The city's published records show little recorded distress here in the last three years. Less recorded distress than 56% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 17. In ZIP 10027, 43% of residential buildings hold an A and
14% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
4 total — 0 class C (immediately hazardous), 2 class B, 2 class A. Oldest open since 2025-09-04.
status snapshot refreshed weekly from HPD records
Patterns
69 heat or hot-water complaints in the last three years (winter 2024–25: 2 · winter 2025–26: 31). Repeated winter clusters suggest a chronic heating problem.
2
’24–25
31
’25–26
No bedbug-infested units reported in the last three years of filings.
$12,500 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
74 service requests in the last three years. Most common: HEAT/HOT WATER (33) · Noise (20) · Illegal Parking (3) · Damaged Tree (3) · Indoor Air Quality (2) · Litter Basket Complaint (2).
Filed construction activity
$1,597,375 in permitted construction work filed since
2016 (12 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2007)
Yes
Six or more residential units (46)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
2130 Adam Clayton Blvd LLC
Head officer
JOHN P MCCARTHY
Managing agent
hubbnyc
Last registered
2025-12-03
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$10,580,000
$4,761,000
2026
$11,248,000
$5,061,600
2027
$11,520,000
$5,184,000
The city's market estimate has risen
9% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 25 YR NO CAP
Building systems
Energy grade (LL33)
D — ENERGY STAR score 43/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
125 St — 2 3 · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: none 125 St — A B C D · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Adam C Powell Blvd / W 128 St — M2 · 250 ft
Citi Bike
Adam Clayton Powell Blvd & W 126 St · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
74 311 service requests from this address in the last three years — 33 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $750,000 on
2011-07-12 (lender: Wells Fargo Bank, N.A.), covering 4 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-08-23
ASSTO $18,800,000 — from 2130 ACP BOULEVARD INVESTORS, LLC to ADAM CLAYTON BLVD LLC
$18,800,000
2023-08-23
Agreement $10,340,000 — from 2130 ADAM CLAYTON BLVD LLC to JPMORGAN CHASE BANK, N.A.
$10,340,000
2015-07-15
Deed $2,880,000 — from HARLEM COMMONWEALTH COUNCIL, INC. to COMMONWEALTH LOCAL DEVELOPMENT CORP.
$2,880,000
2012-11-02
LEAS $22,500,000 — from 2130 GEORGE INVESTORS LLC to 2130 ACP BOULEVARD INVESTORS LLC
$22,500,000
2012-10-22
RETT $490,000 — from 2130 ACPB LLC to 2130 ACP BOULEVARD INVESTORS LLC
$490,000
2011-07-12
Mortgage $850,418 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
$850,418
2011-07-12
Mortgage $750,000 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
$750,000
2011-07-12
Mortgage $1,362,639 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
$1,362,639
2011-07-12
Mortgage $756,095 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
$756,095
2011-07-12
Mortgage $17,887,361 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
$17,887,361
2007-08-01
Mortgage $17,887,361 — from 2130 GEORGE INVESTORS LLC to WACHOVIA BANK,
$17,887,361
2007-08-01
Mortgage $1,362,639 — from 2130 GEORGE INVESTORS LLC to WACHOVIA BANK,
$1,362,639
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
2024
2025
85
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
1
2
8
0
10
21
2018
10
2
13
0
8
33
2019
2
3
4
0
11
20
2020
0
1
18
0
6
25
2021
2
1
76
0
5
84
2022
4
0
16
0
7
27
2023
2
0
11
10
7
30
2024
0
1
13
0
9
23
2025
0
0
27
0
7
34
2026
2
3
78
0
2
85
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Consumer Complaint — Barber Shop, Beauty Salon, or Nail Salon
2026-08-17
311: Noise - Residential — Banging/Pounding
2026-08-17
311: Noise - Residential — Banging/Pounding
2026-08-16
311: Noise - Residential — Banging/Pounding
2026-08-15
311: Noise - Residential — Banging/Pounding
2026-08-14
311: Noise - Residential — Banging/Pounding
2026-08-13
311: Noise - Residential — Banging/Pounding
2026-08-10
311: Noise - Residential — Banging/Pounding
2026-08-02
311: Litter Basket Complaint — Misuse
2026-07-26
311: Noise - Residential — Banging/Pounding
2026-07-14
311: Water System — Fire Hydrant Emergency (FHE)
2026-07-01
311: Litter Basket Complaint — Overflowing
2026-06-15
DOB complaint, category ?
2026-06-12
311: HEAT/HOT WATER — APARTMENT ONLY
2026-06-12
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-06-08
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08
311: Indoor Air Quality — Ventilation
2026-06-08
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08
HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4E, 4th STO
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
311: GENERAL — VENTILATION SYSTEM
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: GENERAL — VENTILATION SYSTEM
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06
311: HEAT/HOT WATER — APARTMENT ONLY
2026-06-06
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-06-06
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-08
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-05-07
FDNY inspection (RISK)
2026-04-27
311: General Construction/Plumbing — Failure To Maintain
2026-04-27
DOB complaint, category ?
2026-04-10
Rodent inspection: Passed
2026-03-31
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-31
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-31
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-31
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-27
311: Noise - Residential — Loud Music/Party
2026-03-17
311: Noise - Residential — Banging/Pounding
2026-03-07
311: Noise - Residential — Loud Music/Party
2026-02-10
Permit General Construction — Signed-off
2026-02-08
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-08
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-06
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-06
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-03
Air permit (REGISTRATION), fuel: NATURALGAS
2026-02-02
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-02
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-31
HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 7D, 7th STORY, 1st APARTMENT
2026-01-31
HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
2026-01-31
HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 7th STORY, 2nd APARTMENT
2026-01-29
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27
311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-18
311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-18
311: Noise - Residential — Loud Music/Party
2026-01-18
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-14
Job filed: Reconstruction repairs in existing accessory parking garage as necessary including walls, floors & ceiling and per plans filed. No change in use, occ
2026-01-05
311: HEAT/HOT WATER — APARTMENT ONLY
showing the 80 most recent
The full timeline
2026
2026-09-17311: Blocked Driveway — No Access
2026-09-02311: Consumer Complaint — Barber Shop, Beauty Salon, or Nail Salon
2026-06-12Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-06-08311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08311: Indoor Air Quality — Ventilation
2026-06-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-08HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4E, 4th STO
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07311: GENERAL — VENTILATION SYSTEM
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: GENERAL — VENTILATION SYSTEM
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06311: HEAT/HOT WATER — APARTMENT ONLY
2026-06-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-06-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-06-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-05-07FDNY inspection (RISK)
2026-04-27311: General Construction/Plumbing — Failure To Maintain
2026-04-27DOB complaint, category ?
2026-04-10Rodent inspection: Passed
2026-03-31311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-31311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-31Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-31Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-31HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 7D, 7th STORY, 1st APARTMENT
2026-01-31HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
2026-01-31HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 7th STORY, 2nd APARTMENT
2026-01-29311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-18Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-14Job filed: Reconstruction repairs in existing accessory parking garage as necessary including walls, floors & ceiling and per plans filed. No change in use, occ$84,375
2026-01-05311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-04311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-02311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025
2025-12-30311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-30311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-04Boiler inspection
2025-11-04Boiler inspection
2025-11-04Boiler inspection
2025-11-04Boiler inspection
2025-10-09Rodent inspection: Passed
2025-09-04HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT
2025-09-04HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4E, 4th
2025-09-03311: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03311: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03311: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03311: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-05-04311: Indoor Air Quality — Other (Explain Below)
2025-04-10Rodent inspection: Passed
2025-01-11311: Illegal Parking — Blocked Bike Lane
2025-01-10311: HEAT/HOT WATER — APARTMENT ONLY
2025-01-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024
2024-12-31Bedbug filing: 0 infested units
2024-12-06311: Water Quality — Taste/Odor, Chlorine (QA1)
2024-11-25Rodent inspection: Passed
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-10-16Rodent inspection: Failed for Other Reason
2024-10-02311: New Tree Request — For One Address
2024-10-01ECB CLASS - 1 violation: FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPEC$12,500
2024-07-03311: Damaged Tree — Entire Tree Has Fallen Down
2024-07-01311: Damaged Tree — Entire Tree Has Fallen Down
2024-06-20311: Damaged Tree — Entire Tree Has Fallen Down
2024-04-17HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-12-06Job filed: Propose exterior and interior renovation for the removal of an existing residential revolving door. Area of work to include new vestibule with new ext$15,000
2023-12-06Job filed: APPLICATION IS FILED FOR A TEMPORARY FENCE$5,000
2023-12-01311: Dead/Dying Tree — Planted More Than 2 Years Ago
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-10-04Rodent inspection: Passed
2023-08-23Agreement — from 2130 ADAM CLAYTON BLVD LLC; COMMONWEALTH LOCAL DEVELOPMENT CORP. to JPMORGAN CHASE BANK, N.A.
2023-08-23ASSTO $18,800,000 — from 2130 ACP BOULEVARD INVESTORS, LLC to ADAM CLAYTON BLVD LLC$18,800,000
2023-08-23Mortgage assigned — from TPG HARLEM CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
2023-08-23Mortgage assigned — from TPG HARLEM CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
2023-08-23Mortgage assigned — from TPG HARLEM CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
2023-08-23Mortgage assigned — from TPG HARLEM CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
2023-08-23Mortgage assigned — from TPG HARLEM CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
2023-08-23Agreement $10,340,000 — from 2130 ADAM CLAYTON BLVD LLC to JPMORGAN CHASE BANK, N.A.$10,340,000
2023-08-23CERT — from COMMONWEALTH LOCAL DEVELOPMENT CORP.
2023-08-23TL&R — from TPG HARLEM CAPITAL LLC to 2130 GEORGE INVESTORS LLC
2022-05-26Permit General Construction — Signed-off
2022-05-17Rodent inspection: Passed
2022-05-15311: Dirty Condition — Trash
2022-05-03Permit Sidewalk Shed — Signed-off
2022-04-28Cooling tower inspection
2022-04-28Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2022-04-08Job filed: Facade restoration as per plans filed herewith. No change in occupancy, use or egress.$450,000
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-08-21Rodent inspection: Passed
2019-04-30DOB violation FISP: CYCLE 8C NRF
2019-04-04Boiler inspection
2019-04-04Boiler inspection
2019-04-04Boiler inspection
2019-04-04Boiler inspection
2019-03-21Permit EW — ISSUED
2019-03-21Permit EW — ISSUED
2019-03-19Rodent inspection: Passed
2019-03-18Elevator permit: To comply with ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code. -$28,848
2019-02-20Facade (LL11) filing, cycle 8: SWARMP
2019-01-23311: HEAT/HOT WATER — ENTIRE BUILDING
2019-01-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-01-22311: HEAT/HOT WATER — ENTIRE BUILDING
2019-01-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018
2018-12-19Bedbug filing: 0 infested units
2018-11-29311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2018-11-19DOB violation E:
2018-11-19DOB violation E:
2018-11-01311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2018-09-19311: HEAT/HOT WATER — APARTMENT ONLY
2018-09-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-09-10Rodent inspection: Passed
2018-08-27311: Street Condition — Pothole
2018-08-27Permit EW — ISSUED
2018-08-08Permit PL — ISSUED
2018-07-26311: Lead — Lead Kit Request (Residential) (L10)
2018-06-27Permit EW — ISSUED
2018-06-27Permit EW — ISSUED
2018-06-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-06-22Job filed: PHENIX SALON SUITES - INTERIOR RENOVATIONS. DEMOLITION AND INSTALLATION OF PARTITIONS, DOORS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION WORK AS P$131,000
2018-06-22Job filed: PHENIX SALON SUITES - MECHANICAL AND PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$401,000
2018-06-22Job filed: PHENIX SALON SUITES - INTERIOR RENOVATIONS. DEMOLITION AND INSTALLATION OF PARTITIONS, DOORS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION WORK AS P$131,000
2018-06-20Cooling tower inspection
2018-06-19Job filed: SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$78,000
2018-06-19Job filed: SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$78,000
2018-06-18311: Water System — Hydrant Leaking (WC1)
2018-06-14Job filed: NEW MANUEL/AUTOMATIC SMOKE/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2018-06-10311: Blocked Driveway — No Access
2018-04-11Rodent inspection: Passed
2018-03-26Rodent inspection: Passed
2018-03-17311: New Tree Request — For One Address
2018-03-17311: New Tree Request — For One Address
2018-03-17311: New Tree Request — For One Address
2018-03-15Boiler inspection
2018-03-15Boiler inspection
2018-03-15Boiler inspection
2018-03-15Boiler inspection
2017
2017-12-29311: Blocked Driveway — Partial Access
2017-11-22311: New Tree Request — For One Address
2017-11-06311: Blocked Driveway — Partial Access
2017-08-30Boiler inspection
2017-08-30Boiler inspection
2017-08-30Boiler inspection
2017-08-30Boiler inspection
2017-08-23311: Dead/Dying Tree — Planted More Than 2 Years Ago
2015-10-17Tenant complaint: WATER LEAK — SLOW LEAK
2015-10-03311: HEAT/HOT WATER — ENTIRE BUILDING
2015-10-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-08-12Permit EW — ISSUED
2015-07-15SMIS — from HARLEM COMMONWEALTH COUNCIL, INC. to COMMONWEALTH LOCAL DEVELOPMENT CORP.
2015-07-15Deed $2,880,000 — from HARLEM COMMONWEALTH COUNCIL, INC. to COMMONWEALTH LOCAL DEVELOPMENT CORP.$2,880,000
2015-04-08Permit PL — ISSUED
2015-04-08Permit EW — ISSUED
2015-04-08Permit EW — ISSUED
2015-04-01Job filed: REPLACE (1) GAS-FIRED DIRECT VENT BOILER WITH (2) GAS-FIRED DIRECT VENT BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2015-04-01Job filed: REPLACE (1) GAS-FIRED DIRECT VENT BOILER WITH (2) GAS-FIRED DIRECT VENT BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2015-01-14311: HEAT/HOT WATER — APARTMENT ONLY
2015-01-14311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-01-11311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-11311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-10311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014
2014-12-16311: Street Condition — Cave-in
2014-12-15Rodent inspection: Passed
2014-12-03Rodent inspection: Passed
2014-07-16Permit PL — ISSUED
2014-06-06Permit EW — ISSUED
2014-06-06Permit EW — ISSUED
2014-05-29Job filed: OFFICE INTERIOR RENOVATION. NO CHANGE OF EGRESS, USE AND OCCUPANCY.$70,400
2014-01-02FDNY inspection (RISK)
2013
2013-10-29DOB violation E:
2013-10-29DOB violation E:
2013-09-20Rodent inspection: Passed
2013-09-20Rodent inspection: Passed
2013-09-20Rodent inspection: Passed
2013-01-10311: Blocked Driveway — Partial Access
2012
2012-11-02AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02LEAS $22,500,000 — from 2130 GEORGE INVESTORS LLC to 2130 ACP BOULEVARD INVESTORS LLC$22,500,000
2012-11-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-11-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to TPG HARLEM CAPITAL LLC
2012-10-25Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK APPROXIMATELY 100 L.F AS PER PLANS. DURING REMEDIAL REPAIR, WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE 2008,C
2012-10-25Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK APPROXIMATELY 100 L.F AS PER PLANS. DURING REMEDIAL REPAIR, WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE 2008,C
2012-10-25Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK APPROXIMATELY 100 L.F AS PER PLANS. DURING REMEDIAL REPAIR, WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE 2008,C
2012-10-25Permit EQ — ISSUED
2012-10-22RETT $490,000 — from 2130 ACPB LLC to 2130 ACP BOULEVARD INVESTORS LLC$490,000
2012-08-28Certificate of occupancy Final
2012-08-06DEED COR — from COMMONWEALTH HOLDING CO., INC to HARLEM COMMONWEALTH COUNCIL, INC
2012-08-01Permit AL — ISSUED
2012-07-24Job filed: FILING HEREWITH PLANS INDICATING THE INSTALLATION OF A MARQUEE. FILED IN CONJUNCTION WITH NB APPLICATION 104693315.$1,000
2012-07-24Job filed: FILING HEREWITH PLANS INDICATING THE INSTALLATION OF A MARQUEE. FILED IN CONJUNCTION WITH NB APPLICATION 104693315.$1,000
2011-08-31311: Damaged Tree — Tree Leaning/Uprooted
2011-07-12Mortgage $850,418 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.$850,418
2011-07-12AL&R — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
2011-07-12AL&R — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
2011-07-12AL&R — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
2011-07-12Mortgage $750,000 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.$750,000
2011-07-12Mortgage $1,362,639 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.$1,362,639
2011-07-12Mortgage $756,095 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.$756,095
2011-07-12Mortgage $17,887,361 — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.$17,887,361
2011-07-12SMIS — from HARLEM COMMONWEALTH COUNCIL, INC. to 2130 GEORGE INVESTORS LLC; WELLS FARGO BANK, N.A.
2011-07-12AL&R — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
2011-07-12AL&R — from 2130 GEORGE INVESTORS LLC to WELLS FARGO BANK, N.A.
2011-06-08Permit EW — ISSUED
2011-05-09Permit EQ — ISSUED
2011-05-05Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH 2008 BUILDI
2011-04-14Rodent inspection: Passed
2011-04-14Rodent inspection: Passed
2011-03-21Job filed: FILING HEREWITH PLANS INDICATING MINOR REPAIRS TO THE FACADE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$28,000
2011-01-19DOB violation E:
2011-01-19DOB violation E:
2010
2010-04-02Rodent inspection: Passed
2010-04-02Rodent inspection: Passed
2010-03-24Rodent inspection: Passed
2009
2009-08-28Permit NB — ISSUED
2009-02-27DOB violation LL1081:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2008
2008-12-22Permit NB — ISSUED
2008-12-22Permit EQ — ISSUED
2008-12-22Permit EW — ISSUED
2008-11-16DOB complaint, category ?
2008-11-15DOB violation C:
2008-10-28DOB complaint, category ?
2008-10-28ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. NOTE: AT THE TIME OF INSPECTION ON ACTIVE CONSTR$1,200
2008-10-28ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING CODE COMPLIANT MANNER. VALVE HANDLE MISSING SCREW AND VALVE CAPS MISSING. NOTE: AT THE TIME OF INSPEC$500
2008-10-28ECB CLASS - 2 violation: SEC.BC3007.1 OPERATION OF AN ELEVATOR W/O A EQUIPMENT USE PERMIT OR A SERVICE EQUIPMENT CERTIFICATE OF COMPLIANCE. NOTE: AT THE TI$500
2008-10-28ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: AT THE TIME OF INSPECTION 2 WORKERS WAS S$2,400
2008-09-19Permit EW — ISSUED
2008-09-19Permit EW — ISSUED
2008-08-25Permit PL — ISSUED
2008-05-07Permit EW — ISSUED
2008-05-02ECB Hazardous violation: 27-1015 NO DESIGN DRAWING FOR SCAFFOLD. NOTED:BLDG UNDER CONSTRUCTION, BLOCK WORK ON 5TH FL IN PROGRESS SCAFFOLD WITH HEIGHT APPR $800
2008-04-24Permit EQ — ISSUED
2008-04-22Permit EW — ISSUED
2008-04-22Permit AL — ISSUED
2008-04-22Permit NB — ISSUED
2008-04-02DOB complaint, category ?
2008-04-02ECB Hazardous violation: NO PERMIT FROM FIRE DEPARTMENT FOR WELDING OR CUTTING OPERATIONS DURING CONSTR OPERATION. NOTED: BLDG TO 5FL WELDING ON STAIR CASE$2,000
2008-03-28Permit EQ — ISSUED
2008-03-26Job filed: INSTALLATION OF A HEAVY DUTY SHED 407'L X 8'14'H DURING NB CONSTRUCTION 104693315. NO CHANGE IN USE EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 A
2008-03-26Job filed: INSTALLATION OF A HEAVY DUTY SHED 407'L X 8'14'H DURING NB CONSTRUCTION 104693315. NO CHANGE IN USE EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 A
2008-03-14ECB Hazardous violation: NO GUARD RAILS. HAZARDOUS. NOTED: NO GUARD RAILS THROUGHOUT BLDG, 1-3 FLOORS CREATING A HAZARDOUS CONDITION. GUARD RAILS MISSING A
2008-03-14ECB Hazardous violation: HORIZONTAL SAFETY NETTING NOT PROVIDED INSUFFICIENT CONTAINERS PROVIDED FOR THE STORABLE OF GARBAGE AND DEBRIS NOTED CONSTRUCTION
2008-03-14ECB Hazardous violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. NOTED: CONSTRUCTION DEBRIS & TRASH WAS OBSERVED THROUGHOUT CONSTRUCTION SITE AT TIME OF
2008-03-11DOB complaint, category ?
2008-01-18Permit EQ — ISSUED
2008-01-14Job filed: INSTALLATION OF SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION #104693315. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-01-14Job filed: INSTALLATION OF SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION #104693315. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007
2007-12-21Permit NB — ISSUED
2007-12-21Permit EQ — ISSUED
2007-12-20Permit AL — ISSUED
2007-12-14Job filed: THIS APPLICATION IS FILED TO DO SHORING IN CONJUNCTION WITH DOB JOB NO. 104693315.$20,000
2007-11-05DOB complaint, category ?
2007-11-03DOB complaint, category ?
2007-11-03ECB Hazardous violation: FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION NOTED: AT EXPOSURE #2 CREATED A SHEAR CUT APPROX. 10' DEEP AND 40' LONG WITH $1,000
2007-11-03DOB violation C:
2007-09-25DOB complaint, category ?
2007-09-25ECB Hazardous violation: FAILURE TO PROVIDE ADEQUATE PROTECTION FOR SIDEWALKS & WALKWAYS DURINGCONSTRUCTION OPERATIONS:NOTED:AT WEST SIDE OF CONSTRUCTION S
2007-08-27Permit EW — ISSUED
2007-08-27Permit EW — ISSUED
2007-08-27Permit EW — ISSUED
2007-08-27Permit PL — ISSUED
2007-08-24Permit EQ — ISSUED
2007-08-20Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 125' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2007-08-01Mortgage $17,887,361 — from 2130 GEORGE INVESTORS LLC to WACHOVIA BANK,$17,887,361
2007-08-01Mortgage $1,362,639 — from 2130 GEORGE INVESTORS LLC to WACHOVIA BANK,$1,362,639
2007-08-01AL&R — from 2130 GEORGE INVESTORS LLC to WACHOVIA BANK,
2007-08-01AL&R — from 2130 GEORGE INVESTORS LLC to WACHOVIA BANK,
2007-05-29Job filed: FILING HEREWITH PLANS INDICATING FIRE PROTECTION PLANS. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. ALL FEES PAID UNDER NEW BUILDING APPLICATI$100
2007-05-23Permit NB — ISSUED
2007-05-23Permit EQ — ISSUED
2007-05-21Job filed: FILING HEREWITH PLANS INDICATING THE NEWINSTALLATION OF A FIRE ALARM SY STEM. FILED IN CONJUNCTION WITH NEWBUILDING APPLICATION 104693315. ALL FEES $100
2007-05-21Job filed: Filing herewith plans indication plumbing, mechanical, and boiler installations. Filed in conjunction with new building application. All fees paid und$300
2007-05-21Job filed: Filing herewith plans indicating the installation of sprinkler and standpipe system. Filed in conjuction with New Building application. All fees paid $200
2007-05-21Job filed: FILING HEREWITH PLANS INDICATING THE NEWINSTALLATION OF A FIRE ALARM SY STEM. FILED IN CONJUNCTION WITH NEWBUILDING APPLICATION 104693315. ALL FEES $100
2007-05-18Job filed: NB
2007-05-18Job filed: NB
2007-05-18Job filed: NB
2007-04-19ZONE — from 2130 GEORGE INVESTORS LLC
2007-04-19CERT — from FIDELITY NATIONAL TITLE INSURANCE COMPAN
2007-04-05Job filed: Filing herewith plans for Builders Pavement Plan Checklist in lieu of plans. Filed in conjunction with New Building application.
2006
2006-08-03MLEA — from HARLEM COMMONWEALTH COUNCIL, INC. to 2130 GEORGE INVESTORS LLC
1974
1974-12-06Deed — from 2130-7TH AVE REALTYCORP to COMMONWEALTH HOLDINGCO