The city's published records show little recorded distress here in the last three years. Less recorded distress than 82% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 2.5. In ZIP 11101, 70% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
21 service requests in the last three years. Most common: Illegal Parking (8) · Street Condition (2) · Illegal Dumping (2) · Homeless Person Assistance (1) · New Tree Request (1) · Missed Collection (1).
Filed construction activity
$600,400 in permitted construction work filed since
2016 (18 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2017)
Yes
Six or more residential units (12)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
Flow House LIC Condominium Inc.
Head officer
George Jiang
Managing agent
Makon Management LLC
Last registered
2025-11-28
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$710,821
$319,869
2026
$167,963
$75,584
2027
$304,212
$136,895
The city's market estimate has fallen
57% between tax years 2025 and 2027.
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $364,382 a year
($38.00 per sq ft), operating expenses $145,753
($15.20 per sq ft), net operating income $218,629. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Queensboro Plaza — 7 N W · 500 ft straight-line (about a 2-minute walk) · station accessibility: full Queens Plaza — E F R · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 23 St / Queens Plaza South — Q66 Q69 · 550 ft
Citi Bike
27 St & Hunter St · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
21 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Mortgage assigned — from JIANG, NAN; CITIBANK to CITI GSM PORTFOLIO LLC
2025-12-20
Bedbug filing: 0 infested units
2025-11-21
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
The full timeline
2026
2026-09-04311: General Construction/Plumbing — Failure To Maintain
2026-01-08Mortgage assigned — from JIANG, NAN; CITIBANK to CITI GSM PORTFOLIO LLC
2025
2025-12-20Bedbug filing: 0 infested units
2025-11-21HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-10-10311: Noise — Noise: Alarms (NR3)
2025-06-02Mortgage satisfied — from BEY, RAMZI M to JPMORGAN CHASE BANK, N.A.
2025-05-29PAT — from ZHANG, EDMOND to THE CRESCENT CONDOMINIUM
2025-05-29Mortgage $247,000 — from ZHANG, EDMOND to MERS$247,000
2025-05-29Deed $860,000 — from MARDAM BEY, RAMZI to ZHANG, EDMOND$860,000
2025-05-13Sold for $860,000$860,000
2025-03-18Restaurant inspection: CHEF PAPA VIETNAMESE KITCHEN — grade A
2025-02-28311: Illegal Parking — Blocked Sidewalk
2024
2024-12-04Bedbug filing: 0 infested units
2024-09-27Restaurant inspection: CHEF PAPA VIETNAMESE KITCHEN
2024-07-08311: Illegal Parking — Parking Permit Improper Use
2024-06-11311: Illegal Parking — Parking Permit Improper Use
2024-06-04311: Illegal Parking — Parking Permit Improper Use
2022-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-18Permit Mechanical Systems — Permit Issued
2022-09-28Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2022-09-20Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2022-09-12Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2022-08-26Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2022-08-08Job filed: MECHANICAL WORK ON CELLAR, 1ST FLOOR AND ROOF COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$10,000
2022-08-06311: New Tree Request — For One Address
2022-08-05Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2022-08-05Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR. PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION.$120,000
2022-07-12311: Abandoned Vehicle — With License Plate
2022-05-23PAT — from CRESCENT PROPERTY 88 LLC to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2022-05-23Deed $1,752,364 — from 888 CRESCENT LLC to CRESCENT PROPERTY 88 LLC$1,752,364
2022-04-29Sold for $1,752,364$1,752,364
2022-04-04Permit Plumbing — Signed-off
2022-03-25Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2022-03-24PAT — from WU, YA DONG to WU, YI FAN
2022-03-24Deed $726,570 — from 888 CRESCENT LLC to WU, YA DONG$726,570
2022-03-24PAT — from WU, YA DONG to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2022-03-24PAT — from WU, YI FAN to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2022-03-24Deed $726,570 — from 888 CRESCENT LLC to WU, YI FAN$726,570
2022-03-03Permit General Construction — Signed-off
2022-02-18Sold for $726,570$726,570
2022-02-18Sold for $726,570$726,570
2022-02-09PREL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2022-02-09PREL — from GOLDEN BRIDGE FUNDING LLC; GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-02-09REL — from GOLDEN BRIDGE FUNDING LLC; GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-08ADEC — from 888 CRESCENT LLC
2022-02-03PAT — from CHEN, STEPHEN XUANYI to BOARD OF MANAGERS OF FLOW HOUSE CONDOMIN
2022-02-03Mortgage $640,000 — from CHEN, STEPHEN XUANYI to U.S. BANK NATIONAL ASSOCIATION$640,000
2022-02-03Deed $814,600 — from 888 CRESCENT LLC to CHEN, STEPHEN XUANYI$814,600
2022-02-01PREL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-02-01PREL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-02-01REL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-01-24Bedbug filing: 0 infested units
2022-01-18Sold for $814,600$814,600
2022-01-17Permit General Construction — Permit Issued
2022-01-14PREL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-01-14TL&R — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-01-14PREL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2022-01-13Permit Plumbing — Permit Issued
2021
2021-12-29Mortgage $588,000 — from NGO, HOANG MINH to JPMORGAN CHASE BANK, N.A.$588,000
2021-12-29PREL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2021-12-29PREL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2021-12-29Deed $735,000 — from 888 CRESCENT LLC to NGO, HOANG MINH$735,000
2021-12-29REL — from GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2021-12-29PAT — from NGO, HOANG MINH to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2021-12-23REL — from GOLDEN BRIDGE FUNDING LLC; GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2021-12-23PREL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2021-12-23PREL — from GOLDEN BRIDGE FUNDING LLC; GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2021-12-22PREL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2021-12-22REL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2021-12-22PREL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2021-12-13Deed $819,691 — from 888 CRESCENT LLC to LIN, ZHOU; LI, RAN$819,691
2021-12-13Mortgage $483,000 — from LIN, ZHOU; LI, RAN to MERS$483,000
2021-12-13PAT — from LI, RAN; LIN, ZHOU to THE FLOW HOUSE CONDOMINIUM
2021-12-08PREL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2021-12-08REL — from GOLDEN BRIDGE FUNDING LLC; GOLDEN BRIDGE LLC to 888 CRESCENT LLC
2021-12-08PREL — from GOLDEN BRIDGE LLC; GOLDEN BRIDGE FUNDING LLC to 888 CRESCENT LLC
2021-12-08PAT — from BEY, RAMZI MARDAM to YOUNG, LOTUS
2021-12-08PAT — from BEY, RAMZI MARDAM to BRD OF MGRS OF THE FLOW HOUSE CONDO
2021-12-08Mortgage $783,750 — from BEY, RAMZI MARDAM to JPMORGAN CHASE BANK, N.A.$783,750
2021-12-08Deed $840,056 — from 888 CRESCENT LLC to BEY, RAMZI MARDAM$840,056
2021-11-26Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR ANDCELLAR. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$110,400
2021-11-26Job filed: PLUMBING WORK ON CELLAR & 1ST FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$29,000
2021-11-24Job filed: MECHANICAL WORK ON CELLAR, 1ST FLOOR AND ROOF COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$10,000
2021-11-22Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR. PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION.$120,000
2021-11-22Job filed: PLUMBING WORK IN CELLAR AND 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$20,000
2021-10-27Mortgage $626,000 — from JIA, XIAOYIN to JPMORGAN CHASE BANK$626,000
2021-10-27PAT — from JIA, XIAOYIN to FLOW HOUSE CONDOMINIUM
2021-10-27Deed $782,500 — from 888 CRESCENT LLC to JIA, XIAOYIN$782,500
2021-10-19Mortgage $840,000 — from JIANG, SHERRY to INDUSTRIAL AND COMMERCIAL BANK OF CHINA $840,000
2021-10-19PAT — from JIANG, SHERRY to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2021-10-19Deed $1,221,900 — from 888 CRESCENT LLC to JIANG, SHERRY$1,221,900
2021-10-08PAT — from YU, WENQING to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2021-09-07Mortgage $618,000 — from JIANG, NAN to CITIBANK, N.A.$618,000
2021-09-07PAT — from JIANG, NAN to BRD OF MANAGERS OF THE FLOW HOUSE CONDOM
2021-09-07Deed $825,000 — from 888 CRESCENT LLC to JIANG, NAN$825,000
2021-09-07Certificate of occupancy Final
2021-09-07Certificate of occupancy Final
2021-08-19Deed $795,000 — from 888 CRESCENT LLC to YU, WENQING$795,000
2021-08-19Mortgage $596,250 — from YU, WENQING to JPMORGAN CHASE BANK NA$596,250
2021-08-18Mortgage $530,000 — from HYMAN, AMANDA to JPMORGAN CHASE BANK, N.A.$530,000
2021-08-18PAT — from HYMAN, AMANDA to BOARD OF MANAGERS OF THE FLOW HOUSE COND
2021-08-18Deed $780,000 — from 888 CRESCENT LLC to HYMAN, AMANDA$780,000
2021-08-09Deed $820,419 — from 888 CRESCENT LLC to ZHOU, CHAO$820,419
2021-08-09Mortgage $602,250 — from ZHOU, CHAO to JPMORGAN CHASE BANK, N.A$602,250
2021-08-09PAT — from ZHOU, CHAO to THE FLOW HOUSE CONDOMINIUM
2021-01-20DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-01-19ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35475569L ISSUED ON 09-20-20 AND TO FILE A CERTIFIC$1,280
2020
2020-10-23Permit EQ — ISSUED
2020-10-22Permit EQ — ISSUED
2020-09-28DOB complaint, category ?
2020-09-28DOB complaint, category ?
2020-09-28ECB CLASS - 1 violation: 1. HOIST ITS MOVING WITH TOP EMERGENCY EXIT COVER OPEN. 2. HOIST HAS BEING OPERATED BY UNAUTHORIZED PERSONNEL. 3. CERTIFICATE ITS $1,250
2020-09-24Permit Supported Scaffold — Signed-off
2020-09-20DOB complaint, category ?
2020-09-20ECB CLASS - 2 violation: PEDESTRIAN PROTECTION AT THE TIME OF MY INSPECTION I OBSERVED A CONST-RUCTION MACHINE/TRACTOR IN THE STREET,ADJACENT TO THE PEDEST
2020-09-20ECB CLASS - 1 violation: BC3303.4.1.1 MAINTENANCE AT TIME OF INSPECTION,1 OBSERVED WOOD & STEELPLATES ON THE SIDEWALK UNDER THE SIDEWALK SHED AT EXPOSURE #$2,500
2020-09-17ECB CLASS - 2 violation: THE EXTERIOR WALLS ON EXPOSURE #2 ON 1ST. FLOOR WERE INSTALLED WITH METAL FRAMED WALLS CONTRARY TO CMU WALLS INDICATED ON COMCHECK$625
2020-09-04Elevator permit: Install new 2:1 Underslung Overhead MRL Traction Passenger Elevator per ASME A17.1-2005S, Chapter 30, Appendix K4. All inspections$220,000
2020-06-25Permit EQ — ISSUED
2020-06-12Permit PL — ISSUED
2020-06-01Permit NB — ISSUED
2020-05-28DOB complaint, category ?
2020-05-27ECB CLASS - 1 violation: FAILURE TO MAINTAIN RECORD OF PRE-SHIFT SAFETY MEETING FOR EACH WORKERAT THE TIME OF INSPECTION I ASKED THE COMPETENT PERSON TO PR$250
2020-05-18DOB complaint, category ?
2020-05-18ECB CLASS - 1 violation: SEC. 3308.5.1 INADEQUATE VERTICAL DEBRIS NETTING/MISSING OR LARGE OPENINGS. AT TIME OF INSPECTION ON AN 8 STY NB. I OBSERVED ACTIV$2,500
2020-05-06Elevator permit: Installation of 2,000 LBS Betamax 2000PMB single car elevator hoist as per plan submitted. Installations and Tests as per ANSI A10$10,000
2020-03-26Permit Supported Scaffold — Signed-off
2020-03-12Permit NB — ISSUED
2020-02-25Permit EW — ISSUED
2020-01-22ECB CLASS - 1 violation: BC330721-OBSTRUCITON OF SIDEWALK OR STREET.NOTES:AT TIME OF INSPECTIONON AN ACTIVE JOBSITE,I OBSERVED SIDEWALK CLOSED WITH YODOCKS$625
2020-01-21DOB complaint, category ?
2020-01-21Permit Supported Scaffold — Signed-off
2020-01-21Permit Sidewalk Shed — Signed-off
2020-01-21Permit Supported Scaffold — Signed-off
2020-01-17ECB CLASS - 1 violation: BC 3303.8.1 FAILURE TO PROVIDE STANDPIPE IN STATE OF READINESS BY CODE(NOT PAINTED IN RED). AT TIME OF INSPECTION,I OBSERVED BUILD$312
2020-01-14Permit NB — ISSUED
2020-01-11Permit NB — ISSUED
2020-01-08DOB complaint, category ?
2019
2019-12-13Permit EW — ISSUED
2019-11-27DOB complaint, category ?
2019-11-25Elevator permit: Installation of 2,000 LBS Betamax 2000PMB single car elevator hoist as per plan submitted. Installations and Tests as per ANSI A10$10,000
2019-11-21Permit EQ — ISSUED
2019-11-21Permit EQ — ISSUED
2019-11-19Job filed: INSTALLATION OF TEMPORARY SHORING TOWER AS HOIST RUNBACK STRUCTURE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN US
2019-11-19Job filed: INSTALLATION OF TEMPORARY SHORING TOWER AS HOIST RUNBACK STRUCTURE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN US
2019-11-15Job filed: INSTALLATION OF TEMPORARY HOIST AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2019-11-05Elevator permit: Install new 2:1 Underslung Overhead MRL Traction Passenger Elevator per ASME A17.1-2005S, Chapter 30, Appendix K4. All inspections$220,000
2019-11-02DOB complaint, category ?
2019-11-01DOB complaint, category ?
2019-10-16Permit EQ — ISSUED
2019-10-15Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPA
2019-10-15Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPA
2019-10-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN INSTITUTE SAFETY MEASURE.IN ADEQUATE GUARDRAILS.NOTE:AT TIME OF MY INSPECTION OF A 8 STORY BUILDING 6TH FLR LE$2,500
2019-10-12ECB CLASS - 1 violation: BC3314.1/FAILURE TO MAINTAIN PIPE SCAFFOLD.NOTE:AT TIME OF MY INSPECTION OF A 8 STORY BUILDING 6TH FLOOR LEVEL UNDER CONSTRUCTION $2,500
2019-10-08DOB complaint, category ?
2019-09-26Permit Supported Scaffold — Signed-off
2019-09-24Job filed: ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY$5,000
2019-07-10Permit Supported Scaffold — Signed-off
2019-07-10Permit Sidewalk Shed — Signed-off
2019-07-01Permit EQ — ISSUED
2019-07-01Permit NB — ISSUED
2019-04-26DOB complaint, category ?
2019-04-26ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS .NOTED:AT TIME O FMY INSPECTION OF A NEW 8 STO$625
2019-03-12ECB CLASS - 2 violation: ELECTRICAL WORK WITHOUT A PERMIT 8 STY BEW BUILDING OF 2ND STY- STEEL ERECTION @THE TIME OF INSPECTION, I OBSERVED ELECTRICAL WIRI
2019-03-06Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION$9,000
2019-02-20FDNY inspection (RISK)
2019-02-04DOB complaint, category ?
2019-02-04DOB complaint, category ?
2019-02-02ECB CLASS - 1 violation: FAILURE TO MAINTAIN AND INSTITUTE SAFETY MEASURES AT CONSTRUCTION JOBSITES. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE WHERE STEEL
2019-02-02ECB CLASS - 1 violation: INADEQUATE HOUSEKEEPING. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,ITWAS OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT JOBSITE ENDE$2,500
2019-02-02DOB violation C:
2019-02-02ECB CLASS - 1 violation: BC-3305.2.2 STRUCTURAL STEEL ASSEMBLY/FABRICATION. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE UNDER STEEL OPERATIONS WERE ACTIVE,I$2,500
2019-02-02ECB CLASS - 1 violation: NO DESIGNATED COMPETENT PERSON ON SITE. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE WHERE STEEL ERECTIONS WERE ACTIVE,UPON REQUEST
2019-02-02DOB violation C:
2019-01-25Permit PL — ISSUED
2018
2018-11-28Permit Supported Scaffold — Signed-off
2018-11-28Permit Sidewalk Shed — Signed-off
2018-11-28Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE$9,000
2018-11-27Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION$9,000
2018-10-04ECB CLASS - 2 violation: FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35273195K ISSUED ON 12/21/17, AND TO FILE A CERTIFICATE O$625
2018-10-03Permit FO — ISSUED
2018-09-13DOB complaint, category ?
2018-07-23FDNY inspection (STRUC_INT_3)
2018-07-20Permit FO — ISSUED
2018-07-20Permit NB — ISSUED
2018-07-02Permit EQ — ISSUED
2018-03-06Permit EQ — ISSUED
2017
2017-12-22DOB complaint, category ?
2017-12-21ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.AS NOTED: AT TIME OF INSPECTION 8 STORIES BUIL$500
2017-11-17Permit PL — ISSUED
2017-09-01Permit NB — ISSUED
2017-07-17Permit FO — ISSUED
2017-07-17Permit NB — ISSUED
2017-07-17Permit FO — ISSUED
2017-03-18Permit NB — ISSUED
2017-03-02ECB CLASS - 2 violation: WORK W/O PERMIT EXPIRED. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE FOUNDATION WORK. OBSERVED CONSTRUCTION PLYWOOD FENCE HA
2017-03-02Permit EQ — ISSUED
2017-01-24Permit EQ — ISSUED
2016
2016-09-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-09-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-07-19DOB complaint, category ?
2016-07-18ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED ACCEPTED PLANS @JOBSITE @TIME OF INSPECTION @THE TIME OF INSPECTION UNDERPINNING WORK WAS COMPLETED.NO$530
2016-06-29Permit FO — ISSUED
2016-06-29Permit NB — ISSUED
2016-06-29Permit FO — ISSUED
2016-06-28DOB complaint, category ?
2016-06-28DOB complaint, category ?
2016-06-28DOB complaint, category ?
2016-06-28DOB complaint, category ?
2016-06-27DOB complaint, category ?
2016-06-24ECB CLASS - 2 violation: FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT (TR1 SPECIAQL INSPECTION) AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE$1,600
2016-06-24ECB CLASS - 1 violation: BC1905.6.2.1 FAILURE TO PROVIDE THE MINIMUM FREQUENCY SAMPLES FOR STRENGTH TEST OF CONCRETE AS NOTED: AT TIME OF INSPECTION ON AN$1,600
2016-06-24ECB CLASS - 2 violation: 28-116.2.3 FAILURE TO PROVIDE AN ADEQUATE INSPECTION PROGRAM. TR-3 CONCRETE DESIGN AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE C$800
2016-06-24ECB CLASS - 2 violation: 28-105.5 FILED WITH DOB DO NOT HAVE RQURIED SIGNATURES.AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE TR-3 CONCRET$800
2016-06-24ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT & OR APPROVED AMENDMENTS. AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE CON$5,000
2016-03-15Permit FO — ISSUED
2016-03-15Permit NB — ISSUED
2016-03-15Permit FO — ISSUED
2016-02-01Permit FO — ISSUED
2016-02-01Permit FO — ISSUED
2016-02-01Permit EQ — ISSUED
2016-02-01Permit NB — ISSUED
2016-01-07Permit EW — ISSUED
2015
2015-12-16Job filed: APPLICATION FILED FOR TEMPORARY STAND PIPE. IN CONJUNCTION NB JOB#400436079$10,000
2015-12-01Permit EQ — ISSUED
2015-11-25Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2015-09-11DOB complaint, category ?
2015-05-26Job filed: FILING OF SOE IN CONJUNCTION WITH NB APPLICATION 421017474
2015-05-26Job filed: FILING OF SOE IN CONJUNCTION WITH NB APPLICATION 421017474
2015-05-26Job filed: FILING OF STRUCTURAL PLANS IN CONJUNCTION WITH NB 421017474
2014
2014-10-16Job filed: TO FILE BUILDING PAVEMENT PLAN FOR 25'.00 LINEAR FEET