Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
82 service requests in the last three years. Most common: Noise (42) · Graffiti (10) · Illegal Parking (8) · For Hire Vehicle Complaint (4) · Illegal Fireworks (3) · Illegal Dumping (2).
Filed construction activity
$384,455 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,651,000
$2,542,950
2026
$5,732,000
$2,579,400
2027
$6,258,000
$2,816,100
The city's market estimate has risen
11% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
C — ENERGY STAR score 59/100 (2022 disclosure cycle)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2020 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Delancey St-Essex St — F J M Z · 350 ft straight-line (about a 2-minute walk) · station accessibility: none Grand St — B D · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Delancey St / Essex St — B39 · 300 ft
Citi Bike
Allen St & Rivington St · 550 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
82 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $6,000,000 on
2019-08-20 (lender: Yellowstone Commons, LLC), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-09-07
AL&R $7,114,547 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK
$7,114,547
2023-08-14
Agreement $7,114,547 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK
$7,114,547
2019-08-20
AL&R $6,000,000 — from 95 DELANCEY LLC; 85 DELANCEY CORP. to YELLOWSTONE COMMONS, LLC
$6,000,000
2019-08-20
Mortgage $6,000,000 — from 85 DELANCEY CORP.; 95 DELANCEY LLC to YELLOWSTONE COMMONS, LLC
$6,000,000
2018-06-28
AL&R $8,000,000 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK
$8,000,000
2018-06-28
Agreement $8,000,000 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK
$8,000,000
2018-06-28
Mortgage $3,002,225 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK
$3,002,225
2018-06-28
Mortgage $4,997,775 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK
$4,997,775
2018-06-28
Agreement $9,995,550 — from 95 DELANCEY LLC; 85 DELANCEY CORP. to THE BERKSHIRE BANK
$9,995,550
2017-10-02
AL&R $10,000,000 — from 85 DELANCEY CORP.; 95 DELANCEY LLC to CLIFTON SAVINGS BANK
$10,000,000
2017-10-02
Agreement $10,000,000 — from 95 DELANCEY LLC; 85 DELANCEY CORP. to CLIFTON SAVINGS BANK
$10,000,000
2017-10-02
Mortgage $6,500,000 — from 95 DELANCEY LLC; 85 DELANCEY CORP. to CLIFTON SAVINGS BANK
$6,500,000
2011-07-25
XXXX $20,000,000 — from 86-98 CANAL LLC; 1135 RAILROAD AVENUE LLC; 54 CANAL STREET LLC; 95 DELANCEY LLC; 98 MORNIN to NEW YORK COMMUNITY BANK
$20,000,000
2010-06-04
Mortgage $20,000,000 — from 1987-1993 CONEY LLC; S.B. INTERSTATE GROUP, LLC; 85 DELANCEY CORP.; 2500 FREDERICK DOUGLAS to NEW YORK COMMUNITY BANK
$20,000,000
2010-06-04
Mortgage $92,192,184 — from 86-98 CANAL LLC; 437 MANHATTAN, LLC; 98 MORNINGSIDE, INC.; 2500 FREDERICK DOUGLAS BLVD, LL to NEW YORK COMMUNITY BANK
$92,192,184
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
51
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
1
5
4
5
15
2018
4
1
11
7
6
29
2019
0
3
6
2
6
17
2020
0
0
3
0
3
6
2021
0
4
10
0
4
18
2022
0
1
4
0
9
14
2023
8
0
30
3
10
51
2024
0
0
15
0
6
21
2025
0
3
36
0
8
47
2026
0
1
26
0
3
30
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-09-29DOB violation C: AT TIME OF INSPECTION OBSERVED VISIBLE CRACKS WITH SPALLING BRICKS BUILDING FACADE AT ALL EXPOSURES OF 262 DELANCY STREET. WHIC
2023-08-16Elevator permit: F/I NEW DOOR and BUCK. All work to comply with ASME A17.1-2013, Part 8, Section 8.7.2 Safety Code for Elevators and Escalators as $6,500
2023-08-14Agreement $7,114,547 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK$7,114,547
2023-08-04Rodent inspection: Passed
2023-07-19Job filed: Alteration
2023-07-19Job filed: CONNECT TO EXISTING GAS PIPING FOR LEGALIZATION OF BOILER AND GAS BURNER AND GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCU$10,000
2023-07-14Job filed: MODIFICATIONS TO EXISTING PLUMBING SYSTEMS TO INCLUDE FIXTURE INSTALLATION AND REPLACEMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS$20,000
2023-07-14Job filed: MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICAT$75,000
2023-07-13Rodent inspection: Passed
2023-07-12311: Graffiti — Graffiti
2023-07-10Permit General Construction — Permit Issued
2023-06-22Job filed: INTERIOR ALTERATIONS OF EXISTING COMMERCIAL SPACE TO INCLUDE MINOR DEMOLITION, PARTITION AND FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS$150,000
2023-06-07Rodent inspection: Failed for Other Reason
2023-05-08311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2023-04-30311: Illegal Dumping — Removal Request
2023-02-09311: Street Condition — Pothole
2023-02-06Rodent inspection: Passed
2023-01-10Rodent inspection: Failed for Rat Activity
2022
2022-12-08Rodent inspection: Failed for Other Reason
2022-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-11-05311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-21Rodent inspection: Failed for Rat Activity
2022-09-20311: Street Condition — Cave-in
2022-08-03Rodent inspection: Failed for Other Reason
2022-07-19Elevator permit: F/I A SYSTEM TO MONITOR AND PREVENT THE AUTOMATIC OPERATION OF 1 PASSENGER ELEVATOR WITH FAULTY DOOR CONTACT CIRCUITS AS PER 3.10.$2,500
2022-07-09311: Illegal Fireworks — N/A
2022-06-03Rodent inspection: Passed
2022-04-17311: Water System — Hydrant Running (WC3)
2022-04-08Rodent inspection: Passed
2022-03-11Rodent inspection: Failed for Rat Activity
2022-02-16Rodent inspection: Failed for Rat Activity
2022-01-31Boiler inspection — defects found
2021
2021-11-11311: Bike Rack Condition — Bike Rack Repair
2021-11-03Rodent inspection: Failed for Rat Activity
2021-10-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-07-08311: Elevator — Elevator - Single Device On Property/No Alternate Service
2021-07-08ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN CONTROLLER AS MANDATED IN APPENDIX K OF THE 2014 BUILDING CODES. REMEDY: INSTALL DLM, FILE AN$6,250
2021-07-08DOB complaint, category ?
2021-07-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-06-16Rodent inspection: Passed
2021-05-24Boiler inspection
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2019-08-26ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT. NOTED, AT THE TIME OF INSPECTION OBSERVED IN 3RD FLOOR AT THE YARD IN THE RIGHT AP$1,562
2019-08-20AL&R $6,000,000 — from 95 DELANCEY LLC; 85 DELANCEY CORP. to YELLOWSTONE COMMONS, LLC$6,000,000
2019-08-20Mortgage $6,000,000 — from 85 DELANCEY CORP.; 95 DELANCEY LLC to YELLOWSTONE COMMONS, LLC$6,000,000
2019-08-07Rodent inspection: Failed for Rat Activity
2019-07-03DOB violation E:
2019-06-28311: General Construction/Plumbing — Failure To Maintain
2019-06-28DOB complaint, category ?
2019-06-19Boiler inspection
2019-06-10Rodent inspection: Passed
2019-05-11311: Graffiti — Graffiti
2019-04-04311: Street Sign - Damaged — Other/Unknown
2019-02-11Rodent inspection: Passed
2019-01-20311: Graffiti — Graffiti
2018
2018-12-26311: Street Condition — Pothole
2018-12-21Rodent inspection: Passed
2018-10-25311: Illegal Tree Damage — Roots Damaged
2018-10-25Permit PL — ISSUED
2018-10-23Permit EW — ISSUED
2018-10-11Job filed: FILING HEREWITH INTERIOR PARTITIONS WORK AND MINOR PLUMBING WORK ON THE 1ST FLOOR AT THE SUBJECT PREMISES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$129,455
2018-10-10311: Lead — Lead Kit Request (Residential) (L10)
2018-09-21Permit PL — ISSUED
2018-08-31311: Water System — Hydrant Running Full (WA4)
2018-08-20Rodent inspection: Passed
2018-08-06Rodent inspection: Failed for Rat Activity
2018-08-02311: Water System — Hydrant Running Full (WA4)
2018-07-18Boiler inspection
2018-06-28AL&R $8,000,000 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK$8,000,000
2018-06-28Agreement $8,000,000 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK$8,000,000
2018-06-28Mortgage $3,002,225 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK$3,002,225
2018-06-28Mortgage $4,997,775 — from 85 DELANCEY CORP. to THE BERKSHIRE BANK$4,997,775
2018-06-28Agreement $9,995,550 — from 95 DELANCEY LLC; 85 DELANCEY CORP. to THE BERKSHIRE BANK$9,995,550
2018-06-28Mortgage assigned — from CLIFTON SAVINGS BANK; KEARNY BANK to THE BERKSHIRE BANK
2018-06-28TL&R — from 95 DELANCEY LLC; 85 DELANCEY CORP. to CLIFTON SAVINGS BANK; THE BERKSHIRE BANK
2014-06-17Rodent inspection: Failed for Rat Activity
2014-06-17DOB complaint, category ?
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-02CERT — from RIDGE ABSTRACT CORP.
2014-05-02ZONE — from 85 DELANCEY CORP.
2014-05-01DOB violation E:
2014-04-29Rodent inspection: Failed for Rat Activity
2014-04-18Rodent inspection: Passed
2014-02-07FDNY inspection (STRUC_INT)
2014-02-04FDNY inspection (SPECIAL-OTH)
2014-01-28FDNY inspection (SPECIAL-OTH)
2014-01-17FDNY inspection (STRUC_INT)
2014-01-10311: Graffiti — Graffiti
2013
2013-12-04Mortgage assigned — from NYC COMMONS LLC to NEW YORK COMMUNITY BANK
2013-12-04Mortgage assigned — from NEW YORK COMMUNITY BANK to NYC COMMONS LLC
2013-11-06Permit EW — ISSUED
2013-11-06Permit EW — ISSUED
2013-11-06Permit EW — ISSUED
2013-08-06Mortgage assigned — from NYC COMMONS LLC to NEW YORK COMMUNITY BANK
2013-08-06Mortgage assigned — from NEW YORK COMMUNITY BANK to NYC COMMONS LLC
2013-08-06Mortgage assigned — from NEW YORK COMMUNITY BANK to NYC COMMONS LLC
2013-08-05AALR — from NEW YORK COMMUNITY BANK to NYC COMMONS LLC
2013-06-27311: Broken Muni Meter — No Receipt
2013-05-22Rodent inspection: Passed
2013-05-22Permit SG — ISSUED
2013-05-22Permit SG — ISSUED
2013-05-16Permit SG — ISSUED
2013-05-16Permit SG — ISSUED
2013-05-16Permit SG — ISSUED
2013-05-08Job filed: FILING HEREWITH FOR EXTENSION OF THE BULKHEAD AT THE FIFTH FLOOR, INTERIOR REN OVATION WORK (OT) INCLUDING MECHANICAL AND PLUMBING ITEMS(MH & PL) $372,425
2013-05-08Job filed: EXTENSION OF THE BULKHEAD AT THE FIFTH FLOOR. INTERIOR RENOVATION WORK (OT) INCLUDING MECHANICAL AND PLUMBING ITEMS (MH & PL) FILED ON DOCUMENT 01$40,000
2013-05-08Job filed: FILING HEREWITH FOR EXTENSION OF THE BULKHEAD AT THE FIFTH FLOOR, INTERIOR REN OVATION WORK (OT) INCLUDING MECHANICAL AND PLUMBING ITEMS(MH & PL) $372,425
2013-05-08Job filed: EXTENSION OF THE BULKHEAD AT THE FIFTH FLOOR. INTERIOR RENOVATION WORK (OT) INCLUDING MECHANICAL AND PLUMBING ITEMS (MH & PL) FILED ON DOCUMENT 01$40,000
2013-04-23Rodent inspection: Failed for Rat Activity
2013-04-05311: Overgrown Tree/Branches — Hitting Building
2013-03-21Rodent inspection: Bait applied
2013-03-15Rodent inspection: Passed
2013-03-14Permit EW — ISSUED
2013-03-05Permit PL — ISSUED
2013-03-05Job filed: FURNISH AND INSTALL MULTI-INDOOR INVERTER HEAT-PUMP SYSTEM.$52,000
2013-03-05Job filed: FURNISH AND INSTALL MULTI-INDOOR INVERTER HEAT-PUMP SYSTEM.$52,000
2013-03-05Job filed: FURNISH AND INSTALL MULTI-INDOOR INVERTER HEAT-PUMP SYSTEM.$52,000
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-02-19Permit AL — ISSUED
2013-02-12Rodent inspection: Bait applied
2013-01-29Rodent inspection: Bait applied
2013-01-19311: Street Light Condition — Street Light Out
2013-01-14Rodent inspection: Bait applied
2012
2012-12-24ECB CLASS - 1 violation: WORK W/O A PERMIT AT 1ST FLR & CELLAR HAVING ERECTED FULL HEIGHT PARTITIONS TO CREATE ROOMS & CHANGE LAYOUT ALSO NOTE CONCRETE SLA$1,600
2012-12-11Job filed: THIS ALTERATION TYPE 1 APPLICATION IS BEING FILED TO ADD 5TH FLOOR TO CERTIFICATE OF OCCUPANCY. ELIMINATE MEZZANINE & TO CREATE ACCESSORY OFFICES$473,860
2012-11-18311: Graffiti — Graffiti
2012-10-15DOB complaint, category ?
2012-07-23Rodent inspection: Bait applied
2012-07-06Rodent inspection: Bait applied
2012-06-19Rodent inspection: Bait applied
2012-06-05Rodent inspection: Bait applied
2012-05-31Rodent inspection: Failed for Rat Activity
2012-05-31Rodent inspection: Passed
2012-05-07Rodent inspection: Failed for Rat Activity
2012-01-11Rodent inspection: Passed
2011
2011-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2011-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2011-10-13311: Street Condition — Cave-in
2011-07-25XXXX $20,000,000 — from 86-98 CANAL LLC; 1135 RAILROAD AVENUE LLC; 54 CANAL STREET LLC; 95 DELANCEY LLC; 98 MORNIN to NEW YORK COMMUNITY BANK$20,000,000
2011-06-10Rodent inspection: Failed for Rat Activity
2011-05-10311: Broken Muni Meter — No Receipt
2011-05-04Rodent inspection: Failed for Rat Activity
2011-04-27Rodent inspection: Passed
2011-03-24311: Broken Muni Meter — No Receipt
2011-01-11DTL — from THE BANK OF NEW YORK MELLON
2010
2010-12-17DOB violation E:
2010-10-08DOB violation VCAT1:
2010-08-11TLS — from THE CITY OF NEW YORK to THE BANK OF NEW YORK MELLON
2010-08-03311: Graffiti — Graffiti
2010-06-04Mortgage $20,000,000 — from 1987-1993 CONEY LLC; S.B. INTERSTATE GROUP, LLC; 85 DELANCEY CORP.; 2500 FREDERICK DOUGLAS to NEW YORK COMMUNITY BANK$20,000,000
2010-06-04Mortgage $92,192,184 — from 86-98 CANAL LLC; 437 MANHATTAN, LLC; 98 MORNINGSIDE, INC.; 2500 FREDERICK DOUGLAS BLVD, LL to NEW YORK COMMUNITY BANK$92,192,184
2006-02-03Job filed: INSTALLATION OF NEW PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$7,000
2006-02-03Job filed: INSTALLATION OF NEW PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$7,000
2005
2005-10-01DOB violation LL1081:
2005-08-03DOB violation E:
2005-04-05Permit PL — ISSUED
2005-02-18Permit EW — ISSUED
2005-02-18Permit EW — ISSUED
2005-01-03Permit EW — ISSUED
2005-01-03Permit EW — ISSUED
2004
2004-11-19DOB violation LL1081:
2004-11-19Job filed: MODIFICATION TO HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC CUPANCY UNDER THIS APPLICATION. INSTALL$50,000
2004-11-18Job filed: INSTALLATION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$50,000
2004-11-18Job filed: INSTALLATION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICA$50,000
2004-10-15Permit EW — ISSUED
2004-10-15Permit EQ — ISSUED
2004-10-01DOB violation E:
2004-09-27Job filed: REMOVAL OF NON LOAD BEARING PARTITIONS A ND RELATED FINISHES AS PER PLAN FILED HEREWITH NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION F$10,000
2004-04-21DOB violation LL1081:
2004-02-10Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to INDEPENDENCE COMMUNITY REALTY CORP.
2004-02-10Agreement — from INDEPENDENCE COMMUNITY REALTY CORP. to 88 DELANCEY CORP.
2003
2003-12-22DOB violation E:
2003-03-19DOB violation LL6291:
2002
2002-10-15Job filed: INSTALLATION OF PLUMBING FIXTURES, NEW PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2002-10-15Job filed: INSTALLATION OF PLUMBING FIXTURES, NEW PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2002-05-24DOB violation E:
2002-03-26DOB violation LL6291:
2001
2001-02-27DOB violation LL6291:
1999
1999-11-05Agreement — from 85 DELANCEY CORP. to INDEPENDENCE COMMUNITY BANK
1999-11-05Mortgage $625,037 — from 85 DELANCEY CORP. to INDEPENDENCE COMMUNITY BANK$625,037
1999-11-05Mortgage assigned — from INDEPENDENCE COMMUNITY REALTY CORP. to INDEPENDENCE COMMUNITY BANK
1999-11-05Mortgage assigned — from INDEPENDENCE SAVINGSBANK to INDEPENDENCE COMMUNITY REALTY CORP.
1999-03-10Permit EW — ISSUED
1997
1997-09-16DOB violation LL6291:
1995
1995-11-15Agreement — from 85 DELANCEY CORP. to INDEPENDENCE SAVINGSBANK
1995-11-15Mortgage $657,795 — from 85 DELANCEY CORP. to INDEPENDENCE SAVINGSBANK$657,795
1995-11-15Deed — from DELOR ASSOCIATES to 85 DELANCEY CORP.
1995-11-15Mortgage assigned — from MADISON NOTE CORP. to INDEPENDENCE SAVINGSBANK
1995-08-29DOB violation LL6291:
1995-07-17Mortgage satisfied — from DELOR ASSOCIATES to KLAGSBURN, SEYMOUR; KLAGSBURN, SHULAMITH
1995-05-30JUDG — from DELOR ASSOCIATES PETITIONER to KLAGSBRUN, SEYMOUR RESPONDENTS
1994
1994-10-24DOB violation C:
1994-10-24DOB violation ES:
1994-05-09Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION to MADISON NOTE CORP.
1994-03-18DOB violation LL6291:
1993
1993-12-28Permit SG — ISSUED
1993-09-30Permit EW — ISSUED
1993-09-30Permit EQ — ISSUED
1993-08-24Permit EW — ISSUED
1993-03-18DOB violation LL6291:
1991
1991-07-24DOB violation B:
1988
1988-10-12DOB violation E: (01)ADJUST CONTACT.(47)DOOR LIGHT & WATERPROOF.(50)TO PIT & ALL FLOORS.(51)REMOVE WATER IN PIT & PROVIDE SUMP PUMP.(52)PROVI
1985
1985-05-23Mortgage $20,754 — from DELOR ASSOCIATES to KLAGSBRUN, SHULAMITH; KLAGSBRUN, SEYMOUR$20,754
1985-05-23Deed — from KLAGSBRUN, SHULAMITH; KLAGSBRUN, SEYMOUR to DELOR ASSOCIATES
1981
1981-03-13Deed — from KLAGSBURN, SHULAMITH to KLAGSBURN, SEYMOUR
1981-02-19RPAT — from KLAGSBRUN, SHULAMITH to KLAGSBRUN, SEYMOUR
1979
1979-12-21Mortgage — from KLAGSBRUN, SHULAMITH to AMERICAN SAVINGS BANK
1979-12-21Agreement — from KLAGSBRUN, SHULAMITH to AMERICAN SAVING BANK
1979-12-21Mortgage assigned — from ISRAEL DSCNTS BK LMTD to AMERICAN SAVING BANK
1979-12-21Mortgage assigned — from ISRAEL DSCNT BK LMTD to AMERICAN SAVING BANK
1979-12-21Mortgage assigned — from ISRAEL DSCNT BK LMTD to AMERICAN SAVING BANK
1978
1978-05-01LEAS — from KLAGSBRUN, SHULAMITH to TOIKACH, ANATOLI
1978-04-20LEAS — from KLAGSBRUN, SHULAMITH to SAUNDERS, PHILIP
1977
1977-04-12Mortgage assigned — from KLAGSBRUN SHULAMITH to ISRAEL DSCNT BK LMTD
1977-04-12Mortgage assigned — from KLAGSBRUN SHULAMITH to ISRAEL DSCNT BK LMTD
1976
1976-10-13Mortgage assigned — from KLAGSBRUN, SHULAMITH to ISRAEL DSCNT BK LMTD
1976-10-13Deed — from BANKERS TRUST COMPANY to KLAGSBRUN, SCULAMITH
1976-10-13Mortgage — from KLAGSBRUN, SHULAMITH to ISRAEL DSCNT BK LMTD
1976-10-13Mortgage assigned — from KLAGSBRUN, SHULAMITH to ISRAEL DSCNT BK LMTD