The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 0. In ZIP 11361, 92% of residential buildings hold an A and
1% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
7 service requests in the last three years. Most common: Dirty Condition (2) · Damaged Tree (2) · Noise (1) · Blocked Driveway (1) · Vendor Enforcement (1).
Filed construction activity
$10,000 in permitted construction work filed since
2016 (4 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2018)
No
Six or more residential units (2)
No
421-a / J-51 tax benefit on the current tax roll
0 of 3 signals present. None of the common signals are present — stabilization is unlikely (though never impossible). The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,288,000
$579,600
2026
$1,315,000
$591,750
2027
$1,337,000
$601,650
The city's market estimate has risen
4% between tax years 2025 and 2027.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
7 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Ten-year activity
50250
2017
2018
23
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
7
13
0
0
2
22
2018
9
12
0
0
0
21
2019
2
19
0
2
0
23
2020
3
11
0
0
0
14
2021
2
0
1
0
0
3
2022
0
2
0
0
0
2
2023
0
0
0
0
0
0
2024
0
0
2
0
0
2
2025
0
0
4
0
0
4
2026
0
0
1
0
1
2
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2020-11-24Job filed: 1 BOILER INSTALLATION @ CELLAR FOR RESIDENTIAL ON 2ND & 3RD FLOOR USE ONLY. THIS JOB IS BEING FILED IN CONJUNCTION WITH NEW BUILDING # 421351584$2,000
2020-11-04Permit Boiler Equipment — Signed-off
2020-10-21Job filed: 1 BOILER INSTALLATION @ CELLAR FOR RESIDENTIAL ON 2ND & 3RD FLOOR USE ONLY. THIS JOB IS BEING FILED IN CONJUNCTION WITH NEW BUILDING # 421351584$2,000
2020-09-02FDNY inspection (RISK)
2020-08-12FDNY inspection (CONSTR)
2020-07-14FDNY inspection (CONSTR)
2020-06-17FDNY inspection (CONSTR)
2020-06-03FDNY inspection (CONSTR)
2020-05-04FDNY inspection (CONSTR)
2020-04-13FDNY inspection (CONSTR)
2020-03-18FDNY inspection (CONSTR)
2020-02-19FDNY inspection (CONSTR)
2020-01-30FDNY inspection (CONSTR)
2020-01-01FDNY inspection (CONSTR)
2019
2019-12-04FDNY inspection (CONSTR)
2019-10-30FDNY inspection (CONSTR)
2019-10-01FDNY inspection (CONSTR)
2019-09-10SMIS — from PARKER GREENFIELD LLC
2019-09-05FDNY inspection (CONSTR)
2019-08-07FDNY inspection (CONSTR)
2019-07-18SMIS — from PARKER GREENFIELD LLC
2019-07-10FDNY inspection (CONSTR)
2019-06-12FDNY inspection (CONSTR)
2019-06-07Permit NB — ISSUED
2019-05-14FDNY inspection (CONSTR)
2019-04-18FDNY inspection (CONSTR)
2019-04-09ECB CLASS - 1 violation: FAILURE TO PRODUCE THE DAILY LOG FOR INSPECTION. AT THE TIME OF INSPECTION,PERMIT HOLDER WHO IS CURRENTLY WORKING ON NB PERMIT#421$2,500
2019-04-09ECB CLASS - 1 violation: FAILURE TO ENSURE EACH WORKER HAS SUCCESSFULLY COMPLETED THE REQUIRED TRAINING. AT THE TIME OF INSPECTION,PERMIT HOLDER FAILED TO $5,000
2019-04-09ECB CLASS - 1 violation: PERMIT HOLDER:FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC 3321.1$5,000
2019-04-09ECB CLASS - 1 violation: OWNER:FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC 3321.1:OBSERVE$5,000
2019-04-09ECB CLASS - 1 violation: FAILURE TO ENSURE EACH WORKER HAS SUCCESSFULLY COMPLETED THE REQUIRED TRAINING. AT THE TIME OF INSPECTION,OWNER FAILED TO ENSURE E$5,000
2019-04-09DOB complaint, category ?
2019-04-08DOB complaint, category ?
2019-03-21FDNY inspection (CONSTR)
2019-02-21FDNY inspection (CONSTR)
2019-01-24FDNY inspection (CONSTR)
2019-01-13Job filed: INSTALL FIRE SPRINKLER SYSTEMS PER THE PLANS FILED HEREWITH AND IN CONJUNCTION WITH NB#421351584. THE SPRINKLER SYSTEM IS HYDRAULICALLY CALCULATED. TH$1,000
2018
2018-12-21FDNY inspection (CONSTR)
2018-11-21FDNY inspection (CONSTR)
2018-10-26FDNY inspection (CONSTR)
2018-09-25FDNY inspection (CONSTR)
2018-09-19Permit PL — ISSUED
2018-08-30FDNY inspection (CONSTR)
2018-08-21DOB complaint, category ?
2018-08-17Job filed: ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING AS PER PLANS. NO CHANGE $5,000
2018-08-17Permit Sidewalk Shed — Permit Issued
2018-07-31FDNY inspection (CONSTR)
2018-07-03FDNY inspection (CONSTR)
2018-06-08Permit FO — ISSUED
2018-06-08Permit FO — ISSUED
2018-06-08Permit NB — ISSUED
2018-06-07FDNY inspection (CONSTR)
2018-05-30FDNY inspection (CONSTR)
2018-05-03Permit FO — ISSUED
2018-05-03Permit NB — ISSUED
2018-05-03Permit FO — ISSUED
2018-04-30FDNY inspection (CONSTR)
2018-02-21FDNY inspection (CONSTR)
2017
2017-12-20FDNY inspection (CONSTR)
2017-12-07FDNY inspection (CONSTR)
2017-12-05Permit NB — ISSUED
2017-11-30DOB complaint, category ?
2017-11-30DOB complaint, category ?
2017-11-20FDNY inspection (CONSTR)
2017-11-16FDNY inspection (STRUC_INT_3)
2017-11-13FDNY inspection (STANDARD)
2017-11-09FDNY inspection (STANDARD)
2017-11-08FDNY inspection (CONSTR)
2017-11-06Rodent inspection: Passed
2017-10-26FDNY inspection (CONSTR)
2017-10-20Permit FO — ISSUED
2017-10-20Permit FO — ISSUED
2017-10-20Permit EQ — ISSUED
2017-10-20Permit NB — ISSUED
2017-06-21Job filed: PROPOSED ADDING MECHANICAL WORK TYPE TO ORIGINAL FILING NB # 421351584
2017-06-08DOB complaint, category ?
2017-04-13FDNY inspection (COMPLAINT)
2017-04-13DOB complaint, category ?
2017-03-01Rodent inspection: Passed
2017-01-03Job filed: PROPOSED FILING BUILDER'S PAVEMENT PLAN IN CONJUNCTION WITH NB # 421351584
2016
2016-11-26ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT FRONT FACADE,EXP#1,SIDING ON 2ND STY IS IN DISREPAIR. SIDING IS LOOSE$1,000
2016-11-22DOB complaint, category ?
2016-11-16Rodent inspection: Passed
2016-08-24FDNY inspection (SPECIAL-OTH)
2016-08-04Rodent inspection: Failed for Other Reason
2016-07-22Job filed: NB
2016-07-18Rodent inspection: Failed for Other Reason
2016-04-26Job filed: PROPOSED LOT SUBDIVISION OF LOT # 16 INTO LOT # 16 & # 18
2015
2015-03-23Job filed: COMBINE LOT 16 & 19 INTO 3 TAX LOTS IN ONE (1) ZONING LOT
2014
2014-09-12DOB complaint, category ?
2014-07-23DOB complaint, category ?
2014-06-23DOB complaint, category ?
2014-06-19DOB complaint, category ?
2014-06-04Job filed: DM
2006
2006-09-19DOB complaint, category ?
2006-05-30DOB complaint, category ?
2006-02-08Job filed: Renovation of exist'g store. Installation of plumbing fixtures & HVAC unit w/ minor construction. No change in use, egress or occupancy.$56,500