The city's published records show little recorded distress here in the last three years. Less recorded distress than 56% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 12.7. In ZIP 10012, 65% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
2 total — 0 class C (immediately hazardous), 2 class B, 0 class A. Oldest open since 2026-03-01.
status snapshot refreshed weekly from HPD records
Patterns
2 heat or hot-water complaints in the last three years (winter 2023–24: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
35 service requests in the last three years. Most common: Noise (14) · UNSANITARY CONDITION (8) · Illegal Parking (4) · Graffiti (2) · HEAT/HOT WATER (1) · Lost Property (1).
Filed construction activity
$152,000 in permitted construction work filed since
2016 (9 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1894)
Yes
Six or more residential units (20)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
SIX MON LLC
Head officer
MOSHE SHARIF
Managing agent
MAJESTY MANAGEMENT LLC
Last registered
2026-06-23
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$6,090,000
$2,740,500
2026
$5,571,000
$2,506,950
2027
$5,786,000
$2,603,700
The city's market estimate has fallen
5% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
W 4 St-Wash Sq — A B C D E F M · 500 ft straight-line (about a 2-minute walk) · station accessibility: full Houston St — 1 · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 6 Av / W 3 St — M55 · 500 ft
Citi Bike
Sullivan St & Washington Sq · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
35 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $366,379 on
2025-09-10 (lender: Morgan Stanley Bank, NA). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-09-10
Mortgage $366,379 — from SIX MON LLC to MORGAN STANLEY BANK, NA
$366,379
2025-09-10
Agreement $7,800,000 — from SIX MON LLC to MORGAN STANLEY BANK, NA
$7,800,000
2025-09-10
AL&R $7,800,000 — from SIX MON LLC to MORGAN STANLEY BANK, NA
$7,800,000
2020-08-03
AL&R $7,936,000 — from SIX MON LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK
$7,936,000
2020-08-03
Agreement $7,936,000 — from SIX MON LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK
$7,936,000
2020-08-03
Mortgage $494,040 — from SIX MON LLC to NEW YORK COMMUNITY BANK; NEW YORK COMMERCIAL BANK
$494,040
2018-08-15
AL&R $7,550,000 — from SIX MON LLC to NEW YORK COMMERCIAL BANK
$7,550,000
2018-08-15
Mortgage $550,528 — from SIX MON LLC to NEW YORK COMMERCIAL BANK
$550,528
2018-08-15
Agreement $7,550,000 — from SIX MON LLC to NEW YORK COMMERCIAL BANK
$7,550,000
2014-05-06
AL&R $7,500,000 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$7,500,000
2014-05-06
Agreement $7,500,000 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$7,500,000
2014-05-06
Mortgage $3,787,730 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$3,787,730
2011-07-13
AL&R $3,900,000 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$3,900,000
2011-07-13
Deed $5,650,000 — from 126 MACDOUGAL HOLDINGS LLC to SIX MON LLC
$5,650,000
2011-07-13
Mortgage $330,774 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$330,774
Ten-year activity
50250
2017
2018
2019
2020
39
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
2
2
4
0
2
10
2018
0
0
10
5
2
17
2019
1
0
14
0
2
17
2020
7
0
13
3
1
24
2021
4
8
25
1
1
39
2022
0
0
29
0
2
31
2023
0
0
12
0
3
15
2024
1
1
23
0
4
29
2025
0
6
22
6
2
36
2026
0
0
9
4
3
16
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Restaurant inspection: SURREAL CREAMERY — grade B · mice evidence
2026-04-29
311: UNSANITARY CONDITION — PESTS
2026-04-29
Tenant complaint: UNSANITARY CONDITION — PESTS
2026-03-26
311: Noise - Residential — Loud Music/Party
2026-03-23
Mortgage assigned — from MORGAN STANLEY BANK, N.A. to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2026-03-23
AALR — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS to DEUTSCHE BANK NATIONAL TRUST COMPANY, AS
2026-03-23
Mortgage assigned — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS to DEUTSCHE BANK NATIONAL TRUST COMPANY, AS
2026-03-23
AALR — from MORGAN STANLEY BANK, N.A. to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2026-03-01
HPD class B: § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE NORTH YARD
2026-03-01
HPD class B: § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AN
2026-03-23Mortgage assigned — from MORGAN STANLEY BANK, N.A. to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2026-03-23AALR — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS to DEUTSCHE BANK NATIONAL TRUST COMPANY, AS
2026-03-23Mortgage assigned — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS to DEUTSCHE BANK NATIONAL TRUST COMPANY, AS
2026-03-23AALR — from MORGAN STANLEY BANK, N.A. to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2026-03-01HPD class B: § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE NORTH YARD
2026-03-01HPD class B: § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AN
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-04-26311: Illegal Parking — Blocked Bike Lane
2025-03-16311: Noise - Residential — Loud Talking
2025-02-07FDNY inspection (COM_OCPCY)
2025-02-07FDNY inspection (AGED_OUT)
2025-02-07FDNY inspection (COM_OCPCY)
2025-02-07FDNY inspection (RISK)
2025-02-07FDNY inspection (AGED_OUT)
2025-02-07FDNY inspection (RISK)
2025-01-29311: Illegal Parking — Blocked Bike Lane
2024-07-28311: Emergency Response Team (ERT) — After Hours Work - Illegal
2024-07-28DOB complaint, category ?
2024-05-13HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM
2024-05-08HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT 2A, 2nd STORY,
2024-05-08HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 2A,
2024-02-09Job filed: FILING FOR INTERIOR WORK AT THE EXISTING COMMERCIAL SPACE AT THE GROUND FLOOR USG 6 , CARPENTRY, COMMERCIAL HOOD AND RELATED DUCT FOR DELI, CARPENTRY$16,000
2024-02-01311: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-01-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-01-09311: Illegal Parking — Blocked Bike Lane
2022
2022-12-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BULKHEAD , 5th STORY
2022-12-12311: HEAT/HOT WATER — ENTIRE BUILDING
2022-12-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-09-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-09-16311: Food Poisoning — 1 or 2
2021-09-08311: PLUMBING — TOILET
2021-09-08Tenant complaint: PLUMBING — TOILET
2021-08-17ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER ATOI NOTED:@EXP1 APPROX200SQ' OF MASONRY STUCCO HAS DELAMANATED FROM FACADE.SWS W$312
2021-07-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-12Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$5,000
2021-07-09Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2021-07-07DOB violation IMEGNCY: INSTALL APPROXIMATELY 35 LINEAR FEET OF SIDEWALK SHED ALONG MACDOUGAL STREET TO PROTECT THE PUBLIC AND PROPERTY
2021-07-07ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY.AT TIME OF INSPECTION IN RESPONSE TO FOLLOW UP OF AN INCIDENT,WHERE BLDG MASONRY/STUC$1,250
2021-07-07DOB complaint, category ?
2021-07-06DOB complaint, category ?
2021-07-06ECB CLASS - 1 violation: AT THE TIME OF INSPECTION IT WAS OBSERVED THAT STUCCO HAD SEPARATED FROM THE BUILDING AT SEVERAL LOCATIONS AT THE TOP FLOOR AND CR$6,250
2021-06-23311: Illegal Parking — Blocked Bike Lane
2021-06-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-25311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-22311: Illegal Parking — Blocked Bike Lane
2021-05-17311: Illegal Parking — Blocked Bike Lane
2021-05-16311: Illegal Parking — Blocked Bike Lane
2021-04-30311: Illegal Parking — Blocked Bike Lane
2021-04-22311: Illegal Parking — Blocked Bike Lane
2021-04-03311: Noise - Vehicle — Car/Truck Music
2021-04-01311: Illegal Parking — Blocked Bike Lane
2021-04-01311: Illegal Parking — Blocked Bike Lane
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-23311: Water System — Hydrant Running (WC3)
2021-02-01LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2021-01-17311: Illegal Parking — Blocked Bike Lane
2021-01-10311: Illegal Parking — Blocked Bike Lane
2020
2020-12-28311: Illegal Parking — Blocked Bike Lane
2020-12-01311: Illegal Parking — Blocked Bike Lane
2020-11-29311: Illegal Parking — Blocked Bike Lane
2020-11-16311: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-15311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-03AL&R $7,936,000 — from SIX MON LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK$7,936,000
2020-08-03Agreement $7,936,000 — from SIX MON LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK$7,936,000
2020-08-03Mortgage $494,040 — from SIX MON LLC to NEW YORK COMMUNITY BANK; NEW YORK COMMERCIAL BANK$494,040
2020-07-23Job filed: INSTALL PLUMBING FIXTURES FOR EXISTING STORE AT BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2020-07-22Boiler inspection
2020-07-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-20311: Illegal Parking — Blocked Bike Lane
2020-06-08Permit Plumbing — Permit Issued
2020-05-31311: Illegal Parking — Blocked Bike Lane
2020-03-11Permit Plumbing — Permit Issued
2020-03-10Job filed: INSTALL HVAC FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,500
2020-03-05Job filed: INSTALL PLUMBING FIXTURES FOR EXISTING STORE AT BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2020-03-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-03-04311: Illegal Parking — Blocked Bike Lane
2020-02-07Permit EW — ISSUED
2020-01-15Job filed: INTERIOR RENOVATION OF EXISTING STORE. PARTITION WORK ON BASEMENT. PLUMBING AND MECHANICAL WILL BE FILE UNDER SEPARATE APPLICATION. NO CHANGE IN USE, $34,500
2017-06-08Job filed: INTERIOR RENOVATION TO INSTALL RESTAURANT, MINOR PARTITION REMOVAL REPLACE BATHROOM FIXTURES AND NEW FINISHES.$49,000
2017-05-10DOB complaint, category ?
2017-04-12311: For Hire Vehicle Complaint — Driver Complaint
2016
2016-12-02311: Illegal Parking — Blocked Bike Lane
2016-11-22Rodent inspection: Passed
2016-08-06311: GENERAL — JANITOR/SUPER
2016-08-06311: PLUMBING — TOILET
2016-08-06Tenant complaint: PLUMBING — TOILET
2016-08-06Tenant complaint: GENERAL — JANITOR/SUPER
2015
2015-10-01HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-07-02Job filed: FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEM. HOOD,CE,AND GAS SHUT OFF VALVE FILED UNDER APPLICATION #NO CHANGE IN USE,EGRESS OR OCCUPANCY$3,000
2015-07-02Job filed: FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEM. HOOD,CE,AND GAS SHUT OFF VALVE FILED UNDER APPLICATION #NO CHANGE IN USE,EGRESS OR OCCUPANCY$3,000
2015-06-22Job filed: INSTALLATION OF COOKING EQUIPMENT, SS HOOD AND DUCT. ALL WORK AS PER PROPOSED PLAN SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$9,300
2015-06-22Job filed: INSTALLATION OF COOKING EQUIPMENT, SS HOOD AND DUCT. ALL WORK AS PER PROPOSED PLAN SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$9,300
2013-06-03311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2013-06-03311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-06-03DOB complaint, category ?
2013-06-03DOB complaint, category ?
2013-06-03DOB complaint, category ?
2013-05-13311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2013-05-13DOB complaint, category ?
2013-04-10311: Noise — Noise: Construction Equipment (NC1)
2013-04-05DOB complaint, category ?
2013-03-26311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2013-03-26ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.DEFECTS NOTED:AT TIME OF INSPECTION THERE IS COMBUSTIBLE GARBAGE STORED IN$1,000
2013-03-22311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2013-03-22DOB complaint, category ?
2013-03-17311: Asbestos — Asbestos Complaint (B1)
2013-03-17311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2012
2012-11-07311: HEATING — HEAT
2012-11-07Tenant complaint: HEATING — HEAT RELATED
2012-10-24Rodent inspection: Passed
2012-10-15311: Noise — Noise: Construction Equipment (NC1)
2012-10-15311: Rodent — Rat Sighting
2012-09-25Permit EW — ISSUED
2012-09-14DOB complaint, category ?
2012-08-28311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2012-08-28311: Hazardous Materials — Chemical Odor (HD1)
2012-08-28311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2012-08-07311: PLUMBING — WATER-SUPPLY
2012-08-07311: PLUMBING — WATER-SUPPLY
2012-08-07311: HEATING — HEAT
2012-08-07Tenant complaint: PLUMBING — WATER SUPPLY
2012-08-07Tenant complaint: PLUMBING — WATER SUPPLY
2012-08-07Tenant complaint: HEATING — HEAT RELATED
2012-08-01311: Noise — Noise: Construction Equipment (NC1)
2012-08-01DOB complaint, category ?
2012-06-25311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2012-06-25DOB complaint, category ?
2012-05-20311: HEATING — HEAT
2012-05-20311: PLUMBING — WATER-SUPPLY
2012-05-20Tenant complaint: HEATING — HEAT RELATED
2012-05-20Tenant complaint: PLUMBING — WATER SUPPLY
2012-05-19311: HEATING — HEAT
2012-05-19Tenant complaint: HEATING — HEAT RELATED
2012-05-16311: HEATING — HEAT
2012-05-16311: HEATING — HEAT
2012-05-16Tenant complaint: HEATING — HEAT RELATED
2012-05-16Tenant complaint: HEATING — HEAT RELATED
2012-05-15City emergency repair (HWO): public area supply and install (5) window guards complete throughout entire staircase.$389
2012-05-11DOB complaint, category ?
2012-05-03311: Noise — Noise: Construction Equipment (NC1)
2012-05-03311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-05-03311: GENERAL CONSTRUCTION — DOORS
2012-05-03311: NONCONST — RUBBISH
2012-05-03DOB complaint, category ?
2012-05-03DOB complaint, category ?
2012-05-03DOB complaint, category ?
2012-05-03Tenant complaint: GENERAL — DOORS
2012-05-03Tenant complaint: NONCONST — RUBBISH
2012-05-02Permit EW — ISSUED
2012-05-02Permit PL — ISSUED
2012-05-02Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD23704-01) WITH BOILER AND GAS BURNER AND INSTALL NEW GAS SERVICE, GAS METER AND GAS PIPING.$33,500
2012-04-27311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-04-27311: NONCONST — RUBBISH
2012-04-27311: NONCONST — RUBBISH
2012-04-27Tenant complaint: NONCONST — RUBBISH
2012-04-27Tenant complaint: NONCONST — RUBBISH
2012-04-27DOB complaint, category ?
2012-04-23311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2012-04-23DOB complaint, category ?
2012-04-21311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-04-21311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-04-21DOB complaint, category ?
2012-04-21DOB complaint, category ?
2012-04-05Rodent inspection: Passed
2012-03-31311: HEATING — HEAT
2012-03-31311: HEATING — HEAT
2012-03-31Tenant complaint: HEATING — HEAT RELATED
2012-03-31Tenant complaint: HEATING — HEAT RELATED
2012-02-23City emergency repair (OMO): as per mini rc (public hall) supply and install total (5) window guards as follows (1) at each landing. '' remove all wo$50
2012-02-06Permit EW — ISSUED
2012-01-30Permit PL — ISSUED
2012-01-20311: Indoor Air Quality — Other (Explain Below)
2012-01-19311: Asbestos — Asbestos Complaint (B1)
2012-01-18311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2012-01-18311: Asbestos — Asbestos Complaint (B1)
2012-01-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2011-11-17DOB complaint, category ?
2011-11-12ECB CLASS - 1 violation: FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #34879817X ISSUED ON 3/28/11. FOR WORK W/O PERMIT AT
2011-11-11311: HEATING — HEAT
2011-11-11311: HEATING — HEAT
2011-11-11Tenant complaint: HEATING — HEAT RELATED
2011-11-11Tenant complaint: HEATING — HEAT RELATED
2011-11-09Permit PL — ISSUED
2011-11-07DOB complaint, category ?
2011-11-07DOB complaint, category ?
2011-11-07Job filed: RENOVATE EXISTING APT UNITS 3A 5C AND 5D, 1B,2B,3B,4C,4D,5A&5B NEW METAL DECK EXISTING SIDE YARD OF THE BUILDING AND NEW METAL EGRESS BALCONY REAR$170,400
2011-11-07Job filed: RENOVATE EXISTING APT UNITS 3A 5C AND 5D, 1B,2B,3B,4C,4D,5A&5B NEW METAL DECK EXISTING SIDE YARD OF THE BUILDING AND NEW METAL EGRESS BALCONY REAR$170,400
2011-11-02311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011-11-02DOB complaint, category ?
2011-10-27311: Noise — Noise: Construction Before/After Hours (NM1)
2011-10-27311: Noise — Noise: Construction Equipment (NC1)
2011-10-27311: Indoor Air Quality — Dust from Construction
2011-10-27311: Rodent — Rat Sighting
2011-10-27311: NONCONST — RUBBISH
2011-10-27311: NONCONST — RUBBISH
2011-10-27Tenant complaint: NONCONST — RUBBISH
2011-10-27DOB complaint, category ?
2011-10-27Tenant complaint: NONCONST — RUBBISH
2011-10-23HPD class B: SECTION 27-2005 ADM CODE PROVIDE CHAIN GUARD AT DOOR IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
2011-10-23HPD class C: SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 2nd APARTME
2011-10-23HPD class B: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RADIATOR SHUT OFF VALVE HANDLE IN THE 1st ROOM FROM EAST LOCATED AT APT 3C, 3rd STORY,
2011-10-23HPD class C: SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK ON DOOR TO ROOM TO FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCAT
2011-10-23HPD class B: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RADIATOR SHUT OFF VALVE HANDLE IN THE 2nd ROOM FROM EAST LOCATED AT APT 3C, 3rd STORY,
2011-10-23HPD class B: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOODEN DOOR IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FR
2011-10-23HPD class C: SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE TOILET IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EA
2011-10-23HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 2nd APARTME
2011-10-23HPD class A: SECTION 27-2041 ADM CODE PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED SO AS TO PERMIT A PERSON INSIDE THE DWELLING T
2011-10-23HPD class B: SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT
2011-10-23HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING NORTH AND WEST WALLS IN THE
2011-10-23HPD class A: SECTION 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
2011-10-23HPD class B: SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE
2011-10-23HPD class B: SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FR
2011-10-22311: HEATING — HEAT
2011-10-22Tenant complaint: HEATING — HEAT RELATED
2011-10-21311: HEATING — HEAT
2011-10-21311: HEATING — HEAT
2011-10-21Tenant complaint: HEATING — HEAT RELATED
2011-10-21Tenant complaint: HEATING — HEAT RELATED
2011-10-20311: HEATING — HEAT
2011-10-20311: HEATING — HEAT
2011-10-20Tenant complaint: HEATING — HEAT RELATED
2011-10-20Tenant complaint: HEATING — HEAT RELATED
2011-09-19Rodent inspection: Failed for Rat Activity and Other Reason
2011-08-12311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2011-08-12DOB complaint, category ?
2011-08-11HPD class B: SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES ELECTRICAL CAMER
2011-08-11HPD class B: SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS
2011-08-09311: HEATING — HEAT
2011-08-09311: PLUMBING — WATER-SUPPLY
2011-08-09Tenant complaint: HEATING — HEAT RELATED
2011-08-09Tenant complaint: PLUMBING — WATER SUPPLY
2011-08-08311: HEATING — HEAT
2011-08-08Tenant complaint: HEATING — HEAT RELATED
2011-08-02DOB complaint, category ?
2011-08-02DOB complaint, category ?
2011-08-02DOB complaint, category ?
2011-07-27Job filed: LEGALIZE ALL BATHROOM, KITCHEN FIXTURES & WATER PIPING IN APT 1D. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.$4,000
2011-07-27Job filed: LEGALIZE ALL BATHROOM, KITCHEN FIXTURES & WATER PIPING IN APT 1D. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.$4,000
2011-07-20ECB CLASS - 1 violation: FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #34879817X ISSUED ON 3/28/11 FOR WORK W/O PERMIT AT
2011-07-19ECB CLASS - 1 violation: FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #34879816Y ISSUED ON 3/28/11 FOR WORK W/O PERMIT. AT
2011-07-14TL&R — from JPMORGAN CHASE BANK, N.A.
2011-07-13AL&R $3,900,000 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION$3,900,000
2011-07-13Deed $5,650,000 — from 126 MACDOUGAL HOLDINGS LLC to SIX MON LLC$5,650,000
2011-07-13Mortgage assigned — from CITIBANK, N.A. to JPMORGAN CHASE BANK, N.A.
2011-07-13Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to CAPITAL ONE, NATIONAL ASSOCIATION
2011-07-13Mortgage $330,774 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION$330,774
2011-07-13Agreement $3,900,000 — from SIX MON LLC to CAPITAL ONE, NATIONAL ASSOCIATION$3,900,000
2011-06-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-06-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-06-14DOB complaint, category ?
2011-05-20ECB CLASS - 1 violation: UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER AT THE COMMISSIONER. RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITIONS CITED IN TH$2,400
2011-05-20ECB CLASS - 1 violation: UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITIONS CITED IN TH$2,400
2011-04-13311: Noise — Noise: Construction Equipment (NC1)
2011-04-13311: Indoor Air Quality — Dust from Construction
2011-04-13DOB complaint, category ?
2011-04-07311: General Construction/Plumbing — Working Contrary To Stop Work Order
2011-04-07DOB complaint, category ?
2011-03-30311: General Construction/Plumbing — Working Contrary To Stop Work Order
2011-03-30DOB complaint, category ?
2011-03-29311: General Construction/Plumbing — Working Contrary To Stop Work Order
2011-03-29DOB complaint, category ?
2011-03-28ECB CLASS - 1 violation: WORK W/O A PERMIT. NOTED: AT NORTH COURTYARD AT 1ST FLR AN ALL WOOD PLANK PLATFORM HAS BEEN BUILT TO HOLD TRASH/GARBAGE CANS. SITE$1,600
2011-03-28ECB CLASS - 1 violation: WORK W/O A PERMIT. NOTED: AT THE 1ST FLR NORTH REAR APT UNIT RENOVATION OF APT UNIT RENOVATION OF APT IS 90% (#1D) COMPLETE W/NEW $1,600
2011-03-28DOB complaint, category ?
2011-03-23Permit PL — ISSUED
2011-03-22Job filed: REPLACE ALL GAS PIPING AND (22) GAS METERS AS PER PLANS. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.$45,000
2011-03-22Job filed: REPLACE ALL GAS PIPING AND (22) GAS METERS AS PER PLANS. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.$45,000
2011-03-13311: HEATING — HEAT
2011-03-13Tenant complaint: HEATING — HEAT RELATED
2011-03-10Rodent inspection: Passed
2011-03-09City emergency repair (OMO): perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7420 method ut$51
2011-03-04City emergency repair (HWO): doh clean & dust wipe only: please submit samples of the window wells for 1st floor public hallway; stairs from 1st to 2$208
2011-03-01Mortgage assigned — from CITIBANK, N.A., A NATIONAL BANKING ASSOC to JP MORGAN CHASE BANK, N.A.
2011-02-19311: HEATING — HEAT
2011-02-19Tenant complaint: HEATING — HEAT RELATED
2011-02-08311: APPLIANCE — ELECTRIC/GAS-RANGE
2011-02-08Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2011-01-18City emergency repair (OMO): apt# 2d, kitchen repair and provide adequate supply of gas to fixtures to stove ; trace repair leak on house pipe; contr$150
2011-01-14HPD class B: SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS STOVE IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APA
2011-01-05AALR — from CITIBANK, N.A., A NATIONAL BANKING ASSOC to JP MORGAN CHASE BANK, N.A.
2011-01-05311: Indoor Air Quality — Dust from Construction
2011-01-05DOB complaint, category ?
2010
2010-12-30Tenant complaint: HEATING — HEAT RELATED
2010-12-28Tenant complaint: GENERAL — DOORS
2010-12-28Tenant complaint: HEATING — HEAT RELATED
2010-12-22311: Asbestos — Asbestos Complaint (B1)
2010-12-21311: Asbestos — Asbestos Complaint (B1)
2010-12-20311: Noise — Noise: Construction Equipment (NC1)
2010-12-20HPD class C: SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES TO STOVE IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTME
2010-12-20HPD class B: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHUT OFF VALVE CONNECTED THE THE GAS LINE OF THE STOVE IN THE KITCHEN LOCATED AT APT 2
2010-12-20HPD class C: SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES STOVE IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT
2010-12-16311: HEATING — HEAT
2010-12-16311: PAINT - PLASTER — CEILING
2010-12-16311: PAINT - PLASTER — RADIATOR
2010-12-16311: NONCONST — VERMIN
2010-12-16311: GENERAL CONSTRUCTION — MOLD
2010-12-16311: HEATING — HEAT
2010-12-16311: PLUMBING — WATER-LEAKS
2010-12-16311: GENERAL CONSTRUCTION — GAS
2010-12-16Tenant complaint: HEATING — HEAT RELATED
2010-12-16Tenant complaint: HEATING — HEAT RELATED
2010-12-14311: Indoor Air Quality — Dust from Construction
2010-12-14311: APPLIANCE — ELECTRIC/GAS-RANGE
2010-12-14Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2010-12-13311: APPLIANCE — ELECTRIC/GAS-RANGE
2010-12-13Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2010-12-09City emergency repair (OMO): bldg: apt 2d : trace and repair gas leak. restore gas to entire building. no gas for cooking. vendor to perform integrit
2010-12-07311: HEATING — HEAT
2010-12-07Tenant complaint: HEATING — HEAT RELATED
2010-11-17HPD class C: SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS STOVE IN THE KITCHENETTE LOCATED AT APT 2D, 2nd STORY, 1st
2010-11-14311: HEATING — HEAT
2010-11-14Tenant complaint: HEATING — HEAT RELATED
2010-11-09311: Sidewalk Condition — Blocked - ATM
2010-11-08311: GENERAL CONSTRUCTION — GAS
2010-11-08Tenant complaint: GENERAL — COOKING GAS
2010-11-02311: NONCONST — VERMIN
2010-11-02311: GENERAL CONSTRUCTION — MOLD
2010-11-02311: GENERAL CONSTRUCTION — GAS
2010-11-02311: NONCONST — RUBBISH
2010-11-02311: NONCONST — VERMIN
2010-11-02Tenant complaint: GENERAL — COOKING GAS
2010-11-02Tenant complaint: NONCONST — VERMIN
2010-11-02Tenant complaint: GENERAL — MOLD
2010-11-02Tenant complaint: NONCONST — RUBBISH
2010-11-02Tenant complaint: NONCONST — VERMIN
2010-10-22311: HEATING — HEAT
2010-10-22Tenant complaint: HEATING — HEAT RELATED
2010-08-27HPD class B: SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE PLASTIC CONTAINE
2010-08-27HPD class B: SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FR
2010-08-27HPD class B: SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM
2010-08-20311: NONCONST — VERMIN
2010-08-20311: NONCONST — VERMIN
2010-08-20311: NONCONST — RUBBISH
2010-08-20311: NONCONST — RUBBISH
2010-08-20311: NONCONST — VERMIN
2010-08-20Tenant complaint: NONCONST — VERMIN
2010-08-20Tenant complaint: NONCONST — VERMIN
2010-08-20Tenant complaint: NONCONST — VERMIN
2010-08-20Tenant complaint: NONCONST — RUBBISH
2010-08-20Tenant complaint: NONCONST — RUBBISH
2010-08-13HPD class A: SECTION 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BO
2010-04-30Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2010-02-19Rodent inspection: Passed
2010-01-07Permit EW — ISSUED
2010-01-04Job filed: INSTALL (2) 275 GALLON OIL TANKS. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.$6,000
2009
2009-12-16Tenant complaint: HEATING — HEAT RELATED
2009-12-01Tenant complaint: HEATING — HEAT RELATED
2009-12-01Tenant complaint: HEATING — HEAT RELATED
2009-11-23Tenant complaint: HEATING — HEAT RELATED
2009-10-16Tenant complaint: HEATING — HEAT RELATED
2009-10-14Tenant complaint: HEATING — HEAT RELATED
2009-08-19Tenant complaint: HEATING — HEAT RELATED
2009-07-23Tenant complaint: PLUMBING — BASIN/SINK
2009-04-14DOB complaint, category ?
2009-03-24Tenant complaint: HEATING — HEAT RELATED
2009-02-27Tenant complaint: PLUMBING — WATER SUPPLY
2009-02-03City emergency repair (HWO): free standing radiator at public hall, 4th story remove all work related debris$179
2009-02-01Tenant complaint: HEATING — HEAT RELATED
2008
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-04Tenant complaint: HEATING — HEAT RELATED
2008-12-03Tenant complaint: HEATING — HEAT RELATED
2008-12-03Tenant complaint: HEATING — HEAT RELATED
2008-12-03Tenant complaint: HEATING — HEAT RELATED
2008-12-02Tenant complaint: HEATING — HEAT RELATED
2008-12-02Tenant complaint: HEATING — HEAT RELATED
2008-12-02Tenant complaint: HEATING — HEAT RELATED
2008-11-22Tenant complaint: HEATING — HEAT RELATED
2008-11-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT 2ND & 3RDFL COMMON HALLWAY FLS SLOPING/CRACKED APPROX 10 SQ FT ON EAC$500
2008-11-12HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF RADIATOR FREE STANDING AT PUBLIC HALL, 4th STORY
2008-11-12DOB complaint, category ?
2008-11-12Tenant complaint: HEATING — HEAT RELATED
2008-11-11Tenant complaint: HEATING — HEAT RELATED
2008-10-24Tenant complaint: HEATING — HEAT RELATED
2008-05-01Mortgage assigned — from INTERVEST NATIONAL BANK to CITIBANK,NA
2008-05-01Mortgage $628,719 — from 126 MACDOUGAL HOLDINGS LLC to CITIBANK,NA$628,719
2008-05-01Agreement $3,750,000 — from 126 MACDOUGAL HOLDINGS LLC to CITIBANK,NA$3,750,000
2008-05-01AL&R $3,750,000 — from 126 MACDOUGAL HOLDINGS LLC to CITIBANK,NA$3,750,000
2008-04-03Tenant complaint: HEATING — HEAT RELATED
2008-02-19Tenant complaint: HEATING — HEAT RELATED
2008-02-03Tenant complaint: HEATING — HEAT RELATED
2008-02-02Tenant complaint: HEATING — HEAT RELATED
2007
2007-12-15Tenant complaint: HEATING — HEAT RELATED
2007-12-04Tenant complaint: HEATING — HEAT RELATED
2007-12-01Tenant complaint: HEATING — HEAT RELATED
2007-11-30Tenant complaint: HEATING — HEAT RELATED
2007-11-29Tenant complaint: HEATING — HEAT RELATED
2007-11-07Tenant complaint: HEATING — HEAT RELATED
2007-11-06Tenant complaint: HEATING — HEAT RELATED
2007-10-08Tenant complaint: GENERAL — DOORS
2007-09-12Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-09-07Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-09-07Tenant complaint: GENERAL — DOORS
2007-09-06Tenant complaint: GENERAL — DOORS
2007-04-16Tenant complaint: HEATING — HEAT RELATED
2007-04-16Tenant complaint: HEATING — HEAT RELATED
2007-02-17Tenant complaint: HEATING — HEAT RELATED
2007-02-17Tenant complaint: HEATING — HEAT RELATED
2007-02-17Tenant complaint: HEATING — HEAT RELATED
2007-02-17Tenant complaint: HEATING — HEAT RELATED
2007-02-16Tenant complaint: HEATING — HEAT RELATED
2007-02-16Tenant complaint: HEATING — HEAT RELATED
2007-01-27Tenant complaint: HEATING — HEAT RELATED
2007-01-18Tenant complaint: HEATING — HEAT RELATED
2007-01-18Tenant complaint: HEATING — HEAT RELATED
2006
2006-12-29Tenant complaint: HEATING — HEAT RELATED
2006-12-28Tenant complaint: HEATING — HEAT RELATED
2006-12-17Tenant complaint: HEATING — HEAT RELATED
2006-11-27Tenant complaint: HEATING — HEAT RELATED
2006-11-27Tenant complaint: HEATING — HEAT RELATED
2006-11-25Tenant complaint: HEATING — HEAT RELATED
2006-11-25Tenant complaint: HEATING — HEAT RELATED
2006-11-24Tenant complaint: HEATING — HEAT RELATED
2006-03-30Agreement $3,200,000 — from 126 MACDOUGAL HOLDINGS LLC to INTERVEST NATIONAL BANK$3,200,000
2006-03-30Deed $4,400,000 — from NIGHT OWLS, L.L.C., AS TO TWENTY-FIVE (2; 307 E. 54 ST. CORP., AS TO SEVENTY-FIVE to 126 MACDOUGAL HOLDINGS LLC$4,400,000
2006-03-30TL&R — from NEW YORK COMMUNITY BANK SUCCESSOR TO THE
2006-03-30Mortgage assigned — from NEW YORK COMMUNITY BANK SUCCESSOR TO THE to INTERVEST NATIONAL BANK
2006-03-30Mortgage $1,483,409 — from 126 MACDOUGAL HOLDINGS LLC to INTERVEST NATIONAL BANK$1,483,409
2003
2003-03-19DOB violation LL6291:
2003-03-07Tenant complaint: PLUMBING — WATER SUPPLY
2003-03-07Tenant complaint: HEATING — HEAT RELATED
2003-03-06Tenant complaint: HEATING — RADIATOR
2003-03-06Tenant complaint: HEATING — RADIATOR
2003-03-03Tenant complaint: GENERAL — LOCKS
2002
2002-03-05Deed — from 126 MACDOUGAL STREETLLC to NIGHT OWLS LLC; 307 E. 54 ST. CORP.
2002-03-05Agreement — from 307 E. 54 ST. CORP.; NIGHT OWLS, LLC to ROSLYN SAVINGS BANK
2001
2001-12-27Mortgage $189,859 — from 126 MACDOUGAL STREETLLC to ROSLYN SAVINGS BANK$189,859
2001-12-27Mortgage assigned — from 126 MACDOUGAL STREET, LLC to ROSLYN SAVINGS BANK
2001-12-27Mortgage assigned — from INTERVEST NATIONAL BANK to ROSLYN SAVINGS BANK
2001-03-23Mortgage $830,000 — from 126 MACDOUGAL STREETLLC to INTERVEST NATIONAL BANK$830,000
2001-03-23Mortgage assigned — from KATZ, ELLIE HENKINDDR. to INTERVEST NATIONAL BANK
2001-03-23Agreement — from 126 MACDOUGAL STREETLLC to INTERVEST NATIONAL BANK
2001-03-23PAT — from HENKIND-KATZ, ELLIE to HENKIND, SOL
2001-03-23Agreement — from HENKIND, SOL to 126 MACDOUGALL STREET CORP.; 126 MACDOUGALL STREET ASSOCIATES
2001-02-27DOB violation LL6291:
2000
2000-02-07DOB violation LL6291:
1999
1999-07-19Permit AL — ISSUED
1999-06-16ECB Non-Hazardous violation: WORK WITHOUT A PERMIT NOTED A CANVAS AWINING INSTALLED WITH METAL FRAME FIXED SPACE D A AT 1ST FL LEVEL SOUTH SIDE SPACE D B A ALT$2,500
1998
1998-11-24HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ASSEMBLY VESTIBULE TO 1 STY PUBLIC HALL.
1998-11-19DTL — from BANK OF NEW YORK
1998-08-12HPD class A: SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES,
1998-06-16Deed — from 126 MACDOUGALL STREET ASSOCIATES to 126 MACDOUGAL STREETLLC
1997
1997-12-23ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NOTED: INSTALLED A CANVAS TYPE AWNING WITH METAL PIPE FRAME BOLTED TO FRONT FACADE OF BUILDING AT FIRST FLO$2,500
1997-12-08DOB complaint, category ?
1997-07-07HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ASSEMBLY VESTIBULE DOOR.
1997-07-07HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ASSEMBLY BLDG ENTRANCE DOOR.
1997-07-07HPD class B: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER LEAK CEILING 5 STY WEST APT 5B FRONT ROOM. LOCATED
1996
1996-11-14DOB complaint, category ?
1996-11-12Permit EQ — ISSUED
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1993
1993-10-25HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST WALL WEST ROOM 5 STY WEST APT 4B
1993-10-25HPD class C: § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING WEST ROOM 5 STY WEST APT 4B. , SECT
1993-10-25HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT SOUTH WALL WEST ROOM 5 STY WEST APT 4
1993-10-25HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT NORTH WALL WEST ROOM 5 STY WEST APT 4
1993-10-25HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CENTER ROOM CEILING 5 STY WEST APT 4B
1993-10-25HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING KITCHEN 5 STY WEST APT 4B. ,
1993-10-25HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT SOUTH WALL CENTER ROOM 5 STY WEST APT
1993-05-24DOB complaint, category ?
1992
1992-01-31DOB complaint, category ?
1992-01-31DOB complaint, category ?
1991
1991-09-25Permit PL — ISSUED
1991-09-25Permit EW — ISSUED
1991-03-08Deed — from 126 DACDOUGALL ST CORP to 126 MACDOUGALL ST ASSOC
1990
1990-03-21Mortgage assigned — from HENKIND, SOL TRST to KATZ, ELLIE HENKIND
1989
1989-06-20HPD class A: SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES,
1987
1987-01-05Mortgage $795,000 — from 126 MACDOUGALL ST CORP to HENKIND, SOL TRUSTEE$795,000
1987-01-05PAT — from HALEGUA, NATHAN to CHEFETZ, MYLES A.
1987-01-05Deed — from HENKIND, SOL to 126 MAC DOUGALL ST CORP
1986
1986-05-19Deed — from FREEDMAN, BEVERLY to HENKIND, SOL
1986-05-19Deed — from QUINT, IRA to HENKIND, SOL
1986-03-13Deed — from BOBROW, ANNA QUINT to HENKIND, SOL
1966
1966-04-07Deed — from BEVIRA ESTATES LTD to BOBROW, ANNA Q; FREEDMAN, BEVERLY; QUINT, IRA; HENKIND, SOL