The city's published records show little recorded distress here in the last three years. More recorded distress than 52% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 18.3. In ZIP 10010, 74% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$27,400 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
20 service requests in the last three years. Most common: Noise (7) · General Construction/Plumbing (5) · Illegal Parking (4) · Graffiti (1) · Drug Activity (1) · Street Sign (1).
Filed construction activity
$64,921,256 in permitted construction work filed since
2016 (60 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1924)
Yes
Six or more residential units (23)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
M4 Gramercy Park Hotel LLC
Head officer
William White
Managing agent
MCR Property Management LLC
Last registered
2025-08-14
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$74,546,000
$33,545,700
2026
$63,964,000
$28,783,800
2027
$65,910,000
$29,659,500
The city's market estimate has fallen
12% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 22/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NO6FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 8)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
23 St-Baruch College — 6 · 400 ft straight-line (about a 2-minute walk) · station accessibility: full 23 St — R W · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Park Av South / E 21 St — M1 M2 M3 · 400 ft
Citi Bike
Gramercy Park N & Gramercy Park E · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
20 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $12,000,000 on
2026-07-21 (lender: BMO Bank N.A.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-07-21
Mortgage $38,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$38,000,000
2026-07-21
Mortgage $12,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$12,000,000
2026-07-02
Mortgage $3,335,605 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$3,335,605
2026-07-02
Mortgage $5,229,623 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$5,229,623
2026-06-02
Mortgage $4,759,541 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$4,759,541
2026-06-02
Mortgage $3,107,709 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$3,107,709
2026-03-10
Mortgage $35,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$35,000
2026-03-10
Agreement $20,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$20,000,000
2026-03-10
Mortgage $35,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
$35,000
2026-01-15
Mortgage $20,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A..
$20,000,000
2023-08-23
MLEA $179,846,754 — from GRAMERCY PARK PARTNERS, LLC to M4 GRAMERCY PARK HOTEL LLC
$179,846,754
2019-06-07
Agreement $75,000,000 — from GPH GROUND TENANT LLC; GPH MANAGEMENT LLC; GPH MASTER TENANT LLC to JPMORGAN CHASE BANK, N.A.
$75,000,000
2017-04-26
Agreement $90,000,000 — from GPH MASTER TENANT LLC; GPH GROUND TENANT LLC; GPH MANAGEMENT LLC to JPMORGAN CHASE BANK, N.A.
$90,000,000
2015-06-01
Deed $4,650,000 — from THE LILLIAN GOLDMAN 2002 L.L.C.; JANE H. GOLDMAN AS CO-EXECUTOR; ALLAN H. GOLDMAN AS CO-EX to GRAMERCY PARK PARTNERS LLC
$4,650,000
2014-05-06
M&CON $4,000,000 — from GPH GROUND TENANT LLC; GPH MANAGEMENT LLC; GPH MASTER TENANT LLC to JPMORGAN CHASE BANK NA
$4,000,000
Ten-year activity
2001000
2017
2018
2019
2020
2021
2022
2023
2024
2025
126
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
5
10
13
1
5
34
2018
4
8
13
0
4
29
2019
8
9
19
1
2
39
2020
6
9
21
0
5
41
2021
3
21
14
2
0
40
2022
0
10
13
1
0
24
2023
2
4
6
3
2
17
2024
6
7
7
0
1
21
2025
39
4
10
1
14
68
2026
80
25
5
11
5
126
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Modifications to existing Plumbing system including fixtures and piping related to 1st fl. Restaurant renovation. No change in occupancy, use or egre
2026-10-07
Job filed: FILING MECHANICAL SCOPE OF WORK FOR THE INTERIOR RENOVATION OF EXISTING 1ST FLOOR RESTAURANT /BAR, COMMERCIAL KITCHENS, HOTEL RECEPTION, GIFT SHOP AN
2026-10-07
Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM INCLUDING SPRINKLER HEADS AND PIPING RELATED TO RESTAURANT RENOVATION. NO CHANGE IN OCCUPANCY, USE OR EGRE
2026-10-01
Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-09-30
Job filed: PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF RESTAURANT & KITCHEN SPACES. NEW FINISHES AND LIGHTING WITH PARTITION MODIFICATI
2026-09-24
Job filed: Modifications to existing Plumbing System related to Guestrooms renovation.
2026-09-24
Permit Sprinklers — Permit Issued
2026-09-24
Permit Plumbing — Permit Issued
2026-09-18
Permit Plumbing — Permit Issued
2026-09-16
Job filed: General Construction renovations related to Cellar BOH renovations and guestrooms on floors 3-16th (17th market). No change to occupancy, use or egr
2026-09-15
Job filed: Proposed Addition at the 17th fl. & Roof Level which will serve as added space to the exist. Kitchen on the 17th fl. & Mechanical rm at the Roof level
2026-09-14
Permit Sprinklers — Permit Issued
2026-09-14
Permit Plumbing — Permit Issued
2026-09-11
Permit Mechanical Systems — Permit Issued
2026-09-11
Permit General Construction — Permit Issued
2026-09-11
Permit Mechanical Systems — Permit Issued
2026-09-11
Permit General Construction — Permit Issued
2026-09-10
Job filed: Installation of suspended scaffold for facade work and/or inspection.Amend #3 added scaffold drops and outrigger detail
2026-09-09
Permit General Construction — Permit Issued
2026-09-09
Permit General Construction — Permit Issued
2026-09-08
Permit Mechanical Systems — Permit Issued
2026-09-08
Permit Mechanical Systems — Permit Issued
2026-08-28
Permit General Construction — Permit Issued
2026-08-25
Job filed: Modifications to existing Mechanical System for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BAC
2026-08-25
Job filed: Modification to existing Plumbing system for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BACK O
2026-08-25
Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-25
Job filed: Modification to existing Sprinkler System for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BACK
2026-08-21
Job filed: INTERIOR RENOVATION OF EXISTING 17TH FLOOR PENTHOUSE, INCLUDING RECEPTION, LOUNGES, TOILET ROOMS, BARS, FINISHES, AND LIGHTING THROUGHOUT, PARTITION M
2026-08-13
311: Illegal Parking — Blocked Crosswalk
2026-08-11
Permit Sidewalk Shed — Permit Issued
2026-08-06
Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-03
ECB CLASS - 1 violation: AN INCIDENT THAT OCCURRED ON 07-22-2026 AT THIS JOBSITE WHERE WORKER FELL OFF LADDER AMBULANCE WAS CALLED, UPON REVIEW DEPARTMENT
2026-08-03
DOB complaint, category ?
2026-07-29
Permit Structural — Permit Issued
2026-07-27
Permit General Construction — Permit Issued
2026-07-27
DOB complaint, category ?
2026-07-27
DOB complaint, category ?
2026-07-27
DOB complaint, category ?
2026-07-23
Permit Sprinklers — Permit Issued
2026-07-23
Permit Sprinklers — Permit Issued
2026-07-22
ECB CLASS - 1 violation: AT TIME OF INSPECTION OF 17 STORY BUILDING OBSERVED SHEET ROCK OPERATIONS ON THE 10 FLOOR WHERE JACOBSON EMPLOYEE WORKING ON PLATF
2026-07-22
DOB complaint, category ?
2026-07-21
Mortgage $38,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
2026-07-21
Mortgage $12,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
2026-07-21
Permit Plumbing — Permit Issued
2026-07-21
Permit Plumbing — Permit Issued
2026-07-20
Permit Structural — Permit Issued
2026-07-07
Job filed: Modifications to existing Sprinkler system per plans filed. No change in occupancy, use or egress.
2026-07-07
Job filed: Interior modifications to existing Mechanical system per plans filed. No change in occupancy, use or egress.
2026-07-07
Job filed: Interior modifications to existing Plumbing system per plans filed. No change in occupancy, Use or Egress
2026-07-06
Job filed: Interior demolition and construction of non- load bearing partitions and hung ceilings per plans filed herewith. No change in occupancy, use or egres
2026-07-02
Mortgage $3,335,605 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
2026-07-02
Mortgage $5,229,623 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
2026-07-01
Permit Protection and Mechanical Methods — Permit Issued
2026-06-22
Permit Protection and Mechanical Methods — Permit Issued
2026-06-16
DOB complaint, category ?
2026-06-16
DOB complaint, category ?
2026-06-16
DOB complaint, category ?
2026-06-16
DOB complaint, category ?
2026-06-15
DOB complaint, category ?
2026-06-15
DOB complaint, category ?
2026-06-15
DOB complaint, category ?
2026-06-15
DOB complaint, category ?
2026-06-15
DOB complaint, category ?
2026-06-12
Permit General Construction — Permit Issued
2026-06-11
Permit Mechanical Systems — Permit Issued
2026-06-10
Permit Mechanical Systems — Permit Issued
2026-06-10
Permit Mechanical Systems — Permit Issued
2026-06-10
Permit General Construction — Permit Issued
2026-06-10
Permit General Construction — Permit Issued
2026-06-02
Mortgage $4,759,541 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
2026-06-02
Mortgage $3,107,709 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.
2026-06-02
Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION& OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-06-02
Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-06-02
Permit Supported Scaffold — Permit Issued
2026-06-02
Permit Protection and Mechanical Methods — Permit Issued
2026-05-29
FDNY inspection (ALT)
2026-05-29
Permit General Construction — Permit Issued
2026-05-14
Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UND
2026-05-14
Permit Sidewalk Shed — Permit Issued
showing the 80 most recent
The full timeline
2026
2026-10-07Job filed: Modifications to existing Plumbing system including fixtures and piping related to 1st fl. Restaurant renovation. No change in occupancy, use or egre$8,050
2026-10-07Job filed: FILING MECHANICAL SCOPE OF WORK FOR THE INTERIOR RENOVATION OF EXISTING 1ST FLOOR RESTAURANT /BAR, COMMERCIAL KITCHENS, HOTEL RECEPTION, GIFT SHOP AN$191,507
2026-10-07Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM INCLUDING SPRINKLER HEADS AND PIPING RELATED TO RESTAURANT RENOVATION. NO CHANGE IN OCCUPANCY, USE OR EGRE$15,000
2026-10-01Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-09-30Job filed: PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF RESTAURANT & KITCHEN SPACES. NEW FINISHES AND LIGHTING WITH PARTITION MODIFICATI$369,592
2026-09-24Job filed: Modifications to existing Plumbing System related to Guestrooms renovation.$7,998,585
2026-09-24Permit Sprinklers — Permit Issued
2026-09-24Permit Plumbing — Permit Issued
2026-09-18Permit Plumbing — Permit Issued
2026-09-16Job filed: General Construction renovations related to Cellar BOH renovations and guestrooms on floors 3-16th (17th market). No change to occupancy, use or egr$13,332,381
2026-09-15Job filed: Proposed Addition at the 17th fl. & Roof Level which will serve as added space to the exist. Kitchen on the 17th fl. & Mechanical rm at the Roof level$454,500
2026-09-14Permit Sprinklers — Permit Issued
2026-09-14Permit Plumbing — Permit Issued
2026-09-11Permit Mechanical Systems — Permit Issued
2026-09-11Permit General Construction — Permit Issued
2026-09-11Permit Mechanical Systems — Permit Issued
2026-09-11Permit General Construction — Permit Issued
2026-09-10Job filed: Installation of suspended scaffold for facade work and/or inspection.Amend #3 added scaffold drops and outrigger detail
2026-09-09Permit General Construction — Permit Issued
2026-09-09Permit General Construction — Permit Issued
2026-09-08Permit Mechanical Systems — Permit Issued
2026-09-08Permit Mechanical Systems — Permit Issued
2026-08-28Permit General Construction — Permit Issued
2026-08-25Job filed: Modifications to existing Mechanical System for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BAC$500,060
2026-08-25Job filed: Modification to existing Plumbing system for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BACK O$300,080
2026-08-25Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-25Job filed: Modification to existing Sprinkler System for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BACK $50,040
2026-08-21Job filed: INTERIOR RENOVATION OF EXISTING 17TH FLOOR PENTHOUSE, INCLUDING RECEPTION, LOUNGES, TOILET ROOMS, BARS, FINISHES, AND LIGHTING THROUGHOUT, PARTITION M$1,500,070
2026-08-06Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-03ECB CLASS - 1 violation: AN INCIDENT THAT OCCURRED ON 07-22-2026 AT THIS JOBSITE WHERE WORKER FELL OFF LADDER AMBULANCE WAS CALLED, UPON REVIEW DEPARTMENT $10,000
2026-08-03DOB complaint, category ?
2026-07-29Permit Structural — Permit Issued
2026-07-27Permit General Construction — Permit Issued
2026-07-27DOB complaint, category ?
2026-07-27DOB complaint, category ?
2026-07-27DOB complaint, category ?
2026-07-23Permit Sprinklers — Permit Issued
2026-07-23Permit Sprinklers — Permit Issued
2026-07-22ECB CLASS - 1 violation: AT TIME OF INSPECTION OF 17 STORY BUILDING OBSERVED SHEET ROCK OPERATIONS ON THE 10 FLOOR WHERE JACOBSON EMPLOYEE WORKING ON PLATF$2,500
2026-07-22DOB complaint, category ?
2026-07-21Mortgage $38,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$38,000,000
2026-07-21Mortgage $12,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$12,000,000
2026-07-21Permit Plumbing — Permit Issued
2026-07-21Permit Plumbing — Permit Issued
2026-07-20Permit Structural — Permit Issued
2026-07-07Job filed: Modifications to existing Sprinkler system per plans filed. No change in occupancy, use or egress.$100,004
2026-07-07Job filed: Interior modifications to existing Mechanical system per plans filed. No change in occupancy, use or egress.$850,000
2026-07-07Job filed: Interior modifications to existing Plumbing system per plans filed. No change in occupancy, Use or Egress$250,016
2026-07-06Job filed: Interior demolition and construction of non- load bearing partitions and hung ceilings per plans filed herewith. No change in occupancy, use or egres$225,080
2026-07-02Mortgage $3,335,605 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$3,335,605
2026-07-02Mortgage $5,229,623 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$5,229,623
2026-07-01Permit Protection and Mechanical Methods — Permit Issued
2026-06-22Permit Protection and Mechanical Methods — Permit Issued
2026-06-16DOB complaint, category ?
2026-06-16DOB complaint, category ?
2026-06-16DOB complaint, category ?
2026-06-16DOB complaint, category ?
2026-06-15DOB complaint, category ?
2026-06-15DOB complaint, category ?
2026-06-15DOB complaint, category ?
2026-06-15DOB complaint, category ?
2026-06-15DOB complaint, category ?
2026-06-12Permit General Construction — Permit Issued
2026-06-11Permit Mechanical Systems — Permit Issued
2026-06-10Permit Mechanical Systems — Permit Issued
2026-06-10Permit Mechanical Systems — Permit Issued
2026-06-10Permit General Construction — Permit Issued
2026-06-10Permit General Construction — Permit Issued
2026-06-02Mortgage $4,759,541 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$4,759,541
2026-06-02Mortgage $3,107,709 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$3,107,709
2026-06-02Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION& OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2026-06-02Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-06-02Permit Protection and Mechanical Methods — Permit Issued
2026-05-29FDNY inspection (ALT)
2026-05-29Permit General Construction — Permit Issued
2026-05-14Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UND$25,000
2026-05-14Permit Sidewalk Shed — Permit Issued
2026-05-12Job filed: MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS RELATED TO PARTIAL INTERIOR RENOVATION OF EXIST. 1ST FLOOR SPACES WITH PUBLIC BAR SPACE (ROSE BAR). NO C$200,000
2026-05-12Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$20,000
2026-05-12Job filed: MODIFICATIONS TO EXISTING PLUMBING SYSTEM RELATED TO PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL LOBB$7,500
2026-05-11Job filed: PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL LOBBY. NEW FINISHES AND LIGHTING WITH PARTITION MODIFICAT$1,399,966
2026-05-11Job filed: MODIFICATIONS TO EXISTING PLUMBING SYSTEM RELATED TO PARTIAL INTERIOR RENOVATION OF EXIST. 1ST FLOOR SPACES WITH PUBLIC BAR SPACE (ROSE BAR). NO CHAN$35,000
2026-05-11Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM RELATED TO PARTIAL INTERIOR RENOVATION OF EXIST. 1ST FLOOR SPACES WITH PUBLIC BAR SPACE (ROSE BAR). NO CHA$15,000
2026-05-11Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM RELATED TO PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL LOB$23,998
2026-05-11Job filed: PARTIAL INTERIOR RENOVATION OF EXIST. 1ST FLOOR SPACES WITH PUBLIC BAR SPACE. NEW FINISHES, LIGHTING AND REPLACEMENT OF EXIST. FIREPLACE. NEW EXTERIOR$259,820
2026-05-11Job filed: MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS RELATED TO PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL L$249,000
2026-05-05Permit Construction Fence — Permit Issued
2026-04-27311: Noise — Noise: Construction Equipment (NC1)
2026-04-24Elevator permit: Modernization of One (1) Passenger Elevator. All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Pa$269,825
2026-04-21Elevator permit: Modernization of 1P14014. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part 8, Secti$150,000
2026-04-21FDNY inspection (RISK)
2026-04-17Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-04-09Elevator permit: Modernization of 1P14015, 1P14016. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part$250,000
2026-03-31Permit Structural — Permit Issued
2026-03-30ECB CLASS - 2 violation: AT THE TIME OF INSPECTION OF AN ALTERATION OF 17 STORY BUILDING MISSING/INADEQUATE GUARDRAIL SYSTEM OBSERVED. GUARDRAIL INSTALLED
2026-03-30ECB CLASS - 2 violation: DURING INSPECTION OF THE 17-STORY BUILDING ALTERATION, OBSERVED ON MULTIPLE LOCATIONS OF THE BUILDING EXPIRED FIRE EXTINGUISHERS A$2,500
2026-03-30ECB CLASS - 2 violation: DURING INSPECTION OF THE 17-STORY BUILDING ALTERATION, THE ROOF (EXPOSURE 3) GUARDRAIL SYSTEM WAS FOUND WITHOUT REQUIRED TOE BOARD$2,500
2026-03-30ECB CLASS - 2 violation: AT TIME OF INSPECTION ON AN ACTIVE JOBSITE 17 STORY BUILDING, OBSERBED UNCOVERED FLOOR OPENINGS GREATER THAN 2", THESE OPENINGS CR
2026-03-30Permit Structural — Permit Issued
2026-03-30Permit General Construction — Permit Issued
2026-03-30Permit Mechanical Systems — Permit Issued
2026-03-30DOB complaint, category ?
2026-03-30DOB complaint, category ?
2026-03-30DOB complaint, category ?
2026-03-25Permit Structural — Permit Issued
2026-03-24Permit Mechanical Systems — Permit Issued
2026-03-23Elevator permit: Modernization of 1P14014. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part 8, Secti$150,000
2026-03-16Elevator permit: Modernization of 1P14014. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part 8, Secti$150,000
2026-03-12Permit Sidewalk Shed — Permit Issued
2026-03-10Mortgage $35,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$35,000
2026-03-10Agreement $20,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$20,000,000
2026-03-10Mortgage $35,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A.$35,000
2026-03-09Permit General Construction — Permit Issued
2026-01-15Mortgage $20,000,000 — from M4 GRAMERCY PARK HOTEL LLC to BMO BANK N.A..$20,000,000
2026-01-15MLEA — from GRAMERCY PARK PARTNERS, LLC to M4 GRAMERCY PARK HOTEL LLC
2026-01-01311: Food Establishment — Water
2025
2025-12-18Job filed: Proposed Addition at the 17th fl. & Roof Level which will serve as added space to the exist. Kitchen on the 17th fl. & Mechanical rm at the Roof level$454,500
2025-12-09Job filed: Installation of suspended scaffold for facade work and/or inspection. Amend #2 added scaffold drops
2025-12-05311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2025-12-05DOB complaint, category ?
2025-12-04Job filed: Structural renovations related to elevator machine room.$250,005
2025-12-04Job filed: Mechanical renovations related to elevator machine room.$30,000
2025-12-03Job filed: Existing Elevator Bulkhead renovation.$200,025
2025-11-11Elevator permit: Modernization of 1P14015, 1P14016. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part$250,000
2025-11-05Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UND$25,000
2025-11-04Elevator permit: Modernization of 1P14013. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part 8,Sectio$150,000
2025-10-27Elevator permit: Modernization of 1P14014. All work shall comply with the Safety Code for Elevators and Escalators (ASME A17.1-2013), Part 8, Secti$150,000
2025-10-25311: Noise — Noise: Construction Before/After Hours (NM1)
2025-09-18Job filed: INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.$240,999
2025-09-18Job filed: Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to a$700,000
2025-09-17Job filed: Installation of suspended scaffold for facade work and/or inspection. Amend #1 Change in tieback
2025-09-05Permit General Construction — Permit Issued
2025-08-27Permit Construction Fence — Permit Issued
2025-08-26Job filed: INSTALLATION OF PYLWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T$10,000
2025-08-01311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2025-08-01DOB complaint, category ?
2025-07-21Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERAIL HOIST AT THE LEXINGTON AVENUE (FRO$1,000
2025-07-21Job filed: Proposed Addition at the 17th fl. & Roof Level which will serve as added space to the exist. Kitchen on the 17th fl. & Mechanical rm at the Roof level$454,500
2025-07-01Permit Protection and Mechanical Methods — Permit Issued
2025-06-24Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERAIL HOIST AT THE LEXINGTON AVENUE (FRO$1,000
2025-06-24Permit Protection and Mechanical Methods — Permit Issued
2025-06-23Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR THE OVERHEAD PROTECTION IS AT THE SOUTHWEST NEIGHBOR'S BACKYAR$1,000
2025-06-16Permit General Construction — Permit Issued
2025-06-11Elevator permit: Modernize Existing Sidewalk Elevator Device # 1S2490 as stated in the Device Job Description. All work to comply with ASME A17.1 2$138,000
2025-06-11Job filed: Modifications to existing Sprinkler System related to Guestrooms renovation.$1,579,539
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-05-28DOB complaint, category ?
2025-05-22311: Noise — Noise: Jack Hammering (NC2)
2025-05-12Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UND$25,000
2025-05-09311: Noise — Noise: Jack Hammering (NC2)
2025-05-07Rodent inspection: Passed
2025-05-07Job filed: Modifications to existing Plumbing System related to Guestrooms renovation.$7,998,585
2025-04-28Job filed: Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per p$250,000
2025-04-24Job filed: Modifications to existing Mechanical/HVAC System and ductwork related to Guestrooms renovation.$5,699,629
2025-04-18311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2025-04-18DOB complaint, category ?
2025-04-16311: Street Sign - Damaged — No Parking, Standing, Stopping
2025-04-16Job filed: Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per p$250,000
2025-03-11Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UND$25,000
2025-02-26Job filed: Facade Repairs at floor locations 2-18 and roof per plans filed.$1,699,380
2025-02-24Job filed: General Construction renovations related to guestrooms on floors 3-16th (17th market).$13,182,381
2025-02-21Job filed: Installation of suspended scaffold for facade work and/or inspection.Amend #3 added scaffold drops and outrigger detail
2025-01-30Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$20,000
2025-01-21Elevator permit: Modernization of One (1) Passenger Elevator. All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Pa$269,825
2025-01-03Job filed: DEMOLITION OF EXISTING STEAM PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024
2024-12-10Cooling tower inspection
2024-12-03311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-12-03Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$20,000
2024-12-03DOB complaint, category ?
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-22Job filed: Interior partitions and partial demolition on floors Cellar, 1-18 which includes Hotel and Tenant floors and Public spaces per plans filed herewith.$250,000
2024-11-15Job filed: Proposed Addition at the 17th fl. & Roof Level which will serve as added space to the exist. Kitchen on the 17th fl. & Mechanical rm at the Roof level$454,500
2024-11-12ECB CLASS - 2 violation: AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAIN AS PER CODE OBSERVED MISSING AND DISPLACED SHED PARAPET, OPEN$2,400
2024-11-12ECB CLASS - 2 violation: AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 AND 2 WITH EXPIRED PERMIT SINCE 04-27-2024$1,250
2024-11-08311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-11-08Job filed: Interior partitions and partial demolition on floors 3, 5-6, 8-14, 16-17 per plans filed herewith.$250,000
2024-11-08DOB complaint, category ?
2024-10-16Permit General Construction — Signed-off
2024-09-30Job filed: Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per p$250,000
2024-09-13311: Drug Activity — Use Outside
2024-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-07-15311: Graffiti — Graffiti
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-04-11ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT$6,250
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-09-21Elevator permit: Wheel chair lift device #1W5925 will be Removed and Permanently Discontinued: per section 8.11.1.4.1.2. All work to comply with AS$3,500
2023-09-11ECB CLASS - 2 violation: AT TIME OF INSPECTION OF A 17 STOREYS BUILDING I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE # 1 AND 2 NOT MAINTAIN AS PER CODE O$5,000
2023-09-10311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-09-10DOB complaint, category ?
2023-09-07TOLCC — from TRUSTEES OF GRAMERCY PARK
2023-09-07TOLCC — from TRUSTEES OF GRAMERCY PARK
2023-08-23MLEA $179,846,754 — from GRAMERCY PARK PARTNERS, LLC to M4 GRAMERCY PARK HOTEL LLC$179,846,754
2023-06-24311: Illegal Tree Damage — Trunk Damaged
2023-05-27311: Homeless Person Assistance
2023-04-27Job filed: INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPA$5,000
2023-04-27Permit Sidewalk Shed — Permit Issued
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2023-02-10ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE(SIDEWALK SHED)EXPIRED PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED SWS IN PLACE AT EXP #1 #$3,125
2022-08-16311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2022-08-16DOB complaint, category ?
2022-07-15311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2022-07-15DOB complaint, category ?
2022-07-11311: Water System — Hydrant Running Full (WA4)
2022-07-11311: Water System — Hydrant Running Full (WA4)
2022-06-04311: Broken Parking Meter — Out of Order
2022-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-05-26311: Broken Parking Meter — Out of Order
2022-05-23ECB CLASS - 2 violation: FAILURE TO MAINTAIN TEMPORARY CONSTRUCTION EQUIPMENT.NOTE:AT TIME OF INSPECTION OBSERVED SIDEALK SHED IN PLACE WITH SEVERAL LIGHTS$2,400
2022-05-19311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2022-05-19DOB complaint, category ?
2022-04-28ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.NOTE:AT TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAINED $6,000
2022-04-27311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2022-04-27DOB complaint, category ?
2022-03-30311: Taxi Complaint — Driver Complaint - Non Passenger
2022-03-29311: General Construction/Plumbing — Building - Vacant, Open And Unguarded
2022-03-29DOB complaint, category ?
2022-03-22LOCC — from GRAMMERCY PARK PARTNERS LLC to TRUSTEES OF GRAMMERCY PARK
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-01-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-11-30311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-11-30ECB CLASS - 2 violation: FAILURE TO MAINTAIN NOTE ATOI I OBSERVED SWS IN PLACE W/SW NOT MAINTAINED LARGE AMTS OF BIRD DROPPINGS CAUSING HAZARDOUS CONDITION$500
2021-11-30ECB CLASS - 2 violation: FAILURE TO MAINTAIN NOTE ATOI I OBSERVED SWS IN PLACE NOT MAINTAINED W/OPEN SPACINGS WHERE BIRDS ARE NESTING MAKING LARGE AMTS OF $5,000
2021-11-30DOB complaint, category ?
2021-11-24ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.NOTE AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE WITH EXPOSED $5,000
2021-11-23311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-10-12ECB CLASS - 1 violation: FAILURE TO PROVIDE LIGHTINGS NOTE:AT TIME OF INSPECTION OF A 17 STORY HOTEL BUILDING I OBSERVED SIDEWALK SHED AT EXPO#1 NORTH SIDE$500
2021-10-08311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-10-08DOB complaint, category ?
2021-09-21311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-09-21ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION AT TIME OF INSPECTION ON A 17 STY OBSERVED SWS ERECTED AT EXPO#1-2 OBSERVED$2,400
2021-09-21DOB complaint, category ?
2021-07-30311: Elevator — Elevator - Multiple Devices On Property
2021-06-01LOCC — from GRAMERCY PARK PARTNERS LLC to TRUSTEES OF GRAMERCY PARK
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-31311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-03-31DOB complaint, category ?
2021-03-30311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-03-30DOB complaint, category ?
2021-03-10ECB CLASS - 2 violation: SWS PROTECTION DOES NOT MEET CODE SPECIFICATIOSN OBSERVED APPROXATELY 100 FEET OF SWS WAS BMIL AND UNIT CAUSING POTENTIAL HAZARD T$6,030
2021-03-09311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-03-09Permit Sidewalk Shed — Permit Issued
2021-03-09DOB complaint, category ?
2021-03-01ECB CLASS - 2 violation: SEC. 3307.6.4.8 FAILURE TO PROVIDE LIGHTINGS. NOTE: AT TIME OF MY INSPECTION OF A 17 STY HOTEL BLDG,I OBSERVED SIDEWALK SHED IN PL$2,400
2021-03-01ECB CLASS - 2 violation: SIDEWALK SHED-EXP PERMIT. NOTE: AT TIME OF MY INSPECTION OF A 17 STY HOTEL BDLG,I OBSERVED SIDEWALK SHED IN PLACE AT EXP#1&2 OF TH$625
2021-02-25311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-02-25DOB complaint, category ?
2021-02-24FDNY inspection (FORTH)
2021-01-25FDNY inspection (FORTH)
2021-01-22Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to RDAC 8 LLC
2021-01-20Certificate of occupancy Temporary
2021-01-02311: Broken Parking Meter — Credit Card Stuck in Meter
2020
2020-12-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-12-29DOB complaint, category ?
2020-12-07311: Broken Parking Meter — Coin or Card Did Not Register
2020-11-27311: Broken Parking Meter — Credit Card Stuck in Meter
2020-11-19311: COVID-19 Non-essential Construction — Construction
2020-10-26311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-10-26DOB complaint, category ?
2020-10-25311: Noise — Noise: Construction Before/After Hours (NM1)
2020-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2020-10-13Certificate of occupancy Temporary
2020-09-30Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$16,000
2020-07-20Certificate of occupancy Temporary
2020-07-14Permit EW — ISSUED
2020-07-08Rodent inspection: Passed
2020-06-16Elevator permit: Alteration of One (1) Passenger Elevator. All new work in compliance with ASME A17.1-2000/RS A17.1b-2003 with supplements Chapter$10,350
2020-06-08311: Rodent — Rat Sighting
2020-05-30311: Maintenance or Facility — Structure - Indoors
2020-05-21Job filed: EXISTING FIREPLACES TO BE DECOMMISSIONED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$20,000
2019-12-23Job filed: ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHA$15,000
2019-12-07311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2019-12-07DOB complaint, category ?
2019-11-23311: Food Establishment — Letter Grading
2019-10-29Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$48,000
2019-10-23Certificate of occupancy Temporary
2019-10-17311: Lost Property — Clothing/Glasses
2019-10-03311: Taxi Complaint — Driver Complaint - Non Passenger
2019-08-21311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2019-08-21DOB complaint, category ?
2019-07-31Certificate of occupancy Temporary
2019-07-03311: Street Condition — Pothole
2019-06-27Job filed: GRAMERCY PARK HOTEL, EXTERIOR FACADE REPAIRS RELATED TO FISP CYCLE 8 INCLUDING PARAPET REPLACEMENT, AS PER THE PLANS FILED.$134,000
2019-06-12Job filed: GRAMERCY PARK HOTEL, EXTERIOR FACADE REPAIRS RELATED TO FISP CYCLE 8 INCLUDING PARAPET REPLACEMENT, AS PER THE PLANS FILED.$134,000
2019-06-07Agreement $75,000,000 — from GPH GROUND TENANT LLC; GPH MANAGEMENT LLC; GPH MASTER TENANT LLC to JPMORGAN CHASE BANK, N.A.$75,000,000
2018-10-22311: Broken Parking Meter — Out of Order
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQU
2018-10-05HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-09-06DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-08-30311: Construction Safety Enforcement — SST Tracking Complaint
2017-08-30ECB CLASS - 2 violation: BC3307.6.5.11FAILURE TO NOTIFY DEPT FOR SIDEWALK SHED REMOVAL.NOTE:OBSERVED SWS HAS BEEN REMOVED.NO REMOVAL NOTIFICATION ON FILE.R
2017-08-30DOB complaint, category ?
2017-07-26ECB CLASS - 2 violation: FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35245281Z ISSUED ON 06/10/17 & TO FILE A C OF C PURSUANT TO 28-201.1$400
2017-06-10311: Emergency Response Team (ERT) — M.A.R.C.H. Program (Interagency)
2017-06-10ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY DEFECT NOTED:AT TIME OF INSPECTION 2 DOORS DESIGNED S EMERGENCY EXIT DOORS ARE OBS$1,200
2017-01-23311: Elevator — Elevator Not Inspected/Illegal/No Permit
2017-01-23ECB CLASS - 1 violation: C/U-59A10,59U15,68B7. C/U COTTER PINS MISSING FROM BRAKE REPLACED WITH CABLE "TEMP FIX" NO TAG STATING DATE OF ANNUAL BRAKE MAINT$1,000
2017-01-23DOB complaint, category ?
2017-01-05Certificate of occupancy Temporary
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-07311: Found Property — Other
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-10-11Certificate of occupancy Temporary
2016-08-16311: Noise — Noise: Construction Before/After Hours (NM1)
2016-08-03311: Street Light Condition — Street Light Cycling
2015-09-27311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-16311: Taxi Complaint — Driver Complaint
2015-08-13Certificate of occupancy Temporary
2015-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-07-02311: Construction Safety Enforcement — SST Tracking Complaint
2015-07-02ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.NOTED: OBSERVED SIDEWALK SHED ERECTED AT EXP1,
2015-06-01Deed $4,650,000 — from THE LILLIAN GOLDMAN 2002 L.L.C.; JANE H. GOLDMAN AS CO-EXECUTOR; ALLAN H. GOLDMAN AS CO-EX to GRAMERCY PARK PARTNERS LLC$4,650,000
2015-02-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-01-06DOB violation E:
2015-01-06DOB violation E:
2015-01-06DOB violation E:
2014
2014-12-31DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-12-31DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-09-30311: Noise — Noise: Construction Equipment (NC1)
2014-09-26Job filed: REPLACEMENT OF ROOFTOP REMOVABLE SUNROOM ENCLOSURE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$500,000
2014-09-20311: Noise - Commercial — Loud Talking
2014-09-18ECB CLASS - 1 violation: BC 1604.1. STRUCTURAL DESIGN INADEQUATE & NOT IN CONFORMANCE WITH STRENGTH & LATERAL LIMITS. BASED ON A REVIEW OF THE DESIGN REPRE$1,600
2014-09-18ECB CLASS - 1 violation: 28-104.7.1. CONSTRUCTION DOCUMENTS ARE NOT COMPLETE & NOT OF SUFFICIENT CLARITY TO INDICATE ENTIRE NATURE & EXTENT OF WORK. BASED $1,600
2014-09-11311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2014-09-11DOB complaint, category ?
2014-09-05ECB CLASS - 2 violation: 3314.4.1 PARTIAL SWO ISSUED FOR FACADE WORK PURSUANT 28-202.2 AND POSTED ON PREMISES FAILED TO PROVIDE FINAL INSPECTION REPORT UPO$400
2014-09-04311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2014-08-19311: Construction Safety Enforcement — SST Tracking Complaint
2014-08-19DOB complaint, category ?
2014-08-13ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONST.DOC OR APPROVED PLANS.NOTED:INSTALLATION OF PIPE SCAFFOLDS ABOVE ADJOINING BLDG(NORTH @ LE$1,000
2014-08-13ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONST DOC OR APPR PLANS.NOTED:SIDEWALK SHED @ LEX AVE EXPOSURE 30'HIGH MISSING STRUCTURE COLUMNS$1,000
2014-08-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2014-08-11ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. NOTED: WHILE RESPONDING TO COMPLAINT # 1377703,T$2,400
2014-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCT DOCUMENTS AND APPROVED AMENDMENTS. WHILE RESPONDING TO #13777703 FOR FACADE WORK IN PR$1,000
2014-08-11ECB CLASS - 1 violation: BC3301.7 DESIGN DRAWING REQUIRED BY THE PROVISION OF CHAPTER 33 OF NYCBUIDLING CODE. NOTED: AT TIME OF INSPECTION RESPONDING TO CO$1,600
2014-08-11DOB complaint, category ?
2014-07-21Permit EW — ISSUED
2014-07-11311: Water System — Leak (Use Comments) (WA2)
2014-07-11ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION.NOTED: NO GUARDRAILS ON SUPPORTED PIPE SCAFFOLD $2,400
2014-06-26Permit EQ — ISSUED
2014-06-23Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-06-23Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-05-13ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS APPUTENANCES.NOTED @ EXP3 A SPALLED MASONRY @ DECORATIVE STONE ON FRONT OF SILL @ WINDOW FROM NE C$500
2013-05-09Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$6,236
2013-05-09Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$6,236
2013-05-09Job filed: SPRINKLER WORK AS SHOWN ON PLANS FILED$4,000
2013-05-09Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES IN COMMERCIAL SPACE AS SHOWN ON PLANS FILED$49,825
2013-05-09Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS FILED$12,860
2013-05-09Job filed: SPRINKLER WORK AS SHOWN ON PLANS FILED$4,000
2013-05-09Job filed: INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES IN COMMERCIAL SPACE AS SHOWN ON PLANS FILED$49,825
2013-04-22ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS AND APPURTENANCES. NOTED:1-OPEN-JOINTEDAND SPALLED DECORATIVE STONE IN FRONT OF 15/F SILLS AT EXPOS$250
2013-04-19Permit PL — ISSUED
2013-04-12Permit EW — ISSUED
2013-04-12Permit EW — ISSUED
2013-03-07Permit PL — ISSUED
2013-03-06Permit EW — ISSUED
2013-03-06Permit EW — ISSUED
2013-02-19Certificate of occupancy Temporary
2013-02-06311: Taxi Complaint — Driver Complaint
2013-01-31311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2012-12-20Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2012-12-20Job filed: MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM ON THESE FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2012-12-20Job filed: RELOCATE SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,000
2012-12-20Job filed: RELOCATION OF DUCTWORK. REPLACE AND RELOCATE FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$23,000
2012-12-20Job filed: MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM ON THESE FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2012-12-20Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2012-12-19Job filed: RELOCATE DUCTWORK. REPLACE AND RELOCATE FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$39,000
2012-12-19Job filed: MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2012-12-19Job filed: RELOCATE DUCTWORK. REPLACE AND RELOCATE FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$39,000
2012-12-19Job filed: RELOCATE SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2012-11-07Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2012-04-06Job filed: MODIFY FIRE SUPPRESSION SYSTEM ONLY, NO CHANGE IN USE EGRESS OR OCCUPANCY. COOKING #120868551$3,000
2012-04-06Job filed: MODIFY FIRE SUPPRESSION SYSTEM ONLY, NO CHANGE IN USE EGRESS OR OCCUPANCY. COOKING #120868551$3,000
2012-04-05Permit EW — ISSUED
2012-04-02311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2012-04-02DOB complaint, category ?
2012-03-31ECB CLASS - 2 violation: OPERATION OF A PLACE OF ASSEMBLY W/O A CURRENT CERTIFICATE OF OPERATION. P.A. #10437383 EXPIRED 2-11-10. THERE WERE 110 PATRONS IN
2012-03-31ECB CLASS - 2 violation: APPROVED PLACE OF ASSEMBLY PLANS NOT AVAILABLE FOR INSPECTION: NOTED PREMISES IS A EAT & DRINKING ESTABLISHMENT W/A OCCUPANCY FOR
2011-10-24Job filed: REMOVAL AND INSTALLATION OF WALLS, FLOORS AND CEILINGS FOR NEW TOILETS, NEW 16 TH FLOOR CEILINGS FOR PLUMBING TIE IN, NEW RAMPS AND CLEAN PAVERS AS SH$71,000
2011-10-24Job filed: MECHANICAL MODIFICATIONS ALONG WITH UNIT INSTALLATION. INSTALLATION OF PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$52,900
2011-10-24Job filed: MODIFICATION OF THE EXISTING CLASS J SYSTEM AS SHOWN ON DRAWINGS FILED HEREWIT H. NO CHANGE IN USE,EGRESS OR OCCUPANCY.IN CONJUNCTION WITH ALT 1#12086$16,000
2011-10-24Job filed: MECHANICAL MODIFICATIONS ALONG WITH UNIT INSTALLATION. INSTALLATION OF PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$52,900
2011-10-24Job filed: REMOVE AND INSTALL NEW SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH AL$30,000
2011-10-24Job filed: FILING FOR CHANGE OF USE, MINOR INTERIOR COSMETIC WORK, NEW CARPETING & PAINTI NG AS SHOWN ON DRAWINGS FILED HEREWITH.$10,725
2011-10-24Job filed: MECHANICAL MODIFICATIONS ALONG WITH UNIT INSTALLATION. INSTALLATION OF PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$52,900
2011-10-24Job filed: REMOVAL AND INSTALLATION OF WALLS, FLOORS AND CEILINGS FOR NEW TOILETS, NEW 16 TH FLOOR CEILINGS FOR PLUMBING TIE IN, NEW RAMPS AND CLEAN PAVERS AS SH$71,000
2011-08-30311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2011-08-18311: Noise — Noise: Air Condition/Ventilation Equip, Residential (NJ1)
2011-08-17311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2011-08-12Rodent inspection: Passed
2011-07-19DOB violation E:
2011-06-16Permit PL — ISSUED
2011-06-08Permit EW — ISSUED
2011-06-07Job filed: INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2011-06-07Job filed: MINOR PATCHING OF WALLS & INSTALLATION OF PAVERS ON FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2011-05-28311: Noise — Noise: Construction Before/After Hours (NM1)
2011-05-28311: Found Property — Electronics/Phones
2011-05-28311: Noise — Noise: Construction Before/After Hours (NM1)
2011-05-28DOB complaint, category ?
2011-05-17Agreement $140,000,000 — from THE UNION LABOR LIFE INSURANCE COMPANY, to GPH PARTNERS LLC$140,000,000
2011-05-17Mortgage $54,000,000 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY, $54,000,000
2011-05-17PREL — from THE UNION LABOR LIFE INSURANCE COMPANY, to GPH PARTNERS LLC
2011-05-17TL&R — from THE UNION LABOR LIFE INSURANCE COMPANY, to GPH PARTNERS LLC
2011-05-17LEAS — from GPH PARTNERS LLC to GPH GROUND TENANT LLC
2011-05-17Agreement — from GPH PARTNERS LLC to GPH GROUND TENANT LLC
2011-05-17Mortgage assigned — from THE UNION LABOR LIFE INSURANCE COMPANY, to GSREMP ORIGINATION JOINT HOLDING, L.P.
2011-05-17Agreement $86,000,000 — from GPH GROUND TENANT LLC to GSREMP ORIGINATION JOINT HOLDING, L.P.$86,000,000
2011-05-17AL&R $86,000,000 — from GPH GROUND TENANT LLC; GPH MANAGEMENT LLC to GSREMP ORIGINATION JOINT HOLDING, L.P.$86,000,000
2010-06-04Mortgage satisfied — from CHATHAM ASSOCIATES, INC.; H.R. WEISSBERG CORPORATION; HOTEL GRAMERCY PARK, INC.; 2 LEXINGT to MORRIS MORGENSTERN, AS TRUSTEE; JAMAICA SAVINGS BANK; METROPOLITAN LIFE INSURANC
2009-11-19RPTT&RET $3,900,000 — from THORNTON, INGRID; THORNTON, JEPTHA W to ACQUAVELLA, ALEXANDER D$3,900,000
2009-09-30Permit EW — ISSUED
2009-09-18Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM ONLY GAS VALVE WAS FILED UNDER APPLI# 104503887 NO CHNAGE IN USE EGRESS OR OCCUPANCY$3,000
2009-09-18Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM ONLY GAS VALVE WAS FILED UNDER APPLI# 104503887 NO CHNAGE IN USE EGRESS OR OCCUPANCY$3,000
2009-09-18Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM ONLY GAS VALVE WAS FILED UNDER APPLI# 104503887 NO CHNAGE IN USE EGRESS OR OCCUPANCY$3,000
2009-09-02Permit PL — ISSUED
2009-09-01DOB violation E:
2009-09-01DOB violation E:
2009-09-01DOB violation E:
2009-09-01DOB violation E:
2009-08-31Permit EW — ISSUED
2009-08-31Permit EW — ISSUED
2009-07-27Job filed: STRUCTURAL PLANS FILED TO INFILL OF EXISTING MECHANICAL DUCT RETURN OPENING AND CREATE NEW OPENING FOR MECHANICAL DUCT RETURN IN NEW LOCATION.NO CHANG$10,000
2009-07-27Job filed: STRUCTURAL PLANS FILED TO INFILL OF EXISTING MECHANICAL DUCT RETURN OPENING AND CREATE NEW OPENING FOR MECHANICAL DUCT RETURN IN NEW LOCATION.NO CHANG$10,000
2009-07-27Job filed: MODIFICATION TO HVAC AND PLUMBING AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$150,000
2009-07-24Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2009-07-23Permit EW — ISSUED
2009-06-30Job filed: INSTALLATION OF PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$900,000
2009-06-30Job filed: INSTALLATION OF PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$900,000
2009-06-30Job filed: INSTALLATION OF PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$900,000
2009-02-18Permit AL — ISSUED
2009-02-18Permit AL — ISSUED
2008
2008-12-02Job filed: APPLICATION FILED TO AMEND CERTIFICATE OF OCCUPANCY TO INCLUDE OCCUPANT LOADS ON ALL FLOORS, TO CORRECT DISCREPANCIES ON FINAL C.O. #103749268. NO WOR$1,000
2008-11-26Job filed: APPLICATION FILED TO AMEND CERTIFICATE OF OCCUPANCY TO INCLUDE OCCUPANT LOADS ON ALL FLOORS. NO WORK TO BE DONE UNDER THIS APPLICATION.$1,000
2008-11-26Job filed: APPLICATION FILED TO AMEND CERTIFICATE OF OCCUPANCY TO INCLUDE OCCUPANT LOADS ON ALL FLOORS. NO WORK TO BE DONE UNDER THIS APPLICATION.$1,000
2008-06-09DOB violation E:
2008-06-09DOB violation E:
2008-06-09DOB violation E:
2008-06-09DOB violation E:
2008-06-09DOB violation E:
2008-06-02DOB violation E:
2008-04-07Permit PL — ISSUED
2008-03-31DOB violation LL2604E:
2008-03-21DOB violation LL1081:
2008-03-21DOB violation LL1081:
2007
2007-11-30DOB violation LL1198:
2007-10-22Permit EQ — ISSUED
2007-10-19Job filed: A3
2007-07-10DOB violation E:
2007-07-10DOB violation E:
2007-07-10DOB violation E:
2007-07-10DOB violation E:
2007-05-01Permit PL — ISSUED
2007-05-01Permit PL — ISSUED
2007-04-03Permit PL — ISSUED
2007-03-20Facade (LL11) filing, cycle 6: SWARMP
2007-03-20DOB violation CMQ:
2007-03-12Permit EQ — ISSUED
2007-03-09Job filed: Erect 40LF Heavy duty Sidewalk shed @300psf.to comply with LL33/91. installed to perform facade repairs. There will be no change in egress, use or occ
2007-03-09Job filed: Erect 40LF Heavy duty Sidewalk shed @300psf.to comply with LL33/91. installed to perform facade repairs. There will be no change in egress, use or occ
2007-03-06Permit PL — ISSUED
2007-02-23DOB complaint, category ?
2007-02-16DOB complaint, category ?
2007-02-15RPTT&RET $7,677,605 — from GPH PARTNERS LLC to ICARUS HOLDINGS LLC$7,677,605
2007-02-15RPTT&RET $7,677,605 — from GPH PARTNERS LLC to ICARUS HOLDINGS LLC$7,677,605
2007-02-06RPTT&RET $9,062,425 — from GPH PARTNERS LLC to MARSICO, THOMAS F$9,062,425
2007-01-26RPTT&RET $5,009,790 — from GPH PARTNERS LLC to MUGRABI, ALBERTO$5,009,790
2007-01-19Permit EW — ISSUED
2007-01-16Permit EW — ISSUED
2007-01-10RPTT&RET $9,227,789 — from GPH PARTNERS LLC to MF 50 GRAMERCY LLC$9,227,789
2007-01-10RPTT&RET $9,227,789 — from GPH PARTNERS LLC to MF 50 GRAMERCY LLC$9,227,789
2007-01-10RPTT&RET $9,227,789 — from GPH PARTNERS LLC to MF 50 GRAMERCY LLC$9,227,789
2007-01-08RPTT&RET $7,126,121 — from GPH PARTNERS LLC to HL 50 GRAMERCY LLC$7,126,121
2007-01-08RPTT&RET $7,126,121 — from GPH PARTNERS LLC to HL 50 GRAMERCY LLC$7,126,121
2007-01-08RPTT&RET $7,126,121 — from GPH PARTNERS LLC to HL 50 GRAMERCY LLC$7,126,121
2007-01-05AL&R $140,000,000 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$140,000,000
2007-01-05Mortgage $60,125,840 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$60,125,840
2007-01-05Agreement $140,000,000 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$140,000,000
2006
2006-12-27RPTT&RET $4,429,388 — from GPH PARTNERS LLC to BLOYS, DAVID; BLOYS, SENIE$4,429,388
2006-12-22RPTT&RET $4,363,201 — from GPH PARTNERS LLC to THORNTON, INGRID; THORNTON, W. JEPTHA$4,363,201
2006-12-22RPTT&RET $4,363,201 — from GPH PARTNERS LLC to THORNTON, INGRID; THORNTON, W. JEPTHA$4,363,201
2006-12-18RPTT&RET $4,185,097 — from GPH PARTNERS LLC to SOVIERO, JOSEPH F$4,185,097
2006-12-18RPTT&RET $4,185,097 — from GPH PARTNERS LLC to SOVIERO, JOSEPH F$4,185,097
2006-12-18RPTT&RET $4,185,097 — from GPH PARTNERS LLC to SOVIERO, JOSEPH F$4,185,097
2006-12-14RPTT&RET $10,360,694 — from GPH PARTNERS LLC to PALMADOTTIR, INGIBJORG S; JOHANNESSON, JON ASGEIR$10,360,694
2006-12-13RPTT&RET $4,531,212 — from GPH PARTNERS LLC to AIRAN, LISA$4,531,213
2006-12-13RPTT&RET $4,531,212 — from GPH PARTNERS LLC to AIRAN, LISA$4,531,213
2006-12-13RPTT&RET $4,531,212 — from GPH PARTNERS LLC to AIRAN, LISA$4,531,213
2006-12-11PAT — from GOLDMAN, ALLAN H to CONCETTA FERRARI - MILETIC
2006-12-11MLEA — from GOLDMAN, ALLAN H; THE ESTATE OF SOL GOLDMAN; EMPIRE ASSOCIATES REALTY CO.; GOLDMAN, JANE to GPH PARTNERS LLC
2006-12-11Agreement $90,771,897 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$90,771,897
2006-12-11Agreement $37,908,103 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$37,908,103
2006-12-11AL&R $128,680,000 — from THE UNION LABOR LIFE INSURANCE COMPANY to GPH PARTNERS LLC$128,680,000
2006-12-11CERT — from LAWYERS TITLE INSURANCE CORPOPRATION
2006-12-11ZONE — from GPH PARTNERS LLC
2006-12-11SAGE — from NORTH FORK BANK
2006-12-11SAGE — from THE UNION LABOR LIFE INSURANCE CORPORATI
2006-12-11DEVR — from GPH PARTNERS LLC to THE LILLIAN GOLDMAN 2002 L.L.C.; GPH PARTNERS LLC
2006-12-11Agreement — from GPH PARTNERS LLC to GPH PARTNERS LLC; THE LILLIAN GOLDMAN 2002 L.L.C.
2006-12-11DECL — from NORTH FORK BANK
2006-12-06Permit EW — ISSUED
2006-11-30RPTT&RET $8,028,901 — from GPH PARTNERS LLC to L.W. CURLY LLC$8,028,901
2006-11-30RPTT&RET $8,028,901 — from GPH PARTNERS LLC to L.W. CURLY LLC$8,028,901
2006-11-27RPTT&RET $13,277,980 — from GPH PARTNERS LLC to BROWN, JULIE N.$13,277,980
2006-11-27RPTT&RET $13,277,980 — from GPH PARTNERS LLC to BROWN, JULIE N.$13,277,980
2006-11-27RPTT&RET $13,277,980 — from GPH PARTNERS LLC to BROWN, JULIE N.$13,277,980
2006-11-22RPTT&RET $7,003,170 — from GPH PARTNERS LLC to HALCYON INTERNATIONAL CORP.$7,003,170
2006-11-20RPTT&RET $6,694,994 — from GPH PARTNERS LLC to PERSO HOLDING NV$6,694,994
2006-11-15RPTT&RET $3,854,076 — from GPH PARTNERS LLC to WHITNEY, PENNELL$3,854,076
2006-11-15RPTT&RET $3,854,076 — from GPH PARTNERS LLC to WHITNEY, PENNELL$3,854,076
2006-11-14RPTT&RET $7,900,848 — from GPH PARTNERS LLC to PELLETIER, ANNE T$7,900,848
2006-11-14RPTT&RET $7,900,848 — from GPH PARTNERS LLC to PELLETIER, ANNE T$7,900,848
2006-11-14RPTT&RET $5,956,762 — from GPH PARTNERS LLC to CDS INTERNATIONAL REALTY LLC$5,956,763
2006-11-14Permit EW — ISSUED
2006-10-27Job filed: INSTALLATION OF KITCHEN EXHAUST AND FIRESUPPERSION SYSTEM WITH NO CHANGE TO BUILDING USE,EGRESS OR OCCUPANCY.$3,000
2006-10-25Job filed: Installation of new devices at Penthouse level connected to existing system. No change in use, egress or occupancy.$10,000
2006-10-25Job filed: Installation of new devices at Penthouse level connected to existing system. No change in use, egress or occupancy.$10,000
2006-10-20Permit PL — ISSUED
2006-09-26Permit EW — ISSUED
2006-09-19AMTX $25,000,000 — from GPH PARTNERS LLC$25,000,000
2006-09-15Permit EW — ISSUED
2006-09-08Permit PL — ISSUED
2006-09-07Permit EW — ISSUED
2006-09-07Permit EW — ISSUED
2006-08-31Permit EW — ISSUED
2006-08-25Job filed: Erect Temporary tents. No change to egress, use or occupancy.$5,000
2006-08-18Job filed: Modification of ductwork and plumbing on the 18th floor as per plans filed herewith. No change in use, egress or ocucpancy.$95,000
2006-08-18Job filed: Modification of ductwork and plumbing on the 18th floor as per plans filed herewith. No change in use, egress or ocucpancy.$95,000
2006-08-16Job filed: Modificatio of Sprinkler on the 18th floor as per plans filed herewith. No change in use, egress or occupancy.$15,000
2006-08-15DECL — from NORTH FORK BANK
2006-08-10Job filed: Interior partitions on the 18th floor as per plans filed herewith. No change in use, egress or occupancy.$85,000
2006-08-10Job filed: Interior partitions on the 18th floor as per plans filed herewith. No change in use, egress or occupancy.$85,000
2006-08-03DOB complaint, category ?
2006-08-02Permit EW — ISSUED
2006-07-27Job filed: INSTALL FIRE SUPPRESSION SYSTEM AS SHOWNON PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2006-07-27Job filed: INSTALL FIRE SUPPRESSION SYSTEM AS SHOWNON PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2006-07-17Permit EW — ISSUED
2006-07-14SUBM — from THE UNION LABOR LIFE INSURANCE COMPANY to THE UNION LABOR LIFE INSURANCE COMPANY
2006-07-14M&CON $90,771,897 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$90,771,897
2006-07-14M&CON $33,185,295 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$33,185,295
2006-07-14Permit EW — ISSUED
2006-07-12Permit EW — ISSUED
2006-07-10Permit EW — ISSUED
2006-07-10Permit EW — ISSUED
2006-07-10Permit EW — ISSUED
2006-07-01DOB violation C:
2006-07-01ECB Non-Hazardous violation: FAILURE TO PROVIDE APPROVED PLANS AT TIME OF INSPECTION. NOTED:WORK INPROGRESS W/ REGARDS TO PERMIT # 103845751-01-EW-07 & NO SET $2,500
2006-06-30Permit EW — ISSUED
2006-06-30Permit AL — ISSUED
2006-06-30Permit EW — ISSUED
2006-06-30Permit AL — ISSUED
2006-06-30Permit EW — ISSUED
2006-06-30Permit EW — ISSUED
2006-06-30Permit EW — ISSUED
2006-06-27Job filed: PA
2006-06-27Job filed: PA
2006-06-23Permit PL — ISSUED
2006-06-21Permit EW — ISSUED
2006-06-21Permit EW — ISSUED
2006-06-20Job filed: Mechanical and Plumbing modifications in the kitchen on the subcellar, cellar and 1st floor as per plans filed herewith. No change in use, egress or o$227,000
2006-06-19Permit EW — ISSUED
2006-06-19Permit EW — ISSUED
2006-06-09DOB complaint, category ?
2006-06-04Tenant complaint: HEATING — HEAT RELATED
2006-06-03DOB complaint, category ?
2006-05-24Job filed: Mechanical and Plumbing work in conjunction with new Restaurant on the 1st floor as per plans filed herewith. No change in use, egress or occupancy.$175,000
2006-05-24Job filed: Mechanical and Plumbing work in conjunction with new Restaurant on the 1st floor as per plans filed herewith. No change in use, egress or occupancy.$175,000
2006-05-24Job filed: Installation of new Fire Alarm devices to existing system. No change in use, egress or occupancy.$10,000
2006-05-23Job filed: MECHANICAL WORK IN CONJUNCTIONion with new Restuarant on teh 1 floor as per plans filed herewith. No change in use, egress or occupancy.$175,000
2006-05-23Job filed: Interior partitions for the Restuarant portion on the 1st floor as per plans filed herewith. No change in use, egress or occupancy.$125,000
2006-05-23DOB complaint, category ?
2006-05-19Job filed: Modification of sprinkler system on the 1st floor in conjunction with new Restaurant as per plans filed herewith. No change in use, egress or occupanc$5,000
2006-05-19Job filed: Modification of sprinkler system on the 1st floor in conjunction with new Restuarant as per plans filed herewith. No change in use, egress or occupanc$10,000
2006-05-19Job filed: Modification of sprinkler system on the 1st floor in conjunction with new Restaurant as per plans filed herewith. No change in use, egress or occupanc$5,000
2006-05-19Job filed: Modification of sprinkler system on the 1st floor in conjunction with new Restuarant as per plans filed herewith. No change in use, egress or occupanc$10,000
2006-05-14DOB complaint, category ?
2006-03-09Job filed: PA
2006-01-25DOB complaint, category ?
2006-01-09Permit EQ — ISSUED
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-04Job filed: Erect 295' of Temporary Plywood Fence in conj. with work under Appl.# 103859665. Sidewalk Shed permitted under appl.# 103969430.No change in use, egr
2005
2005-12-27DOB violation E:
2005-10-29DOB complaint, category ?
2005-10-19SUBM — from THE UNION LABOR LIFE INSURANCE COMPANY to GPH PARTNERS LLC
2005-10-03Permit EQ — ISSUED
2005-09-30Permit EQ — ISSUED
2005-09-30Permit EQ — ISSUED
2005-09-30Permit EQ — ISSUED
2005-09-28Permit EQ — RE-ISSUED
2005-09-28Permit EQ — RE-ISSUED
2005-09-15Mortgage $65,494,705 — from GPH PARTNERS, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$65,494,705
2005-09-08DOB complaint, category ?
2005-09-06DOB complaint, category ?
2005-08-17M&CON $30,000,000 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$30,000,000
2005-07-29M&CON $30,000,000 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$30,000,000
2005-07-12Permit EW — ISSUED
2005-07-12Permit EW — ISSUED
2005-07-12Permit EW — ISSUED
2005-07-12Permit AL — ISSUED
2005-07-11Permit EW — ISSUED
2005-07-11Permit EW — ISSUED
2005-07-11Permit AL — ISSUED
2005-07-05DOB complaint, category ?
2005-06-07DOB complaint, category ?
2005-05-13Agreement — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY
2005-05-12Permit EW — ISSUED
2005-05-12Permit EW — ISSUED
2005-05-12Permit EW — ISSUED
2005-05-03Permit PL — ISSUED
2005-05-03Permit PL — ISSUED
2005-04-20DECL — from LILLIAN GOLDMAN 2002 LLC
2005-04-20DECL — from LILLIAN GOLDMAN 2002 LLC
2005-04-14Tenant complaint: HEATING — RADIATOR
2005-04-14Tenant complaint: PLUMBING — WATER SUPPLY
2005-04-12Permit AL — ISSUED
2005-04-12Permit AL — ISSUED
2005-02-28Job filed: Fire Protection Plan$1,000
2005-02-28Job filed: Fire Protection Plan$1,000
2005-02-23Job filed: Structural work associated with renovation of Hotel.
2005-02-20DOB complaint, category ?
2005-02-19DOB complaint, category ?
2005-02-13ECB Hazardous violation: EXIT PASSAGEWAY OR CORRIDOR TOTAL OBSTRUCTION NOTED AT STAIRWAY A LOCATION ON GROUND FL CONSTRCUTION DEBRIS IS ON CORRIDOR FLOOR L$480
2005-02-12DOB complaint, category ?
2005-02-01ECB Non-Hazardous violation: 5R10/63T15 5 GATE SWITCH JUMPED OUT CEASE USE UNTIL ITEM IS REPAIRED CALL 212-566-5544.$500
2005-01-20Job filed: REPLACE EXISTING CLASS J FIRE ALARM AND COMMUNICTIONS FOR THE HOTEL WITH A NEW FIRE COMMAND.EXISTING FIRE ALARM DEVICES AND WIRING TO REMAIN THE WEST $77,000
2005-01-20Job filed: REPLACE EXISTING CLASS J FIRE ALARM AND COMMUNICTIONS FOR THE HOTEL WITH A NEW FIRE COMMAND.EXISTING FIRE ALARM DEVICES AND WIRING TO REMAIN THE WEST $77,000
2005-01-20Job filed: Modification of existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy.$117,000
2005-01-19Job filed: Interior partitions and plumbing work in conjunction with sales office build out on 10th floor.$25,000
2005-01-19Job filed: Interior partitions and plumbing work in conjunction with sales office build out on 10th floor.$25,000
2005-01-18Job filed: Mechanical and Plumbing work as per plans filed herewith. No change in use, egress or occupancy.
2005-01-18Job filed: Mechanical and Plumbing work as per plans filed herewith. No change in use, egress or occupancy.
2005-01-18Job filed: Mechanical and Plumbing work as per plans filed herewith. No change in use, egress or occupancy.
2005-01-03Permit EQ — ISSUED
2004
2004-12-30Permit EQ — ISSUED
2004-12-30Permit EQ — ISSUED
2004-12-23Permit EQ — ISSUED
2004-12-17Job filed: To erect a temporary Runway forPersonnel Hoist in conj. work under appl.# 103859665 on E 21st St. Personnel Hoist filed under appl.# 103994992. No ch
2004-12-17Permit EQ — ISSUED
2004-12-16Job filed: SI
2004-12-16Job filed: To erect a temporary 7000 Personnel Hoist in conj. work under appl.# 103859665 No change in use, egress or occupancy under this appl.
2004-12-16Job filed: To erect a temporary Runway forPersonnel Hoist in conj. work under appl.# 103859665 Personnel Hoist filed under appl.# 103993555. No change in use, e
2004-12-15Job filed: To erect a temporary Dual 7000 Personnel hoist. Personnel hoist in conj. with work under appl.# 103859665. Hoist erected on Lexington Ave. No change i
2004-12-15Job filed: Erect a temporary material hoist in conj. with work under Appl.# 103859665. No change in use,egress or occupancy under this appl.
2004-12-01Permit EW — ISSUED
2004-12-01Permit EW — ISSUED
2004-12-01Permit EW — ISSUED
2004-12-01Permit EW — ISSUED
2004-12-01Permit EW — ISSUED
2004-11-24DOB violation E:
2004-11-23DOB violation E:
2004-11-23DOB violation E:
2004-11-15Permit EQ — ISSUED
2004-11-10Job filed: To erect 356' 6" in lenght of Heavy Duty Sidewalk Shed 300 psf in conj. with Appl.# 103859665. 204'-6" on E. 21st St. & 152' on Lexington Ave.
2004-10-15Permit EW — ISSUED
2004-10-12Job filed: Filing herewith for installation of 325 ln ft by 8 ft high sidewalk shed. No change in occupancy, use, or egress.
2004-10-12Job filed: Filing herewith for installation of 325 ln ft by 8 ft high sidewalk shed. No change in occupancy, use, or egress.
2004-08-17RPTT — from GREENBERG/GPH PARTNERS LLC to AB GREEN GRAMERCY, LLC
2004-08-11Job filed: REMOVAL OF PLUMBING FIXTURESS THROUGHOUT BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2004-08-11Job filed: INTEIROR DEMOLITION THROUGHOUT BUILDING. NO CHANGE IN USE,EGRESS OR OCCUPANCY. JOB FILED IN CONJUNCTION WITH ALT. I#103749268.$175,000
2004-08-11Job filed: REMOVAL OF PLUMBING FIXTURESS THROUGHOUT BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2004-07-27Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH THE RENOVATION OF AN EXISTING ELEV TOR SHAFT NO CHANGES$250,000
2004-07-27Job filed: STRUCTUAL WORK ASSOC WITH ELEVATOR SHAFT `$250,000
2004-07-22Job filed: CREATE OPENIGS FOR THRU WALL ACS$125,000
2004-07-22Job filed: MECHANICAL WORK AS PER PLANS ATTACHED$125,000
2004-07-22Job filed: CREATE OPENIGS FOR THRU WALL ACS$125,000
2004-06-10ECB Non-Hazardous violation: FULTON HIGH PRUSSRE BOILER. 50> PROPERLY MAINTAIN YOUR BOILER, OR HAVE THE BOILER DISCONECTED BY REMOVING THE POWER SUPPLY, THE PI$180
2004-06-09ECB Non-Hazardous violation: FULTON HIGH PRESSURE BOILER. 50> PROPERLY MAINTAIN YOUR BOILER OR HAVE THE BOILER DISCONECTED BY REMOVING THE POWER SUPPLY THE PIP$180
2004-06-07Permit EW — ISSUED
2004-05-26AL&R $20,000,000 — from THE UNION LABOR LIFE INSURANCE COMPANY to GPH PARTNERS LLC$20,000,000
2004-05-26Mortgage $20,000,000 — from GPH PARTNERS LLC to THE UNION LABOR LIFE INSURANCE COMPANY$20,000,000
2004-05-26TERL — from THE LILLIAN GOLDMAN 220 L.L.C.; JANE H. GOLDMAN, ALLAN H. GOLDMAN & LOUI to AB GREEN GRAMERCY LLC
2004-05-26TERL — from AB GREEN GRAMERCY LLC to WEISSBERG, RUTH F
2004-05-26TERL — from AB GREEN GRAMERCY LLC to WEISSBERG, STEVEN C
2004-05-26ASSTO — from GPH INVESTORS LLC to GPH PARTNERS LLC
2004-05-26MLEA $48,192,000 — from JANE H. GOLDMAN, ALLAN H. GOLDMAN & LOUI; THE LILLIAN GOLDMAN 2002 L. L. C. to GPH INVESTORS LLC$48,192,000
2004-05-10Job filed: INTERIOR DEMO AND REMOVAL OF PLUMBING FI XTURES ON 4TH FLOOR. NO CHANGE N USE, EGRESS OR OCCUPANCY.$85,000
2004-05-10Job filed: INTERIOR DEMO AND REMOVAL OF PLUMBING FI XTURES ON 4TH FLOOR. NO CHANGE N USE, EGRESS OR OCCUPANCY.$85,000
2004-04-05Job filed: Application filed to divide the building into two (2) buildings. Each building will have its own tax lot but the two buildings will be on a single zo$3,000,000
2004-04-05Job filed: Application filed to divide the building into two (2) buildings. Each building will have its own tax lot but the two buildings will be on a single zo$3,000,000
2003
2003-12-17Permit EW — ISSUED
2003-11-14Job filed: RENOVATION TO PENTHOUSE APARTMENT PROVIDE 2 FIXTERIOR DOORS TO TERRACE PARTITION WORK. RENOVATE BATH- ROOM AND KITCHEN. NO CHANGE IN USE, EGRESS OR OC$20,000
2003-08-19MLEA — from AB GREEN GRAMERCY, LLC to WEISSBERG, STEVEN C
2003-08-19MLEA $100 — from AB GREEN GRAMERCY, LLC to WEISSBERG, RUTH F$100
2003-08-19ASSTO — from GRAMERCY PARK HOTEL LTD. to AB GREEN GRAMERCY, LLC
2003-08-19ASSTO — from RUTH F. WEISSBERG, PRELIMINARY CO-EXECUT; CHARLES E. RAMOS, PRELIMINARY CO-EXECUTO to GRAMERCY PARK HOTEL LTD.
2003-05-06DOB complaint, category ?
2003-04-03DOB complaint, category ?
2003-03-18DOB violation E: 1S2489
2003-03-18DOB violation E: 1P8027
2003-01-07Permit EW — ISSUED
2002
2002-12-03Job filed: PARTITION CHANGES AND PLUMBING WORK IN M ENS BATHROOM. NO CHANGE IN USE OCCUPANCY OR EGRESS.$20,000
2002-10-29Permit EW — ISSUED
2002-10-08Job filed: REMOVE PARTITIONS AND BATHROOM FIXTURES ON 1ST. FLOOR MINOR PARTITIONS WORK. NO CHANGE IN USE,EGRESS OR OCCUPAN CY.$5,000
2002-10-08Job filed: REMOVE PARTITIONS AND BATHROOM FIXTURES ON 1ST. FLOOR MINOR PARTITIONS WORK. NO CHANGE IN USE,EGRESS OR OCCUPAN CY.$5,000
2002-07-30Deed — from GOLDMAN, LILLIAN MARITAL TRUST; GOLDMAN, SOL L/W/T/; GOLDMAN, JANE HARRIET AS CO-TRUSTEE; to LILLIAN GOLDMAN 2002L.L.C.
2001
2001-08-07DOB complaint, category ?
2001-02-02DOB violation E: 1P8023
2001-02-02DOB violation E: 1P8027
2001-02-01DOB violation E: 1P4014
2001-02-01DOB violation E: 1P4016
2001-02-01DOB violation E: 1F3314
2001-02-01DOB violation E: 1P4013
2000
2000-08-17Permit EW — ISSUED
2000-07-18Job filed: EXTERIOR REPAIRWORK AS PER PLANS FILED H EREWITH. NO CHANGE TO EGRESS, U E OR OCCUPANCY.$180,000
2000-03-14Permit EQ — ISSUED
2000-03-08Job filed: INSTALLATION OF A HEAVY DUTY SHED 335' DURING FACADE REPAIR. NO CHANGE IN USE EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91.
2000-03-08Job filed: INSTALLATION OF A HEAVY DUTY SHED 335' DURING FACADE REPAIR. NO CHANGE IN USE EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91.
2000-02-18DOB violation E: 1P14015
2000-02-18DOB violation E: 1P14016
2000-02-18DOB violation E: 1P14013
2000-02-16DOB violation LL10/80:
1999
1999-01-20DOB violation LL1081:
1998
1998-01-20ECB Hazardous violation: QUESTIONABLE CONSTRUCTION, THE 25' HIGH BRICK STRUCTED LOCATED ON THE ROOF BUILD AROUND THE WATER TOWER, IS IN DANGER OF COLLAPSED
1994
1994-11-15Permit EQ — ISSUED
1994-07-26Permit EW — ISSUED
1994-07-26Permit EW — ISSUED
1994-05-31DOB violation LL1081:
1994-05-26Deed — from GOLDMAN, ALLAN HOWARD; EMPIRE ASSOCIATES REALTY CO.; GOLDMAN, JANE HARRIET; ESTATE OF SOL to GOLDMAN, JANE HARRIET; LILLIAN GOLDMAN MARITAL TRUST OF SOL GOL; GOLDMAN LILLIAN; GOLDMAN,
1993
1993-07-09Permit EW — ISSUED
1992
1992-12-09Permit EW — ISSUED
1992-04-30DOB complaint, category ?
1992-04-16Permit EW — ISSUED
1988
1988-08-12DOB violation E: CEASE USE OF ALL ELEV. WORK. UNTIL PROPER PERMITS ARE OBTAINED
1983
1983-04-01HPD class B: § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR
1982
1982-03-11Mortgage satisfied — from AVON ASSOCIATES,INC.ETAL to KEMPER, NORMAN & ANO
1980
1980-03-04Mortgage assigned — from GRAMERCY PARK HOTELINC to WEISSBERG, HERBERT R
1978
1978-03-23Deed — from AVON ASSOCIATES INC to EMPIRE ASSCTS RTY CODBA; GOLDMAN, SOL
1977
1977-12-30Mortgage — from SOUTHERN ASSOC ETAL; AVON ASSOCIATES to KEMPER, NORMAN; ADOLF, NORMAN
1977-12-30Agreement — from AVON ASSOCIATES INC to ADOLF, NORMAN L
1977-12-16Deed — from GOLDMAN, SOL DBA to AVON ASSOCIATES; EMPIRE ASSOCIATES RTY CO
1977-10-28Deed — from AVON ASSOCIATES, INC to EMPIRE ASSOCIATES RTY CO
1975
1975-10-29SAGE — from ADOLF, NORMAN L; AVON ASSOCIATES INC; WEISSBERG, HERBERT R
1975-10-06Mortgage assigned — from WEISSBERG, HERBERT R to GRAMERCY PARK HOTELINC
1975-10-06LEAS — from AVON ASSOCIATES, INC to WEISSBERG, HERBERT R
1975-08-20Mortgage assigned — from NEW ENGLAND MUTUAL LF IN to JAMAICA SAVINGS BANK
1975-08-20Agreement — from JAMAICA SAVINGS BANK to AVON ASSOCIATES INC
1975-08-20Agreement — from ADOLF, NORMAN L to JAMAICA SAVINGS BANK
1975-08-20Agreement — from ADOLF, NORMAN L to AVON ASSOCIATES INC
1974
1974-07-02Mortgage — from TIP TREE CORP to BEVERLY WILSHIRE ASSOCTS
1974-07-02Mortgage — from TIP TREE CORP to BEVERLY WILSHIRE ASSOCTS
1972
1972-06-20Deed — from CHATHAM ASSOCIATES INC to AVON ASSOCIATES INC
1971
1971-10-21Mortgage assigned — from TIPTREE CORP; NYHACO CREDIT CORP LTD to BEVERLY WILSHIRE ASSOC
1971-10-07Mortgage assigned — from NYHACO CREDIT CORP LTD to BEVERLY WILSHIRE ASSOC
1971-06-23Mortgage — from TIP TREE CORP to NYHACO CREDIT CORP LTD
1969
1969-08-15Deed — from WELLINGTON ASSOCIATES to DI LORENZO, ALEX JR; GOLDMAN, SOL
1969-01-15Deed — from WELLINGTON ASSOCIATES to CHATHAM ASSOCIATES INC
1969-01-15Agreement — from CHATHAM ASSOCIATES INC to ADOLF, NORMAN L
1969-01-15Deed — from CHATHAM ASSOCIATES INC to ADOLF, NORMAN L
1969-01-15Mortgage assigned — from GOLDMAN, SOL; DI LORENZO, ALEX JR to ADOLF, NORMAN L
1969-01-15Mortgage assigned — from ADOLF, NORMAN L to GOLDMAN, SOL; DI LORENZO, ALEX JR
1969-01-15Mortgage assigned — from CHATHAM ASSOCIATES INC to ADOLF, NORMAN L
1967
1967-10-11Mortgage assigned — from WEISSBERG-TAFT MGMTCORP to TIP TREE CORP
1967-06-07Mortgage assigned — from STEINGART, DANIEL to ADOLF, NORMAN
1967-06-07Mortgage — from WELLINGTON ASSOCIATES to ADOLF, NORMAN L
1967-06-07Agreement — from WELLINGTON ASSOCIATES to ADOLF, NORMAN L
1967-01-19Mortgage — from WEISSBERG TAFT MGMTCORP to COLLATERAL FACTORS CORP
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL