A modest record — below the level that usually signals systemic problems. More recorded distress than 67% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 36.8. In ZIP 11249, 60% of residential buildings hold an A and
7% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
3 total — 2 class C (immediately hazardous), 0 class B, 1 class A. Oldest open since 2023-05-18.
status snapshot refreshed weekly from HPD records
Patterns
8 heat or hot-water complaints in the last three years (winter 2025–26: 8).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
24 service requests in the last three years. Most common: Noise (5) · Abandoned Vehicle (5) · Missed Collection (3) · Illegal Parking (2) · HEAT/HOT WATER (2) · Illegal Dumping (2).
Filed construction activity
$729,592 in permitted construction work filed since
2016 (17 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2015)
Yes
Six or more residential units (19)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
188 PARTNERS, LLC
Head officer
CATHERINE YU
Managing agent
YUCO MANAGEMENT INC
Last registered
2025-09-12
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$386,044
$173,720
2026
$3,522,078
$1,584,935
2027
$3,844,078
$1,729,835
The city's market estimate has risen
896% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $658,789 a year
($28.54 per sq ft), operating expenses $197,590
($8.56 per sq ft), net operating income $461,198. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2021 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Marcy Av — J M Z · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full Bedford Av — L · 0.5 mi straight-line (about a 12-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Bedford Av / S 4 St — B62 · 100 ft
Citi Bike
S 3 St & Bedford Ave · 200 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
24 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT
2025-12-12
HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2025-12-12
HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2025-12-12
HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT AP
2025-12-09
Tenant complaint: PLUMBING — RADIATOR
2025-12-09
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-09
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-09
311: PLUMBING — RADIATOR
2025-12-06
HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2025-12-06
HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2025-12-06
HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT
2025-12-12HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT
2025-12-12HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2025-12-12HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2025-12-12HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT AP
2025-12-09Tenant complaint: PLUMBING — RADIATOR
2025-12-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-09311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-09311: PLUMBING — RADIATOR
2025-12-06HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2025-12-06HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2025-12-06HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT
2025-12-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-28HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM N
2025-01-28HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FRO
2025-01-28HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY,
2025-01-28HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION AT CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st A
2025-01-28HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM S
2025-01-28HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY,
2025-01-21Boiler inspection — defects found
2024
2024-12-12Bedbug filing: 0 infested units
2024-12-11311: Noise — Noise, Barking Dog (NR5)
2024-10-08311: Abandoned Vehicle — With License Plate
2024-10-06311: Abandoned Vehicle — With License Plate
2024-10-03311: Abandoned Vehicle — With License Plate
2024-10-02311: Abandoned Vehicle — With License Plate
2024-10-02311: Abandoned Vehicle — With License Plate
2024-09-05Job filed: FILING FOR INTERIOR TENANT FIT-OUT FOR NEW FOOD RETAIL STORE. INSTALLATION OF NEW ENTRANCE SLIDING DOORS AND VESTIBULE. PROPOSED WORK DOES NOT CHANGE $140,000
2024-08-28311: Illegal Parking — Unauthorized Bus Layover
2023-05-18HPD class A: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DRAWER AT BASE CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 2D, 2nd
2023-05-01Boiler inspection
2023-04-25311: Disorderly Youth — Playing in Unsuitable Place
2023-02-22311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-22HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM ALLOWABLE TEMPERATURE OF 130 DEGREES IN THE EN
2022
2022-12-30311: Outdoor Dining — Site Setup Condition
2022-12-28Bedbug filing: 0 infested units
2022-12-19Rodent inspection: Failed for Rat Activity
2022-09-06Boiler inspection
2022-08-11311: Food Establishment — Letter Grading
2022-08-10311: Illegal Dumping — Removal Request
2022-08-01311: Food Poisoning — 1 or 2
2022-05-25Permit Structural — Signed-off
2022-05-24Permit Mechanical Systems — Signed-off
2022-05-05FDNY inspection (RISK)
2022-04-19311: HEAT/HOT WATER — APARTMENT ONLY
2022-04-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-03-07Bedbug filing: 0 infested units
2022-02-01DOB complaint, category ?
2022-01-31Job filed: Filing sprinkler work for retail space fitout. No change in use, egress or occupancy.$15,050
2022-01-19Job filed: Filing mechanical systems work for kitchen exhaust and refrigeration equipment for retail space fit-out. Existing HVAC for comfort cooling and ventila$84,000
2022-01-17311: Noise - Residential — Loud Talking
2022-01-17311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2022-01-13Permit Sprinklers — Signed-off
2021
2021-12-21Boiler inspection
2021-11-23Permit General Construction — Signed-off
2021-11-22Job filed: Filing structural work for renovation on the 1st floor and dunnage framing work for mechanical unit on roof. Structural integrity of jobsite will not $20,020
2021-11-17Job filed: Filing plumbing work for retail space fitout. No change in use, egress or occupancy.$43,050
2021-11-15Job filed: Propose to erect non-illuminated business accessory awning at exterior wall as per plan. No change in use, egress or occupancy. Wording: 356$17,750
2021-11-15Permit Sign — Signed-off
2021-11-15Job filed: Propose to install illuminated, non-flashing accessory business sign. Wording: Jubilee MarketPlace$1,872
2021-09-15Job filed: Filing plumbing work for retail space fitout. No change in use, egress or occupancy.$43,050
2021-09-07Permit General Construction — Signed-off
2021-07-27Job filed: Filing plumbing work for retail space fitout. No change in use, egress or occupancy.$43,050
2021-07-20311: New Tree Request — For One Address
2021-05-25Permit General Construction — Signed-off
2021-05-10Job filed: FILING FOR INTERIOR TENANT FIT-OUT FOR NEW FOOD RETAIL STORE. INSTALLATION OF NEW ENTRANCE SLIDING DOORS AND VESTIBULE. PROPOSED WORK DOES NOT CHANGE $140,000
2021-04-26HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY
2021-04-08FDNY inspection (RISK)
2021-03-29DOB violation E:
2021-03-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-03-11311: HEAT/HOT WATER — APARTMENT ONLY
2021-02-14HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MIXING VALVE AT BATHTUB FAUCET IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd
2021-02-14HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT BUILDING ENTRANCE DOOR , 1st STORY
2021-02-14HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DRAWERS AT COUNTER TOPS AT WEST IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd
2021-02-14HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOTWATER
2021-02-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-02-10311: HEAT/HOT WATER — APARTMENT ONLY
2021-01-29Tenant complaint: DOOR/WINDOW — DOOR
2021-01-29311: DOOR/WINDOW — DOOR
2021-01-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT AP
2021-01-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE THERMOSTAT IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4B, 4th STORY, 1st A
2021-01-26HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCAT
2021-01-26HPD class B: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTM
2021-01-26HPD class A: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT
2021-01-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTME
2021-01-23311: HEAT/HOT WATER — APARTMENT ONLY
2021-01-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-01-23HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2021-01-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-04311: HEAT/HOT WATER — ENTIRE BUILDING
2020
2020-12-21Bedbug filing: 0 infested units
2020-12-07Boiler inspection
2020-11-23Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2020-11-23311: GENERAL — BELL/BUZZER/INTERCOM
2020-11-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-19311: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-17311: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-01311: HEAT/HOT WATER — APARTMENT ONLY
2020-11-01Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-10-14311: Sidewalk Condition — Cellar Door Open/Unprotected
2020-09-15Elevator permit: Provide New Door Monitor System$7,893
2020-07-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-10HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORT
2020-07-10HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR
2020-07-08311: HEAT/HOT WATER — APARTMENT ONLY
2020-07-08311: HEAT/HOT WATER — APARTMENT ONLY
2020-07-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-07-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-03-10DOB violation E:
2020-02-28Bedbug filing: 0 infested units
2020-01-21311: Graffiti — Graffiti
2020-01-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-10-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-09-23DOB complaint, category ?
2019-08-14DOB violation C: DAMAGE OBSERVED TO HAVE BEEN SUSTAINED AT 117 SOUTH 4TH STREET TO ROOF DUE TO STUCCO VANEER AT ADJACENT PROERTY FALLING TO ROOF AT
2019-08-14DOB complaint, category ?
2019-08-07311: Elevator — Elevator - Single Device On Property/No Alternate Service
2019-08-07ECB CLASS - 1 violation: 97-X-10 ENTIRE DEVICE INOPERATIE REMEDY RESTORE TO SERVICE
2019-08-07DOB complaint, category ?
2019-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-07-29DOB complaint, category ?
2019-05-31Permit PL — ISSUED
2019-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-04-24Permit EW — ISSUED
2019-04-24Permit EW — ISSUED
2019-01-16Job filed: DENTAL OFFICE RENOVATION AS PER PLANS FILED HEREWITH. INTERIOR RENOVATIONS , INSTALLATION OF PL FIXTURES, AND AC UNITS , NO CHANGE IN USE, EGRESS OR O$161,700
2019-01-07Bedbug filing: 1 infested units
2019-01-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-01-05311: HEAT/HOT WATER — APARTMENT ONLY
2018
2018-12-11HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2018-12-11HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2018-12-11HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2018-11-15311: Graffiti — Graffiti
2018-10-23REL — from CITY OF NEW YORK (THE), ACTING BY to HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS, LLC
2018-08-17311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-08-14311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-08-06Agreement $7,539,992 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$7,539,992
2018-08-06Mortgage assigned — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to CITY OF NEW YORK (THE)
2018-08-06Mortgage assigned — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to CITY OF NEW YORK (THE)
2018-08-06Mortgage assigned — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to CITY OF NEW YORK (THE)
2018-08-06Mortgage $6,623,883 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$6,623,883
2018-08-06Agreement $7,539,992 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$7,539,992
2018-08-06SAGE — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY to 188 PARTNERS LLC
2018-08-06SAGE — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to 188 PARTNERS LLC; HP YUCO HOUSING DEVELOPMENT FUND COMPANY
2018-08-06CERT — from CITY OF NEW YORK (THE) to HP YUCO HOUSING DEVELOPMENT FUND COMPANY
2018-08-06Agreement $2,000,000 — from 188 PARTNERS LLC; HP YUCO HOUSING DEVELOPMENT FUND COMPANY to CITY OF NEW YORK (THE)$2,000,000
2018-08-06SAGE — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to 188 PARTNERS LLC; HP YUCO HOUSING DEVELOPMENT FUND COMPANY
2018-08-06Agreement $1,500,000 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$1,500,000
2018-08-06Mortgage $916,109 — from 188 PARTNERS LLC to CITY OF NEW YORK (THE)$916,109
2018-08-06Deed $1,650,000 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY to 188 PARTNERS REALTY LLC$1,650,000
2018-08-06Agreement $7,539,992 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$7,539,992
2018-08-06PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to HP YUCO HOUSING DEVELOPMENT COMPANY INC; 188 PARTNERS LLC
2018-08-06SAGE — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY to 188 PARTNERS LLC
2018-08-06CERT — from CITY OF NEW YORK (THE) to HP YUCO HOUSING DEVELOPMENT FUND COMPANY
2018-08-06CERT — from CITY OF NEW YORK (THE) to HP YUCO HOUSING DEVELOPMENT FUND COMPANY
2018-08-06Agreement $2,000,000 — from 188 PARTNERS LLC; HP YUCO HOUSING DEVELOPMENT FUND COMPANY to CITY OF NEW YORK (THE)$2,000,000
2018-08-06Agreement $1,500,000 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$1,500,000
2018-08-06Agreement $1,445,000 — from 188 PARTNERS LLC; HP YUCO HOUSING DEVELOPMENT FUND COMPANY to CITY OF NEW YORK (THE)$1,445,000
2018-08-06Mortgage assigned — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to CITY OF NEW YORK (THE)
2018-08-06Mortgage assigned — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to CITY OF NEW YORK (THE)
2018-08-06Mortgage assigned — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to CITY OF NEW YORK (THE)
2018-08-06Mortgage $6,623,883 — from HP YUCO HOUSING DEVELOPMENT FUND COMPANY; 188 PARTNERS LLC to CITY OF NEW YORK (THE)$6,623,883
2018-08-06Agreement $1,445,000 — from 188 PARTNERS LLC; HP YUCO HOUSING DEVELOPMENT FUND COMPANY to CITY OF NEW YORK (THE)$1,445,000
2018-08-06SMIS — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR; CITY OF NEW YORK (THE)
2018-05-23Sold for $1,650,000$1,650,000
2018-05-02FDNY inspection (RISK)
2018-03-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-08CDEC — from HP YUCO HOUSING DEVELPMENT FUND COMPANY,; 188 PARTNERS, LLC
2018-03-08CDEC — from HP YUCO HOUSING DEVELPMENT FUND COMPANY,; 188 PARTNERS, LLC
2018-03-08MAPS — from WILLIAMSBURG APARTMENTS CONDOMINIUM
2018-03-08CDEC — from HP YUCO HOUSING DEVELPMENT FUND COMPANY,; 188 PARTNERS, LLC
2018-03-08MAPS — from WILLIAMSBURG APARTMENTS CONDOMINIUM
2018-03-08MAPS — from WILLIAMSBURG APARTMENTS CONDOMINIUM
2018-02-21Certificate of occupancy Temporary
2018-02-01Job filed: SC
2018-01-16Certificate of occupancy Temporary
2018-01-10Certificate of occupancy Temporary
2018-01-08DOB complaint, category ?
2017
2017-11-08FDNY inspection (CONSTR)
2017-11-08Certificate of occupancy Temporary
2017-10-25DOB complaint, category ?
2017-10-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-10-05DOB complaint, category ?
2017-10-04FDNY inspection (CONSTR)
2017-08-30FDNY inspection (CONSTR)
2017-08-25311: Sustainability Enforcement — Sustainability Enforcement Work Order
2017-08-25DOB complaint, category ?
2017-07-28FDNY inspection (CONSTR)
2017-07-03Permit NB — ISSUED
2017-06-23Permit EW — ISSUED
2017-06-22FDNY inspection (CONSTR)
2017-06-15Job filed: INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2017-06-15Job filed: INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2017-05-31DOB complaint, category ?
2017-05-16FDNY inspection (CONSTR)
2017-05-15Permit EQ — ISSUED
2017-05-15Permit NB — ISSUED
2017-05-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-04-25DOB complaint, category ?
2017-04-25DOB complaint, category ?
2017-04-25DOB complaint, category ?
2017-04-15311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-04-15DOB complaint, category ?
2017-04-12FDNY inspection (CONSTR)
2017-04-11FDNY inspection (CONSTR)
2017-04-11Permit PL — ISSUED
2017-03-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-03-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-02-28FDNY inspection (CONSTR)
2017-01-24FDNY inspection (CONSTR)
2017-01-04311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2017-01-04DOB complaint, category ?
2017-01-03ECB CLASS - 1 violation: BC3301.7 NO DESIGN DRAWING. UPON INSPECTION OF 5STORY STRUCTURE OBSERVED THAT THER EWERE TEMP WOOD PLATFORMS ERECTED IN THE ELEVA
2017-01-03ECB CLASS - 1 violation: SEC. 3309.10 PROTECTION ADJACENT PROPERTY NO FIRE ESCAPE PROTECTION BLDG REAR. NO ROOF PROTECTION TO ADJACENT PROPERTY AT 3XP#4,CR$1,600
2016
2016-12-17ECB CLASS - 1 violation: SEC. 3308.3 VERTICAL SAFETY NETTING NOT PER CODE,DAMAGED OR INADEQUATE. NOTED: AT TIME OF INSPECTION,I OBSERVED VERTICAL SAFETY NE$1,600
2016-12-17ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO TOE BOARDS. NOTED: AT TIME OF INSPECTION,I OB$1,000
2016-12-15DOB complaint, category ?
2016-12-12FDNY inspection (CONSTR)
2016-12-08311: General Construction/Plumbing — Adjacent Buildings Not Protected
2016-12-08DOB complaint, category ?
2016-12-08DOB complaint, category ?
2016-11-25311: Emergency Response Team (ERT) — After Hours Work - Illegal
2016-11-25DOB complaint, category ?
2016-11-18Permit EQ — ISSUED
2016-11-18Permit EQ — ISSUED
2016-11-03FDNY inspection (CONSTR)
2016-09-22Permit EW — ISSUED
2016-09-15Job filed: A2$1,000
2016-09-15Job filed: A2$1,000
2016-09-15Job filed: A2$1,000
2016-08-30DOB complaint, category ?
2016-08-24FDNY inspection (CONSTR)
2016-06-13FDNY inspection (CONSTR)
2016-06-01DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-06-01DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-06-01DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-05-16FDNY inspection (CONSTR)
2016-05-12Permit NB — ISSUED
2016-05-12Permit EQ — ISSUED
2016-04-21FDNY inspection (CONSTR)
2016-04-18DOB complaint, category ?
2016-04-18DOB complaint, category ?
2016-04-12Permit PL — ISSUED
2016-03-11311: Construction Safety Enforcement — Excavation Tracking Complaint
2016-03-11DOB complaint, category ?
2016-03-09ECB CLASS - 2 violation: SEC. 3301.3 DESIGNATED SUPERINTENDENT HAS NOT ADEQUATELY DISCHARGED HIS RESPONSIBILITIES IN THAT THE CONSTRUCTION WORK HAS NOT BEE
2016-03-09ECB CLASS - 1 violation: SEC. 1704.1.2 THE PROFESSIONAL ENGINEER RESPONSIBLE FOR CONTROLLED/SPECIAL INSPECTION HAS NOT RESPONTED AN UNSAFE CONDITION TO THE$1,630
2016-03-09ECB CLASS - 1 violation: FAILURE TO IMMEDIATELY NOTIFY THE DEPT OF AN ACCIDENT AT THE CONSTRUCTION. THE RESPONDENT FAILED TO NOTIFIED THE DEPT OF THE DAMAG$2,500
2016-03-09ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. THE RESPONDENT FAILED TO IMPLEMENTS THE NECESSARY$10,000
2016-03-09ECB CLASS - 1 violation: SEC. 3309.4 FAILURE TO PRESERVE & PROTECT ADJOINING STRUCTURE AFFECTEDBY EXCAVATION OPERATIONS. THE RESPONDENT FAILED TO ADEQUATEL$1,600
2016-03-09ECB CLASS - 2 violation: SEC. 1704.9.1 FAILURE TO ADEQUATELY PERFORM SPECIAL INSPECTION FOR UNDERPINNING. THE RESPONDENT HAS FAILED TO ENSURE THAT UNDERPIN$400
2016-03-09ECB CLASS - 2 violation: SEC. 1814.1.1 FAILURE TO TAKE ADEQUATE MEASURES TO PREVENT THE VERTICAL HAD(CATERAL)DISPLACEMENT OF ADJOINING STRUCTURES BEING UND$400
2016-03-09ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. THE RESPONDENT FAILED TO INSTALL THE(CATERAL)BRA
2016-01-27FDNY inspection (CONSTR)
2016-01-07DOB complaint, category ?
2015
2015-12-03DOB complaint, category ?
2015-12-03DOB complaint, category ?
2015-12-02Permit EQ — ISSUED
2015-12-02Permit EQ — ISSUED
2015-12-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-12-01Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-12-01Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-12-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-11-25FDNY inspection (CONSTR)
2015-09-03FDNY inspection (CONSTR)
2015-06-08FDNY inspection (CONSTR)
2015-05-20Permit EW — ISSUED
2015-05-18Permit NB — ISSUED
2015-05-18Permit EQ — ISSUED
2015-05-15FDNY inspection (CONSTR)
2015-04-27DOB complaint, category ?
2015-04-15FDNY inspection (CONSTR)
2015-03-19FDNY inspection (CONSTR)
2015-02-11Permit PL — ISSUED
2014
2014-07-24Permit EW — ISSUED
2014-07-23Job filed: FILING HEREWITH SHEETING,SHORING, EXACAVATION, UNDERPINNING,EARTHWORK AND FOOTING & FOUNDATION IN CONJUCTION WITH NEW BUILDING #320262728.$1,000
2014-06-25Permit NB — ISSUED
2014-06-25Permit EQ — ISSUED
2014-06-24Permit EQ — ISSUED
2014-06-20Job filed: INSTALLATION OF 61 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING CONSTRUCTION FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMP
2014-06-08Job filed: FILING HEREWITH INSTALLATION OF A FENCE IN CONJUCTION WITH THE NEW BUILDING # 320262728
2011
2011-07-13DOB complaint, category ?
2011-07-09ECB CLASS - 2 violation: WORK W/O PERMIT NOTE BACKHOE EXCAVATOR ON SITE W/ RECENT EXCAVATION STARTED W/O PERMITS FULL SWO PURSUANT TO 28-207.2 & POSTED AT
2011-06-27DOB complaint, category ?
2011-02-03Job filed: FILING HEREWITH BUILDER'S PAVEMENT PLAN IN CONJUCTION WITH NEW BUILDING
2011-02-03Job filed: INSTALLATION FO SPRINKLER SYSTEM IN CONJUCTION WITH NEW BUILDING. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2011-02-03Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETETION & SPRINKLER FIRE ALARM SYSTEM$1,000
2011-02-02Job filed: FILING HEREWITH MECHANICAL PLUMBING WORK AND BOILER INSTALLATION IN CONJUNCTIO N WITH NEW BUILDING
2011-02-02Job filed: FILING HEREWITH MECHANICAL PLUMBING WORK AND BOILER INSTALLATION IN CONJUNCTIO N WITH NEW BUILDING
2011-02-02Job filed: NEW BUILDING
2011-02-02Job filed: FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING.