Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

249 West 135 Street

514Records
17City systems
8Open violations
32.2Penalty rate
Manhattan · ZIP 10030 · Neighborhood: Harlem (North)
Open in the map

514 recorded events, 1973–2026, from 17 city data systems. The city's paper trail here is mostly 176 311 service requests, 88 HPD complaints, 64 HPD housing violations.

BoroughManhattan 10030
Built1910
Floors5
Res. units20
ClassC7
Owner (PLUTO)NEW PARQUE, INC.
BBL1019410001
BIN1058868, 1058869, 1082378, 1082379

Full record, year by year   Support this site

GRADE B

A modest record — below the level that usually signals systemic problems. More recorded distress than 64% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 32.2. In ZIP 10030, 33% of residential buildings hold an A and 16% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations8 total — 4 class C (immediately hazardous), 3 class B, 1 class A. Oldest open since 2016-07-06.

status snapshot refreshed weekly from HPD records

Patterns

10 heat or hot-water complaints in the last three years (winter 2025–26: 10).

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

27 service requests in the last three years. Most common: Noise (6) · HEAT/HOT WATER (5) · Homeless Person Assistance (4) · Illegal Parking (3) · Non (2) · Sidewalk Condition (1).

Filed construction activity

$417,770 in permitted construction work filed since 2016 (7 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1910)
YesSix or more residential units (20)
Yes421-a / J-51 tax benefit on the current tax roll

3 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)NEW PARQUE INC
Head officerESMELDY RODRIGUEZ
Managing agentNEW PARQUE INC
Last registered2025-10-21

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$2,319,000 $1,043,550
2026$2,432,000 $1,094,400
2027$2,544,000 $1,144,800

The city's market estimate has risen 10% between tax years 2025 and 2027.

Tax exemptions on the roll: J51

Building systems

Heating fuelNATURALGAS

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

1 street-flooding or sewer-backup complaints at this address since 2021 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway135 St — B C · 500 ft straight-line (about a 3-minute walk) · station accessibility: none
135 St — 2 3 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
BusNearest boarding stop: Frederick Douglass Blvd / W 135 St — M10 · 100 ft
Citi BikeSt Nicholas Ave & W 134 St · 600 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 175 Henry H Garnet. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

249 West 135 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

27 311 service requests from this address in the last three years — 5 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by NEW PARQUE INC — 3 buildings, 44 units. Grades across the portfolio: A1 · B1 · C1. See the whole portfolio

BuildingBoroughUnitsGrade
249 West 135 Street MN20 B
217 West 135 Street MN16 C
207 West 135 Street MN8 A

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $1,673,000 on 2000-07-06 (lender: Community Preservation Corporation), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2000-07-06Mortgage $2,458,000 — from NEW PARQUE, INC. to COMMUNITY PRESERVATION CORPORATION $2,458,000
2000-07-06Mortgage $1,673,000 — from NEW PARQUE, INC. to COMMUNITY PRESERVATION CORPORATION $1,673,000
1992-05-29Mortgage $2,018,000 — from UPTOWN HOUSING PRTNRSHP to COMMUNITY PRSRVTN CORP $2,018,000
1992-05-29Mortgage $1,667,000 — from UPTOWN HOUSING PRTNRSHP to COMMUNITY PRSRVTN CORP $1,667,000

Ten-year activity

100500
2017
62
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsHealth & systemsTotal
20179115126
20184349662
20190317424
20202247051
20215121027
20220020121
2023037717
20240010919
20250013417
20260116320
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The full timeline

Construction 41Enforcement 68Housing & tenants 343Ownership & money 18Health & systems 44

Every one of the 514 recorded events, 1973–2026, is laid out year by year in the full report (print-ready).

Explore: ZIP 10030 · Landlord rankings · How grades work · The map · The Mice Map