Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

204 4 Avenue · Brooklyn · BBL 3004340035 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP44
Structural & safetyDOB violations, ECB/OATH violations by class38
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. More recorded distress than 52% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty points per 10 units; this building carries 4.2. In ZIP 11217, 60% of residential buildings hold an A and 6% grade D or F. How grades work

this building
A
B
C

Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations8 total — 0 class C (immediately hazardous), 0 class B, 8 class A. Oldest open since 2026-09-12.
Pending HPD litigation1 case(s) pending in housing court

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$7,500 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

156 service requests in the last three years. Most common: Noise (18) · Illegal Parking (14) · Indoor Air Quality (14) · General Construction/Plumbing (13) · PLUMBING (8) · Smoking or Vaping (8).

Filed construction activity

$3,859,018 in permitted construction work filed since 2016 (61 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

NoBuilt before 1974 (2023)
YesSix or more residential units (193)
Yes421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)204 4th Avenue LLC
Head officerBRIAN EZRA
Managing agentAVERY RESIDENTIAL LLC
Last registered2025-08-23

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$1,900,000 $855,000
2026$15,071,000 $6,781,950
2027$50,602,000 $22,770,900

The city's market estimate has risen 2563% between tax years 2025 and 2027.

Tax exemptions on the roll: 421A 35YR WITH AFF HOUSING PCT

Building systems

Elevators2 active device(s) on record

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayUnion St — R · 200 ft straight-line (about a 1-minute walk) · station accessibility: none
Bergen St — 2 3 · 0.4 mi straight-line (about a 12-minute walk) · station accessibility: none
BusNearest boarding stop: 3 Av / Union St — B37 · 600 ft
Citi BikeUnion St & 4 Ave · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 282 Park Slope. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

204 4 Avenue

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

156 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by AVERY RESIDENTIAL LLC — 4 buildings, 462 units. Grades across the portfolio: A3 · C1. See the whole portfolio

BuildingBoroughUnitsGrade
204 4 Avenue BK193 A
1 Boerum Place BK138 A
544 Carroll Street BK128 A
115 Willoughby Street BK3 C

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $40,661,000 on 2026-03-09 (lender: Jll Real Estate Capital, LLC). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-03-09Agreement $120,411,000 — from 204 4TH AVENUE LLC to JLL REAL ESTATE CAPITAL, LLC $120,411,000
2026-03-09Mortgage $40,661,000 — from 204 4TH AVENUE LLC to JLL REAL ESTATE CAPITAL, LLC $40,661,000
2023-05-12AL&R $79,750,000 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC $79,750,000
2023-05-12Mortgage $4,720,605 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC $4,720,605
2023-05-12Mortgage $64,099,373 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC $64,099,373
2023-05-12Agreement $10,930,022 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC $10,930,022
2019-11-22Mortgage $25,000,000 — from 204 4TH AVENUE LLC to ISRAEL DISCOUNT BANK OF NEW YORK $25,000,000
2019-11-22Deed $29,750,000 — from SPEEDWAY LLC, D/B/A IN THE STATE OF NEW to 204 4TH AVENUE LLC $29,750,000
2019-11-14Sold for $29,750,000 $29,750,000 $154,145
2014-11-05RPTT&RET $5,300,000 — from HESS CORPORATION to SPEEDWAY LLC $5,300,000

Ten-year activity

2001000
2017
2018
2019
2020
2021
2022
159
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017002002
201810110012
201982104024
2020203117
20219540220
202231994154
2023335258133159
2024375161564
202542118410138
20261647890107
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 116 records

DateRecord
2026-10-11311: UNSANITARY CONDITION — MOLD
2026-10-11Tenant complaint: UNSANITARY CONDITION — MOLD
2026-10-10311: Noise - Street/Sidewalk — Loud Music/Party
2026-10-07Job filed: Mechanical renovation of the 1st floor for retail build out. No change in use, egress or occupancy
2026-10-01311: ELECTRIC — WIRING
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: FLOORING/STAIRS — FLOOR
2026-10-01311: DOOR/WINDOW — WINDOW FRAME
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: PLUMBING — SEWER
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: OUTSIDE BUILDING — ROOFING
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: FLOORING/STAIRS — STAIRS
2026-10-01311: PLUMBING — STEAM PIPE/RISER
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-10-01Tenant complaint: OUTSIDE BUILDING — ROOFING
2026-10-01Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2026-10-01Tenant complaint: FLOORING/STAIRS — STAIRS
2026-10-01Tenant complaint: PLUMBING — SEWER
2026-10-01Tenant complaint: ELECTRIC — WIRING
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-10-01Tenant complaint: FLOORING/STAIRS — FLOOR
2026-10-01Tenant complaint: PLUMBING — STEAM PIPE/RISER
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-09-30311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-29311: Illegal Parking — Blocked Crosswalk
2026-09-29311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-25311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-25HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-09-23311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-22Tenant complaint: GENERAL — VENTILATION SYSTEM
2026-09-22Tenant complaint: GENERAL — VENTILATION SYSTEM
2026-09-21311: Indoor Air Quality — Ventilation
2026-09-18311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-16311: Indoor Air Quality — Dust from Construction
2026-09-16Certificate of occupancy Renewal With Change
2026-09-15311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-12HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2026-09-12HPD class A: §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISS
2026-09-12HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-09-12HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-09-12HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-09-12HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-09-12HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-09-11HPD litigation: Tenant Action/Harrassment
2026-09-09311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2026-09-09DOB complaint, category ?
2026-09-08311: UNSANITARY CONDITION — MOLD
2026-09-08Tenant complaint: UNSANITARY CONDITION — MOLD
2026-09-01311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-08-31311: Street Light Condition — Lamppost Damaged
2026-08-30311: Street Light Condition — Fixture/Luminaire Damaged
2026-08-29311: Indoor Air Quality — Ventilation
2026-08-18311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-08-12311: Noise - Street/Sidewalk — Loud Music/Party
2026-07-15311: PAINT/PLASTER — WALL
2026-07-15311: PAINT/PLASTER — WALL
2026-07-15311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2026-07-15Tenant complaint: PAINT/PLASTER — WALL
2026-07-15Tenant complaint: PAINT/PLASTER — WALL
2026-07-15DOB complaint, category ?
2026-07-13Job filed: Mechanical renovation of the 1st floor for retail build out. No change in use, egress or occupancy
2026-07-13Job filed: Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling tiles. Subsequent filings for plumbi
2026-07-05311: Illegal Fireworks — N/A
2026-07-01311: Illegal Parking — Blocked Crosswalk
2026-07-01311: Indoor Air Quality — Ventilation
2026-06-30311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-06-30311: Elevator — Elevator - Multiple Devices On Property
2026-06-30311: GENERAL — SIGNAGE MISSING
2026-06-30Tenant complaint: GENERAL — SIGNAGE MISSING
2026-06-30DOB complaint, category ?
2026-06-25Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.
2026-06-17311: Lead — Lead Kit Request (Residential) (L10)
2026-06-08Permit Plumbing — Signed-off
2026-06-08Permit Mechanical Systems — Permit Issued
2026-06-08Permit General Construction — Signed-off

showing the 80 most recent

The full timeline

2026
2026-10-11311: UNSANITARY CONDITION — MOLD
2026-10-11Tenant complaint: UNSANITARY CONDITION — MOLD
2026-10-10311: Noise - Street/Sidewalk — Loud Music/Party
2026-10-07Job filed: Mechanical renovation of the 1st floor for retail build out. No change in use, egress or occupancy
2026-10-01311: ELECTRIC — WIRING
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: FLOORING/STAIRS — FLOOR
2026-10-01311: DOOR/WINDOW — WINDOW FRAME
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: PLUMBING — SEWER
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: OUTSIDE BUILDING — ROOFING
2026-10-01311: PLUMBING — RADIATOR
2026-10-01311: FLOORING/STAIRS — STAIRS
2026-10-01311: PLUMBING — STEAM PIPE/RISER
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-10-01Tenant complaint: OUTSIDE BUILDING — ROOFING
2026-10-01Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2026-10-01Tenant complaint: FLOORING/STAIRS — STAIRS
2026-10-01Tenant complaint: PLUMBING — SEWER
2026-10-01Tenant complaint: ELECTRIC — WIRING
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-10-01Tenant complaint: FLOORING/STAIRS — FLOOR
2026-10-01Tenant complaint: PLUMBING — STEAM PIPE/RISER
2026-10-01Tenant complaint: PLUMBING — RADIATOR
2026-09-30311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-29311: Illegal Parking — Blocked Crosswalk
2026-09-29311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-25311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-25HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-09-23311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-22Tenant complaint: GENERAL — VENTILATION SYSTEM
2026-09-22Tenant complaint: GENERAL — VENTILATION SYSTEM
2026-09-21311: Indoor Air Quality — Ventilation
2026-09-18311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-16311: Indoor Air Quality — Dust from Construction
2026-09-16Certificate of occupancy Renewal With Change
2026-09-15311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-09-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-12HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2026-09-12HPD class A: §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISS
2026-09-12HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-09-12HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-09-12HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-09-12HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-09-12HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-09-11HPD litigation: Tenant Action/Harrassment
2026-09-09311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2026-09-09DOB complaint, category ?
2026-09-08311: UNSANITARY CONDITION — MOLD
2026-09-08Tenant complaint: UNSANITARY CONDITION — MOLD
2026-09-01311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-08-31311: Street Light Condition — Lamppost Damaged
2026-08-30311: Street Light Condition — Fixture/Luminaire Damaged
2026-08-29311: Indoor Air Quality — Ventilation
2026-08-18311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-08-12311: Noise - Street/Sidewalk — Loud Music/Party
2026-07-15311: PAINT/PLASTER — WALL
2026-07-15311: PAINT/PLASTER — WALL
2026-07-15311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2026-07-15Tenant complaint: PAINT/PLASTER — WALL
2026-07-15Tenant complaint: PAINT/PLASTER — WALL
2026-07-15DOB complaint, category ?
2026-07-13Job filed: Mechanical renovation of the 1st floor for retail build out. No change in use, egress or occupancy
2026-07-13Job filed: Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling tiles. Subsequent filings for plumbi$480,000
2026-07-05311: Illegal Fireworks — N/A
2026-07-01311: Illegal Parking — Blocked Crosswalk
2026-07-01311: Indoor Air Quality — Ventilation
2026-06-30311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-06-30311: Elevator — Elevator - Multiple Devices On Property
2026-06-30311: GENERAL — SIGNAGE MISSING
2026-06-30Tenant complaint: GENERAL — SIGNAGE MISSING
2026-06-30DOB complaint, category ?
2026-06-25Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.$1,000
2026-06-17311: Lead — Lead Kit Request (Residential) (L10)
2026-06-08Permit Plumbing — Signed-off
2026-06-08Permit Mechanical Systems — Permit Issued
2026-06-08Permit General Construction — Signed-off
2026-06-04Job filed: Plumbing renovation of the 1st floor for retail build out. No change in use, egress or occupancy
2026-06-04Job filed: Mechanical renovation of the 1st floor for retail build out. No change in use, egress or occupancy
2026-05-27Certificate of occupancy Renewal With Change
2026-05-27Job filed: Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling tiles. Subsequent filings for plumbi$480,000
2026-05-22311: Smoking or Vaping — Allowed in Smoke Free Area
2026-05-20311: Smoking or Vaping — Allowed in Smoke Free Area
2026-05-18311: Sidewalk Condition — Blocked - Construction
2026-05-16311: Smoking or Vaping — Allowed in Smoke Free Area
2026-05-05311: Smoking or Vaping — Allowed in Smoke Free Area
2026-04-17311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2026-04-17DOB complaint, category ?
2026-04-11311: Noise - Street/Sidewalk — Loud Music/Party
2026-03-12Certificate of occupancy Renewal With Change
2026-03-10311: Noise - Residential — Banging/Pounding
2026-03-10Permit Suspended Scaffold — Signed-off
2026-03-10Permit Suspended Scaffold — Signed-off
2026-03-09Mortgage assigned — from JLL REAL ESTATE CAPITAL, LLC to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-03-09Agreement — from JLL REAL ESTATE CAPITAL, LLC to THE CITY OF NEW YORK
2026-03-09Agreement $120,411,000 — from 204 4TH AVENUE LLC to JLL REAL ESTATE CAPITAL, LLC$120,411,000
2026-03-09Mortgage $40,661,000 — from 204 4TH AVENUE LLC to JLL REAL ESTATE CAPITAL, LLC$40,661,000
2026-03-09Mortgage assigned — from SM TACTICAL FINANCE III-E LLC to JLL REAL ESTATE CAPITAL, LLC
2026-03-09Mortgage assigned — from SM TACTICAL FINANCE III-E LLC to JLL REAL ESTATE CAPITAL, LLC
2026-03-09Mortgage assigned — from SM TACTICAL FINANCE III-E LLC to JLL REAL ESTATE CAPITAL, LLC
2026-03-09TERA — from CUSTOMERS BANK to SM TACTICAL FINANCE III-E LLC
2026-03-09TL&R — from SM TACTICAL FINANCE III-E LLC to 204 4TH AVENUE LLC
2026-01-23Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.$1,000
2026-01-19311: Noise — Noise: Alarms (NR3)
2025
2025-12-30Certificate of occupancy Renewal Without Change
2025-12-05Bedbug filing: 0 infested units
2025-11-24311: Vendor Enforcement — Non-Food Vendor
2025-11-20311: Vendor Enforcement — Non-Food Vendor
2025-11-20311: Street Sign - Damaged — Other/Unknown
2025-11-10311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2025-11-07Certificate of occupancy Renewal With Change
2025-10-24311: Illegal Parking — Blocked Bike Lane
2025-10-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-12311: Homeless Person Assistance — Non-Chronic
2025-10-09DECL — from 204 4TH AVENUE LLC
2025-09-28311: Noise - Helicopter — Other
2025-09-14311: Lead — Lead Kit Request (Residential) (L10)
2025-09-12FDNY inspection (CONSTR)
2025-09-12FDNY inspection (RISK)
2025-09-02311: Illegal Parking — Blocked Crosswalk
2025-08-27Certificate of occupancy Renewal With Change
2025-08-26311: Street Sign - Missing — Street Cleaning - ASP
2025-08-21FDNY inspection (CONSTR)
2025-08-20Bedbug filing: 0 infested units
2025-08-19311: Sidewalk Condition — Blocked - Construction
2025-08-19311: Non-Emergency Police Matter — Other (complaint details)
2025-08-19Job filed: install hvac units for Bank of America.$237,500
2025-08-18311: Obstruction — Cone
2025-08-17311: Litter Basket Complaint — Overflowing
2025-08-17311: Litter Basket Request — New Basket
2025-08-15311: Smoking or Vaping — Allowed in Smoke Free Area
2025-08-11311: Illegal Parking — Blocked Hydrant
2025-08-06311: Vendor Enforcement — Food Vendor
2025-08-06311: Smoking or Vaping — Allowed in Smoke Free Area
2025-08-05311: Illegal Dumping — Removal Request
2025-08-05Job filed: FILING HEREWITH MECHANICAL WORK (INSTALLATION OF NEW HVAC SYSTEMS AND ASSOCIATED DUCTWORK) IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB$168,529
2025-08-04311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2025-08-04311: DOOR/WINDOW — DOOR
2025-08-04Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2025-08-04Tenant complaint: DOOR/WINDOW — DOOR
2025-08-03HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER AT WEST AND NORTH WALL AT PUBLIC HALL, 1st STORY
2025-08-03HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2025-08-03HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER AT WEST WALL AT PUBLIC HALL, 9th STORY
2025-08-02311: Noise - Street/Sidewalk — Loud Music/Party
2025-08-02311: PLUMBING — WATER SUPPLY
2025-08-02311: ELECTRIC — POWER OUTAGE
2025-08-02311: GENERAL — SIGNAGE MISSING
2025-08-02311: SAFETY — FIRE ESCAPE
2025-08-02311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2025-08-02Tenant complaint: SAFETY — FIRE ESCAPE
2025-08-02Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2025-08-02Tenant complaint: ELECTRIC — POWER OUTAGE
2025-08-02Tenant complaint: GENERAL — SIGNAGE MISSING
2025-08-02Tenant complaint: PLUMBING — WATER SUPPLY
2025-07-19ECB CLASS - 2 violation: FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS. OBSERVER JERSEY BARRIERS INSTALLED AT EXP# 1 NOT AS PER MANUFACTURE SPECIFICAT
2025-07-19DOB complaint, category ?
2025-07-15Job filed: FILING HEREWITH SPRINKLER WORK IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$76,046
2025-07-14Certificate of occupancy Renewal Without Change
2025-06-30311: Vendor Enforcement — Food Vendor
2025-06-26311: Vendor Enforcement — Food Vendor
2025-06-25Permit Mechanical Systems — Signed-off
2025-06-24311: Smoking or Vaping — Allowed in Smoke Free Area
2025-06-24Permit Structural — Signed-off
2025-06-24Permit General Construction — Signed-off
2025-06-23Job filed: FILING HEREWITH MECHANICAL WORK (INSTALLATION OF NEW HVAC SYSTEMS AND ASSOCIATED DUCTWORK) IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB$168,529
2025-06-17Permit Sprinklers — Signed-off
2025-06-17Permit General Construction — Signed-off
2025-06-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-06-15311: Graffiti — Graffiti
2025-06-15311: Graffiti — Police Report Requested
2025-06-12311: Dead Animal — Bird
2025-06-11311: Smoking or Vaping — Allowed in Smoke Free Area
2025-05-31311: Illegal Parking — Paper License Plates
2025-05-27311: PLUMBING — WATER SUPPLY
2025-05-27311: PAINT/PLASTER — WINDOW/FRAME
2025-05-27311: UNSANITARY CONDITION — MOLD
2025-05-27311: SAFETY — WINDOW GUARD BROKEN/MISSING
2025-05-27Tenant complaint: PLUMBING — WATER SUPPLY
2025-05-27Tenant complaint: PAINT/PLASTER — WINDOW/FRAME
2025-05-27Tenant complaint: UNSANITARY CONDITION — MOLD
2025-05-27Tenant complaint: SAFETY — WINDOW GUARD BROKEN/MISSING
2025-05-27Permit Sign — Signed-off
2025-05-27Permit Sign — Signed-off
2025-05-26311: Illegal Parking — License Plate Obscured
2025-05-23Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "BANK OF AMERICA WITH FLAGSCAPE LOGO"$2,808
2025-05-23Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "BANK OF AMERICA WITH FLAGSCAPE LOGO"$2,808
2025-05-21311: Noise - Vehicle — Car/Truck Horn
2025-05-21311: Noise - Vehicle — Car/Truck Horn
2025-05-21311: Noise - Street/Sidewalk — Loud Music/Party
2025-05-20311: Noise - Vehicle — Car/Truck Horn
2025-05-20Job filed: FILING HEREWITH PLUMBING WORK IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$50,000
2025-05-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-05-18311: Illegal Parking — Posted Parking Sign Violation
2025-05-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-05-14Permit Mechanical Systems — Signed-off
2025-05-13311: Illegal Parking — Blocked Bike Lane
2025-05-12311: Vendor Enforcement — Food Vendor
2025-05-09311: Street Condition — Blocked - Construction
2025-05-09DOB complaint, category ?
2025-05-09ECB CLASS - 1 violation: DURING INSPECTION, MULTIPLE SCISSOR LIFTS WERE IN USE. ONE WORKER FAILED TO PROVIDE THE REQUIRED MANUFACTURER'S CERTIFICATE OF TRA
2025-05-09ECB CLASS - 1 violation: DURING INSPECTION, WORKERS WERE OBSERVED OPERATING A SCISSOR LIFT WITHOUT PROVIDING THE MANUFACTURER'S CERTIFICATE OF TRAINING UPO$1,250
2025-05-09ECB CLASS - 1 violation: DURING INSPECTION, WORKERS WERE OBSERVED USING AN A-FRAME LADDER IN A FOLDED POSITION LEANED AGAINST A WALL, CONTRARY TO MANUFACT$2,500
2025-05-07DOB complaint, category ?
2025-05-05Permit Plumbing — Signed-off
2025-04-28311: Street Sign - Missing — Other/Unknown
2025-04-28Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.$1,000
2025-04-26311: Noise — Noise: Construction Before/After Hours (NM1)
2025-04-22Certificate of occupancy Renewal With Change
2025-04-22Permit Standpipe — Signed-off
2025-04-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2025-04-17DOB complaint, category ?
2025-04-12311: Noise - Street/Sidewalk — Loud Talking
2025-04-10Permit Sprinklers — Signed-off
2025-04-10Permit Standpipe — Signed-off
2025-04-05311: Noise - Vehicle — Car/Truck Music
2025-04-01311: Water Conservation — Water Meter Broken/Leaking - Other (CMO)
2025-04-01311: Water Conservation — Water Meter Broken/Leaking - Private Residence (CMR)
2025-04-01311: Illegal Parking — License Plate Obscured
2025-04-01Permit General Construction — Permit Issued
2025-04-01Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.$1,000
2025-03-31Certificate of occupancy Renewal With Change
2025-03-20Job filed: FILING HEREWITH SPRINKLER WORK IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$76,046
2025-03-20Job filed: FILING HEREWITH PLUMBING WORK IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$50,000
2025-03-20Job filed: FILING HEREWITH MECHANICAL WORK (INSTALLATION OF NEW HVAC SYSTEMS AND ASSOCIATED DUCTWORK) IN CONJUNCTION WITH INTERIOR FIT OUT FOR NEW YORK KIDS CLUB$168,529
2025-03-11311: Litter Basket Request — Replacement Basket
2025-03-10Job filed: FILING HEREWITH INTERIOR FIT OUT WORK FOR NEW YORK KID'S CLUB AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$530,000
2025-03-07311: Litter Basket Request — Replacement Basket
2025-03-06311: Litter Basket Request — Replacement Basket
2025-03-05311: Litter Basket Request — New Basket
2025-02-20Permit Sprinklers — Signed-off
2025-02-20Permit Plumbing — Signed-off
2025-02-13Permit Sprinklers — Signed-off
2025-02-13Permit Plumbing — Signed-off
2025-02-04Certificate of occupancy Initial
2025-01-31311: Sidewalk Condition — Blocked - Construction
2025-01-31Permit Structural — Signed-off
2025-01-31Permit Mechanical Systems — Signed-off
2025-01-30Permit General Construction — Signed-off
2025-01-29311: Sidewalk Condition — Blocked - Construction
2025-01-23311: Sidewalk Condition — Blocked - Construction
2025-01-09Permit General Construction — Permit Issued
2025-01-06Permit Plumbing — Signed-off
2024
2024-12-17311: Illegal Dumping — Removal Request
2024-12-12Job filed: Reinforce floor to support new safe and ATMs for Bank of America.$33,000
2024-12-11Job filed: install hvac units for Bank of America.$237,500
2024-12-11Job filed: Install plumbing fixtures for Bank of America.$93,100
2024-12-05Elevator permit: INSTALL (2) NEW 2:1 ROPED UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1, 2005S, PART II, CHAPTER 30 OF 2014 BC, APPENDIX K4. PE$500,000
2024-11-29311: Illegal Parking — Blocked Crosswalk
2024-11-22Job filed: Tenant fit out for Bank of America. No change to use, egress or occupancy.$210,000
2024-11-13Permit Construction Fence — Signed-off
2024-10-30311: Sidewalk Condition — Blocked - Construction
2024-10-24Permit Sidewalk Shed — Signed-off
2024-10-08Job filed: FILING HEREWITH PLUMBING WORK FOR NEW BUILDING AS PER PLANS.$1,000
2024-10-03Job filed: FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.$1,000
2024-10-02311: Derelict Vehicles — Derelict Vehicles
2024-10-01Elevator permit: INSTALL (2) NEW 2:1 ROPED UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1, 2005S, PART II, CHAPTER 30 OF 2014 BC, APPENDIX K4. PE$500,000
2024-10-01Job filed: FILING HEREWITH INSTALLATION OF SP/SD SYSTEM IN CONJUNCTION WITH NB AS PER PLANS.$1,000
2024-09-19Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.$1,000
2024-09-09311: Noise — Noise: Jack Hammering (NC2)
2024-09-01311: Derelict Vehicles — Derelict Vehicles
2024-08-28ECB CLASS - 1 violation: AFTER THE INCIDENT OCCURRED 07/17/2024 AT PROPOSED NEW BUILDING CONSTRUCTION SITE WERE A WORKER SLIP AND FELL ON 6TH FLOOR AREA. A$2,500
2024-08-27DOB complaint, category ?
2024-08-23Permit Structural — Signed-off
2024-08-22Permit General Construction — Permit Issued
2024-08-01Permit Structural — Signed-off
2024-07-31Permit General Construction — Permit Issued
2024-07-25Job filed: SUSPENDED SCAFFOLD AS PER DWGS. SUSP SF SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. REQUESTING LL158/17 PRO
2024-07-17DOB complaint, category ?
2024-07-05Job filed: FILING HEREWITH INSTALLATION OF SP/SD SYSTEM IN CONJUNCTION WITH NB AS PER PLANS.$1,000
2024-07-01311: Illegal Parking — Parking Permit Improper Use
2024-06-24311: Dirty Condition — Trash
2024-06-24311: General Construction/Plumbing — Debris - Excessive
2024-06-24DOB complaint, category ?
2024-06-21311: Illegal Dumping — Removal Request
2024-06-14Elevator permit: INSTALL (2) NEW 2:1 ROPED UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1, 2005S, PART II, CHAPTER 30 OF 2014 BC, APPENDIX K4. PE$500,000
2024-06-11311: Illegal Parking — License Plate Obscured
2024-05-09Job filed: SUSPENDED SCAFFOLD AS PER DWGS. SUSP SF SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. REQUESTING LL158/17 PRO
2024-05-08FDNY inspection (CONSTR)
2024-05-03Permit Protection and Mechanical Methods — Signed-off
2024-05-03Permit Protection and Mechanical Methods — Signed-off
2024-04-30Permit Suspended Scaffold — Signed-off
2024-04-29Job filed: SUSPENDED SCAFFOLD AS PER DWGS. SUSP SF SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. REQUESTING LL158/17 PRO
2024-04-24Rodent inspection: Passed
2024-04-19Permit Sprinklers — Signed-off
2024-04-19Permit Standpipe — Signed-off
2024-04-05311: Illegal Parking — Posted Parking Sign Violation
2024-04-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-04-01Permit Suspended Scaffold — Signed-off
2024-03-25Permit Supported Scaffold — Signed-off
2024-03-24311: Dirty Condition — Trash
2024-03-22Elevator permit: INSTALL (2) NEW 2:1 ROPED UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1, 2005S, PART II, CHAPTER 30 OF 2014 BC, APPENDIX K4. PE$500,000
2024-03-06Permit Supported Scaffold — Signed-off
2024-02-16Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$300,000
2024-02-16Job filed: TEMPORARY SUSPENDED SCAFFOLD DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE I
2024-02-12Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o
2024-02-06311: Noise — Noise: Jack Hammering (NC2)
2024-01-30311: Water System — Hydrant Knocked Over/Missing (WC)
2024-01-25Permit Foundation — Signed-off
2024-01-18Permit Standpipe — Signed-off
2024-01-18Permit Sprinklers — Signed-off
2024-01-18Permit Plumbing — Signed-off
2024-01-18Permit Standpipe — Signed-off
2024-01-17Permit Suspended Scaffold — Signed-off
2024-01-16Permit General Construction — Signed-off
2024-01-10SMIS — from 204 4TH AVENUE LLC
2024-01-08Job filed: Installation of suspended scaffold for facade inspection/repair
2023
2023-12-18EASE — from 204 4TH AVENUE LLC to PEOPLE OF NEW YORK BY DEPT. ENVIRONMENTA
2023-12-13Elevator permit: INSTALL (2) NEW 2:1 ROPED UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1, 2005S, PART II, CHAPTER 30 OF 2014 BC, APPENDIX K4. PE$500,000
2023-11-29DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2023-11-13Permit Construction Fence — Signed-off
2023-11-11311: Building/Use — Zoning - Non-Conforming/Illegal Vehicle Storage
2023-11-11DOB complaint, category ?
2023-11-11Job filed: INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE I USE, EGRESS OR OCCUPANCY. FENCE INSTALLED$5,000
2023-11-09311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-11-09311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-11-09DOB complaint, category ?
2023-11-09ECB CLASS - 2 violation: AT TIME OF INSPECTION OF A NEW BUILDING UNDER CONSTRUCTION UPON REVIEW DEPARTMENT RECORDS I OBSERVED CONSTRUCTION FENCE PERMIT EXP
2023-11-09DOB complaint, category ?
2023-11-07Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO C$10,000
2023-11-06311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-11-06DOB complaint, category ?
2023-11-05311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-11-05311: ELECTRIC — WIRING
2023-11-05311: General Construction/Plumbing — Fence - None/Inadequate
2023-11-05Tenant complaint: ELECTRIC — WIRING
2023-11-05DOB complaint, category ?
2023-11-05DOB complaint, category ?
2023-11-03311: Noise — Noise: Construction Before/After Hours (NM1)
2023-11-03311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-11-03311: General Construction/Plumbing — Building Permit - None
2023-11-03311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2023-11-03311: General Construction/Plumbing — Construction - Change Grade/Watercourse
2023-11-03DOB complaint, category ?
2023-11-03DOB complaint, category ?
2023-11-03DOB complaint, category ?
2023-11-02311: Asbestos — Asbestos Complaint (B1)
2023-11-02311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2023-11-02311: General Construction/Plumbing — Posted Notice Or Order Removed/Tampered With
2023-11-02DOB complaint, category ?
2023-11-02DOB complaint, category ?
2023-11-01311: Street Condition — Defective Hardware
2023-11-01311: Street Condition — Blocked - Construction
2023-11-01311: Street Condition — Line/Marking - After Repaving
2023-11-01311: Sidewalk Condition — Broken Sidewalk
2023-11-01311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-11-01311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-11-01311: Street Condition — Blocked - Construction
2023-11-01DOB complaint, category ?
2023-11-01DOB complaint, category ?
2023-10-25Permit Sidewalk Shed — Signed-off
2023-10-25ECB CLASS - 1 violation: RESPONDING COMPLAINT OBSERVED: BIKE LINE CLOSED, AT EXPOSURE# 4 AT 4TH AVENUE SIDE, CONTRARY TO SITE SAFETY PLAN, BIKERS ARE USING$1,250
2023-10-24311: General Construction/Plumbing — Site Conditions Endangering Workers
2023-10-24DOB complaint, category ?
2023-10-17311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-10-17DOB complaint, category ?
2023-10-12311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-10-12Permit Protection and Mechanical Methods — Signed-off
2023-10-12DOB complaint, category ?
2023-10-12Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MATERIAL HOIST TO CO$10,000
2023-10-11311: Industrial Waste — Concrete In Catch Basin (IEA)
2023-10-10311: Noise — Noise: Construction Equipment (NC1)
2023-10-09311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-10-09DOB complaint, category ?
2023-10-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-10-07DOB complaint, category ?
2023-10-06311: Dirty Condition — Trash
2023-10-05311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2023-10-05DOB complaint, category ?
2023-10-04311: General Construction/Plumbing — Debris - Excessive
2023-10-04DOB complaint, category ?
2023-10-04ECB CLASS - 1 violation: FAILURE TO COMPLY WITH MANUFACTURERS SPECIFICATION FOR EMBEDDED CONCRETE SAFETY STRAPS BEFORE DAILY USE. THIS CREATES A HAZARDOUS
2023-09-28Permit Plumbing — Signed-off
2023-09-13Job filed: Alteration application filed herewith for interior temporary structures in conjunction with new building job# B00637594-I1. No change in use, egress o$15,000
2023-09-09311: Noise — Noise: Construction Before/After Hours (NM1)
2023-09-07311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-09-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-09-07DOB complaint, category ?
2023-09-07DOB complaint, category ?
2023-08-31311: Noise — Noise: Construction Before/After Hours (NM1)
2023-08-31311: Noise — Noise: Construction Before/After Hours (NM1)
2023-08-28311: General Construction/Plumbing — Debris - Excessive
2023-08-28DOB complaint, category ?
2023-08-21ECB CLASS - 1 violation: WHILE HOISTING A LOAD OF FORMWORK FROM THE 8TH FLOOR PRESTON BOX THE LOAD FELL AND PART OF THE LOAD HIT A STOPPED CAR CAUSING DAMA$10,000
2023-08-21DOB complaint, category ?
2023-08-21ECB CLASS - 1 violation: WHILE HOISTING A LOAD OF FORMWORK FROM THE 8TH FLOOR PRESTON BOX THE LOAD FELL AND PART OF THE LOAD HIT A STOPPED CAR CAUSING DAMA
2023-08-21ECB CLASS - 1 violation: AT TIME OF INSPECTION RESPOND TO AN INCIDENT .WHERE JOB SITE CRANE WAS LIFTING MATERIAL FROM THE 8TH FLOOR WHEN THE MATERIAL CAME
2023-08-21DOB complaint, category ?
2023-08-21ECB CLASS - 1 violation: AT TIME OF INSPECTION RESPOND TO AN INCIDENT WHERE JOB SITE CRANE WAS LIFTING MATERIAL FROM THE 8TH FLOOR WHERE THE MATERIAL CAME $25,000
2023-08-16DOB complaint, category ?
2023-08-10Permit Structural — Signed-off
2023-08-09Permit General Construction — Permit Issued
2023-08-06311: Homeless Person Assistance
2023-08-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-08-05311: Noise — Noise: Construction Before/After Hours (NM1)
2023-08-05DOB complaint, category ?
2023-08-01311: Illegal Dumping — Removal Request
2023-07-28DOB complaint, category ?
2023-07-28ECB CLASS - 1 violation: BC 3301.1.1 FAILURE TO INSTITUTE ADEQUATE SAFETY MEASURES. WORKER FELL CLIMBING LADDER FROM 3RD TO THE 4TH FL STAIRS ARE IN AND OP
2023-07-27ECB CLASS - 1 violation: IN RESPONDING TO AN INCIDENT REPORTED BY SITE SAFETY MANAGER THAT WORKER WAS REMOVING/STRIPPING A SHEET OF PLYWOOD FROM CELLING WH$10,000
2023-07-25311: Noise — Noise: Construction Before/After Hours (NM1)
2023-07-25DOB complaint, category ?
2023-07-19Elevator permit: Installation of Cars 1 and 2 Alimak Scando 650 DUAL personnel / material hoist as per plans in conjunction with general constructi$20,000
2023-07-03311: Illegal Dumping — Removal Request
2023-07-01Permit Structural — Signed-off
2023-06-23DOB complaint, category ?
2023-06-23ECB CLASS - 1 violation: AT TIME OF INSPECTION FOR AN INCIDENT WERE A WORKER WAS STRIPPING A CONCRETE FORM WHICH STRUCK AND FELL ON TOP OF HIM AFTER TRIPPI$2,500
2023-06-21DOB complaint, category ?
2023-06-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-06-13DOB complaint, category ?
2023-06-11311: Traffic — Chronic Stoplight Violation
2023-06-09ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION RESPONDING TO INCIDENT WHERE WORKER ENGES TONA TRIPPED OVER METAL BEAM OBSERVED INADEQUATE HOUSEKEEPI$1,250
2023-06-09DOB complaint, category ?
2023-06-05ECB CLASS - 1 violation: RESPONDING A COMPLAINT OBSERVED: SIDEWALK SHED INSTALLED AT EXPO# 1-3-4. UPON REVIEWING SITE SAFETY PLAN DOES NOT REFLECT SITE CON$2,500
2023-06-05ECB CLASS - 2 violation: BC 3307.2.1 MISCELLANEOUS VIOLATIONS. RESPONDING TO A COMPLAINT OBSERVED: SIDEWALK SHED INSTALLED AT EXPO #1-4. UPON REQUEST FOR D
2023-06-05Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO$10,000
2023-06-03311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-06-03311: Water System — Hydrant Defective (WC2)
2023-06-03DOB complaint, category ?
2023-06-01Permit Protection and Mechanical Methods — Signed-off
2023-05-27311: Noise — Noise: Construction Before/After Hours (NM1)
2023-05-26311: General Construction/Plumbing — Debris - Excessive
2023-05-26ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OBSERVED INSTALLED REBARS APPROXIMATELY 10 FEET ABOVE ADJACENT ROOF AT EXP#3. ALSO OBSERVED THAT THER
2023-05-26ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION I OBSERVED USE OF HYDRANT ON SACKETT STREET. UPON REQUEST FROM SITE SAFETY MANAGER DEP PERMIT NONE SE$625
2023-05-26DOB complaint, category ?
2023-05-26ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION RESPONDING TO COMPLAINT OBSERVED THAT EXISTING CONDITIONS NOT COMPLY WITH APPROVED DOCUMENT ( ON SACK$625
2023-05-25311: Sidewalk Condition — Broken Sidewalk
2023-05-17Permit Structural — Signed-off
2023-05-16Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO C$10,000
2023-05-12Mortgage assigned — from SM TACTICAL FINANCE III-E LLC to CUSTOMERS BANK
2023-05-12Agreement — from SM TACTICAL FINANCE III-E LLC to THE CITY OF NEW YORK, DEPARTMENT OF HOUS
2023-05-12AL&R $79,750,000 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC$79,750,000
2023-05-12Mortgage $4,720,605 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC$4,720,605
2023-05-12Mortgage $64,099,373 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC$64,099,373
2023-05-12Agreement $10,930,022 — from 204 4TH AVENUE LLC to SM TACTICAL FINANCE III-E LLC$10,930,022
2023-05-12Mortgage assigned — from ISREAL DISCOUNT BANK OF NEW YORK to SM TACTICAL FINANCE III-E LLC
2023-05-12Agreement — from 204 4TH AVENUE LLC to 204 4TH AVENUE LLC
2023-05-11311: Traffic — Chronic Stoplight Violation
2023-05-05Elevator permit: Installation of Cars 1 and 2 Alimak Scando 650 DUAL personnel / material hoist as per plans in conjunction with general constructi$20,000
2023-05-05Permit Protection and Mechanical Methods — Signed-off
2023-05-05Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO$10,000
2023-05-04Permit Protection and Mechanical Methods — Signed-off
2023-05-04Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOI$20,000
2023-04-28Agreement — from ISRAEL DISCOUNT BANK OF NEW YORK to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2023-04-28DECL — from 204 4TH AVENUE LLC
2023-04-28DEEDO — from 204 4TH AVENUE LLC to 204 4TH AVENUE LLC
2023-04-27Permit General Construction — Permit Issued
2023-04-22311: Taxi Complaint — Driver Complaint - Non Passenger
2023-04-21Permit Protection and Mechanical Methods — Signed-off
2023-04-21Permit Support of Excavation — Signed-off
2023-04-18Deed transfer (nominal price)
2023-03-30Job filed: SUPPORT-OF-EXCAVATION AT SIDEWALK/STREETFOR INSTALLATION OF CON EDISON VAULTS ANDTHE SUPPORTING PILE/CONCRETE PILE CAP, NO CHANGE IN USE OCCUPANCY OR $40,000
2023-03-28Job filed: INSTALLATION AND USE OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICA$60,000
2023-03-22Job filed: FILING HEREWITH SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.$1,000
2023-03-20Permit Structural — Signed-off
2023-03-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-03-02Job filed: FILING HEREWITH PLUMBING WORK FOR NEW BUILDING AS PER PLANS.$1,000
2023-02-15Permit Protection and Mechanical Methods — Signed-off
2023-02-15Job filed: INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$1,000
2023-02-14311: Homeless Person Assistance
2023-02-07Permit Standpipe — Signed-off
2023-02-07Permit Sprinklers — Signed-off
2023-02-07Permit Standpipe — Signed-off
2023-02-06Permit Mechanical Systems — Signed-off
2023-01-20311: Panhandling — N/A
2022
2022-11-17DOB complaint, category ?
2022-11-17DOB complaint, category ?
2022-11-11Permit Protection and Mechanical Methods — Signed-off
2022-11-10Elevator permit: INSTALL (2) NEW 2:1 ROPED UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1, 2005S, PART II, CHAPTER 30 OF 2014 BC, APPENDIX K4. PE$500,000
2022-11-09Job filed: INSTALLATION AND USE OF TEMPORARY CUSTOM MATERIAL PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-11-07311: Noise — Noise: Construction Equipment (NC1)
2022-11-07311: Noise — Noise: Construction Equipment (NC1)
2022-10-27Permit Sidewalk Shed — Signed-off
2022-10-27Permit Plumbing — Signed-off
2022-10-26Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO C$10,000
2022-10-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2022-10-15DOB complaint, category ?
2022-10-13311: Noise — Noise: Construction Equipment (NC1)
2022-09-29Permit Protection and Mechanical Methods — Signed-off
2022-09-29Job filed: INSTALLATION AND USE OF TEMPORARY WORKING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000
2022-09-19Permit Construction Fence — Signed-off
2022-09-16311: Noise — Noise: Construction Equipment (NC1)
2022-09-13Permit Construction Fence — Signed-off
2022-09-01311: Noise — Noise: Construction Equipment (NC1)
2022-08-19311: General Construction/Plumbing — Fence - None/Inadequate
2022-08-19DOB complaint, category ?
2022-08-15Job filed: INSTALLATION AND USE OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICA$60,000
2022-06-27ECB CLASS - 2 violation: AT TIME OF INSPECTION OF AN ACTIVE CONSTRUCTION SITE, I REQUESTED TO SEE THE APPROVED CONSTRUCTION DRAWINGS BUT NONE WAS PROVIDED
2022-06-27ECB CLASS - 1 violation: AT THE TIME OF INSPECTION OF AN ACTIVE CONSTRUCTION SITE I OBSERVED AT EXPOSURE #3 A HYDRANT WITH A HOSE ATTACHED LEADING INTO THE
2022-06-26311: General Construction/Plumbing — Site Conditions Endangering Workers
2022-06-26DOB complaint, category ?
2022-06-13311: General Construction/Plumbing — Building Permit - None
2022-06-13DOB complaint, category ?
2022-06-08Permit Construction Fence — Signed-off
2022-06-07Job filed: Construction fence installation , chain link, plywood and fence on barricades on all street elevations. No change in use, egress or occupancy.$1,000
2022-05-26Permit Support of Excavation — Signed-off
2022-05-23Permit Foundation — Signed-off
2022-05-18Job filed: Filing herewith installation of test piles as per plans in conjunction with NB application B00637594. No change in use, egress or occupancy.$1,000
2022-05-09Job filed: FILING HEREWITH INSTALLATION OF SP/SD SYSTEM IN CONJUNCTION WITH NB AS PER PLANS.$1,000
2022-04-27Permit Construction Fence — Signed-off
2022-04-27Job filed: INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST (B00637594) FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. N$2,000
2022-04-26ZONE — from 204 4TH AVENUE LLC
2022-04-26CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2022-04-14Permit Foundation — Signed-off
2022-04-13Job filed: FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.$1,000
2022-04-13Job filed: FILING HEREWITH PLUMBING WORK FOR NEW BUILDING AS PER PLANS.$1,000
2022-04-02Job filed: FILING TEMPORARY STANDPIPE PRESSURIZATION ALARM IN CONJUNCTION WITH NEW BUILDING APPLICATION # B00637594-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2022-03-30SMIS — from ISRAEL DISCOUNT BANK OF NEW YORK
2022-03-30EASE — from 204 4TH AVENUE LLC to NEW YORK CITY TRANSIT AUTHORITY
2022-03-17Job filed: FOUNDATION ELEMENTS FOR 421A. NB APPLICATION B00637594-I1, FOUNDATION APPLICATION B00637594-S2.$1,000
2022-03-04Job filed: FILING HEREWITH STRUCTURAL WORK FOR NEW BUILDING AS PER PLANS.$1,000
2022-03-04Job filed: FILING HEREWITH FOUNDATION WORK FOR NEW BUILDING AS PER PLANS.$1,000
2022-02-25Job filed: FILING HEREWITH SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.$1,000
2022-02-25Job filed: Filing herewith installation of test piles as per plans in conjunction with NB application B00637594. No change in use, egress or occupancy.$1,000
2022-01-26Job filed: FILING HEREWITH BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB APPLICATION B00637594-I1
2022-01-26Job filed: FILING HEREWITH BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB APPLICATION B00637594-I1
2022-01-26Job filed: FILING HEREWITH BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB APPLICATION B00637594-I1
2022-01-15ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.NOTED:AT TIME OF INSPECTION OF INACTIVE JOBSITE OBSERVED AT EXP
2022-01-03Permit DM — ISSUED
2021
2021-12-29DOB complaint, category ?
2021-12-29DOB complaint, category ?
2021-12-20Permit EQ — ISSUED
2021-12-20Permit EQ — ISSUED
2021-12-20Permit DM — ISSUED
2021-12-08Job filed: ACCEPTED TO HUB PER CONSULTATION ON 10/6. AFFORDABLE HOUSING. FILING HEREWITH NEW MIXED USE BUILDING AS PER PLANS.$1,000
2021-11-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-11-10Asbestos abatement: Removal — New York Insulation, Inc.
2021-10-27Job filed: DM
2021-10-27Job filed: DM
2021-10-12Job filed: FULL DEMOLITION OF ONE STORY STRUCTURE USING MECHANICAL MEANS TO FULLY DEMOLISH.
2021-10-12Job filed: FULL DEMOLITION OF ONE STORY STRUCTURE USING MECHANICAL MEANS TO FULLY DEMOLISH.
2021-09-21Permit Construction Fence — Signed-off
2021-09-16311: Illegal Parking — Blocked Bike Lane
2021-08-06311: General Construction/Plumbing — Fence - None/Inadequate
2021-08-06DOB complaint, category ?
2021-03-19ECB CLASS - 2 violation: AT TIME OF INSPECTION, PERMITTED CONSTRUCTION FENCE #B00255593 AT SITE NOT MAINTAINED IN A CODE COMPLIANT MANNER - FENCE NOT PAINT$1,000
2021-03-03311: General Construction/Plumbing — Fence - None/Inadequate
2021-03-03DOB complaint, category ?
2021-01-05Rodent inspection: Failed for Other Reason
2020
2020-12-07Permit Construction Fence — Signed-off
2020-12-02RPTT&RET — from 204 4TH AVENUE NOMINEE LLC to 204 4TH AVENUE PARTNERS LP
2020-10-15Rodent inspection: Failed for Other Reason
2020-09-17Permit Construction Fence — Signed-off
2020-08-13311: Homeless Street Condition — N/A
2020-08-04311: Rodent — Rat Sighting
2020-05-27311: Consumer Complaint — Bodega/Deli/Supermarket
2019
2019-12-13Permit Construction Fence — Signed-off
2019-11-22Mortgage $25,000,000 — from 204 4TH AVENUE LLC to ISRAEL DISCOUNT BANK OF NEW YORK$25,000,000
2019-11-22Deed $29,750,000 — from SPEEDWAY LLC, D/B/A IN THE STATE OF NEW to 204 4TH AVENUE LLC$29,750,000
2019-11-22Deed — from HESS CORPORATION to SPEEDWAY LLC
2019-11-14Sold for $29,750,000$29,750,000
2019-10-31Permit Construction Fence — Signed-off
2019-10-30Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR E$2,000
2019-10-25311: Illegal Parking — Blocked Sidewalk
2019-10-25311: Illegal Parking — Blocked Sidewalk
2019-10-25311: Illegal Parking — Blocked Sidewalk
2019-10-25311: Illegal Parking — Blocked Sidewalk
2019-10-23311: Illegal Parking — Blocked Sidewalk
2019-10-03311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2019-10-03311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2019-10-03DOB complaint, category ?
2019-10-03DOB complaint, category ?
2019-09-26Permit Construction Fence — Signed-off
2019-09-25311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-09-19Permit EW — ISSUED
2019-09-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-08-30Permit Construction Fence — Signed-off
2019-08-16Job filed: Erect 8'-0" high temporary wood construction fence along the lot lines of the property as shown on plans filed. No change in use or egress.$8,000
2019-06-20Job filed: EXCAVATE & REMOVE 5-4000 GAL CAPACITY UNDERGROUND MOTOR FUEL STORAGE TANKS AND 1-600 GALLON WASTE WATER STORAGE TANK, PIPING,3 SUBMERSIBLE PUMPS, $118,000
2019-03-10311: Derelict Vehicles — Derelict Vehicles
2018
2018-12-07311: Blocked Driveway — No Access
2018-10-12311: Street Condition — Pothole
2018-10-12311: Street Condition — Pothole
2018-10-12311: Street Condition — Pothole
2018-06-19Job filed: PROPOSED INDIRECTLY-ILLUMINATED ADVERTISING SIGN WITH CHANGEABLE COPY ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION$78,624
2018-05-11311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-05-01311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-04-30311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-04-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-04-14311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-02-04311: Street Condition — Pothole
2018-01-08311: Snow — E9 Snow / Icy Sidewalk
2017
2017-03-16311: Snow — E9 Snow / Icy Sidewalk
2017-03-16311: Snow — E9 Snow / Icy Sidewalk
2016
2016-11-30311: Blocked Driveway — No Access
2016-11-29311: Blocked Driveway — No Access
2016-09-10311: Homeless Person Assistance — N/A
2016-03-09311: Noise — Noise: Construction Equipment (NC1)
2016-01-26311: Snow — E9 Snow / Icy Sidewalk
2015
2015-12-21311: Homeless Person Assistance — No Status Call
2015-11-11311: Sidewalk Condition — Broken Sidewalk
2015-10-21311: Noise - Residential — Loud Music/Party
2015-09-19311: Blocked Driveway — No Access
2015-07-05311: Street Condition — Line/Marking - Faded
2015-04-24311: Blocked Driveway — No Access
2015-03-27Permit SG — ISSUED
2015-03-20Permit SG — ISSUED
2015-03-20Permit SG — ISSUED
2015-03-20Permit SG — ISSUED
2015-03-20Permit SG — ISSUED
2015-03-20Permit SG — ISSUED
2014
2014-11-07311: Litter Basket / Request — 10 Litter Basket / Request
2014-11-05RPTT&RET $5,300,000 — from HESS CORPORATION to SPEEDWAY LLC$5,300,000
2014-10-01311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-07-21Deed — from HESS CORPORATION to HESS RETAIL STORES LLC
2013
2013-02-20311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2013-02-20DOB complaint, category ?
2012
2012-10-11311: Blocked Driveway — Partial Access
2012-10-10311: Graffiti — Graffiti
2012-05-21311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2010
2010-10-28311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2006
2006-09-15Permit EW — ISSUED
2006-09-11Job filed: No wrok application filed to obtain an equipment use permit and cure violation number 10943292P. HVAC equipment was installed under Alteration Type II$4,000
2005
2005-05-12Permit EW — ISSUED
2005-05-12Permit EW — ISSUED
2005-05-12Permit EW — ISSUED
2005-05-12Permit EW — ISSUED
2005-03-25Job filed: Filing herewith proposed 8' high plywood construction fence. No change in use, egress, or occupancy.
2004
2004-10-21Job filed: Proposed installation of a fire suppression system over gasoline dispensers as indicated on plans. No change in use, egress or occupancy.$10,000
2004-10-21Job filed: Filing herewith Pump and Tank upgrade, repair concrete mat and replacement of dispeners with all related piping. No change in egress, use, or occupan$75,000
2004-10-21Job filed: Proposed installation of a fire suppression system over gasoline dispensers as indicated on plans. No change in use, egress or occupancy.$10,000
2004-06-30Job filed: NB
2004-06-30Job filed: NB
2004-06-23Job filed: Filing herewith Builders Pavement Plan with 390.0 LF frontage. No change in use, egress or occupancy.
2004-06-23Job filed: NB
1996
1996-11-13Permit EW — ISSUED
1996-09-04Permit PL — ISSUED
1996-07-26Permit EW — ISSUED
1996-07-26Permit EW — ISSUED
1996-07-26Permit EW — ISSUED
1996-07-25Permit EQ — ISSUED
1994
1994-07-08DOB complaint, category ?

Support this site Back to the building page