3,191 recorded events, 1967–2026, from 19 city data systems. The city's paper trail here is mostly 1,425 311 service requests, 972 HPD complaints, 491 HPD housing violations.
Full record, year by year Support this site
A modest record — below the level that usually signals systemic problems. More recorded distress than 66% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 55.1. In ZIP 10030, 33% of residential buildings hold an A and 16% grade D or F. How grades work
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
| Open HPD violations | 42 total — 22 class C (immediately hazardous), 13 class B, 7 class A. Oldest open since 2015-01-05. |
| Active vacate order | 1 unit(s) under an unrescinded HPD vacate order |
status snapshot refreshed weekly from HPD records
38 heat or hot-water complaints in the last three years (winter 2023–24: 10 · winter 2024–25: 12 · winter 2025–26: 16). Repeated winter clusters suggest a chronic heating problem.
1 bedbug-infested unit(s) reported in filings over the last three years.
$1,875 in enforcement penalties imposed (ECB/OATH) in the last three years.
143 service requests in the last three years. Most common: Noise (33) · HEAT/HOT WATER (19) · PLUMBING (11) · WATER LEAK (11) · Illegal Parking (10) · PAINT/PLASTER (9).
$331,000 in permitted construction work filed since 2016 (6 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.
| Yes | Built before 1974 (1920) |
| Yes | Six or more residential units (91) |
| No | 421-a / J-51 tax benefit on the current tax roll |
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
| Registered owner(s) | MALCOLM II PHASE A ASSOCIATES |
| Head officer | WILLIAM N HUBBARD |
| Managing agent | CDC Management Corporation |
| Last registered | 2025-10-14 |
as filed by the owner in the building's HPD registration
| Tax year | City market value | Assessed value |
|---|---|---|
| 2025 | $5,708,000 | $2,568,600 |
| 2026 | $6,417,000 | $2,887,650 |
| 2027 | $6,935,000 | $3,120,750 |
The city's market estimate has risen 21% between tax years 2025 and 2027.
Tax exemptions on the roll: REDEVELOPMENT
| Energy grade (LL33) | C — ENERGY STAR score 55/100 (2022 disclosure cycle) |
| Heating fuel | NATURALGAS |
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
| Subway | 145 St — 3 · 600 ft straight-line (about a 3-minute walk) · station accessibility: none |
| Bus | Nearest boarding stop: Malcolm X Blvd / W 142 St — M1 M7 M102 · 350 ft |
| Citi Bike | Lenox Ave & W 144 St · 500 ft · station location as of 2026-09-23; live availability |
| School zones (2024–25 map) | Elementary: P.S. 194 Countee Cullen. Confirm with the DOE's school search. |
Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
102 West 143 Street
| Heat or hot water | Heat or hot water |
| Apartment maintenance | Apartment maintenance |
| Bed bugs | Bed bugs |
| Residential pests | Residential pests |
| Rats or mice | Rats or mice |
| Anything else | Anything else |
143 311 service requests from this address in the last three years — 19 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.
Managed by CDC MANAGEMENT CORPORATION — 21 buildings, 748 units. Grades across the portfolio: A14 · B5 · C2. See the whole portfolio
| Building | Borough | Units | Grade |
|---|---|---|---|
| 102 West 143 Street | MN | 91 | B |
| 1425 Grand Concourse | BX | 76 | A |
| 112 West 144 Street | MN | 47 | C |
| 384 East 10 Street | MN | 45 | A |
| 364 East 10 Street | MN | 44 | A |
| 966 East 181 Street | BX | 42 | A |
| 934 East 181 Street | BX | 40 | A |
| 2134 Vyse Avenue | BX | 38 | A |
| 627 East 9 Street | MN | 35 | A |
| 924 East 181 Street | BX | 34 | B |
| 355 East 10 Street | MN | 33 | A |
| 1403 Grand Concourse | BX | 29 | A |
| 610 East 11 Street | MN | 28 | B |
| 1417 Grand Concourse | BX | 27 | A |
| 2103 Vyse Avenue | BX | 26 | B |
| 1411 Grand Concourse | BX | 26 | A |
| 199 Avenue B | MN | 23 | B |
| 2131 Vyse Avenue | BX | 20 | A |
| 908 East 181 Street | BX | 18 | C |
| 195 Avenue B | MN | 16 | A |
| 645 East 9 Street | MN | 10 | A |
Most recent mortgage recorded against this lot: $20,398,600 on 2026-08-11 (lender: Lument Real Estate Capital, LLC). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.
| Date | Record | Amount | Per res. unit |
|---|---|---|---|
| 2026-08-11 | Mortgage $20,398,600 — from MALCOLM X II PHASE A ASSOCIATES, L.P. to LUMENT REAL ESTATE CAPITAL, LLC | $20,398,600 | |
| 2005-05-31 | Mortgage $1,187,894 — from MALCOLM X II PHASE A ASSOCIATES, L.P. to SECRETARY OF HOUSING AND URBAN DEVELOPME | $1,187,894 | |
| 2005-05-31 | Mortgage $2,089,000 — from MALCOLM X II PHASE A ASSOCIATES, L.P. to GREYSTONE SERVICING CORPORATION, INC. | $2,089,000 | |
| 2005-05-31 | Mortgage $3,612,151 — from MALCOLM X II PHASE A ASSOCIATES, L.P. to SECRETARY OF HOUSING AND URBAN DEVELOPME | $3,612,151 | |
| 1983-01-04 | Mortgage $4,938,600 — from MALCOLM X II PHASE AASC to NEW YORK CITY HOUS/ETC. | $4,938,600 |
| Year | Construction | Enforcement | Housing & tenants | Ownership & money | Health & systems | Total |
|---|---|---|---|---|---|---|
| 2017 | 5 | 1 | 103 | 0 | 4 | 113 |
| 2018 | 6 | 2 | 152 | 0 | 8 | 168 |
| 2019 | 1 | 2 | 77 | 0 | 7 | 87 |
| 2020 | 1 | 0 | 99 | 0 | 6 | 106 |
| 2021 | 1 | 0 | 163 | 0 | 6 | 170 |
| 2022 | 0 | 0 | 70 | 1 | 8 | 79 |
| 2023 | 0 | 3 | 64 | 0 | 7 | 74 |
| 2024 | 0 | 0 | 78 | 0 | 6 | 84 |
| 2025 | 0 | 1 | 118 | 0 | 6 | 125 |
| 2026 | 8 | 4 | 128 | 7 | 14 | 161 |
Every one of the 3,191 recorded events, 1967–2026, is laid out year by year in the full report (print-ready).
Explore: ZIP 10030 · Landlord rankings · How grades work · The map · The Mice Map