The city's published records show little recorded distress here in the last three years. More recorded distress than 53% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 4.4. In ZIP 10016, 71% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$37,180 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
84 service requests in the last three years. Most common: For Hire Vehicle Complaint (31) · Illegal Parking (18) · Noise (7) · Taxi Complaint (4) · Sidewalk Condition (3) · Dead/Dying Tree (3).
Filed construction activity
$89,733,856 in permitted construction work filed since
2016 (53 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
Yes
Six or more residential units (111)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
First and River LLC
Head officer
Kevin Lalezarian
Managing agent
LALEZARIAN DEVELOPERS INC
Last registered
2026-01-29
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$24,933,000
$11,219,850
2026
$30,073,000
$13,532,850
2027
$33,546,000
$15,095,700
The city's market estimate has risen
35% between tax years 2025 and 2027.
Building systems
Heating fuel
NONE
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Grand Central-42 St — 4 5 6 7 S · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 1 Av / E 36 St — M15 · 250 ft
Citi Bike
1 Ave & E 38 St · 200 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
84 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $8,480,000 on
2023-04-03 (lender: TD Bank, N..A.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-04-03
AL&R $50,000,000 — from FIRST AND RIVER LLC to TD BANK, N..A.
$50,000,000
2023-04-03
Mortgage $16,020,000 — from FIRST AND RIVER LLC to TD BANK, N..A.
$16,020,000
2023-04-03
Agreement $25,500,000 — from FIRST AND RIVER LLC to TD BANK, N..A.
$25,500,000
2023-04-03
Mortgage $8,480,000 — from FIRST AND RIVER LLC to TD BANK, N..A.
$8,480,000
2023-03-27
Deed $33,500,000 — from JERICHO OFFICE, LLC to FIRST AND RIVER LLC
$33,500,000
2023-03-23
Sold for $33,500,000
$33,500,000
$301,802
2016-11-16
Agreement $27,000,000 — from JERICHO OFFICE, LLC to SIGNATURE BANK
$27,000,000
2016-11-16
Mortgage $8,373,285 — from JERICHO OFFICE, LLC to SIGNATURE BANK
$8,373,285
2016-11-16
AL&R $27,000,000 — from JERICHO OFFICE, LLC to SIGNATURE BANK
$27,000,000
2008-02-08
Mortgage $9,319,974 — from JERICHO OFFICE, LLC to SOVEREIGN BANK
$9,319,974
2008-02-08
Agreement $21,000,000 — from JERICHO OFFICE, LLC to SOVEREIGN BANK
$21,000,000
2008-02-08
AL&R $21,000,000 — from JERICHO OFFICE, LLC to SOVEREIGN BANK
$21,000,000
2003-07-08
Agreement $12,498,994 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK
$12,498,994
2003-07-08
Agreement $12,498,994 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK
$12,498,994
2003-07-08
Agreement $12,498,994 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK
$12,498,994
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
89
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
3
4
6
0
7
20
2018
10
6
7
0
3
26
2019
16
3
5
0
3
27
2020
8
5
11
0
14
38
2021
5
0
6
0
1
12
2022
4
2
20
1
1
28
2023
15
2
12
9
3
41
2024
33
28
22
0
6
89
2025
36
4
25
0
5
70
2026
5
0
39
1
0
45
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Dead/Dying Tree — Planted More Than 2 Years Ago
2026-04-29
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION FOR SITE SAFETY RELEASE -OBSERVED SIDEWALK SHED REMOVED FROM EXP#1/4-AFTER SEARCHING DOB RECORDS NO A
2025-10-20
DOB complaint, category ?
The full timeline
2026
2026-10-01311: Illegal Parking — Blocked Sidewalk
2026-09-29Certificate of occupancy Renewal Without Change
2026-09-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-09-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-05-20311: Dead/Dying Tree — Planted More Than 2 Years Ago
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-10-20ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION FOR SITE SAFETY RELEASE -OBSERVED SIDEWALK SHED REMOVED FROM EXP#1/4-AFTER SEARCHING DOB RECORDS NO A
2025-10-20DOB complaint, category ?
2025-10-10311: Taxi Complaint — Driver Complaint - Non Passenger
2025-09-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-09-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-09-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-08-21Facade (LL11) filing, cycle 9: SAFE
2025-08-14Permit Supported Scaffold — Signed-off
2025-08-14Permit General Construction — Signed-off
2025-08-14Permit Sidewalk Shed — Signed-off
2025-07-30Job filed: Application filed for facade repair, brick repointing and replacement, stone/stucco patching and repair. No roofing, flashing tar/waterproofing to be $75,000
2025-07-15Permit General Construction — Signed-off
2025-06-27Elevator permit: Vertical Platform lift device # 1W0991439 and 1W0991440 will be Removed and Permanently Discontinued. All work to comply with ASME$8,000
2025-05-09311: Sidewalk Condition — Blocked - Construction
2025-05-02311: Street Condition — Blocked - Construction
2025-04-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-04-23Job filed: PAA being filed herewith revised plans to add street names at the incoming water and sprinkler service. WVA 44744/22.$200,000
2025-04-23Job filed: Conversion of existing 8-story office building to residential and 3-story vertical extension.$18,800,000
2025-04-23Job filed: PAA being filed herewith revised plans to indicate gas meter room vent. WVA 44744/22.$1,200,000
2025-04-16Permit Sprinklers — Signed-off
2025-04-14Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST (COUNTERWEIGHTED SYSTEM)
2025-04-08Permit General Construction — Permit Issued
2025-04-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-04-04Permit Plumbing — Signed-off
2025-04-01Permit Sprinklers — Signed-off
2025-04-01Permit Standpipe — Signed-off
2025-04-01Permit Mechanical Systems — Signed-off
2025-04-01Permit General Construction — Signed-off
2025-04-01Permit Mechanical Systems — Signed-off
2025-03-21Permit Sprinklers — Signed-off
2025-03-21Permit Standpipe — Signed-off
2025-03-19Job filed: Modification of Plumbing system as shown on plans$80,000
2025-03-15311: Noise — Noise: Construction Before/After Hours (NM1)
2025-03-12Job filed: Modification of sprinkler system as shown on plans$32,250
2025-03-12Job filed: Mechanical work as shown on plans$88,000
2025-03-07Job filed: PAA being filed herewith revised plans to add street names at the incoming water and sprinkler service. WVA 44744/22.$200,000
2025-03-04Job filed: Application filed for non-structural renovations to unit 23A$680,000
2025-03-03Rodent inspection: Passed
2025-03-01311: Homeless Person Assistance
2025-02-25Permit Standpipe — Signed-off
2025-02-18311: Investigations and Discipline (IAD) — Plumbing Work - Unlicensed/Illegal/Improper Work In Progress
2025-02-18DOB complaint, category ?
2025-02-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-01-30Elevator permit: CONSTRUCTION USE TO REMOVAL 1P29206 P1: WE ARE REMOVING DEVICE 1P29206. AS PER 8.11.1.4.1.3. ALL WORK TO COMPLY WITH ASME A17.1-20$3,000
2025-01-30FDNY inspection (CDA-90-DRILL)
2025-01-30Elevator permit: Modernization of device 1P33435.All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Part 8, Section $80,000
2025-01-22Permit Supported Scaffold — Signed-off
2025-01-21Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No$5,000
2025-01-20Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$2,500
2025-01-16311: Dirty Condition — Trash
2025-01-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-01-15Permit Protection and Mechanical Methods — Signed-off
2025-01-13Job filed: Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or$3,000
2025-01-13Permit Protection and Mechanical Methods — Signed-off
2025-01-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-24Permit Protection and Mechanical Methods — Signed-off
2024-11-04311: General Construction/Plumbing — Site Conditions Endangering Workers
2024-11-04DOB complaint, category ?
2024-11-01ECB CLASS - 2 violation: AT TIME OF INSPECTION IN RESPONSE TO AN INCIDENT WHERE A WORKER FELL OFF A FRAME LADDER DURING INSULATION INSTALLATION ON 8TH FLOO$5,000
2024-11-01DOB complaint, category ?
2024-10-31Permit Construction Fence — Signed-off
2024-10-31Permit Construction Fence — Permit Issued
2024-10-10Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$130,000
2024-10-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-08311: Illegal Parking — Blocked Bike Lane
2024-09-19Job filed: PAA being filed herewith revised plans to add street names at the incoming water and sprinkler service. WVA 44744/22.$1,200,000
2024-09-19Job filed: PAA being filed herewith revised plans to add street names at the incoming water and sprinkler service. WVA 44744/22.$200,000
2024-09-11FDNY inspection (CDA-90-DRILL)
2024-09-11311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-09-11311: Illegal Parking — Blocked Bike Lane
2024-09-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-09-04FDNY inspection (CDA-90-DRILL)
2024-08-30311: Dirty Condition — Trash
2024-08-12Permit Supported Scaffold — Signed-off
2024-08-12Permit Sidewalk Shed — Signed-off
2024-08-08Permit Sidewalk Shed — Signed-off
2024-08-08Permit Supported Scaffold — Signed-off
2024-08-01DOB violation FISPFCS: FAILURE TO CORRECT SWARMP CONDITIONS
2024-07-31Permit General Construction — Signed-off
2024-07-11Elevator permit: Installation of two MRL's and tests as per ASME A17.1s/2005 as modified by Appendix K, Chapter K4: Safety Codes for Machine Room L$335,000
2024-07-09Job filed: Mechanical work for Alt-Co$1,000,000
2024-07-03Job filed: PAA being filed herewith revised plans to indicate cross connection detail.$1,200,000
2024-06-27311: Building/Use — Illegal Conversion Of Residential Building/Space
2024-06-25311: Water System — Leak (Use Comments) (WA2)
2024-06-24ECB CLASS - 1 violation: AT THE TIME OF INSPECTION ACTIVE SITE, WHILE RESPONDING TO AN INCIDENT WHERE A WORKER SUSTAINED LACERATION TO THE FACE DURING CONC$10,000
2024-06-24DOB complaint, category ?
2024-06-15ECB CLASS - 2 violation: BC 3307.4.7 WORK OR STORAGE ZONE. OBSERVED MACHINERY STORED IN THE STREET AT EXP#1, WITH ENCLOSURE BETWEEN THE ZONE AND PEDESTRIAN$2,500
2024-06-15ECB CLASS - 2 violation: OBSERVED A JOBSITE FENCE WITH NO VIEWING PANELS INSTALLED ALONG EXP#1.. PROVIDE VIEWING PANELS AT EXP#1.$1,000
2024-06-15DOB complaint, category ?
2024-06-15DOB complaint, category ?
2024-06-13Permit General Construction — Signed-off
2024-06-10311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-06-10DOB complaint, category ?
2024-06-03FDNY inspection (CDA-90-DRILL)
2024-06-03311: Noise — Noise: Jack Hammering (NC2)
2024-05-31Elevator permit: Furnish and install TWO new traction passenger elevator as a subsequent filing to the ALT-1 permit #M00876726-01-AL (Building Code$350,000
2024-05-24ECB CLASS - 1 violation: WORKER FELL DOWN THE STAIRS AND REQUESTED AMBULANCE. UPON REVIEW THE DEPARTMENT RECORDS IT WAS REVEAL THAT NO NOTIFICATION WAS MAD$10,000
2024-05-24DOB complaint, category ?
2024-05-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-20Elevator permit: Temporary personnel/material hoist. Installation of a Single 6000 LB Capacity Personnel/Material Hoist during Alteration Applicati$10,000
2024-05-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-15311: Noise — Noise: Jack Hammering (NC2)
2024-05-14Job filed: INSTALLATION OF TEMPORARY SINGLE PERSONNEL/MATERIAL HOISTS AS PER PLANS SUBMITTED. Work shall comply with 2022 building codes chapter 33. No change in$10,000
2024-05-08311: Noise — Noise: Jack Hammering (NC2)
2024-05-06Job filed: Conversion of existing 8-story office building to residential and 3-story vertical extension.$18,800,000
2024-05-02DOB complaint, category ?
2024-04-26311: Consumer Complaint — Other Store (Non-Food)
2024-04-16ECB CLASS - 2 violation: FAILURE TO COMPLY WITH BC- 3314.9.2 FOUNDATION PORTABLE BAKER SCAFFOLDS ON THE STAIRS INADEQUATE LEGS, POSTS AND NOT PROVIDED FIRM$2,500
2024-04-16ECB CLASS - 2 violation: FAILURE TO COMPLY WITH BC 3307.6.3 AREA TO BE PROTECTED SIDEWALK SHED ERECTED AT CORNER EXPOSURE 3&4 WERE MISSING ADDITIONAL DECKI$2,400
2024-04-16DOB complaint, category ?
2024-04-15DOB complaint, category ?
2024-03-21Permit Foundation — Signed-off
2024-03-18Permit Structural — Signed-off
2024-03-16Permit General Construction — Permit Issued
2024-03-14Job filed: Filing here partial demolition of concrete slab and NON- party wall east wall- no change in use, egress or occupancy-$50,000
2024-03-12Elevator permit: CONSTRUCTION USE TO REMOVAL 1P29206 P1: WE ARE REMOVING DEVICE 1P29206. AS PER 8.11.1.4.1.3. ALL WORK TO COMPLY WITH ASME A17.1-20$3,000
2024-02-26Job filed: PAA being filed herewith revised plans to indicate cross connection detail.$1,200,000
2024-02-21Facade (LL11) filing, cycle 9: SAFE
2024-02-21ECB CLASS - 2 violation: BC 3303.12.4 AT TIME OF INSPECTION OF A 8 STOREYS BUILDING UNDER ALTERATION AND DEMOLITION PERMITS PARTIALLY OCCUPIED WITH TENANTS$2,500
2024-02-19ECB CLASS - 1 violation: FAILURE TO CARRY OUT PROPER SAFETY MEASURES DURING CONSTRUCTION OPERATIONS: THE WORKER WAS PERFORMING DEMOLITION ON THE 9TH FLOOR
2024-02-19DOB complaint, category ?
2024-02-12FDNY inspection (CDA-90-DRILL)
2024-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2024-02-08Permit Mechanical Systems — Signed-off
2024-02-08Permit Standpipe — Signed-off
2024-02-08Permit Standpipe — Signed-off
2024-02-08Permit Sprinklers — Signed-off
2024-02-06FDNY inspection (ALT)
2024-02-05Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No$5,000
2024-02-02Elevator permit: Temporary personnel/material hoist. Installation of a Single 6000 LB Capacity Personnel/Material Hoist during Alteration Applicati$10,000
2024-01-24311: Noise — Noise: Construction Before/After Hours (NM1)
2024-01-24Job filed: INSTALLATION OF TEMPORARY SINGLE PERSONNEL/MATERIAL HOISTS AS PER PLANS SUBMITTED. Work shall comply with 2022 building codes chapter 33. No change in$10,000
2024-01-24Permit Protection and Mechanical Methods — Signed-off
2024-01-16311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2024-01-08311: Illegal Parking — Paper License Plates
2024-01-05Permit Plumbing — Signed-off
2024-01-04Permit Protection and Mechanical Methods — Signed-off
2024-01-03Job filed: Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No chan$3,000
2023
2023-12-05Job filed: Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an$2,500
2023-12-05Permit Construction Fence — Permit Issued
2023-12-05Permit Construction Fence — Signed-off
2023-11-15Job filed: Provide temporary dry manual standpipe system during construction$10,000
2023-11-13ECB CLASS - 2 violation: OBSERVED PORTABLE FIRE EXTINGUISHERS ON MULTIPLE FLOORS NOT MOUNTED, DAMAGED, DEPRESSURIZED, NOT ACCESSIBLE, NOT INSPECTED MONTHLY$1,280
2023-11-13DOB complaint, category ?
2023-10-31Job filed: PAA being filed herewith revised plans to indicate gas meter room vent. WVA 44744/22.$1,200,000
2023-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-25Job filed: PAA being filed herewith revised plans to add street names at the incoming water and sprinkler service. WVA 44744/22.$200,000
2023-10-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-09-21Elevator permit: REMOVAL OF ELEVATOR PER SECTION8.11.1.4.1.3. ALL WORK TO COMPLY WITH ASME A17.1-2013 PART 2, SAFEETY CODE FOR ELEVATORS AND ESCALA$3,000
2023-09-21Elevator permit: REMOVAL OF ELEVATOR PER SECTION8.11.1.4.1.3. ALL WORK TO COMPLY WITH ASME A17.1-2013 PART 2, SAFEETY CODE FOR ELEVATORS AND ESCALA$3,000
2023-08-29311: Encampment — N/A
2023-08-18Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No$5,000
2023-08-18Permit Supported Scaffold — Signed-off
2023-08-18Permit Sidewalk Shed — Signed-off
2023-08-04Permit General Construction — Signed-off
2023-08-01Job filed: Filing here partial demolition of concrete slab and NON- party wall east wall- no change in use, egress or occupancy-$50,000
2023-07-14Rodent inspection: Passed
2023-07-01311: Rodent — Mouse Sighting
2023-05-23Permit General Construction — Signed-off
2023-05-18Job filed: PROPOSE INTERIOR DEMOLITION OF THE EXISTING 8 STORY BUILDING, REMOVE EXISTING PARTITIONS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS$100,000
2023-05-18Permit General Construction — Permit Issued
2023-05-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-04-25311: Illegal Parking — Blocked Bike Lane
2023-04-03Mortgage assigned — from SIGNATURE BANK to SIGNATURE BRIDGE BANK, N.A.
2023-04-03TL&R — from SIGNATURE BANK to JERICHO OFFICE, LLC
2023-04-03AL&R $50,000,000 — from FIRST AND RIVER LLC to TD BANK, N..A.$50,000,000
2023-04-03Mortgage $16,020,000 — from FIRST AND RIVER LLC to TD BANK, N..A.$16,020,000
2023-04-03Agreement $25,500,000 — from FIRST AND RIVER LLC to TD BANK, N..A.$25,500,000
2023-04-03Mortgage assigned — from SIGNATURE BRIDGE BANK, N.A. to TD BANK, N..A.
2023-04-03Mortgage $8,480,000 — from FIRST AND RIVER LLC to TD BANK, N..A.$8,480,000
2023-03-27Deed $33,500,000 — from JERICHO OFFICE, LLC to FIRST AND RIVER LLC$33,500,000
2023-02-08Job filed: Mechanical work for Alt-Co$1,000,000
2022
2022-12-31311: Broken Parking Meter — Out of Order
2022-12-06Permit General Construction — Signed-off
2022-12-03311: Street Condition — Line/Marking - Faded
2022-12-02ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT$1,250
2022-11-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-13311: Street Condition — Line/Marking - After Repaving
2022-11-09311: Illegal Parking — Blocked Bike Lane
2022-11-04Job filed: Structural work in conjunction with Alt-CO$1,000
2022-11-04Job filed: Foundation work in conjunction with Alt-CO$1,000
2022-11-03Job filed: Conversion of existing 8-story office building to residential and 3-story vertical extension.$18,800,000
2020-05-18Elevator permit: FURNISH AND INSTALL ONE NEW VERTICAL WHEELCHAIR LIFT. TOTAL TRAVEL 3'3"$19,000
2020-05-18Elevator permit: FURNISH AND INSTALL ONE NEW VERTICAL WHEELCHAIR LIFT. TOTAL TRAVEL 4'$71,000
2020-04-10DOB violation E:
2020-04-10DOB violation E:
2020-04-09DOB violation E: CEASE USE
2020-04-09DOB violation E:
2020-04-06Permit EW — ISSUED
2020-04-06Permit EW — ISSUED
2020-04-06Permit EW — ISSUED
2020-04-05311: General Construction/Plumbing — Failure To Maintain
2020-04-05DOB complaint, category ?
2020-02-28Rodent inspection: Passed
2020-02-24Cooling tower inspection
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10Asbestos abatement: Removal — PAR Environmental Corporation
2020-02-10311: Illegal Parking — Blocked Bike Lane
2020-01-08Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$16,000
2019
2019-09-16311: Illegal Parking — Blocked Bike Lane
2019-09-09Permit EW — ISSUED
2019-09-08Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$32,000
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-07-30311: Illegal Parking — Blocked Bike Lane
2019-07-25Permit PL — ISSUED
2019-07-15Permit Supported Scaffold — Signed-off
2019-07-15Permit Sidewalk Shed — Signed-off
2019-07-12Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2019-07-12Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2019-06-14Permit EW — ISSUED
2019-06-14Permit EW — ISSUED
2019-06-14Permit EW — ISSUED
2019-05-28FDNY inspection (RISK)
2019-05-22Job filed: FILING FOR STRUCTURAL MODIFICATIONS TO THE GROUND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$98,500
2019-05-22Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL, INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS, RELATED FINISHES TO THE LOBBY FLOOR AS PER PLANS FILED H$960,000
2019-05-22Job filed: FILING FOR SPRINKLER MODIFICATIONS TO THE GROUND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$24,750
2019-05-22Job filed: FILING FOR MECHANICAL AND PLUMBING MODIFICATIONS TO THE GROUND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,500
2019-05-22Job filed: FILING FOR STRUCTURAL MODIFICATIONS TO THE GROUND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$98,500
2019-05-22Job filed: FILING FOR MECHANICAL AND PLUMBING MODIFICATIONS TO THE GROUND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,500
2019-05-03311: Illegal Parking — Blocked Bike Lane
2018-08-27Job filed: FILING FOR INTERIOR ALTERATION TO AN ONE OFFICE SPACE TO INCLUDE NEW DROP CEILING, ONE NEW BATHROOM WITH ARRANGEMENT OF CUBCUE IN SIDE THE OFFICE AND $35,000
2018-08-27Job filed: FILING FOR INTERIOR ALTERATION TO AN ONE OFFICE SPACE TO INCLUDE NEW DROP CEILING, ONE NEW BATHROOM WITH ARRANGEMENT OF CUBCUE IN SIDE THE OFFICE AND $35,000
2018-08-15311: Taxi Complaint — Driver Complaint
2018-06-14Job filed: INSTALLATION OF NEW MANUAL, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH_VOICE COMMUICATION & COC AS PER PLANS FILED. NOCHA$100,000
2018-06-14Job filed: INSTALLATION OF NEW MANUAL, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH_VOICE COMMUICATION & COC AS PER PLANS FILED. NOCHA$100,000
2018-06-10311: Illegal Parking — Blocked Bike Lane
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-30Job filed: APPLICATION FILED FOR INTERIOR DEMOLITION. NO CHANGE IN USE OCCUPANCY OR EGRESS.$110,024
2018-05-30Job filed: APPLICATION FILED FOR INTERIOR DEMOLITION. NO CHANGE IN USE OCCUPANCY OR EGRESS.$110,024
2018-05-30Job filed: APPLICATION FILED FOR INTERIOR DEMOLITION. NO CHANGE IN USE OCCUPANCY OR EGRESS.$110,024
2018-05-30Permit EW — ISSUED
2018-05-18ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQU
2018-04-12DOB violation E:
2018-04-11DOB violation E:
2018-04-11DOB violation E:
2018-03-08311: Taxi Complaint — Driver Complaint
2018-02-12311: Noise — Noise: air condition/ventilation equipment (NV1)
2017-08-10Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS FOR NEW AIR HANDELER UNIT AS PER PLANS. NO CHANGE OF USE,EGRESS OR OCCUPANCY.$648,892
2017-08-10Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS FOR NEW AIR HANDELER UNIT AS PER PLANS. NO CHANGE OF USE,EGRESS OR OCCUPANCY.$648,892
2017-06-07311: Illegal Parking — Blocked Bike Lane
2015-10-21Job filed: INSTALL AN EXTERIOR TEMPORARY HANDICAP RAMP DURING THE THE RENOVATION OF AN EXISTING STREET LEVEL ELEVATOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,500
2015-10-21Permit AL — ISSUED
2015-08-24Permit EW — ISSUED
2015-08-20Permit PL — ISSUED
2015-08-19Permit EW — ISSUED
2015-08-19Permit EW — ISSUED
2015-08-10Permit EW — ISSUED
2015-08-10Permit EW — ISSUED
2015-07-28311: Sanitation Condition — 12 Dead Animals
2015-07-16Job filed: MODIFICATIONS TO HVAC EQUIPMENT, DUCTWORK AND PIPING WITH ASSOCIATED PLUMBING AND SPRINKLER WORK TO ACCOMMODATE THE OB/GYN OUTPATIENT OFFICES IN THE E$255,000
2015-07-16Job filed: MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE OB/GYN OUTPATIENT OFFICES ON PARTIAL 7TH FLOOR IN THE EXISTING NYU LANGONE MEDICA$300,000
2015-07-16Job filed: MODIFICATIONS TO HVAC EQUIPMENT, DUCTWORK AND PIPING WITH ASSOCIATED PLUMBING AND SPRINKLER WORK TO ACCOMMODATE THE OB/GYN OUTPATIENT OFFICES IN THE E$255,000
2015-06-15Job filed: INSTALLATION OF AC UNITS AND RELATED MECHANICAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$169,883
2015-06-15Job filed: PARTITIONS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION INCLUDING SOFT DEMO AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$156,377
2015-06-15Job filed: PARTITIONS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION INCLUDING SOFT DEMO AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$156,377
2015-03-27Air permit (REGISTRATION), fuel: NONE
2015-03-18FDNY inspection (SPECIAL-OTH)
2015-02-28311: Taxi Complaint — Driver Complaint
2015-02-16DOB violation E:
2015-02-16DOB violation E:
2015-02-16DOB violation E:
2015-02-16DOB violation E:
2015-01-16311: Homeless Encampment — N/A
2014
2014-12-07311: Blocked Driveway — No Access
2014-12-01ECB CLASS - 2 violation: 44H11,98BB05. 44H11-HOIST MACHINE TRACTION SHEAVE ROPES WORN,REPLACE SHEAVES 98BB05-CURRENT 5 YEAR TEST TAG EXPIRED 11/09 REMEDY
2014-11-24311: Elevator — Elevator - Defective/Not Working
2014-11-24ECB CLASS - 2 violation: 97X10/ 97-X-10 RESTORE DEVICE 1P33070
2014-11-24DOB complaint, category ?
2014-10-21311: Broken Muni Meter — Coin or Card Did Not Register
2014-02-10DOB violation E:
2014-02-10DOB violation E:
2014-02-10DOB violation E:
2014-02-10DOB violation E:
2013
2013-12-04Agreement — from NYC, DEPARTMENT T; NYC DEPARTMENT OF TRANSPORTATION to THE HORIZON CONDOMINIUM; THE HORIZON CONDOMINIUM
2013-12-04Agreement — from NYC, DEPARTMENT T; NYC DEPARTMENT OF TRANSPORTATION to THE HORIZON CONDOMINIUM; THE HORIZON CONDOMINIUM
2013-11-19311: Broken Muni Meter — Credit Card Stuck in Meter
2013-10-29311: Taxi Complaint — Vehicle Complaint
2013-08-24311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-07-17311: Broken Muni Meter — No Receipt
2013-06-24311: Broken Muni Meter — No Receipt
2013-06-11311: Broken Muni Meter — No Receipt
2013-05-16Permit EW — ISSUED
2013-04-29Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$130,000
2013-02-06DOB violation E:
2013-02-06DOB violation E:
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2012
2012-10-15311: Broken Muni Meter — Credit Card Stuck in Meter
2012-10-05Rodent inspection: Passed
2012-07-26311: Taxi Complaint — Driver Complaint
2012-07-07311: Noise — Noise: Construction Equipment (NC1)
2012-03-28311: Noise — Noise: air condition/ventilation equipment (NV1)
2011
2011-09-03311: Broken Muni Meter — No Receipt
2011-09-02Rodent inspection: Passed
2011-08-08Permit EW — ISSUED
2011-08-04DOB violation E:
2011-08-04DOB violation E:
2011-08-04DOB violation E:
2011-08-04DOB violation E:
2011-08-01Job filed: MASONRY REPAIRS AS PER ATTACHED DRAWINGS. NO CHANGE TO USE, EXITS OR OCCUPANCY.$96,357
2011-08-01Job filed: MASONRY REPAIRS AS PER ATTACHED DRAWINGS. NO CHANGE TO USE, EXITS OR OCCUPANCY.$96,357
2011-07-08Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-07-08Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-07-08Permit EQ — ISSUED
2011-07-08Permit EQ — ISSUED
2011-06-11311: Broken Muni Meter — No Receipt
2011-05-11Permit PL — ISSUED
2011-05-09311: Street Sign - Damaged — Construction
2011-04-05Job filed: INSTALLATION OF 2 BACKFLOW PREVENTORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$35,000
2011-04-05Job filed: INSTALLATION OF 2 BACKFLOW PREVENTORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$35,000
2010-02-01311: Street Condition — Failed Street Repair
2010-01-13311: Broken Muni Meter — No Receipt
2009
2009-04-27Permit EW — ISSUED
2009-04-24Job filed: REPLACEMENT OF TWO (2) AC UNITS ON THE ROOF.NO CHANGE IN USE, EGREES OR OCCUPANCY$52,500
2009-04-24Job filed: REPLACEMENT OF TWO (2) AC UNITS ON THE ROOF.NO CHANGE IN USE, EGREES OR OCCUPANCY$52,500
2009-02-12Permit AL — ISSUED
2009-02-04Job filed: INSTALL NON ILLUMINATED ACCESSORY BUSINESS AWNING$2,000
2009-02-04Job filed: INSTALL NON ILLUMINATED ACCESSORY BUSINESS AWNING$2,000
2009-01-22DOB violation E:
2009-01-22DOB violation E:
2009-01-22DOB violation E:
2008
2008-11-28Permit EW — ISSUED
2008-11-21Permit PL — ISSUED
2008-10-06ECB CLASS - 2 violation: 56Y10,56Y13,61M07,42I11,56Q07,64M07,100BB05,98U05,16B10,21M07,71X10. 56Y REPAIR AND SEAL GLAN PARKING. 61M PROVIDE EMERGENCY PHONE
2008-07-11Job filed: MINOR RENOVATION TO EXISTING STORE.$72,000
2008-03-06DOB violation E:
2008-03-06DOB violation E:
2008-03-06DOB violation E:
2008-03-06DOB violation E:
2008-02-08Mortgage $9,319,974 — from JERICHO OFFICE, LLC to SOVEREIGN BANK$9,319,974
2008-02-08Agreement $21,000,000 — from JERICHO OFFICE, LLC to SOVEREIGN BANK$21,000,000
2008-02-08AL&R $21,000,000 — from JERICHO OFFICE, LLC to SOVEREIGN BANK$21,000,000
2007
2007-11-30DOB violation LL1198:
2007-02-23Facade (LL11) filing, cycle 6: SWARMP
2006
2006-09-06Permit EW — ISSUED
2006-08-23Job filed: REPLACEMENT AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY.$20,000
2006-07-07DOB violation E:
2006-07-07DOB violation E:
2006-07-07DOB violation E:
2005
2005-12-19Permit AL — ISSUED
2005-12-08Job filed: INSTALL NON-ILLUMINATED AWNING WITHLETTERING NO LARGER THAN 12' NOR MORE THAN 12 SQ. FT. IN COPY READING:650 1ST. AVENUE.$2,000
2005-12-08Job filed: INSTALL NON-ILLUMINATED AWNING WITHLETTERING NO LARGER THAN 12' NOR MORE THAN 12 SQ. FT. IN COPY READING:650 1ST. AVENUE.$2,000
2005-09-26DOB violation E:
2005-03-08Permit EQ — ISSUED
2004
2004-11-30DOB violation E:
2004-11-30DOB violation E:
2004-11-30DOB violation E:
2004-11-23Permit EQ — ISSUED
2004-11-19DOB violation LL1081:
2004-11-18Job filed: Install heavy duty sidewalk shed a total of 26 ft long at 650 1st Avenue. - during remedial repairs. Work shall comply with LL33/91. No change in use
2004-11-18Job filed: Install heavy duty sidewalk shed a total of 26 ft long at 650 1st Avenue. - during remedial repairs. Work shall comply with LL33/91. No change in use
2004-11-16Permit PL — ISSUED
2004-10-06Permit EW — ISSUED
2004-10-06Permit EW — ISSUED
2004-10-06Permit EW — ISSUED
2004-09-22Job filed: Filing for interior alteration to an office space including general construction, new ceiling, flooring and finishes as shown on drawings filed herewi$75,000
2004-09-22Job filed: New Mechanical equipment and ductwork. Installation and removal of plumbing fixtures in association w/ interior renovation of office space as shown o$95,000
2004-09-22Job filed: Filing for interior alteration to an office space including general construction, new ceiling, flooring and finishes as shown on drawings filed herewi$75,000
2004-09-22Job filed: Structural work for installation of medical equipment in conjunction with an interior alteration as shown on drawings filed herewith. No change in us$10,000
2004-09-22Job filed: Removal and installation of sprinkler heads in conjunction with interior renovation filed under separate application as shown on drawings filed herewi$15,000
2004-09-03ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LOCAL LAW 11 OF 1
2003
2003-10-10DOB violation E:
2003-07-08Agreement $12,498,994 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK$12,498,994
2003-07-08Agreement $12,498,994 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK$12,498,994
2003-07-08Agreement $12,498,994 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK$12,498,994
2003-05-23ECB Non-Hazardous violation: FAILURE TO AM AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION CONDITION DESCRIBED IN INITIAL LL11/98 REPOR$1,750
2003-03-21DOB violation LL1081:
2003-03-21ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT FIVE REPORT ACEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDICAT$400
2003-03-03ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHINCAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW
2003-01-27ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE ACCEPTABLE TO THIS DEPARTMENT PURSANT TO RULE R.C.N.Y 32-03B(5), INDICATING CORRECTION OF HA$400
2002
2002-10-25DOB violation E: 1P29206
2002-09-12Job filed: AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY.$18,000
2002-09-12Job filed: AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY.$18,000
2002-09-12Permit EW — ISSUED
2002-08-08DOB violation L1198:
2002-08-02Job filed: Install Scaffold 32ft long by 75 ft high at 650 1st Avenue during remedial repairs Work shall comply with LL33/91 No change in use egress or occupancy
2002-08-02Job filed: Install Scaffold 32ft long by 75 ft high at 650 1st Avenue during remedial repairs Work shall compÝly with LL33/91 No change in use egress or occupanc
2002-08-02Permit EQ — ISSUED
2002-07-23Agreement — from JERICHO OFFICE, LLC to INDEPEDENCE COMMUNITY BANK
2002-07-23Mortgage $2,747,092 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK$2,747,092
2002-07-23Mortgage assigned — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK
2002-06-17Permit EW — ISSUED
2002-05-09Permit EW — ISSUED
2002-04-16Permit EQ — ISSUED
2002-04-11Permit PL — ISSUED
2002-04-05Job filed: INSTALLATION OF HEAVY DITY SIDEWALK SHED 45'DURING FACADE REPAIR. NO CHANGE IN USE,EGRESS OR OCCUPANCY SHED TO COMPLY WITH LL33/91.
2002-03-18Permit EQ — ISSUED
2002-03-12Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED , 118' DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. NO C HANGE IN EGRESS, USE OR OCCUPANCY. S
2002-02-28ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS CRACKED SPALLING DECARATIVE STORY AT 3 FLOORS SPALLING WINDOW SIDE FROM 4 THAN 4 FLOOR$180
2002-02-25DOB complaint, category ?
2002-02-22DOB violation LL10/80:
2002-02-07Permit EW — ISSUED
2002-02-07Permit EW — ISSUED
2002-01-23Job filed: APPLICATION FILED FOR INTERIOR MODIFICAT IONS AS INDICATED ON PLANS SUBM TTED HEREWITH. NO CHANGE IN USE, OCCUPAN CY OR EGRESS UNDER THIS APPLICATION.$184,000
2002-01-23Job filed: SUBSEQUENT APPLICATION FILED FOR MODIFIC ATIONS TO HVAC, PLUMBING & SPRI KLER SYSTEM AS INDICATED ON PLANS SUBMIT TED HEREWITH. NO CHANGE IN USE, $54,000
2002-01-23Job filed: APPLICATION FILED FOR INTERIOR MODIFICAT IONS AS INDICATED ON PLANS SUBM TTED HEREWITH. NO CHANGE IN USE, OCCUPAN CY OR EGRESS UNDER THIS APPLICATION.$184,000
2002-01-23Job filed: SUBSEQUENT APPLICATION FILED FOR MODIFIC ATIONS TO HVAC, PLUMBING & SPRI KLER SYSTEM AS INDICATED ON PLANS SUBMIT TED HEREWITH. NO CHANGE IN USE, $54,000
2000
2000-07-18Deed — from KIPS BAY FARM REALTYPARTNERS to JERICHO OFFICE, LLC
2000-07-18Mortgage assigned — from UNITED BANK OF KUWAIT PLC to INDEPENDENCE COMMUNITY BANK
2000-07-18Mortgage $14,113 — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK$14,113
2000-07-18Agreement — from JERICHO OFFICE, LLC to INDEPENDENCE COMMUNITY BANK
2000-07-18SAGE — from UNITED BANK OF KUWAIT PLC
2000-07-10Mortgage assigned — from UNITED BANK OF KUWAIT PLC to INDEPENDENCE COMMUNITY BANK
2000-03-10DOB violation LL1081:
2000-03-10DOB violation LL1081:
1999
1999-07-22Permit EW — ISSUED
1999-07-22Permit EW — ISSUED
1999-07-22Permit EW — ISSUED
1999-04-30Permit EW — ISSUED
1999-04-30Permit EW — ISSUED
1999-03-16Permit PL — ISSUED
1999-03-05Permit EW — ISSUED
1999-02-24ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID C OF O. ALTERATION NUMBER 100369352 TYPE 1 FOR OFFICE ON SECOND FLOOR ON 2 FLOOR FROM OF$350
1999-01-20DOB violation LL1081:
1998
1998-12-03Permit EW — ISSUED
1998-12-03Permit EW — ISSUED
1998-08-13DOB complaint, category ?
1998-07-24Permit EW — ISSUED
1998-07-24Permit EW — ISSUED
1998-03-10Permit EW — ISSUED
1998-01-16Permit PL — ISSUED
1997
1997-07-10Permit PL — ISSUED
1997-07-02Permit EW — ISSUED
1997-06-04Permit EW — ISSUED
1997-06-04Permit EW — ISSUED
1996
1996-10-21DOB complaint, category ?
1995
1995-08-09Permit PL — ISSUED
1994
1994-07-20DOB violation C:
1994-07-20DOB violation C:
1994-07-20DOB violation C:
1994-01-31Mortgage assigned — from KIPS BAY FARM REALTYPARTNERS to UNITED BANK OF KUWAIT PLC
1993
1993-12-29Agreement — from KIPS BAY FARM PARTNERS to UNITED BK/KUWAIT LTDFKA; UNITED BANK/KUWAIT PLC
1992
1992-04-01Permit PL — RE-ISSUED
1992-03-23Permit AL — ISSUED
1991
1991-12-13Permit EW — ISSUED
1991-04-02Permit EW — ISSUED
1991-03-11Permit PL — ISSUED
1991-01-25Permit EW — ISSUED
1988
1988-09-02Agreement — from KIPS BAY FARM RLTY PRTN to UNITED BANK KUWAIT
1988-09-02Mortgage $499,999 — from KIPS BAY FARM RLTY PTNRS to UNITED BANK OF KUWAIT$499,999
1988-09-02Agreement — from KIPS BAY FARM RLTY PRTNR to UNITED BANK KUWAIT LTD
1987
1987-07-27Agreement — from CHASE MANHATTN BANKNA to GLICK DVLPMNT AFFILIATES
1987-07-27Agreement — from CHASE MANHATTAN BANK to GLICK DVLPMNT AFFILIATES
1987-07-27Agreement — from CHASE MANHATTAN BANK to GLICK DVLPMNT AFFILIATES
1987-07-22SAGE — from UNITED BANK KUWAIT LTD
1987-06-26EASE — from KIPS BAY FARM REALTYPRT to GLICK DVLPMNT AFFLIIATES
1987-04-14Agreement — from KIPS BAY FARM RLTY PRTNR to UNITED BANK KUWAIT LTD
1987-04-14Agreement — from KIPS BAY FARM RLTY PRTNR to UNITED BANK KUWAIT LTD
1987-04-14Mortgage $1,000,000 — from KIPS BAY FARM REALTYPTN to UNITED BANK/KUWAIT LTD$1,000,000
1986
1986-08-27Mortgage $1,000,000 — from KIPS BAY FARM RLTY PTNS to UNITED BANK KUWAIT LTD$1,000,000
1986-08-27Mortgage assigned — from KIPS BAY FARM RLTY PTRS to UNITED BK/KUWAIT LTD.
1986-02-26Mortgage assigned — from CITIBANK N A to UNITED BK KUWAIT LTD
1986-02-26Mortgage $4,300,000 — from KIPS BAY FARM RLTY PRTNR to UNITED BANK KUWAIT LTD$4,300,000
1986-02-26Agreement — from KIPS BAY FARM RLTY PRTNR to UNITED BK KUWAIT LTD
1986-02-26Mortgage assigned — from KIPS BAY FARM RLTY PRTNR to UNITED BANK KUWAIT LTD
1986-02-26Mortgage assigned — from FLORENTINE HOLDING CORP to UNITED BK KUWAIT LTD
1984
1984-08-23Mortgage satisfied — from BRESLAU, RUTH; BARLENE REALTY CORP.; PEPAN REALTY CORP to ZAKREIM REALTY CORP.; PATRICK HOLDING CO.; UNITED STATES TR/CON.Y.
1984-04-12Mortgage $2,700,000 — from KIPS BAY FARM RLTY ETC to CITIBANK, N.A.$2,700,000
1984-04-12Mortgage $2,500,000 — from KIPS BAY FARM RLTY ETC to FLORENTINE HOLDING CORP.$2,500,000
1984-04-12Deed — from FLORENTINE HOLDING CORP. to KIPS BAY FARM RLTY PTNER
1984-04-10SAGE — from FLORENTINE HOLDING CORP
1981
1981-06-03CNTR — from FLORENTINE HOLDING CORP to KIPS BAY FARM REALTYCO
1981-06-03Agreement — from FLORENTINE HOLDING CORP to KIPS BAY FARM REALTYCO
1975
1975-01-13Agreement — from FLORENTINE HOLDING CORP to PRUDENTIAL SAVINGS BANK
1967
1967-03-24Mortgage assigned — from UNITED STATES TR CONY to BROOKLYN SAV BNK