Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

240 East 83 Street · Manhattan · BBL 1015280030 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP1.4
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s3
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 83% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 2.2. In ZIP 10028, 79% of residential buildings hold an A and 3% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations1 total — 0 class C (immediately hazardous), 1 class B, 0 class A. Oldest open since 2014-07-01.

status snapshot refreshed weekly from HPD records

Patterns

2 heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

5 service requests in the last three years. Most common: Real Time Enforcement (1) · Noise (1) · Homeless Person Assistance (1) · UNSANITARY CONDITION (1) · HEAT/HOT WATER (1).

Filed construction activity

$196,000 in permitted construction work filed since 2016 (5 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1910)
YesSix or more residential units (20)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)FAMECO LLC
Head officerALAN MANOCHERIAN
Managing agentFAMECO LLC
Last registered2025-07-25

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$2,785,000 $1,253,250
2026$3,029,000 $1,363,050
2027$3,248,000 $1,461,600

The city's market estimate has risen 17% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway86 St — Q · 300 ft straight-line (about a 1-minute walk) · station accessibility: full
86 St — 4 5 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: partial (Uptown local only)
BusNearest boarding stop: 2 Av / E 84 St — M15 · 300 ft
Citi Bike3 Ave & E 82 St · 700 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 290 Manhattan New School
Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

240 East 83 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

5 311 service requests from this address in the last three years — 1 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by FAMECO LLC — 13 buildings, 424 units. Grades across the portfolio: A13. See the whole portfolio

BuildingBoroughUnitsGrade
420 East 79 Street MN111 A
369 West 52 Street MN48 A
316 East 55 Street MN41 A
225 East 10 Street MN39 A
229 East 80 Street MN35 A
93 3 Avenue MN24 A
338 East 83 Street MN22 A
523 East 85 Street MN20 A
210 East 83 Street MN20 A
240 East 83 Street MN20 A
323 East 83 Street MN20 A
1588 York Avenue MN16 A
1325 3 Avenue MN8 A

Ten-year activity

20100
2017
2018
2019
12
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsHealth & systemsTotal
201730025
201800022
201900156
2020703212
202110629
202200336
202300325
202401427
202500437
202600123
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 3 records

DateRecord
2026-09-24Boiler inspection
2026-06-25Rodent inspection: Passed
2026-01-08Bedbug filing: 0 infested units

The full timeline

2026
2026-09-24Boiler inspection
2026-06-25Rodent inspection: Passed
2026-01-08Bedbug filing: 0 infested units
2025
2025-09-22Boiler inspection
2025-07-29Rodent inspection: Passed
2025-06-27311: HEAT/HOT WATER — ENTIRE BUILDING
2025-06-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-06-03311: UNSANITARY CONDITION — PESTS
2025-06-03Tenant complaint: UNSANITARY CONDITION — PESTS
2025-05-30Rodent inspection: Failed for Rat Activity
2024
2024-12-09Bedbug filing: 0 infested units
2024-11-08Boiler inspection
2024-10-16311: Homeless Person Assistance
2024-09-25Rodent inspection: Passed
2024-08-31311: Noise — Noise: Construction Before/After Hours (NM1)
2024-05-29311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2024-05-29DOB complaint, category ?
2023
2023-12-21Bedbug filing: 0 infested units
2023-10-16Rodent inspection: Passed
2023-10-12311: Street Light Condition — Lamppost Damaged
2023-07-31Boiler inspection
2023-05-21311: Noise — Noise: Construction Before/After Hours (NM1)
2022
2022-12-28Bedbug filing: 0 infested units
2022-11-30Bedbug filing: 0 infested units
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-09-01Rodent inspection: Passed
2022-07-27Boiler inspection
2022-01-20Rodent inspection: Passed
2021
2021-12-30Bedbug filing: 0 infested units
2021-12-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-12-15Boiler inspection
2021-12-15Rodent inspection: Failed for Rat Activity
2021-11-29Bedbug filing: 0 infested units
2021-11-29Bedbug filing: 0 infested units
2021-07-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-14Permit Plumbing — Signed-off
2021-03-15311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020
2020-12-21Bedbug filing: 0 infested units
2020-12-16Job filed: GAS CONNECTION FOR REPLACEMENT BOILER.$1,000
2020-06-16Boiler inspection
2020-06-08Permit Mechanical Systems — Signed-off
2020-06-02Job filed: INSTALL CHIMNEY LINER PER PLANS.$23,000
2020-05-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-13Permit Boiler Equipment — Signed-off
2020-05-13Permit Plumbing — Signed-off
2020-05-12Job filed: GAS CONNECTION FOR REPLACEMENT BOILER.$1,000
2020-04-28Air permit (REGISTRATION), fuel: NATURALGAS
2020-04-28Job filed: REPLACE GAS BOILER.$133,000
2020-04-21311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019
2019-12-12Bedbug filing: 0 infested units
2019-12-12Rodent inspection: Passed
2019-07-08Boiler inspection
2019-04-08Rodent inspection: Passed
2019-04-02Rodent inspection: Passed
2019-03-11Rodent inspection: Failed for Rat Activity
2018
2018-08-07Boiler inspection
2018-06-08Rodent inspection: Passed
2017
2017-12-12Boiler inspection
2017-10-17Rodent inspection: Passed
2017-05-25Permit PL — ISSUED
2017-05-22Permit EW — ISSUED
2017-05-10Job filed: INTERIOR RENOVATION TO APARTMENT# 4B ON THE 4TH FLOOR.REPLACE EX. KITCHEN CABINETS AND COUNTER. RETILE BATHROOM FLOOR AND WALLS. REPLACE PLUMBING FIXT$38,000
2016
2016-10-24Rodent inspection: Passed
2016-08-27311: Dirty Conditions — E1 Improper Disposal
2014
2014-07-16Rodent inspection: Passed
2014-07-10311: Rodent — Rat Sighting
2014-07-01HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2014-04-08HPD class A: § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT 1ST FIRE E
2014-01-15HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2014-01-09311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2012
2012-07-03Rodent inspection: Passed
2012-03-02Rodent inspection: Passed
2012-02-16311: Water System — Dirty Water (WE)
2011
2011-11-28311: Dirty Conditions — E15 Illegal Postering
2011-11-17Rodent inspection: Passed
2011-05-01Rodent inspection: Bait applied
2011-04-09Rodent inspection: Bait applied
2011-03-24Rodent inspection: Bait applied
2011-03-15Rodent inspection: Bait applied
2010
2010-12-21Rodent inspection: Failed for Rat Activity
2010-11-22Rodent inspection: Failed for Rat Activity
2007
2007-08-06Deed — from MANOCHERIAN, AMIR; MANOCHERIAN, ROBERT; MANOCHERIAN, ROSITA; MANOCHERIAN, BARBARA; MANOCHE to FAMECO LLC
2007-06-05Permit EW — ISSUED
2007-04-17Job filed: RENOVATE APARTMENT #4B. REPLACE ALL DOORS. IN BATHROOM REPLACE FLOOR AND WALL TILES, REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING. IN KITCHEN REPLAC$10,000
2007-04-17Job filed: RENOVATE APARTMENT #4B. REPLACE ALL DOORS. IN BATHROOM REPLACE FLOOR AND WALL TILES, REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING. IN KITCHEN REPLAC$10,000
2007-04-10ECB Non-Hazardous violation: WORK W/O A PERMIT.ILLEGAL WORK NOTED:AT THE 4TH FL REAR EAST SIDE APT PARTITIONS REMOVED AT REAR & AC UNIT INSTALLED THRU MASONRY $250
2007-04-05DOB complaint, category ?
2007-03-05DOB complaint, category ?
2005
2005-01-31DOB violation LL6291:
2003
2003-03-19DOB violation LL6291:
1994
1994-09-01DOB violation LL6291:
1991
1991-07-02Permit EW — ISSUED
1991-07-02Permit PL — ISSUED
1991-03-13DOB complaint, category ?
1987
1987-07-14Mortgage assigned — from MANHATTAN SVGS BK to MANOCHERIAN, AMIR
1976
1976-04-09Deed — from ELLDRED REALTY CORP to MANOCHERIAN ROSETA; MANOCHERIAN ROBERT; MANOCHERIAN BARBARA; MANOCHERIAN AMIR; MANOCHERIAN
1976-04-08Mortgage assigned — from MANOCHERIAN ALAN to MANHATTAN SAVINGS BANK
1973
1973-08-09Deed — from MANOCHERIAN, FRAYDUN to MANOOCHEHRIAN, AMIR; MANOOCHEHRIAN, ROSITA; MANOOCHEHRIAN, ALAN; MANOOCHEHRIAN, ROBERT; MA
1973-08-09Deed — from MANOOCHEHRIAN, AMIR to MANOOCHEHRIAN, ROBERT; CAPRI EQUITIES CO DBA; MANOOCHEHRIAN, ALAN; MANOOCHEHRIAN, AMIR; MA

Support this site Back to the building page