Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

250 West 102 Street · Manhattan · BBL 1018730059 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP3
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s6.5
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 62% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 9.5. In ZIP 10025, 70% of residential buildings hold an A and 2% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations10 total — 0 class C (immediately hazardous), 10 class B, 0 class A. Oldest open since 2005-12-08.

status snapshot refreshed weekly from HPD records

Patterns

4 heat or hot-water complaints in the last three years (winter 2023–24: 4).

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

4 service requests in the last three years. Most common: HEAT/HOT WATER (2) · Rodent (1) · Lead (1).

Filed construction activity

$104,000 in permitted construction work filed since 2016 (6 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1899)
YesSix or more residential units (10)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)Thirdwave Japan
Head officerKenji Asazuma
Managing agentNew York Zone Property Inc
Last registered2025-06-03

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$2,465,000 $1,109,250
2026$2,958,000 $1,331,100
2027$2,816,000 $1,267,200

The city's market estimate has risen 14% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway103 St — 1 · 450 ft straight-line (about a 2-minute walk) · station accessibility: none
96 St — 1 2 3 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
BusNearest boarding stop: Broadway / W 102 St — M104 · 200 ft
Citi BikeW 100 St & Broadway · 500 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 075 Emily Dickinson. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

250 West 102 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

4 311 service requests from this address in the last three years — 2 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by NEW YORK ZONE PROPERTY INC — 12 buildings, 89 units. Grades across the portfolio: A9 · B1 · C2. See the whole portfolio

BuildingBoroughUnitsGrade
159 West 85 Street MN20 A
250 West 102 Street MN10 A
248 West 102 Street MN10 A
45 West 55 Street MN10 A
311 6 Avenue BK8 A
447 West 22 Street MN7 A
401 12 Street BK6 B
449 West 22 Street MN5 A
163 West 85 Street MN4 C
1001 Lorimer Street BK3 C
627 Carroll Street BK3 A
838 2 Avenue MN3 A

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $6,771,856 on 2025-09-16 (lender: Sumitomo Mitsui Banking Corporation), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2025-09-16Mortgage $6,771,856 — from THIRDWAVE CORP. to SUMITOMO MITSUI BANKING CORPORATION $6,771,856
2025-06-11Deed $9,000,000 — from 250 ASSOCIATES, L.P. to THIRDWAVE CORP. FICTITIOUS NAME THIRDWAV $9,000,000
2025-05-15Sold for $9,000,000 $9,000,000 $900,000
2021-07-07Mortgage $41,675 — from 250 ASSOCIATES L.P. to JPMORGAN CHASE BANK, NA $41,675
2021-07-07Agreement $1,950,000 — from 250 ASSOCIATES L.P. to JPMORGAN CHASE BANK, NA $1,950,000
2015-06-11Agreement $2,175,000 — from 250 ASSOCIATES, L.P. to ASTORIA BANK $2,175,000
2015-06-11Mortgage $857,176 — from 250 ASSOCIATES, L.P. to ASTORIA BANK $857,176
2011-12-01Agreement $1,400,000 — from 250 ASSOCIATES L.P. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA $1,400,000
2011-12-01Mortgage $489,316 — from 250 ASSOCIATES L.P. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA $489,316
2005-12-16Agreement $1,000,000 — from INDEPENDENCE COMMUNITY BANK to 250 ASSOCIATES L.P. $1,000,000
2005-12-16AL&R $1,000,000 — from INDEPENDENCE COMMUNITY BANK to 250 ASSOCIATES L.P. $1,000,000
2005-12-16Mortgage $495,575 — from 250 ASSOCIATES L.P. to INDEPENDENCE COMMUNITY BANK $495,575
1999-04-28Mortgage $174,809 — from 250 ASSOCIATES, L.P. to NORTH FORK BANK $174,809
1994-09-27Mortgage $60,338 — from 250 ASSOCIATES L.P. to QUEENS COUNTY SAVINGS BANK $60,339
1986-01-07Mortgage $375,000 — from CHERNEY, HENRY to GONZALEZ, MARINO R. $375,000

Ten-year activity

50250
2017
2018
2019
2020
2021
2022
29
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20173050311
2018001023
2019005027
2020511119
20212063314
20221050511
2023211201429
20240070310
2025002428
2026000022
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 3 records

DateRecord
2026-09-14Boiler inspection
2026-08-13Air permit (REGISTRATION), fuel: NATURALGAS
2025-12-23Bedbug filing: 0 infested units

The full timeline

2026
2026-09-14Boiler inspection
2026-08-13Air permit (REGISTRATION), fuel: NATURALGAS
2025
2025-12-23Bedbug filing: 0 infested units
2025-09-17Boiler inspection
2025-09-16Rodent inspection: Passed
2025-09-16Mortgage $6,771,856 — from THIRDWAVE CORP. to SUMITOMO MITSUI BANKING CORPORATION$6,771,856
2025-06-11Deed $9,000,000 — from 250 ASSOCIATES, L.P. to THIRDWAVE CORP. FICTITIOUS NAME THIRDWAV$9,000,000
2025-05-28Mortgage satisfied — from 250 ASSOCIATES, L.P.; CHERNEY, HENRY to JPMORGAN CHASE BANK, N.A.; ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA; NORTH FORK BANK; INDE
2025-05-15Sold for $9,000,000$9,000,000
2025-01-05311: Lead — Lead Kit Request (Residential) (L10)
2024
2024-12-04Bedbug filing: 0 infested units
2024-09-05Boiler inspection
2024-08-06Rodent inspection: Passed
2024-04-04Bedbug filing: 0 infested units
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-02-13311: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-13311: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-04Rodent inspection: Bait applied
2023
2023-12-22Rodent inspection: Bait applied
2023-11-18311: Rodent — Signs of Rodents
2023-11-17Rodent inspection: Failed for Rat Activity
2023-10-17Rodent inspection: Failed for Rat Activity
2023-10-03311: Dead Animal — Rat or Mouse
2023-10-01311: Noise — Noise: Construction Before/After Hours (NM1)
2023-09-30311: Rodent — Rat Sighting
2023-09-22311: Missed Collection — Trash
2023-09-08Rodent inspection: Stoppage done
2023-09-05Rodent inspection: Passed
2023-08-29Rodent inspection: Bait applied
2023-08-23311: Rodent — Rat Sighting
2023-08-09311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2023-08-09DOB complaint, category ?
2023-07-24Rodent inspection: Failed for Rat Activity and Other Reason
2023-07-13Boiler inspection
2023-07-07Rodent inspection: Bait applied
2023-06-30Rodent inspection: Failed for Rat Activity
2023-06-05311: Rodent — Condition Attracting Rodents
2023-06-02Rodent inspection: Failed for Rat Activity
2023-05-24Rodent inspection: Bait applied
2023-05-15Rodent inspection: Bait applied
2023-05-08Rodent inspection: Failed for Rat Activity
2023-05-03311: Rodent — Rat Sighting
2023-04-17311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2023-04-17Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2023-03-23Permit EW — ISSUED
2023-03-09Permit EW — ISSUED
2023-01-20311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2022
2022-12-30Bedbug filing: 0 infested units
2022-11-29Permit EW — ISSUED
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-08-30Rodent inspection: Failed for Rat Activity
2022-07-27Rodent inspection: Failed for Rat Activity and Other Reason
2022-07-25Boiler inspection
2022-07-14311: Rodent — Rat Sighting
2022-05-27Rodent inspection: Passed
2022-04-13Rodent inspection: Failed for Rat Activity
2022-02-16HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-10-29311: Water Quality — Clear Water With Other Particles (Use Comments) (QEZ)
2021-10-25311: Water Quality — Clear Water With Other Particles (Use Comments) (QEZ)
2021-10-21311: Water Quality — Clear Water With Other Particles (Use Comments) (QEZ)
2021-10-05Rodent inspection: Passed
2021-08-25Rodent inspection: Failed for Rat Activity
2021-08-12Permit Plumbing — Signed-off
2021-07-09Boiler inspection
2021-07-07Mortgage assigned — from STERLING NATIONAL BANK; ASTORIA BANK; ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to JPMORGAN CHASE BANK, NA
2021-07-07Mortgage $41,675 — from 250 ASSOCIATES L.P. to JPMORGAN CHASE BANK, NA$41,675
2021-07-07Agreement $1,950,000 — from 250 ASSOCIATES L.P. to JPMORGAN CHASE BANK, NA$1,950,000
2021-06-30Bedbug filing: 0 infested units
2021-05-21311: Noise - Vehicle — Car/Truck Music
2021-04-21Permit EW — ISSUED
2021-04-02HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2020
2020-12-21Boiler inspection
2020-12-07Job filed: Plumbing work being filed in conjunction with Alteration 2 application to renovate unit 2A on the 2nd floor. No change to use, egress or occupancy.$7,500
2020-11-23Permit EW — ISSUED
2020-11-06Job filed: Plumbing work being filed in conjunction with Alteration 2 application to renovate unit 2A on the 2nd floor. No change to use, egress or occupancy.$7,500
2020-11-05Job filed: RENOVATE UNIT 2A ON THE 2ND FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING INTERIOR PARTITIONS, FLOORING AND FINISH WORK. NO CHANGE TO USE, EGRESS O$24,500
2020-11-05Job filed: RENOVATE UNIT 2A ON THE 2ND FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING INTERIOR PARTITIONS, FLOORING AND FINISH WORK. NO CHANGE TO USE, EGRESS O$24,500
2020-08-19LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-02-24311: General Construction/Plumbing — Building Permit - None
2020-02-24DOB complaint, category ?
2019
2019-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-07-19Boiler inspection
2019-07-02Rodent inspection: Passed
2019-03-30311: PAINT/PLASTER — CEILING
2019-03-30311: WATER LEAK — HEAVY FLOW
2019-03-30Tenant complaint: PAINT/PLASTER — CEILING
2019-03-30Tenant complaint: WATER LEAK — HEAVY FLOW
2018
2018-12-27Boiler inspection — defects found
2018-10-10HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-08-22Rodent inspection: Passed
2017
2017-12-16311: Street Condition — Defective Hardware
2017-12-14311: Street Condition — Defective Hardware
2017-12-04Boiler inspection
2017-11-27Rodent inspection: Passed
2017-08-22Permit EW — ISSUED
2017-08-01Job filed: REPAIR BUILDING ENTRANCE. NO CHANGE TO USE EGRESS OR OCCUPANCY.$20,000
2017-08-01Job filed: REPAIR BUILDING ENTRANCE. RETILE 1ST FLOOR LOBBY AND PUBLIC HALL NO CHANGE TO USE EGRESS OR OCCUPANCY.$20,000
2017-06-22311: UNSANITARY CONDITION — MOLD
2017-06-22Tenant complaint: UNSANITARY CONDITION — MOLD
2017-05-09311: New Tree Request — For One Address
2017-02-24Rodent inspection: Passed
2016
2016-12-07DOB violation LANDMK:
2016-12-07DOB violation LANDMK:
2016-04-14311: New Tree Request — For One Address
2016-03-21Rodent inspection: Passed
2015
2015-10-02HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-09-23311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2015-09-23311: Noise — Noise: Construction Equipment (NC1)
2015-09-23DOB complaint, category ?
2015-08-05HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST AT
2015-08-05HPD class B: SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCA
2015-08-05HPD class B: SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WEST WALL IN THE 2nd ROOM FROM EAST AT NORT
2015-08-02311: UNSANITARY CONDITION — MOLD
2015-08-02311: PAINT/PLASTER — WINDOW/FRAME
2015-08-02Tenant complaint: UNSANITARY CONDITION — MOLD
2015-08-02Tenant complaint: PAINT/PLASTER — WINDOW/FRAME
2015-07-06311: Noise — Noise: Construction Equipment (NC1)
2015-06-11Agreement $2,175,000 — from 250 ASSOCIATES, L.P. to ASTORIA BANK$2,175,000
2015-06-11Mortgage $857,176 — from 250 ASSOCIATES, L.P. to ASTORIA BANK$857,176
2015-06-02Rodent inspection: Passed
2015-05-12Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-05-12Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-05-12Permit EQ — ISSUED
2015-05-08Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-05-08Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-05-08Permit EQ — ISSUED
2015-03-23311: New Tree Request — For One Address
2014
2014-07-16Rodent inspection: Passed
2014-01-25311: Water System — Dirty Water (WE)
2013
2013-09-17311: PLUMBING — WATER-SUPPLY
2013-09-17Tenant complaint: PLUMBING — WATER SUPPLY
2013-08-14311: Noise — Noise: Construction Before/After Hours (NM1)
2013-08-10311: Noise — Noise: Construction Before/After Hours (NM1)
2013-07-27311: Noise — Noise: Construction Before/After Hours (NM1)
2013-07-18311: Water Conservation — Wasting Faucets,Sinks,Flushometer,Urinal,Etc. - Private Residence (CWR)
2013-07-15311: Water Conservation — Wasting Faucets,Sinks,Flushometer,Urinal,Etc. - Private Residence (CWR)
2013-07-12Permit PL — ISSUED
2013-05-23Permit EW — ISSUED
2013-05-23Permit EW — ISSUED
2013-05-14Rodent inspection: Passed
2013-04-25Job filed: REMODEL APARTMENT 2B ON THE SECOND FLOOR REAR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY$30,000
2013-04-25Job filed: REMODEL APARTMENT 2B ON THE SECOND FLOOR REAR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY$30,000
2013-02-02DOB complaint, category ?
2012
2012-04-23311: Other Enforcement — E10 Obstruction (Street/Sidewalk)
2012-04-18311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2012-04-18DOB complaint, category ?
2012-03-21Rodent inspection: Passed
2012-02-15ZONE — from 250 ASSOCIATES, LP
2012-02-08Permit PL — ISSUED
2012-01-12Permit PL — ISSUED
2011
2011-12-14Permit EW — ISSUED
2011-12-14Permit EW — ISSUED
2011-12-01Agreement $1,400,000 — from 250 ASSOCIATES L.P. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$1,400,000
2011-12-01Mortgage assigned — from FANNIE MAE to SOVEREIGN BANK
2011-12-01Mortgage assigned — from SOVEREIGN BANK to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2011-12-01Mortgage $489,316 — from 250 ASSOCIATES L.P. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$489,316
2011-12-01TL&R — from 250 ASSOCIATES L.P. to FANNIE MAE
2011-11-07311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2011-11-07DOB complaint, category ?
2011-10-18Rodent inspection: Passed
2011-10-17311: Building/Use — Illegal Conversion Of Residential Building/Space
2011-10-17311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2011-10-17DOB complaint, category ?
2011-10-04Permit EW — ISSUED
2011-10-04Permit EW — ISSUED
2011-07-26Job filed: REMODEL APARTMENT ON FIRST FLOOR. ADD RECREATION ROOM IN CELLAR CONNECTED TO SAME.ADD EXTENSION AND GREEN HOUSE. NO CHANGE TO USE,EGRESS,OR OCCUPANCY.$53,000
2011-07-26Job filed: REMODEL APARTMENT ON FIRST FLOOR. ADD RECREATION ROOM IN CELLAR CONNECTED TO SAME.ADD EXTENSION AND GREEN HOUSE. NO CHANGE TO USE,EGRESS,OR OCCUPANCY.$53,000
2010
2010-11-07311: Air Quality — Air: Smoke, Residential (AA1)
2009
2009-01-22Tenant complaint: HEATING — HEAT RELATED
2009-01-22Tenant complaint: HEATING — HEAT RELATED
2009-01-17Tenant complaint: HEATING — HEAT RELATED
2008
2008-03-22DOB complaint, category ?
2008-02-29HPD class B: SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE
2008-02-29HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CLOSET CEILING IN THE 4th ROOM F
2008-02-29HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 4th ROOM FROM NORT
2008-01-27Tenant complaint: PLUMBING — WATER-LEAKS
2008-01-27Tenant complaint: NONCONST — VERMIN
2008-01-27Tenant complaint: GENERAL — MOLD
2008-01-17Tenant complaint: PAINT/PLASTER — CEILING
2008-01-03DOB violation LL6291:
2007
2007-06-19Tenant complaint: PLUMBING — TOILET
2007-05-17DOB complaint, category ?
2007-05-05DOB complaint, category ?
2007-02-27Permit EW — ISSUED
2007-01-19DOB violation LL6291:
2006
2006-09-26Permit AL — ISSUED
2006-02-27Tenant complaint: HEATING — HEAT RELATED
2006-02-24Tenant complaint: HEATING — HEAT RELATED
2005
2005-12-16Agreement $1,000,000 — from INDEPENDENCE COMMUNITY BANK to 250 ASSOCIATES L.P.$1,000,000
2005-12-16AL&R $1,000,000 — from INDEPENDENCE COMMUNITY BANK to 250 ASSOCIATES L.P.$1,000,000
2005-12-16AALR — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2005-12-16TL&R — from 250 ASSOCIATES, L.P. to NORTH FORK BANK
2005-12-16Mortgage $495,575 — from 250 ASSOCIATES L.P. to INDEPENDENCE COMMUNITY BANK$495,575
2005-12-16Mortgage assigned — from NORTH FORK BANK to INDEPENDENCE COMMUNITY BANK
2005-12-16Mortgage assigned — from NORTH FORK BANK to INDEPENDENCE COMMUNITY BANK
2005-12-08HPD class B: SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR .. IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM SO
2005-12-08HPD class B: SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE
2005-12-08HPD class B: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF A CONCEAL WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3A, 3
2005-12-08HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT A
2005-12-07Tenant complaint: PLUMBING — WATER-LEAKS
2005-12-07Tenant complaint: PAINT/PLASTER — CEILING
2005-12-07Tenant complaint: PAINT/PLASTER — CEILING
2005-06-29Permit AL — ISSUED
2005-03-01Tenant complaint: PLUMBING — WATER-LEAKS
2005-03-01Tenant complaint: PAINT/PLASTER — CEILING
2004
2004-10-18Tenant complaint: HEATING — HEAT RELATED
2004-10-15Tenant complaint: HEATING — HEAT RELATED
2004-10-15Tenant complaint: GENERAL — COOKING GAS
2004-10-13Tenant complaint: HEATING — HEAT RELATED
2004-10-13Tenant complaint: GENERAL — COOKING GAS
2004-10-13Tenant complaint: GENERAL — COOKING GAS
2004-10-13Tenant complaint: HEATING — HEAT RELATED
2004-05-19Permit AL — ISSUED
2003
2003-08-04Permit AL — ISSUED
2002
2002-04-02ECB Non-Hazardous violation: BOILER ROOM DOOR MUST OPEN TOWARDS EGRESS- SECTION 4-6,8 PART 4 OF TITLE 12 OF THE OFFCIAL COMPILATION OF CODES, RULES AND REGULAT$180
2002-03-05Permit AL — ISSUED
2002-02-26Job filed: RENOVATE FIRST FLOOR REAR APARTMENT, CONNECT WITH CONVENIENT STAIRS TO CELLAR TO RECR. ROOM.$30,000
2002-02-26Job filed: RENOVATE FIRST FLOOR REAR APARTMENT, CONNECT WITH CONVENIENT STAIRS TO CELLAR TO RECR. ROOM.$30,000
2001
2001-09-28Permit PL — ISSUED
2001-09-28Permit EW — ISSUED
2001-08-30Job filed: REPLACE GAS BOILER AND REMOVE GAS HOT WATER(NYC BOILER NO.813186-01). NO CHANGE IN EGRESS,OCCUPAANCY OR USE UN DER THIS APPLICATION.$16,500
2001-08-30Job filed: REPLACE GAS BOILER AND REMOVE GAS HOT WATER(NYC BOILER NO.813186-01). NO CHANGE IN EGRESS,OCCUPAANCY OR USE UN DER THIS APPLICATION.$16,500
2001-04-11Permit EW — ISSUED
2001-04-09Job filed: REMODEL APT 4B ON THE 4TH FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY$24,000
2001-04-09Job filed: REMODEL APT 4B ON THE 4TH FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY$24,000
1999
1999-04-28Mortgage assigned — from QUEENS COUNTY SAVINGS BANK to NORTH FORK BANK
1999-04-28Agreement — from 250 ASSOCIATES, L.P. to NORTH FORK BANK
1999-04-28Mortgage assigned — from 250 ASSOCIATES, L.P. to NORTH FORK BANK
1999-04-28Mortgage $174,809 — from 250 ASSOCIATES, L.P. to NORTH FORK BANK$174,809
1994
1994-09-27Agreement — from 250 ASSOCIATES, L.P. to QUEENS COUNT SAVINGSBANK
1994-09-27Mortgage $60,338 — from 250 ASSOCIATES L.P. to QUEENS COUNTY SAVINGS BANK$60,339
1994-09-27Mortgage assigned — from GONZALEZ, MARINO R. to QUEENS COUNTY SAVINGS BANK
1993
1993-02-01Deed — from CHERNEY, HENRY to 250 ASSOCIATES LP
1986
1986-02-05Mortgage satisfied — from MAEL RTLY CORP to WOODSIDE SVGS LN ASOC; WOODSIDE SV/LN ASOC
1986-01-07Mortgage $375,000 — from CHERNEY, HENRY to GONZALEZ, MARINO R.$375,000
1986-01-07PAT — from CHERNEY, HENRY to CHERNEY, RONALD
1986-01-07Deed — from GONZALEZ, MARINO R. to CHERNEY, HENRY
1982
1982-11-30Deed — from GONZALEZ, LOUIS R. to GONZALEZ, MARINO R.
1979
1979-09-07Deed — from GONZALEZ, MARINO R to GONZALEZ, LOUIS R
1969
1969-05-21Mortgage — from GONZALEZ, MARINO R to GARCIA, JOHN
1968
1968-07-22Mortgage — from MAEL REALTY CORP to WOODSIDE S/LA
1968-07-22Deed — from GONZALEZ, MARINO R to MAEL REALTY CORP
1968-07-22Deed — from MAEL REALTY CORP to GONZALEZ, MARINO R

Support this site Back to the building page