The city's published records show little recorded distress here in the last three years. Less recorded distress than 88% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0.8. In ZIP 10028, 79% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
2 heat or hot-water complaints in the last three years (winter 2024–25: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
16 service requests in the last three years. Most common: Noise (9) · Illegal Parking (2) · Rodent (1) · HEAT/HOT WATER (1) · Indoor Air Quality (1) · Real Time Enforcement (1).
Filed construction activity
No permitted work with a declared cost filed in the last decade. Permit
costs cover filed construction work only — they do not capture routine maintenance or repairs done
without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
Yes
Six or more residential units (20)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
FRANK & WALTER EBERHART L.P. #1
Head officer
DAVID F EBERHART
Managing agent
Eberhart Brothers, LLC
Last registered
2025-10-11
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$3,770,000
$1,696,500
2026
$4,207,000
$1,893,150
2027
$4,187,000
$1,884,150
The city's market estimate has risen
11% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
86 St — Q · 600 ft straight-line (about a 3-minute walk) · station accessibility: full 77 St — 6 · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 2 Av / E 82 St — M15 · 300 ft
Citi Bike
E 80 St & 2 Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
16 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,177,938 on
2019-07-03 (lender: The Bank Of New York Mellon), covering 23 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-07-03
Mortgage $1,177,938 — from FRANK & WALTER EBERHART L.P. NO. 1; FRANK & WALTER EBERHART L.P. NO. 2 to THE BANK OF NEW YORK MELLON
$1,177,938
2019-07-03
Agreement $19,940,000 — from FRANK & WALTER EBERHART L.P. NO. 2; FRANK & WALTER EBERHART L.P. NO. 1 to F/K/A THE BANK OF NEW YORK; THE BANK OF NEW YORK MELLON
$19,940,000
2019-07-03
AL&R $19,940,000 — from FRANK & WALTER EBERHART L.P. NO. 1; FRANK & WALTER EBERHART L.P. NO. 2 to F/K/A THE BANK OF NEW YORK; THE BANK OF NEW YORK MELLON
$19,940,000
2007-07-02
Agreement $37,753,070 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK
$37,753,070
2007-07-02
AL&R $37,753,070 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK
$37,753,070
2007-07-02
Mortgage $2,990,000 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK
$2,990,000
2007-07-02
AL&R $2,990,000 — from FRANK & WALTER EBERHART L.P. NO. 1; FRANK & WALTER EBERHART L.P. NO.2 to THE BANK OF NEW YORK
$2,990,000
2007-07-02
Mortgage $11,521,059 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK
$11,521,059
2005-01-18
Mortgage $5,000,000 — from EBERHART L.P. #1; FRANK AND WALTER EBERHART L.P. NO.1; EBERHART L.P. #.2; FRANK AND WALTER to THE BANK OF NEW YORK
$5,000,000
2003-06-23
Mortgage $3,000,000 — from FRANK AND WALTER EBERHART L.P. NO. 1; FRANK AND WALTER EBERHART L.P. NO. 2 to THE BANK OF NEW YORK
$3,000,000
2003-06-23
Agreement $10,384,153 — from FRANK AND WALTER EBERHART L.P. NO. 2; FRANK AND WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK
$10,384,153
2001-12-18
Mortgage $7,500,000 — from FRANK AND WALTER EBERHART L.P. NO. 2; FRANK AND WALTER EBERHART L.P. NO. 1 to BANK OF NEW YORK
$7,500,000
1991-03-19
Mortgage $6,289,000 — from EBERHART, DAVID F. EXEC; EBERHART,WALTER M EST/OF; EBERHART, FRANK IIIEXEC; EBERHART, PAME to BANK NEW YORK
$6,289,000
1986-12-08
Mortgage $558,228 — from EBERHART, DAVID F. TR; EBERHART III, FRANKTR; EBERHART, VIRGINIA F. TR; EBERHART, FRANK LW to WDF ASSOCIATES
$558,228
1983-10-28
Agreement $1,650,643 — from EBERHART, FRANK III; EBERHART, WALTER M.; EBERHART, DAVID F. TR; EBERHART, FRANK LWT to METROPOLITAN SVG BK,FSB
$1,650,643
Ten-year activity
50250
2017
2018
2019
21
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
3
0
8
11
2018
0
0
2
1
1
4
2019
0
0
5
3
4
12
2020
2
0
5
0
14
21
2021
1
0
3
0
1
5
2022
0
0
7
0
0
7
2023
0
0
5
0
0
5
2024
0
0
3
0
1
4
2025
0
1
8
0
0
9
2026
0
0
8
0
0
8
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2020-12-28Rodent inspection: Failed for Rat Activity
2020-12-07Permit Sidewalk Shed — Signed-off
2020-12-03Job filed: Sidewalk Shed installed per plans, no change in use, egress or occupancy
2020-09-24Rodent inspection: Bait applied
2020-09-23311: Rodent — Rat Sighting
2020-09-14Rodent inspection: Bait applied
2020-08-05Rodent inspection: Bait applied
2020-07-20Rodent inspection: Bait applied
2020-07-16Rodent inspection: Bait applied
2020-06-29Rodent inspection: Bait applied
2020-06-26Rodent inspection: Failed for Other Reason
2020-06-17311: Rodent — Rat Sighting
2020-06-08Rodent inspection: Bait applied
2020-05-13311: Rodent — Mouse Sighting
2020-04-29311: Rodent — Rat Sighting
2020-03-10Rodent inspection: Failed for Rat Activity
2020-03-03311: Rodent — Rat Sighting
2020-02-24Rodent inspection: Bait applied
2020-02-12Rodent inspection: Failed for Rat Activity and Other Reason
2020-02-12Rodent inspection: Failed for Rat Activity
2020-01-31Rodent inspection: Failed for Rat Activity
2019
2019-12-04Rodent inspection: Failed for Rat Activity
2019-11-10311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-10-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-10-18Rodent inspection: Failed for Rat Activity
2019-07-03Mortgage $1,177,938 — from FRANK & WALTER EBERHART L.P. NO. 1; FRANK & WALTER EBERHART L.P. NO. 2 to THE BANK OF NEW YORK MELLON$1,177,938
2019-07-03Agreement $19,940,000 — from FRANK & WALTER EBERHART L.P. NO. 2; FRANK & WALTER EBERHART L.P. NO. 1 to F/K/A THE BANK OF NEW YORK; THE BANK OF NEW YORK MELLON$19,940,000
2019-07-03AL&R $19,940,000 — from FRANK & WALTER EBERHART L.P. NO. 1; FRANK & WALTER EBERHART L.P. NO. 2 to F/K/A THE BANK OF NEW YORK; THE BANK OF NEW YORK MELLON$19,940,000
2019-06-21Rodent inspection: Failed for Rat Activity and Other Reason
2019-06-14311: Rodent — Rat Sighting
2019-05-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-01-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-01-03Rodent inspection: Passed
2018
2018-06-06311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-05-04Rodent inspection: Passed
2018-04-09CORRD — from ESTATE OF WALTER M. EBERHART; EBERHART, DAVID F; EBERHART, FRANK; ROTHE, AS EXECUTRIX, NAN to FRANK & WALTER EBERHART L.P. NO. 1
2016-07-07311: Water System — Hydrant Running (WC3)
2016-05-17311: Water System — Hydrant Leaking (WC1)
2016-04-25311: Illegal Parking — Blocked Hydrant
2016-01-14Permit PL — ISSUED
2015
2015-11-27Job filed: INTERIOR RENOVATION TO APARTMENT 1FW ON THE FIRST FLOOR. WORK TO INCLUDE GENERAL CONSTRUCTION AND PLUMBING WORK, ALL AS PER PLANS FILED HEREWITH. NO C$19,650
2015-11-27Permit EW — ISSUED
2014
2014-03-03Agreement — from NYC DEPARTMENT OF TRANSPORTATION to FRANK & WALTER EBERHART LP NO 1
2012
2012-07-26Rodent inspection: Passed
2011
2011-12-02Rodent inspection: Passed
2011-11-10Rodent inspection: Failed for Rat Activity
2011-03-31Permit PL — ISSUED
2011-03-30Permit EW — ISSUED
2011-03-16Job filed: REPLACE EXISTING FIXTURES. MINOR PARTITION WORK. NO CHANGE IN USE, EGRESS, ROOM COUNT OR OCCUPANCY.$10,000
2011-03-16Job filed: REPLACE EXISTING FIXTURES. MINOR PARTITION WORK. NO CHANGE IN USE, EGRESS, ROOM COUNT OR OCCUPANCY.$10,000
2010
2010-11-19Rodent inspection: Passed
2010-11-15311: Street Condition — Failed Street Repair
2007
2007-07-02Agreement $37,753,070 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK$37,753,070
2007-07-02AL&R $37,753,070 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK$37,753,070
2007-07-02Mortgage $2,990,000 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK$2,990,000
2007-07-02AL&R $2,990,000 — from FRANK & WALTER EBERHART L.P. NO. 1; FRANK & WALTER EBERHART L.P. NO.2 to THE BANK OF NEW YORK$2,990,000
2007-07-02Mortgage $11,521,059 — from FRANK & WALTER EBERHART L.P. NO.2; FRANK & WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK$11,521,059
2007-04-21DOB complaint, category ?
2005
2005-01-18AL&R — from THE BANK OF NEW YORK to FRANK AND WALTER EBERHART L.P. NO.1; FRANK AND WALTER EBERHART L.P. NO.2; EBERHART L.P. #1
2005-01-18Mortgage $5,000,000 — from EBERHART L.P. #1; FRANK AND WALTER EBERHART L.P. NO.1; EBERHART L.P. #.2; FRANK AND WALTER to THE BANK OF NEW YORK$5,000,000
2004
2004-10-13Permit PL — ISSUED
2004-06-02Permit EQ — ISSUED
2004-06-01Permit EQ — ISSUED
2003
2003-12-12Permit AL — ISSUED
2003-12-12Permit EW — ISSUED
2003-12-02Permit EW — ISSUED
2003-08-29Permit AL — ISSUED
2003-08-29Permit PL — ISSUED
2003-07-29EASE — from FRANK & WALTER EBERHART, L.P. #1 to FRANK & WALTER EBERHART, L.P. #1
2003-07-29EASE — from FRANK & WALTER EBERHART, L.P.#1 to FRANK & WALTER EBERHART, L.P. #1
2003-07-18Permit EQ — ISSUED
2003-07-18Permit EQ — ISSUED
2003-07-17Job filed: Installation of heavy duty sidewalk shed 25ft long at 313 EAST 81th STREET - during remedial repairs. Work shall comply with LL33/91. No change in
2003-07-17Job filed: Installation of heavy duty sidewalk shed 25ft long at 313 EAST 81th STREET - during remedial repairs. Work shall comply with LL33/91. No change in
2003-07-17Job filed: Install scaffold 16ft long by 50ft high at 313 EAST 81 STREET- during remedial repairs. No change in use egress or occupancy.
2003-07-15Agreement — from NYC DOT DIV. OF FRANCHISES, CONCESSIONS to FRANK AND WALTER EBERHART L.P. NO. 1
2003-06-23AL&R — from THE BANK OF NEW YORK to FRANK AND WALTER EBERHART L.P. NO. 2; FRANK AND WALTER EBERHART L.P. NO. 1
2003-06-23Mortgage $3,000,000 — from FRANK AND WALTER EBERHART L.P. NO. 1; FRANK AND WALTER EBERHART L.P. NO. 2 to THE BANK OF NEW YORK$3,000,000
2003-06-23Agreement $10,384,153 — from FRANK AND WALTER EBERHART L.P. NO. 2; FRANK AND WALTER EBERHART L.P. NO. 1 to THE BANK OF NEW YORK$10,384,153
2003-03-19DOB violation LL6291:
2003-01-10Permit EW — ISSUED
2002
2002-12-26Job filed: NEW 6TH FLOOR AND PENTHOUSE LEVEL. OBTAIN NEW CERTIFICATE OF OCCUPANCY.$85,000
2002-11-07Permit EW — ISSUED
2002-09-23Permit EW — ISSUED
2002-09-18Job filed: ASSEMBLE 4" X 4" WOOD POST AND PLANK SCA FFOLD APPROX. 30' LONG, 8' HIGH AND 3' WIDE IN FRONT OF FACADE FOR THE PURPOSE OF MINOR BROWNSTONE REPAIR. RE$1,500
2002-09-17EASE — from FRANK & EBERHART, L.P. to FRANK & WALTER EBERHART, L.P.
2002-09-10Permit PL — ISSUED
2002-09-10ECB Non-Hazardous violation: FAILURE TO POST D.O.T PERMIT AT TIME OF INSPECTION POLE SCAFFOLD WAS ERECTED ON THE SIDEWORK AND NO D.O.T PERMIT WAS POSTED. REMED
2002-09-10ECB Non-Hazardous violation: WORK WITHOUT PERMIT. AT TIEM OF INSPECTION ELEVATION WORK WAS IN PROGRESS FROM PALE SCAFFOLD AND DOB RECORD SHOWS NO PERMIT FOR FO
2002-09-10ECB Non-Hazardous violation: NO DESIGN DRAWING FOR SCOFFOLOL. AT TIME OF INSPECTION ELEVATION WORK WAS IN PROGRESS FROM POLE SCAFFOLD AND NO DESIGN DRAWING WAS
2002-08-23Job filed: REPLACE EXISTING FIXTURES MINOR PARTITION WORK NO CHANGE IN USE OCCUPANCY EGRESS OR ROOM COUNT$10,000
2002-08-23Permit EW — ISSUED
2002-08-08Permit PL — ISSUED
2002-08-08Permit EW — ISSUED
2002-06-20Permit PL — ISSUED
2002-05-14Job filed: INSTALLATION OF AUTOMATIC SPRINKLERS,AS PER PLAN CONNECTION TO EXISTING 3"SPRINKLER MAIN NO CHANGE IN USE,OCCUPA NCY OR EGRESS.$18,000
2002-05-14Job filed: REHABILITATION OF PUBLIC HALLWAY REPLACE MENT OF DOORS INSTALL PLUMBING INSE FROM CELLAR TO 5TH FLOOR FOR FUTURE USE NO CHANGE IN USE EGRESS OR OCCUP$38,000
2002-03-26DOB violation LL6291:
2001
2001-12-18Mortgage assigned — from FRANK AND WALTER EBERHART L.P. NO. 1; FRANK AND WALTER EBERHART L.P. NO. 2 to BANK OF NEW YORK
2001-12-18Mortgage $7,500,000 — from FRANK AND WALTER EBERHART L.P. NO. 2; FRANK AND WALTER EBERHART L.P. NO. 1 to BANK OF NEW YORK$7,500,000
2001-06-11SAGE — from FRANK & WALTER EBERHART, L.P.
2001-03-26SAGE — from EBERHART L.P. #2; EBERHART L.P. #1
2001-03-26SAGE — from EBERHART L.P. #2
2001-03-26SAGE — from EBERHART, L.P. #1; EBERHART, L.P. #2
2001-03-26SAGE — from ROYAL ABSTRACT OF NEW YORK LLC
2001-02-27DOB violation LL6291:
2001-02-12Permit PL — ISSUED
2001-01-17Permit EW — ISSUED
2001-01-12Job filed: REPLACE EXISTING FIXTURES, MINOR PARTITION WORK NO CHANGE IN USE OCCUPANCY OR EGRESS$10,000
2000
2000-12-29Job filed: REPLACE EXISTING FIXTURES, MINOR PARITION WORK. NO CHANGE IN USE OCCUPANCY, EGRESS OR ROOM COUNT.$10,000
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1998
1998-09-16Agreement — from FRANK AND WALTER EBERHART L.P. NO. 2; FRANK AND WALTER EBERHART L.P. NO. 1 to BANK OF NEW YORK
1998-05-04DOB violation LL6291:
1997
1997-09-16DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-06-18Mortgage assigned — from FRANK & WALTER EBERHART L.P. NO. 1; EBERHART L.P. #1; EBERHART L.P. # 2; FRANK & WALTER EB to BANK OF NEW YORK
1996-06-18Agreement — from FRANK & WALTER EBHART L.P. NO. 2; EBERHART L.P. #2; EBERHART L.P. #1; FRANK & WALTER EBERH to BANK OF NEW YORK
1996-04-04Permit PL — ISSUED
1996-04-04Permit PL — ISSUED
1996-03-08Permit EW — ISSUED
1995
1995-12-06Permit EW — ISSUED
1995-08-29DOB violation LL6291:
1995-07-07Deed — from EBERHART, ELIZABETHEXEC; EBERHART, WALTER M.ESTATE OF; EBERHART, DAVID F.; ROTHE, NANCY EX to EBERHART L.P. #1
1994
1994-03-18DOB violation LL6291:
1993
1993-03-18DOB violation LL6291:
1991
1991-04-29HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILINGS 1 STY FRONT WEST APT TH
1991-04-29HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING OF KITCHEN AND NORTH ROOM OF 1 STY
1991-04-29HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL UNDER SINK OF KITCHEN AT 1 STY F
1991-04-29HPD class B: D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING GLASS TOP SASHES 1ST STY FRONT WEST APT 1FW FRONT ROOM. , SECTION '' ''
1991-03-19Mortgage $6,289,000 — from EBERHART, DAVID F. EXEC; EBERHART,WALTER M EST/OF; EBERHART, FRANK IIIEXEC; EBERHART, PAME to BANK NEW YORK$6,289,000
1991-03-19Mortgage assigned — from WDG ASSOCIATES to BANK OF NEW YORK
1991-03-19Agreement — from ROTHE, NANCY EXEC; EBERHART, ELIZABETHB EX; EBERHART, W. M. JR EST/; EBERHART, DAVID F.; E to BANK OF NEW YORK
1991-03-19Mortgage assigned — from ROTHE, NANCY EXEC; EBERHART, ELIZABETHB EX; EBERHART, W. M JR EST/; EBERHART, FRANK III; E to BANK OF NEW YORK
1991-03-19MISC — from BANKERS TRUST CO
1991-03-11Permit PL — ISSUED
1991-03-11Permit PL — ISSUED
1991-03-08Permit EW — ISSUED
1991-03-08Permit EW — ISSUED
1989
1989-05-15Deed — from EBERHART, DAVID F(TRSTE); EBERHART, FRANK(L/W/T); EBERHART, FRANK III to EBERHART, FRANK; EBERHART, DAVID F
1987
1987-02-24SMIS — from WDF ASSOCIATES to BANKERS TRUST COMPANY
1986
1986-12-08PAT — from EBERHART, WALTER M. to EBERHART, WALTER M.; EBERHART, FRANK III; EBERHART, DAVID F.
1986-12-08Mortgage assigned — from CROSSLAND SAVINGS to WDF ASSOCIATES
1986-12-08Mortgage $558,228 — from EBERHART, DAVID F. TR; EBERHART III, FRANKTR; EBERHART, VIRGINIA F. TR; EBERHART, FRANK LW to WDF ASSOCIATES$558,228
1983
1983-10-28PAT — from EBERHART, WALTER M. to EBERHART, WALTER M JR.
1983-10-28Mortgage assigned — from AMERICAN SAVINGS BK,FSB to METROPOLITAN SVG BK,FSB
1983-10-28Agreement $1,650,643 — from EBERHART, FRANK III; EBERHART, WALTER M.; EBERHART, DAVID F. TR; EBERHART, FRANK LWT to METROPOLITAN SVG BK,FSB$1,650,643
1983-10-28Mortgage $1,650,643 — from EBERHART, DAVID F TR; EBERHART, FRANK DEC'D; EBERHART, FRANK IIITR; EBERHART, WALTER M.TR to METROPOLITAN SVGS BK,FSB$1,650,643
1983-08-19Deed — from EBERHART, VIRGINIA FEXE; EBERHART, FRANK EXECOF; EBERHART, FRANK IIIEXEC; EBERHART, DAVID to EBERHART, DAVID F TRS; EBERHART, VIRGINIA FTRS; EBERHART, FRANK DECD; EBERHART, FRANK IIIT
1983-03-31MISC — from EBERHART BROS.,INC.
1980
1980-08-15Mortgage assigned — from TABORI, DEZIDER T to AMERICAN SAVINGS BANK
1980-08-15Mortgage — from EBERHART, WALTER; EBERHART, FRANK DECD to AMERICAN SAVINGS BANK
1980-08-15Agreement — from EBERHART, FRANK DECD; EBERHART, WALTER to AMERICAN SAVINGS BANK
1980-08-15MISC — from TABORI, DEZIDER T
1977
1977-02-03Agreement — from DAFRAN HOLDING CORP to TABORI, DEZIDER T
1977-01-20Deed — from DAFRAN HOLDING CORP to EBERHART, FRANK; EBERHART, WALTER M
1977-01-20Deed — from EBERHART, WALTER M; EBERHART, FRANK to DAFRAN HOLDING CORP
1966
1966-06-16Mortgage assigned — from SASON, ELIZABETH to SCHRAMM, CATHERINE A