
2027
$410,112
$184,551
The city's market estimate has risen
64% between tax years 2025 and 2027.
1 Food Establishment complaint to 311 at this address in the last three years (most often: Allergy Information), shared by 4 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2026 (2 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Flushing-Main St — 7 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Northern Blvd / Main St — Q19 Q63 Q66 · 200 ft
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
55 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
$14,000,000
Ten-year activity
5002500
2017
2018
2019
2020
2021
462
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
22
44
0
0
0
66
2018
33
18
0
0
4
55
2019
31
2
0
1
0
34
2020
7
11
0
84
0
102
2021
1
14
1
0
0
16
2022
42
2
5
413
0
462
2023
40
28
10
70
8
156
2024
20
1
10
0
8
39
2025
21
4
28
0
12
65
2026
18
1
16
38
10
83
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Street Sign - Missing — No Parking, Standing, Stopping
2026-07-31
Job filed: No Work
2026-07-30
Permit Mechanical Systems — Permit Issued
2026-07-28
Certificate of occupancy Renewal Without Change
2026-07-28
Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F
2026-07-08
Job filed: No Work
2026-06-25
311: Consumer Complaint — Garage or Parking Lot
2026-06-22
Boiler inspection
2026-06-22
Boiler inspection
2026-06-22
Boiler inspection
2026-06-09
Job filed: SUPERSEDE JOB 440770033 FOR PERMIT. RENOVATION AT EXISTING ROOF TERRACE, 2ND TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. NO CHANGE OF EXISTING
2026-06-09
Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F
2026-06-04
Job filed: UPFITTING EXISTING RESTAURANT SPACE. NEW PARTITIONS, CEILING/FLOOR/WALL FINISHES, NEW KITCHEN VENTILATION AND HEAT PUMP SYSTEMS, NO CHANGE IN USE, EGR
2026-05-18
Permit Plumbing — Permit Issued
2026-05-18
Permit Plumbing — Permit Issued
2026-05-14
Job filed: INSTALL PLUMBING FIXTURES IN 11TH FLOOR OF THE EXISTING 14 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK
2026-05-13
311: For Hire Vehicle Complaint — Driver Complaint - Passenger
Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F
Job filed: MODIFY EXISTING SPRINKLER LAYOUT AS PER NEW PARTITION AT 2ND TO 4TH FLOOR SPA, AND AT 5TH FLOOR OFFICE.
2026-03-14
311: Water System — Hydrant Leaking (WC1)
2026-03-04
Permit General Construction — Signed-off
2026-02-27
311: Elevator — Elevator - Multiple Devices On Property
2026-02-27
DOB complaint, category ?
2026-02-08
311: Water System — Possible Water Main Break (Use Comments) (WA1)
2026-01-30
311: Non-Residential Heat — Inadequate or No Heat
2026-01-27
Permit General Construction — Permit Issued
2026-01-27
Permit General Construction — Permit Issued
showing the 80 most recent
The full timeline
2026
2026-10-02Restaurant inspection: THE DUO — grade A
2026-08-13311: Street Condition — Line/Marking - Faded
2026-08-13311: Street Sign - Missing — No Parking, Standing, Stopping
2026-07-31Job filed: No Work
2026-07-30Permit Mechanical Systems — Permit Issued
2026-07-28Certificate of occupancy Renewal Without Change
2026-07-28Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F$49,680
2026-07-08Job filed: No Work
2026-06-25311: Consumer Complaint — Garage or Parking Lot
2026-06-22Boiler inspection
2026-06-22Boiler inspection
2026-06-22Boiler inspection
2026-06-09Job filed: SUPERSEDE JOB 440770033 FOR PERMIT. RENOVATION AT EXISTING ROOF TERRACE, 2ND TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. NO CHANGE OF EXISTING$300,000
2026-06-09Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F$49,680
2026-06-04Job filed: UPFITTING EXISTING RESTAURANT SPACE. NEW PARTITIONS, CEILING/FLOOR/WALL FINISHES, NEW KITCHEN VENTILATION AND HEAT PUMP SYSTEMS, NO CHANGE IN USE, EGR$310,120
2026-05-18Permit Plumbing — Permit Issued
2026-05-18Permit Plumbing — Permit Issued
2026-05-14Job filed: INSTALL PLUMBING FIXTURES IN 11TH FLOOR OF THE EXISTING 14 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$29,500
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13AL&R $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13Agreement $14,000,000 — from CA PLAZA, LLC to CATHAY BANK$14,000,000
2026-05-13311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-05-04Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F$49,680
2026-04-02Certificate of occupancy Renewal Without Change
2026-03-30Job filed: MODIFY EXISTING SPRINKLER LAYOUT AS PER NEW PARTITION AT 2ND TO 4TH FLOOR SPA, AND AT 5TH FLOOR OFFICE.$26,400
2026-03-14311: Water System — Hydrant Leaking (WC1)
2026-03-04Permit General Construction — Signed-off
2026-02-27311: Elevator — Elevator - Multiple Devices On Property
2026-02-27DOB complaint, category ?
2026-02-08311: Water System — Possible Water Main Break (Use Comments) (WA1)
2026-01-30311: Non-Residential Heat — Inadequate or No Heat
2026-01-27Permit General Construction — Permit Issued
2026-01-27Permit General Construction — Permit Issued
2026-01-22Job filed: INTERIOR RENOVATION OF 11TH FL OF EXISTING 14 STORY BUILDING, DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN, PARTITION, FLOORING, CEILING AND PAIN$90,000
2026-01-16311: Smoking or Vaping — Allowed in Smoke Free Area
2026-01-12311: Non-Residential Heat — Inadequate or No Heat
2025
2025-12-31Certificate of occupancy Renewal Without Change
2025-12-09Job filed: MINOR ALTERATION TO EXISTING SPRINKLE HEADS ONLY. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.$19,500
2025-11-28Restaurant inspection: MIN DU SHENG YAN — grade Z
2025-11-04Boiler inspection
2025-11-04Boiler inspection
2025-11-04Boiler inspection
2025-11-03ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 3914617
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-10-31Job filed: INSTALL RELOCATE EXIST. 2 LAV SINK, 4 W.C & 2 NEW URINALS @ 10TH FLOOR, OF THE EXISTING 14 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EG$23,000
2025-10-28DOB complaint, category ?
2025-10-27Permit General Construction — Permit Issued
2025-10-21Job filed: INTERIOR RENOVATION OF EXISTING SPACE, BUILD PARTITION WALLS, PAINTING THE CEILING, AND REPAIR THE FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2025-10-07Certificate of occupancy Renewal Without Change
2025-07-31Restaurant inspection: LITTLE ULUH — grade A
2025-07-28Job filed: INSTALL NEW PLUMBING & GAS WORK AT ROOF TERRACE, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. INSTALL NEW SUBMETERS & MODIFY STORM DR$49,680
2025-07-16Permit EW — ISSUED
2025-07-08Restaurant inspection: MIN DU SHENG YAN
2025-07-03311: Water System — Leak (Use Comments) (WA2)
2025-07-01Certificate of occupancy Renewal With Change
2025-06-30311: Water System — Possible Water Main Break (Use Comments) (WA1)
2025-06-30311: Water System — Leak (Use Comments) (WA2)
2025-05-01Job filed: RENOVATION OF EXISTING COMMERCIAL SPACE ON THE SECOND FLOOR. INSTALLATION OF NEW COOKING APPLIANCES UNDER NEW HOOD WITH NEW FIRE SUPPRESSION VALVE. IN$48,000
2025-04-27ECB CLASS - 1 violation: AT TIME OF INSPECTION OBSERVED PREMISES OCCUPIED WITHOUT A VALID C OF O. TEMPORARY C OF O EXPIRED ON 04/02/25., OBTAIN A VALID CER
2025-04-25DOB complaint, category ?
2025-04-20311: Consumer Complaint — Hotel or Motel
2025-04-16311: Illegal Parking — Parking Permit Improper Use
2025-04-14Job filed: INTERIOR ALTERATION IN RETAIL #2-12 ON 2ND FLOOR. INSTALL PLUMBING FIXTURES, MODIFY EXISTING SPRINKLER HEAD PER NEW FLOORLAYOUT. NO CHANGE OF USE, EGR$60,000
2025-04-02Restaurant inspection: THE DUO — grade A
2025-03-28Permit General Construction — Permit Issued
2025-03-26Permit Plumbing — Signed-off
2025-03-26Permit General Construction — Signed-off
2025-03-24Job filed: INTERIOR RENOVATION OF 10th FL. OF EXISTING 14 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. PARTITION, FLOORING, CEILING AND PAI$65,000
2025-03-24Job filed: INSTALL RELOCATE EXIST. 2 LAV SINK, 4 W.C & 2 NEW URINALS @ 10TH FLOOR, OF THE EXISTING 14 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EG$23,000
2025-03-12Permit Sprinklers — Signed-off
2025-03-11311: Illegal Parking — Blocked Hydrant
2025-02-23311: Street Condition — Pothole
2025-01-02Certificate of occupancy Renewal Without Change
2024
2024-11-22FDNY inspection (RISK)
2024-10-16311: Food Establishment — Allergy Information
2024-10-16311: Drinking — Underage - Licensed Est
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-10-04Boiler inspection
2024-09-27311: Smoking or Vaping — Allowed in Smoke Free Area
2024-09-26Certificate of occupancy Renewal Without Change
2024-09-24Permit Plumbing — Signed-off
2024-09-24Permit Plumbing — Permit Issued
2024-09-23Permit Sprinklers — Signed-off
2024-08-28311: Consumer Complaint — Hotel or Motel
2024-08-18311: Illegal Parking — Unauthorized Bus Layover
2024-07-30Job filed: MINOR ALTERATION TO EXISTING SPRINKLE HEADS ONLY. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.$19,500
2024-07-12Job filed: SUPERSEDE JOB 440770033 FOR PERMIT. RENOVATION AT EXISTING ROOF TERRACE, 2ND TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. NO CHANGE OF EXISTING$300,000
2024-07-05Job filed: INSTALL NEW PLUMBING & GAS WORK AT ROOF TERRACE, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. INSTALL NEW METERS. NO CHANGE OF EXISTI$49,680
2024-06-28Certificate of occupancy Renewal Without Change
2024-06-21Permit Plumbing — Signed-off
2024-06-10Permit Mechanical Systems — Signed-off
2024-06-10Permit General Construction — Signed-off
2024-04-17Job filed: PROPOSED PLUMBING WORKS FOR THE 1ST FLOOR RETAIL SPACE FIT-OUT RENOVATION, THIS IS FILED IN CONJUNCTION WITH GC APPLICATION# Q01022545-I1. NO CHANGE I$44,000
2024-04-17Job filed: PROPOSED 1ST FLOOR RETAIL SPACE FIT-OUT RENOVATION FOR CAFE SHOP WITH INTERIOR COSMETIC WORKS, MINOR PARTITIONS, MECHANICAL MODIFICATIONS WORKS AS PER$125,450
2024-04-02Job filed: RENOVATION OF EXISTING COMMERCIAL SPACE ON THE SECOND FLOOR. INSTALLATION OF NEW COOKING APPLIANCES UNDER NEW HOOD WITH NEW FIRE SUPPRESSION VALVE. IN$48,000
2024-03-29Certificate of occupancy Renewal Without Change
2024-03-22311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-12Job filed: INSTALL NEW PLUMBING WORK AT ROOF TERRACE, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. NO CHANGE OF EXISTING CO OR MEANS OF EGRESS.$50,000
2024-03-01Permit General Construction — Signed-off
2024-02-19Job filed: RENOVATION OF EXISTING COMMERCIAL SPACE ON THE SECOND FLOOR. INSTALLATION OF NEW COOKING APPLIANCES UNDER NEW HOOD WITH NEW FIRE SUPPRESSION VALVE. IN$48,000
2024-02-09311: Street Condition — Pothole
2024-01-30Job filed: INTERIOR RENOVATION OF EX. HOTEL RESTAURANT ON 003 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICA$40,000
2024-01-09Certificate of occupancy Renewal Without Change
2024-01-02311: Consumer Complaint — Garage or Parking Lot
2023
2023-12-13Job filed: PROPOSE TO INSTALL NEW MECHANICAL SYSTEMS FOR THE TENANT FITOUT AREA(SPA) FRON 2ND FLOOR TO 5TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$180,000
2023-12-08Permit Plumbing — Signed-off
2023-12-07311: Illegal Dumping — Removal Request
2023-12-07Permit General Construction — Signed-off
2023-12-07Permit Mechanical Systems — Signed-off
2023-12-07Permit General Construction — Permit Issued
2023-12-07Permit General Construction — Signed-off
2023-12-07Permit Mechanical Systems — Permit Issued
2023-12-07Permit Mechanical Systems — Signed-off
2023-12-01Permit General Construction — Signed-off
2023-11-20Permit Mechanical Systems — Signed-off
2023-11-20Permit General Construction — Signed-off
2023-11-17Job filed: RENOVATION OF EXISTING COMMERCIAL SPACE ON THE SECOND FLOOR. INSTALLATION OF NEW COOKING APPLIANCES UNDER NEW HOOD WITH NEW FIRE SUPPRESSION VALVE. IN$48,000
2023-11-15Job filed: UPFITTING EXISTING RESTAURANT SPACE. NEW PARTITIONS, CEILING/FLOOR/WALL FINISHES, NEW KITCHEN VENTILATION AND HEAT PUMP SYSTEMS, NO CHANGE IN USE, EGR$310,120
2023-11-15Job filed: PROPOSE INTERIOR RENOVATION AT UNIT#802 & #805 OF 8TH FLOOR IN EXISTING BUILDING. WORKS INCLUDES MINOR PARTITIONS, FINISH WORKS, & INSTALL NEW HVAC S$268,726
2023-11-03FDNY inspection (COM_OCPCY)
2023-11-03FDNY inspection (COM_OCPCY)
2023-11-03FDNY inspection (COM_OCPCY)
2023-11-03FDNY inspection (COM_OCPCY)
2023-11-03FDNY inspection (OTHER)
2023-11-03FDNY inspection (RISK)
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-19Boiler inspection
2023-10-17Certificate of occupancy Renewal Without Change
2023-09-22Job filed: INSTALL NEW PLUMBING FIXTURES, ASSOCIATED PIPING AND HOT WATER HEATER PER NEW DOCTOR'S OFFICE NEEDS. REMOVE ALL EXISTING SPRINKLER HEADS / PIPING AND $94,716
2023-09-18Job filed: MODIFY EXISTING SPRINKLER LAYOUT AS PER NEW PARTITION AT 2ND TO 4TH FLOOR SPA, AND AT 5TH FLOOR OFFICE.$26,400
2023-09-01Permit General Construction — Signed-off
2023-08-30311: General Construction/Plumbing — Failure To Maintain
2023-08-30DOB complaint, category ?
2023-08-21Job filed: SUPERSEDE JOB 440770033 FOR PERMIT. RENOVATION AT EXISTING ROOF TERRACE, 2ND TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. NO CHANGE OF EXISTING$300,000
2023-08-14Job filed: NEW PLUMBING & GAS WORK AT ROOF TERRACE, CELLAR METER ROOM, 2ND FLOOR TO 4TH FLOOR SPA, AND 5TH FLOOR HEALTH CARE OFFICE. AND 4 SAUNA / STEAM AT 3RD F$49,680
2023-07-25Certificate of occupancy Renewal Without Change
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18Agreement $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18AL&R $33,500,000 — from CA PLAZA, LLC to CATHAY BANK$33,500,000
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18TL&R — from CATHAY BANK to CA PLAZA, LLC
2023-07-18Mortgage $2,500,000 — from CA PLAZA, LLC to CATHAY BANK$2,500,000
2023-06-01311: Food Establishment — Letter Grading
2023-05-30Permit Plumbing — Signed-off
2023-05-30Permit Sprinklers — Signed-off
2023-05-26Job filed: ERECT AN NON-ILLUMINATED CHANGEABLE SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCU$5,640
2023-05-22Permit Sign — Signed-off
2023-05-09Permit Plumbing — Signed-off
2023-05-09Permit Sprinklers — Signed-off
2023-05-06311: Non-Emergency Police Matter — Other (complaint details)
2023-04-24Permit General Construction — Signed-off
2023-04-18Certificate of occupancy Renewal Without Change
2023-04-12311: Illegal Parking — Blocked Hydrant
2023-04-03Job filed: INSTALL NEW PLUMBING FIXTURES, ASSOCIATED PIPING AND HOT WATER HEATER PER NEW DOCTOR'S OFFICE NEEDS. REMOVE ALL EXISTING SPRINKLER HEADS / PIPING AND $94,716
2023-03-30Job filed: PROPOSE INTERIOR RENOVATION AT UNIT#802 & #805 OF 8TH FLOOR IN EXISTING BUILDING. WORKS INCLUDES MINOR PARTITIONS, FINISH WORKS, & INSTALL NEW HVAC S$268,726
2023-03-23Job filed: ERECT AN NON-ILLUMINATED CHANGEABLE SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCU$5,640
2023-03-06Deed $3,980,000 — from CA PLAZA LLC to CONNEXION 8 LLC$3,980,000
2023-03-06PAT — from CONNEXION 8 LLC to CA PLAZA CONDOMINIUM; BOARD OF MANAGERS OF CA PLAZA CONDOMINIU
2023-03-06Deed $3,980,000 — from CA PLAZA LLC to CONNEXION 8 LLC$3,980,000
2023-03-06PAT — from CONNEXION 8 LLC to CA PLAZA CONDOMINIUM; BOARD OF MANAGERS OF CA PLAZA CONDOMINIU
2023-02-28PREL — from CATHAY BANK to CA PLAZA LLC
2023-02-28REL — from CATHAY BANK to CA PLAZA LLC
2023-02-28PREL — from CATHAY BANK to CA PLAZA LLC
2023-02-28REL — from CATHAY BANK to CA PLAZA LLC
2023-02-16Job filed: IN CONJUNCTION WITH NB 401816923, INTERIOR RENOVATION OF SPA AT 2NR TO 4TH FLOOR.$300,000
2023-02-15Job filed: IN CONJUNCTION WITH NB 401816923, INTERIOR RENOVATION OF SPA AT 2NR TO 4TH FLOOR.$500,000
2023-02-07Sold for $3,980,000$3,980,000
2023-02-07Sold for $3,980,000$3,980,000
2023-01-24Certificate of occupancy Renewal Without Change
2022
2022-12-12311: Consumer Complaint — Hotel
2022-12-08Job filed: INTERIOR ALTERATION IN RETAIL #2-12 ON 2ND FLOOR. INSTALL PLUMBING FIXTURES, MODIFY EXISTING SPRINKLER HEAD PER NEW FLOORLAYOUT. NO CHANGE OF USE, EGR$60,000
2022-12-01FDNY inspection (COMPLAINT)
2022-11-21Permit Plumbing — Permit Issued
2022-11-21Permit Sprinklers — Permit Issued
2022-11-21Permit Plumbing — Signed-off
2022-11-21Permit General Construction — Permit Issued
2022-11-21Permit Sprinklers — Signed-off
2022-11-21Permit Sprinklers — Signed-off
2022-11-21Permit Plumbing — Signed-off
2022-11-18Permit Plumbing — Signed-off
2022-11-18Permit Plumbing — Permit Issued
2022-11-18Permit Sprinklers — Signed-off
2022-11-18Permit Sprinklers — Permit Issued
2022-11-18Permit Sprinklers — Signed-off
2022-11-18Permit Plumbing — Signed-off
2022-11-16Permit Mechanical Systems — Signed-off
2022-11-14Job filed: INTERIOR ALTERATION IN RETAIL #2-12 ON 2ND FLOOR. INSTALL NEW AC UNIT, EXHAUST SYSTEM, RELATED DUCTWORK. NO CHANGE OF USE, EGRES, OR OCCUPANCY.$12,000
2022-11-14Job filed: INTERIOR ALTERATION IN RETAIL #2-12 ON 2ND FLOOR. INSTALL PLUMBING FIXTURES, MODIFY EXISTING SPRINKLER HEAD PER NEW FLOORLAYOUT. NO CHANGE OF USE, EGR$60,000
2022-11-09Job filed: INTERIOR ALTERATION IN RETAIL #2-12 OF 2ND FLOOR IN EXISTING BUILDING.$66,000
2022-11-01Certificate of occupancy Renewal Without Change
2022-10-18PREL — from CATHAY BANK to CA PLAZA LLC
2022-10-18PSAT — from CA PLAZA LLC to CATHAY BANK
2022-10-18PSAT — from CA PLAZA LLC to CATHAY BANK
2022-10-18PREL — from CATHAY BANK to CA PLAZA LLC
2022-10-18Permit Plumbing — Signed-off
2022-10-11Permit General Construction — Signed-off
2022-10-07REL — from CATHAY BANK to CA PLAZA, LLC
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Deed $7,769,818 — from CA PLAZA, LLC to M&T 9FL LLC$7,769,818
2022-10-07PAT — from M&T 9FL LLC to BOARD OF MANAGERS OF CA PLAZA
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07PAT — from M&T 9FL LLC to BOARD OF MANAGERS OF CA PLAZA
2022-10-07AL&R $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07M&CON $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07Mortgage assigned — from CATHAY BANK to BANK OF AMERICIA, N.A.
2022-10-07Mortgage $5,438,873 — from CA PLAZA, LLC to CATHAY BANK$5,438,873
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Deed $7,769,818 — from CA PLAZA, LLC to M&T 9FL LLC$7,769,818
2022-10-07REL — from CATHAY BANK to CA PLAZA, LLC
2022-10-07PAT — from M&T 9FL LLC to BOARD OF MANAGERS OF CA PLAZA
2022-10-07AL&R $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07Mortgage assigned — from CATHAY BANK to BANK OF AMERICIA, N.A.
2022-10-07M&CON $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Deed $7,769,818 — from CA PLAZA, LLC to M&T 9FL LLC$7,769,818
2022-10-07Mortgage assigned — from CATHAY BANK to BANK OF AMERICIA, N.A.
2022-10-07Mortgage $5,438,873 — from CA PLAZA, LLC to CATHAY BANK$5,438,873
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Deed $7,769,818 — from CA PLAZA, LLC to M&T 9FL LLC$7,769,818
2022-10-07REL — from CATHAY BANK to CA PLAZA, LLC
2022-10-07PAT — from M&T 9FL LLC to BOARD OF MANAGERS OF CA PLAZA
2022-10-07AL&R $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07M&CON $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage assigned — from CATHAY BANK to BANK OF AMERICIA, N.A.
2022-10-07Mortgage $5,438,873 — from CA PLAZA, LLC to CATHAY BANK$5,438,873
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07AL&R $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07M&CON $6,216,000 — from M&T 9FL LLC to BANK OF AMERICIA, N.A.$6,216,000
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $16,798,901 — from CA PLAZA, LLC to CATHAY BANK$16,798,901
2022-10-07REL — from CATHAY BANK to CA PLAZA, LLC
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-10-07Mortgage $5,438,873 — from CA PLAZA, LLC to CATHAY BANK$5,438,873
2022-10-07Agreement $22,237,773 — from CA PLAZA, LLC to CATHAY BANK$22,237,773
2022-09-28Job filed: INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK AT 2ND FLOOR UNIT#2-10. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2022-09-28Job filed: INTERIOR RENOVATION UNIT#2-10 WITH PARTITION WORK AT 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$28,500
2022-09-10311: Taxi Complaint — Driver Complaint - Non Passenger
2022-08-30Sold for $7,769,818$7,769,818
2022-08-30Sold for $7,769,818$7,769,818
2022-08-30Sold for $7,769,818$7,769,818
2022-08-30Sold for $7,769,818$7,769,818
2022-08-21DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
2022-08-18311: Street Sign - Damaged — St Name - Attached to Pole
2022-08-09Job filed: INTERIOR FIT OUT OF 12TH FLOOR SPACE WITH INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOOR TILES, CARPENTRY AND FINISH WORK AS PER PLAN. THIS JO$100,000
2022-08-04Certificate of occupancy Renewal Without Change
2022-05-20Deed $2,312,079 — from CA PLAZA LLC to PEACH GARDEN LLC$2,312,079
2022-05-20PAT — from PEACH GARDEN LLC to THE BOARD OF MANAGERS OF CA PLAZA C/O
2022-05-20PAT — from PEACH GARDEN LLC to THE BOARD OF MANAGERS FOR CA PLAZA C/O
2022-05-20Deed $1,753,327 — from CA PLAZA LLC to PEACH GARDEN LLC$1,753,327
2022-05-16Certificate of occupancy Renewal Without Change
2022-05-13Permit Sprinklers — Signed-off
2022-05-13Permit Plumbing — Signed-off
2022-05-10Sold for $1,753,327$1,753,327
2022-05-10Sold for $2,312,079$2,312,079
2022-05-04311: Graffiti — Graffiti
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03TL&R — from CATHAY BANK to CA PLAZA, LLC
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Mortgage $2,000,000 — from CA PLAZA, LLC to CATHAY BANK$2,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-05-03Agreement $54,000,000 — from CA PLAZA, LLC to CATHAY BANK$54,000,000
2022-05-03AL&R $25,000,000 — from CA PLAZA, LLC to CATHAY BANK$25,000,000
2022-05-03Agreement $31,000,000 — from CA PLAZA, LLC to CATHAY BANK$31,000,000
2022-05-03Mortgage $23,000,000 — from CA PLAZA, LLC to CATHAY BANK$23,000,000
2022-04-25Permit Sprinklers — Signed-off
2022-04-25Permit Plumbing — Signed-off
2022-04-21Permit General Construction — Signed-off
2022-04-21Permit Mechanical Systems — Signed-off
2022-04-21Permit Mechanical Systems — Signed-off
2022-04-21Job filed: 9th FLOOR MODIFICATION TO EXISTING SPRINKLER SYSTEM AND FILE NEW AND MODIFICATION PLUMBING WORK IN CONJUNCTION WITH Q00702182. NO CHANGE IN EGRESS, US$16,650
2022-04-19Job filed: FILE MECHANICAL WORK WITH INSTALLATION OF (5) WATER SOURCE HEAT PUMP WITH ASSOCIATED DUCT WORK ON 12TH FLOOR AS PER PLAN. CONSTRUCTION WORK FILED UNDE$40,000
2022-04-19Job filed: FILE PLUMBING WORK WITH INSTALLATION OF PLUMBNING FIXTURES ON 12TH FLOOR AS PER PLAN. CONSTRUCTION WORK FILED UNDER DOB NOW #Q00706462. NO CHANGE IN U$3,200
2022-03-30Permit Plumbing — Signed-off
2022-03-29Permit General Construction — Signed-off
2022-03-25311: Street Sign - Missing — Stop
2022-03-25Job filed: INTERIOR FIT OUT OF 12TH FLOOR SPACE WITH INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOOR TILES, CARPENTRY AND FINISH WORK AS PER PLAN. THIS JO$100,000
2022-03-25Job filed: FILE PLUMBING WORK WITH INSTALLATION OF PLUMBNING FIXTURES ON 12TH FLOOR AS PER PLAN. CONSTRUCTION WORK FILED UNDER DOB NOW #Q00706462. NO CHANGE IN U$3,200
2022-03-20Job filed: HEREWITH FILING FOR INSTALLATION OF NON LOAD BEARING PARTITIONS, NEW FLOOR & CEILING FINISH AT 9th FLOOR, INSTALL (8) WATER-COOLED AC UNITS, NO CH$260,000
2022-03-17Certificate of occupancy Initial
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11ZONE — from CA PLAZA LLC
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2022-01-11CERT — from SUMMIT ASSOCIATES
2021
2021-10-04Permit NB — ISSUED
2021-09-09311: Homeless Person Assistance
2021-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-04-27FDNY inspection (CONSTR)
2021-03-23FDNY inspection (CONSTR)
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-12DOB violation E:
2021-03-11FDNY inspection (CONSTR)
2020
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11CDEC — from CA PLAZA LLC
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11MAPS — from CA PLAZA
2020-09-11CDEC — from CA PLAZA LLC
2020-08-21Permit EW — ISSUED
2020-07-24Job filed: IN CONJUNCTION WITH NB 401816923, INSTALL 3 HOT WATER HEATER (HOT WATER SUPPLY BOILER) AT 12TH FLOOR MECHANICAL ROOM.$30,000
2020-04-09Permit Construction Fence — Signed-off
2020-02-14Permit Boiler Equipment — Signed-off
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E:
2020-02-08DOB violation E: CEASE USE
2020-01-30Job filed: IN CONJUNCTION WITH NB 401816923, SUPERSEDE BL - BOILER WORK TYPE AT BIS 421158669. INSTALL 3 NEW BOILER AT 36-16 MAIN ST 14TH FL, 2 NEW BOILER AT 36-$50,000
2020-01-14Job filed: IN CONJUNCTION WITH NB 401816923, INSTALL 3 HOT WATER HEATER (HOT WATER SUPPLY BOILER) AT 12TH FLOOR MECHANICAL ROOM.$30,000
2020-01-03Job filed: SUBDIVIDE EXISTING TAX LOT 16 INTO FORTY TWO (42) CONDO TAX LOTS. NO CHANGE OF EXISTING ZONING USE, OCCUPANCY GROUP OR MEANS OF EGRESS.
2019
2019-12-30Permit Boiler Equipment — Permit Issued
2019-12-09Permit EW — ISSUED
2019-12-06Job filed: IN CONJUNCTION WITH NB 401816923, SUPERSEDE BL - BOILER WORK TYPE AT BIS 421158669. INSTALL 3 NEW BOILER AT 36-16 MAIN ST 14TH FL, 2 NEW BOILER AT 36-$50,000
2019-12-05Permit EW — ISSUED
2019-11-06Permit EW — ISSUED
2019-11-01Job filed: INTERIOR RENOVATION OF EXISTING STORE. PARTITION WORK ON UNIT 2-12. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,360
2019-10-04Job filed: PROVIDE TENANT PROTECTION PLAN IN CONJUNCTION WITH NB #401816923 FOR PARTIAL TEMPORARY CERTIFICATE OF OCCUPANCY OF THIS BUILDING PORTION THEREOF, USED$1,000
2019-10-04Job filed: PROVIDE TENANT PROTECTION PLAN IN CONJUNCTION WITH NB #401816923 FOR PARTIAL TEMPORARY CERTIFICATE OF OCCUPANCY OF THIS BUILDING PORTION THEREOF, USED$1,000
2019-10-04Job filed: PROVIDE TENANT PROTECTION PLAN IN CONJUNCTION WITH NB #401816923 FOR PARTIAL TEMPORARY CERTIFICATE OF OCCUPANCY OF THIS BUILDING PORTION THEREOF, USED$1,000
2019-10-02Deed transfer (nominal price)
2019-08-13Permit EW — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-13Permit PL — ISSUED
2019-07-26Permit EW — ISSUED
2019-07-23Permit Structural — Signed-off
2019-07-15FDNY inspection (CDA-90-DRILL)
2019-07-12Job filed: Erect structure. Sign on structure filed under application #Q00169046.$4,800
2019-07-10Permit Curb Cut — Signed-off
2019-07-10Permit Curb Cut — Signed-off
2019-06-21Permit EW — ISSUED
2019-06-21Permit EW — ISSUED
2019-06-21Permit EW — ISSUED
2019-06-21Permit NB — ISSUED
2019-06-21Permit EQ — ISSUED
2019-06-18Permit Sign — Signed-off
2019-06-17Job filed: ERECT ILLUMINATED SIGN ON STRUCTURE. STRUCTURE FILED UNDER SEPARATE PERMIT.$4,212
2019-06-05Permit EW — ISSUED
2019-05-30Permit EQ — ISSUED
2019-05-16Job filed: INSTALL NEW 12' INCLUDE (2) 2'-6" SPLAYS AT PRINCE STREET IN CONJUNCTION WITH NB 401816923, 152.13' TO CORNER OF NORTHERN BLVD. NO CHANGE OF EXISTING $12,000
2019-05-16Job filed: INSTALL NEW 24' INCLUDE (2) 2'-6" SPLAYS AT PRINCE STREET IN CONJUNCTION WITH NB 401816923, 173.13' TO CORNER OF NORTHERN BLVD. NO CHANGE OF EXISTING $24,000
2019-05-08Job filed: THIS JOB FILED IN CONJUNCTION WITH NB 401816923, INSTALL NEW 73'-6"X13'-4" GLASS CANOPY WITHIN PROPERTY LINE. NO CHANGE OF EXISTING ZONING USE GROUP, $80,000
2019-04-10Permit Supported Scaffold — Signed-off
2019-04-10Permit Construction Fence — Signed-off
2019-04-01FDNY inspection (CDA-90-DRILL)
2018
2018-10-26Permit EW — ISSUED
2018-10-18Job filed: INSTALLATION OF AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH APPLICATION #421158669, #401816923. NO CHANGE IN USE ,EGRESS OR OCCUPANCY.$3,000
2018-09-24FDNY inspection (CDA-90-DRILL)
2018-08-31Elevator permit: Furnish and install one new roped hydraulic passenger elevator to comply with ASME A17.1/2000 with supplements A17.1a-2002 and A1
2018-08-22Elevator permit: -Furnish and Install one (1) new wheelchair lift as per ASME A18.1. 2005, section 2 for Vertical Wheelchair lifts, Appendix K and $28,000
2018-07-09DOB complaint, category ?
2018-07-06Permit EW — ISSUED
2018-07-05Permit Supported Scaffold — Signed-off
2018-07-05Permit Construction Fence — Signed-off
2018-06-25Permit Supported Scaffold — Signed-off
2018-06-22Permit EW — ISSUED
2018-06-22Permit EW — ISSUED
2018-06-22Permit NB — ISSUED
2018-06-22Permit EQ — ISSUED
2018-06-20DOB complaint, category ?
2018-06-19DOB complaint, category ?
2018-06-19ECB CLASS - 1 violation: NO SITE SAFETY MANAGER PRESENT ON SITE. OBSERVED AT TIME OF INSPECTION, ACTIVE CONSTRUCTION SITE, APPROX 25 WORKERS PRESENT. UPON $10,000
2018-06-18Permit PL — ISSUED
2018-06-18Permit EW — ISSUED
2018-06-15Job filed: TEMPORARY SHORING OF UTILITY POLE ON PRINCE STREET$5,000
2018-06-15Job filed: TEMPORARY SHORING FOR UTILITY POLE ON PRINCE STREET SIDEWALK$5,000
2018-06-15Job filed: TEMPORARY SHORING OF UTILITY POLE ON PRINCE STREET$5,000
2018-06-14Permit Supported Scaffold — Signed-off
2018-06-13Job filed: INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHA$3,000
2018-06-11Elevator permit: -Furnish and Install (3) new escalators as per ASME 17.1. 2000/2003 per section 6.1. Appendix K and Chapter 30 of N.Y.C Building $540,000
2018-06-07Permit EQ — ISSUED
2018-06-07Permit EQ — ISSUED
2018-05-31Job filed: MANUAL AND AUTOMATIC SMOKE/HEAT/CO DETECTION&SPRINKLER FIRE ALARM SYSTEM WITH ONE WAY VOICE COMMUNICATION SYSTEM WITH POST-FIRE SMOKE PURGE & $450,000
2018-05-31Job filed: MANUAL AND AUTOMATIC SMOKE/HEAT/CO DETECTION&SPRINKLER FIRE ALARM SYSTEM WITH ONE AND TWO-WAY VOICE COMMUNICATON SYSTEM WITH POST-FIRE SMOKE PURGE$300,000
2018-05-31Job filed: MANUAL AND AUTOMATIC SMOKE/HEAT/CO DETECTION&SPRINKLER FIRE ALARM SYSTEM WITH ONE WAY VOICE COMMUNICATION SYSTEM WITH POST-FIRE SMOKE PURGE & $450,000
2018-05-25Permit EQ — ISSUED
2018-05-23Permit EQ — ISSUED
2018-05-21Permit EQ — ISSUED
2018-05-18Job filed: INSTALLATION OF TWO-TIER HANGING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-18Job filed: INSTALLATION OF TWO-TIER HANGING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-04DOB complaint, category ?
2018-05-03Elevator permit: -Furnish and Install one (1) new MRL Gearless passenger elevator as per ASMI 17.1. 2000/2003 Appendix K and Chapter 30 of N.Y.C Bu$160,000
2018-04-24DOB complaint, category ?
2018-04-24ECB CLASS - 2 violation: HOUSEKEEPING. AT TIME OF INSPECTION ON A ACTIVE JOBSITE OF 14 STY BLDG(2 TOWERS MAIN ST & PRINCE ST),OBSERVED INADEQUATE HOUSEKEEP$625
2018-04-24ECB CLASS - 1 violation: SEC. 3308.5 NETTING(VERTICAL) AT TIME OF INSPECTION ON A ACTIVE JOBSITE OF A 14 STY BLDG(2 TOWERS ONE ON MAIN ST THE OTHER ON PRIN$2,500
2018-04-24ECB CLASS - 1 violation: SEC. 3301.2 FAILURE TO USE/WEAR FALL PROTECTION. AT TIME OF INSPECTIONON A ACTIVE JOBSITE OF A 14 STY BLDG,OBSERVED WORKER WORKING$2,500
2018-04-10Permit Supported Scaffold — Signed-off
2018-04-09Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2018-03-27Permit EQ — ISSUED
2018-03-22Permit Construction Fence — Signed-off
2018-02-07DOB complaint, category ?
2018-02-07ECB CLASS - 2 violation: 3301.2 LOGS/FAILURE TO MAINTAIN. AT TIME OF INSPECTION LOGS FOR MULTI POINT SCAFFOLD WERE NOT ADEQUATE SCAFFOLD WAS INSEPECTED BY
2018-02-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-02-07Permit Construction Fence — Signed-off
2018-02-07Job filed: Installation of temporary fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy w
2018-02-01DOB complaint, category ?
2018-02-01ECB CLASS - 1 violation: 97,B,7/(97-B-7)UNSAFE USE OF ELEVATOR.FAILURE TO MAINTAIN ALL SAFETY MEASURES REQUIRED BY NYC BUILDING CODE AND ELEVATOR STANDARDS
2018-02-01ECB CLASS - 1 violation: 97,B,7/(97-B-7)UNSAFE USE OF ELEVATOR.FAILURE TO MAINTAIN ALL SAFETY MEASURES REQUIRED BY NYC BUILDING CODE AND ELEVATOR INDUSTRY
2018-01-30FDNY inspection (RISK)
2018-01-30FDNY inspection (CDA-90-DRILL)
2017
2017-12-18Permit NB — ISSUED
2017-12-06DOB complaint, category ?
2017-12-06ECB CLASS - 2 violation: SEC. 3301.2 FAILURE TO MAINTAIN AT TIME OF INSPECTION,WORKER WAS INJURIED FROM FALLING DEBRIS & CONSTRUCTION MATERIALS WHICH HAD F$400
2017-12-06ECB CLASS - 2 violation: FAILURE TO INSTITUTE SAFETY MEASURES. IN RESPONSE TO AN INCIDENT WHERE IT WAS REPORTED THAT A WORKER WAS STRUCK IN THE SHOULDER WH$5,000
2017-12-06ECB CLASS - 1 violation: MANUFACTURES SPECIFICATIONS OBSERVED AT TIME OF INSPECTION,SAFETY HARNESS TIE OFF EQUIPMENT,NOT INSTALLED AS PER MFG (SPECKS) CONS$400
2017-12-06ECB CLASS - 1 violation: DESIGN DRAW OBSERVED,LIFE LINES FOR FALL ARREST SYSTEM IN PLACE ON ROOF,CONSISTING OF NYLON ROPE & STEEL WIRE ROPE TIED AROUND A C$250
2017-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-22Permit NB — ISSUED
2017-11-08FDNY inspection (STRUC_INT_3)
2017-10-24ECB CLASS - 2 violation: MFG SPECIFICATION FOR EQUIPMENT USED OBSERVED THAT THE EQUIPMENT USED FOR FABRICATING & INSTALLING THE HORIZONTAL NETTING WAS BASI$400
2017-10-24ECB CLASS - 2 violation: EQUIPMENT DOES NOT CONFORM TO APPROVED PE PLAN @ TIME OF INSPECTION,OBSERVED THAT THE BRACKET'S USED TO SECURE THE HORIZONTAL NET $250
2017-10-24ECB CLASS - 1 violation: 3308.6.HORIZONTAL NETTING INADEQUATE.@ TIME OF INSPECTION OBSERVED THAT HORIZONTAL NETTING IN PLACE COULD NOT BE RETRACTED EASILY $1,600
2017-10-24Permit NB — ISSUED
2017-10-18DOB complaint, category ?
2017-10-18ECB CLASS - 1 violation: HOUSEKEEPING. AT TIME OF INSPECTION OBSERVED INADEQUATE HOUSEKEEPING AT STY'S 12,13,14,OF EAST TOWER,CONSISTING OF BLDG MATERIAL,E$400
2017-10-18ECB CLASS - 1 violation: BC3310 SITE SAFETY MANAGER AT TIME OF INSPECTION OBSERVED THAT THE SSMON PW2 HADN'T BEEN TO THE SITE IN OVER 30 DAYS,JONG PINDER I$400
2017-10-18ECB CLASS - 2 violation: SEC. 3301.2 FAILURE TO INSTITUTE SAFETY MEASURES. AT TIME OF INSPECTION,OBSERVED PLANKS ON NEEDLE BEAMS AT EXTERIOR OF SHEET WALL $400
2017-09-15DOB complaint, category ?
2017-09-15DOB complaint, category ?
2017-09-15DOB complaint, category ?
2017-09-15DOB complaint, category ?
2017-08-31DOB complaint, category ?
2017-08-30ECB CLASS - 1 violation: SPIDER CRANE/NOT AS PER APPROVED PLANS AT TIME OF INSPECTION OBSERVED A SPIDER CRANE AT THE WEST TOWER LOCATION,UPON REQUEST TO SE$250
2017-08-30ECB CLASS - 1 violation: SEC. 3301.2 RESHORES FAILURE TO MAINTAIN AT TIME OF INSPECTION OBSERVED THAT THERE WERE A # OF RESHORES ON THE LEADING EDGE THAT W$1,600
2017-08-30ECB CLASS - 1 violation: HOUSEKEEPING. AT TIME OF INSPECTION OF PROPOSED 14 STY BLDG W/2 TOWERS1 EAST,1 AT WEST,OBSERVED THAT THE HOUSEKEEPING WAS INADEQUA$400
2017-08-30ECB CLASS - 1 violation: GUARD RAILS. OBSERVED GUARD RAILS WERE INADEQUATE & MISSING AT VARIOUS LOCATIONS THROUGHOUT SITE,CONSISTING OF MISSING & SLACK CAB$1,200
2017-08-30ECB CLASS - 1 violation: SEC. 3301.2 FAILURE TO MAINTAIN AT TIME OF INSPECTION OBSERVED SUPPORTED PIPE SCAFFOLD IN USE AT VARIOUS LOCATIONS THROUGHOUT SITE$1,600
2017-08-30Permit EQ — ISSUED
2017-08-30ECB CLASS - 1 violation: SEC. 3301.2 HOLES/FLOOR PENETATIONS OBSERVED HOLES NOT COVERED AT VARIOUS LOCATIONS THROUGHPUT ENTIRE BLDG FROM 7 STY TO ROOF IN B$400
2017-08-17Job filed: INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED.SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CH
2017-08-17Job filed: INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED.SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CH
2017-08-02Permit EQ — ISSUED
2017-07-28FDNY inspection (CDA-90-DRILL)
2017-06-28Permit EQ — ISSUED
2017-06-28Permit EQ — ISSUED
2017-06-23Permit EW — ISSUED
2017-06-23Permit EW — ISSUED
2017-06-23Permit EQ — ISSUED
2017-06-23Permit NB — ISSUED
2017-06-06Permit EW — ISSUED
2017-05-24Permit EQ — ISSUED
2017-05-19Permit PL — ISSUED
2017-05-11ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.NOTED:OBSERVED SIDEWALK SHED LIGHTS ARE NOT OPERATING AT TIME AT INSPECTION$2,400
2017-05-08FDNY inspection (CDA-90-DRILL)
2017-05-05DOB complaint, category ?
2017-04-13Permit EQ — ISSUED
2017-04-13Permit EQ — ISSUED
2017-04-12Job filed: A3
2017-04-11ECB CLASS - 1 violation: NO TOE BOARDS.AT TIME OF INSPECTION OF A 15 STY NEW BUILDING AT 10 STY I OBSERVED NO TOE BOARDS AT THE 7 STY EXPO 1.THIS CREATES A$1,000
2017-04-07Job filed: SUPERSED JOB 420826574. THIS APPLICATION IS FILED TO INSTALL NEW FIRE ALARM SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION 401816923. NO CHANGE O$1,000
2017-03-31Permit EQ — ISSUED
2017-03-30Job filed: INSTALLATION OF MINI CRANE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-03-24ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT OR TEMPORARY CONSTRUCTION(NO GUARDRAIL). AS NOTED: AT TIME OF INSPECTION AN ACTIVE $1,200
2017-02-08DOB complaint, category ?
2017-02-08ECB CLASS - 2 violation: FAILURE TO PROVIDE PE APPROVED DESIGN DRAWINGS.AS NOTED:AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE.OBSERVED AT LOBBY LEV
2017-02-02DOB complaint, category ?
2017-02-02DOB complaint, category ?
2017-02-02DOB complaint, category ?
2017-02-01ECB CLASS - 2 violation: SEC. 28-104.7 SUBMITTAL OF CONSTRUCTION DOCUMENTS. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE HORIZONTAL NETTI$400
2017-02-01ECB CLASS - 1 violation: WOKR DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AS NOTED: AT TIME OF INSPECTON ON AN ACTIVE CONS$1,000
2017-02-01ECB CLASS - 2 violation: SEC. 3301.7 FAILURE TO PROVIDE PE APPROVED DESIGN DRAWINGS. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE,OBSERVE$400
2016
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-11-04DOB complaint, category ?
2016-11-04ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS OF PROPERTY AFFECTED BY CONSTRUCTION OPERATION. AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE CONS$5,000
2016-09-16Permit NB — ISSUED
2016-09-08Permit EQ — ISSUED
2016-09-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-08-25Permit EW — ISSUED
2016-08-25Permit EW — ISSUED
2016-08-23DOB complaint, category ?
2016-08-23DOB complaint, category ?
2016-08-23ECB CLASS - 1 violation: UNLAWFULLY CONTINUOUS WORK WHILE A NOTICE OF STOP WORK ORDER AT TIME OF INSPECTION THE FOLLOWING WAS OBSERVED.12 STORY PROPOSED NE$4,800
2016-08-22ECB CLASS - 2 violation: 3304.8 FAILURE TO DRAIN CONSTRUCTION SITE OF STANDING WATER.AS NOTED:@THE TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSERV$400
2016-08-22ECB CLASS - 2 violation: 3301.7 FAILURE TO PROVIDE P.E APPROVED DESIGN DRAWINGS.AS NOTED:@TIME OF INSPECTION OBSERVED SAFETY WORK IN PROGRESS @(A)FLR #2EXP$250
2016-08-19Permit EW — ISSUED
2016-08-19Permit EW — ISSUED
2016-08-16Permit EQ — ISSUED
2016-08-11Job filed: PROPOSED INSTALLATION OF NEEDLE BEAMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-11Job filed: PROPOSED INSTALLATION OF NEEDLE BEAMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-09Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-09Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-01DOB complaint, category ?
2016-08-01DOB complaint, category ?
2016-08-01ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION NO TOE BOARDS.@TIME OF INSPECTION OBSERVED ACTIV$1,000
2016-08-01ECB CLASS - 2 violation: WORK DOESN'T CONFORM TO APPROVED AMENDMENTS.@TIME OF INSPECTION OBSERVED ACTIVE JOBSITE W.CONCRETE OPERATIONS @2ND FLR W.NO OVERHE$500
2016-07-31FDNY inspection (CONSTR)
2016-07-29ECB CLASS - 2 violation: FAILURE TO PERFORM PROPER CONCRETE WASHOUT PROCEDURES @ SITE. COLLECTIVE&CONTAINMENT. AS NOTED:@ TIME OF INSPECTION ON AN ACTIVE C$1,200
2016-07-27ECB CLASS - 2 violation: BC3301.7 FAILURE TO PROVIDE P.E. APPROVED DESIGN DRAWINGS. AS NOTED:@ TIME OF INSPECTION ON AN ACTIVE CONSTR SITE CONCRETE PLACEM$400
2016-07-21Permit EQ — ISSUED
2016-07-20Job filed: INSTALLATION OF 6800 LBS ALIMAK SCANDO 650 32/39 SINGLE CAR PERSONNEL/ MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODE CH
2016-07-16DOB violation P: NO ACCESS TO PREMISES TO INSPECT APPROVED WORK UNDER ACTIVE JOB #421093765. INSPECTION TIME 09:35AM AT ABOVE DATE. NEED
2016-07-15DOB complaint, category ?
2016-07-08Permit EQ — ISSUED
2016-07-05Job filed: INSTALLATION OF 6800 LBS ALIMAK SCANDO 650 32/39 SINGLE CAR PERSONNEL/ MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODE CH
2016-06-30Permit NB — ISSUED
2016-06-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-06-21Permit NB — ISSUED
2016-06-21Permit EQ — ISSUED
2016-06-17DOB complaint, category ?
2016-06-17DOB complaint, category ?
2016-06-17DOB complaint, category ?
2016-06-16Permit NB — RE-ISSUED
2016-06-15ECB CLASS - 2 violation: WORK DOESN'T CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.AS NOTED:@TIMEOF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSERVE @FLR#2 $250
2016-06-15ECB CLASS - 2 violation: 28-104.7 SUBMITTAL OF CONSTRUCTION DOCUMENTS.AS NOTED:@TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSERVED @FLR#2,EXP#2 A.P$400
2016-06-15ECB CLASS - 2 violation: 3309.1 FAILURE TO PROVIDE ROOF PROTECTION @ADJOINING PROPERTY.AS NOTED:@TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSERVE $400
2016-06-09Permit EQ — ISSUED
2016-06-06ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOESN'T MEET CODE SPECS.NOTE:OBSERVED SIDEWALK SHED IS IN PLACE @EXP#1(MAIN ST.)SIDEWALK SHED ISN'T EXTENDED$2,400
2016-06-06ECB CLASS - 2 violation: SIGN.NOTE:OBSERVED SIDEWALK SHED IS IN PLACE @EXP#1(MAIN ST.)SIDEWAK SHED INFO PANEL IS NOT PROVIDED.REM:COMPLY W. CODE.
2016-05-31DOB complaint, category ?
2016-05-31DOB complaint, category ?
2016-05-20FDNY inspection (CONSTR)
2016-05-20Permit EQ — ISSUED
2016-05-18Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-05-12Permit EW — ISSUED
2016-05-12Permit PL — ISSUED
2016-04-13DOB complaint, category ?
2016-04-13ECB CLASS - 1 violation: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, OBSERVED THE FOLLOWING. WHILE ON NOTICE OF $1,600
2016-04-13ECB CLASS - 2 violation: WORK DOES NOT CONFORM FITS SAFETY PLAN DOES NOT REFLEX SITE CONDITIONS. NOTED; AT 15 STORY NEW BLDG A GROUND LEVEL APPROVED PLAN, $250
2016-04-06DOB complaint, category ?
2016-04-06ECB CLASS - 1 violation: FAILURE TO SAFEGUARD. AT TIME OF INSPECTION NOTE THAT THERE WHERE WOODSTRIPED OF CONCRETE WORK W/NAIL STICKING UP POSING A HAZARD $2,400
2016-04-06ECB CLASS - 2 violation: SEC. 3301.4.1 MAINTENCE SIDEWALK. AT TIME OF INSPECTION NOTED THAT THESIDEWALK @ ENTRANCE OF JOB SITE IS SEVERLY DAMAGED POSING A $400
2016-04-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN SAFETY EQUIPMENT GUARDRAILS AT TIME OF INSPECTION NOTED THAT THE SITES GUARDRAIL SYSTEM WAS INADEQUATE TOP RAI$1,200
2016-04-06ECB CLASS - 1 violation: FAILURE TO SAFEGUARD. AT TIME OF INSPECTION NOTED THAT THERE WAS WORKERS ON PIPE SCAFFOLDS THAT WHERE ERECTED INPROPERLY W/O SCREW$2,400
2016-04-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. AT TIME OF INSPECTION NOTEDPLYWOOD ON THE SITE WEATHERED WARPED POSING A TRIPING HAZARD$2,400
2016-04-06ECB CLASS - 1 violation: FAILURE TO SAFEGUARD. AT TIME OF INSPECTION SITE FORMING 1ST FL DECK,DOWN BELOW GRADE APPROX 16',THERE IS NO FIRE LANE DESIGNATED $2,400
2016-04-04Job filed: INSTALLATION OF 265 LINEAR FT. HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #
2016-04-04Job filed: INSTALLATION OF 265 LINEAR FT. HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #
2016-03-24Permit NB — RE-ISSUED
2016-03-15FDNY inspection (CONSTR)
2016-02-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-02-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-02-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-02-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-01-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-01-20FDNY inspection (STRUC_INT)
2016-01-04FDNY inspection (CONSTR)
2015
2015-12-04DOB complaint, category ?
2015-12-04DOB complaint, category ?
2015-12-04ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. THE INSTALLATION OF RAKERS DID NOT CONFORM TO THE APPROVED PLANS AT THE $250
2015-12-03ECB CLASS - 1 violation: USE OF SUPPORTED SCAFFOLD W/O A SCAFFOLD USER CERTIFICATE. AT TIME OF INSPECTION USER CERTIFICATE.AT TIME OF INSPECTION OF 15 STY $400
2015-12-03ECB CLASS - 2 violation: 28-116.2.3 FAILURE TO PROVIDE AN ADEQUATE INSPECTION PROGRAM TR-1 SPECIAL INSPECTION. REINSPECTION CALL CEU @ 2123932730.AS NOTED $400
2015-12-03ECB CLASS - 1 violation: BC3313.1 COMPRESSED GAS NOT STORED PROPERLY. AT TIME OF INSPECTION THEFOLLOWING WAS OBSERVED AT 10STY NEW BUILDING UNDER CONSTRUCT$1,600
2015-12-03ECB CLASS - 2 violation: 3301.7 FAILURE TO PROVIDE P.E PROFESSIONAL ENGINEER APPROVED DESIGN DRAWINGS.AS NOTED @ TIME OF INSPECTION @ AN ACTIVE CONSTRUCTIO$400
2015-12-03ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR APPROVED AMENDMENTS.AS NOTED @ TIME OF INSPECTION @ AN ACTIVE CONSTRUC$250
2015-11-05Permit NB — ISSUED
2015-11-02DOB complaint, category ?
2015-11-02DOB complaint, category ?
2015-10-27DOB complaint, category ?
2015-10-27ECB CLASS - 1 violation: 3315.1.4 SLOPE LIMITATIONS:EQUIPMENT RAMP ON SITE.NOTE:15 STORY BLDG UNDER CONST OBSERVED EQUIPMENT SOIL RAMP IN PLACE @#2 TOWARDS$1,630
2015-10-27ECB CLASS - 2 violation: 3301.7 DESIGN DRAWING REQUIRED NY PROVISION OF CHAPTER 33 OF NYC BLDG CODE:CHAIN HOISTING EQUIPMENT NOTE:15 STORY BLDG UNDER CONST$830
2015-10-21FDNY inspection (STRUC_INT)
2015-10-21FDNY inspection (CONSTR)
2015-10-02Permit NB — RE-ISSUED
2015-09-30DOB complaint, category ?
2015-09-30ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NOTE: OBSERVED ONLY 1 MODE OF EGRESS IN THE FORM$1,000
2015-09-30ECB CLASS - 1 violation: NO CONCRETE SAFETY MANAGER PRESENT DOING ALL CONCRETE OPERATIONS AS REQUIRED. NOTE: OBSERVED FORM WORK IN PROGRESS AT 1ST FL DECK,$1,200
2015-09-30ECB CLASS - 2 violation: SEC. 3310.8.3 FAILURE TO COMPLY RULES PROMULGATED BY THE COMMISSIONER-NO WEEKLY TOOL BOX SAFETY FALL. NOTE: OBSERVED ON SITE SAFET
2015-09-25Permit NB — RE-ISSUED
2015-09-22ECB CLASS - 1 violation: NO CONCRETE SAFETY MANAGER PRESENT DURING ALL CONCRETE OPERATIONS AS REQUIRED. NOTE: OBSERVED REBAR WORK,FORM WORK CREATING DECK W$1,200
2015-09-22ECB CLASS - 2 violation: SEC. 3301.7 DESIGN DRAWING REQUIRED BY THE PROVISION OF CHAPTER 33 BLDG CODE. NOTE: OBSERVED 2 STAIR TOWERS ERECTED ON SITE,APPROX
2015-09-22ECB CLASS - 1 violation: FAILURE TO MAINTAIN: NO GUARDRAILS NOTE: OBSERVED JOBSITE,ERECTING DECK AT 1ST FL LEVEL APPROX 12FEET IN THE AIR OBSERVED WORKERS $1,200
2015-09-22ECB CLASS - 2 violation: SEC. 3310.6 NO DESIGNATED SAFETY MANAGER. NOTE: CONCRETE OPERATIONS ONGOING,WORKERS ON SITE FORM WORK,REBAR WORK ERECTING OPERATIO
2015-09-22ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: OBSERVED WORKERS ERECTING FOR DECK AT THE 1$2,400
2015-09-22ECB CLASS - 1 violation: FAILURE TO PROVIDE AT SIDE OF EXCAVATION. NOTE: AT EXP#3 OF SITE OBSERVED SHEER CUT APPROX 8FEET DEEP & 10FEET WIDE,THERE WAS NO S$2,400
2015-09-16DOB complaint, category ?
2015-08-05FDNY inspection (CONSTR)
2015-06-22Permit FO — RE-ISSUED
2015-06-18Permit EW — ISSUED
2015-06-18Permit NB — ISSUED
2015-06-18Permit FO — ISSUED
2015-06-18Permit EQ — ISSUED
2015-06-13ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED SITE SAFETY PLAN.AT TIME OF INSP.OBSERVED AT TIME OF INSP.OBSERVED FOUNDATION/EXCAVATION IN PROG$500
2015-06-04DOB complaint, category ?
2015-06-03ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. O$1,000
2015-05-27FDNY inspection (CONSTR)
2015-05-16DOB complaint, category ?
2015-05-16ECB CLASS - 1 violation: SHORING AND BRACING AND SHEETING.AT TIME OF INSPECTION OBSERVED EXCAVATION/FOUNDATION PHASE OF N.B. IN PROGRESS.APPRX 80'WIDE AND $2,400
2015-05-16ECB CLASS - 1 violation: OSHA 10. AT TIME OF INSPECTION OBSERVED ACTIVE EXCAVATION/FOUNDATION PHASE OF N.B. APPRX 5 WORKS ONSITE DID NOT HAVE OSHA 10 AS R$1,600
2015-05-16ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED TO APPROVED CONSTRUCTION DOCUMENTS; SITE SAFETY PLAN.AT TIME OF INSPECTION OBSERVED ACTIVE EXCAV$1,000
2015-05-16ECB CLASS - 1 violation: 3304.7 SAFE MEANS OF INGRESS AND EGRESS. AT TIME OF INSPECTION OBSERVED EXCAVATION/FOUNDATION IN PROGRESS.EXCAVATION IS APPRX 60'$1,600
2015-05-15Permit PL — ISSUED
2015-05-12Job filed: A2$3,500
2015-05-06DOB complaint, category ?
2015-05-06ECB CLASS - 1 violation: SEC. 3301.1.2 FAILURE TO COMPLY W/NYC FIRE CODE GENERAL. NO FIRE WATCHINADEQUATE. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE,SO$1,200
2015-05-06ECB CLASS - 2 violation: SEC. 28-110.1 OSHA 10 CARD EXPIRED. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE SOE IN PROGRESS. I ASKED 5 WORKERS FOR OSHA 10 C
2015-05-06ECB CLASS - 2 violation: SEC. 3301.7 DESIGN REQUIRED BY THE CHAPTER 33: TEMPORARY STAIRS. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE,SOE WORK IN PROGRES
2015-05-06ECB CLASS - 2 violation: SEC. 3301.1.2 FAILURE TO COMPLY W/NYC FIRE CODE GENERAL PLASTIC FIRE CANS ON SITE. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE,S
2015-04-09Permit EW — ISSUED
2015-03-18Job filed: SUPERSEDE 420826592 PL WORK TYPE, INSTALL NEW PLUMBING SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF EXISTING ZONING USE, OCCUPANCY GROUP OR M$1,000
2015-03-18Job filed: SUPERSEDE 420826592 PL WORK TYPE, INSTALL NEW PLUMBING SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF EXISTING ZONING USE, OCCUPANCY GROUP OR M$1,000
2015-03-11FDNY inspection (CONSTR)
2015-03-11Permit NB — RE-ISSUED
2015-02-17DOB complaint, category ?
2015-02-17ECB CLASS - 2 violation: BC3301.1.2 FAILURE TO COMPLY W/NYC FIRE CODE-GENERAL-NO PERMIT FOR PORTABLE FUELED SPACE HEATERS NOTED AT TIME OF INSPECTION OBSER
2015-01-14DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014
2014-12-17FDNY inspection (CONSTR)
2014-10-27DOB complaint, category ?
2014-10-25ECB CLASS - 1 violation: 28-105.1 WORK AFTER HRS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5 @TIME OF INSPEC OBSERVED N.B. UNDER CONSTRUCTION - EXCAVATION
2014-09-24FDNY inspection (CONSTR)
2014-07-15FDNY inspection (CONSTR)
2014-06-20Permit EW — ISSUED
2014-06-20Permit FO — ISSUED
2014-06-20Permit FO — ISSUED
2014-06-20Permit NB — ISSUED
2014-06-20Permit EQ — ISSUED
2014-05-22Permit EQ — ISSUED
2014-05-14FDNY inspection (CONSTR)
2014-05-01DOB complaint, category ?
2014-02-25Permit NB — ISSUED
2014-02-19FDNY inspection (CONSTR)
2014-01-31FDNY inspection (CONSTR)
2013
2013-12-31FDNY inspection (CONSTR)
2013-11-12FDNY inspection (CONSTR)
2013-10-29FDNY inspection (CONSTR)
2013-10-28DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-10-16FDNY inspection (CONSTR)
2013-10-01FDNY inspection (CONSTR)
2013-09-20FDNY inspection (CONSTR)
2013-09-10FDNY inspection (CONSTR)
2013-08-28FDNY inspection (CONSTR)
2013-08-09FDNY inspection (CONSTR)
2013-08-07DOB complaint, category ?
2013-08-07DOB complaint, category ?
2013-08-07ECB CLASS - 1 violation: FAILURE TP HAVE SITE SAFETY MANAGER AS REQUIRED. AT TIME OF INSPECTION OBSERVED WORKER INSTALLING LAGGING FOR SHORING & MECHANICAL$1,200
2013-07-23FDNY inspection (CONSTR)
2013-07-10FDNY inspection (CONSTR)
2013-06-26FDNY inspection (CONSTR)
2013-06-25Permit EW — ISSUED
2013-06-21Permit NB — RE-ISSUED
2013-06-21Permit FO — RE-ISSUED
2013-06-21Permit FO — RE-ISSUED
2013-06-21Permit EQ — RE-ISSUED
2013-06-14FDNY inspection (CONSTR)
2013-06-04FDNY inspection (CONSTR)
2013-05-15FDNY inspection (CONSTR)
2013-05-03Permit EQ — ISSUED
2013-04-24FDNY inspection (CONSTR)
2013-04-19Permit FO — ISSUED
2013-04-19Permit NB — ISSUED
2013-04-19Permit FO — ISSUED
2013-04-17Permit EQ — ISSUED
2013-04-15Permit EW — ISSUED
2013-04-12Permit EQ — ISSUED
2013-04-12Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-04-03Job filed: INSTALL NEW EMERGENCY GENERATOR SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GROUP & MEANS OF EGRESS.
2013-04-03Job filed: INSTALL NEW EMERGENCY GENERATOR SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GROUP & MEANS OF EGRESS.
2013-04-03Job filed: INSTALL NEW EMERGENCY GENERATOR SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GROUP & MEANS OF EGRESS.
2013-04-01Job filed: SUPERSED JOB 410132039 & 410132020. INSTALL NEW STANDPIPE & SPRINKLER SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GRO$2,000
2013-04-01Job filed: INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR ALARM IN CONJUNCTION WITH NB 401816923. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2013-04-01Job filed: INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR ALARM IN CONJUNCTION WITH NB 401816923. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2013-04-01Job filed: INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR ALARM IN CONJUNCTION WITH NB 401816923. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2013-04-01Job filed: SUPERSED JOB 410132039 & 410132020. INSTALL NEW STANDPIPE & SPRINKLER SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GRO$2,000
2013-03-28Job filed: INSTALL NEW PLUMBING, MECHANICAL, HEATING, ELECTRICAL SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GROUP & MEANS OF EGRESS$3,000
2013-03-28Job filed: SUPERSED JOB 410132048 & 410221674. THIS APPLICATION IS FILED TO INSTALL NEW FIRE ALARM SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION 401816$1,000
2013-03-28Job filed: INSTALL NEW PLUMBING, MECHANICAL, HEATING, ELECTRICAL SYSTEM IN CONJUNCTION WITH NB 401816923. NO CHANGE OF USE, OCCUPANCY GROUP & MEANS OF EGRESS$3,000
2012
2012-10-15Permit EQ — ISSUED
2012-08-15Permit EW — ISSUED
2012-07-20Job filed: THIS APPLICATION IS SUPERSEDE 410109467, INSTALL NEW SECANT PILE EXCAVATION SUPPORTING SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION #401816923.$1,000
2012-07-20Job filed: THIS APPLICATION IS SUPERSEDE 410109467, INSTALL NEW SECANT PILE EXCAVATION SUPPORTING SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION #401816923.$1,000
2012-07-20Job filed: THIS APPLICATION IS SUPERSEDE 410109467, INSTALL NEW SECANT PILE EXCAVATION SUPPORTING SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION #401816923.$1,000
2012-02-17Permit EQ — ISSUED
2012-01-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-01-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011
2011-12-14DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-11-02ECB CLASS - 1 violation: OCCUAPCNY CONTRAY TO THAT ALLOWED BY THE CERTIFICATE OC OCCUPANCY AT TIME OF INSPECTION OBSERVED ACTIVE PARKING LOT ON THIS SITE.$2,400
2011-11-02ECB CLASS - 1 violation: OCCUAPANCY CONTRARY TO THAT OF ALLOWED BY THE CERTIFICATE OF OCCUPANCY AT TIME OF INSPECTION. OBSERVED AT TIME PARKING LOT FOR THI$1,200
2011-09-14ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O OR BLDG DEPT RECORDS - NOTED: SITE HAS DEMO SIGN - NO FENCE PERMIT HAS BEEN ISSUED $1,200
2011-09-14ECB CLASS - 1 violation: WORK W/O A PERMIT. NOTED: DEMO SIGNED-OFF NO FENCE PERMIT ISSUED FOR APPROX 120' OF FENCE ON PRINCE STREET AND 50' OF FENCE ON MA$1,600
2011-06-24Rodent inspection: Failed for Other Reason
2011-05-10Permit EQ — ISSUED
2011-05-06Rodent inspection: Failed for Other Reason
2011-04-06Rodent inspection: Failed for Rat Activity and Other Reason
2011-04-05Rodent inspection: Passed
2011-04-05Rodent inspection: Passed
2010
2010-11-17Permit EQ — ISSUED
2010-09-29Job filed: PROPOSED 8'-0' HEIGHT TEMPORARY CONSTRUCTION FENCE WITH LESS THAN 3 FEETS AWAY FROM PROPERTY LINE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2010-09-29Job filed: PROPOSED 8'-0" HEIGHT TEMPORARY CONSTRUCTION FENCE WITH LESS THAN 3 FEETS AWAY FROM PROPERTY LINE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2010-04-22ECB CLASS - 2 violation: WORK W/O A PERMIT: EXPIRED PERMIT. NOTED: PLYWOOD CONSTRUCTION FENCE UNDER PERMIT #402679614 EXPIRED 3/31/09. REMEDY: RENEW PERMIT$800
2009
2009-12-31DOB violation LBLVIO:
2009-12-04ECB CLASS - 2 violation: WRK W/O A PERMIT NOTED FOUND 8'HIGH WD CONSTRUCTION FENCE INSTALLED @ DM SITE UNDER APPLICATION#402679598 W/EXISTING BLDG DEMOLISH$800
2009-12-04ECB CLASS - 2 violation: WRK W/O A PERMIT.NOTED:FOUND 8'HIGH WOOD CONSTRUCTION FENCE INSTALLED @ DM SITE UNDER APPL#402679614 W/EXISTING BLDG DEMOLISHED TO$800
2009-12-01ECB CLASS - 2 violation: FAILURE TO POST DOT PERMIT FOR STREET/SIDEWALK CLOSING. NOTED: AT FRONT OF CONST SITE UNDER APPL 402679605. INSTALLATION OF 8'HIGH$500
2009-12-01ECB CLASS - 2 violation: WORK W.O PERMIT. NOTED: AT CONST SITE UNDER APPL 402679605 DM/FN WITH EXISTING BLDG DEMO. TO GRADE & SIGNED OFF ON 12/1/08. 8'HIGH$800
2009-02-03Job filed: THIS APPLICATION IS FILED TO PROPOSE A FIRE ALARM SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # 401816923 THIS APPLICATION IS FILED FOR THE CO$1,000
2009-02-03Job filed: THIS APPLICATION IS FILED TO PROPOSE A FIRE ALARM SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # 401816923 THIS APPLICATION IS FILED FOR THE CO$1,000
2009-01-01DOB violation LL6291:
2008
2008-07-31Job filed: THIS APPLICATION IS TO FILE SITE SAFETY PLAN IN CONJUNCTION WITH NB APPLICATION #401816923. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2008-07-31Job filed: THIS APPLICATION IS TO FILE SITE SAFETY PLAN IN CONJUNCTION WITH NB APPLICATION #401816923. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2008-06-26Job filed: THIS SUBSEQUENT APPLICATION IS FILED FOR PLUMBING WORK ONLY IN CONJUNCTION WITH NEW BUILDING APPLICATION# 401816923.
2008-06-26Job filed: THIS APPLICATION IS FILED TO PROPOSE A NEW STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION #401816923. NO CHANGE TO USE, EGRESS, OR OCCU$1,000
2008-06-26Job filed: THIS SUBSEQUENT APPLICATION IS FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION# 401816923 FOR MECHANICAL WORK ONLY.
2008-06-26Job filed: THIS APPLICATION IS FILED TO PROPOSE A NEW FIRE ALARM SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION# 401816923$1,000
2008-06-26Job filed: THIS APPLICATION IS FILED TO PROPOSE A NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION# 401816923. NO CHANGE TO USE, EGRESS, OR OCCU$1,000
2008-06-24Job filed: THIS APPLICATION IS FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION#401816923 FOR STRUCTURAL WORK ONLY
2008-05-19Job filed: DEMOLITION OF A ONE FAMILY HOME
2008-05-19Job filed: DEMOLITION OF A WAREHOUSE
2008-05-19Job filed: COMPLETE DEMOLITION OF EXISTING PROPERTY
2008-05-14Job filed: THIS APPLICATION IS FILE TO PROPOSE SECANT PILE EXCAVATION SUPPORT SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION#401816923. NO CHANGE TO USE, EG$1,000
2008-03-14DOB complaint, category ?
2008-01-23Job filed: BUILDERS PAVEMENT PLAN FILED FOR 225 LINEAR FEET IN CONJUNCTION WITH NEW BUILDING APPLCIATION # 401816923
2005
2005-08-26Job filed: THIS APPLICATION IS FILED FOR BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB APPLICATION #401816923. THE TOTAL LOT FRONTAGE 77 FEET.
2004
2004-01-30Job filed: NB
2001
2001-12-12DOB violation C:
1999
1999-04-13DOB complaint, category ?
1993
1993-03-05ECB Hazardous violation: FAILURE TO MAINTAIN HAZARDOUS DEFECT IS 8' FENCE ATFRONT OF CONSTRUCTION PROJECT HAS COLAPSED FOR A LENGTH OF APPROX 12' WITH NAIL$1,000