Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
9 service requests in the last three years. Most common: Illegal Parking (7) · Sewer (2).
Filed construction activity
$162,700 in permitted construction work filed since
2016 (2 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$919,000
$413,550
2026
$883,000
$397,350
2027
$852,000
$383,400
The city's market estimate has fallen
7% between tax years 2025 and 2027.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
9 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Ten-year activity
1050
2017
2018
2019
2020
2021
2022
2023
6
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
0
0
0
0
0
2018
0
0
2
0
2
2019
0
0
3
0
3
2020
0
0
1
0
1
2021
3
0
2
0
5
2022
2
0
2
0
4
2023
0
0
1
1
2
2024
0
2
3
1
6
2025
0
0
3
1
4
2026
0
0
3
0
3
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-03-08DOB violation P: BASED ON COMMISSIONERS SUSPENSION NOTIFICATION ON 2/28/2024 INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT ISSUED UNDER JOB #
2024-03-06DOB complaint, category ?
2024-01-20311: Illegal Parking — Parking Permit Improper Use
2021-12-18311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-12-08Permit General Construction — Signed-off
2021-11-30Job filed: Filing herewith plumbing work for an existing Starbucks location as per plans filed herewith. No change to use, egress or occupancy.$33,000
2021-11-22Job filed: Filing herewith renovation to an existing Starbucks location as per plans filed herewith. No change to use, egress or occupancy.$129,700
2014-06-04RPTT — from RICHMOND VALLEY PLAZA, LLC; E.B. REALTY HOLDING CORP; A.E.T. REALTY HOLDING CORP to RVP OWNERS LLC
2014-05-20RPTT — from RICHMOND VALLEY PLAZA LLC to RICHMOND VALLEY PLAZA LLC
2013
2013-04-23Permit EW — ISSUED
2013-04-05Permit PL — ISSUED
2013-03-01Permit EW — ISSUED
2013-01-03Job filed: PROPOSING TO RENOVATION AN EXISTING UG 6 TO BE OCCUPIED BY A STARBUCK'S COFFEE SHOP. INTERIOR RENOVATION FOR PARTITION WORK, CASEWORK, AND FINISHES.$152,360
2013-01-03Job filed: PROPOSING TO RENOVATION AN EXISTING UG 6 TO BE OCCUPIED BY A STARBUCK'S COFFEE SHOP. INTERIOR RENOVATION FOR PARTITION WORK, CASEWORK, AND FINISHES.$152,360
2010-11-23Job filed: INSTALL NEW FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSION SHUT OFF VALVE PREVIOUSLY FILED UNDER DOB JOB #520048083. NO CHANGE IN O$3,000
2010-11-23Job filed: INSTALL NEW KITCHEN EXHAUST SYSTEM ONLY AS SHOWN ON PLANS. NO CHANGE IN OCCUPANCY,USE OR EGRESS$8,000
2010-11-23Job filed: INSTALL NEW FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSION SHUT OFF VALVE PREVIOUSLY FILED UNDER DOB JOB #520048083. NO CHANGE IN O$3,000
2010-11-23Job filed: INSTALL NEW FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSION SHUT OFF VALVE PREVIOUSLY FILED UNDER DOB JOB #520048083. NO CHANGE IN O$3,000
2010-10-05Permit PL — ISSUED
2010-10-05Permit PL — ISSUED
2010-09-21Permit EW — ISSUED
2010-09-21Permit EW — ISSUED
2010-09-17Job filed: PROPOSED RENOVATION OF CHECKERS WITH PARTITION, FLOORING, FINISHES, MECHANICAL AND PLUMBING WORK; INSTALL NEW HVAC UNIT AS PER PLAN. NO CHANGE IN USE,$97,000
2010-04-29Permit NB — ISSUED
2010-04-28Permit EQ — ISSUED
2010-04-06Job filed: ADD MECHANICAL WORK TYPE.
2009
2009-12-23Job filed: REVISED PLAN PG. A-001.01
2009-12-23Job filed: REVISED PLAN PG. A-001.01
2008
2008-06-03RPTT — from E.B. REALTY HOLDING CORP. to A.E.T. REALTY HOLDING CORP.
2008-05-30RPTT — from A.E.T REALTY HOLDING CORP. to A.E.T REALTY HOLDING CORP.
2007
2007-09-24Job filed: NB
2007-09-17RPTT — from RICHMOND VALLEY PLAZA, LLC to T M REALTY HOLDING CORP
2007-09-17RPTT — from RICHMOND VALLEY PLAZA, LLC to T M REALTY HOLDING CORP
2007-09-17RPTT — from RICHMOND VALLEY PLAZA, LLC to T M REALTY HOLDING CORP
2005
2005-11-10RPTT — from A.E.T. REALTY HOLDING CORP. to RICHMOND VALLEY PLAZA, LLC