The city's published records show little recorded distress here in the last three years. Less recorded distress than 87% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 0.4. In ZIP 10036, 62% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
34 service requests in the last three years. Most common: Homeless Person Assistance (9) · Sidewalk Condition (5) · Taxi Complaint (4) · Illegal Parking (3) · For Hire Vehicle Complaint (2) · Commercial Disposal Complaint (1).
Filed construction activity
$3,406,380 in permitted construction work filed since
2016 (16 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1894)
Yes
Six or more residential units (112)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
METROPOLITAN TIMES SQUARE ASSOCIATES LLP
Head officer
BRADLEY J KORMAN
Managing agent
SHK MANAGEMENT
Last registered
2025-11-07
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$25,615,000
$11,526,750
2026
$26,030,000
$11,713,500
2027
$27,668,000
$12,450,600
The city's market estimate has risen
8% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 2/100, posted at the entrance by law (2022 disclosure cycle)
1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick) 1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Worker Hygiene) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2018 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
42 St-Bryant Pk — 7 B D F M · 550 ft straight-line (about a 3-minute walk) · station accessibility: none Times Sq-42 St — 1 2 3 7 A C E N Q R S W · 650 ft straight-line (about a 3-minute walk) · station accessibility: full
Bus
Nearest boarding stop: W 44 St / 6 Av — M55 · 450 ft
Citi Bike
6 Ave & W 45 St · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
34 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $62,500,000 on
2026-08-06 (lender: Pfss 2 Sub VII LP). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-08-06
AL&R $62,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP
$62,500,000
2026-08-06
Mortgage $62,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP
$62,500,000
2026-08-06
Mortgage $28,800,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP
$28,800,000
2026-07-29
RPTT&RET $63,900,000 — from CAL I ORIGINATED ASSETS LLC to METROPOLITAN TIMES SQUARE PURCHASER LLC
$63,900,000
2023-04-19
Agreement $37,700,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$37,700,000
2023-04-19
AL&R $37,700,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$37,700,000
2023-04-19
SPRD $37,700,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$37,700,000
2023-04-19
SPRD $54,800,000 — from METROPOLITAN 58TH STREET ASSOCIATES, LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$54,800,000
2016-12-28
M&CON $57,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC
$57,000,000
2016-12-28
AL&R $57,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CIBC INC.
$57,000,000
2015-05-29
RPTT&RET $109,930,000 — from BLACKROCK CAL I LLC to CAL I ORIGINATED ASSETS, LLC
$109,930,000
2012-02-15
AL&R $52,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATS LLC to CIBC INC
$52,000,000
2012-02-15
Agreement $57,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATS LLC to CIBC INC
$57,000,000
2007-02-05
Mortgage $6,086,659 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to 123 WEST 44TH STREET FUNDING COMPANY, IN
$6,086,659
2007-02-05
Agreement $57,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to 123 WEST 44TH STREET FUNDING COMPANY, IN
$57,500,000
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
2024
2025
36
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
5
11
7
0
6
29
2018
4
3
6
0
5
18
2019
15
3
5
0
2
25
2020
10
5
5
0
3
23
2021
4
6
9
0
2
21
2022
3
2
9
0
2
16
2023
3
1
7
7
3
21
2024
13
2
8
0
3
26
2025
9
1
15
0
4
29
2026
11
0
15
8
2
36
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: REMOVAL OF EXISTING ROOFTOP MECHANICAL EQUIPMENT AND FOOTING. INSTALLATION OF NEW STEEL DUNNAGE BETWEEN AIRSHAFT PARAPETS. NO CHANGE IN USE, EGRESS OR
2026-09-03
Permit General Construction — Permit Issued
2026-09-03
Permit Mechanical Systems — Permit Issued
2026-09-03
Permit General Construction — Permit Issued
2026-09-03
Permit Mechanical Systems — Permit Issued
2026-09-03
Permit General Construction — Permit Issued
2026-09-03
Permit Mechanical Systems — Permit Issued
2026-08-27
Agreement — from METROPOLITAN 58TH STREET ASSOCIATES LLC to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2026-08-22
311: Sidewalk Condition — Broken Sidewalk
2026-08-19
Job filed: INSTALL REPLACEMENT ROOFTOP DEDICATED OUTDOOR AIR SYSTEMS (DOAS) UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-08-17
311: Homeless Person Assistance — Non-Chronic
2026-08-06
TL&R — from CAPITAL ONE NATIONAL ASSOCIATION to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2026-08-06
AL&R $62,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP
2026-08-06
Mortgage $62,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP
2026-08-06
Mortgage $28,800,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP
2026-08-06
PREL — from CAPITAL ONE NATIONAL ASSOCIATION to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2026-08-06
Mortgage assigned — from CAPITAL ONE NATIONAL ASSOCIATION to PFSS 2 SUB VII LP
2026-08-04
Bedbug filing: 0 infested units
2026-07-29
Restaurant inspection: HUNT & FISH CLUB — grade Z
2026-07-29
RPTT&RET $63,900,000 — from CAL I ORIGINATED ASSETS LLC to METROPOLITAN TIMES SQUARE PURCHASER LLC
311: Smoking or Vaping — Allowed in Smoke Free Area
2025-11-17
311: Taxi Complaint — Driver Complaint - Non Passenger
2025-11-12
Bedbug filing: 0 infested units
2025-11-07
Restaurant inspection: HUNT & FISH CLUB
2025-11-07
311: General Construction/Plumbing — Failure To Maintain
2025-11-07
DOB complaint, category ?
2025-10-22
Boiler inspection
The full timeline
2026
2026-10-01Boiler inspection
2026-10-01311: Homeless Person Assistance — Non-Chronic
2026-10-01311: Homeless Person Assistance — Non-Chronic
2026-09-28311: Food Poisoning — 1 or 2
2026-09-19311: Homeless Person Assistance — Non-Chronic
2026-09-19311: Homeless Person Assistance — Non-Chronic
2026-09-16311: Homeless Person Assistance — Non-Chronic
2026-09-14Job filed: REMOVAL OF EXISTING ROOFTOP MECHANICAL EQUIPMENT AND FOOTING. INSTALLATION OF NEW STEEL DUNNAGE BETWEEN AIRSHAFT PARAPETS. NO CHANGE IN USE, EGRESS OR$5,000
2026-09-03Permit General Construction — Permit Issued
2026-09-03Permit Mechanical Systems — Permit Issued
2026-09-03Permit General Construction — Permit Issued
2026-09-03Permit Mechanical Systems — Permit Issued
2026-09-03Permit General Construction — Permit Issued
2026-09-03Permit Mechanical Systems — Permit Issued
2026-08-27Agreement — from METROPOLITAN 58TH STREET ASSOCIATES LLC to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2026-08-19Job filed: INSTALL REPLACEMENT ROOFTOP DEDICATED OUTDOOR AIR SYSTEMS (DOAS) UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
2026-08-17311: Homeless Person Assistance — Non-Chronic
2026-08-06TL&R — from CAPITAL ONE NATIONAL ASSOCIATION to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2026-08-06AL&R $62,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP$62,500,000
2026-08-06Mortgage $62,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP$62,500,000
2026-08-06Mortgage $28,800,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to PFSS 2 SUB VII LP$28,800,000
2026-08-06PREL — from CAPITAL ONE NATIONAL ASSOCIATION to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2026-08-06Mortgage assigned — from CAPITAL ONE NATIONAL ASSOCIATION to PFSS 2 SUB VII LP
2026-08-04Bedbug filing: 0 infested units
2026-07-29Restaurant inspection: HUNT & FISH CLUB — grade Z
2026-07-29RPTT&RET $63,900,000 — from CAL I ORIGINATED ASSETS LLC to METROPOLITAN TIMES SQUARE PURCHASER LLC$63,900,000
2026-07-21311: Consumer Complaint — Hotel or Motel
2025-06-27Certificate of occupancy Renewal Without Change
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-05-14Job filed: INSTALLATION OF NEW DUAL FUEL BOILER INCLUDING PIPING IN CELLAR, CAP AND REMOVE OLD BOILER AND PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2025-05-03311: Homeless Person Assistance
2025-05-03311: Homeless Person Assistance
2025-03-31Certificate of occupancy Renewal Without Change
2025-03-27Permit Mechanical Systems — Signed-off
2025-03-26Job filed: INSTALLATION OF NEW DUAL FUEL BOILER INCLUDING PIPING IN CELLAR, CAP AND REMOVE OLD BOILER AND PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2025-02-10Job filed: INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2025-01-02Certificate of occupancy Renewal With Change
2024
2024-12-18Job filed: INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-07-23Certificate of occupancy Renewal Without Change
2024-07-17Permit Boiler Equipment — Signed-off
2024-06-26311: Lost Property — Other
2024-06-18Cooling tower inspection
2024-05-20Job filed: INSTALLATION OF NEW DUAL FUEL BOILER INCLUDING PIPING IN CELLAR, CAP AND REMOVE OLD BOILER AND PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2024-05-20Job filed: SEBSEQUENT FILING FOR MECHANICAL WORK FOR INSTALLATION OF NEW DUAL FUEL BOILER.$25,000
2024-05-20Job filed: INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024-05-02Boiler inspection
2024-05-01FDNY inspection (RISK)
2024-04-26Bedbug filing: 0 infested units
2024-04-24FDNY inspection (SPECIAL-OTH)
2024-04-24Certificate of occupancy Renewal Without Change
2024-04-08Permit Sign — Signed-off
2024-04-08Permit Sign — Signed-off
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-15Job filed: ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - HUNT&FISH CLUB NYC. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$400
2024-03-15Job filed: ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - HUNT&FISH CLUB NYC. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$400
2024-02-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-26Certificate of occupancy Renewal Without Change
2023-06-16Certificate of occupancy Renewal Without Change
2023-06-15Agreement — from METROPOLITAN 58TH STREET ASSOCIATES, LLC to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2023-05-10311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2023-05-05Boiler inspection — defects found
2023-04-19TL&R — from CIBC INC. to METROPOLITAN TIMES SQUARE ASSOCIATES LLC
2023-04-19Mortgage assigned — from CIBC INC. to CAPITAL ONE, NATIONAL ASSOCIATION
2023-04-19Agreement $37,700,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION$37,700,000
2023-04-19AL&R $37,700,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION$37,700,000
2023-04-19SPRD $37,700,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION$37,700,000
2023-04-19SPRD $54,800,000 — from METROPOLITAN 58TH STREET ASSOCIATES, LLC to CAPITAL ONE, NATIONAL ASSOCIATION$54,800,000
2023-03-31Bedbug filing: 0 infested units
2023-03-22311: Consumer Complaint — Retail Store
2023-03-21Certificate of occupancy Renewal Without Change
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-01-11FDNY inspection (RISK)
2022
2022-09-23311: Illegal Parking — Blocked Bike Lane
2022-09-22Certificate of occupancy Renewal Without Change
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-06-23Certificate of occupancy Renewal Without Change
2022-06-17Boiler inspection
2022-06-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-05-30311: Consumer Complaint — Pedicab
2022-05-25Cooling tower inspection
2022-04-25311: Food Poisoning — 1 or 2
2022-04-23311: Building/Use — Illegal Conversion Of Residential Building/Space
2022-04-23DOB complaint, category ?
2022-03-25Certificate of occupancy Renewal Without Change
2022-03-13311: Lost Property — Clothing/Glasses
2022-03-10311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-08311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-12-28Certificate of occupancy Renewal Without Change
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-10-05311: Lost Property — Bag/Wallet
2021-09-27Certificate of occupancy Renewal Without Change
2021-09-15FDNY inspection (RISK)
2021-09-12311: Homeless Person Assistance — Chronic
2021-08-17ECB CLASS - 2 violation: FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OFCORRECTION W/ THE DOB FOR VIOLATING CONDITIONS CITED ON NOV#$1,250
2021-08-17DOB complaint, category ?
2021-08-10311: Noise — Noise: Construction Before/After Hours (NM1)
2021-07-27Boiler inspection
2021-07-24311: Noise — Noise: air condition/ventilation equipment (NV1)
2021-07-16ECB CLASS - 2 violation: ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1-28-118.3.2. AT TIME OF INSPECTION NOTED;C/O#120932465T028 W$625
2021-06-22311: Building/Use — Illegal Conversion Of Residential Building/Space
2021-06-22DOB complaint, category ?
2021-05-20Facade (LL11) filing, cycle 9: SAFE
2021-05-12Permit Sidewalk Shed — Signed-off
2021-05-09311: Consumer Complaint — Hotel
2021-04-27311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2021-04-12Permit EW — ISSUED
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2020
2020-11-24Boiler inspection
2020-11-24311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-09Cooling tower inspection
2020-09-18311: Noise — Noise: Construction Before/After Hours (NM1)
2020-09-11Facade (LL11) filing, cycle 9: SAFE
2020-09-11DOB violation FISPHAZ:
2020-09-11DOB violation FISPFCS: CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
2020-09-11DOB violation FISPHAZ:
2020-09-03311: Noise — Noise: Jack Hammering (NC2)
2020-08-23311: Homeless Street Condition — N/A
2020-08-21Permit EQ — ISSUED
2020-08-17311: Homeless Street Condition — N/A
2020-07-06Certificate of occupancy Temporary
2020-06-24Permit EQ — ISSUED
2020-06-23Job filed: INSTALLATION OF 600 LBS CAPACITY ELECTRIC MATERIAL ONLY HOIST DURING BLDG ALTERATION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2020-06-23Job filed: INSTALLATION OF 600 LBS CAPACITY ELECTRIC MATERIAL ONLY HOIST DURING BLDG ALTERATION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2020-04-30Permit Supported Scaffold — Signed-off
2020-04-30Permit Sidewalk Shed — Signed-off
2020-04-09Certificate of occupancy Temporary
2020-04-09Permit EW — ISSUED
2020-02-06ECB CLASS - 2 violation: PROJECT INFORMATION PANE/SIDEWALK SHED PARPET PANEL/CONSTRUCTION SIGN NOT PROVIDED OR NOT IN COMPLIANCE WITH SECTION AT TIME OF MY$3,125
2019-09-12311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-12311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-12311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-10311: Water Conservation — Water Meter Broken/Leaking - Other (CMO)
2019-08-23Permit EQ — ISSUED
2019-08-08Job filed: INSTALLATION OF (2) 600 LBS SINGLE LINE BETA MAX MATERIAL HOISTS PER PLAN. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGR
2019-08-07Job filed: INSTALLATION OF (2) 600 LBS SINGLE LINE BETA MAX MATERIAL HOISTS PER PLAN. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGR
2019-08-07Job filed: INSTALLATION OF (2) 600 LBS SINGLE LINE BETA MAX MATERIAL HOISTS PER PLAN. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGR
2019-07-31Certificate of occupancy Temporary
2019-07-29Permit EW — ISSUED
2019-07-11Boiler inspection
2019-06-26Permit Supported Scaffold — Signed-off
2019-06-25Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE
2019-06-25Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC
2019-06-25Permit Sidewalk Shed — Signed-off
2019-05-09Certificate of occupancy Temporary
2019-02-17DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-02-13Certificate of occupancy Temporary
2019-02-11ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIR$1,250
2019-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2019-01-11Job filed: FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$935,490
2019-01-11Job filed: FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$935,490
2018
2018-11-19311: Taxi Complaint — Driver Complaint
2018-11-17311: Taxi Complaint — Driver Complaint
2018-11-16Certificate of occupancy Temporary
2018-10-25Boiler inspection
2018-10-10HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-08-27ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES.NOTE: EXPOSURE # 1 EXPOSED BRICK ON EIGHT (8) FLOORS ERODING (DELA$1,250
2017-06-27ECB CLASS - 1 violation: 05A10,41M07. 05A10-CEASE USE ITEM. DOOR ZONE RESTRICTOR HAS BEEN TAMPERED WITH/DISABLED AND RENDERED INOPERATIVE.THIS IS A SAFETY$1,000
2017-06-22311: Elevator — Accident - Elevator
2017-06-22311: Elevator — Elevator - Defective/Not Working
2017-06-22DOB complaint, category ?
2017-06-22DOB complaint, category ?
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000003753 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$5,000
2017-01-03311: Mold — Public Complaint - Comm Location
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB complaint, category ?
2016
2016-12-28M&CON $57,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC$57,000,000
2016-12-28AL&R $57,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to CIBC INC.$57,000,000
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-10-26311: Emergency Response Team (ERT) — Lights From Parking Lot Shining On Building
2016-10-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-10-26DOB complaint, category ?
2016-10-06311: Elevator — Elevator - Defective/Not Working
2016-10-06DOB complaint, category ?
2016-08-23Permit PL — ISSUED
2016-08-19DOB violation E:
2016-08-12311: Food Establishment — Ventilation
2016-08-11311: Taxi Complaint — Driver Complaint
2016-08-02311: Noise — Noise: Construction Equipment (NC1)
2016-03-17Permit EW — ISSUED
2016-03-10Permit PL — ISSUED
2016-02-04Permit EW — ISSUED
2016-02-04Permit EW — ISSUED
2016-02-04Permit EW — ISSUED
2016-02-02Certificate of occupancy Temporary
2016-01-25Permit EW — ISSUED
2016-01-22Job filed: SELECTIVE RENOVATION OF PARTIAL 12TH & 13TH FLOORS, INTERIOR NON-LOAD BEARING PARTITION WORK, GWB,COSMETIC FINISHES IN UNITS AS INDICATED ON PLANS$750,000
2016-01-22Job filed: SUBSEQUENT APPLICANT FOR MISC PLUMBING , SPRINKLER AND MECHANICAL WORK.$229,600
2016-01-22Job filed: SUBSEQUENT APPLICANT FOR MISC STRUCTURAL WORK.$200,000
2015
2015-12-24FDNY inspection (SPECIAL-OTH)
2015-11-19Permit EW — ISSUED
2015-11-17Certificate of occupancy Temporary
2015-11-17Job filed: SELECTIVE RENOVATION OF PARTIAL 12TH & 13TH FLOORS, INTERIOR NON-LOAD BEARING PARTITION REMOVALS AND INTERIOR DEMO OF FINISHES AND UNITS AS INDICA$50,000
2015-09-02DOB violation E:
2015-08-24Certificate of occupancy Temporary
2015-06-25311: Broken Muni Meter — Out of Order
2015-06-01Certificate of occupancy Temporary
2015-05-29RPTT&RET $109,930,000 — from BLACKROCK CAL I LLC to CAL I ORIGINATED ASSETS, LLC$109,930,000
2015-03-25311: Street Condition — Defective Hardware
2015-03-24FDNY inspection (RISK)
2015-03-03Certificate of occupancy Temporary
2015-02-25311: Food Poisoning — 1 or 2
2015-01-17311: Taxi Complaint — Driver Complaint
2014
2014-12-10Certificate of occupancy Temporary
2014-09-17Certificate of occupancy Temporary
2014-09-10DOB violation E:
2014-09-10DOB violation E:
2014-08-13311: Noise — Noise: Construction Before/After Hours (NM1)
2014-07-21Permit EW — ISSUED
2014-07-07Job filed: FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#121916935, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM A$3,000
2014-06-09Permit EQ — ISSUED
2014-06-06Permit EW — ISSUED
2014-06-05Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-06-03Job filed: PA
2014-06-03Job filed: TO FILE "SP" SPRINKLER WORK TYPE IN CONJUNCTION WITH ALT-2 APPLICATION 121916935. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$25,000
2014-06-03Job filed: PA
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30Certificate of occupancy Temporary
2014-05-02Permit PL — ISSUED
2014-04-22Permit EW — ISSUED
2014-04-22Permit EW — ISSUED
2014-04-04311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-04311: Noise - Vehicle — Engine Idling
2014-04-01FDNY inspection (SPECIAL-OTH)
2014-03-14Rodent inspection: Passed
2014-03-07Certificate of occupancy Temporary
2014-02-24311: Taxi Complaint — Driver Complaint
2014-02-10Permit AL — ISSUED
2014-02-07Job filed: RENOVATION OF AN EXISTING RESTAURANT AT CELLAR AND 1ST FLOOR. INSTALL NEW PLUMBING FIXTURES. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATI$101,700
2014-02-07Job filed: RENOVATION OF AN EXISTING RESTAURANT AT CELLAR AND 1ST FLOOR. INSTALL NEW PLUMBING FIXTURES. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATI$101,700
2014-02-07Job filed: WALL STRUCTURE FOR ACCESSORY SIGN$15,000
2013
2013-12-12Certificate of occupancy Temporary
2013-11-26Permit SG — ISSUED
2013-10-04Permit PL — ISSUED
2013-10-04Permit EW — ISSUED
2013-10-04Permit EW — ISSUED
2013-10-04Permit EW — ISSUED
2013-10-04Permit EW — ISSUED
2013-09-16Certificate of occupancy Temporary
2013-08-02Permit EW — ISSUED
2013-08-02Permit EW — ISSUED
2013-07-11311: For Hire Vehicle Complaint — Driver Complaint
2013-06-27311: For Hire Vehicle Complaint — Driver Complaint
2013-06-21Certificate of occupancy Temporary
2013-06-19DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-05-03Job filed: SUBSEQUENT APPLICANT FOR MECHANICAL,PLUMBING & SPRINKLER WORK.$161,300
2013-05-03Job filed: SUBSEQUENT APPLICANT FOR EXTERIOR STRUCTURAL WORK.$50,000
2013-05-03Job filed: MODERATE EXTERIOR RENOVATION OF DUPLEX UNIT # 1209 ON 12 & 13 FLOORS. INSTALL SKLIGHT, WINDOW REPLACEMENT, REPLACE WATER GRAVITY TANK ON ROOF, INS$157,500
2013-04-30ECB CLASS - 1 violation: UNLAWFUL ACTS:FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.NOTED: JOB#1121584972 TO LEGALIZE WORK CITED IN NOV (SWO)35004561X $2,400
2013-04-15DOB complaint, category ?
2013-04-11Job filed: MODERATE INTERIOR RENOVATION OF DUPLEX UNIT # 1209 ON 12 & 13 FLOORS. PARTITION WORK, GWB, ACCESS STAIRS, FLOORING AND COSMETIC FINISHES THROUGHOU$218,000
2013-04-11Job filed: SUBSEQUENT APPLICANT FOR STRUCTURAL WORK.$59,000
2013-04-11Job filed: SUBSEQUENT APPLICANT FOR STRUCTURAL WORK.$59,000
2013-03-25Certificate of occupancy Temporary
2013-03-22ECB CLASS - 1 violation: WORK W/O PERMIT.ILLEGAL WORK NOTED @12 FL.HAVING DEMOLISHED CONCRETE FLOOR OF ROOF BULKHEAD & REMOVED STEEL STRUCTURAL FRAMING TO $1,600
2013-03-14Permit EQ — ISSUED
2013-02-25Permit AL — ISSUED
2012
2012-12-28Certificate of occupancy Temporary
2012-11-29Rodent inspection: Passed
2012-11-21Permit EW — ISSUED
2012-11-14Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH ALT 1 # 120932465$1,000
2012-11-14Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH ALT 1 # 120932465$1,000
2012-10-15Permit EW — ISSUED
2012-10-12Job filed: CYCLE 7 FISP REPAIRS AND MAINTENANCE PROGRAM REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.$644,580
2012-08-15Job filed: PROPOSED INSTALLATION OF BOSUM CHAIR ON PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-08-15Job filed: PROPOSED INSTALLATION OF BOSUM CHAIR ON PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-08-15Job filed: PROPOSED INSTALLATION OF BOSUM CHAIR ON PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-08-15Permit EQ — ISSUED
2012-07-18Job filed: INSTALLATION OF ROOF PROTECTION AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPERATELY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 200
2012-07-18Permit EQ — ISSUED
2012-07-11Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2012-07-11Permit EQ — ISSUED
2012-07-06Job filed: INSTALLATION OF 154 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2012-07-06Permit EQ — ISSUED
2012-07-06Permit EQ — ISSUED
2012-06-26Rodent inspection: Passed
2012-05-29Permit EW — ISSUED
2012-05-29Permit EW — ISSUED
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-03-16Permit EW — ISSUED
2012-02-29Permit EW — ISSUED
2012-02-29Permit EW — ISSUED
2012-02-29Permit EW — ISSUED
2012-02-24Permit AL — ISSUED
2012-02-15TL&R — from 123 WEST 44TH STREET FUNDING COMPANY, IN
2012-02-15Mortgage assigned — from 123 WEST 44TH STREET FUNDING COMPANY, IN to CIBC INC
2012-02-15AL&R $52,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATS LLC to CIBC INC$52,000,000
2012-02-15Agreement $57,000,000 — from METROPOLITAN TIMES SQUARE ASSOCIATS LLC to CIBC INC$57,000,000
2012-02-15311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-02-15DOB complaint, category ?
2012-02-14DOB complaint, category ?
2011
2011-12-23Job filed: A1$55,000
2011-07-29Rodent inspection: Passed
2011-06-23Permit EW — ISSUED
2011-06-23Permit EW — ISSUED
2011-06-23Permit EW — ISSUED
2011-05-24Permit PL — ISSUED
2011-04-20Job filed: PA
2011-04-05DOB violation LANDMK:
2011-04-05DOB violation LANDMK:
2011-04-05DOB violation LANDMK:
2011-03-09Job filed: PROPOSE TO INSTALL EMEGENCY GENERATOR WITH 120 GALLONS TANK ON THE ROOF AS PER PLANS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY.$501,000
2011-03-09Job filed: PROPOSE TO INSTALL EMEGENCY GENERATOR WITH 120 GALLONS TANK ON THE ROOF AS PER PLANS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY.$501,000
2011-02-11Permit EW — ISSUED
2011-02-11Permit EW — ISSUED
2011-02-11Permit EW — ISSUED
2011-01-06Job filed: MECHANICAL & PLUMBING MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH$292,000
2011-01-06Job filed: STRUCTURAL MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH$61,000
2011-01-06Job filed: APPLICATION FOR INTERIOR DEMOLITION & RENOVATION WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$249,551
2011-01-06Job filed: APPLICATION FOR INTERIOR DEMOLITION & RENOVATION WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$249,551
2010
2010-10-08DOB violation VCAT1:
2010-10-07311: General Construction/Plumbing — Landmark Bldg - Illegal Work
2010-10-07311: General Construction/Plumbing — Building Permit - None
2010-10-07DOB complaint, category ?
2010-10-07DOB complaint, category ?
2010-07-20DOB violation E:
2010-07-20DOB violation E:
2010-07-15311: Noise — Noise: Other Noise Sources (Use Comments) (NZZ)
2010-07-14Rodent inspection: Passed
2010-05-28311: General Construction/Plumbing — Building Permit - None
2010-05-28DOB complaint, category ?
2010-05-22311: Street Condition — Pothole
2010-02-01311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2010-02-01DOB complaint, category ?
2009
2009-12-31DOB violation LBLVIO:
2009-11-19Permit SG — ISSUED
2009-07-22DOB complaint, category ?
2009-07-07DOB complaint, category ?
2009-06-26Job filed: INSTALLATION OF A MANUAL & AUTOMATIC SMOKE /HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM AND CONTROLS FOR POST$185,000
2009-06-26Job filed: INSTALLATION OF A MANUAL & AUTOMATIC SMOKE /HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM AND CONTROLS FOR POST$185,000
2009-06-01DOB complaint, category ?
2009-05-05Permit EQ — ISSUED
2009-05-05Permit EW — ISSUED
2009-04-17Job filed: MINOR RENOVATIONS TO INCLUDE NEW PARTITIONS AND DOORS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$14,200
2009-04-01Permit SG — ISSUED
2009-04-01Permit SG — ISSUED
2009-02-11Permit EW — ISSUED
2009-02-10DOB complaint, category ?
2009-02-09ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O #101059444. ILLEGAL OCCUPANCY NOTED: A LEGAL 13 FL CLASS 'A' APT BLDG HAS NOW BEEN CO$1,200
2009-02-09ECB CLASS - 2 violation: WORK W/O PERMITS. WORK NOTED: AT 1ST FL FULL HEIGHT WALLS ERECTED CREATING A HOTEL LOBBY AS WELL AS KITCHENETTE. REMEDY: OBTAIN PE$800
2009-02-09Permit EQ — ISSUED
2008
2008-11-21Job filed: REMOVE EXISTING STOREFRONTS AND REPLACE WITH NEW STOREFRONT WINDOWS AND DOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$105,000
2008-05-02Job filed: PA
2008-04-29Job filed: PA
2008-04-29Job filed: PA
2008-03-20DOB violation E: CEASE USE
2008-03-20DOB violation E:
2008-02-04DOB complaint, category ?
2008-01-17ECB Non-Hazardous violation: 55Y13.
2008-01-03DOB violation LL6291:
2007
2007-10-29Permit EW — ISSUED
2007-10-29Permit EW — ISSUED
2007-09-27Job filed: SUBEQUENT APPLICATION FOR STRUCTURAL WORK RELATED TO THE VAULT REPAIRS A S PER PLANS FILED HEREWITH.$120,000
2007-09-27Job filed: SIDEWALK VAULT REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EG RESS OR OCCUPANCY.$400,000
2007-08-28DOB complaint, category ?
2007-07-12DOB complaint, category ?
2007-07-10DOB complaint, category ?
2007-07-09DOB complaint, category ?
2007-07-03DOB complaint, category ?
2007-06-30DOB complaint, category ?
2007-06-30DOB complaint, category ?
2007-06-27DOB complaint, category ?
2007-02-13DOB violation E:
2007-02-13DOB violation E:
2007-02-05Mortgage assigned — from FREMONT INVESTMENT & LOAN to 123 WEST 44TH STREET FUNDING COMPANY, IN
2007-02-05Mortgage assigned — from FREMONT INVESTMENT & LOAN to 123 WEST 44TH STREET FUNDING COMPANY, IN
2007-02-05Mortgage $6,086,659 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to 123 WEST 44TH STREET FUNDING COMPANY, IN$6,086,659
2007-02-05Mortgage assigned — from FREMONT INVESTMENT & LOAN to 123 WEST 44TH STREET FUNDING COMPANY, IN
2007-02-05Mortgage assigned — from FREMONT INVESTMENT & LOAN to 123 WEST 44TH STREET FUNDING COMPANY, IN
2007-02-05Agreement $57,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to 123 WEST 44TH STREET FUNDING COMPANY, IN$57,500,000
2007-02-05AL&R $57,500,000 — from METROPOLITAN TIMES SQUARE ASSOCIATES LLC to 123 WEST 44TH STREET FUNDING COMPANY, IN$57,500,000
2007-02-05TL&R — from FREMONT INVESTMENT & LOAN
2007-02-05Deed $82,000,000 — from FD-HFZ GP LLC; FD-HFZ WEST 44 L.P. to METROPOLITIAN TIMES SQUARE ASSOCIATES LL$82,000,000
2006
2006-12-27Permit PL — ISSUED
2006-12-14Mortgage $8,917,800 — from FD-HFZ WEST 44 L.P.,; ZIEL FELDMAN; FD-HFZ GP LLC to FREMONT INVESTMENT & LOAN$8,917,800
2006-12-14Mortgage $1,700,000 — from FD-HFZ WEST 44 L.P to FREMONT INVESTMENT & LOAN$1,700,000
2006-12-14AL&R $1,700,000 — from FREMONT INVESTMENT & LOAN to FD-HFZ WEST 44 L.P.,$1,700,000
2006-09-28Facade (LL11) filing, cycle 6: SAFE
2006-09-24Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2006-09-18Job filed: INSTALL SPRINKLER ALARM SYSTEM AND SMOKE DETECTION SYSTEM. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.$97,800
2006-09-14HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NO
2006-09-14HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCA
2006-09-14HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE NORTH WALL LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTM
2006-09-14HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HAND RAIL FROM 4 TO 5TH STY ON NORTHEAST AT PUBLIC HALL STAIRS
2006-09-14HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL ON 1ST STY ON EAST AT PUBLIC HALL STAIRS
2006-09-14HPD class B: § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT
2006-09-14HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NOR
2006-09-14HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM
2006-09-05HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NOR
2006-09-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AT CEILING LIGHT,AND ELECTRICAL WALL OUTLET IN THE BATHROOM LOCATED AT APT 5B, 5t
2006-09-05HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NOR
2006-09-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING MATERIAL AT SOUTH WALL ON 2ND AND 3RD STY ,A
2006-09-05HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCA
2006-09-05HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT
2006-09-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEING LIGHT FIXTURE AT PUBLIC HALL, 5th STORY, SECTION AT EAST
2006-09-05Tenant complaint: ELECTRIC — LIGHTING
2006-09-05Tenant complaint: ELECTRIC — LIGHTING
2006-09-04Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2006-09-04Tenant complaint: GENERAL — VENTILATION SYSTEM
2006-09-01HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR LOCK AT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 5B, 5th STORY, 1st APAR
2006-09-01HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS TUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NO
2006-09-01HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WES
2006-09-01HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, IN THE BATHROOM LOCATED AT APT 5B
2006-08-30Job filed: Application filed for new fixtures on existing roughing this application is filed to correct violation # 34490504J. No change in use egress or occupan$200,000
2006-08-29Tenant complaint: ELECTRIC — WIRING
2006-08-29Tenant complaint: ELECTRIC — WIRING
2006-08-19HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 5B,
2006-08-19HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NOR
2006-08-19HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH
2006-08-19HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED
2006-08-19HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEAL WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY
2006-08-19HPD class B: § 27-2026 ADM CODE REPAIR BY CLOSING SO AS TO BE GAS TIGHT ALL OPENINGS IN THE WASTLINE PIPE AT SINK IN THE KITCHEN LOCATED AT APT 5B, 5th S
2006-08-19HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSE ELECTRICAL WIRES, ATFLOOR THRU-OUT IN THE ENTIRE APARTMENT LOCATED
2006-08-17Tenant complaint: HEATING — HEAT RELATED
2006-08-14ECB Hazardous violation: PLUMBING WORK W/O A PERMIT. AT TIME OF INSPECTION FOUND SPRINKLERS PIPING & HEAD INSTALLED 7FL,ALSO TRAPS FROM FIXTURES WERE REMOV$800
2006-08-11DOB complaint, category ?
2006-08-09Job filed: Herewith filing for the installation of a new fire sprinkler system combining the existing fire standpipe system.$269,000
2006-07-12DOB complaint, category ?
2006-07-11DOB complaint, category ?
2006-07-05HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 5B,
2006-07-05HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT CENTE
2006-04-23Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2006-04-22Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2006-04-22Tenant complaint: HEATING — HEAT RELATED
2006-04-21Tenant complaint: ELECTRIC — LIGHTING
2006-04-21DOB complaint, category ?
2006-04-20DOB complaint, category ?
2006-04-20DOB complaint, category ?
2006-04-18Permit EW — ISSUED
2006-04-18Permit EW — ISSUED
2006-04-18Permit EW — ISSUED
2006-04-17DOB complaint, category ?
2006-04-11DOB complaint, category ?
2006-03-31DOB complaint, category ?
2006-03-31Permit EW — ISSUED
2006-03-31Permit EW — ISSUED
2006-03-31Permit EW — ISSUED
2006-03-31Permit EW — ISSUED
2006-03-31Permit EW — ISSUED
2006-03-31Permit EW — ISSUED
2006-03-31Permit EW — ISSUED
2006-03-23DOB violation E:
2006-03-17Job filed: General construction to include new partitions and finishes for five apartments on 12th floor. No change in use egress or occupancy.$25,000
2006-03-17Job filed: General construction to include new partitions and finishes for five apartments on 12th floor. No change in use egress or occupancy.$25,000
2006-03-17Job filed: General Construction to include repairs of existing ceiling & new finishes for 12th floor corridor. No change in use egress or occupancy.$7,000
2006-03-17Job filed: General construction to include new partitions and finishes for five apartments on 12th floor. No change in use egress or occupancy.$25,000
2006-03-16Permit EW — ISSUED
2006-03-16Permit EW — ISSUED
2006-03-16Permit EW — ISSUED
2006-03-16Permit EW — ISSUED
2006-03-15DOB complaint, category ?
2006-03-10Permit EW — ISSUED
2006-03-10Permit EW — ISSUED
2006-03-10Permit EW — ISSUED
2006-03-09Permit EW — ISSUED
2006-03-09Permit EW — ISSUED
2006-03-09Permit EW — ISSUED
2006-03-07Permit PL — ISSUED
2006-03-07Permit PL — ISSUED
2006-03-02Tenant complaint: HEATING — HEAT RELATED
2006-02-23Job filed: General construction to include new partitions and finishes for five apartments on 3rd floor. No change in use egress or occupancy.$25,000
2006-02-23Job filed: General Construction to include repairs of existing ceiling & new finishes for 3rd floor corridor. No change in use egress or occupancy.$7,000
2006-02-23Job filed: General construction to include new partitions and finishes for five apartments on 3rd floor. No change in use egress or occupancy.$25,000
2006-02-21Job filed: General construction to include new partitions and finishes for five apartments on 6th floor. No change in use egress or occupancy.$25,000
2006-02-21Job filed: General construction to include new partitions and finishes for five apartments on 6th floor. No change in use egress or occupancy.$25,000
2006-02-21Job filed: General Construction to include repairs of existing ceiling & new finishes for 6th floor corridor. No change in use egress or occupancy.$7,000
2006-02-19Tenant complaint: HEATING — HEAT RELATED
2006-02-19Tenant complaint: HEATING — HEAT RELATED
2006-02-19DOB complaint, category ?
2006-02-14DOB complaint, category ?
2006-02-10Job filed: General Construction to include repairs of existing ceiling & new finishes for 10th floor corridor. No change in use egress or occupancy.$7,000
2006-02-10Job filed: General construction to include new partitions and finishes for five apartments on 10th floor. No change in use egress or occupancy.$25,000
2006-02-10Job filed: General construction to include new partitions and finishes for five apartments on 10th floor. No change in use egress or occupancy.$25,000
2006-02-10Job filed: General construction to include new partitions and finishes for five apartments on 10th floor. No change in use egress or occupancy.$25,000
2006-02-10Job filed: General Construction to include repairs of existing ceiling & new finishes for 10th floor corridor. No change in use egress or occupancy.$7,000
2006-02-10Job filed: General construction to include new partitions and finishes for five apartments on 10th floor. No change in use egress or occupancy.$25,000
2006-02-10Permit EW — ISSUED
2006-02-10Permit EW — ISSUED
2006-02-10Permit EW — ISSUED
2006-02-08Job filed: General construction to include new partitions and finishes for five apartments on 2nd floor. No change in use egress or occupancy.$25,000
2006-02-08Job filed: General construction to include new partitions and finishes for five apartments on 2nd floor. No change in use egress or occupancy.$25,000
2006-02-08Job filed: General construction to include new partitions and finishes for five apartments on 2nd floor. No change in use egress or occupancy.$25,000
2006-02-08Job filed: General Construction to include repairs of existing ceiling & new finishes for 2nd floor corridor. No change in use egress or occupancy.$7,000
2006-02-08Job filed: General construction to include new partitions and finishes for five apartments on 2nd floor. No change in use egress or occupancy.$25,000
2006-02-02HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED A
2006-02-02HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET AT REFRIGRERATOR IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTME
2006-01-28DOB complaint, category ?
2006-01-28Tenant complaint: HEATING — HEAT RELATED
2006-01-27Tenant complaint: HEATING — HEAT RELATED
2006-01-24HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING MATERIAL AT CEILING AT PUBLIC HALL, 11th STO
2006-01-24HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 11th STORY
2006-01-23DOB complaint, category ?
2006-01-23DOB complaint, category ?
2006-01-18Tenant complaint: NONCONST — RUBBISH
2006-01-18Tenant complaint: HEATING — HEAT RELATED
2006-01-17Permit EW — ISSUED
2006-01-16DOB complaint, category ?
2006-01-16DOB complaint, category ?
2006-01-14DOB complaint, category ?
2006-01-12Tenant complaint: GENERAL — MOLD
2006-01-12Tenant complaint: ELECTRIC — LIGHTING
2006-01-12Tenant complaint: CONSTRUCTION — ELEVATOR
2006-01-11Job filed: General Construction to include repairs of existing ceiling & new finishes for 7th floor corridor. No change in use egress or occupancy.$7,000
2006-01-11Job filed: General construction to include new partitions and finishes for five apartments on 7th floor. No change in use egress or occupancy.$25,000
2006-01-11Job filed: General construction to include new partitions and finishes for five apartments on 7th floor. No change in use egress or occupancy.$25,000
2006-01-11Job filed: General Construction to include repairs of existing ceiling & new finishes for 7th floor corridor. No change in use egress or occupancy.$7,000
2006-01-09Job filed: General construction to include new partitions and finishes for five apartments on 4th floor. No change in use egress or occupancy.$25,000
2006-01-09Job filed: General Construction to include repairs of existing ceiling & new finishes for 4th floor corridor. No change in use egress or occupancy.$7,000
2006-01-09Job filed: General construction to include new partitions and finishes for five apartments on 4th floor. No change in use egress or occupancy.$25,000
2006-01-09Job filed: General construction to include new partitions and finishes for five apartments on 4th floor. No change in use egress or occupancy.$25,000
2006-01-04Permit EW — ISSUED
2006-01-04Permit EW — ISSUED
2006-01-03DOB complaint, category ?
2006-01-03Permit EW — ISSUED
2005
2005-12-29Job filed: General Construction to include repairs of existing ceiling & new finishes for lobby. No change in use egress or occupancy.$7,000
2005-12-29Job filed: General Construction to include repairs of existing ceiling & new finishes for lobby. No change in use egress or occupancy.$7,000
2005-12-26DOB complaint, category ?
2005-12-23DOB complaint, category ?
2005-12-19DOB complaint, category ?
2005-12-19DOB complaint, category ?
2005-12-16DOB complaint, category ?
2005-12-16Permit EW — ISSUED
2005-12-16Permit EW — ISSUED
2005-12-16Permit EW — ISSUED
2005-12-14Tenant complaint: HEATING — HEAT RELATED
2005-12-11DOB complaint, category ?
2005-12-10DOB complaint, category ?
2005-12-10DOB complaint, category ?
2005-12-09Job filed: General Construction to include repairs of existing ceiling & new finishes for corridor on 5th floor. No change in use egress or occupancy.$7,000
2005-12-07Job filed: General construction to include new partitions and finishes for five apartments on 5th floor. No change in use egress or occupancy.$25,000
2005-12-07Job filed: General construction to include new partitions and finishes for five apartments on 5th floor. No change in use egress or occupancy.$25,000
2005-12-04DOB complaint, category ?
2005-12-02DOB complaint, category ?
2005-12-02DOB complaint, category ?
2005-12-02Job filed: General Construction to include repairs of existing ceiling & new finishes for corridor on 11th floor. No change in use egress or occupancy.$7,000
2005-12-02Job filed: General construction to include new partitions and finishes for five apartments on 11th floor. No change in use egress or occupancy.$25,000
2005-12-02Job filed: General construction to include new partitions and finishes for five apartments on 11th floor. No change in use egress or occupancy.$25,000
2005-12-01DOB complaint, category ?
2005-12-01DOB complaint, category ?
2005-12-01DOB complaint, category ?
2005-11-30Tenant complaint: NONCONST — VERMIN
2005-11-30Tenant complaint: CONSTRUCTION — ELEVATOR
2005-11-19DOB complaint, category ?
2005-11-17Permit EW — ISSUED
2005-11-17Permit EW — ISSUED
2005-11-17Permit EW — ISSUED
2005-11-14DOB complaint, category ?
2005-11-09Permit EW — ISSUED
2005-11-09Permit EW — ISSUED
2005-11-09Permit EW — ISSUED
2005-11-04Job filed: General construction to include new partitions and finishes for five apartments on 9th floor. No change in use egress or occupancy.$25,000
2005-11-04Job filed: General construction to include new partitions and finishes for five apartments on 9th floor. No change in use egress or occupancy.$25,000
2005-11-04Job filed: General Construction to include repairs of existing ceiling & new finishes for corridor on 9th floor. No change in use egress or occupancy.$7,000
2005-11-02Job filed: General Construction to include repairs of existing ceiling & new finishes for corridor on 8th floor. No change in use egress or occupancy.$7,000
2005-11-02Job filed: General construction to include new partitions and finishes for five apartments on 8th floor. No change in use egress or occupancy.$25,000
2005-11-02Job filed: General Construction to include repairs of existing ceiling & new finishes for corridor on 8th floor. No change in use egress or occupancy.$7,000
2005-11-02Job filed: General construction to include new partitions and finishes for five apartments on 8th floor. No change in use egress or occupancy.$25,000
2005-10-24DOB complaint, category ?
2005-10-21DOB complaint, category ?
2005-10-15DOB complaint, category ?
2005-10-15DOB complaint, category ?
2005-10-08DOB complaint, category ?
2005-10-07ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY C O #1059444 APT. 2D CHANGED FROM APARTMENT (CLASS A) TO BUSINESS (CLEANING SERVICE). REMEDY$400
2005-10-07DOB complaint, category ?
2005-10-04HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 10G, 10th STORY, 3rd APARTMENT FRO
2005-10-04HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10G, 10th STORY, 3rd APARTMENT FROM E
2005-10-04DOB complaint, category ?
2005-10-01Tenant complaint: CONSTRUCTION — ELEVATOR
2005-10-01DOB complaint, category ?
2005-10-01DOB complaint, category ?
2005-10-01DOB complaint, category ?
2005-10-01DOB complaint, category ?
2005-10-01Tenant complaint: NONCONST — VERMIN
2005-10-01Tenant complaint: NONCONST — VERMIN
2005-10-01Tenant complaint: NONCONST — VERMIN
2005-09-23DOB complaint, category ?
2005-09-14ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY #101059444. ILLEGAL OCCUPANCY NOTED: EIGHT FLOOR APT 8J NOW CON$800
2005-09-13ECB Non-Hazardous violation: 58O2/55O02/55Y02/57B10/62AA02 57-B- MOTOR BEARINGS "NOISE"- REPAIR.
2005-06-22Job filed: INSTALL PIPE SCAFFOLD 100 FT LONG AND 135 FT HIGH AT 123 WEST 44 STREET. LL33/91. NO CHANGE IN OCCUPANCY USE OR EGRESS FILED ON THIS APPLICATION.
2005-06-22Job filed: INSTALL HEAVY DUTY SIDEWALK SHED 130 FT AT 123 WEST 44 STREET. - DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. LL33/91. NO CHANGE IN OCCUPANC
2005-06-16Job filed: FACADE REPAIRS CONSISTING OF TUCK POINTING, REPLACING DAMAGED BRICK, REPAIRS TO DAMAGED TERRACOTTA AND REPLACING A SEVEN FOOT SECTION OF THE PARAPET A$200,000
2005-06-16Job filed: FACADE REPAIRS CONSISTING OF TUCK POINTING, REPLACING DAMAGED BRICK, REPAIRS TO DAMAGED TERRACOTTA AND REPLACING A SEVEN FOOT SECTION OF THE PARAPET A$200,000
2003-09-16Job filed: REPLACE 100 FEET OF EXISTING SIDEWALK WITH NEW STEEL BEAMS AND CONCRETE. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.$150,000
2003-06-15Tenant complaint: HEATING — HEAT RELATED
2003-06-04Permit EW — ISSUED
2003-05-07Tenant complaint: PLUMBING — WATER SUPPLY
2003-04-23Job filed: INSTALL COOLING TOWER AND SUPPORT STEEL. NO CHANGE IN OCCUPANCY OR USE, NO CHANGE IN MEANS OR EGRESS.$35,000
2003-03-19DOB violation LL6291:
2002
2002-11-04Permit EW — ISSUED
2002-08-19Mortgage $11,784,346 — from PRIME 123 WEST 44THLLC to BERKSHIRE MORTGAGE FINANCE LIMITED PARTN$11,784,346
2002-08-19Deed — from 123 WEST 44TH STREETASSOCIATES, L.P. to PRIME 44TH EAST 32ND, LLC; PRIME 123 WEST 44TH,LLC
2002-08-19SAGE — from BANKERS TRUST COMPANY OF CALIFORNIA, N.A
2002-08-19Mortgage assigned — from BERKSHIRE MORTGAGE FINANCE LIMITED PARTN to FANNIE MAE
2002-08-19Deed — from PRIME WEST 44TH EAST32ND LLC to PRIME 123 WEST 44THLLC
2002-08-19Mortgage assigned — from FIRST UNION NATIONALBANK to BANKERS TRUST COMAPNY OF CALIFORNIA
2002-08-19Mortgage assigned — from BANKERS TRUST COMPANY OF CALIFORNIA, N.A to BERKSHIRE MORTGAGE FINANCE LIMITED PARTN
2002-08-19Agreement — from PRIME 123 WEST 44TH,LLC to BERKSHIRE MORTGAGE FINANCE LIMITED PARTN
2002-07-22Job filed: INSTALL GREEN HOUSE IN REAR OF BUILDING ON 1ST FLOOR. NO CHANGE IN USE GROUP, OCCUPANCY AND CAPACITY.$33,000
2002-07-22Job filed: INSTALL GREEN HOUSE IN REAR OF BUILDING ON 1ST FLOOR. NO CHANGE IN USE GROUP, OCCUPANCY AND CAPACITY.$33,000
2002-01-23Permit PL — ISSUED
2001
2001-12-31Permit AL — ISSUED
2001-10-30ECB Non-Hazardous violation: OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT PA PERMIT. PA 101247688. REMEDY: OBTIAN PA PERMIT.$500
2001-10-30ECB Non-Hazardous violation: OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT PA PERMIT. PA 101618572. REMEDY: OBTAIN PA PERMIT.
2001-10-30ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. ALT 101059444 REMEDY: OBTAIN VALID C OF O.
2001-10-26Job filed: TO EXTEND THE EXISTING CELLAR DINING RM. INSTALL NEW ROOF OVER NEW CELLA DINING AREA. REMOVE PARTITION WALL AND WINDOWS, RELOCATE EXISTING CONDESING U$10,000
2001-10-26Job filed: TO EXTEND THE EXISTING CELLAR DINING RM. INSTALL NEW ROOF OVER NEW CELLA DINING AREA. REMOVE PARTITION WALL AND WINDOWS, RELOCATE EXISTING CONDESING U$10,000
2001-01-10ECB Non-Hazardous violation: 05B11,57O02,73F11.05-REPAIR DOOR FROM SLAMMING.73-DEVICE JERKS DURING TRAVEL REMOVE THIS CONDITION.
2001-01-03DOB complaint, category ?
2000
2000-06-19DOB complaint, category ?
2000-03-21Permit AL — ISSUED
2000-03-21Permit SG — ISSUED
1999
1999-12-15ECB Non-Hazardous violation: 57O.
1999-12-15ECB Non-Hazardous violation: 57O.
1999-11-15ECB Non-Hazardous violation: INSTALLATION OF MECHANICAL EQUIPMENT WITHOUT FIRST OBTAINING AN EQUIPMENT USSE PERMIT. NOTED: ONE LARGE BALTIMORE AIRCOIL UNIT LOC
1999-01-30DOB violation E: 1P6892
1999-01-30DOB violation E: 1P6891
1998
1998-12-16DOB complaint, category ?
1998-09-03Permit PL — ISSUED
1998-07-21DOB violation LANDMK:
1998-03-25HPD class C: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF RODENTS RAT EXCRETA AT 3 STY PUBLIC HALL STAIRS
1998-02-11Permit AL — ISSUED
1998-02-09DOB complaint, category ?
1998-01-13Permit EW — ISSUED
1998-01-13Permit EW — ISSUED
1998-01-13Permit PL — ISSUED
1997
1997-09-11DOB complaint, category ?
1997-07-21ECB Non-Hazardous violation: WORK WITHOUT A PERMIT: WORK NOTED: STEEL BEAM'S ERECTED BETWEEN 123 W 44 STREET. AND 125 WEST 44 STREET IN BASEMENT AND WORK IN BA
1997-07-18DOB complaint, category ?
1997-06-04Permit AL — ISSUED
1996
1996-11-08Permit EQ — ISSUED
1996-11-06DOB violation C:
1996-11-01DOB complaint, category ?
1996-06-06Permit PL — ISSUED
1996-05-23Permit AL — ISSUED
1996-04-03DOB violation E:
1995
1995-12-26SAGE — from COLONY NYRO PARTNERS, L.P.
1995-12-26Mortgage assigned — from COLONY NYRO PARTNERS, L.P. to FIRST UNION NATIONALBANK/NORTH CAROLINA
1995-12-26Mortgage assigned — from 123 WEST 44TH STREETASSOCIATES, L.P.; 123 WEST STREET ASSOCIATES to FIRST UNION NATIONALBANK/NORTH CAROLINA
1995-12-26Agreement — from 123 WEST 44TH STREETASSOCIATES, L.P.; 123 WEST 44TH STREETASSOCIATES to FIRST UNION NATIONALBANK/NORTH CAROLINA
1995-12-26Mortgage assigned — from COLONY FINANCIAL SERVICES-NYRO, INC. to COLONY NYRO PARTNERS, L.P.
1995-12-26Mortgage assigned — from COLONY FINANCIAL SERVICES-NYRO INC. to COLONY NYRO PARTNERS, L.P.
1995-11-13Permit EW — ISSUED
1995-10-12Permit PL — ISSUED
1995-10-12Permit EW — ISSUED
1995-09-11Permit PL — ISSUED
1995-08-21Permit EW — ISSUED
1995-05-16Permit EW — ISSUED
1994
1994-12-29Permit PL — ISSUED
1994-12-29Permit PL — ISSUED
1994-12-20Permit EW — ISSUED
1994-10-07Permit EW — ISSUED
1994-01-11Permit EW — ISSUED
1993
1993-12-09PAT — from COLONY FINANCIAL ETC to COLONY ADVISORS INC
1993-12-09Mortgage assigned — from COLONY NYRO PARTNERSLP to COLONY FINANCIAL ETC
1993-12-09Mortgage assigned — from COLONY NYRO PARTNERSLP to COLONY FINANCIAL ETC
1993-12-09Mortgage assigned — from FEDERAL DEPOSIT INSCORP to COLONY NYRO PARTNERSLP
1993-12-09Mortgage assigned — from FEDERAL DEPOSIT INSCORP to COLONY NYRO PARTNERSLP
1993-09-21ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS PORTION OF FRONT FACADE FALLEN INTO SIDEWALK FRONT FACADE IN NEED OF REPAIRS $800
1991-06-19ECB Non-Hazardous violation: 35D;35M;35O;74#;57O; 35. PROVIDE ALL MISSING ELEC.COVERS.74.REMOVE ALLNON RELATED EQUIPMENT FROM MOTOR ROOM.$1,000