The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 0. In ZIP 11201, 70% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
4 service requests in the last three years. Most common: Noise (2) · Construction Lead Dust (1) · Snow or Ice (1).
Filed construction activity
$446,700 in permitted construction work filed since
2016 (7 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
Yes
Six or more residential units (35)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
PIERREPONT APARTMENT CORP
Head officer
PAULA GARZON
Managing agent
BPC MANAGMENT CORP.
Last registered
2025-08-13
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$12,639,000
$5,687,550
2026
$13,064,000
$5,878,800
2027
$13,291,000
$5,980,950
The city's market estimate has risen
5% between tax years 2025 and 2027.
For property tax, the Department of Finance values this co-op
as if it were a rental building. Its 2022 estimate: gross income $2,049,840 a year
($37.96 per sq ft), operating expenses $491,940
($9.11 per sq ft), net operating income $1,557,900. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Energy grade (LL33)
B — ENERGY STAR score 84/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Borough Hall — 2 3 4 5 R · 650 ft straight-line (about a 3-minute walk) · station accessibility: partial
Bus
Nearest boarding stop: Cadman Plaza West / Clark St — B25 · 1,000 ft
Citi Bike
Pierrepont St & Monroe Pl · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
4 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $250,000 on
2018-12-10 (lender: National Consumer Cooperative Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-09-12
RPTT&RET $1,150,000 — from KAUFMAN, PETER B to RICKETT, ALIZA WHITE; RICKETT, KARL
$1,150,000
2024-09-10
Sold for $1,150,000
$1,150,000
$32,857
2024-06-05
RPTT&RET $1,725,000 — from WOLBERG, STACY to ROBERTSON, EDWARD; RAY, ELIZABETH
$1,725,000
2024-05-31
Sold for $1,725,000
$1,725,000
$49,286
2023-11-03
RPTT&RET $2,375,000 — from FONTAS, GEORGE; FARRELLY, JENNIFER to MARTINEZ, JOHN; BOZZO, ANDREA
$2,375,000
2023-10-12
Sold for $2,375,000
$2,375,000
$67,857
2022-01-10
RPTT&RET $1,195,000 — from ACKROYD, JAMES CAMERON; CHAVALI, SREE MALATI to AGATHOCLEOUS, NICOS; AGATHOCLEOUS, HAMIDA
$1,195,000
2021-12-28
Sold for $1,195,000
$1,195,000
$34,143
2021-06-11
RPTT&RET $1,240,000 — from BYNUM, SCOTT; BYNUM, SCOTT S to BAILEY, ANNIE Y; BAILEY, RONALD J
$1,240,000
2021-05-27
RPTT&RET $2,125,000 — from VONNEGUT, ELI; VONNEGUT, LYDON to FORNI, LOUISA; HUNT, ADAM J
$2,125,000
2021-05-24
Sold for $1,240,000
$1,240,000
$35,429
2021-05-18
Sold for $2,125,000
$2,125,000
$60,714
2020-09-10
RPTT&RET $965,000 — from GRINKOT, BORIS; GRINKOT, KARINA to GREBE, ALEXANDER W; FLAGG, LINDSAY N
$965,000
2020-08-20
Sold for $965,000
$965,000
$27,571
2020-01-22
RPTT&RET $1,080,000 — from STOLLER, HELENE; STOLLER, NEIL to THALER, MICHAEL; GUZENFELD, INA
$1,080,000
Ten-year activity
20100
2017
2018
2019
2020
17
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
2
2
1
0
1
6
2018
0
0
3
10
2
15
2019
0
0
1
11
2
14
2020
4
1
2
4
3
14
2021
3
3
3
5
3
17
2022
0
1
1
3
2
7
2023
3
0
4
2
5
14
2024
8
0
2
4
3
17
2025
5
1
2
0
2
10
2026
0
1
2
0
3
6
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-07-23Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCC$5,000
2024-06-24Boiler inspection
2024-06-24Boiler inspection
2024-06-05RPTT&RET $1,725,000 — from WOLBERG, STACY to ROBERTSON, EDWARD; RAY, ELIZABETH$1,725,000
2023-11-03RPTT&RET $2,375,000 — from FONTAS, GEORGE; FARRELLY, JENNIFER to MARTINEZ, JOHN; BOZZO, ANDREA$2,375,000
2023-10-12Sold for $2,375,000$2,375,000
2023-09-05Permit General Construction — Signed-off
2023-06-09Boiler inspection
2023-06-09Boiler inspection
2023-06-09Boiler inspection
2023-06-09Boiler inspection
2023-06-07Job filed: Partial demolition for lintels. No change of use, occupancy or egress.$100
2023-05-18Job filed: Rear parapet replacement, new metal siding, replace lintels, brick replacement, brick repointing, painting and miscellanous repairs. No change of use $312,100
2023-02-10Facade (LL11) filing, cycle 9: SWARMP
2023-01-12311: Illegal Parking — Paper License Plates
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-04-20Permit EW — ISSUED
2017-04-20Permit EW — ISSUED
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-11-23Permit PL — ISSUED
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-07-26Job filed: INTERIOR RENOVATION TO EXISTING BATHROOM AND KITCHEN @ 4TH FLOOR APARTMENT #4B. MINOR PLUMBING & MECHANICAL WORK ALL AS PER PLANS. NO CHANGE TO US$16,600
2016-07-26Permit EW — ISSUED
2016-07-26Permit EW — ISSUED
2016-07-02311: Lead — Lead Kit Request (Residential) (L10)
2016-06-28311: Lead — Lead Kit Request (Residential) (L10)
2016-06-08DOB violation E:
2016-05-25311: Street Light Condition — Fixture/Luminaire Out Of Position
2016-04-05Permit PL — ISSUED
2016-03-24RPTT&RET — from SOUTO-MAIOR, ALEXANDRE H to SOLIZ PASTORE, MARIA DEL CARMEN
2016-03-09Permit EW — ISSUED
2016-03-04Facade (LL11) filing, cycle 7: SWARMP
2016-03-04Facade (LL11) filing, cycle 8: SAFE
2016-01-21Job filed: INTERIOR RENOVATION OF EXISTING APARTMENT 8D AS PER PLANS. NO IN USE, EGRESS OR OCCUPANCY.$50,000
2015
2015-12-21ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURT
2015-12-01RPTT&RET $1,040,000 — from CAROSONE, JOSEPHINE to DE OLANO, JONATHAN; MODESITT, GRETA$1,040,000
2015-11-20311: General Construction/Plumbing — Failure To Maintain
2015-11-20DOB complaint, category ?
2015-09-14311: General Construction/Plumbing — Failure To Maintain
2015-09-14DOB complaint, category ?
2015-08-27ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. NOTED AT TIME OFINSPECTION, FLOWER POTS WERE SITTING ON WINDOW SILLS AT FLRS$250
2015-08-21FDNY inspection (OTHER)
2015-08-18Rodent inspection: Passed
2015-07-11311: Water System — Leak (Use Comments) (WA2)
2015-06-22Permit EW — ISSUED
2015-06-22Permit PL — ISSUED
2015-06-22Permit EW — ISSUED
2015-06-12Job filed: RELOCATION OF THE EXISTING KITCHEN, ADDITION OF A POWDER ROOM, MINOR DEMOLITION OF PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.NEW WASHER/DR YE$56,400
2015-06-12Job filed: RELOCATION OF THE EXISTING KITCHEN, ADDITION OF A POWDER ROOM, MINOR DEMOLITION OF PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.NEW WASHER/DR YE$56,400
2015-06-11Job filed: RELOCATION OF THE EXISTING KITCHEN, ADDITION OF A POWDER ROOM, MINOR DEMOLITION OF PARTITIONS. NO CHANE IN USE, EGRESS OR OCCUPANCY$52,000
2015-05-27Permit PL — ISSUED
2015-05-22Permit EW — ISSUED
2015-05-14HPD litigation: Tenant Action
2015-04-30RPTT&RET $1,050,000 — from LI, XIAOMING; MA, HENG to ACKROYD, JAMES CAMERON; CHAVALI, SREE MALATI$1,050,000
2015-04-22RPTT&RET $2,000,000 — from GROBLER, JOHANNES J to LAGERBERG, ERIC STEPHEN; LAGERBERG, SUSAN PARK$2,000,000
2015-04-09311: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09311: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09311: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09311: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-04-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-04-06DOB violation E:
2015-03-31311: HEAT/HOT WATER — APARTMENT ONLY
2015-03-31Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-03-26311: HEAT/HOT WATER — APARTMENT ONLY
2015-03-26311: PLUMBING — RADIATOR
2015-03-26Tenant complaint: PLUMBING — RADIATOR
2015-03-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-02-25311: HEAT/HOT WATER — APARTMENT ONLY
2015-02-25Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-02-23311: Noise — Noise: Construction Equipment (NC1)
2015-02-23DOB complaint, category ?
2015-02-20Permit PL — ISSUED
2015-02-09Permit EW — ISSUED
2015-02-09Permit EW — ISSUED
2015-01-26ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &$1,200
2014
2014-12-24Job filed: RENOVATE KITCHEN AND BATHROOMS IN APT 1C/D. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. COMBINATION WAS MADE PURSUANT TO TPPN 3/97.$214,250
2014-12-12RPTT&RET $1,175,000 — from JEFFREY WADE, EXECUTOR; ESTATE OF MARVIN A. HOLLAND to FARRELLY, JENNIFER M; FONTAS, GEORGE M$1,175,000
2014-06-24RPTT&RET $660,500 — from ROSENBERG, RICHARD to MELAMED, KARINA; GRINKOT, BORIS$660,500
2014-06-19RPTT&RET — from IMOGEN BEVIN CLINE AS EXECUTRIX; ESTATE OF BRIAN HOWARD to MESEREAU, ANNE ELIZABETH; CLINE, IMOGEN BEVIN; HOWARD, CHARLES EMANUEL
2014-06-09Job filed: RENOVATE APT 5C. NO CHANGE TO EGRESS USE OR OCCUPANCY.$66,000
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-03-26DOB violation E:
2014-02-10Job filed: RENOVATE KITCHEN & BATHROOM AREAS AS PER PLANS FILED$15,000
2014-01-13Mortgage assigned — from NCB, FSB to FANNIE MAE
2014-01-07FDNY inspection (RISK)
2013
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-10-12311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-09-10RPTT&RET $765,000 — from NEEDLEMAN, DAVID SETH; MINSKOFF, EVAN GARY to ZILBER, SOPHIE$765,000
2013-05-08RPTT&RET $519,000 — from MAJEWSKI, RAYMOND; KURDAS, CHIDEM to CHO, CHRISTINA L; CHO, ISAAC W$519,000
2013-01-28311: Noise — Noise: Jack Hammering (NC2)
2013-01-28311: Noise — Noise: Construction Equipment (NC1)
2013-01-28311: Noise — Noise: Construction Equipment (NC1)
2013-01-28311: Noise — Noise: Construction Equipment (NC1)
2013-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2012
2012-11-15311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-11-15DOB complaint, category ?
2012-08-30Permit EQ — ISSUED
2012-08-30Permit EQ — ISSUED
2012-07-26DOB complaint, category ?
2012-07-20RPTT&RET $1,200,000 — from CLOUGH , EDWARD; CLOUGH , SANDRA to BUSBY, LOREN A$1,200,000
2012-07-06311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2012-07-06DOB complaint, category ?
2012-06-25Permit PL — ISSUED
2012-06-22Permit EW — ISSUED
2012-06-21Permit EW — ISSUED
2012-06-18311: Non-Emergency Police Matter — Other (complaint details)
2012-06-13Job filed: INTERIOR RENOVATION OF EXTG. APARTMENT #5E ON 5TH. FLOOR INCLUDING INSTALLING KITCHEN, POWDER ROOM, NEW PARTITIONS,NEW FIXTURES AND FINISHES AS SHOWN $76,100
2012-05-14Permit EQ — ISSUED
2012-05-09Job filed: INSTALLATION OF A PIPE SCAFFOLDING SYSTEM PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2012-05-09Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2012-05-09Permit EQ — ISSUED
2012-05-03Job filed: INSTALL PIPE SCAFFOLDING SYSTEM PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2012-05-03Permit EQ — ISSUED
2012-03-06DOB violation E:
2012-02-09RPTT&RET $650,000 — from IRVING BLUMBERG TRUST; OBERLANDER, MELVYN S to BAILEY, ANNIE VAN; BAILEY, RONALD JOHN$650,000
2012-01-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011
2011-12-16Permit EQ — ISSUED
2011-11-22Permit EW — ISSUED
2011-11-22Permit EW — ISSUED
2011-11-02ECB CLASS - 1 violation: B154,4A,19B,24B,50A,B,C,D,E. 50A- A.O. SMITH HOT WATER HEATER W/(H) STAMP OVER 350,000 BTUS FLUE HAS SEPARATE CONNECTION 10 CHIMNE$2,500
2011-08-08Job filed: INSTALL LOT LINE WINDOW IN APT.5C. AND KITCHEN EXHAUST DUCT. NO CHANGE TO EGRESS,USE OR OCCUPANCY.$20,000
2011-08-08Job filed: INSTALL LOT LINE WINDOW IN APT.6E. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2011-05-26Job filed: BOILER AND BURNER REPLACEMENT (LEGALIZATION OF BOILER BUILT IN 1982 AS PER BOILER IDENTIFICATION PLATE ) . INSTALLATION FIRING BOTH #2 OIL AND NATUR$19,000
2011-05-26Permit EW — ISSUED
2011-05-26Permit PL — ISSUED
2011-05-26Permit EW — ISSUED
2011-04-05Permit EW — ISSUED
2011-03-31DOB violation E:
2011-01-19Job filed: A2$173,450
2011-01-19Job filed: A2$173,450
2010
2010-12-16311: HEATING — HEAT
2010-12-16Tenant complaint: HEATING — HEAT RELATED
2010-12-16Permit EQ — ISSUED
2010-11-22RPTT&RET $635,000 — from SIEGEL , ZACHARY; SIEGEL , SARAH to MINSKOFF, EVAN G; NEEDLEMAN, DAVID S$635,000
2010-10-27Mortgage satisfied — from PIERREPONT APT. CORP. to NEW YORK CITY HISTORIC PROPERTIES FUND,
2010-10-27TL&R — from NEW YORK CITY HISTORIC PROPERTIES FUND,
2010-10-26Permit EW — ISSUED
2010-10-14Mortgage satisfied — from PIERREPONT APT. CORP. to EMIGRANT FUNDING CORPORATION
2010-10-14TL&R — from EMIGRANT FUNDING CORPORATION
2010-10-08DOB violation VCAT1:
2010-09-23Mortgage $1,250,000 — from PIERREPONT APT. CORP. to NATIONAL CONSUMER COOPERATIVE BANK, DBA $1,250,000
2010-09-23Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK, DBA to NCB, FSB
2010-09-23AL&R $1,250,000 — from PIERREPONT APT. CORP. to NATIONAL CONSUMER COOPERATIVE BANK, DBA $1,250,000
2010-09-23AALR — from NATIONAL CONSUMER COOPERATIVE BANK, DBA to NCB, FSB
2010-07-03311: General Construction/Plumbing — Site Conditions Endangering Workers
2010-07-03DOB complaint, category ?
2010-05-06DOB violation E:
2010-02-16RPTT&RET $1,100,000 — from SHONFIELD, LISE M; ARNOLD , JONATHAN P to VONNEGUT, LYDON F; VONNEGUT, ELI J$1,100,000
2010-02-05RPTT&RET $740,000 — from SHONFIELD, LISE M; ARNOLD, JONATHAN P to BYNUM, SCOTT$740,000
2010-02-03RPTT&RET — from HOWARD, BRIAN; HOWARD, GABRIELLE to HOWARD, BRIAN
2009
2009-12-31DOB violation LBLVIO:
2009-12-31DOB violation LBLVIO:
2009-12-17Permit EQ — ISSUED
2009-08-18DOB complaint, category ?
2009-08-10Permit AL — ISSUED
2009-05-07AL&R — from PIERREPONT APT. CORP. to NEW YORK CITY HISTORIC PROPERTIES FUND,
2009-05-07Mortgage $200,000 — from PIERREPONT APT. CORP. to NEW YORK CITY HISTORIC PROPERTIES FUND, $200,000
2009-03-09Job filed: MINOR INTERIOR ENOVATION OF EXISTING KITCHEN & BATHROOM OF PARTITION & PL.FXTR$60,000
2008
2008-12-24Permit EQ — ISSUED
2008-12-11Permit AL — ISSUED
2008-10-22RPTT&RET $206,435 — from BAKER, JULIE V; GROBLER, JOHANN to GROBLER, JOHANN$206,435
2008-10-14RPTT&RET $737,500 — from MORSE, SARAH G; MORSE, MATTHEW G to WALLACE, WENDY; TETENS, DAVID$737,500
2008-05-30RPTT&RET $775,000 — from TRUST OF IRVING BLUMBERG, AS NOMINEE; MELVYN S. OBERLANDER, AS NOMINEE to SHONFIELD, LISE; ARNOLD, JONATHAN$775,000
2008-03-20Job filed: INSTALLATION OF 75'SIDEWALK SHED FOR THE PURPOSE OF FACADE INSPECTION. THE SIDEWALK SHED WILL COMPLY WITH LL33/91 AND PPN9/99. THE SIDEWALK SHED WILL
2008-03-20Permit EQ — ISSUED
2008-02-04DOB violation E:
2007
2007-07-12Permit EW — ISSUED
2007-04-18DOB violation E:
2007-03-08Job filed: Plans submitted herewith indicating wall separating Boiler Room and Storage Room to satisfy violation # 34537356M. No change to use, occupancy, or eg$2,000
2007-03-08Job filed: Plans submitted herewith indicating wall separating Boiler Room and Storage Room to satisfy violation # 34537356M. No change to use, occupancy, or eg$2,000
2007-03-07DOB complaint, category ?
2007-03-07DOB complaint, category ?
2007-02-16Facade (LL11) filing, cycle 6: SAFE
2007-02-15RPTT&RET $427,000 — from ESTATE OF IRVING BLUMBERG to SIEGEL, SARAH; SIEGEL, ZACHARY$427,000
2006
2006-09-15ECB Non-Hazardous violation: WORK W/O PERMIT.ILLEGAL WORK NOTED:AT NORTH WEST CORNER OF CELLAR 2 CONCRETE BLOCK WALLS ERECTED ENCLOSING CORNER & CREATING ROOM $250
2006-09-05DOB complaint, category ?
2006-01-27RPTT&RET $752,153 — from TRUST OF IRVING BLUMBERG; OBERLANDER, MELVYN S to KLISE, MARY JULIA; AUGUSTINE, JOSEPH$752,153
2006-01-01Tenant complaint: HEATING — HEAT RELATED
2005
2005-12-30RPTT&RET $740,000 — from AUGUSTINE, JOSEPH; KLISE, MARY J to CHUN, MONA L; CHENG, YAN K$740,000
2004
2004-11-30Mortgage assigned — from FANNIE MAE to INDEPENDENCE COMMUNITY BANK
2004-11-30Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to EMIGRANT FUNDING CORP
2004-11-30Mortgage $286,747 — from PIERREPONT APT. CORP. to EMIGRANT FUNDING CORP$286,747
2004-11-30AL&R $1,000,000 — from EMIGRANT FUNDING CORP to PIERREPONT APT. CORP.$1,000,000
2004-09-02Agreement $1,000,000 — from PEIRREPONT APT. CORP. to EMIGRANT FUNDING CORP.$1,000,000
2004-07-23ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPRURTENANCES AS REQUIRED BY LOCAL LAW
2004-03-10Permit PL — ISSUED
2004-03-03Permit EW — ISSUED
2004-01-09ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OR EXERIOR WALLS AND APPURTNENACES AS REQUIRED BY LOCAL LAW
2003
2003-12-11Job filed: COMBINE APT. 4C & 4D, MINOR PARTITION CHANGE, REFURBISH EXIST. BATHROOM & LAUNDRY AREA.$20,000
2003-12-11Job filed: COMBINE APT. 4C & 4D, MINOR PARTITION CHANGE, REFURBISH EXIST. BATHROOM & LAUNDRY AREA.$20,000
2003-10-29DOB violation E:
2003-09-04Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2003-03-21DOB violation LL1081:
2002
2002-08-20Permit EW — ISSUED
2002-08-08DOB violation L1198:
2002-07-18Job filed: RENOVATE PARTITION IN EXISTING APT 3B NO CHANGE TO EGRESS OCCUPANCY OR USE$3,000
2001
2001-07-23Permit EQ — ISSUED
2001-07-13Job filed: FURNISH, ERECT AND DISMANTLE 115 LINEAR FEET OF SIDEWALK BRIDGE IN CONJU NCTION WITH WATERPROOFING.
2001-07-13Job filed: FURNISH, ERECT AND DISMANTLE 115 LINEAR FEET OF SIDEWALK BRIDGE IN CONJU NCTION WITH WATERPROOFING.
2000
2000-05-12Mortgage assigned — from HSBC BANK USA to INDEPENDENCE COMMUNITY BANK
2000-05-12Agreement — from PIERREPONT, APT. CORP. to INDEPENDENCE COMMUNITY BANK
2000-05-12Mortgage $190,000 — from PIERREPONT APT CORP to INDEPENDENCE COMMUNITY BANK$190,000
2000-05-12SAGE — from HSBC BANK USA
2000-01-19ECB Non-Hazardous violation: 74M07. PROVIDE CWT GUARD IN PIT.