Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
2 heat or hot-water complaints in the last three years (winter 2024–25: 2).
No bedbug-infested units reported in the last three years of filings.
$33,680 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
29 service requests in the last three years. Most common: Noise (7) · For Hire Vehicle Complaint (3) · Illegal Parking (3) · Non (3) · Homeless Person Assistance (2) · Damaged Tree (2).
Filed construction activity
$156,854,263 in permitted construction work filed since
2016 (289 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$624,073,000
$280,832,850
2026
$633,354,000
$285,009,300
2027
$648,979,000
$292,040,550
The city's market estimate has risen
4% between tax years 2025 and 2027.
Tax exemptions on the roll: HOSPITAL
Building systems
Energy grade (LL33)
D — ENERGY STAR score 17/100, posted at the entrance by law (2022 disclosure cycle)
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
29 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $72,155,000 on
2015-07-10 (lender: The Bank Of New York Mellon), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2015-07-10
Agreement $8,620,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$8,620,000
2015-07-10
Agreement $233,615,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$233,615,000
2015-07-10
Mortgage $72,155,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$72,155,000
2015-07-10
Agreement $137,525,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$137,525,000
2015-07-10
Agreement $98,125,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$98,125,000
2014-11-10
Agreement $161,545,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$161,545,000
2014-11-10
Agreement $81,230,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$81,230,000
2014-11-10
Agreement $123,600,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$123,600,000
2014-11-10
Agreement $10,390,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$10,390,000
2014-11-10
Agreement $123,265,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$123,265,000
2014-11-10
Agreement $447,885,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$447,885,000
2014-11-10
Agreement $235,615,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$235,615,000
2014-11-10
Agreement $50,000,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$50,000,000
2014-11-10
Agreement $37,500,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$37,500,000
2014-11-10
Agreement $37,500,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
$37,500,000
Ten-year activity
5002500
2017
2018
2019
2020
2021
2022
235
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
53
49
14
0
24
140
2018
106
20
8
0
59
193
2019
121
40
9
0
59
229
2020
67
17
7
0
42
133
2021
46
20
9
0
28
103
2022
43
7
4
1
27
82
2023
171
15
11
0
38
235
2024
109
7
14
2
47
179
2025
122
29
10
1
32
194
2026
160
9
3
0
24
196
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Placement of new ground floor slab infills and housekeeping pads to support new transformers and switchboards. Enlargement of existing door opening.
2026-10-12
Boiler inspection
2026-10-08
Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-10-08
Permit Supported Scaffold — Permit Issued
2026-10-07
Permit Sprinklers — Permit Issued
2026-10-07
Permit Sprinklers — Permit Issued
2026-10-05
Boiler inspection
2026-10-01
Permit Sprinklers — Permit Issued
2026-09-29
Permit Sprinklers — Permit Issued
2026-09-28
Boiler inspection
2026-09-25
DOB complaint, category ?
2026-09-25
DOB complaint, category ?
2026-09-21
Air permit (REGISTRATION), fuel: NATURALGAS
2026-09-20
311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-09-16
Permit Sidewalk Shed — Permit Issued
2026-08-25
Permit Sprinklers — Permit Issued
2026-08-20
Air permit (REGISTRATION), fuel: NATURALGAS
2026-08-12
Elevator permit: alteration/modernization of vertical wheelchair lift device #4w11254 as detailed in the attached drawings. All work will comply wi
2026-07-29
Certificate of occupancy Renewal Without Change
2026-07-29
Permit General Construction — Permit Issued
2026-07-29
Permit General Construction — Permit Issued
2026-07-29
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-27
Permit General Construction — Permit Issued
2026-07-27
Permit General Construction — Permit Issued
2026-07-27
Permit General Construction — Permit Issued
2026-07-21
Permit General Construction — Permit Issued
2026-07-17
Permit Plumbing — Signed-off
2026-07-17
Permit Plumbing — Permit Issued
2026-07-02
Permit Plumbing — Permit Issued
2026-07-02
Permit Sprinklers — Permit Issued
2026-07-02
Permit Sprinklers — Permit Issued
2026-07-02
Permit Plumbing — Permit Issued
2026-07-01
Permit Plumbing — Permit Issued
2026-07-01
Permit Plumbing — Permit Issued
2026-07-01
Permit Sprinklers — Permit Issued
2026-07-01
Permit Sprinklers — Permit Issued
2026-06-30
Job filed: installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
2026-06-30
Permit Sidewalk Shed — Permit Issued
2026-06-30
Permit Sidewalk Shed — Permit Issued
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Structural — Permit Issued
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit General Construction — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit General Construction — Permit Issued
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-24
Permit Plumbing — Permit Issued
2026-06-24
Permit Structural — Permit Issued
2026-06-24
Permit Standpipe — Permit Issued
2026-06-23
Permit General Construction — Permit Issued
2026-06-23
Permit Support of Excavation — Signed-off
2026-06-23
Permit Mechanical Systems — Permit Issued
2026-06-23
Permit Structural — Permit Issued
2026-06-23
Permit General Construction — Permit Issued
2026-06-23
Permit Mechanical Systems — Permit Issued
2026-06-23
Permit Support of Excavation — Signed-off
showing the 80 most recent
The full timeline
showing the 2,000 most recent of
4,374 events
2026
2026-10-14Job filed: Placement of new ground floor slab infills and housekeeping pads to support new transformers and switchboards. Enlargement of existing door opening. $90,000
2026-10-12Boiler inspection
2026-10-08Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-08-12Elevator permit: alteration/modernization of vertical wheelchair lift device #4w11254 as detailed in the attached drawings. All work will comply wi$46,000
2026-07-29Certificate of occupancy Renewal Without Change
2026-07-29Permit General Construction — Permit Issued
2026-07-29Permit General Construction — Permit Issued
2026-07-29Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-27Permit General Construction — Permit Issued
2026-07-27Permit General Construction — Permit Issued
2026-07-27Permit General Construction — Permit Issued
2026-07-21Permit General Construction — Permit Issued
2026-07-17Permit Plumbing — Signed-off
2026-07-17Permit Plumbing — Permit Issued
2026-07-02Permit Plumbing — Permit Issued
2026-07-02Permit Sprinklers — Permit Issued
2026-07-02Permit Sprinklers — Permit Issued
2026-07-02Permit Plumbing — Permit Issued
2026-07-01Permit Plumbing — Permit Issued
2026-07-01Permit Plumbing — Permit Issued
2026-07-01Permit Sprinklers — Permit Issued
2026-07-01Permit Sprinklers — Permit Issued
2026-06-30Job filed: installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc$75,000
2026-06-30Permit Sidewalk Shed — Permit Issued
2026-06-30Permit Sidewalk Shed — Permit Issued
2026-06-24Permit Sprinklers — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Structural — Permit Issued
2026-06-24Permit Sprinklers — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Sprinklers — Permit Issued
2026-06-24Permit Sprinklers — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit General Construction — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit General Construction — Permit Issued
2026-06-24Permit Sprinklers — Permit Issued
2026-06-24Permit Plumbing — Permit Issued
2026-06-24Permit Structural — Permit Issued
2026-06-24Permit Standpipe — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit Support of Excavation — Signed-off
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Structural — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Support of Excavation — Signed-off
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit Structural — Permit Issued
2026-06-22Job filed: Northwell LIJ Kaufman: minor plumbing renovations in open space in conjunction with courtyard renovations, including replacement of (5) storm area dra$75,000
2026-06-16Job filed: Northwell LIJ Kaufman: minor plumbing renovations in open space in conjunction with courtyard renovations, including replacement of (5) storm area dra$75,000
2026-06-04Permit General Construction — Permit Issued
2026-06-04Permit General Construction — Permit Issued
2026-06-03Job filed: Installation of material hoist
2026-06-02Job filed: Northwell LIJ EP Lab # 1: minor Structural scope in conjunction with EP lab renovation (framing in support of medical equipment), as per plans filed h$74,665
2026-06-01Job filed: Northwell LIJ EP Lab # 1 Project: modify Plumbing & Sprinkler systems to conform with hospital program renovations, as per plans filed herewith.$61,458
2026-06-01Job filed: Northwell LIJ EP Lab # 1: modify existing Mechanical systems to conform with hospital program renovations as per plans filed herewith.$585,452
2026-06-01Job filed: Northwell LIJ - EP Lab # 1 Project: rearrange interior, non-bearing partitions, install hung ceiling, wall & floor finishes as per plans filed herewit$998,119
2026-05-27Job filed: Filing herewith plumbing on existing ground floor and 1st floor space. No change in use, egress or occupancy.$25,000
2026-05-07Job filed: Northwell LIJ Sprinkler Upgrade Project: ECCC Wing: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors in$25,000
2026-04-30Job filed: Northwell Health LIJ Medical Center - Doctor's On Call project: modify Mechanical systems to conform with new layouts.$38,899
2026-04-28Permit Standpipe — Signed-off
2026-04-28Permit General Construction — Permit Issued
2026-04-28Permit Sprinklers — Signed-off
2026-04-28Permit Plumbing — Signed-off
2026-04-28Permit Standpipe — Signed-off
2026-04-28Permit Sprinklers — Signed-off
2026-04-28Permit Plumbing — Signed-off
2026-04-27ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT TIME OF INSPECTION,I OBSERVED AT PREMISES SIDEWALK SHEDS IN PLACE AT EX$2,400
2026-04-27Job filed: Northwell LIJ Sprinkler Upgrade project - Research Wing: sprinkler upgrades throughout building, as per plans filed herewith.$1,600,000
2026-04-27Permit General Construction — Permit Issued
2026-04-27Permit General Construction — Permit Issued
2026-04-24Job filed: Northwell LIJ Sprinkler Upgrade project - ECCC Wing: sprinkler upgrades throughout building, as per plans filed herewith.$279,500
2026-04-24Job filed: Northwell LIJ Sprinkler Upgrade project - Main Building: sprinkler upgrades throughout building, as per plans filed herewith.$4,389,967
2026-04-24DOB complaint, category ?
2026-04-24Permit Standpipe — Permit Issued
2026-04-24Permit Standpipe — Permit Issued
2026-04-24Permit Plumbing — Permit Issued
2026-04-24Permit Plumbing — Permit Issued
2026-04-24Permit Sprinklers — Permit Issued
2026-04-24Permit Sprinklers — Permit Issued
2026-04-23Job filed: Northwell LIJ Medical Center Sprinkler Upgrade Project - Main Building: minor Architectural scope in conjunction with Sprinkler upgrades throughout b$360,000
2026-04-21Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2026-04-21Job filed: Northwell LIJ Sprinkler Project - Research Wing: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indica$176,000
2026-04-20Job filed: Northwell LIJ Sprinkler Upgrade project - West Wing: sprinkler upgrades throughout building, as per plans filed herewith.$1,150,000
2026-04-20Job filed: Northwell LIJ Sprinkler project - West Wing: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated,$110,000
2026-04-14Permit Structural — Permit Issued
2026-04-14Permit Structural — Permit Issued
2026-04-13Job filed: Repair Parking Garage as per plans filed. No change in use, egress or occupancy.$759,360
2026-04-09Job filed: Northwell LIJ Kaufman: minor plumbing renovations in open space in conjunction with courtyard renovations, including replacement of (5) storm area dra$75,000
2026-04-09Job filed: Northwell LIJ Kaufman: civil site make-ready scope in OSP for existing courtyard renovations, as per plans filed herewith.$75,000
2026-04-08Job filed: Northwell LIJ Sprinkler project - Womens Hospital: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indi$2,000
2026-04-08Job filed: Northwell LIJ Medical Center Sprinkler Project: sprinkler upgrades at portion of basement & 1st floor, as per plans filed herewith.$90,000
2026-04-03Facade (LL11) filing, cycle 10: UNSAFE
2026-04-02Job filed: Northwell LIJ Kaufman: existing courtyard renovations in OSP on private hospital property, including concrete ramp & paving renovations, removal of ex$100,000
2026-03-30Asbestos abatement: Removal — JVN Restoration Inc.
2026-03-30Asbestos abatement: Removal — JVN Restoration Inc.
2026-03-30Asbestos abatement: Removal — JVN Restoration Inc.
2026-03-30Asbestos abatement: Removal — JVN Restoration Inc.
2026-03-16Permit Support of Excavation — Signed-off
2026-03-16Permit Support of Excavation — Signed-off
2026-03-13Permit Foundation — Permit Issued
2026-03-13Permit Foundation — Permit Issued
2026-03-13Permit Foundation — Signed-off
2026-03-12FDNY inspection (EDU)
2026-03-12Permit General Construction — Permit Issued
2026-03-12Permit General Construction — Permit Issued
2026-03-09Restaurant inspection: PANERA BREAD — grade A
2026-03-09Permit Sidewalk Shed — Signed-off
2026-03-09Permit Sidewalk Shed — Signed-off
2026-03-05Permit Structural — Permit Issued
2026-03-05Permit Structural — Permit Issued
2026-03-03Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC$98,500
2026-03-03Permit Construction Fence — Permit Issued
2026-03-03Permit Construction Fence — Permit Issued
2026-02-25Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC$98,500
2026-02-25DOB complaint, category ?
2026-02-20DOB complaint, category ?
2026-02-10Job filed: IRA to assist with Condition Assessment.
2026-02-03Job filed: installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.$50,000
2026-01-29Job filed: Northwell LIJ IR-8 Equipment Replacement Project: modify Plumbing & Sprinkler systems to conform with new layouts as per plans filed herewith.$150,000
2026-01-05311: For Hire Vehicle Report — Driver Report - Non Passenger
2025
2025-12-17DOB violation C: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DAMAGED MORTAR JOINTS IN MULTIPLE LOCATIONS ON EXPOSURE 2,3,
2025-12-16FDNY inspection (RISK)
2025-12-16Cooling tower inspection
2025-12-11Job filed: Northwell Health LIJ Medical Center: Combo Lab Project: modify existing Plumbing and Sprinkler systems to confirm with new layouts as per plans filed $251,500
2025-12-10Permit Sprinklers — Permit Issued
2025-12-10Permit Sprinklers — Permit Issued
2025-12-10Permit Plumbing — Permit Issued
2025-12-10Permit Plumbing — Signed-off
2025-12-10Permit Plumbing — Permit Issued
2025-12-10Permit Plumbing — Signed-off
2025-12-10Permit Sprinklers — Signed-off
2025-12-02ECB CLASS - 1 violation: OPERATION OF A CRANE CD# 5634 WITHOUT A CERTIFICATE OF OPERATION/CERTIFICATE OF APPROVAL. CRANE WAS SETUP ON SITE WITH A 223' BOOM$12,500
2025-12-02ECB CLASS - 1 violation: OPERATION OF A CRANE CD# 5634 WITHOUT A CERTIFICATE OF OPERATION/CERTIFICATE OF APPROVAL. CRANE WAS SETUP ON SITE WITH A 223' BOOM$5,000
2025-12-01ECB CLASS - 1 violation: FAILED TO PROVIDE THE REQUIRED DOCUMENTS MONTHLY INSPECTION FOR CRAWLER CRANE CD# 5634 RCNY 3319-01(K), PROVIDE/MAINTAIN REQUIRED $2,500
2025-12-01ECB CLASS - 1 violation: FAILED TO PROVIDE THE REQUIRED DOCUMENTS MONTHLY INSPECTION FOR CRAWLER CRANE CD# 5634. 1 RCNY 3319-01(K), PROVIDE/MAINTAIN REQUIR$2,500
2025-11-09Job filed: Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: minor structural scope (installation of roof dunnage framing in support of new me$377,016
2025-11-03Job filed: Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: modify plumbing, sprinkler & standpipe systems to accommodate new hospital progra$929,999
2025-11-03Job filed: Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: modify Mechanical systems to conform with new layouts for new hospital program, a$1,529,983
2025-11-03Permit Sprinklers — Signed-off
2025-11-03Permit Sprinklers — Signed-off
2025-11-03Permit Standpipe — Signed-off
2025-11-03Permit Plumbing — Signed-off
2025-11-03Permit Standpipe — Signed-off
2025-11-03Permit Plumbing — Signed-off
2025-10-29FDNY inspection (RISK)
2025-10-29FDNY inspection (RISK)
2025-10-21FDNY inspection (RISK)
2025-10-21FDNY inspection (RISK)
2025-10-21FDNY inspection (RISK)
2025-10-21FDNY inspection (RISK)
2025-10-20Boiler inspection
2025-10-20Boiler inspection
2025-10-15FDNY inspection (RISK)
2025-10-15FDNY inspection (RISK)
2025-10-13Boiler inspection
2025-10-10FDNY inspection (RISK)
2025-10-09Elevator permit: REGROOVE TRACTION SHEAVE- All work to comply with ASME A17.1-2013, Part 8, Section 8.7.2.25 Safety Code for Elevators and Escalato$10,000
2025-10-06Boiler inspection
2025-10-06Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2025-09-29Boiler inspection
2025-09-29Job filed: Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: Make Ready interior demolition of non-bearing partitions & interior environment o$118,995
2025-09-24Permit Plumbing — Signed-off
2025-09-24Permit Plumbing — Signed-off
2025-09-23FDNY inspection (RISK)
2025-09-22Permit Sprinklers — Signed-off
2025-09-22Permit Plumbing — Signed-off
2025-09-22Permit Sprinklers — Signed-off
2025-09-22Permit Plumbing — Signed-off
2025-09-18311: Water System — Possible Water Main Break (Use Comments) (WA1)
2025-09-09FDNY inspection (RISK)
2025-09-09FDNY inspection (RISK)
2025-09-05FDNY inspection (RISK)
2025-09-03311: Abandoned Vehicle — With License Plate
2025-09-02Job filed: Northwell LIJ Fire Pump Project: install final run of Fire Service piping @ Cellar Fire Pump Rm; install RPZ & misc. PL for same; install final run of$865,827
2025-08-27FDNY inspection (RISK)
2025-08-27FDNY inspection (RISK)
2025-08-26Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2025-08-05Elevator permit: REGROOVE TRACTION SHEAVE-ALL WORK TO COMPLY WITH ASME A17.1-2013 PART 2, SAFETY CODE FOR ELEVATORS AND ESCALATORS AS MODIFIED BY C$10,000
2025-08-01Permit Mechanical Systems — Permit Issued
2025-08-01Permit Mechanical Systems — Permit Issued
2025-07-29Permit Standpipe — Permit Issued
2025-07-29Permit Standpipe — Permit Issued
2025-07-29Permit Plumbing — Permit Issued
2025-07-29Permit Plumbing — Permit Issued
2025-07-29Permit Sprinklers — Permit Issued
2025-07-29Permit Standpipe — Permit Issued
2025-07-29Permit Sprinklers — Permit Issued
2025-07-29Permit Plumbing — Permit Issued
2025-07-29Permit Plumbing — Permit Issued
2025-07-29Permit Standpipe — Permit Issued
2025-07-28Permit Structural — Signed-off
2025-07-28Permit Structural — Signed-off
2025-07-21Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2025-07-21Permit General Construction — Signed-off
2025-07-21Permit General Construction — Signed-off
2025-07-14311: Homeless Person Assistance — Non-Chronic
2025-06-26Job filed: Northwell LIJ Medical Center: IR-8 Equipment Replacement: rearrange mechanical systems to conform with new layouts as per plans filed herewith.$730,000
2025-06-25Job filed: Northwell LIJ IR-8 Equipment Replacement Project: modify Plumbing & Sprinkler systems to conform with new layouts as per plans filed herewith.$150,000
2025-06-25Job filed: Northwell LIJ Medical Center: IR-8 Equipment Replacement Project: structural scope (framing for medical equipment) in conjunction with this project, a$65,000
2025-06-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-06-06311: Street Condition — Rough, Pitted or Cracked Roads
2025-06-06311: Street Condition — Rough, Pitted or Cracked Roads
2025-06-04Job filed: Seated fashion show for the children at Long Island Jewish Medical Center. For invited guests only.
2025-06-03Facade (LL11) filing, cycle 10: UNSAFE
2025-06-02Job filed: Northwell LIJ Medical Center: Water Service piping & Site Storm Drainage piping with associated installations for campus civil site work in conjunctio
2025-05-20Job filed: Northwell LIJ Medical Center: Civil site work general construction scope in conjunction with BHP-II New Building. All work is contained within privat
2025-05-19Job filed: Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: modify plumbing and sprinkler systems to conform with new layouts as per pla$463,204
2025-05-16Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2025-05-12Permit Structural — Permit Issued
2025-05-12Permit Structural — Permit Issued
2025-05-01Permit Plumbing — Permit Issued
2025-05-01Permit Plumbing — Permit Issued
2025-04-30Facade (LL11) filing, cycle 10: UNSAFE
2025-04-24DOB complaint, category ?
2025-04-18Permit Standpipe — Signed-off
2025-04-18Permit Sprinklers — Signed-off
2025-04-18Permit Standpipe — Signed-off
2025-04-18Permit Plumbing — Signed-off
2025-04-18Permit Plumbing — Signed-off
2025-04-18Permit Sprinklers — Signed-off
2025-04-17Permit Standpipe — Signed-off
2025-04-17Permit Standpipe — Signed-off
2025-04-17Permit Sprinklers — Signed-off
2025-04-17Permit Plumbing — Signed-off
2025-04-17Permit Sprinklers — Signed-off
2025-04-17Permit Plumbing — Signed-off
2025-04-16Permit Plumbing — Signed-off
2025-04-16Permit Plumbing — Signed-off
2025-04-16Permit Standpipe — Signed-off
2025-04-16Permit Sprinklers — Signed-off
2025-04-16Permit Standpipe — Signed-off
2025-04-16Permit Sprinklers — Signed-off
2025-04-14Permit Mechanical Systems — Permit Issued
2025-04-14Permit Mechanical Systems — Permit Issued
2025-04-11Permit General Construction — Permit Issued
2025-04-11Permit General Construction — Permit Issued
2025-04-09Job filed: Northwell LIJ Medical Center: Support Of Excavation work in conjunction with new building construction (new BHP II building).
2025-04-07Job filed: Northwell LIJ Medical Center: Water Service piping & Site Storm Drainage piping with associated installations for campus civil site work in conjunctio
2025-03-26311: Noise — Noise: Construction Before/After Hours (NM1)
2025-03-19Job filed: Northwell Health LIJ Medical Center: Separation of Branches ECCC Phase: rearrange interior non-bearing partitions, install wall and floor finishes and$150,000
2025-03-19Permit Support of Excavation — Signed-off
2025-03-19Permit Foundation — Permit Issued
2025-03-19Permit Support of Excavation — Signed-off
2025-03-19Permit Foundation — Permit Issued
2025-03-19Permit Foundation — Signed-off
2025-03-18Job filed: Northwell Health LIJ Medical Center: Separation of Branches ECCC Phase: modify existing plumbing, sprinkler and standpipe systems to conform with new $140,000
2025-03-18Job filed: Northwell LIJ Medical Center: Separation of Branches ECCC Phase: rearrange existing Mechanical systems to conform with new layouts as per plans filed $575,000
2025-03-06Permit Construction Fence — Permit Issued
2025-03-06Permit Construction Fence — Permit Issued
2025-03-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2025-03-03EASE — from LONG ISLAND JEWISH MEDICAL CENTER D/B/A to THE CITY OF NEW YORK
2025-02-26Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2025-02-25ECB CLASS - 2 violation: 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND$1,250
2025-02-21Job filed: CONSTRUCTION FENCE IN CONJUNCTION WITH NEW THREE STORY BEHAVIORAL HELATH PAVILION$25,000
2025-02-21Permit Plumbing — Signed-off
2025-02-21Permit Sprinklers — Signed-off
2025-02-21Permit Sprinklers — Signed-off
2025-02-21Permit Plumbing — Signed-off
2025-02-20Permit Plumbing — Signed-off
2025-02-20Permit Sprinklers — Signed-off
2025-02-20Permit Plumbing — Signed-off
2025-02-20Permit Sprinklers — Signed-off
2025-02-19Permit Structural — Signed-off
2025-02-19Permit General Construction — Signed-off
2025-02-19Permit Structural — Signed-off
2025-02-19Permit Mechanical Systems — Signed-off
2025-02-19Permit General Construction — Signed-off
2025-02-19Permit Mechanical Systems — Signed-off
2025-02-17Job filed: Northwell Health LIJ Medical Center: Plumbing, Sprinkler and Standpipe installation in conjunction with the construction of new three-story Behavioral
2025-02-12Job filed: NORTHWELL HEALTH (LONG ISLAND JEWISH MEDICAL CENTER), INSTALLATION OF A 10,000-GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHA$20,000
2025-02-12Permit Boiler Equipment — Signed-off
2025-02-12Permit Boiler Equipment — Signed-off
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Boiler inspection
2025-02-03Job filed: Northwell LIJ: LINAC Project: modify existing plumbing & sprinkler systems to conform with new medical suite equipment installation as per plans filed$100,425
2025-02-03Job filed: LIJ Northwell Health: LINAC Project: modify existing Mechanical systems to conform with new suite layout due to replacement of LINAC equipment, as per$335,000
2025-01-25ECB CLASS - 1 violation: AC 28-323.8 AND RCNY 103-13(5). FAILURE TO SECURE PUBLIC SAFETY AND/ORMAKE THE BUILDING'S STRUCTURE AND APPURTENANCES CONFORM TO T$2,500
2025-01-23Job filed: installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.$50,000
2025-01-23Job filed: installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
2025-01-22Job filed: LIJ Northwell Health: LINAC Project: installation of structural support systems and concrete pad for new medical equipment, as per plans filed herewit$14,000
2025-01-21Job filed: Northwell LIJ Medical Center: BHP 2 project: Limited PL for under cellar slab piping and at cellar slab drains, as per plans filed herewith. See comme
2025-01-16Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2025-01-09311: Non-Residential Heat — Inadequate or No Heat
2024-12-09311: Mold — Public Complaint - Comm Location
2024-11-22Permit Sprinklers — Signed-off
2024-11-22Permit Plumbing — Signed-off
2024-11-22Permit Plumbing — Signed-off
2024-11-22Permit Sprinklers — Signed-off
2024-11-21Permit Plumbing — Signed-off
2024-11-21Permit Sprinklers — Signed-off
2024-11-21Permit Plumbing — Signed-off
2024-11-21Permit Sprinklers — Signed-off
2024-11-20Permit Mechanical Systems — Signed-off
2024-11-20Permit Mechanical Systems — Signed-off
2024-11-19CERT — from FIRST AMERICAN TITLE INSURANCE COMPANY
2024-11-19ZONE — from LONG ISLAND JEWISH MEDICAL CENTER
2024-11-19Cooling tower inspection
2024-11-19Job filed: Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital pro
2024-11-13Permit General Construction — Signed-off
2024-11-13Permit General Construction — Signed-off
2024-11-12Job filed: Northwell Health LIJ Medical Center: Superstructure work in conjunction with the construction of a new three-story Behavioral Health Pavilion (BHP 2)
2024-11-07Permit Structural — Signed-off
2024-11-07Permit Structural — Signed-off
2024-11-07Permit General Construction — Signed-off
2024-11-07Permit General Construction — Signed-off
2024-11-01Restaurant inspection: PANERA BREAD — grade A
2024-10-28Boiler inspection
2024-10-28Boiler inspection
2024-10-25Permit Structural — Signed-off
2024-10-25Permit Structural — Signed-off
2024-10-18Job filed: Northwell Health LIJ Medical Center: Combo Lab Project: modify existing Mechanical systems to conform with new layouts as per plans filed herewith.$430,000
2024-10-17Job filed: Northwell Health LIJ Medical Center: Construction of new three-story Behavioral Health Pavilion (BHP 2) on private hospital property
2024-10-17Job filed: Northwell Health LIJ Medical Center: Foundation scope in conjunction with new three-story Behavioral Health Pavilion (BHP 2) project.
2024-10-17Job filed: Filing herewith interior renovation of existing ground floor space, Microbiology Suite. No change in use, egress or occupancy.$15,000
2024-10-17Job filed: Northwell LIJ Medical Center: Support Of Excavation work in conjunction with new building construction (new BHP II building).
2024-10-17Job filed: Northwell Health LIJ Medical Center: Combo Lab Project: modify existing Plumbing and Sprinkler systems to confirm with new layouts as per plans filed $251,500
2024-10-17Job filed: Northwell Health LIJ Medical Center: Combo Lab project: rearrange interior, non-bearing partitions, install hung ceiling and wall and floor finishes a$517,000
2024-10-16Job filed: Northwell Health LIJ Medical Center: Combo Lab Project: minor Structural scope (framing for support of medical equipment) in conjunction with new room$37,000
2024-10-16Permit General Construction — Signed-off
2024-10-15311: Non-Residential Heat — Inadequate or No Heat
2024-10-14Boiler inspection
2024-10-14Permit Mechanical Systems — Signed-off
2024-10-14Permit Mechanical Systems — Signed-off
2024-10-10Job filed: Structural garage repairs to parking garage as indicated in plans. No change in use, egress or occupancy.$50,000
2024-10-09Permit General Construction — Signed-off
2024-10-09Permit General Construction — Signed-off
2024-10-08Permit Mechanical Systems — Signed-off
2024-10-07Boiler inspection
2024-10-05Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-10-02FDNY inspection (RISK)
2024-10-01ECB CLASS - 1 violation: FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE COND$2,500
2024-09-30Boiler inspection
2024-09-27Permit General Construction — Signed-off
2024-09-26Certificate of occupancy Renewal Without Change
2024-08-20Job filed: Northwell Health LIJ Medical Center - Doctor's On Call project: modify Mechanical systems to conform with new layouts.$38,899
2024-08-20Permit Mechanical Systems — Signed-off
2024-08-20Permit General Construction — Signed-off
2024-08-20Permit Mechanical Systems — Signed-off
2024-08-09311: Damaged Tree — Tree Alive - in Poor Condition
2024-08-08Permit Standpipe — Permit Issued
2024-08-08Permit Plumbing — Permit Issued
2024-08-08Permit Standpipe — Permit Issued
2024-08-08Permit Plumbing — Permit Issued
2024-08-07FDNY inspection (RISK)
2024-08-06Permit General Construction — Signed-off
2024-08-06Permit General Construction — Signed-off
2024-08-01Job filed: Northwell LIJ O.R. Hybrid Project: modify Plumbing and Sprinkler systems to conform with new room layouts as per plans filed herewith.$59,599
2024-07-31311: Damaged Tree — Tree Leaning/Uprooted
2024-07-31Job filed: Northwell LIJ O.R. Hybrid Project: modify Mechanical/HVAC systems to conform with new room lay-outs as per plans filed herewith.$149,000
2024-07-16Job filed: Northwell Health - Women's Hospital Fire Pump Project: install new 8" Fire Service connection to existing hospital campus loop on private property in $297,970
2024-07-15Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-07-11Permit General Construction — Signed-off
2024-07-10Job filed: Northwell LIJ Medical Center - Zucker Hillside Campus: Kaufman IP Project: civil site work including grading, installation of handrails, and restorati$96,963
2024-07-10Job filed: Doctor's On Call: rearrange interior, non-bearing partitions, install hung ceiling, wall and floor finishes as per plans filed herewith. No change in $184,755
2024-07-10Job filed: Northwell LIJ Medical Center Zucker Campus - Kaufman IP Project: Civil plumbing scope in conjunction with project, as per plans filed herewith.$22,815
2024-07-10Permit Structural — Signed-off
2024-07-08Job filed: Northwell LIJ O.R. Hybrid project: rearrange interior, non-bearing partitions, install hung ceiling, wall and floor finishes as per plans filed herewi$234,930
2024-07-03Job filed: Northwell LIJ O.R. Hybrid project: Structural scope in support of medical equipment installation for O.R. Hybrid suite, as per plans filed herewith.$43,000
2024-07-01Job filed: Northwell Health Cath Lab 3 Project: modify Plumbing and Sprinkler systems @ portion of 2nd floor to conform with new room layout as per plans filed h$27,700
2024-06-26Job filed: Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: modify Mechanical/HVAC systems to conform to new layouts as per plans filed $1,197,179
2024-06-25Certificate of occupancy Renewal Without Change
2024-06-20311: For Hire Vehicle Complaint — Car Service Company Complaint
2024-06-20311: Animal-Abuse — Other (complaint details)
2024-06-20Job filed: Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: rearrange interior, non-bearing partitions, install hung ceiling, wall & fl$1,860,232
2024-06-19Job filed: Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: modify plumbing and sprinkler systems to conform with new layouts as per pla$463,204
2024-06-14Job filed: Northwell LIJ Medical Center - Zucker Hillside Campus: Kaufman IP Project: minor structural scope in conjunction with project as per plans filed herew$134,228
2024-06-14Permit Sprinklers — Signed-off
2024-06-14Permit Plumbing — Signed-off
2024-06-14Permit Plumbing — Signed-off
2024-06-14Permit Sprinklers — Signed-off
2024-06-10Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-06-03Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-06-03Job filed: Filing herewith drawings indicating the modification to the existing sprinkler system on the 1st floor. No change in use, egress, or occupancy under t$24,973
2024-05-08Job filed: Northwell Health Cath Lab 3 Project: modify Plumbing and Sprinkler systems @ portion of 2nd floor to conform with new room layout as per plans filed h$27,700
2024-04-11ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINIATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPUR$1,250
2024-04-11ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINIATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPUR$1,280
2024-04-11Permit Plumbing — Signed-off
2024-04-11Permit Plumbing — Signed-off
2024-04-10Job filed: Northwell Health - Women's Hospital Fire Pump Project: extend new 8" Fire Service piping through basement of building and underground to connect to ne$152,143
2024-04-08Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-04-08Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-04-03Job filed: Northwell Health - Women's Hospital Fire Pump Project: install new 8" Fire Service connection to existing hospital campus loop on private property in $297,970
2024-03-29Certificate of occupancy Renewal Without Change
2024-03-25Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-22Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2024-03-13Boiler inspection
2024-03-13Boiler inspection
2024-03-13Boiler inspection
2024-03-13Boiler inspection
2024-03-11Job filed: Northwell LIJ Fire Pump Project: install final run of Fire Service piping in cellar Fire Pump Rm.; install RPZ & misc. PL scope for same; install fina$456,427
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-07Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-05Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-05Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2024-03-05Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2023-09-25Job filed: Northwell LIJ Medical Center: Pediatric Wellness/Holistic Services: minor interior renovations, as per plans filed herewith; no change in use, occupan$541,800
2023-09-22Permit Plumbing — Signed-off
2023-09-22Permit Sprinklers — Signed-off
2023-09-22Permit Sprinklers — Signed-off
2023-09-22Permit Standpipe — Signed-off
2023-09-22Permit Plumbing — Signed-off
2023-09-22Permit Standpipe — Signed-off
2023-09-12Job filed: Northwell LIJ Sloman Bldg: partial roof repair/replacement, including parapet, as per plans filed herewith.$160,000
2023-09-08FDNY inspection (RISK)
2023-09-05Job filed: Filing here with mechanical work in existing ground floor and lower roof space. No change in use, egress or occupancy.$10,000
2023-09-05Job filed: Filing herewith interior renovation of existing ground floor space, Microbiology Suite. No change in use, egress or occupancy.$15,000
2023-09-05Permit Plumbing — Permit Issued
2023-09-05Permit Standpipe — Permit Issued
2023-09-05Permit Sprinklers — Permit Issued
2023-09-05Permit Standpipe — Permit Issued
2023-09-05Permit Sprinklers — Permit Issued
2023-09-05Permit Plumbing — Permit Issued
2023-08-31Job filed: Seated ceremony for ribbon cutting event of studio opening. For invited guests only.
2023-08-31Job filed: Filing herewith plumbing work in exiting ground floor space. No change in use egress or occupancy.$6,500
2023-08-31Permit Standpipe — Permit Issued
2023-08-31Permit Plumbing — Permit Issued
2023-08-31Permit Plumbing — Permit Issued
2023-08-31Permit Standpipe — Permit Issued
2023-08-30Job filed: INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2023-08-30Job filed: INSTALL EXHAUST VENT FOR NEW HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2023-08-30Permit General Construction — Signed-off
2023-08-30Permit General Construction — Signed-off
2023-08-15Job filed: Split existing gas load to separate meters for con ed usage to allow proper operation of kitchen$45,000
2023-08-15Permit General Construction — Signed-off
2023-08-15Permit General Construction — Signed-off
2023-08-11Job filed: Northwell Health Cath Lab 3 Project: modify Plumbing and Sprinkler systems @ portion of 2nd floor to conform with new room layout as per plans filed h$27,700
2023-08-11Job filed: Northwell Health Cath Lab 3 Project: modify Mechanical systems to conform with new layouts as per plans filed herewith.$403,600
2023-08-10Job filed: Northwell Health - Women's Hospital Fire Pump Project: extend new 8" Fire Service piping through basement of building and underground to connect to ne$152,143
2023-08-10Job filed: Northwell LIJ Fire Pump Project: install final run of Fire Service piping @ Cellar Fire Pump Rm; install RPZ & misc. PL for same; install final run of$865,827
2023-08-10Job filed: Northwell Health Cath Lab 3 Project: structural work (support framing for medical equipment) in conjunction with Cath Lab 2 interior renovations as pe$35,050
2023-08-10Permit General Construction — Signed-off
2023-08-10Permit General Construction — Signed-off
2023-08-04Job filed: Northwell LIJ Main Building: modify mechanical systems in Fire Pump room to accommodate new fire service upgrades, as per plans filed herewith. Scope $18,925
2023-08-01FDNY inspection (RISK)
2023-08-01Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2023-08-01Permit General Construction — Signed-off
2023-08-01Permit General Construction — Signed-off
2023-07-31Job filed: Northwell LIJ Main Building: Rearrange/install non-bearing partitions, install hung ceiling, wall & floor finishes for new Fire Pump Room, as per plan$750,661
2023-07-28Permit Plumbing — Signed-off
2023-07-26Job filed: Northwell LIJ Women's Hospital: modify mechanical systems infrastructure in Fire Pump rooms to accommodate new fire service in conjunction with Fire P$56,775
2023-07-25Job filed: Northwell LIJ Womens Hospital: rearrange/install non-bearing partitions, wall & floor finishes, as per plans filed herewith. No change in use, occupan$750,661
2023-07-18Job filed: INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2023-07-16311: Homeless Person Assistance
2023-07-16311: Homeless Person Assistance
2023-07-15Permit Structural — Signed-off
2023-07-15Permit General Construction — Signed-off
2023-07-14Certificate of occupancy Renewal Without Change
2023-07-13Job filed: Northwell LIJ Fire Pump Project: trenching in open space to accommodate new fire service piping from existing campus fire service loop; grading/restor$57,500
2023-07-13Job filed: Northwell Health - Women's Hospital Fire Pump Project: install new 8" Fire Service connection to existing hospital campus loop on private property in $297,970
2023-06-14Permit General Construction — Signed-off
2023-06-14Permit Structural — Signed-off
2023-06-14Permit EW — ISSUED
2023-06-13Permit General Construction — Signed-off
2023-06-09Permit Plumbing — Signed-off
2023-06-05Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2023-06-02Permit Mechanical Systems — Signed-off
2023-05-19FDNY inspection (RISK)
2023-05-15Boiler inspection
2023-05-15Boiler inspection
2023-05-15Boiler inspection
2023-05-12Permit General Construction — Signed-off
2023-05-12Permit General Construction — Signed-off
2023-05-11Permit Mechanical Systems — Signed-off
2023-05-11Permit Sprinklers — Signed-off
2023-05-11Permit Mechanical Systems — Signed-off
2023-05-11Permit Sprinklers — Signed-off
2023-05-09Permit Sprinklers — Signed-off
2023-05-09Permit Sprinklers — Signed-off
2023-05-05Permit Plumbing — Signed-off
2023-05-05Permit Plumbing — Signed-off
2023-05-04Permit PL — ISSUED
2023-05-02FDNY inspection (RISK)
2023-05-02Job filed: REMOVAL/INSTALLATION OF NEW/EXISTING PLUMBING FIXTURES AS PER PLANS$65,000
2023-05-02Job filed: Northwell LIJ Medical Center: modify plumbing and sprinkler systems to conform to new layout for Seacrest Studio interior alteration, as per plans fil$82,715
2023-05-01Job filed: THE MECHANICAL SCOPE IS TO PROVIDE ALL REQUIRED WORK AND MODIFICATIONS INSUPPORT OF THE NEW SEWAGE PUMP TO BE INSTALLED WITHIN THE EXISTING CELLARMEN'$25,000
2023-05-01Job filed: THE PLUMBING SCOPE IS TO PROVIDE A NEW SEWAGE PUMP WITHIN THE EXISTING CELLARMEN'S BATHROOM FOOTPRINT TO SERVE EXISTING PLUMBING FIXTURES$25,000
2023-05-01Job filed: THE ARHITECTURAL SCOPE IS TO PROVIDE ALL REQUIRED GENERAL CONSTRUCTION WORK AND MODIFICATIONS IN SUPPORT OF THE NEW SEWAGE PUMP TO BE INSTALLED WITHIN$100,000
2023-05-01Job filed: THE FIRE PROTECTION SCOPE IS TO PROVIDE ALL REQUIRED WORK AND MODIFICATIONS AS ARESULT OF THE NEW SEWAGE PUMP TO BE INSTALLED WITHIN THE EXISTING CELL$21,000
2023-04-27311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2023-04-27DOB complaint, category ?
2023-04-26Job filed: Filing herewith drawings indicating the modification to the existing sprinkler system on the 1st floor. No change in use, egress, or occupancy under t$24,973
2023-04-11Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-04-10Permit General Construction — Signed-off
2023-04-10Permit General Construction — Signed-off
2023-03-31311: For Hire Vehicle Complaint — Car Service Company Complaint
2023-03-22Job filed: Filing herewith new interior partitions, new doors, finishes and lighting in existing ground floor and first floor space. No change in use, egress or $80,001
2023-03-21Job filed: Filing herewith plumbing on existing ground floor and 1st floor space. No change in use, egress or occupancy.$25,000
2023-03-21Job filed: Filing herewith mechanical work on existing Ground floor and 1st floor space. No change in use egress or occupancy.$150,003
2023-03-17Permit EW — ISSUED
2023-03-17Permit EW — ISSUED
2023-03-16Job filed: Northwell LIJ Medical Center: Phase 6: rearrange interior, non-bearing partitions, install hung ceiling, wall and floor finishes; no change to use, oc$95,000
2023-03-15Job filed: Northwell LIJ Medical Center: Phase 6: modify existing Mechanical systems to conform to new layouts; no change to use, occupancy or egress under this $100,000
2023-03-15Job filed: Northwell LIJ Medical Center: Phase 6: modify existing Plumbing and Sprinkler systems to conform to new layouts; no change to use, occupancy or egress$32,000
2023-03-14Job filed: Northwell LIJ Medical Center Littauer Building: remove smoke stack no longer in use down to roof level, and cap same. Repair existing building roof &$509,000
2022-12-19Job filed: Northwell: LIJ Medical Center Zucker Hillside BHP: modify mechanical systems (associated ducts & piping) to conform with new room layout as per plans $69,900
2022-12-19Job filed: Northwell: LIJ Medical Center Zucker Hillside BHP: modify plumbing and sprinkler systems to conform with new layouts at a portion of second floor as p$7,900
2022-12-15Job filed: Northwell LIJ Medical Center: Pediatric Wellness & Holistic Services: modify existing HVAC infrastructure to conform with new room lay-outs as per pla$304,800
2022-12-15Job filed: Northwell LIJ Medical Center: Pediatric Wellness & Holistic Services: modify plumbing and sprinkler systems to conform to new room layouts at portion $66,400
2022-12-09Permit General Construction — Signed-off
2022-12-09Permit General Construction — Signed-off
2022-12-07Cooling tower inspection
2022-12-05Mortgage satisfied — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON
2022-12-05Job filed: Northwell LIJ Medical Center: Pediatric Wellness/Holistic Services: minor interior renovations, as per plans filed herewith; no change in use, occupan$541,800
2022-11-29Certificate of occupancy Renewal Without Change
2022-11-21Job filed: Northwell LIJ Medical Center: herewith filing for minor structural scope in conjunction with Seacrest Studio interior alteration, as per plans filed h$40,500
2022-11-21Permit Mechanical Systems — Permit Issued
2022-11-17Permit Mechanical Systems — Permit Issued
2022-11-17Permit Mechanical Systems — Permit Issued
2022-11-16Permit Plumbing — Signed-off
2022-11-15Job filed: INSTALL EXHAUST VENT FOR NEW HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2022-11-15Job filed: INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2022-11-15Permit General Construction — Signed-off
2022-11-15Permit General Construction — Signed-off
2022-11-04Job filed: Northwell LIJ Medical Center: modifications to existing HVAC infrastructure to conform to new layout for Seacrest Studio interior alteration, as per p$263,000
2022-11-04Job filed: Northwell LIJ Medical Center: modify plumbing and sprinkler systems to conform to new layout for Seacrest Studio interior alteration, as per plans fil$82,715
2022-11-03Job filed: Northwell Health: Seacrest Studio: rearrange interior partitions, install wall and floor finishes, hung ceiling, at portion of 1st floor; no change to$1,190,700
2022-11-01Job filed: Northwell LIJ Medical Center: CT Scanner Project: rearrange HVAC infrastructure to serve new room layout for CT Scanner, as per plans filed herewith.$25,000
2022-11-01Job filed: Northwell LIJ Medical Center: CT Scanner project: rearrange interior, non-bearing partitions, install hung ceiling, wall & floorfinishes as per plans $35,000
2022-10-31Boiler inspection
2022-10-31Boiler inspection
2022-10-31Boiler inspection
2022-10-31Boiler inspection
2022-10-31Boiler inspection
2022-10-26Job filed: PROPOSED DEMO/INSTALL OF NON-LOAD BEARING PARTITIONS, FIXTURES & FINISHES + COSMETIC UPGRADES FOR PANERA BREAD AT LONG ISLAND JEWISH MEDICAL CENTER AS$560,000
2022-10-20Job filed: PROPOSED MODIFICATION TO EX. DUCT WORK AS PER PLANS ON 1ST FL OF LIJ MEDICAL CENTER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,000
2022-10-20Job filed: REMOVAL/INSTALLATION OF NEW/EXISTING PLUMBING FIXTURES AS PER PLANS$65,000
2022-10-17Boiler inspection
2022-10-12Boiler inspection
2022-10-03Boiler inspection
2022-09-29ECB CLASS - 2 violation: 97R5: DEVICE WAS ILLEGALLY INSTALLED WITHOUT FILING AND OBTAINING AN APPLICATION WITH THE DOB. TWO DUMBWAITERS WAS INSTALLED WITHO$1,250
2022-09-29ECB CLASS - 2 violation: 97R5: DEVICE WAS ILLEGALLY INSTALLED WITHOUT FILING AND OBTAINING AN APPLICATION WITH THE DOB. TWO DUMBWAITERS WAS INSTALLED WITHO$1,250
2022-09-28311: Elevator — Elevator - Multiple Devices On Property
2022-09-07Job filed: PROPOSED DEMO/INSTALL OF NON-LOAD BEARING PARTITIONS, FIXTURES & FINISHES + COSMETIC UPGRADES FOR PANERA BREAD AT LONG ISLAND JEWISH MEDICAL CENTER AS$560,000
2022-09-07Certificate of occupancy Renewal Without Change
2022-09-06FDNY inspection (RISK)
2022-08-31Elevator permit: FURNISH AND INSTALL NEW STAINLESS STEEL DUMBWAITER AS PER DRAWINGS ALL WORK/INSTALLATION TO COMPLY WITH ASME A17.1-2000/2003 (A17.$191,000
2022-08-30311: Noise — Noise: lawn care equipment (NCL)
2022-07-29Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2022-06-27311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2022-06-22Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2022-06-22Certificate of occupancy Renewal Without Change
2022-06-13Permit PL — ISSUED
2022-06-09Permit PL — ISSUED
2022-06-03FDNY inspection (RISK)
2022-05-06Cooling tower inspection
2022-05-04Elevator permit: DISMANTLE ELEVATOR -All work to comply with ASME A17.1/2000 with supplements A17.1a-2002 and A17.1b-2003, as modified by NYC 201$10,000
2022-02-02Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
2021
2021-12-22311: Street Sign - Dangling — Other/Unknown
2021-12-08Certificate of occupancy Renewal Without Change
2021-12-01311: Elevator — Elevator - Multiple Devices On Property
2021-12-01DOB violation E:
2021-12-01DOB complaint, category ?
2021-11-29DOB violation E:
2021-11-29DOB violation E:
2021-11-29DOB violation E:
2021-11-29DOB violation E:
2021-11-29DOB violation E:
2021-11-29DOB violation E:
2021-11-24DOB violation E:
2021-11-24DOB violation E:
2021-11-23Boiler inspection
2021-11-23Boiler inspection
2021-11-23Boiler inspection
2021-11-23DOB violation E:
2021-11-23DOB violation E:
2021-11-23DOB violation E:
2021-11-23DOB violation E:
2021-11-17Permit EW — ISSUED
2021-11-15Permit PL — ISSUED
2021-10-27Permit EW — ISSUED
2021-10-27Permit EW — ISSUED
2021-10-26Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2021-10-26Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2021-10-26Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2021-10-26Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2021-10-18Boiler inspection
2021-10-15FDNY inspection (RISK)
2021-10-11Boiler inspection
2021-10-04Boiler inspection
2021-10-01Certificate of occupancy Initial
2021-10-01Permit EW — ISSUED
2021-09-09Permit PL — ISSUED
2021-08-25Permit EW — ISSUED
2021-08-25Permit EW — ISSUED
2021-08-18Permit AL — ISSUED
2021-07-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-14Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2021-07-13Boiler inspection
2021-07-13Boiler inspection
2021-07-13Boiler inspection
2021-07-13Boiler inspection
2021-07-13Boiler inspection
2021-07-02Permit PL — ISSUED
2021-07-01FDNY inspection (RISK)
2021-06-30FDNY inspection (RISK)
2021-06-28Asbestos abatement: Removal — PAR Environmental Corporation
2021-06-24Permit EW — ISSUED
2021-06-24Permit EW — ISSUED
2021-06-22Permit EW — ISSUED
2021-06-22Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-21Permit EW — ISSUED
2021-06-18Permit EW — ISSUED
2021-06-18Permit EW — ISSUED
2021-06-18Permit EW — ISSUED
2021-06-18Permit EW — ISSUED
2021-06-18Permit EW — ISSUED
2021-06-18Permit EW — ISSUED
2021-06-02Elevator permit: REGROOVE TRACTION SHEAVE ALL WORK TO COMPLY WITH ASME/ANSI A 17.1 2000/2003, CHAPTER 30, APPENDIX K.ALL TEST TO COMPLY WITH OPPN 2$20,000
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-26Permit EW — ISSUED
2021-05-22311: Noise — Noise: air condition/ventilation equipment (NV1)
2021-05-22311: Noise — Noise: Construction Equipment (NC1)
2021-05-12FDNY inspection (RISK)
2021-05-05Permit Mechanical Systems — Signed-off
2021-05-05Permit Mechanical Systems — Signed-off
2021-04-29Elevator permit: REGROOVE TRACTION SHEAVE AND REPLACE HOIST CABLES.ALL WORK TO COMPLY WITH ASME/ANSI A 17.1 2000/2003, CHAPTER 30, APPENDIX K.ALL T$10,000
2021-04-29Elevator permit: REGROOVE TRACTION SHEAVE AND REPLACE HOIST CABLES,ALL WORK TO COMPLY WITH ASME/ANSI A 17.1 2000/2003, CHAPTER 30, APPENDIX K.ALL T$10,000
2021-04-20Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$16,000
2021-04-13FDNY inspection (RISK)
2021-03-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-03-11Boiler inspection
2021-03-11Boiler inspection
2021-03-11Boiler inspection
2021-03-11Boiler inspection
2021-03-11Boiler inspection
2021-03-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-03-03Permit Sidewalk Shed — Signed-off
2021-03-02311: NonCompliance with Phased Reopening — Business not in compliance
2021-03-02Permit Sidewalk Shed — Signed-off
2021-02-26Cooling tower inspection
2021-02-12311: Noise — Noise, Barking Dog (NR5)
2021-02-02Cooling tower inspection
2021-01-29Permit Mechanical Systems — Signed-off
2021-01-29Permit Mechanical Systems — Signed-off
2021-01-29Permit AL — ISSUED
2021-01-25311: Damaged Tree — Branch or Limb Has Fallen Down
2021-01-13Permit EW — ISSUED
2020
2020-12-21311: Elevator — Elevator - Multiple Devices On Property
2020-12-21311: Elevator — Elevator - Multiple Devices On Property
2020-12-21ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER$1,250
2020-12-21ECB CLASS - 2 violation: THE ELEVATOR IN SECTION OF BUILDING OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT-OF-SERVICE CREATING A HAZARDOUS$625
2020-08-31311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-13Permit Mechanical Systems — Signed-off
2020-08-13Permit Mechanical Systems — Signed-off
2020-08-06Job filed: NORTHWELL HEALTH: VISITOR PARKING GARAGE: RE-STRIPING OF EXISTING OPEN PARKING GARAGE AS PER PLANS FILED HEREWITH.
2020-07-28Job filed: NORTHWELL HEALTH: VISITORS PARKING GARAGE: RE-STRIPING OF EXISTING PARKING GARAGE RESULTING IN A REDUCTION TO THE NUMBER OF PARKING SPACES. DOCUMENT 0$60,000
2020-07-28Job filed: NORTHWELL HEALTH: VISITORS PARKING GARAGE: RE-STRIPING OF EXISTING PARKING GARAGE RESULTING IN A REDUCTION TO THE NUMBER OF PARKING SPACES. DOCUMENT 0$60,000
2020-07-08Permit PL — ISSUED
2020-07-07Permit EQ — ISSUED
2020-07-01Permit EW — ISSUED
2020-06-29Boiler inspection
2020-06-24Elevator permit: NEW CONTROLLER,HYDRAULIC RUPTURE VALVE and SHUT OFF,HYDRAULIC JACK AND PISTON,HEADER and OPERATOR,TRACKS,HANGERS,LOCKS,CLOSERS,CAR$198,000
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-16Permit Sprinklers — Signed-off
2020-06-16Permit Sprinklers — Signed-off
2020-05-30Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2020-05-30Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2020-05-26Asbestos abatement: Removal — PAR Environmental Corporation
2020-05-26Asbestos abatement: Removal — PAR Environmental Corporation
2020-05-26Asbestos abatement: Removal — PAR Environmental Corporation
2020-05-26Asbestos abatement: Removal — PAR Environmental Corporation
2020-05-26Asbestos abatement: Removal — PAR Environmental Corporation
2020-05-20Job filed: Northwell Health: Separation of Branches Phase 1: installation of split A/C systems to service new emergency electrical service rooms.$600,000
2020-04-24Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2020-04-24Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2020-04-24Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2020-04-24Permit EW — ISSUED
2020-04-17Permit Sprinklers — Signed-off
2020-04-17Permit Sprinklers — Signed-off
2020-04-17Permit Plumbing — Signed-off
2020-04-17Permit Plumbing — Signed-off
2020-04-17Permit Plumbing — Signed-off
2020-04-17Permit Sprinklers — Signed-off
2020-04-17Permit Plumbing — Signed-off
2020-04-17Permit Sprinklers — Signed-off
2020-04-16Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$32,000
2020-04-16Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$64,000
2020-04-16Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$80,000
2020-04-16Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$32,000
2020-04-14Permit Sidewalk Shed — Signed-off
2020-04-10Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2020-04-09Permit Mechanical Systems — Signed-off
2020-04-09Permit Mechanical Systems — Signed-off
2020-04-03Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$16,000
2020-03-25Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$64,000
2020-03-25Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$32,000
2020-03-25Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$128,000
2020-03-24Job filed: Northwell Health PACU Decanting Sleep Lab: modify existing plumbing and sprinkler systems to conform with new room layouts at portion of 4th floor.$105,000
2020-03-23Job filed: Northwell PACU Decanting Sleep Lab: modify portion of existing 4th floor Mechanical system to conform with new room layouts.$220,000
2020-03-20Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$16,000
2020-03-19Job filed: NORTHWELL PACU DECANTING SLEEP LAB: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FILED HEREW$300,000
2020-03-19Job filed: NORTHWELL PACU DECANTING SLEEP LAB: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FILED HEREW$300,000
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-13Permit EW — ISSUED
2020-03-13Permit EW — ISSUED
2020-02-28Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-28Permit Construction Fence — Signed-off
2020-02-28Permit Construction Fence — Signed-off
2020-02-26Permit Standpipe — Signed-off
2020-02-26Permit Sprinklers — Signed-off
2020-02-25Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-21Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$64,000
2020-02-06Job filed: Northwell LIJ DAEHERS Project: installation of (1) floor riser/control valve on existing combined sprinkler/standpipe system in conjunction with BIS j$2,500
2020-02-03Permit EW — ISSUED
2020-01-30Permit PL — ISSUED
2020-01-28Permit Sprinklers — Signed-off
2020-01-28Permit Sprinklers — Signed-off
2020-01-23Permit EW — ISSUED
2020-01-23Permit EW — ISSUED
2020-01-06Permit Sidewalk Shed — Signed-off
2020-01-02Job filed: REPLACE 2 CHILLERS AND HEAT EXCHANGER WITH ASSOCIATED PIPING AND INSULATION$430,000
2019-12-27Job filed: Northwell Health: modify existing plumbing and sprinkler systems to conform with new room layouts.$73,000
2019-12-23Permit Sprinklers — Signed-off
2019-12-23Permit Sprinklers — Signed-off
2019-12-18Job filed: NORTHWELL HEALTH: REPAIRS TO EXISTING VISITOR'S PARKING GARAGE AS PER PLANS FILED HEREWITH; NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATI$5,220,000
2019-12-18Job filed: NORTHWELL HEALTH: REPAIRS TO EXISTING VISITOR'S PARKING GARAGE AS PER PLANS FILED HEREWITH; NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATI$5,220,000
2019-12-16Permit Construction Fence — Signed-off
2019-12-16Permit Construction Fence — Signed-off
2019-12-12Elevator permit: FURNISH AND INSTALLONE NEW VERTICAL WHEELCHAIR LIFT TOTAL TRAVEL 2'$22,000
2019-12-12Elevator permit: FURNISH AND INSTALL ONE VERTICAL WHEELCHAIR LIFT- OUTDOOR PARKING LOT TO FIRST FLOOR. TOTAL TRAVEL 3'10"$22,000
2019-12-12Job filed: Northwell Health CT Surgery (Decanting): rearrange existing HVAC system to conform with new room layouts$145,000
2019-12-09Job filed: NORTHWELL HEALTH:REPAIRS TO EXISTING EMPLOYEE PARKING GARAGE AS PER PLANS FILED HEREWITH; NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$4,258,000
2019-12-09Job filed: NORTHWELL HEALTH:REPAIRS TO EXISTING EMPLOYEE PARKING GARAGE AS PER PLANS FILED HEREWITH; NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$4,258,000
2019-12-09Job filed: NORTHWELL HEALTH:REPAIRS TO EXISTING EMPLOYEE PARKING GARAGE AS PER PLANS FILED HEREWITH; NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$4,258,000
2019-12-05311: Asbestos — N/A
2019-12-03ECB CLASS - 2 violation: 100-R-9, 60-I-11.100/R/9 REMOVE SPRINKLER HEAD ABOVE MAIN LINE DISCONNECT IN ELEVATOR MACHINE SPACE. 60/I/11 REPLACE DAMAGED LIGHT$625
2019-12-02Elevator permit: FURNISH AND INSTALL NEW MACHINE,HOIST CABLES,CONTROLLER,GOVERNOR and TENSION SHEAVE,GOVERNOR ROPE,CAR STATION,HALL LANTERNS,HALL B$391,000
2019-09-20Job filed: Northwell Health: Separation of Branches Phase 1: installation of split A/C systems to service new emergency electrical service rooms.$600,000
2019-09-17Permit Sprinklers — Signed-off
2019-09-17Permit Sprinklers — Signed-off
2019-09-09Asbestos abatement: Removal — PAR Environmental Corporation
2019-09-09Asbestos abatement: Removal — PAR Environmental Corporation
2019-09-09Asbestos abatement: Removal — PAR Environmental Corporation
2019-09-09Asbestos abatement: Removal — PAR Environmental Corporation
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-05Job filed: NORTHWELL HEALTH SEPARATION OF BRANCHES PHASE 1: MODIFY EXISTING SPRINKLER SYSTEM TO CONFORM TO NEW LAY-OUTS AS PER PLANS FILED HEREWITH.$30,000
2019-08-30Permit EW — ISSUED
2019-08-20Job filed: NORTHWELL HEALTH SEPARATION OF BRANCHES: REARRANGE INTERIOR NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AT PORTION OF BASEME$1,900,000
2019-08-13Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. -All work to comply with AS$50,000
2019-08-12DOB complaint, category ?
2019-08-12ECB CLASS - 2 violation: B 254 FOUND BECKETT CG25 GAS FIRED BURNER NOT REGISTERED, REGISTER THE BURNER AND SUBMIT A CERTIFICATE OF CORRECTION$3,125
2019-08-12Job filed: Northwell Health: modify existing plumbing and sprinkler systems to conform with new room layouts.$73,000
2019-08-08Job filed: Northwell Health CT Surgery (Decanting): rearrange existing HVAC system to conform with new room layouts$145,000
2019-08-06Permit PL — ISSUED
2019-08-01Permit EW — ISSUED
2019-08-01Permit EW — ISSUED
2019-07-30Job filed: NORTHWELL HEALTH: PACU / DECANTING PROJECT: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES. NO CHANGE IN US$380,000
2019-07-30Permit EW — ISSUED
2019-07-30Permit EW — ISSUED
2019-07-30Permit EW — ISSUED
2019-07-30Permit EW — ISSUED
2019-07-25Job filed: Northwell Health Cohen Children's Hospital: installation of Temporary Sprinkler loop in conjunction with fit out of shell space filed separately under$12,800
2019-07-08Permit EW — ISSUED
2019-07-08Permit EW — ISSUED
2019-07-08Permit EW — ISSUED
2019-07-05Permit PL — ISSUED
2019-07-01Permit EW — ISSUED
2019-07-01Permit EW — ISSUED
2019-06-21Asbestos abatement: Removal — PAR Environmental Corporation
2019-06-21Asbestos abatement: Removal — PAR Environmental Corporation
2019-06-21Asbestos abatement: Removal — PAR Environmental Corporation
2019-06-21Asbestos abatement: Removal — PAR Environmental Corporation
2019-06-21Asbestos abatement: Removal — PAR Environmental Corporation
2019-06-21Asbestos abatement: Removal — PAR Environmental Corporation
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-21Boiler inspection
2019-06-19Permit EW — ISSUED
2019-06-12Permit EQ — ISSUED
2019-06-11Permit EW — ISSUED
2019-06-03Job filed: NORTHWELL HEALTH MORRIS LOWENSTEIN BLDG: REPLACE SPRINKLER HEADS ON FIRST FLOOR OF EXISTING BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS$26,000
2019-06-01311: Other Enforcement — E2A Storage Of Receptacles
2019-04-26Asbestos abatement: Removal — ETS Contracting, Inc.
2019-04-26Asbestos abatement: Removal — ETS Contracting, Inc.
2019-04-26311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2019-04-25Permit EW — ISSUED
2019-04-22FDNY inspection (OTHER)
2019-04-12Asbestos abatement: Removal — ETS Contracting, Inc.
2019-04-12Asbestos abatement: Removal — ETS Contracting, Inc.
2019-04-12Asbestos abatement: Removal — ETS Contracting, Inc.
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-29Job filed: NEUROSCIENCE PROJECT: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM TO NEW ROOM LAYOUTS AT PORTION OF 2ND FLOOR.$1,029,000
2019-03-27Job filed: NEUROSCIENCE PROJECT: REARRANGE INTERIOR NON-BEARING PARTITIONS, INSTALL WALL AND FLOOR FINISHES, HUNG CEILING @ PORTION OF SECOND FLOOR. NO CHANGE IN$300,000
2019-03-26Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM.$38,000
2019-03-24FDNY inspection (EDU)
2019-03-21Permit EW — ISSUED
2019-03-13Permit PL — ISSUED
2019-03-12Job filed: CAFETERIA: INSTALL HALF WALL IN PORTION OF CAFETERIA.$12,000
2019-03-12Job filed: CAFETERIA: INSTALL HALF WALL IN PORTION OF CAFETERIA.$12,000
2019-03-12Permit EW — ISSUED
2019-03-12Permit EW — ISSUED
2019-03-02Asbestos abatement: Removal — PAR Environmental Corporation
2019-03-02Asbestos abatement: Removal — PAR Environmental Corporation
2019-03-02Asbestos abatement: Removal — PAR Environmental Corporation
2019-02-26Job filed: LIJ NORTHWELL: STRUCTURAL WORK IN CONJUNCTION WITH PACU PROJECT AS PER PLANS FILED HEREWITH.$272,000
2019-02-26Job filed: NORTHWELL HEALTH: PACU: MODIFY EXISTING PLUMBING, MECHANICAL, SPRINKLER AND STANDPIPE SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$3,798,000
2019-02-26Job filed: LIJ NORTHWELL: STRUCTURAL WORK IN CONJUNCTION WITH PACU PROJECT AS PER PLANS FILED HEREWITH.$272,000
2019-02-26Job filed: NORTHWELL HEALTH: PACU: MODIFY EXISTING PLUMBING, MECHANICAL, SPRINKLER AND STANDPIPE SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$3,798,000
2019-02-05Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 5: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS$158,000
2019-02-05Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 6: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS$456,000
2019-01-30311: Homeless Person Assistance
2019-01-30311: Homeless Person Assistance
2019-01-30Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 3 + 4: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS$456,000
2019-01-30Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 3 + 4: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS$456,000
2019-01-30Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 3 + 4: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS$456,000
2019-01-28Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 2: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$695,000
2019-01-28Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 2: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$695,000
2019-01-24Permit EW — ISSUED
2019-01-24Permit EW — ISSUED
2019-01-24Permit EW — ISSUED
2019-01-23Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM.$33,000
2019-01-23Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 5: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FIL$204,000
2019-01-23Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 2: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FIL$893,000
2019-01-23Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$9,000
2019-01-23Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 2: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FIL$893,000
2019-01-23Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 6: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FIL$740,000
2019-01-23Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM.$33,000
2019-01-09Cooling tower inspection
2019-01-09Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 1: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$99,446
2019-01-09Job filed: NORTHWELL HEALTH: FIT-OUT OF PEDIATRIC O.R. SHELL SPACE: MODIFY BASE BUILDING PLUMBING, MECHANICAL, SPRINKLER AND STANDPIPE SYSTEMS TO CONFORM WITH FI$5,871,700
2019-01-09Job filed: NORTHWELL HEALTH: STRUCTURAL WORK IN CONJUNCTION WITH FIT-OUT OF 1ST FLOOR PEDIATRIC O.R. SHELL SPACE IN CHILDREN'S HOSPITAL, INCLUDING INSTALLATION $299,900
2019-01-09Job filed: NORTHWELL HEALTH: FIT-OUT OF PEDIATRIC O.R. SHELL SPACE: MODIFY BASE BUILDING PLUMBING, MECHANICAL, SPRINKLER AND STANDPIPE SYSTEMS TO CONFORM WITH FI$5,871,700
2019-01-09Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 1: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$99,446
2019-01-09Job filed: NORTHWELL HEALTH: STRUCTURAL WORK IN CONJUNCTION WITH FIT-OUT OF 1ST FLOOR PEDIATRIC O.R. SHELL SPACE IN CHILDREN'S HOSPITAL, INCLUDING INSTALLATION $299,900
2019-01-08Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$5,683
2019-01-08Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$5,683
2019-01-08Job filed: NORTHWELL HEALTH: PACU DECANTING PHASE 1: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FILED$127,650
2019-01-08Job filed: NORTHWELL HEALTH: FIT-OUT OF 1ST FLOOR PEDIATRIC O.R. SHELL SPACE IN CHILDREN'S HOSPITAL. INSTALL/REARRANGE INTERIOR, NON-BEARING PARTITIONS, HUNG CEI$14,931,974
2019-01-08Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$301,000
2019-01-04Permit EW — ISSUED
2019-01-04Permit EW — ISSUED
2019-01-04Permit EW — ISSUED
2018
2018-12-28Boiler inspection — defects found
2018-12-28Boiler inspection — defects found
2018-12-28Boiler inspection — defects found
2018-12-27Permit Sidewalk Shed — Signed-off
2018-12-27Permit Sidewalk Shed — Signed-off
2018-12-26Permit Construction Fence — Signed-off
2018-12-26Permit Construction Fence — Signed-off
2018-12-24Job filed: LITTAUER: STRUCTURAL WORK IN CONJUNCTION WITH BASEMENT RENOVATION, INCLUDING REPLACEMENT OF EXTERIOR STAIR AND INFRASTRUCTURE FOR INSTALLATION OF ADA $232,000
2018-12-24Job filed: LITTAUER: STRUCTURAL WORK IN CONJUNCTION WITH BASEMENT RENOVATION, INCLUDING REPLACEMENT OF EXTERIOR STAIR AND INFRASTRUCTURE FOR INSTALLATION OF ADA $232,000
2018-12-24Job filed: LITTAUER BLDG: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW LAYOUTS AT PORTION OF EXISTING BASEMENT.$707,000
2018-12-24Job filed: LITTAUER BLDG: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW LAYOUTS AT PORTION OF EXISTING BASEMENT.$707,000
2018-12-20Job filed: LITTAUER: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL WALL AND FLOOR FINISHES, HUNG CEILING, AT PORTION OF BASEMENT. NO CHANGE TO USE, OPCCUPA$321,000
2018-12-20Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$33,000
2018-12-20Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$33,000
2018-12-16311: Homeless Person Assistance
2018-12-03Job filed: MODIFICATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH 421318096 AND 421598890$20,000
2018-12-03Job filed: MODIFICATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH 421318096 AND 421598890$7,000
2018-12-03Job filed: MODIFICATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH 421318096 AND 421598890$20,000
2018-11-15Boiler inspection
2018-11-15Boiler inspection
2018-11-15Boiler inspection
2018-11-15Boiler inspection
2018-11-15Boiler inspection
2018-11-09Asbestos abatement: Removal — PAR Environmental Corporation
2018-11-01DOB violation E:
2018-10-30Permit EW — ISSUED
2018-10-30Permit EW — ISSUED
2018-10-29Permit EW — ISSUED
2018-10-23Boiler inspection
2018-10-17Boiler inspection
2018-10-10Permit PL — ISSUED
2018-10-09Boiler inspection
2018-10-09Job filed: DUNNAGE STEEL IN CONJUNCTION WITH MECHANICAL WORK AS PER DRAWING.$75,000
2018-10-09Job filed: DUNNAGE STEEL IN CONJUNCTION WITH MECHANICAL WORK AS PER DRAWING.$75,000
2018-10-09Permit EW — ISSUED
2018-10-09Permit EW — ISSUED
2018-10-09Permit EW — ISSUED
2018-10-08Permit EW — ISSUED
2018-10-08Permit EW — ISSUED
2018-10-08Permit EW — ISSUED
2018-10-05Permit EW — ISSUED
2018-10-04Asbestos abatement: Removal — JVN Restoration Inc.
2018-10-02Boiler inspection
2018-10-02Boiler inspection
2018-10-02Boiler inspection
2018-10-02Boiler inspection
2018-10-02Boiler inspection
2018-10-01Job filed: MODIFICATION TO EXISTING ALARM SYSTEM$10,000
2018-10-01Job filed: MODIFICATION TO EXISTING ALARM SYSTEM$10,000
2018-09-25Permit EW — ISSUED
2018-09-15Asbestos abatement: Removal — ETS Contracting, Inc.
2018-09-15Asbestos abatement: Removal — ETS Contracting, Inc.
2018-09-07Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$15,000
2018-09-07DOB complaint, category ?
2018-09-07Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$15,000
2018-09-07Job filed: LIJ NORTHWELL HEALTH: STRUCTURAL SCOPE IN CONJUNCTION WITH NEW ATS MECHANICAL ROOM ON PORTION OF SECOND-STORY ROOF AS PER PLANS FILED HEREWITH.$35,000
2018-09-07Job filed: LIJ NORTHWELL HEALTH: HEREWITH FILING ARCHITECTURAL PLANS IN CONJUNCTION WITH CONSTRUCTION OF ATS MECHANICAL ROOM AT PORTION OF 2ND FLOOR ROOF.$85,000
2018-09-07Job filed: LIJ NORTHWELL HEALTH: STRUCTURAL SCOPE IN CONJUNCTION WITH NEW ATS MECHANICAL ROOM ON PORTION OF SECOND-STORY ROOF AS PER PLANS FILED HEREWITH.$35,000
2018-09-07Job filed: LIJ NORTHWELL HEALTH: HEREWITH FILING ARCHITECTURAL PLANS IN CONJUNCTION WITH CONSTRUCTION OF ATS MECHANICAL ROOM AT PORTION OF 2ND FLOOR ROOF.$85,000
2018-09-06Job filed: NORTHWELL LIJ: CONSTRUCT ENCLOSURE FOR NEW ATS MECHANICAL ROOM (AUTOMATIC TRANSFER SWITCH FOR EMERGENCY POWER)AT PORTION OF SECOND FLOOR ROOF.$30,000
2018-09-05Asbestos abatement: Cleanup — PAR Environmental Corporation
2018-09-05Asbestos abatement: Removal — PAR Environmental Corporation
2018-09-05Asbestos abatement: Removal — PAR Environmental Corporation
2018-08-23DOB complaint, category ?
2018-08-22Permit EW — ISSUED
2018-08-22Permit EW — ISSUED
2018-08-14Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-14Permit EW — ISSUED
2018-08-14Permit EW — ISSUED
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-10Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-08311: Homeless Person Assistance
2018-08-06Job filed: REPLACE 6250 CFM AIR HANDLER UNIT, NEW DUCTWORK AND NEW GYLCOL PIPING, NEW STEAM COIL AND HUMIDIFIER$200,000
2018-08-06Job filed: REPLACE 6250 CFM AIR HANDLER UNIT, NEW DUCTWORK AND NEW GYLCOL PIPING, NEW STEAM COIL AND HUMIDIFIER$200,000
2018-08-03Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-03Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-03Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-03Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-03Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-03Asbestos abatement: Removal — ETS Contracting, Inc.
2018-08-02Asbestos abatement: Cleanup — PAR Environmental Corporation
2018-08-02Asbestos abatement: Removal — PAR Environmental Corporation
2018-07-27Asbestos abatement: Removal — ETS Contracting, Inc.
2018-07-27Asbestos abatement: Removal — ETS Contracting, Inc.
2018-07-27Asbestos abatement: Removal — ETS Contracting, Inc.
2018-07-27Asbestos abatement: Removal — ETS Contracting, Inc.
2018-07-12311: Hazardous Materials — Chemical Spill/Release (HA1)
2018-07-11311: Water System — Dirty Water (WE)
2018-07-11311: Water System — Dirty Water (WE)
2018-07-11311: Sanitation Condition — 22 Weeds
2018-07-06Permit EW — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-06Permit PL — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-06Permit PL — ISSUED
2018-07-06Permit PL — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-06Permit PL — ISSUED
2018-07-06Permit PL — ISSUED
2018-06-21Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM.$7,000
2018-06-21Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM$1,500
2018-06-21Job filed: INSTALLATION OF SECURITY BARRIER CHECK-POINT AT ENTRANCE OF ABOVE-REFERENCED PREMISES. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$308,000
2018-06-21Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM.$7,000
2018-06-21Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$10,000
2018-06-21Job filed: INSTALLATION OF SECURITY BARRIER CHECK-POINT AT ENTRANCE OF ABOVE-REFERENCED PREMISES. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$528,000
2018-06-21Job filed: INSTALLATION OF SECURITY BARRIER CHECK-POINT AT ENTRANCE OF ABOVE-REFERENCED PREMISES. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$97,500
2018-06-21Job filed: INSTALLATION OF SECURITY BARRIER CHECK-POINT AT ENTRANCE OF ABOVE-REFERENCED PREMISES. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$97,500
2018-06-08Job filed: INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-06-01Permit Sidewalk Shed — Signed-off
2018-06-01Permit Construction Fence — Signed-off
2018-05-31Job filed: INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-31Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-10Permit EW — ISSUED
2018-05-07Job filed: INSTALLATION OF CHAIN LINK FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-07Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-07Permit Construction Fence — Signed-off
2018-05-07Permit Sidewalk Shed — Signed-off
2018-05-03Elevator permit: INSTALLING SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF ELEVATOR WITH FAULTY DOOR CONTACTS CIRCUIT AS PER APPENDIX K3-3.10$16,000
2018-04-25Elevator permit: INSTALLING SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF ELEVATOR WITH FAULTY DOOR CONTACTS CIRCUIT AS PER APPENDIX K3-3.10$16,000
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-03-27Boiler inspection
2018-03-27Boiler inspection
2018-03-27Boiler inspection
2018-03-27Boiler inspection
2018-03-27Boiler inspection
2018-03-27DOB complaint, category ?
2018-03-27DOB complaint, category ?
2018-03-20FDNY inspection (NOV_AUD)
2018-03-15311: Street Condition — Pothole
2018-03-07Job filed: LITTAUER BLDG: MINOR STRUCTURAL SCOPE FILED IN CONJUNCTION WITH DUEL FUEL BOILER INSTALLATION, AS PER PLANS FILED HEREWITH.$30,000
2018-03-06Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$5,000
2018-03-06Job filed: A2$457,000
2018-03-06Job filed: A2$1,215,000
2018-03-06Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$5,000
2018-03-06Job filed: A2$1,215,000
2018-03-06Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$5,000
2018-03-06Job filed: A2$457,000
2018-03-06Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$5,000
2018-03-06Permit EW — ISSUED
2018-02-23Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2018-02-23Asbestos abatement: Removal — 192 Branch Interior Services, Inc.
2018-02-22Permit EW — ISSUED
2018-02-22Permit EW — ISSUED
2018-02-21Facade (LL11) filing, cycle 8: SWARMP
2018-02-21Facade (LL11) filing, cycle 8: SWARMP
2018-02-02Job filed: NEW 2-HOUR RATED FIRE ALARM EQUIPMENT CLOSET FILED IN CONJUNCTION WITH 421318096$170,000
2018-02-02Job filed: NEW 2-HOUR RATED FIRE ALARM EQUIPMENT CLOSET FILED IN CONJUNCTION WITH 421318096$170,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-23Job filed: LIJ NORTHWELL HEALTH: COHEN GME/PHARMACY: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM TO NEW FIT-OUT OF EXISTING SHELL SPACE$490,000
2018-01-23Job filed: COHEN GME / PHARMACY PROJECT: MINOR STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION AT PORTION OF CELLAR.$25,000
2018-01-23Job filed: COHEN GME / PHARMACY PROJECT: MINOR STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION AT PORTION OF CELLAR.$25,000
2018-01-19Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$20,000
2018-01-19Job filed: A2$500,000
2018-01-19Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$20,000
2017-10-25Job filed: LIJ NORTHWELL HEALTH INFUSION SUITE: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS AS PER PLANS FILED HE$436,000
2017-10-24Job filed: LIJ NORTHWELL HEALTH INFUSION SUITE: REARRANGE INTERIOR, NON-BEARING PARTITIONS, HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS FILED HEREWITH. NO$322,000
2017-10-24Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$40,000
2017-10-24Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$40,000
2017-10-18Job filed: A2$27,000
2017-10-18Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$5,900
2017-10-18Job filed: ACP BLDG: MODIFY MECHANICAL SYSTEM TO CONFIRM WITH MINOR INTERIOR ALTERATION AT PORTION OF 1ST FLOOR.$22,000
2017-10-18Job filed: ACP BLDG: MODIFY MECHANICAL SYSTEM TO CONFIRM WITH MINOR INTERIOR ALTERATION AT PORTION OF 1ST FLOOR.$22,000
2017-10-13DOB complaint, category ?
2017-10-07DOB violation E:
2017-10-07DOB violation E:
2017-10-07DOB violation E:
2017-10-07DOB violation E:
2017-10-06DOB violation E:
2017-10-06DOB violation E:
2017-10-06DOB violation E:
2017-10-06DOB violation E:
2017-10-06DOB violation E:
2017-10-06Permit EW — ISSUED
2017-10-06Permit EW — ISSUED
2017-10-05DOB violation E:
2017-10-05DOB violation E:
2017-10-05DOB violation E:
2017-10-05DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-04DOB violation E:
2017-10-03Boiler inspection
2017-10-03Boiler inspection
2017-10-03Boiler inspection
2017-10-03Boiler inspection
2017-10-03Boiler inspection
2017-10-03DOB violation E:
2017-10-03DOB violation E:
2017-10-03DOB violation E:
2017-10-02311: Smoking — Smoking Violation
2017-09-22FDNY inspection (SPECIAL-OTH)
2017-09-19Boiler inspection
2017-09-19Boiler inspection
2017-09-19Boiler inspection
2017-09-19Boiler inspection
2017-09-19Boiler inspection
2017-09-19Certificate of occupancy Temporary
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-12FDNY inspection (SPECIAL-OTH)
2017-09-06311: Smoking — Smoking Violation
2017-08-24Permit EW — ISSUED
2017-08-11Job filed: WE HEREBY FILING TO ADD 41 NEW SPRINKLER HEADS PARTIAL FIRST FLOOR TO AN EXISTING SPRINKLER SYSTEM DUE TO THE ALTERATION TO EXISTING OFFICE SPACE. NO $34,850
2017-08-08Permit PL — ISSUED
2017-07-25FDNY inspection (NOV_AUD)
2017-07-12FDNY inspection (EDU_VISITS)
2017-07-12Permit EW — ISSUED
2017-07-12Permit EW — ISSUED
2017-07-12Permit EW — ISSUED
2017-07-10Job filed: DSRIP ENDO PROJECT: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW LAY-OUTS.$280,000
2017-07-10Job filed: DSRIP ENDO PROJECT: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW LAY-OUTS.$280,000
2017-07-07311: Noise — Noise: air condition/ventilation equipment (NV1)
2017-06-30Job filed: LIJ NORTHWELL HEALTH: DSRIP ENDO PROJECT: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AT PORTION OF 1ST $365,000
2017-06-30Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$50,000
2017-06-23FDNY inspection (NOV_AUD)
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000542 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENAN$10,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000002241 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENAN$10,000
2017-06-20Permit EW — ISSUED
2017-06-20Permit EW — RE-ISSUED
2017-06-12Certificate of occupancy Temporary
2017-05-23311: Homeless Person Assistance — N/A
2017-05-23311: Homeless Person Assistance — N/A
2017-05-22311: Consumer Complaint — Overcharge
2017-05-22Job filed: LIJ NORTHWELL HEALTH MIBG PROJECT: MODIFY PLUMBING, SPRINKLER AND MECHANICAL SYSTEMS TO CONFORM WITH NEW ROOM LAYOUTS.$133,000
2017-05-19Job filed: LIJ NORTHWELL HEALTH: MIBG PROJECT: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR COVERINGS AS PER PLANS FILED HERE$176,000
2017-05-19Job filed: LIJ NORTHWELL HEALTH: MIBG PROJECT: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR COVERINGS AS PER PLANS FILED HERE$176,000
2017-05-12311: Animal Abuse — In Car
2017-05-01311: Mold — Public Complaint - Comm Location
2017-05-01Job filed: LIJ WOMEN'S HOSPITAL WEST PHASE: INSTALLATION OF SPRINKLER IN CONJUNCTION WITH PRE-ACTION SYSTEM AT ABOVE PREMISES. NO CHANGE IN USE, OCCUPANCY OR EGR$34,000
2017-05-01Job filed: LIJ WOMEN'S HOSPITAL, EAST PHASE: INSTALLATION OF SPRINKLER SCOPE IN CONJUNCTION WITH PRE-ACTION SYSTEM AT ABOVE PREMISES. NO CHANGE IN USE, OCCUPANCY$34,000
2017-05-01Job filed: LIJ WOMEN'S HOSPITAL WEST PHASE: INSTALLATION OF SPRINKLER IN CONJUNCTION WITH PRE-ACTION SYSTEM AT ABOVE PREMISES. NO CHANGE IN USE, OCCUPANCY OR EGR$34,000
2017-04-26Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$70,000
2017-04-26Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$70,000
2017-04-26Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$70,000
2017-04-26Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$70,000
2017-04-26Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$70,000
2016-11-30311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-11-30DOB complaint, category ?
2016-11-17Job filed: NEW COMPLEX-WIDE MANUAL AND AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FI RE ALRAM SYSTEM WITH ONE-WAY VOICE COMMUNICATION SYSTEM NETWORK INFRAST$2,100,000
2016-11-17Job filed: NEW COMPLEX-WIDE MANUAL AND AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FI RE ALRAM SYSTEM WITH ONE-WAY VOICE COMMUNICATION SYSTEM NETWORK INFRAST$2,100,000
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-10-12311: Noise — Noise: Construction Before/After Hours (NM1)
2016-10-12DOB violation E:
2016-10-12Permit EW — ISSUED
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-07DOB violation E:
2016-10-07DOB violation E:
2016-10-07DOB violation E:
2016-10-06DOB violation E:
2016-10-04FDNY inspection (EDU)
2016-10-04FDNY inspection (OTHER)
2016-10-04Job filed: ALTERATIONS TO EXISTING OFFICE SPACE AT FIRST FLOOR. NO CHANGE TO USE OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION.$300,000
2016-09-28Job filed: INSTALLATION OF A TEMPORARY SPRINKLER SYSTEM ON THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.$12,600
2016-09-28Permit EW — ISSUED
2016-09-23Permit PL — ISSUED
2016-09-22311: Dead/Dying Tree — Planted More Than 2 Years Ago
2016-09-19Permit EW — ISSUED
2016-09-16FDNY inspection (SPECIAL-OTH)
2016-09-07Permit EW — ISSUED
2016-08-31Job filed: LIJ COHEN PHARMACY: INSTALLATION OF (2) ADDITIONAL SPRINKLER HEADS AS REQUIRED BY DOH. ORIGINAL FILING SIGNED-OFF UNDER ALT. 2 # 420983573.$6,000
2016-08-31Job filed: LIJ COHEN PHARMACY: INSTALLATION OF (2) ADDITIONAL SPRINKLER HEADS AS REQUIRED BY DOH. ORIGINAL FILING SIGNED-OFF UNDER ALT. 2 # 420983573.$6,000
2016-07-08311: Public Payphone Complaint — Lost Coin
2016-07-06Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$6,000
2016-07-06Permit EW — ISSUED
2016-07-06Permit EW — ISSUED
2016-06-24FDNY inspection (SPECIAL-OTH)
2016-06-22FDNY inspection (SPECIAL-OTH)
2016-06-17FDNY inspection (ABATE)
2016-06-17FDNY inspection (ABATE)
2016-06-13Job filed: ADDITIONS / MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$65,000
2016-06-03Job filed: LIJ / NORTHWELL HEALTH: ENDOSCOPY RELOCATION - MODIFY MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW LAY-OUTS.$1,951,000
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-05-20FDNY inspection (ABATE)
2016-05-20Job filed: LIJ / NORTHWELL HEALTH: ENDOSCOPY RELOCATION: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS F$1,300,000
2016-05-20Job filed: LIJ / NORTHWELL HEALTH: ENDOSCOPY RELOCATION: REARRANGE INTERIOR, NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES AS PER PLANS F$1,300,000
2016-02-22311: Non-Residential Heat — Inadequate or No Heat
2016-02-10FDNY inspection (ABATE)
2016-02-09FDNY inspection (ABATE)
2016-02-09FDNY inspection (ABATE)
2016-02-02Job filed: COHEN CHILDREN'S HOSPITAL: STRUCTURAL SCOPE IN CONJUNCTION W/CONSTRUCTION OF CENTRAL PHARMACY IN PORTION OF EXISTING CELLAR: PARTIAL SLAB ON GRADE REP$60,000
2016-02-02Job filed: COHEN CHILDREN'S HOSPITAL: STRUCTURAL SCOPE IN CONJUNCTION W/CONSTRUCTION OF CENTRAL PHARMACY IN PORTION OF EXISTING CELLAR: PARTIAL SLAB ON GRADE REP$60,000
2016-01-29FDNY inspection (ABATE)
2016-01-29FDNY inspection (SPECIAL-OTH)
2016-01-29Job filed: COHEN CHILDREN'S HOSPITAL: STRUCTURAL WORK IN CONJUNCTION WITH BUILD-OU OF EXISTING 4TH FLOOR SHELL SPACE FOR NEW MRI SUITE, INCLUDING INSTALLATION OF
2016-01-28FDNY inspection (SPECIAL-OTH)
2016-01-27Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM AT PORTION OF FOURTH FLOOR AND ROOF.$50,000
2016-01-19Certificate of occupancy Temporary
2016-01-19Job filed: LIJ COHEN CHILDREN'S HOSPITAL: MODIFY EXISTING PLUMBING, MECHANICAL AND SPRINKLER SYSTEMS TO CONFORM WITH FIT-OUT OF EXISTING 4TH FLOOR SHELL SPACE.$959,000
2016-01-14Job filed: LIJ COHEN CHILDREN'S HOSPITAL: INSTALLATION OF MRI SUITE AT EXISTING FOURTH FLOOR SHELL SPACE; CONSTRUCT INTERIOR NON-BEARING PARTITIONS, HUNG CEILING$2,300,000
2015-10-09Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$3,000
2015-10-09Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$3,000
2015-10-08Permit PL — ISSUED
2015-10-01Permit PL — ISSUED
2015-09-28Job filed: INTERIOR REMOVALS CONSISTING OF PARTITIONS, DOORS ON PART OF THE FIRST FLOOR AS INDICATED ON DRAWINGS. THERE IS NO CHANGE IN EGRESS, USE OR OCCUPANCY$16,500
2015-09-28Job filed: INTERIOR REMOVALS CONSISTING OF PARTITIONS, DOORS, PLUMBING FIXTURES AND ASSOCIATED PIPING ON PART OF THE FIRST FLOOR AS INDICATED ON DRAWINGS. THERE$16,500
2015-09-28Job filed: INTERIOR REMOVALS CONSISTING OF PARTITIONS, DOORS, PLUMBING FIXTURES AND ASSOCIATED PIPING ON PART OF THE FIRST FLOOR AS INDICATED ON DRAWINGS. THERE$16,500
2015-09-28Job filed: INTERIOR REMOVALS CONSISTING OF PARTITIONS, DOORS, PLUMBING FIXTURES AND ASSOCIATED PIPING ON PART OF THE FIRST FLOOR AS INDICATED ON DRAWINGS. THERE$16,500
2015-07-10Agreement $8,620,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$8,620,000
2015-07-10Agreement $233,615,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$233,615,000
2015-07-10Mortgage $72,155,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$72,155,000
2015-07-10Agreement $137,525,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$137,525,000
2015-07-10Agreement $98,125,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$98,125,000
2015-07-09Permit EW — ISSUED
2015-07-09Permit EW — ISSUED
2015-06-30FDNY inspection (SPECIAL-OTH)
2015-06-22FDNY inspection (ABATE)
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-02FDNY inspection (RISK)
2015-05-27Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRER ALARM SYSTEM AT CELLAR.$50,000
2015-05-27Job filed: PHARMACY: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOM LAY-OUTS IN PORTION OF EXISTING CELLAR.$1,236,000
2015-05-26FDNY inspection (ABATE)
2015-05-22Job filed: PHARMACY: REARRANGE / ERECT INTERIOR NON-BEARING PARTITIONS, INSTALL HUNG CEILING, WALL AND FLOOR FINISHES, AT PORTION OF EXISTING HOSPITAL ACCESSORY $1,170,000
2015-03-09Job filed: LIJ STEM CELL PROJECT: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW ROOMS LAYOUTS AT 4TH FLOOR.$457,000
2015-03-04311: For Hire Vehicle Complaint — Car Service Company Complaint
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-02Certificate of occupancy Final
2015-03-02Job filed: LIJ STEM CELL PROJECT: REARRANGE INTERIOR NON-BEARING PARTITIONS, INSTALL WALL AND FLOOR FINISHES, HUNG CEILING, AT PORTION OF 4TH FLOOR AS PER PLANS $501,000
2015-03-02Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$29,000
2015-02-25FDNY inspection (ABATE)
2015-02-10FDNY inspection (ABATE)
2015-02-04FDNY inspection (ABATE)
2015-01-28FDNY inspection (SPECIAL-OTH)
2015-01-26Permit EW — ISSUED
2015-01-23Permit EW — ISSUED
2015-01-23Permit EW — ISSUED
2015-01-22311: Construction — Initial - CO
2015-01-22311: Construction — Initial - CO
2015-01-21Certificate of occupancy Temporary
2015-01-20FDNY inspection (ABATE)
2015-01-20FDNY inspection (ABATE)
2015-01-20Certificate of occupancy Temporary
2014
2014-12-17FDNY inspection (ABATE)
2014-12-17DOB complaint, category ?
2014-12-17DOB complaint, category ?
2014-12-16311: Industrial Waste — Chemical Spill (IAC)
2014-12-11Certificate of occupancy Temporary
2014-12-11Certificate of occupancy Temporary
2014-12-02FDNY inspection (ABATE)
2014-11-18FDNY inspection (ABATE)
2014-11-10Agreement $161,545,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$161,545,000
2014-11-10Agreement $81,230,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$81,230,000
2014-11-10Agreement $123,600,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$123,600,000
2014-11-10Agreement $10,390,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$10,390,000
2014-11-10Agreement $123,265,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$123,265,000
2014-11-10Agreement $447,885,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$447,885,000
2014-11-10Agreement $235,615,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$235,615,000
2014-11-10Agreement $50,000,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$50,000,000
2014-11-10Agreement $37,500,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$37,500,000
2014-11-10Agreement $37,500,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$37,500,000
2014-11-10Agreement $60,890,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$60,890,000
2014-11-10Agreement $392,200,000 — from LONG ISLAND JEWISH MEDICAL CENTER to THE BANK OF NEW YORK MELLON$392,200,000
2014-11-06Permit EW — ISSUED
2014-11-01311: Taxi Complaint — Driver Complaint
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-23Permit EW — ISSUED
2014-10-23Permit EW — ISSUED
2014-10-23Permit EW — ISSUED
2014-10-23Permit EW — ISSUED
2014-10-23Permit EW — ISSUED
2014-10-21311: Industrial Waste — Oil Spill Into Basin/Sewer - Large (IABL)
2014-09-24FDNY inspection (RISK)
2014-09-24FDNY inspection (RISK)
2014-09-04Permit AL — ISSUED
2014-09-04Permit EW — ISSUED
2014-09-04Permit EW — ISSUED
2014-09-04Permit AL — ISSUED
2014-08-13Permit EW — ISSUED
2014-08-13Permit EW — ISSUED
2014-08-12FDNY inspection (RISK)
2014-08-12FDNY inspection (RISK)
2014-08-12FDNY inspection (RISK)
2014-08-08FDNY inspection (SPECIAL-OTH)
2014-08-07Certificate of occupancy Temporary
2014-08-06FDNY inspection (SPECIAL-OTH)
2014-08-06FDNY inspection (RISK)
2014-08-05FDNY inspection (RISK)
2014-08-05FDNY inspection (RISK)
2014-08-05FDNY inspection (RISK)
2014-08-01FDNY inspection (RISK)
2014-08-01FDNY inspection (RISK)
2014-08-01FDNY inspection (RISK)
2014-08-01311: Construction — Initial - CO
2014-07-30FDNY inspection (RISK)
2014-07-29FDNY inspection (SPECIAL-OTH)
2014-07-25FDNY inspection (RISK)
2014-07-25Permit PL — ISSUED
2014-07-25Permit PL — ISSUED
2014-07-09Permit EW — ISSUED
2014-07-09Permit AL — ISSUED
2014-07-09Permit AL — ISSUED
2014-07-09Permit EW — ISSUED
2014-07-02Permit PL — ISSUED
2014-07-02Permit EW — ISSUED
2014-06-20311: Street Condition — Pothole
2014-06-04FDNY inspection (SPECIAL-OTH)
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-19Job filed: ADDITIONS/MODIFICATIONS TO EXITING FIRE ALARM.$85,000
2014-05-19Job filed: NEUROSCIENCE RESEARCH PROJECT: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH FIT-OUT OF EXISTING ACCESSORY USE SHELL SPAC$701,000
2014-05-19Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2014-05-19Job filed: ADDITIONS/MODIFICATIONS TO EXITING FIRE ALARM.$46,000
2014-05-19Job filed: ADDITIONS/MODIFICATIONS TO EXITING FIRE ALARM.$46,000
2014-05-19Job filed: NEUROSCIENCE RESEARCH PROJECT: MODIFY EXISTING MECHANICAL, PLUMBING AND SPRINKLER SYSTEMS TO CONFORM WITH NEW LAY-OUT AT PORTION OF FIRST FLOOR. NO CH$377,000
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-09Job filed: NEUROSCIENCE RESEARCH: INCREASE CELLAR OCCUPANT LOAD BY 90 PERSONS TO NEW TOTAL OF 361 PERSONS, TO ACCOMMODATE INCREASE TO EXISTING CELLAR ACCESSORY $973,000
2014-05-09Job filed: A1$524,000
2014-05-02FDNY inspection (SPECIAL-OTH)
2014-04-29Permit PL — ISSUED
2014-04-25Permit EW — ISSUED
2014-04-25Permit EW — ISSUED
2014-04-25Permit EW — ISSUED
2014-04-23Permit AL — RE-ISSUED
2014-04-18Certificate of occupancy Temporary
2014-04-18Permit AL — RE-ISSUED
2014-04-18Permit AL — RE-ISSUED
2014-04-16Permit EW — ISSUED
2014-04-08FDNY inspection (SPECIAL-OTH)
2014-04-03Permit EW — ISSUED
2014-04-02Permit EW — ISSUED
2014-04-02Permit EW — ISSUED
2014-04-02Permit EW — ISSUED
2014-04-02Permit EW — ISSUED
2014-04-02Permit EW — ISSUED
2014-04-02Permit EW — ISSUED
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-13Job filed: INSTALLATION OF NOVEC AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH FIRE ALARM SYSTEM FOR SAME FILED UNDER SEPARATE APPLICATION.$90,000