Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

210 East 35 Street · Manhattan · BBL 1009150056 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 0. In ZIP 10016, 71% of residential buildings hold an A and 4% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations1 total — 0 class C (immediately hazardous), 1 class B, 0 class A. Oldest open since 2018-05-29.

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

9 service requests in the last three years. Most common: Street Condition (4) · Noise (3) · Encampment (1) · Sidewalk Condition (1).

Filed construction activity

$20,000 in permitted construction work filed since 2016 (1 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1920)
YesSix or more residential units (11)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)210 EAST 35TH STREET CORP
Head officerARVINDER S LAMBA
Managing agentCONSORT MANAGEMENT INC
Last registered2025-07-02

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$3,073,000 $1,382,850
2026$3,533,000 $1,589,850
2027$3,903,000 $1,756,350

The city's market estimate has risen 27% between tax years 2025 and 2027.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway33 St — 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
Grand Central-42 St — 4 5 6 7 S · 0.4 mi straight-line (about a 9-minute walk) · station accessibility: full
BusNearest boarding stop: E 34 St / 3 Av — M34-SBS M34A-SBS BM5 · 250 ft · Select Bus Service
Citi BikeLexington Ave & E 36 St · 750 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 116 Mary Lindley Murray
Middle: J.H.S. 104 Simon Baruch. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

210 East 35 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

9 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by CONSORT — 7 buildings, 175 units. Grades across the portfolio: A7. See the whole portfolio

BuildingBoroughUnitsGrade
150 North 12 Street BK51 A
59 Kent Street BK36 A
38 Roebling Street BK30 A
46 Roebling Street BK30 A
74 Greenpoint Avenue BK13 A
210 East 35 Street MN11 A
62 Greenpoint Avenue BK4 A

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $31,488 on 2026-04-24 (lender: JPMorgan Chase Bank, N.A.). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-04-24Agreement $3,575,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A. $3,575,000
2026-04-24Mortgage $31,488 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A. $31,488
2019-04-02Mortgage $38,047 — from 210 E 35TH ST CORP to JPMORGAN CHASE BANK, NA.A $38,047
2019-04-02Agreement $4,100,000 — from 210 E 35TH ST CORP to JPMORGAN CHASE BANK, NA.A $4,100,000
2014-07-11Agreement $4,500,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A. $4,500,000
2014-07-11Agreement $4,500,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A. $4,500,000
2014-07-11Mortgage $2,285,968 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A. $2,285,968
2012-01-24AL&R $2,300,000 — from 210 E35TH ST CORP to SIGNATURE BANK $2,300,000
2012-01-24Agreement $2,300,000 — from 210 E 35TH ST CORP to SIGNATURE BANK $2,300,000
2009-06-30Agreement $2,850,000 — from 210 E 35TH ST CORP to MADISON NATIONAL BANK $2,850,000
2008-03-11Mortgage $2,850,000 — from 210 EAST 35TH ST. CORP. to MADISON NATIONAL BANK $2,850,000
2008-02-19Deed $3,800,000 — from MCNULTY, CYNTHIA to 210 E. 35TH ST. CORP. $3,800,000
2007-07-31M&CON $350,000 — from MCNULTY, CYNTHIA to HSBC MORTGAGE CORPORATION USA $350,000
2006-11-09Mortgage $300,000 — from MCNULTY, CYNTHIA to HSBC MORTGAGE CORPORATION USA $300,000
2005-07-21Deed $3,400,000 — from 210 EAST 35TH STREET, LLC to MC NULTY, CYNTHIA $3,400,000

Ten-year activity

20100
2017
2018
2019
2020
2021
12
2022
2023
2024
2025
2026
EnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201702013
201806017
201914218
202034018
202116007
20220120012
202303003
202405005
202507018
202600202
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 3 records

DateRecord
2026-04-24Agreement $3,575,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.
2026-04-24Mortgage $31,488 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.
2025-12-22Bedbug filing: 0 infested units

The full timeline

2026
2026-04-24Agreement $3,575,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.$3,575,000
2026-04-24Mortgage $31,488 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.$31,488
2025
2025-12-22Bedbug filing: 0 infested units
2025-07-07311: Sidewalk Condition — Blocked - Construction
2025-05-14311: Noise — Noise: Construction Before/After Hours (NM1)
2025-05-03311: Street Condition — Defective Hardware
2025-05-02311: Street Condition — Defective Hardware
2025-03-28Rodent inspection: Passed
2025-02-23311: Street Condition — Defective Hardware
2025-02-23311: Street Condition — Defective Hardware
2024
2024-12-13Bedbug filing: 0 infested units
2024-11-04311: Encampment — N/A
2024-04-15311: Noise — Noise: Construction Equipment (NC1)
2024-04-14311: Noise — Noise: Construction Before/After Hours (NM1)
2024-01-10Bedbug filing: 0 infested units
2023
2023-06-18311: Noise - Residential — Loud Music/Party
2023-03-15311: Street Condition — Plate Condition - Noisy
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022
2022-09-17311: Noise - Residential — Loud Music/Party
2022-09-10311: Noise - Residential — Loud Music/Party
2022-09-10311: Noise - Residential — Loud Music/Party
2022-09-10311: Noise - Residential — Loud Music/Party
2022-09-04311: Noise - Residential — Loud Music/Party
2022-09-04311: Noise - Residential — Loud Music/Party
2022-09-04311: Noise - Residential — Loud Music/Party
2022-08-22311: Noise - Residential — Loud Talking
2022-08-22311: Noise - Residential — Loud Music/Party
2022-05-27311: Homeless Person Assistance
2022-03-28Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-11-11311: General Construction/Plumbing — Working Contrary To Stop Work Order
2021-11-11DOB complaint, category ?
2021-05-15311: Noise - Residential — Loud Music/Party
2021-05-08311: Dirty Conditions — E3 Dirty Sidewalk
2021-04-03311: Noise - Residential — Loud Music/Party
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-02-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020
2020-10-25311: Noise - Residential — Loud Music/Party
2020-09-20311: Noise - Residential — Loud Music/Party
2020-07-30ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS.EXIT DISCHARGE AND PUBLIC CORRIDORS PER$2,500
2020-07-29DOB complaint, category ?
2020-07-28311: General Construction/Plumbing — Building Permit - None
2020-07-28DOB complaint, category ?
2020-06-16311: Noise - Residential — Loud Music/Party
2020-03-03Rodent inspection: Passed
2019
2019-06-07311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-04-30Elevator permit: Furnish and install door lock monitoring upgrade as per ANSA/ASMA A17.1 2000-03 in compliance with NYC building code appendix K.$2,050
2019-04-22311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-04-18311: New Tree Request — For One Address
2019-04-02Mortgage $38,047 — from 210 E 35TH ST CORP to JPMORGAN CHASE BANK, NA.A$38,047
2019-04-02Agreement $4,100,000 — from 210 E 35TH ST CORP to JPMORGAN CHASE BANK, NA.A$4,100,000
2019-03-13DOB violation E:
2019-01-23Bedbug filing: 0 infested units
2018
2018-11-14311: Water System — LOW WATER PRESSURE - WLWP
2018-06-06311: Street Condition — Cave-in
2018-05-29HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2018-04-30311: Street Condition — Defective Hardware
2018-01-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-01-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-01-19Rodent inspection: Passed
2017
2017-11-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-01-30311: Street Condition — Plate Condition - Noisy
2017-01-26Rodent inspection: Passed
2016
2016-12-31311: New Tree Request — For One Address
2016-10-25Permit EW — ISSUED
2016-10-17Job filed: PROPOSE NEW INSTALLATION OF SPRINKLER BOOSTER PUMP AT BASEMENT SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.$20,000
2016-08-01Rodent inspection: Passed
2016-06-13FDNY inspection (RISK)
2016-06-12311: New Tree Request — For One Address
2016-03-07DOB violation E:
2015
2015-10-15311: Dirty Conditions — E1 Improper Disposal
2015-08-26311: Street Condition — Cave-in
2015-01-28DOB violation E:
2014
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-07-11TL&R — from SIGNATURE BANK to 210 E 35TH ST CORP.
2014-07-11Agreement $4,500,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.$4,500,000
2014-07-11Agreement $4,500,000 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.$4,500,000
2014-07-11Mortgage $2,285,968 — from 210 E 35TH ST CORP. to JPMORGAN CHASE BANK, N.A.$2,285,968
2014-07-11Mortgage assigned — from SIGNATURE BANK to JPMORGAN CHASE BANK, N.A.
2014-04-26311: Noise — Noise, Barking Dog (NR5)
2014-04-16Certificate of occupancy Final
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-24DOB complaint, category ?
2014-01-06Permit PL — ISSUED
2014-01-05311: General Construction/Plumbing — Adjacent Buildings Not Protected
2014-01-05311: Water System — Leak (Use Comments) (WA2)
2014-01-05DOB complaint, category ?
2013
2013-08-21Permit AL — ISSUED
2013-06-13Permit EQ — ISSUED
2013-04-15311: Noise — Noise: Jack Hammering (NC2)
2013-04-02Permit EW — ISSUED
2013-04-02Permit PL — ISSUED
2013-03-29311: General Construction/Plumbing — Adjacent Buildings Not Protected
2013-03-29DOB complaint, category ?
2013-03-28Job filed: INSTALLATION OF SPRINKLER SYSTEM$10,100
2013-03-18Permit EW — ISSUED
2013-03-18Permit EQ — ISSUED
2013-01-09Permit PL — ISSUED
2012
2012-11-22311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-11-22DOB complaint, category ?
2012-10-28DOB complaint, category ?
2012-10-21311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-10-21DOB complaint, category ?
2012-10-04Rodent inspection: Passed
2012-08-25311: Noise — Noise: Construction Equipment (NC1)
2012-08-25311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2012-08-25311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-08-25311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-08-25DOB complaint, category ?
2012-08-25DOB complaint, category ?
2012-07-31Job filed: REMOVAL OF SPRINKLER HEADS.$1,000
2012-07-16311: General Construction/Plumbing — Working Contrary To Stop Work Order
2012-07-16DOB complaint, category ?
2012-07-11311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2012-07-11311: Noise — Noise: Construction Equipment (NC1)
2012-07-11ECB CLASS - 2 violation: "PARTIAL STOP WORK ORDER (ALL DEMOLITION WORK) - ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES" WORK DOES NOT CONFORM TO APPR
2012-07-11DOB complaint, category ?
2012-05-23311: General Construction/Plumbing — Failure To Maintain
2012-05-23311: Noise — Noise: Construction Equipment (NC1)
2012-05-23DOB complaint, category ?
2012-05-21Permit AL — ISSUED
2012-04-27Permit EQ — ISSUED
2012-04-25Permit EW — ISSUED
2012-04-17Permit EW — ISSUED
2012-01-24AL&R $2,300,000 — from 210 E35TH ST CORP to SIGNATURE BANK$2,300,000
2012-01-24Agreement $2,300,000 — from 210 E 35TH ST CORP to SIGNATURE BANK$2,300,000
2012-01-24Mortgage assigned — from MADISON NATIONAL BANK to SIGNATURE BANK
2011
2011-09-14Rodent inspection: Passed
2011-06-17Job filed: SUBMIT STRUCTURAL PLANS$2,000
2011-06-17Job filed: INSTALLATION OF SPRINKLER SYSTEM$201
2011-06-17Job filed: INSTALLATION OF SPRINKLER SYSTEM$201
2011-05-06Permit AL — ISSUED
2011-04-28Permit EQ — ISSUED
2010
2010-08-18Rodent inspection: Passed
2009
2009-06-30PAT — from TULI, SANDEEP to ARORA, SONU
2009-06-30Agreement $2,850,000 — from 210 E 35TH ST CORP to MADISON NATIONAL BANK$2,850,000
2008
2008-12-29Permit AL — ISSUED
2008-04-18Job filed: PROPOSED 1 STORY VERTICAL EXTENSION ALSO HORIZONTAL EXTENSION AND ADD CELLAR TO AN EXISTING BASEMENT. CONVERT 4 STORY AND BASEMENT BUILDING TO CELLAR $350,000
2008-03-25Mortgage satisfied — from MCNULTY, CYNTHIA to WELLS FARGO BANK, N.A.
2008-03-11Mortgage $2,850,000 — from 210 EAST 35TH ST. CORP. to MADISON NATIONAL BANK$2,850,000
2008-03-11PAT — from TULI, SANDEEP to ARORA, SONU
2008-02-28Mortgage satisfied — from MCNULTY, CYNTHIA to HSBC MORTGAGE CORPORATION (USA)
2008-02-19Deed $3,800,000 — from MCNULTY, CYNTHIA to 210 E. 35TH ST. CORP.$3,800,000
2008-02-19PAT — from MCNULTY, CYNTHIA to RAINES, ALAN P
2007
2007-12-20Tenant complaint: PLUMBING — WATER SUPPLY
2007-12-20Tenant complaint: PLUMBING — WATER SUPPLY
2007-07-31M&CON $350,000 — from MCNULTY, CYNTHIA to HSBC MORTGAGE CORPORATION USA$350,000
2007-01-22Permit EW — ISSUED
2006
2006-11-22Job filed: Installation of residential air-conditio ning system. No change to use, occupancy or egress with this applicatio n.$10,000
2006-11-22Job filed: Installation of residential air-conditio ning system. No change to use, occupancy or egress with this applicatio n.$10,000
2006-11-09Mortgage $300,000 — from MCNULTY, CYNTHIA to HSBC MORTGAGE CORPORATION USA$300,000
2005
2005-09-06DOB complaint, category ?
2005-08-15Mortgage satisfied — from 210 EAST 35TH STREET LLC to FIRST REPUBLIC BANK
2005-07-21Deed $3,400,000 — from 210 EAST 35TH STREET, LLC to MC NULTY, CYNTHIA$3,400,000
2005-07-19Mortgage $2,000,000 — from MCNULTY, CYNTHIA to WELLS FARGO BANK, N.A.$2,000,000
2005-07-15ECB Non-Hazardous violation: WORK DOES NOT CONFORM TO APPROVED PLANS. AT A REQUESTED MTF RE-INSPECTION LOCATION WAS FOUND TO BE CONTRARY TO APPROVED PERFORATED$500
2003
2003-11-25Permit PL — ISSUED
2003-11-21Permit EW — ISSUED
2003-11-10Job filed: INSTALLATION OF NEW GAS BOILER IN BASEMENT (<350K) AND HEAT PIPING AND RADIATORS ON FLOORS BASEMENT THROUGH 4TH FLOOR. NEW BOILER FLUE. NO CHANGE I$20,000
2003-11-10Job filed: INSTALLATION OF NEW GAS BOILER IN BASEMENT (<350K) AND HEAT PIPING AND RADIATORS ON FLOORS BASEMENT THROUGH 4TH FLOOR. NEW BOILER FLUE. NO CHANGE I$20,000
2003-11-03Permit EQ — ISSUED
2003-10-30Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED , 25, DURING FACADE REPAIR. NO HANGE IN EGRESS, USE OR OCCUPANCY. SHED TO COMPLY WITH LL 33/91. NO MATERIAL O
2003-10-29Permit EW — ISSUED
2003-09-19Permit PL — ISSUED
2003-08-25Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM. NEW SIAMESE CONNECTION, RISER, SPRINKLER BRANCH LINES AND HEADS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2003-08-06Job filed: SC
2003-08-06Job filed: SC
2003-07-10Permit AL — ISSUED
2003-07-07Job filed: A1$50,000
2003-06-02Permit EW — ISSUED
2003-05-30Job filed: DEMOLITION OF INTERIOR PARTITIONS ON THE BASEMENT AND 1ST FLOOR. NO CHANGE ON USE, OCCUPANCY OR EGRESS.$5,000
2003-05-30Job filed: DEMOLITION OF INTERIOR PARTITIONS ON THE BASEMENT AND 1ST FLOOR. NO CHANGE ON USE, OCCUPANCY OR EGRESS.$5,000
2003-05-30Job filed: DEMOLITION OF INTERIOR PARTITIONS ON THE BASEMENT AND 1ST FLOOR. NO CHANGE ON USE, OCCUPANCY OR EGRESS.$5,000
2002
2002-02-21DTL — from BANK OF NEW YORK
2001
2001-03-23Mortgage $900,000 — from 210 EAST 35TH STREET, LLC to FIRST REPUBLIC BANK$900,000
2001-03-23Deed — from OPITZ, RAYMOND C. ASEXECUTOR; OPITZ, WILLIAM J. L/W/T/ to 210 EAST 35TH STREET, LLC
2001-03-23RTXL — from OPITZ, WILLIAM J. ESTATE OF
2000
2000-10-03DTL — from BANK OF NEW YORK
2000-07-27TLS — from BANK OF NEW YORK to BANK OF NEW YORK
2000-04-21ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECTS ARE :VERTICAL CRACKS AROUND WINDOW AT 1SST FLOOR FRONT OF BLDG .2-EXTERIOR MAS$2,500
2000-04-19DOB complaint, category ?
1999
1999-01-20ATL — from NYCTL 1998-1 TRUST to BANK OF NEW YORK
1998
1998-07-29TLS — from CITY OF NEW YORK to NYCTL 1998-1 TRUST
1993
1993-09-28DOB violation Z:
1993-09-28DOB violation Z:
1993-09-28DOB violation C:
1992
1992-06-02Deed — from OPITZ, WILLIAM J. to OPITZ, NITA AKA; OPITZ, JAUNITA M.; OPITZ, WILLIAM J.
1985
1985-08-19Mortgage satisfied — from OPITZ, WILLIAM J. to KROEHLE, LUCILLE H.
1984
1984-05-11Mortgage assigned — from BEARNS,STUYVESANT KCSTR; KROEHLE, LUCILLE H EST/O to COMM/INCOME MAINTENANCE
1976
1976-11-17Mortgage assigned — from KROEHLE, LUCILLE H to HARTFORD NTL BK TR CO TR
1976-11-17Agreement — from OPITZ, WILLIAM J to HARTFORD NTL BK TR CO TR
1974
1974-10-09Agreement — from OPITZ, WILLIAM J to KROEHLE, LUCILLE H

Support this site Back to the building page