Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

2118 2 Avenue · Manhattan · BBL 1016800049 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0.5
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. More recorded distress than 78% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty points per 10 units; this building carries 1.7. In ZIP 10029, 43% of residential buildings hold an A and 12% grade D or F. How grades work

this building
A
C

Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

36 service requests in the last three years. Most common: Noise (23) · Residential Disposal Complaint (3) · Street Condition (1) · Rodent (1) · Graffiti (1) · Drinking (1).

Filed construction activity

$335,413 in permitted construction work filed since 2016 (9 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1920)
NoSix or more residential units (2)
No421-a / J-51 tax benefit on the current tax roll

1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)Ferrari 2nd Ave LLC
Head officerJeremy Tahari
Managing agentRockSolid PM LLC
Last registered2025-07-17

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$522,000 $234,900
2026$557,000 $250,650
2027$587,000 $264,150

The city's market estimate has risen 12% between tax years 2025 and 2027.

Building systems

Heating fuelNO2FUEL

Flood exposure

In the FEMA 1%-annual-chance floodplain (2015 preliminary flood maps) — lenders typically require flood insurance here.

Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway110 St — 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
BusNearest boarding stop: 2 Av / E 111 St — M15 · 450 ft
Citi Bike1 Ave & E 110 St · 700 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 146 Ann M. Short. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

2118 2 Avenue

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

36 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by ROCKSOLID PM LLC — 9 buildings, 110 units. Grades across the portfolio: A6 · C1 · D2. See the whole portfolio

BuildingBoroughUnitsGrade
323 East 108 Street MN33 A
156 East 117 Street MN31 A
515 West 47 Street MN15 A
6 Avenue B MN10 A
347 East 105 Street MN10 A
103 Mosco Street MN3 C
1886 Park Avenue MN3 D
1888 Park Avenue MN3 D
2118 2 Avenue MN2 A

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $1,170,000 on 2022-03-01 (lender: Axos Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2025-01-03AL&R $1,700,000 — from FERRARI 2ND AVE LLC to FIRST BANK $1,700,000
2025-01-03M&CON $1,700,000 — from FERRARI 2ND AVE LLC to FIRST BANK $1,700,000
2022-03-01Mortgage $1,170,000 — from FERRARI 2ND AVE LLC to AXOS BANK $1,170,000
2022-03-01Deed $1,800,000 — from FGP 300 LLC to FERRARI 2ND AVE LLC $1,800,000
2022-02-22Sold for $1,800,000 $1,800,000 $900,000

Ten-year activity

50250
2017
2018
2019
2020
2021
26
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20170062210
2018002237
2019000022
2020001012
2021004015
202280133226
20236170418
202400170421
20250073313
202630130319
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 21 records

DateRecord
2026-10-02311: Noise — Construction
2026-09-30311: Noise — Construction
2026-09-29311: Noise — Construction
2026-09-23311: Noise — Construction
2026-09-16311: Noise — Construction
2026-09-15311: Noise — Construction
2026-09-15311: Noise — Construction
2026-09-01311: Noise — Construction
2026-08-31311: Noise — Construction
2026-07-23311: Noise — Construction
2026-07-17Bedbug filing: 0 infested units
2026-07-05311: Water System — Fire Hydrant Emergency (FHE)
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit Structural — Permit Issued
2026-06-01Job filed: SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection work on property. Including but not limited to repair/repoi
2026-05-23Rodent inspection: Passed
2026-04-29Asbestos abatement: Removal — International Asbestos Removal, Inc.
2026-04-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-02-11Boiler inspection
2025-12-02Bedbug filing: 0 infested units
2025-11-17Rodent inspection: Passed

The full timeline

2026
2026-10-02311: Noise — Construction
2026-09-30311: Noise — Construction
2026-09-29311: Noise — Construction
2026-09-23311: Noise — Construction
2026-09-16311: Noise — Construction
2026-09-15311: Noise — Construction
2026-09-15311: Noise — Construction
2026-09-01311: Noise — Construction
2026-08-31311: Noise — Construction
2026-07-23311: Noise — Construction
2026-07-17Bedbug filing: 0 infested units
2026-07-05311: Water System — Fire Hydrant Emergency (FHE)
2026-06-23Permit General Construction — Permit Issued
2026-06-23Permit Structural — Permit Issued
2026-06-01Job filed: SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection work on property. Including but not limited to repair/repoi$28,972
2026-05-23Rodent inspection: Passed
2026-04-29Asbestos abatement: Removal — International Asbestos Removal, Inc.
2026-04-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-02-11Boiler inspection
2025
2025-12-02Bedbug filing: 0 infested units
2025-11-17Rodent inspection: Passed
2025-10-05311: Homeless Person Assistance — Non-Chronic
2025-07-16Boiler inspection
2025-06-03311: Residential Disposal Complaint — Trash or Recycling Not Secure
2025-05-30311: Illegal Parking — Double Parked Blocking Vehicle
2025-05-15Rodent inspection: Passed
2025-03-17311: Residential Disposal Complaint — Waste Left in Front of Other Residence
2025-03-17311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2025-02-27311: Noise — Noise: Construction Before/After Hours (NM1)
2025-01-03AL&R $1,700,000 — from FERRARI 2ND AVE LLC to FIRST BANK$1,700,000
2025-01-03M&CON $1,700,000 — from FERRARI 2ND AVE LLC to FIRST BANK$1,700,000
2025-01-03Mortgage assigned — from AXOS BANK to FIRST BANK
2024
2024-12-10Bedbug filing: 0 infested units
2024-12-09311: Dirty Condition — Trash
2024-12-08311: Commercial Disposal Complaint — Waste Disposal
2024-11-15Rodent inspection: Passed
2024-10-06311: Noise - Residential — Loud Music/Party
2024-10-06311: Noise - Residential — Loud Music/Party
2024-10-06311: Noise - Residential — Loud Music/Party
2024-10-05311: Drinking — After Hours - Licensed Est
2024-10-05311: Noise - Residential — Loud Music/Party
2024-10-05311: Noise - Residential — Loud Music/Party
2024-10-05311: Noise - Street/Sidewalk — Loud Music/Party
2024-10-05311: Noise - Residential — Loud Music/Party
2024-10-05311: Noise - Residential — Loud Music/Party
2024-06-29311: Noise - Residential — Loud Music/Party
2024-06-28311: Noise - Residential — Loud Music/Party
2024-06-28311: Noise - Residential — Loud Music/Party
2024-05-21Boiler inspection
2024-05-16Rodent inspection: Passed
2024-05-04311: Graffiti — Police Report Not Requested
2024-03-27Rodent inspection: Passed
2024-03-09311: Rodent — Rat Sighting
2023
2023-12-11311: Street Condition — Failed Street Repair
2023-12-04Bedbug filing: 0 infested units
2023-11-24Rodent inspection: Passed
2023-11-05311: Noise - Street/Sidewalk — Loud Talking
2023-10-16Permit Plumbing — Signed-off
2023-10-12Job filed: SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing fou$26,469
2023-10-12Job filed: SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection work on property. Including but not limited to repair/repoi$28,972
2023-10-05Boiler inspection
2023-10-02Permit General Construction — Signed-off
2023-09-27Job filed: Relocate 1 sink, 1 wc, 1 lav, 1 shower, 1 new washer, 1 new dishwasher$6,000
2023-09-11Job filed: Minor partition work in apt 3 with general carpentry, no change to use , bulk or egress$95,000
2023-07-31Eviction executed (3)
2023-07-24311: Derelict Vehicles — Derelict Vehicles
2023-07-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-07-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-09Rodent inspection: Passed
2023-04-18DOB complaint, category ?
2023-01-03Air permit (REGISTRATION), fuel: NO2FUEL
2022
2022-12-15Boiler inspection
2022-12-01Bedbug filing: 0 infested units
2022-10-03311: HEAT/HOT WATER — APARTMENT ONLY
2022-10-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-09-09Permit Mechanical Systems — Permit Issued
2022-09-01Permit Plumbing — Permit Issued
2022-09-01Job filed: INSTALLATION OF A COMMERCIAL EXHAUST HOOD AND DUCTLESS SPLIT AC UNITS ON THE 1ST AND MEZZANINE LEVELS.$26,000
2022-08-30311: Illegal Parking — Blocked Bike Lane
2022-08-19Job filed: PROPOSED PLUMBING FOR BAKERY LOCATED ON THE FIRST FLOOR.$20,000
2022-06-22Rodent inspection: Passed
2022-06-14Permit Plumbing — Signed-off
2022-05-27Permit General Construction — Permit Issued
2022-05-17Job filed: Cap and remove 1 stove, relocate 1 sink, 1 tub, 1 wc, 1 lav , 1 new washer, 1 new dw, 1 new wc, 1 lav, 1 new shower$9,000
2022-04-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-28311: Illegal Parking — Blocked Bike Lane
2022-04-07Job filed: Minor partition work in apt 4 with general carpentry. No change to use, bulk or egress$95,000
2022-03-28311: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-24311: Illegal Parking — Posted Parking Sign Violation
2022-03-20311: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-14311: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-01Mortgage $1,170,000 — from FERRARI 2ND AVE LLC to AXOS BANK$1,170,000
2022-03-01Deed $1,800,000 — from FGP 300 LLC to FERRARI 2ND AVE LLC$1,800,000
2022-02-22Sold for $1,800,000$1,800,000
2021
2021-12-08Boiler inspection
2021-04-06311: GENERAL — CABINET
2021-04-06311: GENERAL — CABINET
2021-04-06Tenant complaint: GENERAL — CABINET
2021-04-06Tenant complaint: GENERAL — CABINET
2020
2020-12-25311: Street Condition — Pothole
2020-05-15Boiler inspection
2019
2019-09-18Boiler inspection
2019-05-14Rodent inspection: Passed
2018
2018-11-30Rodent inspection: Passed
2018-10-01Boiler inspection
2018-03-02311: Noise - Street/Sidewalk — Loud Music/Party
2018-03-02311: Noise - Residential — Loud Music/Party
2018-03-01Deed — from CAPPI, DANTE; CAPPI, CHRISTOPHER to FGP 300 LLC
2018-02-16Deed transfer (nominal price)
2018-02-16Rodent inspection: Passed
2017
2017-10-10311: Noise - Residential — Loud Music/Party
2017-10-07311: Noise - Residential — Loud Music/Party
2017-10-06Boiler inspection
2017-09-30311: Noise - Residential — Loud Music/Party
2017-09-01311: Noise - Street/Sidewalk — Loud Music/Party
2017-07-25311: Noise - Residential — Loud Talking
2017-05-15Deed — from PC2118 LLC to CAPPI, CHRISTOPHER; CAPPI, DANTE
2017-05-02Rodent inspection: Passed
2017-04-07311: Street Condition — Pothole
2017-04-05Deed transfer (nominal price)
2016
2016-12-09FDNY inspection (RISK)
2016-09-02Rodent inspection: Passed
2015
2015-12-10Rodent inspection: Passed
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-08-10311: Unsanitary Pigeon Condition — Pigeon Waste
2015-02-11Rodent inspection: Passed
2014
2014-06-10311: Lead — Lead Kit Request (Residential) (L10)
2013
2013-11-26Rodent inspection: Passed
2013-11-09311: Noise — Noise: Construction Before/After Hours (NM1)
2012
2012-12-21Deed — from CAPPI, PAUL to PC2118 LLC
2012-05-09Rodent inspection: Passed
2012-03-18Tenant complaint: ELECTRIC — LIGHTING
2011
2011-05-16Rodent inspection: Passed
2010
2010-12-15311: Graffiti — Graffiti
2010-12-14Permit EW — ISSUED
2010-11-24Permit PL — ISSUED
2010-09-10Job filed: PROPOSED TO REPLACE EXISTING BOILER/BURNER IN CELLAR. REMOVE OIL TANK IN CELLA R.$13,000
2010-09-10Job filed: PROPOSED TO REPLACE EXISTING BOILER/BURNER IN CELLAR. REMOVE OIL TANK IN CELLA R.$13,000
2010-05-04Rodent inspection: Passed
2009
2009-08-10DOB complaint, category ?
2009-03-31DOB complaint, category ?
2007
2007-12-03Permit EW — ISSUED
2007-12-03Job filed: DEMOLISH AND REBUILD 40 X 5 1/2 FEET OF PARAPET WALL, REPAIR CRACKS, RESET LOOSE BRICKS, RE-POINT AREA W/ FRESH MOTAR AS NEEDED. REPLACE 6 WINOW LINT$11,000
2007-11-21Permit EQ — ISSUED
2007-11-21Job filed: PROPOSED INSTALLATION OF 80 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL33/1991. NO CHANGE IN U
2004
2004-11-15Permit EW — ISSUED
2004-10-04Permit EW — ISSUED
2004-09-17Job filed: Replace of structural members and concrete side walk as per plan. No changing use occupancy, or egress.$20,000
2004-02-13DOB violation LL6291:
2003
2003-12-06ECB Hazardous violation: FAILURE TO MAINTAIN DEFECT IS AT CELLAR CEILING LEVEL SUPPORTING STEELBEAM SUPPORTING CONCRETE SLAB SEVERE DETERIORATING OF STEEL $800
2003-12-05DOB complaint, category ?
1997
1997-03-04DOB complaint, category ?
1996
1996-02-06Permit EW — ISSUED
1996-02-06Permit EW — ISSUED
1994
1994-05-25DOB complaint, category ?
1993
1993-10-27DOB complaint, category ?
1985
1985-10-09Deed — from CAPPI, FRANK; CAPPI, PAUL to CAPPI, PAUL
1968
1968-02-15Mortgage — from CAPPI, FRANK; CAPPI, PAUL to 2118 SECOND AVE CORP

Support this site Back to the building page