The city's published records show little recorded distress here in the last three years. Less recorded distress than 65% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 9.7. In ZIP 10009, 59% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
5 total — 1 class C (immediately hazardous), 2 class B, 2 class A. Oldest open since 2025-03-05.
status snapshot refreshed weekly from HPD records
Patterns
4 heat or hot-water complaints in the last three years (winter 2025–26: 4).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
39 service requests in the last three years. Most common: WATER LEAK (11) · GENERAL (6) · PLUMBING (5) · UNSANITARY CONDITION (4) · Elevator (4) · Noise (3).
Filed construction activity
No permitted work with a declared cost filed in the last decade. Permit
costs cover filed construction work only — they do not capture routine maintenance or repairs done
without a permit.
Rent-stabilization signals
No
Built before 1974 (2002)
Yes
Six or more residential units (61)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
222 E 3RD STREET LLC
Head officer
KEVIN LALEZARIAN
Managing agent
LALEZARIAN DEVELOPERS INC
Last registered
2025-08-27
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$16,384,000
$7,372,800
2026
$18,479,000
$8,315,550
2027
$16,155,000
$7,269,750
The city's market estimate has fallen
1% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 54/100, posted at the entrance by law (2022 disclosure cycle)
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
2 Av — F · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: none Delancey St-Essex St — F J M Z · 0.4 mi straight-line (about a 9-minute walk) · station accessibility: none
Bus
Nearest boarding stop: East Houston St / Av C — M9 M21 · 450 ft
Citi Bike
E 2 St & Ave B · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
39 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $850,518 on
2021-03-29 (lender: Santander Bank, N.A.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2021-03-29
Agreement $12,900,000 — from 222 E. 3RD STREET, LLC to SANTANDER BANK, N.A.
$12,900,000
2021-03-29
Mortgage $850,519 — from 222 E. 3RD STREET, LLC to SANTANDER BANK, N.A.
$850,519
2011-04-21
Mortgage $2,129,586 — from 222 E. 3RD STREET, LLC to SOVEREIGN BANK
$2,129,586
2011-04-21
Agreement $13,000,000 — from 222 E. 3RD STREET, LLC to SOVEREIGN BANK
$13,000,000
2003-12-17
Agreement $12,500,000 — from INDEPENDENCE COMMUNITY BANK to 222 E. 3RD STREET, LLC
$12,500,000
2003-12-17
Mortgage $4,500,000 — from 222 E. 3RD STREET, LLC to INDEPENDENCE COMMUNITY BANK
$4,500,000
2001-10-26
Mortgage $8,000,000 — from 222 E. 3RD STREET, LLC to CITIBANK, NA
$8,000,000
Ten-year activity
50250
2017
2018
2019
46
2020
2021
2022
2023
2024
2025
2026
EnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
29
0
6
35
2018
1
4
0
3
8
2019
2
15
0
3
20
2020
6
37
0
3
46
2021
0
13
2
2
17
2022
1
9
0
4
14
2023
2
13
0
3
18
2024
0
35
0
3
38
2025
1
39
0
3
43
2026
1
13
0
2
16
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-11-08Tenant complaint: ELEVATOR — MAINTENANCE
2025-11-03311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-11-03311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-11-03311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-11-03311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-11-03DOB complaint, category ?
2025-09-18311: WATER LEAK — SLOW LEAK
2025-09-18Tenant complaint: WATER LEAK — SLOW LEAK
2025-09-16311: PLUMBING — WATER SUPPLY
2025-09-16Tenant complaint: PLUMBING — WATER SUPPLY
2025-09-04Boiler inspection
2025-08-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE PRIVATE HALLWAY LOCATE
2025-08-18HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT W
2025-08-18HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED
2025-08-18HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT E
2025-08-18HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED
2025-08-14Tenant complaint: WATER LEAK — DAMP SPOT
2025-08-14Tenant complaint: WATER LEAK — SLOW LEAK
2025-03-05HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM ALLOWABLE TEMPERATURE OF 130 DEGREE FAHRENHEIT
2025-03-05HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM E
2025-03-05HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY,
2025-03-05HPD class A: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FRO
2025-03-05HPD class A: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAS
2025-02-24311: WATER LEAK — DAMP SPOT
2025-02-24Tenant complaint: WATER LEAK — DAMP SPOT
2025-02-05Rodent inspection: Passed
2025-01-28311: GENERAL — BELL/BUZZER/INTERCOM
2025-01-28311: WATER LEAK — SLOW LEAK
2025-01-28Tenant complaint: WATER LEAK — SLOW LEAK
2025-01-28Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2023-08-28311: Elevator — Elevator - Single Device On Property/No Alternate Service
2023-08-28DOB complaint, category ?
2023-08-24311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2023-08-15FDNY inspection (RISK)
2023-08-09Rodent inspection: Passed
2023-06-30HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2022-03-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-02-22311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020
2020-12-07Bedbug filing: 0 infested units
2020-11-12HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6D
2020-11-12HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCA
2020-11-12HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6D
2020-11-12HPD class C: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTM
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-07-10311: WATER LEAK — SLOW LEAK
2020-07-10Tenant complaint: WATER LEAK — SLOW LEAK
2020-07-03311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-14311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-09311: Lead — Lead Kit Request (Residential) (L10)
2020-05-27311: COVID-19 Non-essential Construction — Construction
2020-05-27DOB violation E:
2020-05-27DOB complaint, category ?
2020-05-27ECB CLASS - 1 violation: ELECTRICAL WORK WITHOUT A PEMRIT OBSERVED AT 7 00 AM REPLACEMENT OF COPPER DETAILS INSTALLED IN BASEMENT END LINE BOX NO APPLICATI
2020-05-27DOB complaint, category ?
2020-05-27DOB complaint, category ?
2020-05-22311: Non-Emergency Police Matter — Social Distancing
2020-02-12Elevator permit: PPN Upgrading passenger elevator door operating system as per code ASSI/ASME A17.3 2002 as modified by Chapter K3 of Appendix K se$23,000
2017-11-03311: Noise — Noise: Construction Before/After Hours (NM1)
2017-10-12Rodent inspection: Passed
2017-09-06Boiler inspection
2017-09-01Rodent inspection: Passed
2017-08-11311: Taxi Report — Driver Report
2017-07-27Rodent inspection: Failed for Other Reason
2017-07-25311: Rodent — Mouse Sighting
2017-06-23HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2017-06-23HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2017-06-23HPD class B: § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT APT4B, 4th STORY, 3rd APARTMENT FROM
2017-06-23HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT 1
2017-06-23HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2017-06-23HPD class B: § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT APT4B, 4th STORY, 3rd APARTMENT FROM EAS
2017-06-12HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2017-06-12HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISS
2017-06-12HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2017-06-12HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2017-06-12HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2016-12-01Tenant complaint: WATER LEAK — SLOW LEAK
2016-11-04311: Noise - Vehicle — Car/Truck Music
2016-08-30311: Homeless Person Assistance — N/A
2016-06-09HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2015-09-17311: General Construction/Plumbing — Failure To Maintain
2015-09-17DOB complaint, category ?
2015-09-15ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS
2015-08-26Facade (LL11) filing, cycle 8: SAFE
2015-08-26Facade (LL11) filing, cycle 7: SAFE
2015-08-19FDNY inspection (OTHER)
2015-08-19ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING NORTH ELEVATION EXP#1,WEST ELEVATION EXP#4 NORTH ELEVATION EXP#1 CRACKING AND DETERIORATION $500
2014-04-09ECB CLASS - 2 violation: FAILUER TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &$800
2013-08-12ECB CLASS - 2 violation: B254,16,50A -LOUD NOISY CONDITION NOTED @DOMESTIC WATER BOOSTER PUMP. SLANT FIN BOILERS. CORRECT OR REPAIR AND FILE CERTIFICATE O
2011-07-10Tenant complaint: PLUMBING — WATER SUPPLY
2011-04-21Mortgage $2,129,586 — from 222 E. 3RD STREET, LLC to SOVEREIGN BANK$2,129,586
2011-04-21TL&R — from SOVEREIGN BANK to 222 E. 3RD STREET, LLC
2011-04-21Agreement $13,000,000 — from 222 E. 3RD STREET, LLC to SOVEREIGN BANK$13,000,000
2011-04-08Rodent inspection: Passed
2011-03-31Permit EW — ISSUED
2011-02-17Permit PL — ISSUED
2011-02-16ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED CONSTRUCTION DOCUMENTS AT JOBSITE AT TIME OF INSP NOTED AT CONSTRUCTION SITE AT UPPER FLOORS OF ROOF N
2011-02-09311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2011-02-09DOB complaint, category ?
2010
2010-12-10Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHAN
2010-12-10Permit EQ — ISSUED
2010-11-30Job filed: SPRINKLER SYSTEM IN CONJUNCTION WITH APPLICATION 120258808$10,000
2007-02-16Tenant complaint: HEATING — HEAT RELATED
2005
2005-11-15DOB violation E:
2003
2003-12-17TL&R — from CITIBANK, N.A. to 222 E. 3RD STREET, LLC
2003-12-17AL&R — from INDEPENDENCE COMMUNITY BANK to 222 E. 3RD STREET, LLC
2003-12-17Agreement $12,500,000 — from INDEPENDENCE COMMUNITY BANK to 222 E. 3RD STREET, LLC$12,500,000
2003-12-17Mortgage $4,500,000 — from 222 E. 3RD STREET, LLC to INDEPENDENCE COMMUNITY BANK$4,500,000
2003-12-17Mortgage assigned — from CITIBANK, N.A.
2003-03-26Permit EW — ISSUED
2003-02-25Permit EW — ISSUED
2003-02-12Job filed: WE ARE FILING A NEW BOILER APPLICATION I N CONJUNCTION WITH NEW BUILDING APPLICATION #102348158.$10,000
2003-01-10Permit EQ — ISSUED
2003-01-08Job filed: Installation of 100' long X 70' high pipe scaffold in conjunction with new building# 102348158. No change of use, egress or occupancy under this appli
2002
2002-10-15Permit EQ — RE-ISSUED
2002-10-15Permit EQ — RE-ISSUED
2002-10-15Permit NB — ISSUED
2002-09-13Permit EQ — ISSUED
2002-08-15ECB Non-Hazardous violation: NO DESIGN DRAWING FOR SCAFFOLD. AT TIME OF INSPECTION PIPE SCAFFOLD WAS ERECTED ON THE SIDE OF THE BLDG APPROX 54' AND NO DESIGN D$200
2002-07-19Permit EQ — ISSUED
2002-07-18Job filed: INSTALLATION OF SIDEWALK BRIDGE IN CONJUNCTION WITH NEW BUILDING # 102348158 ALL WORK TO COMPLY WITH LL 33/91. NO CHANGE OF USE, EGRESS OR OCCUPANCY U
2002-07-17ECB Hazardous violation: NO SIDEWALK SHED. UPON INSPECTION OF THE ABOVE PROPERTY, FLOOR FRAMING AT 6TH FLOOR WAS IN PROGRESS APPROX. 60' HIGH AND NO SIDEWA$2,000
2002-06-27Permit EQ — ISSUED
2002-06-27Permit NB — ISSUED
2002-06-13Permit EW — ISSUED
2002-06-13Permit EW — ISSUED
2002-05-14Permit PL — ISSUED
2002-03-28Job filed: WE ARE HEREWITH THE FIRE PROTECTION PLAN FOR A NEW 8 STORY BUILDING WITH A CELLAR FILED IN CONJUNCTION WITH A NEW BUILDING APPLICATION.$1,000
2002-02-04DOB complaint, category ?
2002-02-03ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION THE EXTERIOR WEST WALL OF 226 E 3RD STREET, 1ST FLOOR $1,000
2002-01-31Permit EW — ISSUED
2002-01-30Permit EQ — ISSUED
2002-01-16Job filed: UNDERPINNING FOR THE NEW BUILDING APPLICATION PERMITTED UNDER APPLI. #102348158. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2002-01-09Job filed: INSTALLATION OF A FIRE ALARM SYSTEM FILED INCONJUCTION WITH A NEW BUILDING APPLICATION#102348158 NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2001
2001-10-29Permit NB — RE-ISSUED
2001-10-26Mortgage $8,000,000 — from 222 E. 3RD STREET, LLC to CITIBANK, NA$8,000,000
2001-10-26SAGE — from LALEZARIAN, FRANK
2001-10-26Mortgage assigned — from 222 E. 3RD STREET, LLC to CITIBANK, NA
2001-10-25Permit EQ — ISSUED
2001-08-30Job filed: WE ARE FILING FOR STANDPIPE SYSSTEM FOR AN 8 STORY NEW BUILDING WITH A CELLAR.$1,000
2001-08-30Job filed: WE ARE FILING FOR SPRINKLER SYSTEM FOR AN 8 STORY NEW BUILDING WITH A CELLAR$1,000
2001-08-30Job filed: WE ARE FILING A BUILDING PAVING PLAN IN CONJUNCTION WITH NEW BUILDING AP PLICATION TOTAL ITNEAR DEET 99-0
2001-08-30Job filed: WE ARE FILING FOR STANDPIPE SYSSTEM FOR AN 8 STORY NEW BUILDING WITH A CELLAR.$1,000
2001-08-30Job filed: WE ARE FILING FOR SPRINKLER SYSTEM FOR AN 8 STORY NEW BUILDING WITH A CELLAR$1,000
2001-08-30Job filed: WE ARE FILING A BUILDING PAVING PLAN IN CONJUNCTION WITH NEW BUILDING AP PLICATION TOTAL ITNEAR DEET 99-0
2001-08-28Job filed: NB
2001-08-28Job filed: WE ARE FILING STRUCTURAL PLANS FOR A NEW 8 STORY PLUS CELLAR BUILDING.
2001-08-28Job filed: NB
2001-08-28Job filed: WE ARE FILING STRUCTURAL PLANS FOR A NEW 8 STORY PLUS CELLAR BUILDING.
2001-08-28Job filed: WE ARE FILING MECHANICAL AND PLUMBING PLANS FOR NEW 8 STORY BUILDING WITH A CELLAR
2001-08-28Job filed: NB
2001-08-28Job filed: WE ARE FILING MECHANICAL AND PLUMBING PLANS FOR NEW 8 STORY BUILDING WITH A CELLAR
2001-08-27DOB complaint, category ?
2001-08-27DOB complaint, category ?
2001-08-21DOB complaint, category ?
2001-07-25ECB Hazardous violation: NO DOT PERMIT.AT TIME OF INSP. NO DOT PERMITS WERE POSTED.REMEDY:PROVIDE DOT PERMITS AS PER CODE
2001-07-25ECB Hazardous violation: MECH DEMO WITHOUT PERMIT:UPON INSPECTION OF ABOVE PROPERTY MECH MACHINE WAS USED TO REMOVE TWO SECTION OF ROOF AND HOLE IN WEST WA
2001-07-25ECB Hazardous violation: FAILURE TO REMOVE GLASS AT TIME OF INSPECTION DEMOLITION UNDERWAY WHILE STOREFRONT GLASS REMAINS IN PLACE.REMEDY:REMOVE ALL GLASS $500
2001-07-25ECB Hazardous violation: NO JOB SITE FENCE:AT TIME OF INSPECTION NO FENCE WAS IN PLACE TO PROTECT PUBLIC FROM DEMO OPERATIONS.STOP ALL WORK,&INSTALL FENCE
2001-07-23Permit DM — ISSUED
2001-07-23Permit EQ — ISSUED
2001-07-17SAGE — from 222 E. 3RD STREET, LLC
2001-07-17SAGE — from STEWART TITLE INSURANCE COMPANY
2001-05-29Job filed: DM
2001-05-29Job filed: DM
2001-05-25Deed — from TAMILY, HENRY; SANTO, MARINO J.; VIRZI, JOSEPH P. to 222 E. 3RD STREET, LLC
1981
1981-11-10Deed — from 254 HURON STREET CORP to SANTO, MARINO T; VIRZI, JOSEPH P; TAMILY, HENRY
1978
1978-05-23Deed — from DICKSTEIN, SAMUEL; GREIF, MEYER; SILVER, MAX to 254 HURON STREET CORP