The city's published records show little recorded distress here in the last three years. Less recorded distress than 81% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 2.9. In ZIP 10011, 68% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
4 heat or hot-water complaints in the last three years (winter 2025–26: 4).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
30 service requests in the last three years. Most common: Dirty Condition (5) · Noise (4) · Residential Disposal Complaint (3) · Illegal Parking (3) · Food Establishment (2) · Homeless Person Assistance (2).
Filed construction activity
$1,160,719 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2015)
Yes
Six or more residential units (18)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
CHELSEA 7 JV
Head officer
SABAH SHEMEL
Managing agent
ROBERT TORNELLO
Last registered
2025-06-18
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$16,053,000
$7,223,850
2026
$16,148,000
$7,266,600
2027
$17,042,000
$7,668,900
The city's market estimate has risen
6% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
A — ENERGY STAR score 97/100 (2022 disclosure cycle)
2 Food Establishment complaints to 311 at this address in the last three years (most often: Letter Grading, Rodents/Insects/Garbage), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2012 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
23 St — 1 · 100 ft straight-line (about a 1-minute walk) · station accessibility: none 23 St — C E · 750 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 7 Av / W 24 St — M7 M20 · 50 ft
Citi Bike
W 24 St & 7 Ave · 150 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
30 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $2,250,000 on
2019-02-12 (lender: Bank Hapoalim B.m.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-08-06
Agreement $29,000,000 — from RD CHELSEA PARTNERS LLC; KARMELENA REALTY CO. LLC; KA-NO REALTY, LLC to JPMORGAN CHASE BANK, N.A.
$29,000,000
2019-02-12
Agreement $30,250,000 — from KARMELENA REALTY CO. LLC; KA-NO REALTY, LLC; RD CHELSEA PARTNERS LLC to BANK HAPOALIM B.M.
$30,250,000
2019-02-12
AL&R $30,250,000 — from RD CHELSEA PARTNERS LLC; KARMELENA REALTY CO. LLC; KA-NO REALTY, LLC to BANK HAPOALIM B.M.
$30,250,000
2019-02-12
Mortgage $2,250,000 — from KA-NO REALTY, LLC; RD CHELSEA PARTNERS LLC; KARMELENA REALTY CO. LLC to BANK HAPOALIM B.M.
$2,250,000
2014-04-08
Agreement $2,100,000 — from RD CHELSEA PARTNERS LLC; KARMELENA REALTY CO. LLC; KA-NO REALTY, LLC to BANK HAPOALIM B.M.
$2,100,000
2014-04-08
Mortgage $21,379,287 — from KA-NO REALTY, LLC; KARMELENA REALTY CO. LLC; RD CHELSEA PARTNERS LLC to BANK HAPOALIM B.M.
$21,379,287
2014-04-08
Mortgage $4,520,713 — from RD CHELSEA PARTNERS LLC; KA-NO REALTY, LLC; KARMELENA REALTY CO. LLC to BANK HAPOALIM B.M.
$4,520,713
2013-04-10
M&CON $2,100,000 — from CHELSEA 7 JV LLC to BANK HAPOALIM B.M.
$2,100,000
2004-07-28
M&CON $750,000 — from KARMELENA REALTY CO. LLC to BANCO POPULAR NORTH AMERICA
$750,000
2004-07-28
AL&R $750,000 — from BANCO POPULAR NORTH AMERICA to KARMELENA REALTY CO. LLC
$750,000
2002-08-30
Mortgage $55,000 — from KARMELENA REALTY CO,LLC to ASTORIA FEDERAL SAVINGS & LOAN ASSOCIATI
$55,000
1997-07-17
Mortgage $370,000 — from SHEMEL, SABAH to AHN, YONG SEOK
$370,000
1992-06-30
Mortgage $40,000 — from KIM, OCK SOON; KIM, JOONG LOG to KOREA EXCHANGE BANK
$40,000
1987-05-04
Mortgage $250,000 — from KIM, JOONG LOG; KIM, OCK SOON to KOREA EXCHANGE BK
$250,000
1986-09-23
Mortgage $627,000 — from 232 SEVENTH AVE CORP to CURCIO, VINCENT
$627,000
Ten-year activity
100500
72
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
21
30
19
1
1
72
2018
21
4
15
0
1
41
2019
12
3
12
3
6
36
2020
15
2
1
0
4
22
2021
2
1
28
0
5
36
2022
11
2
12
0
6
31
2023
4
1
17
0
5
27
2024
1
1
11
3
7
23
2025
2
4
17
0
9
32
2026
5
0
8
0
4
17
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2023-07-03Permit General Construction — Signed-off
2023-06-26Rodent inspection: Passed
2023-06-09Bedbug filing: 0 infested units
2023-05-24Boiler inspection — defects found
2023-05-24Boiler inspection — defects found
2023-05-24Boiler inspection — defects found
2023-05-24Boiler inspection — defects found
2023-05-16Job filed: Filing for minor interior work in related to job# 123816228, install counter-top, millwork, and interior finishes as per plans only. No change is use,$16,000
2023-01-24HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2023-01-24HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT P
2023-01-24HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2023-01-24HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2023-01-24HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2023-01-24HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2023-01-24HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2023-01-24HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2023-01-22311: PLUMBING — WATER SUPPLY
2023-01-22Tenant complaint: PLUMBING — WATER SUPPLY
2022
2022-12-30Permit Sign — Signed-off
2022-12-13Job filed: PROPOSAL TO INSTALL ILLUMINATED, NON-FLASHING, ACCESSORY BUSINESS SIGN. Wording- "BOSQE FLOWERS *logo* COFFEE"$1,872
2022-01-11Job filed: Application is being filed for mechanical work on 1st floor. There are no change in use, egress or occupancy.$3,000
2022-01-11Job filed: Installation of plumbing fixtures, kitchen equipment and related piping. There are no change in use, egress or occupancy.$42,000
2022-01-11Job filed: This Alteration Type II application is being filed for the modification to existing sprinkler system and related piping. There are no change in use, e$21,780
2020-08-29Job filed: CHANGE OF USE AND OCCUPANCY OF SECOND THROUGH NINTH FLOOR APARTMENT UNITS,USE GROUP: 2:;OCCUPANCY GROUP: R-2 TO TRANSIENT HOTEL SUITES, USE GROUP:5, O$10,000
2020-08-29Job filed: CHANGE OF USE AND OCCUPANCY OF SECOND THROUGH NINTH FLOOR APARTMENT UNITS,USE GROUP: 2:;OCCUPANCY GROUP: R-2 TO TRANSIENT HOTEL SUITES, USE GROUP:5, O$10,000
2020-07-16Job filed: Installation of sign saying: Operation Falafel$14,966
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-04-16Job filed: Installation of plumbing fixtures, kitchen equipment and related piping. There are no change in use, egress or occupancy.$42,000
2020-04-06Job filed: This Alteration Type II application is being filed for the modification to existing sprinkler system and related piping. There are no change in use, e$21,780
2020-04-06Job filed: Application is being filed for mechanical work on 1st floor. There are no change in use, egress or occupancy.$3,000
2020-03-27Job filed: THIS NO WORK ALTERATION TYPE I APPLICATION IS BEING FILED FOR CHANGE OF USE ON 1ST FROM RETAIL STORE TO EATING & DRINKING ESTABLISHMENT.$1,000
2020-03-04DOB violation E:
2020-03-04DOB violation E:
2020-02-20Certificate of occupancy Final
2020-01-03Certificate of occupancy Temporary
2019
2019-12-30Permit Plumbing — Permit Issued
2019-12-20311: Noise - Helicopter — Other
2019-12-13Job filed: Install plumbing fixtures and related piping$87,999
2019-12-12Job filed: Installation of sprinkler heads and related piping$24,974
2019-12-06Permit EW — ISSUED
2019-10-18Boiler inspection
2019-10-18Boiler inspection
2019-10-18Boiler inspection
2019-10-18Boiler inspection
2019-10-16Certificate of occupancy Temporary
2019-09-23Job filed: INSTALLATION OF INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$558,000
2019-08-29Rodent inspection: Passed
2019-08-20311: Homeless Person Assistance — N/A
2019-08-01311: Water System — Hydrant Leaking (WC1)
2019-02-18311: Street Condition — Defective Hardware
2019-02-16DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-02-12Agreement $30,250,000 — from KARMELENA REALTY CO. LLC; KA-NO REALTY, LLC; RD CHELSEA PARTNERS LLC to BANK HAPOALIM B.M.$30,250,000
2019-02-12AL&R $30,250,000 — from RD CHELSEA PARTNERS LLC; KARMELENA REALTY CO. LLC; KA-NO REALTY, LLC to BANK HAPOALIM B.M.$30,250,000
2019-02-12Mortgage $2,250,000 — from KA-NO REALTY, LLC; RD CHELSEA PARTNERS LLC; KARMELENA REALTY CO. LLC to BANK HAPOALIM B.M.$2,250,000
2019-02-01Certificate of occupancy Temporary
2019-01-14Bedbug filing: 0 infested units
2019-01-02311: New Tree Request — For One Address
2018
2018-12-26Permit EW — ISSUED
2018-12-14Job filed: THIS ALTERATION TYPE II APPLICATION IS BEING FILED FOR THE INTERIOR RENOVATION OF COMMERCILA SPACE ON CELLAR AND 1ST FLOOR WITH OT WORK TYPE ONLY, THE$17,000
2018-12-14Job filed: THIS ALTERATION TYPE II APPLICATION IS BEING FILED FOR THE INTERIOR RENOVATION OF COMMERCILA SPACE ON CELLAR AND 1ST FLOOR WITH OT WORK TYPE ONLY, THE$17,000
2018-11-19Certificate of occupancy Temporary
2018-10-23311: New Tree Request — For One Address
2018-10-19Permit AL — ISSUED
2018-10-18FDNY inspection (CDA-90-DRILL)
2018-10-18FDNY inspection (RISK)
2018-10-12Permit NB — ISSUED
2018-10-01311: Noise — Noise: Construction Before/After Hours (NM1)
2018-09-12Job filed: THIS ALTERTION TYPE III APPLICATION IS BEING FILED IN CONJUNCTION WITH NB APPLICATION #1210407229 FOR THE FIRE PROTECTION PLAN. THERE ARE NO CHANGE IN$1,000
2018-09-11Permit AL — ISSUED
2018-08-22Permit PL — ISSUED
2018-08-18311: Noise — Noise: Construction Equipment (NC1)
2018-08-18311: Noise — Noise: Construction Before/After Hours (NM1)
2018-08-13311: Noise — Noise: Construction Before/After Hours (NM1)
2018-08-06311: Noise — Noise: Construction Before/After Hours (NM1)
2018-08-04311: Noise — Noise: Construction Before/After Hours (NM1)
2018-08-03311: Noise — Noise: Construction Before/After Hours (NM1)
2018-08-03311: Noise — Noise: Construction Before/After Hours (NM1)
2018-07-28311: Noise — Noise: Construction Equipment (NC1)
2018-07-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-07-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-07-11311: Noise — Noise: Construction Before/After Hours (NM1)
2018-06-05311: Illegal Parking — Blocked Bike Lane
2018-05-30Rodent inspection: Passed
2018-05-25Permit EQ — ISSUED
2018-05-17Permit EW — ISSUED
2018-04-12Permit EW — ISSUED
2018-04-12Permit EW — ISSUED
2018-04-12Permit EW — ISSUED
2018-04-11FDNY inspection (CDA-90-DRILL)
2018-04-03Permit EW — ISSUED
2018-03-28Job filed: INSTALLATION OF MARQUEE AT GROUND LEVEL. FILED IN CONJUNCTION WITH NB# 121040729.$1,000
2018-03-16Permit EW — ISSUED
2018-02-28Permit EW — ISSUED
2018-02-26Permit EQ — ISSUED
2018-02-07Permit EW — ISSUED
2018-02-07Permit EW — ISSUED
2018-02-03ECB CLASS - 1 violation: FAILURE TO MAINTAIN HANDRAILS. AT TIME OF INSPECTION OF A 17 STORY NB CURRENTLY TOPPED OFF, I OBSERVED HANDRAILS MISSING ON SEVERA$1,000
2017
2017-12-22Permit EW — ISSUED
2017-12-08Permit NB — ISSUED
2017-12-07FDNY inspection (CDA-90-DRILL)
2017-11-14Permit EQ — ISSUED
2017-11-09SAGE — from TIME WARNER CABLE ENTERPRISES LLC to KARMELENA REALTY, LLC RD CHELSEA PARTNER
2017-10-30Permit EQ — ISSUED
2017-10-19Permit EQ — ISSUED
2017-10-19Permit EQ — ISSUED
2017-10-03Permit NB — ISSUED
2017-09-11311: Sustainability Enforcement — Sustainability Enforcement Work Order
2017-08-14311: Noise — Noise: Construction Before/After Hours (NM1)
2017-08-06311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2017-08-06DOB complaint, category ?
2017-06-28311: Construction Safety Enforcement — SST Tracking Complaint
2017-06-28DOB complaint, category ?
2017-06-27ECB CLASS - 2 violation: PSWO SUPPORTED SCAFFOLD.WORK DOES NOT CONFORM TO APPROVED CONSTRUCTIONDOCUMENTS AT TIME OF INSPECTION SCAFFOLD HAS 15 FULLY PLANKE
2017-06-22Permit NB — ISSUED
2017-06-16Job filed: INSTALLATION OF TEMPORARY STORAGE PLATFORM AS PER DRAWINGS. TEMPORARY STORAGE PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHAN
2017-06-16Permit EQ — ISSUED
2017-06-10311: Blocked Driveway — Partial Access
2017-06-01Permit EQ — ISSUED
2017-05-24Permit EW — ISSUED
2017-05-09ECB CLASS - 1 violation: 3314.3.4 LOADS IMPOSED.NOTE:AT THE TIME OF MY INSPECTION OF A 17 STORYBUILDING AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS.I O
2017-05-08FDNY inspection (CDA-90-DRILL)
2017-05-06ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. (CAZ,PROTECTION) SAFETY MEASURES. NOTE: @ TIME OF
2017-05-06ECB CLASS - 1 violation: SEC: BC3301.1.3. MANUFACTURER SPECIFICATION. NOTE: @ TIME OF INSP OF A 17 STORY BLDG @ ROOF LEVEL, CONSTRUCTION WORK IN PROGRESS. $1,000
2017-05-05311: General Construction/Plumbing — Adjacent Buildings Not Protected
2017-05-05DOB complaint, category ?
2017-04-20Permit EW — ISSUED
2017-04-04Permit EW — ISSUED
2017-03-30Permit EQ — ISSUED
2017-03-30Permit EW — ISSUED
2017-03-29311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2017-03-29ECB CLASS - 1 violation: OPERATING AN ARTICULATING BOOM CRANE W/O A CERTIFICATE OF OPERATION AT THE TIME OBSERVED,EQUIPMENT WAS BEING USED OUTSIDE OF THE E$1,000
2017-03-29ECB CLASS - 1 violation: OPERATING A ARTICULATING BOOM CRANE W/O A CERTIFICATE OF OPERATION A TIME OBSERVED EQUIPMENT WAS BEING USED OUTSIDE OF THE EXCEPT
2017-03-29DOB complaint, category ?
2017-03-15ECB CLASS - 1 violation: SEC. 3308.2 HORIZONTAL NETTING. NOTED: HORIZONTAL NETTING NOT INSTALLED AS PER SITE SAFETY PLAN,UPON INSPECTION OF A 17 STY BLDG,R$1,600
2017-03-07311: Water System — Hydrant Running (WC3)
2017-03-07311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-07DOB complaint, category ?
2017-03-06ECB CLASS - 2 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURE OR TEMPORARY CONSTRUCTION. NOTE: @ TIME OF INSP OF A 17 STORY BLDG @ 16TH FLR LEVEL
2017-03-06ECB CLASS - 2 violation: SEC. 3301.1.3 MANUFACTURER SPECIFICATIONS. NOTE: AT THE TIME OF MY INSPECTION OF A 17 STY BLDG AT 16TH FL LEVEL CONSTRUCTION WORK
2017-03-06ECB CLASS - 2 violation: CONCRETE WASHOUT CONTAINMENT. NOTE: @ TIME OF INSP OF A 17 STORY BLDG @ 16TH FLR LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED CO
2017-03-06DOB violation C:
2017-02-24Permit EQ — ISSUED
2017-02-23311: Noise — Noise: Construction Equipment (NC1)
2017-02-17Permit EW — ISSUED
2017-02-17Permit EW — ISSUED
2017-02-06311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-02-06DOB complaint, category ?
2017-02-04DOB violation C:
2017-02-04ECB CLASS - 1 violation: FAIL TO PERFORM HYDROSTATIC PRESSURE TEST. STAND PIPE. NOTED: BLDG ERECTED TO THE 14TH FLR. WHEN I ASKED FOR HYDROSTATIC TEST- NOT$2,400
2017-02-04DOB violation C:
2017-02-04ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. NOTED: EXP#1 OF SITE HAS GRADE LEVEL MECHANICAL OPE$5,000
2017-02-04ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR AMENDMENTS. NOTED: BLDG ERECTED TO 14 FLR- THE HORIZONTAL NETTING @ $250
2017-01-29311: Noise — Noise: Construction Before/After Hours (NM1)
2017-01-29311: Noise — Noise: Construction Before/After Hours (NM1)
2017-01-28311: General Construction/Plumbing — Safety Netting/Guard Rails - Damaged/Inadequate/None (6 Stories/75 Feet Or Less)
2017-01-28311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-01-28DOB complaint, category ?
2017-01-28DOB complaint, category ?
2017-01-25Rodent inspection: Passed
2017-01-24311: Noise — Noise: Construction Before/After Hours (NM1)
2017-01-22311: Noise — Noise: Construction Before/After Hours (NM1)
2016
2016-11-30Permit EQ — ISSUED
2016-11-28FDNY inspection (CDA-90-DRILL)
2016-11-21311: Noise — Noise: Construction Before/After Hours (NM1)
2016-11-21Permit EQ — ISSUED
2016-11-18311: Noise — Noise: Construction Before/After Hours (NM1)
2016-11-15Permit EQ — ISSUED
2016-11-15Permit EQ — ISSUED
2016-10-05Permit FO — ISSUED
2016-10-05Permit FO — ISSUED
2016-10-03Permit NB — ISSUED
2016-09-13Permit EW — ISSUED
2016-09-13Permit PL — ISSUED
2016-09-07FDNY inspection (CDA-90-DRILL)
2016-08-30311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-08-30DOB complaint, category ?
2016-08-29Permit EW — ISSUED
2016-08-25Permit FO — ISSUED
2016-08-10DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-07-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-07-18Permit FO — ISSUED
2016-07-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-07-08Permit NB — ISSUED
2016-07-06311: Homeless Person Assistance — N/A
2016-06-25311: Homeless Person Assistance — N/A
2016-06-20Job filed: INSTALLATION OF ROOF/OVERHEAD PROTECTION AT ADJACENT BUILDINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. ROOF/OVERHEAD PROTECTION SHALL COMP
2016-06-20Job filed: INSTALLATION OF ROOF/OVERHEAD PROTECTION AT ADJACENT BUILDINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. ROOF/OVERHEAD PROTECTION SHALL COMP
2016-06-20Job filed: INSTALLATION OF ROOF/OVERHEAD PROTECTION AT ADJACENT BUILDINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. ROOF/OVERHEAD PROTECTION SHALL COMP
2016-06-20Permit EQ — ISSUED
2016-05-25FDNY inspection (CONSTR)
2016-05-13311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-05-13DOB complaint, category ?
2016-05-06ECB CLASS - 1 violation: PROTECTION OF ROOFS AT TIME OF INSPECION FORMING WORK GOING AT 3RD FLRLEVEL. THERE IS NO PROTECTION PROVIDED ON NORTH AND SOUTH SI$1,600
2016-05-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-05-05ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: AT FRAMING DECK TO POW 3RD STY-NO EVIDENCE$10,000
2016-05-05DOB complaint, category ?
2016-04-27Permit EQ — ISSUED
2016-04-25Job filed: INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPERATELY. DEBRIS NETTING SHALL COMPLY WITH CHAPTER #33 OF THE
2016-04-25Job filed: INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPERATELY. DEBRIS NETTING SHALL COMPLY WITH CHAPTER #33 OF THE
2016-04-25Job filed: INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPERATELY. DEBRIS NETTING SHALL COMPLY WITH CHAPTER #33 OF THE
2016-04-22Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE
2016-04-22Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE
2016-04-22Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE
2016-04-22Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE
2016-04-19311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2016-04-19DOB complaint, category ?
2016-04-18ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS AS NOTED: AT TIME OF INSPECTION AT ACTIVE JOB SIT$1,000
2016-04-12311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2016-04-12DOB complaint, category ?
2016-04-08Job filed: INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION. DEBRIS NETTING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE
2016-04-08Job filed: INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION. DEBRIS NETTING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE
2016-04-05Permit EW — ISSUED
2016-03-28311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2016-03-28311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2016-03-28DOB complaint, category ?
2016-03-28DOB complaint, category ?
2016-03-25Permit EW — ISSUED
2016-03-25Permit EW — ISSUED
2016-03-25Permit EW — ISSUED
2016-03-24ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR APPROVED AMENDMENTS.AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONST$1,000
2016-03-24ECB CLASS - 2 violation: BC3301.7 FAILURE TO PROVIDE PE APPROVED DESIGN DRAWINGS FOR STAY FORMAS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SI$400
2016-03-14FDNY inspection (CONSTR)
2016-03-11Permit EW — ISSUED
2016-03-03Permit EW — ISSUED
2016-03-01Rodent inspection: Passed
2016-02-26Permit EQ — ISSUED
2016-02-26Permit FO — ISSUED
2016-02-26Permit FO — ISSUED
2016-02-23311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2016-02-23311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2016-02-23Permit EW — ISSUED
2016-02-23DOB complaint, category ?
2016-02-23DOB complaint, category ?
2016-02-22ECB CLASS - 2 violation: SEC. 28-104.7 SUBMITTAL OF CONSTRUCTION DOCUMENTS AS NOTED: AT TIME OFINSPECTION OBSERVED RESHORES AT CELLAR LEVEL IN CRIBBING NO
2016-02-22ECB CLASS - 1 violation: SEC. 3301.7 FAILURE TO PROVIDE P.E. APPROVED DESIGN DRAWING. AS NOTED:AT TIME OF INSPECTION AT ACTIVE SITE OBSERVED COLD JOINT AT $1,600
2016-01-28Permit NB — ISSUED
2016-01-14FDNY inspection (CONSTR)
2016-01-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2016-01-05DOB complaint, category ?
2015
2015-12-30Permit EQ — ISSUED
2015-12-21Permit EQ — ISSUED
2015-12-18Permit EQ — ISSUED
2015-12-18Permit EQ — ISSUED
2015-11-14311: Noise — Noise: Construction Before/After Hours (NM1)
2015-11-12FDNY inspection (CONSTR)
2015-10-01311: Noise — Noise: Construction Equipment (NC1)
2015-09-21311: Taxi Complaint — Vehicle Complaint
2015-09-08FDNY inspection (CONSTR)
2015-09-03Permit PL — ISSUED
2015-08-28311: Taxi Complaint — Driver Complaint
2015-08-05Permit EW — ISSUED
2015-07-14311: Construction Safety Enforcement — Excavation Tracking Complaint
2015-07-14DOB complaint, category ?
2015-07-01Job filed: A2$1,000
2015-07-01Job filed: A2$1,000
2015-06-24311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2015-06-24DOB complaint, category ?
2015-06-08FDNY inspection (CONSTR)
2015-05-01311: Construction Safety Enforcement — Excavation Tracking Complaint
2015-05-01DOB complaint, category ?
2015-04-30ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS @ THE JOBSITE @ THE TIME OF INSP.THE RESPONDENT FAILED TO PROVIDE ACCEPTED SUPPORT OF E
2015-04-30ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED PLANS OR APPROVED AMENDMENTS.UNDERPINNINGS DOES NOT CONFORM TO APPROVED PLANS.BECAUSE OF EXISTIN
2015-03-30FDNY inspection (CONSTR)
2015-03-26Permit EW — ISSUED
2015-03-20Permit EW — ISSUED
2015-03-20Permit EW — ISSUED
2015-03-20Permit EW — ISSUED
2015-03-19311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-03-19DOB complaint, category ?
2015-03-11Job filed: INSTALLATION OF AIR PRESSURIZED STANDPIPE ALARM IN ACCORDANCE WITH LOCAL LAW 64/2009 AS PER SUBMITTED PLANS. ALL WORK IN CONJUNCTION WITH NEW BUILDING$1,000
2015-03-11Permit EW — ISSUED
2015-03-11Permit NB — ISSUED
2015-03-09FDNY inspection (CONSTR)
2015-03-06Permit EW — ISSUED
2015-02-26Permit EW — ISSUED
2015-02-26Permit FO — ISSUED
2015-02-26Permit FO — ISSUED
2015-02-25Permit EQ — ISSUED
2015-02-25Permit EW — ISSUED
2015-02-23Permit EW — ISSUED
2015-02-20Permit EW — ISSUED
2015-02-17Job filed: TEMPORARY SUPPORTS FOR FIRST FLOOR TEMPORARY HOIST WORK IN CONJUNCTION WITH NB# 121040729.$1,000
2015-01-29Job filed: INSTALLATION OF A SINGLE 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTE
2015-01-29Permit EW — ISSUED
2015-01-29Permit EQ — ISSUED
2015-01-29Permit EW — ISSUED
2014
2014-12-24Permit EQ — ISSUED
2014-12-23Job filed: INSTALLATION OF 100 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL
2014-12-23Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. N
2014-12-23Job filed: INSTALLATION OF ROOF PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF TH
2014-12-23Permit EQ — ISSUED
2014-12-23Permit EQ — ISSUED
2014-12-15311: Taxi Complaint — Driver Complaint
2014-11-13Permit EW — ISSUED
2014-11-13Permit EW — ISSUED
2014-10-23Rodent inspection: Passed
2014-10-17Job filed: APPLICATION FILED HEREWITH FOR SUPPORT OF EXCAVATION WORK. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION# 12104079. NO CHANGE OF USE$1,000
2014-10-17Permit PL — ISSUED
2014-10-15311: Rodent — Rat Sighting
2014-10-09311: Construction Safety Enforcement — SST Tracking Complaint
2014-10-09DOB complaint, category ?
2014-10-06FDNY inspection (SPECIAL-OTH)
2014-10-02ECB CLASS - 2 violation: CONSTRUCTION DOCUMENTS SHALL BE MAINTAINED AT JOB SITE UNTIL THE WORK AUTHORIZED BY THE PERMIT IS COMPLETED & SIGNED OFF BY THE DE
2014-09-05311: BEST/Site Safety — Demolition Notification Received
2014-09-05311: BEST/Site Safety — Demolition Notification Received
2014-09-05311: BEST/Site Safety — Demolition Notification Received
2014-09-05DOB complaint, category ?
2014-09-05DOB complaint, category ?
2014-09-05DOB complaint, category ?
2014-09-02Permit DM — ISSUED
2014-09-02Permit EQ — ISSUED
2014-08-25Permit DM — ISSUED
2014-08-22Permit EQ — ISSUED
2014-08-22Permit DM — ISSUED
2014-08-12Permit EQ — ISSUED
2014-08-11Permit EQ — ISSUED
2014-08-11Permit EQ — ISSUED
2014-08-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-08-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-08-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-08-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-07-31Job filed: 232-236 7TH.AVENUE - INSTALLATION OF PROPOSED 8' HIGH TEMPORARY CONSTRUCTION PLYWOOD FENCE IN CONJUNCTION WITH NB APPLICATION# 121040729
2014-07-31Permit EQ — ISSUED
2014-07-21311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2014-02-28Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH ONE WAY VOICE COMMUNICATION.$1,000
2014-01-30Permit EQ — ISSUED
2014-01-30Permit EQ — ISSUED
2014-01-30Permit EQ — ISSUED
2014-01-29City emergency repair (OMO): emergency for permanent shed 1.) erect steelpole sidewalk shed at front, approx. 20w x 16w (3 legs) x 16h with outrigger$4,650
2014-01-29Job filed: PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-01-29Job filed: PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-01-29Job filed: PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-01-22DOB violation EGNCY:
2014-01-18ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. DEFECTS NOTED: APPROX 20 LAYERS OF BRICK WORK AT 2ND FLR OF THE FRONT OF THE PR$250
2014-01-14311: Broken Muni Meter — Coin or Card Did Not Register
2013
2013-12-30Job filed: DM
2013-12-30Job filed: DM
2013-12-30Job filed: DM
2013-12-30Job filed: DM
2013-12-30Job filed: DM
2013-12-21311: Broken Muni Meter — No Receipt
2013-12-09311: General Construction/Plumbing — Failure To Maintain
2013-12-09DOB complaint, category ?
2013-10-18Permit PL — ISSUED
2013-10-18Permit EW — ISSUED
2013-10-18Permit EW — ISSUED
2013-09-28311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-28311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-28311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-19Job filed: THIS ALTERATION TYPE II APPLICATION IS BEING FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #121040729 FOR THE MECHANICAL & BOILER WORK AT THE$2,000
2013-09-02311: Graffiti — Graffiti
2013-09-02311: Graffiti — Graffiti
2013-08-19311: Broken Muni Meter — Coin or Card Did Not Register
2013-08-01Rodent inspection: Passed
2013-07-20311: Rodent — Rat Sighting
2013-06-09311: Street Light Condition — Street Light Out
2013-05-01TL&R — from BANCO POPULAR NORTH AMERICA
2013-04-18311: Water System — No Water/Low Pressure (WA5)
2013-04-10M&CON $2,100,000 — from CHELSEA 7 JV LLC to BANK HAPOALIM B.M.$2,100,000
2013-04-10Mortgage assigned — from BANCO POPULAR NORTH AMERICA to BANK HAPOALIM B.M.
2013-03-22Tenant complaint: HEATING — HEAT RELATED
2013-02-11311: Food Poisoning — 1 or 2
2012
2012-09-21Job filed: THIS ALTERATION TYPE II APPLICATION IS BEING FILED FOR SPRINKLER AND RELATED PLUMBING & STANDPIPE WORK ON CELLAR, 001 TO 16 STORY BUILDING IN CONJ$3,000
2012-08-23311: Broken Muni Meter — Coin or Card Did Not Register
2012-08-16Rodent inspection: Passed
2012-08-16Rodent inspection: Passed
2012-08-16Rodent inspection: Passed
2012-07-24Job filed: THIS ALTERATION TYPE III APPLICATION IS BEING FILED FOR BUILDERS PAVEMENT PLAN IN COMJUNCTION WITH NEW BUILDING APPLICATION #121040729. THERE ARE NO C
2012-07-24Job filed: THIS ALTERATION TYPE III APPLICATION IS BEING FILED FOR BUILDERS PAVEMENT PLAN IN COMJUNCTION WITH NEW BUILDING APPLICATION #121040729. THERE ARE NO C
2012-07-24Job filed: FILING IN CONSTRUCT A MARQUEE AT THE GROUND LEVEL AS PER PLANS FILED. THE STRUCTURAL WORK FOR THE MARQUEE WILL BE FILED UNDER A SEPARATE APPLICATION T$1,000
2012-07-24Job filed: STRUCTURAL WORK THROUGHOUT THE CELLAR, FLOORS 1 TO 17 AND ROOF AS PER PLANS FILED. THIS APPLICATION IS BEING FILED IN CONJUNCTION WITH THE NEW BUILDIN$1,000
2012-07-24Job filed: FILING IN CONSTRUCT A MARQUEE AT THE GROUND LEVEL AS PER PLANS FILED. THE STRUCTURAL WORK FOR THE MARQUEE WILL BE FILED UNDER A SEPARATE APPLICATION T$1,000
2012-07-20CERT — from KINGS TITLE AGENCY LLC to CHELSEA 7 JV LLC
2012-07-20ZONE — from CHELSEA 7 JV LLC
2012-07-13Job filed: EXCAVATION, SHORING AND FOUNDATION WORK TO CONSTRUCT A NEW BUILDING.
2012-05-21Job filed: TO CONSTRUCT A NEW MULTIPLE DWELLING RESIDENTIAL BUILDING WITH RETAIL STORES ON THE FIRST FLOOR.
2012-05-21Job filed: TO CONSTRUCT A NEW MULTIPLE DWELLING RESIDENTIAL BUILDING WITH RETAIL STORES ON THE FIRST FLOOR.
2012-05-11Deed — from BRIGHTON BEACH ENTERPRISES CORP.; KA-NO REALTY INC.; KARMELENA REALTY CO., LLC to CHELSEA 7 JV LLC
2009-04-17Job filed: INSTALL FIRE SUPPRESSION SYSTEM UNDER THE KITCHEN HOOD.THIS APPLICATION IS FILED IN CONJUNCTION WITH JOB #120077521. U.G.#6 NO CHANGE IN EGRESS, OCCUP$3,000
2009-04-17Job filed: INSTALL FIRE SUPPRESSION SYSTEM UNDER THE KITCHEN HOOD.THIS APPLICATION IS FILED IN CONJUNCTION WITH JOB #120077521. U.G.#6 NO CHANGE IN EGRESS, OCCUP$3,000
2009-04-17Job filed: INSTALL FIRE SUPPRESSION SYSTEM UNDER THE KITCHEN HOOD.THIS APPLICATION IS FILED IN CONJUNCTION WITH JOB #120077521. U.G.#6 NO CHANGE IN EGRESS, OCCUP$3,000
2009-03-26Permit EW — ISSUED
2009-03-26Permit EW — ISSUED
2009-03-24Job filed: RENOVATE EXISTING EATING AND DRINKING ESTABLISHMENT WITH REPLACING COOKING EQUIPMENTS AND PLUMBING FIXTURES. U.G.#6 NO CHANGE IN EGRESS, OCCUPANCY OR $38,000
2009-03-24Job filed: RENOVATE EXISTING EATING AND DRINKING ESTABLISHMENT WITH REPLACING COOKING EQUIPMENTS AND PLUMBING FIXTURES. U.G.#6 NO CHANGE IN EGRESS, OCCUPANCY OR $38,000
2008
2008-02-01Permit EW — ISSUED
2008-01-23Job filed: MODIFY EXISTING FIRE SUPPRESSION SYSTEM (FDNY PLAN# 2309-03 DOB JOB# 103670573) IN KITCHEN RANGE HOOD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2006
2006-09-26Tenant complaint: PLUMBING — TOILET
2006-09-26Tenant complaint: PLUMBING — WATER SUPPLY
2005-06-21Job filed: INSTALL NON ILLUMINATED STOREFRONT BUSIN ESS AWNING READING: " LITTLE SE UL" + "KOREAN & JAPANESE RESTURANT" + 23 20.$2,000
2004
2004-11-06Tenant complaint: HEATING — HEAT RELATED
2004-07-28M&CON $750,000 — from KARMELENA REALTY CO. LLC to BANCO POPULAR NORTH AMERICA$750,000
2004-07-28Mortgage assigned — from ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to BANCO POPULAR NORTH AMERICA
2004-07-28AL&R $750,000 — from BANCO POPULAR NORTH AMERICA to KARMELENA REALTY CO. LLC$750,000
2004-07-28TL&R — from KARMELENA REALTY CO., LLC to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2004-03-23Tenant complaint: HEATING — HEAT RELATED
2004-03-14DOB complaint, category ?
2004-01-28Tenant complaint: NONCONST — VERMIN
2004-01-24Tenant complaint: HEATING — HEAT RELATED
2003
2003-12-19Permit EW — ISSUED
2003-12-16Job filed: REPLACE AUTOMATIC FIRE SUPPRESSION SYSTEM IN EXISTING KITCHEN RANGEHOOD. NO CHANGE IN USE, EGRESS AND OCCUPANCY. GAS SHUT-OFF VALVE AND COOKING EQUIPM$3,000
2003-12-16Job filed: REPLACE AUTOMATIC FIRE SUPPRESSION SYSTEM IN EXISTING KITCHEN RANGEHOOD. NO CHANGE IN USE, EGRESS AND OCCUPANCY. GAS SHUT-OFF VALVE AND COOKING EQUIPM$3,000
2003-05-19ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED LOCAL LAW 11
2003-03-11Permit EW — ISSUED
2003-02-12Permit PL — ISSUED
2002
2002-08-30Deed — from SHEMEL, SABAH to KARMELENA REALTY CO,LLC
2002-08-30Mortgage assigned — from KARMELENA REALTY CO,LLC to ASTORIA FEDERAL SAVINGS & LOAN ASSOCIATI
2002-08-30Mortgage assigned — from AHN, YONG SEOK to ASTORIA FEDERAL SAVINGS & LOAN ASSOCIATI
2002-08-30Mortgage $55,000 — from KARMELENA REALTY CO,LLC to ASTORIA FEDERAL SAVINGS & LOAN ASSOCIATI$55,000
2001
2001-11-01DOB violation C:
2001-08-08Permit EW — ISSUED
2001-05-09Permit PL — ISSUED
2001-05-09Permit PL — ISSUED
2001-05-02Permit EQ — ISSUED
2001-05-02Permit EW — ISSUED
2001-05-02Permit EW — ISSUED
2001-04-26Job filed: INSTALLATION OF COOKING EQUIPMENTS, RANGE HOOD EXHAUST SYSTEM, SINKS AND FIRE SUPPRESSION SYSTEM, NEW STORE FRONT, AS PER PLAN FILED. NO CHANGE IN E$12,000
2001-04-26Job filed: INSTALLATION OF COOKING EQUIPMENTS, RANGE HOOD EXHAUST SYSTEM, SINKS AND FIRE SUPPRESSION SYSTEM, NEW STORE FRONT, AS PER PLAN FILED. NO CHANGE IN E$12,000
1998
1998-03-19Permit EW — ISSUED
1997
1997-12-04Permit PL — ISSUED
1997-08-25Permit EW — ISSUED
1997-08-25Permit EW — ISSUED
1997-07-17Mortgage $370,000 — from SHEMEL, SABAH to AHN, YONG SEOK$370,000
1997-07-17Deed — from AHN, YONG SEOK to SHEMEL, SABAH
1997-07-17Deed — from SHEMEL, SABAH to KARMELENA REALTY CO.LLC
1996
1996-07-11Permit PL — ISSUED
1996-06-18Permit EW — ISSUED
1996-01-09DOB complaint, category ?
1995
1995-10-20DOB violation Z:
1995-10-20DOB violation C:
1995-10-20DOB violation Z:
1995-10-20DOB violation C:
1995-03-14DOB violation Z:
1995-03-14DOB violation Z:
1995-03-14DOB violation C:
1995-03-14DOB violation C:
1995-01-19Mortgage satisfied — from KIM, JOONG LOG; KIM, OCK SOON to KOREA EXCHANGE BANK
1995-01-19Mortgage satisfied — from 232 SEVENTH AVENUE CORP. to CURCIO, VINCENT
1994
1994-12-28Deed — from KIM, JOONG LOG; KIM, OCK SOON to AHN, YONG SEOK
1993
1993-12-15Permit EW — ISSUED
1993-07-09Permit EW — ISSUED
1993-04-28Permit PL — ISSUED
1993-04-27Permit PL — ISSUED
1992
1992-12-10DOB complaint, category ?
1992-12-10DOB complaint, category ?
1992-07-02SMIS — from KIM, JOENG LOG to KOREA EXCHANGE BANK
1992-06-30Agreement — from CURCIO, VINCENT to KIM, JOONG LOG; KIM, OCK SOON
1992-06-30Agreement — from KOREA EXCHANGE BANK to KOREA EXCHANGE BANK
1992-06-30CERT — from CURCIO, VINCENT
1992-06-30Mortgage $40,000 — from KIM, OCK SOON; KIM, JOONG LOG to KOREA EXCHANGE BANK$40,000
1992-06-30Mortgage assigned — from CURCIO, VINCENT to KOREA EXCHANGE BANK
1992-06-30Agreement — from CURCIO, VINCENT to KIM, JOONG LOG; KIM, OCK SOON
1992-06-30Agreement — from KIM, JOONG LOG; KIM, OCK SOON to KOREA EXCHANGE BANK
1992-06-30Agreement — from CURCIO, VINCENT to KIM, OCK SOON; KIM, JOONG LOG
1991
1991-11-07Permit EW — ISSUED
1991-11-07Permit EW — ISSUED
1991-10-23Permit PL — ISSUED
1991-10-07Permit EQ — ISSUED
1991-10-07Permit EW — ISSUED
1991-09-17DOB violation C:
1991-09-17DOB violation C:
1991-05-23DOB violation C:
1991-05-23DOB violation Z:
1991-05-23DOB violation C:
1991-05-23DOB violation Z:
1990
1990-08-21Permit EW — ISSUED
1990-08-02DOB complaint, category ?
1989
1989-05-22DOB violation Z:
1989-05-22DOB violation C:
1989-05-22DOB violation Z:
1989-05-22DOB violation Z:
1988
1988-10-27ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED INSTALLED NEW WOOD FLOOR BEAMS ON 1ST FLOOR ;REMEDY OBTAIN A PERMIT
1987
1987-05-04PAT — from JEONG, KYOUNG HEE; KIM, KYOUNG HEE FKA to KIM, IN HACK; KIM, SOON SIL
1987-05-04Deed — from 232 7TH AVE REALTY CORP to KIM, OCK SOON; KIM, JOONG LOG
1987-05-04CERT — from CURCIO, VINCENT
1987-05-04Mortgage $250,000 — from KIM, JOONG LOG; KIM, OCK SOON to KOREA EXCHANGE BK$250,000
1986
1986-09-23Deed — from CURCIO, VINCENT to 232 SEVENTH AVE RLTYCP.
1986-09-23Mortgage $627,000 — from 232 SEVENTH AVE CORP to CURCIO, VINCENT$627,000
1985
1985-12-30Deed — from ECHEZABAL, X. L. LWT; LUCIRICA, XAVIER LWT; ECHEZABAL, J.L. LWTAKA; LAUCIRICA, MERCEDESAKA to CURCIO, VINCENT A